http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 1 of 8
CASE NO.:
Appeal (civil) 8394 of 2002
PETITIONER:
J.M.D. Alloys Ltd.
RESPONDENT:
Bihar State Electricity Board & Ors.
DATE OF JUDGMENT: 06/03/2003
BENCH:
S. Rajendra Babu, D.M. Dharmadhikari & G.P. Mathur.
JUDGMENT:
JUDGMENT
(With C.A. No.8395 of 2002)
G.P.Mathur, J.
These appeals are directed against the judgment and order dated
18.4.2000 of a Division Bench of Patna High Court, by which the Writ
Petition preferred by M/s J.M.D. Alloys Ltd. was partly allowed and the
Bihar State Electricity Board was directed to serve a fresh bill as per the
observations made in the judgment and to restore the electricity connection
within two days of the payment of the said bill.
M/s J.M.D. Alloys Ltd. (hereinafter referred to as the petitioner) has a
high tension industrial connection of electricity for running induction
furnaces for manufacturing steel ingots. The officials of the Bihar State
Electricity Board (hereinafter referred to as "the electricity board") inspected
the petitioner’s factory premises on 26th and 27th August, 1999 and found
that the seal fixed on CT/PT box was tampered. An FIR was lodged at the
concerned police station on 27.8.1999 alleging that the petitioner had
committed theft of 6.96 lakh units and had thereby caused a loss of Rs.2.58
crores to the Electricity Board. The Electricity Board thereafter issued a bill
dated 31.8.1999 for Rs.8,85,77,131/-. This bill was challenged by the
petitioner by filing CWJC No. 8939 of 1999 before the High Court. The
learned Single Judge, who heard the writ petition vide his judgment/order
dated 27.9.1999 directed that a show cause notice in the light of the
observations made in the judgment be given to the petitioner within a week
and it will be open to the petitioner to raise all its defences against the charge
of committing theft of electrical energy and/or drawing electrical energy at a
load higher than its contracted demand. It was further directed that the
show notice shall be given by the General Manager-cum-Chief Engineer,
Central Bihar Area, Electricity Board, Patna, or by any other officer of the
Electricity Board of equal or higher rank and he shall pass final order after
giving an opportunity of hearing to the petitioner. The liability of the
petitioner was to be determined afresh on the basis of the final order passed
by the Chief Engineer.
The Chief Engineer (Transmission) Bihar State Electricity Board
thereafter issued a notice dated 13.10.1999 to which a reply was given by
the petitioner on 20.10.1999. After affording an opportunity of personal
hearing and considering the reply, the Chief Engineer passed an order on
27.10.1999 holding that Clause 16.9 (b) and (c) of Tariff is attracted and the
consumer M/s J.M.D. Alloys Ltd. is liable to pay compensatory bill in terms
of the aforesaid clauses of the Tariff. In accordance with the decision of the
Chief Engineer, a fresh bill dated 29.10.1999 for Rs.7,85,77,131/- was
issued. This bill was again challenged by the petitioner by filing a Writ
Petition which was dismissed by a learned Single Judge on 13.12.1999.
Against the said decision the petitioner preferred a Letters Patent Appeal
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 2 of 8
which was partly allowed by the Division Bench by the impugned judgment
and order dated 18.4.2000. The Division Bench held that the petitioner is
liable to pay electricity charges in accordance with Clause 16.9 of the Tariff.
However with regard to fuel surcharge it was held that the same cannot be
levied at thrice the rate in accordance with Clause 16.9 of the Tariff, which
permits consumption of electricity to be assessed at thrice the rate per unit.
Feeling aggrieved by the aforesaid decision, M/s J.M.D. Alloys Ltd. have
preferred Civil Appeal No.8394 of 2002 and the Bihar State Electricity
Board has preferred Civil Appeal No.8395 of 2002.
As stated earlier, the Chief Engineer (Transmission), Bihar State
Electricity Board, issued a notice dated 13.10.1999 to the petitioner. The
notice was issued on the grounds, inter alia, that the inspection of the
business premises of the petitioner was conducted from 14.15 hours to 20.30
hours on 26.8.1999 and thereafter on the following day; that on examination
of CT/PT unit and its terminal box, the seal bearing No.045660P which was
put on CT/PT terminal box on 14.5.1999, was found to be tampered with
and the signature of the authority was also not found on the same; that a
seizure memo of the tampered seal was prepared on the same day; that on
account of the fact that the seal on the terminal box had been removed, it had
become easily accessible to the consumer and by fiddling with the terminals,
namely by removing the wires or putting wires of higher resistance, the flow
of energy to the metering unit was manipulated to show a very low recording
of both KVA and unit consumption; that the total capacity of induction
furnaces on operation was 12 M. T. for which energy requirement was 7200
KVA but the petitioner had entered into a contract demand of 4850 KVA
and, therefore, the consumer was engaged in theft of electricity and was
consuming energy at a much higher load than the contracted demand; that
the supplier of the furnaces to the petitioner, namely Megatherm Electronic
Pvt. Ltd. had reported to the Director General of Police (Vigilance), Bihar
State Electricity Board consumption equivalent to approximately 3000
KVA for running the furnaces exclusive of auxiliary load like water supply,
cooling systems, cranes, etc; that the feasibility report given to the
Electricity Board by the petitioner showed that the minimum required
energy for each MT furnace was 500 KVA for the furnace alone besides 100
KVA for auxiliary load and thus 600 KVA was required for each MT
furnance; that the electronic meter showed that the power had been
consumed by the factory on an average basis of 21.25 hours per day which
runs into two shifts of 12 hours each having 40 workers in each shift and the
load and the capacity of two furnaces showed production of 3000 MT ingots
every month and, therefore, the minimum consumption of power was 16.20
lakh units per month whereas bills had been paid on an average of 9.24 lakh
units per month; that the theft of power was further substantiated from the
meter reading of J.D. Feeder at 33/11 KV Air Force Sub-station Bihta and
also the claim filed by the petitioner under clause 13 of the agreement and
on the basis of the aforesaid facts and material it was obvious that the
petitioner had been committing theft of electricity on a massive scale by
tampering with the seal of the CT/PT terminal cover. The petitioner was
accordingly directed to show cause as to why a bill in terms of Clause 16.9
of the Tariff Notification be not raised. The petitioner give a reply to the
show cause notice raising various pleas and denying that it had committed
any theft of electricity. It was pleaded that the meter had been regularly
inspected by different teams of the Electricity Board but no tampering of the
seal of the CT/PT terminal cover had been found; that the furnaces can
operate only to the extent of 80% of its rated capacity; that the Electricity
Board itself had assessed the capacity of the connected load at 5100 KVA,
which was very near to the contracted demand; that the meter installed in
the factory premises never recorded a maximum demand of more than the
contracted demand; that the assumption that 100 KVA per ton is required
for auxiliary load was not based on facts and that in the case of a high
tension industrial consumer the connected load is of no relevance because to
constantly monitor the load availed of by a high tension consumer a
Trivector meter, containing the maximum demand indicator is compulsorily
installed. It was further submitted that the seal in CT/PT unit had not been
tampered with and the allegation regarding tampering of the seal was being
investigated by the Investigating Officer of the criminal case registered
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 3 of 8
against the petitioner and his report shall be considered by the Court of law
at the appropriate time.
The Chief Engineer after consideration of the material and the
submissions made held that the theft of electricity cannot be found
physically and this has to be worked out from evidences parameters and
various circumstances under which the consumer is availing power. He
passed a detailed order on 27.10.1999 and the relevant part of the findings
recorded by him are being reproduced below:
"It appears from Annexure 1 of show-cause notice that
two nos. of induction furnaces of six M.T. capacity each
totaling 12 MT were in operation. This is supported by the
facts with the inspection report that the total capacity of
Transformer was 7230 KVA. The CTPT cover terminal seal
which was found tampered was unsigned. There were large
number officials of the Board including Executive Magistrates
and therefore there is no reason to disbelieve that seal of
terminal cover of CTPT was tampered. The capacity of the
furnaces being 12 MT it is evidently clear that the power was
used unauthorised by the consumer because the consumption
recorded in the meter was much less than what it ought to have
been on actual load i.e. 7200 KVA (600 X 12 T). In this
connection the Annexure-3 & 4 the vouchers of the purchase of
induction furnace from Megatherm, show the capacity of
induction furnace, 6 MT as 2500 KW i.e. equivalent to 3000
KVA therefore the load of 12 M.T. Furnace besides @
KVA/MT as auxiliary load totaling to 7200 KVA as the actual
load. It is not out of place to mention here that the induction
furnace Association of Bihar has proposed and agreed that the
load of induction furnace could be 600 KVA per M.T.
This is also brought to my notice that on average basis
the power was consumed at the average period of 21.25 hrs. per
day. The factory runs into two shifts with 40 workers in each
shift. So far as the nos of days of pilferage is concerned, it has
been rightly interpreted and assessed the maximum period of
six months for the assessment of compensatory amount under
clause 16.9 of Tariff.
The variant factors of the consumption as per formula i.e.
LEFXHED have been thoroughly taken care of in the formula
provided in the Tariff.
From the facts and circumstances as set forth above, it is
absolutely clear that clause 16.9 (b) and (c) of Tariff is
attracted and the consumer M/s JMD Alloys is liable to pay the
compensatory bill in terms of clause 16.9 of Tariff."
In accordance with the order of the Chief Engineer, a fresh electricity
bill was prepared on 29.10.1999 for Rs.4,09,32,925/- towards the cost of
units of electricity and Rs.3,90,73,217/- towards fuel surcharge. After
adding the electricity duty and charges for rental of transformer and fuse
replacement, etc. a bill was issued for Rs.8,85,77,131/-.
Shri Gopal Subramanium, learned senior counsel for the petitioner,
has submitted that the factory premises of the petitioner had been inspected
on 14.5.1999 and then again on 20.7.1999 and no irregularity of any kind
had been found on the said dates and, therefore, the allegation that the
petitioner had tampered with the seal of CT/PT unit is wholly incorrect.
There was no material or evidence to show that any effort had been made by
the petitioner to interfere with the metering unit which may have the effect
of showing lesser consumption of energy. Learned counsel has also
submitted that in absence of any evidence relating to presence of artificial
means which would have rendered abstraction of electrical energy possible
the provisions of Clause 16.9 of the Tariff could not be made applicable and
the electricity bill issued to the petitioner is incorrect. It has also been
urged that the last inspection of the petitioner’s premises having been done
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 4 of 8
on 20.7.1999, there is no justification for counting the period of dishonest
abstraction of energy as 180 days (six months) and, therefore, the bill issued
to the petitioner is for much longer period which was not permissible in law.
The learned counsel has further submitted that the findings recorded by the
Chief Engineer are wholly incorrect as instead of basing his order on the
actual production of steel, he has gone by the capacity of the furnaces. Shri
Subramanium has also urged that the faulty recording of the meter has to be
judged from the standpoint of Section 26(6) of the Indian Electricity Act,
1910 and the matter should have been referred to Electrical Inspector.
Shri V.R. Reddy, learned senior counsel for the Electricity Board, has
submitted that Section 26(6) of the Indian Electricity Act has no application
to a case where the seal fixed on CT/PT terminal box had been tampered
with and the recording of consumption by the meter had been effected by
recourse to artificial means. Learned counsel has laid stress on the fact that
the Chief Engineer, after considering all the relevant material and
circumstances has recorded a categorical finding that the seal of the CT/PT
terminal box had been tampered with and the petitioner had exceeded the
contracted load and had also dishonestly abstracted electrical energy to a
very large extent. According to the learned counsel, the findings recorded
by the Chief Engineer being based upon relevant material are not open to
challenge in proceedings under Article 226 of the Constitution of India. In
support of the appeal preferred by the Electricity Board, Shri Reddy has
submitted that the surcharge being part of the electricity bill, the Division
Bench of the High Court had erred in holding that the same was chargeable
on per unit basis and not at thrice the value thereof. According to the
learned counsel, in view of Clause 16.9 of the Tariff, the fuel surcharge has
also to be levied at three times the units assessed.
It may be stated at the very outset that a detailed show cause notice
dated 13.10.1999 mentioning all the relevant facts was served upon the
petitioner to which the petitioner gave a reply on 20.10.1999. The order of
the Chief Engineer mentions that the petitioner was afforded an opportunity
of personal hearing and its counsel appeared before him and argued the
matter on 25.10.1999 and 26.10.1999. The Chief Engineer has recorded a
clear finding that the seal on CT/PT terminal box was found to be tampered
with. A seal bearing No.045660P had been put on the CT/PT terminal box
on 14.5.1999 and the authority fixing the seal had put his signatures thereon.
At the time of the inspection on 27.8.1999, the seal was found to be
tampered with, which was seized by the inspecting team. The seal did not
contain the signature of the authority who had put the seal. The record
shows that the inspection had been done by a high level team consisting of
as many as 8 responsible officers, some of whom had come from the
headquarters of the Electricity Board at Patna. An Executive Magistrate
was also a member of the team. The Manager of the petitioner himself
lodged a report on 28.8.1999 with the Deputy Superintendent of Police,
Danapur (Patna), alleging that 8 officers of the Bihar State Electricity Board
with armed force visited and tested the installation and the members of the
team with the help of screw and plier themselves tampered with the cover of
the LT terminal box of CT/PT and the plastic seal was removed and brought
down by one of the Executive Engineers. However, in reply to the show
cause notice filed by the petitioner, tampering of the seal was denied and it
was pleaded that the matter was being investigated by the investigating
officer of the criminal case registered against the petitioner and his report
shall be considered by the Court at the appropriate time. The Chief
Engineer after considering the entire material and taking into consideration
the fact that there were large number of officers of the Board at the time of
the inspection, has recorded a finding that the seal had been tampered with.
It is an admitted position that in the factory of the petitioner there were two
furnaces, each of 6 MT and thus the total capacity was 12 MT. The
manufacturer of the induction furnaces namely, Megatherm Electronic Pvt.
Ltd. had given in writing that the load of 6 MT induction furnace was 2500
KV which is equivalent to 3000 KVA and, therefore, the actual load of the
furnaces installed at the petitioner’s factory, after taking into consideration
the auxiliary load, came to 7200 KVA. The Induction Furnaces Association
of Bihar of which the petitioner is also a member, had agreed and proposed
that the load of an induction furnace could be taken to be 600 KVA per MT.
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 5 of 8
On consideration of these factors the Chief Engineer came to a conclusion
that the actual load of the petitioner’s factory was 7200 KVA. The other
material which has been considered by the Chief Engineer is that on an
average the power was consumed for 21.25 hours per day as the factory was
running in two shifts with 40 workers in each shift and, therefore, the
number of units being actually consumed were much higher than that
recorded in the meter. On the basis of these findings, the assessment has
been made of the compensatory amount under Clause 16.9 of the Tariff.
The contention that the dispute regarding tampering of the seal of
CT/PT terminal unit should have been referred to the Electrical Inspector,
has hardly any merit. In Madhya Pradesh Electricity Board & Ors. v.
Basantibai, 1988(1) SCC 23, it has been held that a dispute regarding the
commission of fraud in tampering with the meter and breaking the body seal
is one outside the ambit of Section 26(6) of the Indian Electricity Act and
the Electrical Inspector has no jurisdiction to decide such cases of fraud. It
was further held that under Section 26(6), the only dispute which can be
decided by the Electrical Inspector is as to whether the meter is correct and
is accurately recording the reading or there is some fault in the same. Since
in the present case it has been found that the seal on the CT/PT terminal box
had been tampered with and the natural working of the meter had been
affected by taking recourse to external devices, a dispute of this kind cannot
be referred to an Electrical Inspector.
The next contention raised is that the period of 180 days for which
theft of electricity has been assessed is absolutely wrong and has no rational
basis. The Electricity Board has proceeded on the footing that Clause 16.9 of
the Tariff framed by the Bihar State Electricity Board with the approval of
the State Government is applicable. Clause 16.9 of the Tariff reads as
under:
"16.9 (A) Detection of unauthorised load :- If at any time the
consumer is found exceeding the contracted load without
specific permission of the Board, the Board may without
prejudice to its other rights under the agreement or under the
provisions of the Electricity Act, estimate the value of the
electrical energy, so extracted, consumed or used shall be
calculated as below and may also disconnect the supply without
notice:-
I. Necessary assessment for compensation in the following
malpractice and theft of energy cases shall be made as
below:-
(a)
(b) In case of using energy by creating obstruction in
running of meters or interfering with the system of
supply or wires etc.
(c) ..
Unit assessed = L x F x H x D
Where L = .
H =
D= is the no. of days for which the pilferage took place
which can be established from production of satisfactory
evidence by the consumer. In case there is no possible
evidence to establish the period, this factor be taken
equivalent to 180 or the no. of days elapsed from the date
of connection/installation of meter till the date of
detection of the pilferage whichever is less.
F= ..
II. .
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 6 of 8
III. Method of charging the assessed units as indicated in
para I & II above.
(a) The consumption so assessed shall be charged at
thrice the rate per unit of the Tariff applicable to the
consumer excluding the consumption recorded by the
meter and the latter shall be charged at the appropriate
tariff rates. The amount billed at this (thrice the tariff
rate) shall not be taken into consideration for the purpose
of computing consumer’s liability to pay
monthly/minimum guarantee.
(b) ..
IV When connected load is more than the sanctioned load in
case of all categories LT connection except Domestic
Service.
Assessment charge:- Rs. C x M (LD-LS)x3
Where, M= Minimum consumption guarantee charge
per BHP per month as applicable in the tariff schedule.
LD= is the load detected in BHP at the time of
inspection.
LS= is the load sanctioned to the consumer in BHP
C= This factor be taken equivalent to six months or no.
of months or part thereof elapsed from the date of
connection/installation whichever is less."
The relevant part of the Tariff quoted above shows that in the cases of
theft of electricity or dishonest abstraction of electrical energy the
assessment for compensation has to be done on the basis of a formula
wherein ’D’ stands for number of days for which the pilferage took place
and where there is no possible evidence to establish the period, this factor
can be taken to be equivalent to 180 days. Similarly, in a case where
connected load is more than the sanctioned load, the assessment charge has
to be done on the basis of a formula where ’C’ stands for six months or the
number of months or part thereof elapsed from the date of
connection/installation, whichever is less. Therefore under the Tariff in
both the cases the period can be taken as 180 days or six months. It is on
the basis of this formula that the assessment for consumption of units has
been done for 180 days. In Hyderabad Vanaspathi Ltd. v. A.P. State
Electricity Board & Ors., 1998 (4) SCC 470, it has been held that the terms
of conditions for supply of electricity to consumers notified by the Board in
exercise of power under Section 49 of Electricity (Supply) Act, 1948 and
made applicable to all consumers availing supply of electricity, are statutory
in character. This being the legal position, the Electricity Board in our
opinion rightly applied Clause 16.9 of the Tariff and there is no infirmity in
the assessment made and the bill prepared in pursuance thereof.
Shri Gopal Subramanium has also submitted that after the inspection
had been done on 27.8.1999, an FIR had been lodged against the petitioner
on the same day by Shri Om Prakash, Assistant Executive Engineer at the
Police Station and a criminal case was registered under Section 39/44 of
Indian Electricity Act. This case was investigated and thereafter a final
report was submitted, which was accepted by the concerned Magistrate and
as a result of this order, the petitioner stands exonerated from the charge of
theft of electricity and no compensatory bill could be issued by taking
recourse to Clause 16.9 of the Tariff. Shri V.R. Reddy, learned senior
counsel for the Electricity Board has submitted that before accepting the
final report, the learned Magistrate had issued notice to Shri Om Prakash,
Assistant Executive Engineer, but the said notice was not served upon him
as he was transferred from Patna on account of his allocation to Jharkhand
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 7 of 8
State and as such no representation could be made on behalf of the
Electricity Board against the final report. Subsequently, an application has
been moved on behalf of the Electricity Board before the concerned
Magistrate for recall of the order by which final report was accepted. In our
opinion, the mere acceptance of final report by the Magistrate cannot
amount to a finding by the criminal Court that theft of electricity was not
committed. The accused was not even summoned, no charge was framed
nor any evidence was recorded. In such a situation, it cannot be held that
the criminal Court has recorded any finding to the effect that the petitioner
has not committed theft of electricity. That apart, the purpose of a trial
under Section 39/44 of the Indian Electricity Act is entirely different and the
object is to punish and sentence the person who is alleged to have
committed the offence. The trial of an accused in a criminal case can have
no bearing in the matter of assessment made in accordance with the tariff of
the value of electricity dishonestly abstracted or consumed. Therefore, the
contention raised on the basis of alleged acceptance of the final report in the
criminal case has absolutely no merit.
It is to be noted that in pursuance of the order passed on 27.9.1999 by
the High Court in CWJC No.8939 of 1999, the Chief Engineer decided the
matter holding that the petitioner had exceeded the contracted load and had
also committed theft of electricity and consequently assessment of
compensatory amount had to be done in accordance with Clause 16.9 of the
Tariff. In terms of the order of the Chief Engineer the bill dated 29.10.1999
was prepared which was challenged by the petitioner by filing the writ
petition before the High Court under Article 226 of the Constitution. The
High Court was not hearing an appeal against the decision of the Chief
Engineer. The scope of inquiry in such a matter is a limited one. We would
like to quote here what was said by Venkatachaliah, J. in State of U.P. &
Ors. v. Maharaja Dharmander Prasad Singh, AIR 1989 SC 997 (para 28),
which reads as under :
"However, Judicial review under Article 226 cannot be
converted into appeal. Judicial review is directed, not against
the decision, but is confined to the examination of the decision
making process. In Chief Constable of the North Wales Police
v. Evans, (1982) 1 W.L.R. 1155 refers to the merits-legality
distinction in judicial review. Lord Hailsham said:
"The purpose of judicial review is to ensure that the
individual receives fair treatment, and not to ensure that the
authority, after according fair treatment, reaches on a matter
which it is authorised by law to decide for itself a conclusion
which is correct in the eyes of the Court."
Lord Brightman observed:
"Judicial review, as the words imply, is not an
appeal from a decision, but a review of the manner in which the
decision was made.."
And held that it would be an error to think:
"..that the Court sits in judgment not only on
the correctness of the decision making process but also on the
correctness of the decision itself".
When the issue raised in judicial review is whether a
decision is vitiated by taking into account irrelevant, or
neglecting to take into account of relevant factors or is so
manifestly unreasonable that no reasonable authority entrusted
with the power in question could reasonably have made such a
decision, the judicial review of the decision-making process
includes examination, as a matter of law, of the relevance of the
factors. .."
In Apparel Export Promotion Council v. A.K. Chopra, JT 1999 (1) SC
http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 8 of 8
61, Chief Justice Anand held as under :
"Judicial Review, not being an appeal from a decision,
but a review of the manner in which the decision was arrived at,
the Court while exercising the power of Judicial Review must
remain conscious of the fact that if the decision has been
arrived at by the Administrative Authority after following the
principles established by law and the rules of natural justice and
the individual has received a fair treatment to meet the case
against him, the Court cannot substitute its judgment for that of
the Administrative Authority on a matter which fell squarely
within the sphere of jurisdiction of that authority."
There is no dispute that the Chief Engineer issued notice to the
petitioner mentioning all the relevant facts to which the petitioner gave a
reply. The petitioner was also afforded an opportunity of hearing and it
appeared through a counsel, who made submissions on two days and
thereafter the Chief Engineer passed the order. As discussed earlier, the
Chief Engineer has taken into consideration relevant factors and the findings
recorded by him are clearly borne out from the material available before
him. It cannot be said that the order passed by him is unreasonable or
perverse in any manner. The High Court therefore rightly took the view
that the order passed by the Chief Engineer that the compensatory bill is to
be prepared in accordance with Clause 16.9 of the Tariff could not be
interfered with in a writ petition under Article 226 of the Constitution.
The Bihar State Electricity Board feels aggrieved by that part of the
judgment and order of the Division Bench of the High Court by which it has
been held that the surcharge cannot be levied at thrice the rate per unit and
has accordingly filed Civil Appeal No.8395 of 2002. Shri V.R. Reddy,
learned senior counsel for the Electricity Board has submitted that the cost
of a unit of electricity is not fixed and on the contrary it is dependent upon
the fuel surcharge. The formula for calculating the fuel surcharge is a long
and complicated one and is given in Clause 16.10.3 of the Tariff. A host of
factors have to be taken into consideration in calculating the fuel surcharge
and they depend upon many variables. Shri Reddy has submitted that since
the surcharge has necessarily to be taken into consideration and has to be
added in the cost of electricity and, therefore, in accordance with part (III) of
Clause 16.9 of the Tariff, it should also be assessed at three times the rate
per unit. We are unable to accept the contention raised. Clauses 16.9 and
16.10.3 are separate and distinct clauses in the Tariff. Clause 16.9 lays
down the formula for calculating the value of the electrical energy abstracted
or consumed by a consumer by exceeding the contracted load or by creating
obstruction in running of meter. Part (III) of this clause deals with method
of charging the assessed units and sub-para (a) thereof lays down that the
consumption so assessed shall be charged at thrice the rate per unit of the
Tariff applicable to the consumer excluding the consumption recorded by
the meter and the latter shall be charged at the appropriate Tariff rates.
Clause 16.10.3 is a separate clause which deals with fuel surcharge and it
nowhere lays down that this additional surcharge will also be levied at thrice
the rate per unit of the tariff. The two clauses namely 16.9 and 16.10.3 have
to be read separately and there being no specific provision for assessing the
fuel surcharge at thrice the rate per unit, it is not possible to hold that in such
a case the fuel surcharge should also be charged at thrice the rate per unit.
We are, therefore, of the opinion that the view taken by the High
Court is perfectly correct and calls for no interference. In the result, both
the appeals lack merit and are hereby dismissed. No costs.