http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 1 of 19
CASE NO.:
Appeal (civil) 3492-3494 of 2005
PETITIONER:
State of Karnataka & Anr.
RESPONDENT:
All India Manufacturers Organization & Ors.
DATE OF JUDGMENT: 20/04/2006
BENCH:
Ruma Pal, B. N. Srikrishna & Dalveer Bhandari
JUDGMENT:
J U D G M E N T
with Civil Appeal Nos. 3497/05, 3842-3844/05, 3848-3884/05,
3889-4127/05, 4128-4366/05, 4575-4576/05, 5399-5401/05, 5402/05, 5746-
5747/05, 5759/05, 5797-5799/05, 6098/05, 6099/05, 5092-5093/05, 7024-
7040/05, 7591/05, 7592/05, 61/06, 73/06, 74-76/06 and
Civil Appeal Nos. /06 @ SLP Nos. 1562-63/06.
SRIKRISHNA, J.
Leave granted in Special Leave Petition (C) Nos. 1562-63/06.
Since this matter consists of two sets of distinct but related appeals,
for the sake of convenience, they may be considered under the two heads of:
(i) the Main Matters and (ii) the Land Acquisition Matters.
The Main Matters
(Civil Appeal Nos. 3492-3494/2005, 3497/2005, 3842-3844/2005)
The Background
These appeals are directed against a common judgment of the High
Court of Karnataka (dated 3.5.2005) by which three Public Interest
Litigations being Writ Petition Nos. 45334/04 (All India Manufacturers
Organisation v. State of Karnataka and Ors.), 45386/04 (J.C. Madhuswamy
and Ors. v. State of Karnataka and Ors.) and 48981/04 (Dakshinamurthy and
Anr. v. State of Karnataka and Ors.) were disposed of resulting in dismissal
of Mr. J.C. Madhuswamy’s writ petition and a direction to the State of
Karnataka to continue to implement a certain project known as the
"Bangalore-Mysore Infrastructure Corridor Project" (hereinafter "the
Project").
A brief statement regarding the Project: Bangalore is the capital of the
State of Karnataka and a rapidly developing city, which is projected to be
the IT boom town in the country. As a result of the pressures of urbanisation
and industrialisation, the infrastructure in and around Bangalore was found
to be inadequate. The traffic situation in Bangalore and on the roads leading
into and out of the city was found to be chaotic and hardly conducive to the
important role that the city is expected to play in the near future. The
Government of Karnataka, realising the importance of rapidly developing
the city of Bangalore, and also for developing its transport and
communication systems, conceived of the Project. The Project had twin
objectives: firstly, to provide for an express highway linking Bangalore with
Mysore, the former capital of the erstwhile State of Mysore, which is now
coming up as an industrial town, and for developing infrastructure along the
corridor and in and around Bangalore city. The Project is a massive
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 2 of 19
undertaking, which requires design, construction, maintenance and operation
of an Express Highway between Bangalore and Mysore. Equally, the Project
is to also develop infrastructure around the periphery of Bangalore and all
along the Bangalore-Mysore Express Highway, which is about hundred
years old and has become incapable of handling the heavy volume of
vehicular traffic.
On 28.9.1988, the State of Karnataka invited tenders for
implementation of such an Express Highway. There was no satisfactory
response to the tenders called for. There was only one tenderer and the
tenderer insisted on certain conditions which were not acceptable to the
Government of Karnataka. Thus, the bid of the tenderer was not accepted. A
survey was conducted by the Asian Development Bank and its report
pointed out that the projected population of Bangalore city would be about
8.2 million by the year 2011 and, therefore, there was an urgent need for
improvement of the Bangalore-Mysore Corridor. It was also suggested that
the State Government bear 20% of the project cost, along with the cost of
land acquisition, if such a project was to be implemented. The State
Government did not have sufficient means and had to look for other
alternative ways for implementing this project. The State Government then
decided to take up the project on a Build-Own-Operate-Transfer (hereinafter
"BOOT") basis with any consortium. The consortium was to carry out the
development of the project from its own resources and recoup its investment
by collection of tolls along the Express Highway.
On 20.2.1995, a Memorandum of Understanding (hereinafter "MOU")
was entered into between the State Government and the Consortium of
Vanasse Hangen Brustlin Inc. USA (hereinafter "VHB"), Kalyani Group of
Companies (hereinafter "Kalyani") and SAB Engineering and Construction
Inc. USA (hereinafter "SAB"). The Governor of the State of Massachusetts,
U.S.A., Mr. William Weld, and Mr. H.D. Deve Gowda, the then Chief
Minister of the State of Karnataka were present and appended their
signatures thereto. It was agreed that the State Government would extend
support for the development of the Bangalore-Mysore Expressway, provided
commercial viability, competitiveness and feasibility of the project was
established to the satisfaction of the State Government. The Consortium
submitted a Project Report for review by the State Government.
On 5.6.1995, a "High Level Committee" (hereinafter "the HLC") was
formed under the Chairmanship of the Minister for Public Works. The HLC
consisted of the Principal Secretary, Commerce and Industries Department;
Principal Secretary, Housing and Urban Development; Secretary, Public
Works Department; Chief Engineer C and B (South Zone, Bangalore). The
Chairman and Managing Director, Karnataka State Industrial Investment
Development Corporation, were official members and the Chairman,
Technical Advisory Committee (Irrigation)\026one K.C. Reddy\027was a non-
official member. The HLC met from time to time and reviewed the progress
made in the implementation of the Project. On 26.8.1995, the Consortium
presented the details of the Project to the HLC. After detailed consideration
of the Project, on 12.10.1995 the HLC submitted its report to the
Government. The Project was considered in detail by the State Cabinet Sub-
Committee, which recommended that the matter be placed before the
Cabinet for consideration. The report of the HLC and the Project Report
made by the Consortium was accepted by the Cabinet, subject to the
modification that instead of seven townships as proposed in the Project
Report, only five townships were to be developed.
A Government Order (No. PWD 32 CSR 95, Bangalore, dated
20.11.1995) ensued, which in terms pointed out that the implementation of
the Project was to be done by a private consortium. The Preamble to the
Government Order recited that the Project work was to be completed by the
Consortium with their own resources and that the Consortium would keep
the Project going for thirty years, so as to get a return of the expenditure,
profit, etc. through collection of tolls. It is important to note that the land
acquisition expenditure was also to be borne by the Consortium. To make
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 3 of 19
the Project economically viable, the Consortium had proposed development
of seven townships, which as already stated, was reduced to five by the
Cabinet. It is also important to note that the Government Order specifically
permitted the development of five townships along with the construction of
the Express Highway. As already stated, the Consortium was to recoup its
expenditure and obtain profits through tolls\027the first system of its kind in
Karnataka. Consequently, it was felt that the modification of the existing
laws might become necessary. The necessary legal changes were to be
examined by the concerned administrative departments, who would take
"\005necessary action and also extend co-operation for implementation of the
Project."
The three members of the Consortium\027VHB, Kalyani and SAB\027
entered into a "Consent and Acknowledgement Agreement" (hereinafter
"the CAA") dated 9.9.1996, specially assigning their respective rights under
the Government Order (dated 20.11.1995) and the MOU with regard to the
Project, in favour of Nandi Infrastructure Corridor Enterprises Ltd.
(hereinafter "Nandi"). Nandi had been registered on 16.1.1996 as a company
under the Companies Act, 1956, to serve as a corporate vehicle for the
development and implementation of the Project. On 21.12.1996, the CAA
was forwarded to the State Government for necessary action. The State
Government was advised by its Law Department (through Opinion No. 182
OPN II/97 dated 3/4.3.1997) that since the Government was finalising a
separate agreement with Nandi, there was no need to specifically consent to
the CAA. Consequently, the State Government took no further action except
noting it.
In February 1997, Nandi submitted a draft of the Framework
Agreement (hereinafter "the FWA") to be executed between it and the State
Government. This draft FWA was considered by the Core Committee, which
had been set up to negotiate the terms with Nandi. It was also referred to the
Cabinet Sub-Committee, which suggested certain modifications to the FWA.
After due incorporation of such modifications, the Government of Karnataka
approved the FWA on 17.3.1997 and the same was signed between Nandi
and the State Government on 3.4.1997.
Under Clause 4.1.1 of the FWA, the State Government set up an
"Empowered Committee" headed by the Chief Secretary of the State to
oversee the Project and its implementation keeping in mind the importance
of timely completion. The Empowered Committee included technical
experts and held about ten meetings from time to time, the last one being on
24.7.2004. The main task of the Empowered Committee was to remove
administrative bottlenecks and to ensure the smooth execution of the Project.
The Empowered Committee was the State’s agent of coordination and
carried out the State Government’s obligations under the FWA.
One of the key obligations of the State Government under the FWA
was to make available approximately 20,193 acres of land. As set out in
Schedule I to the FWA, 6,956 acres was Government land and the remaining
13,237 acres was private land, which was to be acquired by the State
Government. There was also an undertaking by the State Government under
the FWA to carry out appropriate amendments to its laws, rules and
regulations so that the massive Project could be implemented fully and
within a time-bound schedule. Accordingly, the provisions of the Karnataka
Industrial Areas Development Act, 1966 ("the KIAD Act") were amended
by Act No. 11 of 1997 so that the land required for the Project could be
acquired expeditiously. The Karnataka Industrial Areas Development Board
("KIAD Board") set up under the KIAD Act, entered into an agreement with
Nandi on 14.10.1998 for acquisition of private land. Notifications were
issued from time to time for acquiring lands for the Project.
The Litigation in Somashekar Reddy
While all these frenetic activities were going on for the successful and
timely implementation of the Project, the FWA was challenged in a Public
Interest Writ Petition No. 29221/97 in November 1997 (reported as H.T.
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 4 of 19
Somashekar Reddy v. Government of Karnataka and Anr. ) by one H.T.
Somashekar Reddy, a retired Chief Engineer. The State Government and
Nandi were the two respondents thereto. The FWA was challenged on all
conceivable grounds and the writ petition was vigorously opposed by the
State Government and also by Nandi. Both the State Government and Nandi
contended that the FWA was valid and that it had been entered into in larger
public interest. It was also successfully pleaded on the part of the State
Government that it had agreed to provide the "minimum extent of land" for
the Project, which was 20,193 acres of land and that no excess land was
being acquired.
The Division Bench of the Karnataka High Court hearing the said writ
petition formulated for its consideration, the following questions:
"(a) Whether the Government has acted arbitrarily in entering
into the agreement with Respondent No. 2?
(b) Whether agreement is illegal as being opposed to public
policy?
(c) Whether the agreement contravenes any Constitutional
provisions or other existing enactments?
(d) Whether the agreement is vitiated by mala fides?
(e) Whether the rights of any individual or groups of
individuals is being illegally affected by the execution of the
agreement?
(f) Scope and extent of judicial review in matters of State
Policy."
For the purpose of the present litigation, it is important to note that
one of the main grounds of challenge to the FWA in Somashekar Reddy
(supra) was that land was being acquired far in excess of what was required
for the Project. In fact, it was specifically stated in the Writ Petition that
Article 7 of the FWA (that provides for construction of townships) was the
"most damaging provision detrimental to the owners of land". Further, it was
stated in the Writ Petition that the land requirement in Schedule I of the
FWA was "highly exaggerated" and would illegally create "huge profits" for
Nandi. It was prayed that the FWA be quashed and further, since the FWA
was purportedly the result of "offences of breach of trust", for institution of
a Central Bureau of Investigation (hereinafter "CBI") enquiry into the whole
project.
Each of the questions was answered in favour of the respondents i.e.
State of Karnataka and Nandi. It was held that the FWA was not arbitrarily
entered into by the State Government; that it was not opposed to public
policy; that it was not unconstitutional or illegal; that it was not vitiated by
mala fides; that no rights of any individual or individuals had been illegally
affected by the execution of the agreement. Finally, the court found that it
could not exercise its power of judicial review to interfere with the FWA
which was in reality a policy choice of the Government.
Further, as we shall discuss subsequently, the argument of excess land
being acquired, was not acceded to by the High Court which found that the
Project envisaged, in addition to the construction of an expressway between
Bangalore and Mysore, other connected developmental activities, such as:
"(i) Development of area between Bangalore-Mysore.
(ii) Divergence of traffic from Mysore-Chennai; Chennai-
Bombay.
(iii) Construction of elected road from Sirsi Circle upto 9.4
Kms.
(iv) Construction of 2 truck terminals.
(v) Development of five identified local areas into townships
with all infrastructure for habitation and economic activities.
(vi) Utilisation of sewage water being put to no productive use
by BWSSB.
(vii) Development of tourism to augment the State’s
revenues."
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 5 of 19
Thus, through an exhaustive consideration of all the background
material and documents presented to it, the High Court dismissed the writ
petition by holding against the petitioner on all the contentions urged. The
judgment in Somashekar Reddy (supra) was challenged before this Court
(in SLP (Civil)\005CC 1423/99) but was dismissed in limine on 26.3.1999.
The judgment in Somashekar Reddy (supra) thus reached finality.
The Present Litigation
Although the writ petition in Somashekar Reddy (supra) was
dismissed by the High Court by its judgment dated 21.9.1998, it is of
relevance to notice that between November 1997, when this writ petition
was filed, and when the petition was dismissed, the work of implementing
the Project was going on in view of the stand of the State Government and
Nandi. Accordingly, a number of notifications were issued for acquisition of
the land required under the FWA. Many landowners challenged the
acquisition of their lands before the High Court. Although the issue of the
landowners will be dealt with in the second part of our judgment, it will be
useful to note that the Government supported the stand of Nandi before the
Single Judge, who partially allowed the land owners’ petitions. It was during
the writ appeal stage that the Government reversed its stance and opposed
Nandi.
Even while the said writ appeals filed in the land acquisition matters
were pending before the High Court, a second round of writ petitions
challenging the Project itself was filed before the High Court. Despite the
High Court’s go-ahead for the Project in 1997, and after seven years of
implementation, suddenly in the year 2004, these petitions were filed against
it in so-called "public interest" by two Members of the Legislative Assembly
(hereinafter "MLAs") and a "social worker" (i.e. Mr. J.C. Madhuswamy and
others). This petition prayed for a CBI enquiry and to restrain the State
Government from continuing with the Project or acquiring any further land
thereunder. Perhaps inspired by Mr. J.C. Madhuswamy and others, and also
in the so-called "public interest", All India Manufacturer’s Organisation, as
well as two ex-Mayors of Mysore (Mr. Dakshinamurthy and another),
moved the High Court for a direction to the State Government to implement
the Project according to the FWA.
The High Court in the impugned judgment (vide Paragraph 18) raised
the following two questions for consideration in the three writ petitions:
"(1) Whether the FWA entered into between the Government
of Karnataka and Nandi was a result of any fraud or
misrepresentation as alleged by J.C. Madhuswamy and others
and the State Government?
(2) Whether any excess land than what is required for the
Project had been acquired by the State Government and
whether it is open to it to raise such a plea?"
The Division Bench disposed of all the writ petitions by a common
judgment by which it dismissed Writ Petition No. 45386/04 filed by Mr. J.C.
Madhuswamy and others with costs. Writ Petition Nos. 45334/04 and
48981/04 were allowed by the Division Bench directing the State of
Karnataka and all its instrumentalities, including the KIAD Board, to
execute the Project as conceived originally and to implement the FWA in
"letter and spirit". The High Court also directed the prosecution of K.K.
Misra, Chief Secretary of the Government of Karnataka and M.
Shivalingaswamy, Under Secretary, Department of Industries and
Commerce, as envisaged by Section 340 of the Code of Criminal Procedure,
1973, for certain offences which came to its notice as a result of the
affidavits filed by them. K.K. Misra and M. Shivalingaswamy have filed
separate appeals with regard to the direction of their prosecution with which
we are not concerned at present.
The Contentions of the Appellants
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 6 of 19
The main arguments in the present Civil Appeal Nos. 3492-3494 of
2005 were addressed on behalf of the State of Karnataka by Mr. Anil B.
Divan, learned Senior Counsel, whose main contentions are as under:
1. That the dispute between the State of Karnataka and Nandi is not
barred by the principle of res judicata, constructive res judicata or
estoppel arising from the judgment and proceedings in Somashekar
Reddy (supra).
2. That the principle of res judicata cannot be inflexibly applied to
Public Interest Litigations, especially when a re-examination of
decided issues might be in public interest.
3. To the bar of res judicata, it would be a successful answer that fraud
and misrepresentation had vitiated the entire transaction. Hence, there
would be no question of res judicata since the fraud was discovered
subsequent to the judgment in Somashekar Reddy (supra).
4. That the High Court erred in brushing aside the report of the Expert
Committee headed by K.C. Reddy, which clearly demonstrated that
there was excess land, which in terms showed that the FWA was not a
bona fide agreement and, therefore, was against public interest.
5. The High Court could not have granted the final relief in the
impugned judgment. The High Court’s order amounted to a
mandamus to specifically perform the FWA, which is an extremely
complex contract, and hence the order is incorrect.
We will examine the third contention first\027namely of fraud,
misrepresentation and mala fides vitiating the entire project.
Fraud and Misrepresentation
The main ground on which the matter was argued by the learned
counsel for the State of Karnataka before the Division Bench of the High
Court was that there was fraud and misrepresentation on the part of Nandi,
which vitiated the entire transaction. It was contended before the High Court
by the State Government that this fraud came to be noticed subsequent to the
judgment in Somashekar Reddy (supra). It is pertinent to note that this point
was put on record through the affidavits of K.K. Misra, Chief Secretary of
the Government of Karnataka, M. Shivalingaswamy, Under Secretary,
Department of Industries and Commerce, which suggested that public
interest was being affected as a result of the execution of the FWA. It
appears that the main contention of the writ petitioners Mr. J.C.
Madhuswamy and others before the High Court was that the FWA was
vitiated as a result of fraud and/or misrepresentation. Presumably, this
contention was urged in order to get over the bar of res judicata arising from
the judgment in Somashekar Reddy (supra). When the matter was argued
before us, although Mr. Divan addressed some arguments on fraud, he
quickly abandoned them and expressly gave it up. Considering that this was
the main thrust of the State’s argument before the High Court and has been
expressly given up before us, we could have dismissed the appeals on this
narrow point alone. Nonetheless, since Mr. Divan argued the question of res
judicata with some persistence, we will deal with it subsequently.
On the merits of the argument of fraud/misrepresentation, the High
Court has gone into it at great length and has demonstrated the hollowness of
this contention. We are in complete agreement with the views expressed
therein on this issue but we wish to highlight the following aspects to
illustrate how the argument of mala fides is actually the boot on the other
foot.
The High Court has come to the categorical conclusion that the flip-
flop on the part of the State Government occurred only because of
politicians, that the mala fides, if any, appears to be on the part of the State
Government for political reasons. The High Court has pointed out that the
FWA did not materialise out of the blue. The FWA was negotiated over
several months; it came to be drafted by considering several points that the
Cabinet Sub-Committee had raised. As we have already highlighted, it was
only thereafter, when detailed deliberations had taken place at the highest
levels of the State Government that the MOU was signed and the Project
Report accepted. A Government Order (dated 20.11.1995) was issued
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 7 of 19
requiring the Public Works Department to enter into a Memorandum of
Understanding with the Consortium of three companies, VHB, SAB and
Kalyani. On 9.9.1996, through the CAA, the three members of the
Consortium agreed to "\005unconditionally and irrevocably transfer and
assign, jointly and severally\005" to Nandi "\005all rights, interest and title
granted to them\005with respect to the Infrastructure Corridor by GOK under
the Government Order and the Memorandum of Understanding". The CAA
came to be signed by the three members of the Consortium on the one hand
and Nandi on the other; the Governor of Karnataka, on behalf of the
Government of Karnataka, was shown as the "Consenting Party". A copy of
this agreement was forwarded to the State Government along with a
forwarding letter dated 21.12.1996 requesting that the Government approve
of the same and advise of its approval so that the original agreement could
be given to the State Government for its consent. This letter was forwarded
by the Public Works Department to the Law Department through a letter
dated 22.1.1997 (No. PWD 155 CRM 96) seeking an opinion on the issue.
The State Government was advised by its Law Department (through Opinion
No. 182 OPN II/97 dated 3/4.3.1997) that since the Government was
finalising a separate agreement with Nandi, there was no need to specifically
consent to the CAA. Thus, it would appear that the State Government had
specifically been made aware of the CAA and the fact that the members of
the Consortium had transferred their rights to Nandi. The argument made
before the High Court that the Government was unaware of the CAA, was
defrauded to execute the FWA is, therefore, utterly dishonest. We concur
with the decision of the High Court on this issue that the plea was lacking
any bona fides and that there was neither fraud nor misrepresentation on the
part of Nandi or any member of the Consortium.
Subsequently, as we have already discussed, Nandi as the assignee of
the Consortium, submitted a draft of the FWA to the State Government
which was considered by the Core Committee that had been set up to
negotiate the terms with Nandi. The Core Committee referred the draft FWA
to the Cabinet Sub-Committee which suggested various modifications to it,
which were incorporated in the FWA. Finally, the FWA was approved by
the State Government and came to be signed on 3.4.1997. Thus, it appears
that the plea of fraud and misrepresentation was clearly an afterthought and
it was conveniently raised by the State Government through the petitioners
in Writ Petition No. 45386/04, who were rightly described by the High
Court as the State Government’s "mouth piece" (vide Paragraph 22).
The High Court has also totally disbelieved the affidavits of the Chief
Secretary, K.K. Misra, and the Under Secretary, M. Shivalingaswamy on
this issue. We have refrained from commenting on the merits of their
affidavits since their appeals against prosecution for perjury are pending
separately. We may, however, point out that both the affidavits of the two
senior bureaucrats are on the issue that certain facts which had been
suppressed from the Government had come to light after the judgment in
Somashekar Reddy (supra) and that these indicated fraud and
misrepresentation on the part of Nandi. Indeed, this was the central argument
put forward for impugning the FWA.
The FWA was executed on 3.4.1997 and implemented by the parties
for at least seven years. Several obligations under the FWA were carried out
by the State Government and its instrumentalities and also by Nandi, which
had invested a large amount of money in the Project. These included monies
for payment of compensation to landowners whose lands were being
acquired for the Project. Soon after the FWA was entered into, some
interested parties had raised the issue in "public interest" that the FWA was
a fraud and was nothing but a charade for a lucrative real estate business on
the part of Nandi. The Government through the then Minister for Public
Works vigilantly defended the Project against all these allegations both
inside and outside the Legislature.
It would appear that the change of mind on the part of the State
Government came about \026 co-incidentally or otherwise \026 with a change of
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 8 of 19
Government in Karnataka in 2004. In the year 2004, while the State
Government’s writ appeal was still pending before the Division Bench, a
statement was made by Mr. H.D. Deve Gowda, former Prime Minister,
making serious allegations with regard to the Project stating that it was
nothing but a charade by which Nandi had converted it into a real estate
business. It was at this stage that a note (No. PWD/E/375/2004 dated
6.7.2004) was written by the new Minister, Public Works Department, Mr.
H.D. Revanna, who is none other than the son of Mr. Deve Gowda, to the
Principal Secretary, Public Works Department. The note in terms states that
land acquisition by the State Government for the Project was to cease till the
allegation that Nandi was carrying out a real estate business was enquired
into. With this, the State Government suddenly halted/slowed all ongoing
activities for smooth implementation of the Project. Indeed, it is strange that
the State Government woke up after seven long years, and even more
strangely after a change in the State’s political leadership, to the fact that
there was fraud/ misrepresentation by Nandi or anyone else.
Pursuant to this, the Minister of the Public Works Department set up
the "Expert Committee" (headed by K.C. Reddy) to go into the allegations
of excess land acquired by the Government for implementation of the
Project. After accepting the Interim Report of the Expert Committee, the
Government withdrew its appeal filed before the High Court and the reasons
for the same are mentioned in a Government Order (PWD 155 CRM 95
BMICP Expert Committee/2004, Bangalore dated 7.1.2005). As we shall see
later in the judgment, the constitution and functioning of this Committee
also illustrates the mala fides with which the State Government has
approached the Project. Thus, the utter irresponsibility with which the theory
of fraud/misrepresentation was put forward is thoroughly exposed by the
High Court in its impugned judgment.
Res Judicata
Res judicata is a doctrine based on the larger public interest and is
founded on two grounds: one being the maxim nemo debet bis vexari pro
una et eadem causa ("No one ought to be twice vexed for one and the same
cause" ) and second, public policy that there ought to be an end to the same
litigation . It is well settled that Section 11 of the Civil Procedure Code,
1908 (hereinafter "the CPC") is not the foundation of the principle of res
judicata, but merely statutory recognition thereof and hence, the Section is
not to be considered exhaustive of the general principle of law. The main
purpose of the doctrine is that once a matter has been
determined in a former proceeding, it should not be open to parties to re-
agitate the matter again and again. Section 11 of the CPC recognises this
principle and forbids a court from trying any suit or issue, which is res
judicata, recognising both ’cause of action estoppel’ and ’issue estoppel’.
There are two issues that we need to consider, one, whether the doctrine of
res judicata, as a matter of principle, can be applied to Public Interest
Litigations and second, whether the issues and findings in Somashekar
Reddy (supra) constitute res judicata for the present litigation.
Explanation VI to Section 11 states:
"Explanation VI. \026 Where persons litigate bona fide in respect
of a public right or of a private right claimed in common for
themselves and others, all persons interested in such right shall,
for the purposes of this section, be deemed to claim under the
persons so litigating."
Explanation VI came up for consideration before this Court in
Forward Construction Co. and Ors. v. Prabhat Mandal and Ors.
(hereinafter "Forward Construction Co."). This Court held that in view of
Explanation VI, it could not be disputed that Section 11 applies to Public
Interest Litigation, as long as it is shown that the previous litigation was in
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 9 of 19
public interest and not by way of private grievance. Further, the previous
litigation has to be a bona fide litigation in respect of a right which is
common and is agitated in common with others.
As a matter of fact, in a Public Interest Litigation, the petitioner is not
agitating his individual rights but represents the public at large. As long as the
litigation is bona fide, a judgment in a previous Public Interest Litigation
would be a judgment in rem. It binds the public at large and bars any member
of the public from coming forward before the court and raising any connected
issue or an issue, which had been raised/should have been raised on an earlier
occasion by way of a Public Interest Litigation. It cannot be doubted that the
petitioner in Somashekar Reddy (supra) was acting bona fide. Further, we
may note that, as a retired Chief Engineer, Somashekar Reddy had the special
technical expertise to impugn the Project on the grounds that he did and so, he
cannot be dismissed as a busybody. Thus, we are satisfied in principle that
Somashekar Reddy (supra), as a Public Interest Litigation, could bar the
present litigation.
We will presently consider whether the issues and findings in
Somashekar Reddy (supra) actually constitute res judicata for the present
litigation. Section 11 of the CPC undoubtedly provides that only those
matters that were "directly and substantially in issue" in the previous
proceeding will constitute res judicata in the subsequent proceeding.
Explanation III to Section 11 provides that for an issue to be res judicata it
should have been raised by one party and expressly denied by the other:
"Explanation III. \026 The matter above referred to must in the
former suit have been alleged by one party and either denied or
admitted, expressly or impliedly, by the other."
Further, Explanation IV to Section 11, states:
"Explanation IV. \026 Any matter which might and ought to have
been made ground defence or attack in such former suit shall be
deemed to have been a matter directly and substantially in issue
in such suit."
The spirit behind Explanation IV is brought out in the pithy words of
Wigram, V.C. in Henderson v. Henderson as follows:
"The plea of res judicata applies, except in special case (sic),
not only to points upon which the court was actually required
by the parties to form an opinion and pronounce a judgment,
but to every point which properly belonged to the subject of
litigation and which the parties, exercising reasonable diligence,
might have brought forward at the time."
In Greenhalgh v. Mallard (hereinafter "Greenhalgh"), Somervell
L.J. observed thus:
"I think that on the authorities to which I will refer it would be
accurate to say that res judicata for this purpose is not confined
to the issues which the Court is actually asked to decide, but
that it covers issues or facts which are so clearly part of the
subject matter of the litigation and so clearly could have been
raised that it would be an abuse of the process of the Court to
allow a new proceeding to be started in respect of them."
The judgment in Greenhalgh (supra) was approvingly referred to by
this Court in State of U.P. v. Nawab Hussain . Combining all these
principles, a Constitution Bench of this Court in Direct Recruit, Class II
Engineering Officers’ Association v. State of Maharashtra expounded on
the principle laid down in Forward Construction Co. (supra) by holding
that:
"\005an adjudication is conclusive and final not only as to the actual
matter determined but as to every other matter which the parties might
and ought to have litigated and have had (sic) decided as incidental to
or essentially connected with (sic) subject matter of the litigation and
every matter coming into the legitimate purview of the original action
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 10 of 19
both in respect of the matters of claim and defence. Thus, the principle
of constructive res judicata underlying Explanation IV of Section 11
of the Code of Civil Procedure was applied to writ case. We,
accordingly hold that the writ case is fit to be dismissed on the ground
of res judicata."
With these legal principles in mind, the question, therefore, arises as
to what exactly was sought in Somashekar Reddy (supra), how it was
decided by the High Court in the first round of litigation, and what has been
sought in the present litigation arising at the instance of Mr. J.C.
Madhuswamy and others. In order to show that the issue of excess land was
"directly and substantially in issue" in Somashekar Reddy (supra) we will
first examine the prayers of the parties, the cause of action, the averments of
parties and the finding of the High Court in Somashekar Reddy (supra).
First, learned counsel for the Respondents has pointedly drawn our
attention to the identity of the prayers made in the previous Public Interest
Litigation by Somashekar Reddy as compared to the prayers made in the
present case of Mr. Madhuswamy and others. The prayers in Somashekar
Reddy’s petition were: (a) for quashing the FWA and (b) for directing an
inquiry by the CBI in the matter and to prosecute the offenders. In Mr.
Madhuswamy’s petition, the prayers were: (a) to direct the CBI to conduct
inquiries to various acts as enumerated by items 1 to 16 (specifically the
issue of excess land) and (b) for quashing the various agreements, and acts
done in pursuance of the Project and consequently, to denotify the land of all
farmers situated away from the peripheral road and link road. We are
therefore, satisfied that the prayers made in Somashekar Reddy (supra) and
in Mr. Madhuswamy’s writ petitions are substantially the same.
Second, the cause of action in both Somashekar Reddy (supra) and
the present cases is the FWA, which includes the provisions for acquiring
20,193 acres of land for the Project (comprising 13,237 acres of private land
and 6,956 acres of Government land). Indeed, it was stated in Somashekar
Reddy’s Writ Petition that the land requirement in Schedule I of the FWA
was "highly exaggerated" and would illegally create "huge profits" for
Nandi. Somashekar Reddy thus prayed that the FWA be quashed \026 this
prayer was, however, specifically rejected. The very same FWA that was
upheld earlier has now been impugned in the present case.
Third, in both Somashekar Reddy and Mr. Madhuswamy’s petitions,
the averment was that excess land than required for the implementation of
the Project was being acquired by the State Government at the behest of
Nandi and that the Project was nothing but a camouflage to carry out a real
estate business by Nandi. The High Court records the following contention
of Somashekar Reddy’s counsel:
"The next submission of the Counsel for the petitioner is that
Government of Karnataka though ostensible (sic- ostensibly)
purported to form an Express Highway has in reality allowed
the 2nd respondent to develop the townships as a developer by
conferring a huge largess (sic-largesse) by way of giving
20,000 acres of land\005According to petitioner, the land required
for the construction of four lane Highway is only 2775 acres,
whereas the remaining land would be utilized for the purpose of
development of the towns thereby permitting respondent No. 2
to develop townships as a developer and on huge profits."
The averment of Somashekar Reddy regarding excess land came to be
considered by the High Court which records some of the opposing
contentions of the Respondent-State, in the following terms:
"As a mega project like the Expressway involves considerable
extent of land, answering respondent (the State) has agreed to
provide the minimum extent of land required for the project
partly out of the land owned by the State and by acquiring the
balance. Second respondent will not only construct the
proposed Expressway but also link roads, peripheral road,
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 11 of 19
interchanges, Service Roads, toll plazas and Maintenance area
etc., in addition to the townships."
"It is stated that the project by its very nature requires
considerable extent of land and that is why the respondent has
agreed to provide the land to the extent available with it and
acquire the balance and make available the same to the replying
respondent. There are mutual obligations on both the parties
under the impugned agreement and Respondent-No. 1 is only
facilitating the acquisition of land for which the replying
respondent has to pay at the existing market rates."
Crucially, two very striking findings have been made by the High
Court in Somashekar Reddy (supra) as follows:
"So out of 20,193 acres, land required for the Expressway
would be 6999 acres leaving 13,000 acres for development of
townships. Government of Karnataka in its written statement
has said that it has agreed to provide minimum extent of land
for the project partly out of the land owned by the Government
and by acquiring the balance. Permission has been given to
develop the five township instead of 7, proposed by respondent
No. 2 to make the Project viable."
"The submission that the contract was entered in a clandestine
manner also cannot be accepted\005Respondents in their
statement of objections have admitted that this point was raised
on the floor of the House and the respondent made detailed
presentation on this subject in the House\005Every minute detail
was explained including the scientific method adopted by the
respondent for identification of the land for the Project."
All of these unequivocally show that the issue of excess land (and
connected issues) was specifically raised by the petitioner in Somashekar
Reddy (supra) and was also forcefully denied by the State. In fact, the
decision in Somashekar Reddy (supra), went further with the High Court
according its imprimatur to the land requirements under the FWA amounting
to 20,193 acres, which in no small measure, resulted from the State’s
successful defence that it had provided the "bare minimum of land" for the
Project calculated by a "scientific method". The judgment also contains
copious references to the issue of land (including the acreage), the types of
land to be acquired, the land requirement for different aspects of the Project,
the scientific techniques involved in identifying the land and road alignment
etc. In these circumstances, it cannot be doubted that Explanation III to
Section 11 squarely applies. It is clear that the issue of excess land under the
FWA was "directly and substantially in issue" in Somashekar Reddy
(supra) and hence, the findings recorded therein having reached finality,
cannot be reopened in this case.
The principle and philosophy behind Explanation IV, namely to
prevent "the abuse of the process of the court" (as stated in Greenhalgh
(supra)) through re-agitation of settled issues, provides yet another ground to
reject the appellants’ contentions. For instance, the High Court specifically
records (vide Paragraph 29) of the impugned judgment that:
"It is common case of the parties that the validity of FWA had
earlier been challenged in Somashekar Reddy’s case (supra) on
all conceivable grounds including the one that land in excess of
what is required for the Project had been acquired by the State
Government".
In the face of such a finding by the High Court, Explanation IV to
Section 11 squarely applies as, admittedly, the litigation in Somashekar
Reddy (supra) exhausted all possible challenges to the validity of the FWA,
including the issue of excess land. Merely because the present petitioners
draw semantic distinctions and claim that the excess land not having been
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 12 of 19
identified at the stage of the litigation in Somashekar Reddy (supra), the
Project should be reviewed, the issue does not cease to be res judicata or
covered by principles analogous thereto. If we were to re-examine the issues
that had been raised/ought to have been raised in Somashekar Reddy (supra)
it would simply be an abuse of the process of the court, which we cannot
allow.
As we have pointed out, the cause of action, the issues raised, the
prayers made, the relief sought in Somashekar Reddy’s petition and the
findings in Somashekar Reddy (supra), and the claims and arguments in the
present petitions were substantially the same. Therefore, it is not possible to
accept the contention of the appellants before us that the judgment in
Somashekar Reddy (supra) does not operate as res judicata for the
questions raised in the present petitions.
Excess Land and the Expert Committee
There was considerable time taken by the learned counsel for the
appellants in trying to persuade us that excess land had actually been
delivered to Nandi under the FWA. A subsidiary argument was that even
though the actual area of land delivered might not have been in excess, since
land in prime areas had improperly been acquired for Nandi’s benefit, the
issue needed to be re-examined. In our view, this argument too is not open to
be agitated at this point. As we have already pointed out, the writ petition in
Somashekar Reddy (supra) was the culmination of all such allegations
which had been successfully refuted even on the floor of the Legislature.
Finally, having failed on the floor of the Legislature, a Public Interest
Litigation was filed on the ground that there was something wrong with the
FWA and that it was virtually a sell-out to Nandi. The Division Bench of the
High Court considered every argument very carefully and recorded findings
on all the issues against Mr. J.C. Madhuswamy and others. In our view,
permitting the argument on excess land to be heard again to scuttle a project
of this magnitude for public benefit would encourage dishonest politically
motivated litigation and permit the judicial process to be abused for political
ends. The High Court, therefore, has refused to answer the first part of the
second question framed for consideration on the ground that it was already
answered in Somashekar Reddy (supra) and as it was res judicata, it could
not be re-agitated. Further, that since this argument involved details of
contractual disputes, the High Court would not examine it in its writ
jurisdiction. We are not satisfied that the High Court was wrong in so
holding.
The High Court’s finding on this issue only gains strength if we were
to examine the factual matrix in which the State took its stand that excess
land had been acquired for the Project. As we have previously stated,
pursuant to the objections raised to the Project by the new Minister for
Public Works, an "Expert Committee" was setup in 2004 to review the
Project. The Expert Committee was conveniently headed by K.C. Reddy,
who was the Advisor to the Public Works Minister. This K.C. Reddy was
the same gentleman, who as a member of the previous HLC, had scrutinised
the Project threadbare and had given it the green signal. Surprisingly
however, at this stage, he appeared to be all willing to find faults and flaws
in the Project and the FWA, despite the fact that there was an Empowered
Committee that was required to monitor the implementation of the Project.
The High Court rightly pointed out that the Expert Committee was
constituted virtually in supersession of Clause 4.1.1 of the FWA.
The Expert Committee suddenly woke up to the alleged fact that
excess land was being acquired. Like the State Government, the Expert
Committee also made flip-flops and came out with a report saying that there
was acquisition of excess land. Crucially, it left the actual identification of
the excess lands to the KIAD Board. Surprisingly, the State Cabinet in its
meeting dated 26.10.2004 accepted the report but reaffirmed its support to
the Project and expressed some reservations on the acquisition of more lands
than what was necessary for the Project. In this regard, the High Court
critically comments (vide Paragraph 26) that:
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 13 of 19
"By constituting this Committee the State Government has
ensured that the Project gets stalled. It is interesting to note that
Sri K.C. Reddy who is the Chairman of the Expert Committee
was also a Member of the HLC which had approved the Project
and was associated with it till the signing of the FWA which
provides for 20,193 acres of land to be made available. Sri K.C.
Reddy did not record his dissent in those proceedings and at no
stage did he ever point out that the land that was sought to be
provided for the Project was in excess of what was required but
now as the Chairman of the Expert Committee he has, without
identifying the excess lands which he has left for the Board to
identify, opined that excess land has been acquired for the
Project. We cannot appreciate such a conduct."
We too cannot appreciate the conduct on the part of K.C. Reddy or the
State Government. The inference drawn by the High Court is that the plea of
fraud and misrepresentation sought to be raised was not only an afterthought
but also false to the knowledge of the State Government. The High Court,
therefore, observed (vide Paragraph 27): "It is unfortunate that the
petitioners and the State Government have chosen to raise this bogie (sic\027
bogey) to defeat the public project subserving public interest."
Interestingly, neither the interim report nor the final report of the
Expert Committee identified the excess land but in fact, left it for the KIAD
Board. The counsel for the KIAD Board handed over a set of documents,
which purportedly identified the specific excess lands. It was the grievance
of the KIAD Board that they had not been given the opportunity for placing
these documents before the High Court. Since the date of documents showed
that they were drawn subsequent to the date on which the High Court had
delivered its judgment, the learned Senior Counsel for KIAD Board Mr.
K.K. Venugopal candidly admitted that this exercise was carried out after
the impugned judgment had been delivered. It is a moot point whether the
person, who swore this affidavit on behalf of the KIAD Board stating that no
opportunity had been given to the KIAD Board to place these documents on
the record of the High Court, needs to be considered for prosecution under
Section 340 read with Section 195 of the Code of Criminal Procedure, 1973.
We strongly deprecate such misleading or false affidavits on the part of the
KIAD Board.
According to Mr. Venugopal, Article 300A of the Constitution, as
well as the KIAD Act, would be violated if the KIAD Board were to directly
acquire or acquiesce in the acquisition of land in excess of what is required
for the Project. In our view, this is nothing but a repetition of the arguments
made by the State of Karnataka. As we have elaborately discussed, that the
land was not in excess has been held by the Division Bench of the High
Court on two occasions and we agree with it. Thus, there was no question of
the land being acquired for a purpose other than a public purpose or there
being any contravention of Article 300A. In fact, we are somewhat surprised
that this type of argument must come from the KIAD Board, which was
intimately involved, from the very beginning, with the process of acquiring
land. Further, the State and its instrumentalities (including the KIAD Board)
were enjoined by Clause 5.1.1.1 of the FWA, to make "best efforts" to
acquire the land required for the Project. Indeed, till the State itself changed
its stand with regard to the Project, nothing was heard from the KIAD Board
about lands being acquired in excess of the public purpose. Further, as an
instrumentality of the State, the KIAD Board cannot have a case to plead
different from that of the State of Karnataka. Thus, we are unable to
countenance the arguments of Mr. Venugopal on behalf of the KIAD Board.
Considering the facts as a whole, the High Court came to the
conclusion that since the Project had been implemented and Nandi had
invested a large amount of money and work had been carried out for more
than seven years, the State Government could not be permitted to change its
stand and to contend that the land allotted for the Project was in excess of
what was required. Having perused the impugned judgment of the High
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 14 of 19
Court, we are satisfied that there is no need for us to interfere therewith.
Thus, there is no merit in this contention, which must consequently fail.
The Relief Granted by the High Court
One final argument was made by Mr. Divan as regards the relief
granted by the High Court. To appreciate the argument, it is necessary to
look at the relief granted in terms of Paragraph 42.2, which is as follows:
"Writ petitions nos. 45334 and 48981 of 2004 are allowed
directing the State of Karnataka and all its Instrumentalities
including the Board to forthwith execute the Project as
conceived originally and upheld by this court in Somashekar
Reddy’s case (supra) and implement FWA in letter and spirit.
Consequently, Government Orders dated 4.11.2004 and
17.12.2004 constituting the Review Committee and Expert
Committee are quashed. The report submitted by these
committees in pursuance to these orders and all subsequent
actions taken incidental thereto are also quashed. Nandi is also
directed to implement the Project as expeditiously as possible.
Parties will bear their own costs in these two cases."
Mr. Divan strongly urged that the relief granted was wholly beyond
the jurisdiction of the High Court under Article 226 of the Constitution, as it
would amount to granting a decree for specific performance in writ
jurisdiction. A reading of the relief granted by the High Court does not
persuade us that it is so. The High Court merely directed that the Project and
the FWA, as conceived originally and upheld by the High Court in
Somashekar Reddy (supra), should be implemented "in letter and spirit". In
other words, the High Court said that there is no scope for raising frivolous
and mala fide objections for ulterior purposes. This, the High Court was
fully entitled to do. It is trite law that when one of the contracting parties is
"State" within the meaning of Article 12 of the Constitution, it does not
cease to enjoy the character of "State" and, therefore, it is subjected to all the
obligations that "State" has under the Constitution. When the State’s acts of
omission or commission are tainted with extreme arbitrariness and with
mala fides, it is certainly subject to interference by the Constitutional Courts
in this country. We may refer to Gujarat State Financial Corporation v.
M/s Lotus Hotels Pvt. Ltd., in which a statutory corporation (the Gujarat
State Financial Corporation) arbitrarily refused to grant the sanction of loans
to entrepreneurs who had already acted on the basis of the sanction and had
incurred expenditure and liabilities. The argument that the transaction was
purely a contractual arrangement between the parties and, therefore, not
amenable to writ jurisdiction, was categorically rejected by the following
observations:
"Now if appellant entered into a solemn contract in discharge
and performance of its statutory duty and the respondent acted
upon it, the statutory corporation cannot be allowed to act
arbitrarily so as to cause harm and injury, flowing from its
unreasonable conduct, to the respondent. In such a situation, the
court is not powerless from holding the appellant to its promise
and it can be enforced by a writ of mandamus directing it to
perform its statutory duty. A petition under Article 226 of the
Constitution would certainly lie to direct performance of a
statutory duty by ’other authority’ as envisaged by Article
12."
Kumari Shrilekha Vidyarthi and Ors. v. State of U.P. and Ors. is
another authority for the proposition that the State Government has to act
reasonably and without arbitrariness even with regard to the exercise of its
contractual rights. In M/s Dwarkadas Marfatia and Sons v. Board of
Trustees of the Port of Bombay the situation was one in which a lease
between the Bombay Port Trust and certain parties was terminated in
exercise of contractual rights and the lease rent was abnormally increased. It
was held that there was always an obligation on the part of public authorities
in their acts of omission and commission to be reasonable. In Biman
Krishna Bose v. United India Insurance Co. Ltd. and Anr. the question
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 15 of 19
was whether an insurance company could arbitrarily and unreasonably
refuse the renewal of a policy. Considering that the insurance company, as a
result of State-monopoly in the insurance sector, had become "State" under
Article 12 of the Constitution, this Court held that:
"\005it (the insurance company) requires (sic) to satisfy the
requirement of reasonableness and fairness while dealing with
the customers. Even in an area of contractual relations, the State
and its instrumentalities are enjoined with the obligations to act
with fairness and in doing so, can take into consideration only
the relevant materials. They must not take any irrelevant and
extraneous consideration while arriving at a decision.
Arbitrariness should not appear in their actions or decisions."
Thus, it appears that no exception could be taken to relief granted in
the judgment of the High Court impugned before us. All that the High Court
has done is to reaffirm and require the State Government and its
instrumentalities, as "State" under the Constitution, to act without
arbitrariness and mala fides, especially in the matter of land acquisition. It is
pertinent to note that the State had agreed (vide Clause 5.1.1.1 of the FWA)
in respect of the lands required under the FWA, that:
"GOK shall use its best efforts and cause its Governmental
Instrumentalities to use their best efforts, to exercise its and
their legal right of eminent domain (or other right of similar
nature) under the Laws of India to acquire the Acquired Land.
Prior to acquiring any Acquired Land, GOK will obtain from
the company written confirmation of its willingness to purchase
such Acquired Land from GOK at the purchase price (whether
in the form of cash or comparable land) required under the
Laws of India (the "Acquired Land Compensation"). GOK shall
offer to the ex-propriated owners of the land the Rehabilitation
package specifically worked out for this Infrastructure Corridor
Project with mutual consultation of the consortium and the
Revenue Authorities in accordance with the applicable rules".
In these circumstances, we find no reason to interfere with the said
directions of the High Court. In the future also, we make it clear that while
the State Government and its instrumentalities are entitled to exercise their
contractual rights under the FWA, they must do so fairly, reasonably and
without mala fides; in the event that they do not do so, the Court will be
entitled to interfere with the same.
The High Court also found, justifiably in our view, that the writ
petitioners had been sponsored by the State Government to put forward its
changed stand in the garb of a Public Interest Litigation. In the opinion of
the High Court (vide Paragraph 29):
"The court cannot allow its process to be abused by politicians
and others to delay the implementation of a public project
which is in larger public interest nor can the court allow anyone
to gain a political objective. These legislators who have not
been successful in achieving their objective on the floor of the
Assembly have now chosen this forum to achieve their political
objective which cannot be allowed."
Although this should have really put an end to the writ petitions filed
by Mr. Madhuswamy and others, the High Court had to consider the
petitions filed by Mr. Dakshinamurthy and the All India Manufacturer’s
Organisation, who were also before the court by way of Public Interest
Litigation and sought a Mandamus of the continuation of the Project. A
grievance was made before the High Court that these were persons put up by
Nandi and that they were virtually projecting the viewpoint of Nandi. The
High Court having taken note of the same has said that despite this, larger
public interest required the implementation of the Project. We see no reason
to differ with the High Court on this point.
Writ Petition No. 45386/04 (Mr. J.C. Madhuswamy and others) was
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 16 of 19
rightly dismissed as raising the very same issues which had been concluded
by the decision in Somashekar Reddy (supra). Writ Petition Nos. 45334/04
and 48981/04 were rightly allowed and the order to implement the Project in
its letter and spirit had been made in exercise of the writ jurisdiction of the
High Court. We refrain from dealing with the third relief granted, namely
directing the prosecution of K.K. Misra and M. Shivalingaswamy, as their
appeals shall be independently dealt with by this Court.
Taking an overall view of the matter, it appears that there could hardly
be a dispute that the Project is a mega project which is in the larger public
interest of the State of Karnataka and merely because there was a change in
the Government, there was no necessity for reviewing all decisions taken by
the previous Government, which is what appears to have happened. That
such an action cannot be taken every time there is a change of Government
has been clearly laid down in State of U.P. and Anr. v. Johri Mal and in
State of Haryana v. State of Punjab and Anr. where this court observed
thus:
"\005in the matter of governance of a State or in the matter of
execution of a decision taken by a previous Government, on the
basis of a consensus arrived at, which does not involve any
political philosophy, the succeeding Government must be held
duty-bound to continue and carry on the unfinished job rather
than putting a stop to the same."
The Land Acquisition Matters
(Civil Appeal Nos. 3848-3884/2005, 3889-4127/2005, 4128-4366/2005,
4575-4576/2005, 5399-5401/2005, 5402/2005, 5746-5747/2005, 5759/2005,
5797-5799/2005, 6098/2005, 6099/2005, 5092-5093/2005, 7024-7040/2005,
7591/2005, 7592/2005, 61/2006, 73/2006, 74-76/2006, SLP 1562-63/2006).
The Background
In all these appeals, another attempt by a side wind, was made to
scuttle the Project. The attempt, this time, was primarily on the part of the
landowners, whose lands were acquired for implementation of the Project
and who challenged the same before the High Court of Karnataka. A learned
Single Judge of the Karnataka High Court, through judgment dated
18.12.2003, disposed of these petitions. The learned Judge took the view that
acquisition of 60% of the land by the State Government, insofar as it related
to the formation of roads and infrastructure development was valid, while
the acquisition of the remaining 40% meant for the development of
townships and convention centres was invalid and to that extent the
acquisition was quashed. The landowners, the State Government, the KIAD
Board and also Nandi were aggrieved by the judgment of the learned Single
Judge and filed separate writ appeals challenging the judgment. The stand of
the State Government in its writ appeal was that the learned Single Judge
was wrong in quashing 40% of the acquisition of land. This was also the
stand of the KIAD Board. Nandi also challenged the said part of the order.
Thus, it would appear that the State Government, KIAD Board and Nandi
were ad idem in their writ appeals that the learned Single Judge had erred in
interfering and quashing 40% of the land as not being in public interest.
Sometime in August 2004, when the writ appeals came up for hearing
before the Division Bench of the High Court, the State Government and the
KIAD Board withdrew their appeals, because by then, as we have already
discussed, the State Government appeared to have second thoughts about the
Project and felt that the land acquisitions were far in excess of the Project’s
requirements. Even though they were also respondents under the writ appeal
filed by Nandi, they did not contest the claim and addressed no arguments
before the Division Bench of the High Court. Those appeals were disposed
of by an order dated 28.2.2005. The appeals filed by Nandi and the Indian
Machine Tools Manufacturers Association (hereinafter "the IMTMA") were
allowed, whereas those filed by the landowners were dismissed, and the
order of the learned Single Judge was set aside and the entire acquisition was
upheld.
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 17 of 19
Various connected appeals against the order of the learned Single
Judge came to be disposed of by orders of the High Court dated 29.6.2005
and 18.11.2005, in terms of the detailed judgment and order of a Division
Bench of the High Court dated 28.2.2005 (hereinafter in the Land
Acquisition Matters "the impugned judgment").
The Contentions of the Appellants
Though there are a number of appellants before us, the contentions
raised before the High Court and us were principally as under: first, that no
notice was served on the landowners under Section 28(1) of the KIAD Act;
secondly, that the notice of acquisition was vague and consequently
prejudiced any effective objection being raised by the landowners whose
lands were sought to be acquired and finally, that the land acquisition was
not for a public purpose, or for a purpose as specified in the KIAD Act, and
was also in excess of the Project’s requirement.
Although other contentions have also been raised, we will not deal
with them here as they have already been dealt with in the first part of our
judgment.
Non-Service of Notice
The argument that no notice was served on the landowners under
Section 28(1) of the KIAD Act, appears to be factually incorrect. Even the
learned Single Judge who partially allowed the writ petition came to the
conclusion (vide Paragraph 22) in his judgment (dated 18.12.2003) that the
"\005petitioners in all these cases have filed objections on several grounds."
Even in the appeal before the Division Bench, the High Court observed (vide
Paragraph 30) that it was "\005not in dispute that the land owners were served
with notices and the objections filed by them have been considered." Even
before us, when these appeals were argued, no attempt was made by any of
the learned counsel to satisfy us that the appellants had not actually been
served notice of the acquisition. Neither was the finding of the learned
Single Judge or the Division Bench impugned on this point. We are,
therefore, unable to accept the contention that notices were not served on the
appellants as required under Section 28(1) of the KIAD Act.
Vagueness of Notice of Acquisition
The next contention is that the notice of acquisition was vague and
consequently prejudiced any effective objection being made by the
landowners whose lands were sought to be acquired. The vagueness of the
notification, it is contended, has vitiated the notice itself, according to the
learned counsel for some of the landowners.
The notification in the instant case states that the lands were being
acquired for the purposes of "industrial development" i.e. establishing and
developing industrial areas by the KIAD Board. In our opinion, the purpose
indicated in the notifications is sufficiently precise and is not affected by the
vice of vagueness as alleged. Our attention was drawn to the judgment of
this Court in Aflatoon v. Lt. Governor of Delhi where this Court pointed
out as follows:
"The question whether the purpose specified in a notification
under Section 4 is sufficient to enable an objection to be filed
under Section 5A would depend upon the facts and
circumstances of each case\005In the case of an acquisition of a
large area of land comprising several plots belonging to
different persons, the specification of the purpose can only be
with reference to the acquisition of the whole area. Unlike in
the case of an acquisition of a small area, it might be practically
difficult to specify the particular public purpose for which each
and every item of land comprised in the area is needed."
It is difficult to accept that the landowners were not aware of the
purpose of the acquisition nor can it be accepted that they were unable to file
their objections on this ground. As a matter of fact, as the High Court has
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 18 of 19
concurrently found, they did file their objections before the competent
authorities. We do not see any prejudice caused to them as a result of the
wordings of the notification of acquisition. The concerned authority also
heard them on the objections filed after affording them an opportunity to file
such objections under Section 28(2) of the KIAD Act. Thus, there is no
substance in the contention of the appellants that the notification was vague
and hence that the State did not comply with the principles of natural justice.
Purpose of Acquisition
The next contention urged on behalf of the landowners is that the
lands were not being acquired for a public purpose. The counsel who have
argued for the landowners have expatiated in their contention by urging that
land in excess of what was required under the FWA had been acquired; land
far away from the actual alignment of the road and periphery had been
acquired, consequently, it is urged that even if the implementation of the
Highway Project is assumed to be for a public purpose, acquisition of land
far away therefrom would not amount to a public purpose nor would it be
covered by the provisions of the KIAD Act.
In our view, this was an entirely misconceived argument. As we have
pointed out in the earlier part of our judgment, the Project is an integrated
infrastructure development project and not merely a highway project. The
Project as it has been styled, conceived and implemented was the Bangalore-
Mysore Infrastructure Corridor Project, which conceived of the development
of roads between Bangalore and Mysore, for which there were several
interchanges in and around the periphery of the city of Bangalore, together
with numerous developmental infrastructure activities along with the
highway at several points. As an integrated project, it may require the
acquisition and transfer of lands even away from the main alignment of the
road.
The various changes brought about to the KIAD Act, also reflect the
intention of the State’s Legislature to provide for land acquisition for the
Project. The expressions "Industrial area" and "Industrial Infrastructural
facilities" as defined under the KIAD Act, definitely include within their
ambit establishment of facilities that contribute to the development of
industries. We cannot forget that, as originally enacted, the KIAD Act had a
different, narrower definition of "Industrial area" in Section 2(6). In 1997,
the definition was broadened to also include "industrial infrastructural
facilities and amenities". Further, Section 2(7-a) was added to define
"Industrial Infrastructural facilities" in a manner broad enough to take into
its sweep the land acquisition for the Project.
The learned Single Judge erred in assuming that the lands acquired
from places away from the main alignment of the road were not a part of the
Project and that is the reason he was persuaded to hold that only 60% of the
land acquisition was justified because it pertained to the land acquired for
the main alignment of the highway. This, in the view of the Division Bench,
and in our view, was entirely erroneous. The Division Bench was right in
taking the view that the Project was an integrated project intended for public
purpose and, irrespective of where the land was situated, so long as it arose
from the terms of the FWA, there was no question of characterising it as
unconnected with a public purpose. We are, therefore, in agreement with the
finding of the High Court on this issue.
Civil Appeal No. 7024-25/05
As regards these appeals, the impugned judgment of the High Court
(vide Paragraph 32) specifically records that the appellants did not have any
right or interest in the land in question on the date that they filed the writ
petitions before the High Court. The counsel too admitted the same before
the High Court. The High Court accordingly found that the writ petitions
were not maintainable. Since the writ petition proceeded on this footing, we
cannot permit the appellants to take a different stand before us, contrary to
what had been stated before the High Court. Since we have not been
convinced otherwise, the writ petitions were not maintainable and the High
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 19 of 19
Court was justified in the view that it took.
In summary, having perused the well considered judgment of the
Division Bench which is under appeal in the light of the contentions
advanced at the Bar, we are not satisfied that the acquisitions were, in any
way, liable to be interfered with by the High Court, even to the extent as
held by the learned Single Judge. We agree with the decision of the Division
Bench that the acquisition of the entire land for the Project was carried out in
consonance with the provisions of the KIAD Act for a public project of great
importance for the development of the State of Karnataka. We do not think
that a Project of this magnitude and urgency can be held up by individuals
raising frivolous and untenable objections thereto. The powers under the
KIAD Act represent the powers of eminent domain vested in the State,
which may need to be exercised even to the detriment of individuals’
property rights so long as it achieves a larger public purpose. Looking at the
case as a whole, we are satisfied that the Project is intended to represent the
larger public interest of the State and that is why it was entered into and
implemented all along.
The Final Orders
In the result, we find that the judgment of the High Court (dated
3.5.2005) impugned before us in the Main Matter, is not liable to be
interfered with. There is no merit in the appeals and they are hereby
dismissed. Considering the frivolous arguments and the mala fides with
which the State of Karnataka and its instrumentalities have conducted this
litigation before the High Court and us, it shall pay Nandi costs quantified at
Rupees Five Lakhs, within four weeks of this order.
Appellants in C.A. No. 3497/2005 (J.C. Madhuswamy and others), in
addition to the costs already ordered by the High Court, shall pay to the
Supreme Court Legal Services Authority costs quantified at Rupees Fifty
Thousand within four weeks of this order. A copy of this order be sent to the
Member-Secretary of the Supreme Court Legal Services Authority for
his/her information.
In the Land Acquisition Matters, the appeals challenging the
judgments of the High Court dated 28.2.2005, 29.6.2005 and 18.11.2005 are
dismissed as without substance. However, in the circumstances, there shall
be no order as to costs.