Full Judgment Text
1
REPORTABLE
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
CIVIL APPEAL NO.1110 of 2010
RELIANCE CELLULOSE
PRODUCTS LTD. …APPELLANT
VERSUS
OIL AND NATURAL GAS
CORPORATION LTD. …RESPONDENT
WITH
CIVIL APPEAL NO.1111 of 2010
OIL AND NATURAL GAS
CORPORATION LTD. …APPELLANT
VERSUS
RELIANCE CELLULOSE
PRODUCTS LTD. …RESPONDENT
J U D G M E N T
R.F. NARIMAN, J.
1. The present appeals relate to questions which arise qua the pre-
reference and pendente lite interest under the Arbitration Act, 1940. The
ONGC floated a notice inviting tender for the supply of 1200 Metric Tons
(hereinafter referred to as “MT”) of Sodium Carboxyl Methyl Cellulose
Signature Not Verified
Digitally signed by
SHASHI SAREEN
Date: 2018.07.25
15:10:46 IST
Reason:
(hereinafter referred to as “CMC”). Reliance Cellulose Products Ltd.
(hereinafter referred to as “Reliance”) submitted its tender quoting a
2
price of Rs.14,999/- per MT for quantities above 900 MT. It is not
disputed that the offer of Reliance was accepted for the supply of 1200
MT of CMC, and accordingly, a supply order dated 01.12.1988 was
placed on Reliance. Since Reliance agreed to supply 1200 MT only if
the price is higher than Rs.14,999/- per MT, the parties ultimately went to
arbitration in order to decide what should be the contract price for supply
of 1200 MT of CMC. A separate order, referred to as the repeat order,
was also placed for supply of 600 MT of CMC. It is undisputed that the
supply was made on time and payments were received for both
contracts at the rate of Rs.14,999/- per MT.
2. In October 1990, the petitioner filed a Special Civil Application
before the Gujarat High Court in the course of which, by an order dated
11.10.1990, the disputes between the parties were referred to
arbitration, which were with regard to the price for the supply of 1200 MT
and 600 MT of CMC respectively. The original Arbitral Tribunal consisted
of Justice V.S. Deshpande and Mr. S. Tibrewal. Shri Deshpande having
died, Justice B.J. Divan was appointed in his place.
3. By an award dated 29.12.1993, the Arbitrators fixed the price of
1200 MT at Rs.18,500/- per MT, and Rs.20,500/- per MT insofar as 600
MT of CMC was concerned. The Arbitrators awarded pre-reference,
pendente lite and future interest all at the rate of 18% per annum.
3
Objections were filed to the award by the ONGC. The learned Civil
Judge, by his judgment dated 30.07.1998, rejected these objections, but
ultimately reduced the interest for all three periods to 10% per annum.
Needless to state, this interest was payable on the difference between
Rs.14,999/- and Rs.18,500/- and Rs.20,500/- respectively. The appeals
that were filed to the High Court yielded the same result vide the
impugned judgment dated 23.08.2006. Both parties are in appeal before
us.
4. Shri K.V. Viswanathan, who argued Civil Appeal No.1110/2010,
has argued before us that no good reason is given for reducing interest
from 18% to 10%. Indeed, the only reason that is forthcoming from the
impugned judgment is that interest has been reduced because ONGC is
a Public Sector Undertaking. According to him, therefore, pre-reference,
pendente lite and future interest at 18% all become payable from the
date of the cause of action till 21.01.1999, when the ONGC had
deposited an amount of Rs.1,09,34,323/-, and an amount of
Rs.46,86,138/- on 30.04.2003, on account of principal and interest at the
rate of 10% per annum, and differential interest till date.
5. In the ONGC appeal, the learned Additional Solicitor General, Shri
Sandeep Sethi, has argued that though the plea that no pre-reference or
pendente lite interest was payable, there is an express bar to the grant
4
of such interest between the parties, which was noted by both the
learned Civil Judge and the High Court, but no finding has been given
thereon. According to the learned ASG, clause 16 of the General
Conditions of Contract clearly bars payment of interest for any delay and
is set out hereinbelow:
“16. Our standard terms of payment are within 30 days
of receipt of stores and inspection at site. But any delay in
payment will not make the Commission liable for any
interest.”
6. He has cited a number of judgments to buttress his submission
that clause 16 would amount to a contractual bar to the payment of any
interest on the facts of this case. On the other hand, Shri Viswanathan
has also referred to various judgments. His argument is that clause 16
does not apply at all on the facts of this case as there was no delay in
payment, but only the difference between the sum of Rs.14,999/- per MT
and the higher figures mentioned above were payable on account of the
disputes between the parties being resolved through arbitration. In any
case, he submitted that a holistic reading of the various decisions cited
by both the learned ASG as well as by him would show that so far as the
1940 Act is concerned, interest would be payable only if there is no
express bar in the agreement, and agreements between the parties
have to be construed strictly as interest is the grant of compensation for
value of money lost, as has been held in some of the judgments. This
5
being so, though there may be a bar inter-se the parties, yet the
Arbitrator is not barred from awarding either pre-reference or pendente
lite interest. It may be added that there is no dispute that future interest
is to be granted, except as to the rate of interest awarded.
7. Two important five-Judge Bench judgments have laid down that,
under the 1940 Act, in the absence of an express bar under the
agreement, the Arbitrator has jurisdiction to award interest for all three
periods, i.e., pre-reference, pendente lite as well as future interest. The
judgment of this Court in Irrigation Department, State of Orissa v.
G.C. Roy , (1992) 1 SCC 508, overruled Jena’s case [ Executive
| Engineer (Irrigation), Balimela | v. | Abhaduta Jena | , (1988) 1 SCC 418 |
|---|
held that arbitrators under the 1940 Act would be clothed with the
jurisdiction to award pendente lite interest. Insofar as pre-reference
interest is concerned, another five-Judge Bench in Executive Engineer,
Dhenkanal Minor Irrigation Division, Orissa and Ors. v. N.C.
Budharaj , (2001) 2 SCC 721, held that arbitrators under the 1940 Act
were clothed with the power to award pre-reference interest even before
the 1978 Interest Act came into force. We are concerned in the present
case only with the 1940 Act. The 1996 Act has made a major departure
from the position under the 1940 Act qua pre-reference and pendente
lite interest which will emerge from the conspectus of case law laid down
by this Court.
6
8. In Board of Trustees for the Port of Calcutta v. Engineers-De-
Space-Age , (1996) 1 SCC 516, a two-Judge Bench of this Court had to
consider whether clause 13(g) of the contract barred the award of
interest pendente lite. Clause 13(g) of the contract in that case is set out
hereunder:-
“No claim for interest will be entertained by the
Commissioners with respect to any money or balance
which may be in their hands owing to any dispute between
themselves and the Contractor or with respect to any delay
on the part of the Commissioners in making interim or final
payment or otherwise.”
[at paragraph 2]
After setting out the judgment in G.C. Roy (supra), this Court held:-
| “ | 4. | We are not dealing with a case in regard to award of | |||||
|---|---|---|---|---|---|---|---|
| interest for the period prior to the reference. We are | |||||||
| dealing with a case in regard to award of interest by the | |||||||
| arbitrator post reference. The short question, therefore, is | |||||||
| whether in view of sub-clause ( | g | ) of clause 13 of the | |||||
| contract extracted earlier the arbitrator was prohibited from | |||||||
| granting interest under the contract. Now the term in sub- | |||||||
| clause ( | g | ) merely prohibits the Commissioner from | |||||
| entertaining any claim for interest and does not prohibit the | |||||||
| arbitrator from awarding interest. The opening words “no | |||||||
| claim for interest will be entertained by the Commissioner” | |||||||
| clearly establishes that the intention was to prohibit the | |||||||
| Commissioner from granting interest on account of | |||||||
| delayed payment to the contractor. Clause has to be | |||||||
| strictly construed for the simple reason that as pointed out | |||||||
| by the Constitution Bench, ordinarily, a person who has a | |||||||
| legitimate claim is entitled to payment within a reasonable | |||||||
| time and if the payment has been delayed beyond | |||||||
| reasonable time he can legitimately claim to be | |||||||
| compensated for that delay whatever nomenclature one | |||||||
| may give to his claim in that behalf. If that be so, we would | |||||||
| be justified in placing a strict construction on the term of |
7
| the contract on which reliance has been placed. Strictly | |
|---|---|
| construed the term of the contract merely prohibits the | |
| Commissioner from paying interest to the contractor for | |
| delayed payment but once the matter goes to arbitration | |
| the discretion of the arbitrator is not, in any manner, stifled | |
| by this term of the contract and the arbitrator would be | |
| entitled to consider the question of grant of interest | |
| pendente lite and award interest if he finds the claim to be | |
| justified. We are, therefore, of the opinion that under the | |
| clause of the contract the arbitrator was in no manner | |
| prohibited from awarding interest pendente lite.” |
9. In Bhagwati Oxygen Ltd. v. Hindustan Copper Ltd. , (2005) 6
SCC 462, a judgment of two learned judges arising out of the 1940 Act,
this Court was concerned with all the three periods relating to interest,
and held that it was open for the Arbitrator acting under the 1940 Act to
award interest for each of these periods provided there is no contractual
bar.
10. In M.B. Patel and Co. v. ONGC , (2008) 8 SCC 251, the clause
which was said to interdict interest was clause 18 of the Agreement
which provided as follows:
| “ | 18. | Interest on amounts | .—No interest will be payable on | |
|---|---|---|---|---|
| the security deposit or any other amount payable to the | ||||
| contractor under the contract.” |
[at paragraph 4]
The Court held that interest had been awarded in violation of clause 14
of the Agreement as the Arbitrator did not take into account this clause
at all. On this and other grounds, the Award as a whole was set aside,
and remanded to the Arbitrator to consider the matter afresh.
8
11. In State of Rajasthan and Anr. v. M/s. Ferro Concrete
| Construction (P) Ltd. | , | (2009) 12 SCC 1, | a two-Judge Bench decision |
|---|
of this Court was concerned with pre-reference interest given by an
| award under the 1940 Act. This Court restated the position | qua | pre- |
|---|
reference interest by referring to the five-Judge Bench referred to
| hereinabove and | Bhagwati Oxygen | (supra). What was highlighted was |
|---|
the importance of the Interest Act, 1978, under Section 3 of which it is
clear that pre-reference interest can be allowed by an arbitrator unless
| there is a bar by virtue of an express provision between the parties ( | see |
|---|
paragraphs 63 and 64).
| 12. | In |
|---|
504, the question of pendente lite interest arose under the Arbitration
and Conciliation Act, 1996. The clause which was said to bar interest in
the aforesaid case was clause 31 of the Agreement which provided as
follows:
“31. No interest or damage for delay in payment. — No
interest or damage shall be paid to the contractor for delay
in payment of the bill or any other amount due to the
contractor for any reason whatsoever . The Railway
Administration will, however, make every endeavour for
payment of the bills or other amount due to the contractor
within a reasonable time.”
[emphasis supplied]
The judgment in Engineers-De-Space-Age (supra) was distinguished
9
by stating that clause 31 of the Agreement was materially different as no
interest or damage was payable for any reason whatsoever, as a result
of which it was held:
“ 33. In the case in hand Clause 31 of the agreement is
materially different. It bars payment of any interest or
damage to the contractor for any reason whatsoever. We
are, therefore, clearly of the view that no pre-reference or
pendente lite interest was payable to the respondent on
the amount under Item 3 and the arbitrator's award
allowing pre-reference and pendente lite interest on that
amount was plainly in breach of the express terms of the
agreement. The order of the High Court insofar as pre-
reference and pendente lite interest on the amount under
Item 3 is concerned is, therefore, unsustainable.”
This case has later been distinguished as having arisen under the 1996
Act, under which the position qua both pre-reference and pendente lite
interest is materially different.
13. In Madnani Construction Corporation (P) Ltd. v. Union of
India and Ors. , (2010) 1 SCC 549, two judges of this Court had to deal
with the grant of pre-reference interest under the Interest Act in an
award passed under the 1940 Act. Paragraphs 22 and 23 of the
judgment set out the clauses which interdict payment of interest as
follows:
| “22. … Clause 16(2) of GCC is set out below: | ||
|---|---|---|
| “16. (2) No interest will be payable upon the<br>earnest money or the security deposit or amounts<br>payable to the contractor under the contract but<br>government securities deposited in terms of such |
10
| Clause (1) of this Clause will be repayable with<br>interest accrued thereto.” | ||
|---|---|---|
| 23. … The relevant portion of Clause 30 relating to interest<br>is set out below: | ||
| “… That the contractor will have no claim for<br>interest and damage whatsoever on any account<br>in respect of such withholding or retention under<br>the lien referred to supra and duly notified as<br>such to the contractor.” |
After referring to the Interest Act and Section 29 of the Arbitration Act,
1940, the Court referred to a three-Judge Bench decision in State of
U.P. v. Harish Chandra and Co. , (1999) 1 SCC 63, as follows:
| “34. In a subsequent decision of a three-Judge Bench<br>in State of U.P. v. Harish Chandra and Co. [(1999) 1 SCC<br>63] there was stipulation in the arbitration agreement<br>against grant of interest. The relevant clause, namely,<br>Clause 1.9 to the aforesaid effect is set out below: (SCC p.<br>67, para 9) | ||
|---|---|---|
| “9. … ‘1.9. No claim for delayed payment due to<br>dispute, etc.—No claim for interest or damages<br>will be entertained by the Government with<br>respect to any moneys or balances which may be<br>lying with the Government owing to any dispute,<br>difference; or misunderstanding between the<br>Engineer-in-Charge in marking periodical or final<br>payments or in any other respect whatsoever.’ ” | ||
| Considering the said clause, the Court held that the<br>prohibition in the said clause does not prevent the<br>contractor from raising the claim of interest by way of<br>damages before the arbitrator on the relevant items placed<br>for adjudication. (See SCC p. 67, para 10.) In saying so,<br>the learned Judges relied on the ratio in B.N.<br>Agarwalla [(1997) 2 SCC 469] and G.C. Roy [(1992) 1<br>SCC 508].” |
11
It then referred to Engineers-De-Space-Age (supra) in paragraph 35
| Saraswat Trading Agency | (supra) in paragraphs 37 and 38. |
|---|
Finally, however, the two-Judge Bench held:-
“ 39. In the instant case also the relevant clauses, which
have been quoted above, namely, Clause 16(2) of GCC
and Clause 30 of SCC do not contain any prohibition on
the arbitrator to grant interest. Therefore, the High Court
was not right in interfering with the arbitrator's award on
the matter of interest on the basis of the aforesaid clauses.
We therefore, on a strict construction of those clauses and
relying on the ratio in Engineers [(1996) 1 SCC 516] find
that the said clauses do not impose any bar on the
arbitrator in granting interest.”
| 14. |
|---|
Railway Manager (Works), Palghat and Ors. , (2010) 8 SCC 767, a
two-Judge Bench of this Court, after referring to some of the earlier
judgments of this Court, held: -
“ 18. At the outset it should be noticed that Engineers-De-
Space-Age [(1996) 1 SCC 516] and Madnani [(2010) 1
SCC 549] arose under the old Arbitration Act, 1940 which
did not contain a provision similar to Section 31(7) of the
new Act. This Court, in Sayeed Ahmed [(2009) 12 SCC 26]
held that the decisions rendered under the old Act may not
be of assistance to decide the validity of grant of interest
under the new Act. The logic in Engineers-De-Space-
Age [(1996) 1 SCC 516] was that while the contract
governed the interest from the date of cause of action to
date of reference, the arbitrator had the discretion to
decide the rate of interest from the date of reference to
date of award and he was not bound by any prohibition
regarding interest contained in the contract, insofar as
pendente lite period is concerned. This Court in Sayeed
Ahmed [(2009) 12 SCC 26] held that the decision
in Engineers-De-Space-Age [(1996) 1 SCC 516] would not
12
| apply to cases arising under the new Act. We extract<br>below, the relevant portion from Sayeed Ahmed [(2009) 12<br>SCC 26] : (SCC p. 36, paras 23-24) | ||
|---|---|---|
| “23. The observation in Engineers-De-Space-<br>Age [(1996) 1 SCC 516] that the term of the<br>contract merely prohibits the department/<br>employer from paying interest to the contractor<br>for delayed payment but once the matter goes to<br>the arbitrator, the discretion of the arbitrator is not<br>in any manner stifled by the terms of the contract<br>and the arbitrator will be entitled to consider and<br>grant the interest pendente lite, cannot be used to<br>support an outlandish argument that bar on the<br>Government or department paying interest is not<br>a bar on the arbitrator awarding interest. Whether<br>the provision in the contract bars the employer<br>from entertaining any claim for interest or bars the<br>contractor from making any claim for interest, it<br>amounts to a clear prohibition regarding interest.<br>The provision need not contain another bar<br>prohibiting the arbitrator from awarding interest.<br>The observations made in the context of interest<br>pendente lite cannot be used out of contract. | ||
| 24. The learned counsel for the appellant next<br>contended on the basis of the above observations<br>in Engineers-De-Space-Age [(1996) 1 SCC 516],<br>that even if Clause G 1.09 is held to bar interest<br>in the pre-reference period, it should be held not<br>to apply to the pendente lite period, that is, from<br>14-3-1997 to 31-7-2001. He contended that the<br>award of interest during the pendency of the<br>reference was within the discretion of the<br>arbitrator and therefore, the award of interest for<br>that period could not have been interfered with by<br>the High Court. In view of the Constitution Bench<br>decisions in G.C. Roy [(1992) 1 SCC 508]<br>and N.C. Budharaj [(2001) 2 SCC 721] rendered<br>before and after the decision in Engineers-De-<br>Space-Age [(1996) 1 SCC 16], it is doubtful<br>whether the observation in Engineers-De-Space-<br>Age [(1996) 1 SCC 516] in a case arising under<br>the Arbitration Act, 1940 that the arbitrator could |
13
| award interest pendente lite, ignoring the express<br>bar in the contract, is good law. But that need not<br>be considered further as this is a case under the | ||
|---|---|---|
| new Act where there is a specific provision | ||
| regarding award of interest by the arbitrator.” | ||
| The same reasoning applies to the decision<br>in Madnani [(2010) 1 SCC 549] also as that also<br>relates to a case under the old Act and did not<br>independently consider the issue but merely<br>relied upon the decision in Engineers-De-Space-<br>Age [(1996) 1 SCC 516]. | ||
19. Section 37(1) [Sic Section 31(7)] of the new Act by
using the words “ unless otherwise agreed by the parties ”
categorically clarifies that the arbitrator is bound by the
terms of the contract insofar as the award of interest from
the date of cause of action to the date of award . Therefore,
where the parties had agreed that no interest shall be
payable, the Arbitral Tribunal cannot award interest
between the date when the cause of action arose to the
date of award.”
[emphasis supplied]
| 15. | In | Union of India v. Krafters Engineering and Leasing (P) Ltd. |
|---|
(2011) 7 SCC 279, a two-Judge Bench considered as to whether clause
1.15 of the contract in that case would bar pendente lite interest. Clause
1.15 reads as follows:
“ 1.15. Interest on amounts .—No interest will be payable
upon the earnest money or the security deposit or amounts
payable to the contractor under the contract but
government securities deposited in terms of Clause 1.14.4
will be repayable with interest accrued thereon.”
This Court, after referring to Engineers-De-Space-Age (supra) and
| Sayeed Ahmed and Co. | v. | State of U.P., | (2009) 12 |
|---|
14
SCC 26], then held that they were of the view that Sayeed Ahmed
(supra) having held to the contrary, Engineers-De-Space-Age (supra)
could not possibly be followed. Same was the position with Madnani
Construction (supra) which was dismissed by saying that it did not
independently consider the issue but merely relied upon the decision in
Engineers-De-Space-Age (supra). The Court then went on to state:-
“ 20. In the light of the above discussion, the following
conclusion emerges: reliance based on the ratio in
Engineers-De-Space-Age [(1996) 1 SCC 516] is
unacceptable since the said view has been overruled in
Sayeed Ahmed and Co. [(2009) 12 SCC 26 : (2009) 4 SCC
(Civ) 629] and insofar as the ratio in Madnani Construction
Corpn. (P) Ltd. [(2010) 1 SCC 549 : (2010) 1 SCC (Civ)
168] which is also unacceptable for the reasons mentioned
in the earlier paras, we reject the stand taken by the
counsel for the respondent. On the other hand, we fully
accept the stand of the Union of India as rightly projected
by Mr. A.S. Chandhiok, learned ASG. We reiterate that
where the parties had agreed that no interest shall be
payable, the arbitrator cannot award interest for the
amounts payable to the contractor under the contract.
Where the agreement between the parties does not
prohibit grant of interest and where a party claims interest
and the said dispute is referred to the arbitrator, he shall
have the power to award interest pendente lite. As
observed by the Constitution Bench in G.C. Roy case
[(1992) 1 SCC 508], in such a case, it must be presumed
that interest was an implied term of the agreement
between the parties. However, this does not mean that in
every case, the arbitrator should necessarily award interest
pendente lite. In the subsequent decision of the
Constitution Bench i.e. N.C. Budharaj case [(2001) 2 SCC
721], it has been reiterated that in the absence of any
specific stipulation or prohibition in the contract to claim or
grant any such interest, the arbitrator is free to award
interest.
21. In the light of the above principle and in view of the
15
specific prohibition of contract contained in Clause 1.15,
the arbitrator ceases to have the power to grant interest.
We also clarify that the Arbitration Act, 1940 does not
contain any specific provision relating to the power of
arbitrator to award interest. However, in the Arbitration and
Conciliation Act, 1996, there is a specific provision with
regard to award of interest by the arbitrator. The bar under
Clause 1.15 is absolute and interest cannot be awarded
without rewriting the contract.”
16. Clearly, the conclusion of the Court that Engineers-De-Space-
Age (supra) had been overruled by Sayeed Ahmed (supra) is incorrect
for two reasons: first, a Bench of two learned Judges cannot overrule a
coordinate Bench of two learned Judges; and second, the Court in
Sayeed Ahmed (supra) was not deciding a case arising under the 1940
Act, but was deciding a case arising under the 1996 Act.
17. In Tehri Hydro Development Corporation Ltd. v. Jai Prakash
Associates Ltd. , (2012) 12 SCC 10, a three-Judge Bench of this Court
dealt with an award passed under the 1940 Act. The relevant clauses
barring interest under the agreement in that case are set out herein
below:-
| “14. … | Clauses 1.2.14 and 1.2.15 on which much | |
|---|---|---|
| arguments have been advanced by the learned counsel for | ||
| both sides may now be extracted below: |
“P ART II
CONDITIONS OF CONTRACT
1.2.14. No claim for delayed payment due to
dispute, etc. —The contractor agrees that no
claim for interest of damages will be entertained
or payable by the Government in respect of any
money or balances which may be lying with the
Government owing to any disputes, differences or
16
misunderstandings between the parties or in
respect of any delay or omission on the part of
the engineer-in-charge in making immediate or
final payments or in any other respect
whatsoever.
1.2.15. Interest on money due to the contractor .—
No omission on the part of the engineer-in-charge
to pay the amount due upon measurement or
otherwise shall vitiate or make void the contract,
nor shall the contractor be entitled to interest
upon any guarantee or payments in arrears nor
upon any balance which may on the final
settlement of his accounts be due to him.”
After referring to Krafters Engineering (supra) and some of the earlier
judgments, it was held:
| “ | 16. | In | Krafters Engg. case | [ | (2011) 7 SCC 279 : (2011) 3 | |||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SCC (Civ) 533] the somewhat discordant note struck by | ||||||||||||||||||||||||||||||||||||||||||||||||
| the decisions of this Court in | Port of Calcutta | v. | Engineers- | |||||||||||||||||||||||||||||||||||||||||||||
| De-Space-Age | [(1996) 1 SCC 516] and | Madnani | ||||||||||||||||||||||||||||||||||||||||||||||
| Construction Corpn. (P) Ltd. | v. | Union of India | [(2010) 1 | |||||||||||||||||||||||||||||||||||||||||||||
| SCC 549 : (2010) 1 SCC (Civ) 168] were also taken note | ||||||||||||||||||||||||||||||||||||||||||||||||
| of. Thereafter, it was also noticed that the decision | ||||||||||||||||||||||||||||||||||||||||||||||||
| in | Engineers-De-Space-Age case | [(1996) 1 SCC 516] was | ||||||||||||||||||||||||||||||||||||||||||||||
| considered in | Sayeed Ahmed & Co. | v. | State of U.P. | [(2009) | ||||||||||||||||||||||||||||||||||||||||||||
| 12 SCC 26 : (2009) 4 SCC (Civ) 629] and the decision | ||||||||||||||||||||||||||||||||||||||||||||||||
| in | Madnani Construction case | [(2010) 1 SCC 549 : (2010) | ||||||||||||||||||||||||||||||||||||||||||||||
| 1 SCC (Civ) 168] was considered in | Sree Kamatchi | |||||||||||||||||||||||||||||||||||||||||||||||
| Amman Constructions | v. | Railways | [(2010) 8 SCC 767 : | |||||||||||||||||||||||||||||||||||||||||||||
| (2010) 3 SCC (Civ) 575] . In | Sayeed Ahmed case | [(2009) | ||||||||||||||||||||||||||||||||||||||||||||||
| 12 SCC 26 : (2009) 4 SCC (Civ) 629] (SCC para 24) it was | ||||||||||||||||||||||||||||||||||||||||||||||||
| held that in the light of the decisions of the Constitution | ||||||||||||||||||||||||||||||||||||||||||||||||
| Bench in | G.C. Roy case | [(1992) 1 SCC 508] and | N.C. | |||||||||||||||||||||||||||||||||||||||||||||
| Budharaj case | [(2001) 2 SCC 721] it is doubtful whether | |||||||||||||||||||||||||||||||||||||||||||||||
| the observations in | Engineers-De-Space-Age case | [(1996) | ||||||||||||||||||||||||||||||||||||||||||||||
| 1 SCC 516] to the effect that the arbitrator could award | ||||||||||||||||||||||||||||||||||||||||||||||||
| interest pendente lite, ignoring the express bar in the | ||||||||||||||||||||||||||||||||||||||||||||||||
| contract, is good law. In | Sree Kamatchi Amman | |||||||||||||||||||||||||||||||||||||||||||||||
| Constructions case | [(2010) 8 SCC 767 : (2010) 3 SCC | |||||||||||||||||||||||||||||||||||||||||||||||
| (Civ) 575] while considering | Madnani case | [(2010) 1 SCC | ||||||||||||||||||||||||||||||||||||||||||||||
| 549 : (2010) 1 SCC (Civ) 168] this Court noted that the | ||||||||||||||||||||||||||||||||||||||||||||||||
| decision in | Madnani case | [(2010) 1 SCC 549 : (2010) 1 |
17
| SCC (Civ) 168] follows the decision in | Engineers-De- | |||
|---|---|---|---|---|
| Space-Age case | [(1996) 1 SCC 516]. | ” |
In this view of the matter, the Court held:
“ 19. Clauses 1.2.14 and 1.2.15, already extracted and
analysed, imposed a clear bar on either entertainment or
payment of interest in any situation of non-payment or
delayed payment of either the amounts due for work done
or lying in security deposit. On the basis of the discussions
that have preceded we, therefore, take the view that the
grant of pendente lite interest on the claim of Rs 10,17,461
lakhs is not justified. The award as well as the orders of
the courts below are accordingly modified to the aforesaid
extent.
20. However, the grant of interest for the post-award period
would stand on a somewhat different footing. This very
issue has been elaborately considered by this Court
in B.N. Agarwalla [(1997) 2 SCC 469] in the light of the
provisions of Section 29 of the Arbitration Act, 1940.
Eventually this Court took the view that in a situation where
the award passed by the arbitrator granting interest from
the date of the award till the date of payment is not
modified by the Court “… the effect would be as if the
Court itself had granted interest from the date of the
decree till the date of payment…”. In view of the above, the
grant of interest on the amount of Rs 10,17,461 lakhs from
the date of the award till the date of the decree or date of
payment, whichever is earlier, is upheld. In the facts of the
case we are of the view that the rate of interest should be
12% per annum as determined in the arbitration
proceeding between the parties.”
18. In Union of India v. Bright Power Projects (India) (P) Ltd. ,
(2015) 9 SCC 695, a three-Judge Bench of this Court had to deal with
interest awarded by an arbitral award under the 1996 Act. This
judgment, like Sree Kamatchi Amman Constructions (supra), sets out
how Section 31(7)(a) is a complete departure from the position under
18
the 1940 Act. This Court held:-
| “12. Section 31(7) of the Arbitration and Conciliation Act,<br>1996 (hereinafter referred to as “the Act”) is clear to the<br>effect that unless otherwise agreed by the parties, the<br>Arbitral Tribunal can award interest at reasonable rate for a<br>period commencing from that date when the cause of<br>action arises till the date of the award. Section 31(7) of the<br>Act, reads as under: | ||
|---|---|---|
| “31. (7)(a) Unless otherwise agreed by the<br>parties, where and insofar as an arbitral award is<br>for the payment of money, the Arbitral Tribunal<br>may include in the sum for which the award is<br>made interest, at such rate as it deems<br>reasonable, on the whole or any part of the<br>money, for the whole or any part of the period<br>between the date on which the cause of action<br>arose and the date on which the award is made.” | ||
| 13. Section 31(7) of the Act, by using the words “unless<br>otherwise agreed by the parties”, categorically specifies<br>that the arbitrator is bound by the terms of the contract so<br>far as award of interest from the date of cause of action to<br>date of the award is concerned. Therefore, where the<br>parties had agreed that no interest shall be payable, the | ||
| Arbitral Tribunal cannot award interest. | ||
| 14. We may also refer to the decision of this Court<br>in Union of India v. Saraswat Trading Agency [(2009) 16<br>SCC 504: (2011) 3 SCC (Civ) 499]. This Court has<br>observed in the said case that if there is a bar against<br>payment of interest in the contract, the arbitrator cannot<br>award any interest for such period. In view of the specific<br>bar under Clause 13(3) of the contract entered into<br>between the parties, we are of the view that the Arbitral<br>Tribunal was not justified in awarding interest from the date<br>of entering upon the reference to the Arbitral Tribunal till<br>the date of the award. | ||
| xxxxxx | ||
| 16. Relying upon the aforestated judgment delivered by<br>this Court, the Arbitral Tribunal thought it proper to award |
19
interest on the amount payable to the contractor for the
period commencing from the date on which the reference
was entered upon till the date of the award. The Tribunal,
however, failed to consider the provisions of Section 31(7)
of the Act and Clause 13(3) of the contract before
awarding interest in the present case.
17. It is also pertinent to note that G.C. Roy case [(1992) 1
SCC 508] had been decided on 12-12-1991 on the basis of
the provisions of the Arbitration Act, 1940, which was not
operative at the time when the dispute on hand was
decided by the Arbitral Tribunal.
18. Section 31(7)( a ) of the Act ought to have been read
and interpreted by the Arbitral Tribunal before taking any
decision with regard to awarding interest. The said section,
which has been reproduced hereinabove, gives more
respect to the agreement entered into between the parties.
If the parties to the agreement agree not to pay interest to
each other, the Arbitral Tribunal has no right to award
interest pendente lite.”
[emphasis supplied]
19. Given the labyrinth of case law referred to hereinabove, and the
perception that some of the judgments were pulling in different
directions, a reference was made to a three-Judge Bench. In Union of
India v. Ambica Construction (“First Ambica Construction Case”) ,
(2016) 6 SCC 36, paragraph 1 reflects how the matter had been referred
to a larger Bench for decision. After referring to the labyrinth of case law
that has been referred to in this case, this Court held:
“ 21. This Court in Sayeed Ahmed [ Sayeed Ahmed &
Co. v. State of U.P. , (2009) 12 SCC 26 : (2009) 4 SCC
(Civ) 629] has also distinguished the decision in Harish
Chandra [ State of U.P. v. Harish Chandra & Co. , (1999) 1
SCC 63] in which Clause 1.09 came up for consideration
20
thus: ( Sayeed Ahmed case [ Sayeed Ahmed & Co. v. State
of U.P. , (2009) 12 SCC 26 : (2009) 4 SCC (Civ) 629], SCC
pp. 33-34, paras 17-19)
“ 17. … This Court held that the said clause did not bar
award of interest on any claim for damages or for
claim for payment for work done. We extract below the
reasoning for such decision: (SCC p. 67, para 10)
‘ 10. A mere look at the clause shows that the
claim for interest by way of damages was not to
be entertained against the Government with
respect to only a specified type of amount,
namely, any monies or balances which may be
lying with the Government owing to any dispute,
difference between the Engineer-in-Charge and
the contractor; or misunderstanding between the
Engineer-in-Charge and the contractor in making
periodical or final payments or in any other
respect whatsoever. The words “or in any other
respect whatsoever” also referred to the dispute
pertaining to the monies or balances which may
be lying with the Government pursuant to the
agreement meaning thereby security deposit or
retention money or any other amount which might
have been with the Government and refund of
which might have been withheld by the
Government. The claim for damages or claim for
payment for the work done and which was not
paid for would not obviously cover any money
which may be said to be lying with the
Government . Consequently, on the express
language of this clause, there is no prohibition
which could be culled out against the respondent
contractor that he could not raise the claim for
interest by way of damages before the arbitrator
on the relevant items placed for adjudication.’
18. In Harish Chandra [ State of U.P. v. Harish
Chandra & Co. , (1999) 1 SCC 63] a different version
of Clause 1.09 was considered. Having regard to the
restrictive wording of that clause, this Court held that it
did not bar award of interest on a claim for damages
or a claim for payments for work done and which was
21
| not paid. This Court held that the said clause barred<br>award of interest only on amounts which may be lying<br>with the Government by way of security<br>deposit/retention money or any other amount, refund<br>of which was withheld by the Government. | ||
|---|---|---|
| 19. But in the present case, clause G1.09 is<br>significantly different. It specifically provides that no<br>interest shall be payable in respect of any money that<br>may become due owing to any dispute, difference or<br>misunderstanding between the Engineer-in-Charge<br>and contractor or with respect to any delay on the part<br>of the Engineer-in-Charge in making periodical or final<br>payment or in respect of any other respect<br>whatsoever. The bar under Clause G1.09 in this case<br>being absolute, the decision in Harish Chandra [State<br>of U.P. v. Harish Chandra & Co., (1999) 1 SCC 63] will<br>not assist the appellant in any manner.” | ||
| (emphasis in original) | ||
| In Harish Chandra [State of U.P. v. Harish Chandra &<br>Co., (1999) 1 SCC 63], this Court has laid down that<br>Clause 1.09 did not bar award of interest for claim of<br>damages for payment for work done and which was<br>not paid for would not obviously cover any money<br>which may be said to be lying with the Government. | ||
22. In our opinion, it would depend upon the nature of the
ouster clause in each case. In case there is express
stipulation which debars pendente lite interest, obviously, it
cannot be granted by the arbitrator. The award of pendente
lite interest inter alia must depend upon the overall
intention of the agreement and what is expressly
excluded.”
After referring to the earlier judgments, this Court held:-
“ 28. It is apparent from various decisions referred to above
that in G.C. Roy [ Irrigation Deptt., State of Orissa v. G.C.
Roy , (1992) 1 SCC 508] the Constitution Bench of this
Court has laid down that where the agreement expressly
provides that no interest pendente lite shall be payable on
22
amount due, the arbitrator has no power to award interest.
In N.C. Budharaj [ Dhenkanal Minor Irrigation
Division v. N.C. Budharaj , (2001) 2 SCC 721] a
Constitution Bench has observed that in case there is
nothing in the arbitration agreement to exclude jurisdiction
of the arbitrator to entertaining claim for interest, the
jurisdiction of the arbitrator to consider and award interest
in respect to all periods is subject to Section 29 of the Act.
In Hindustan Construction Co. Ltd. [ Hindustan
Construction Co. Ltd. v. State of J&K , (1992) 4 SCC 217]
this Court has followed the decision in G.C. Roy [ Irrigation
Deptt., State of Orissa v. G.C. Roy , (1992) 1 SCC 508] and
laid down that on the basis of principles of Section 34 the
arbitrator would have the power to award pendente lite
interest also. In B.N. Agarwalla [ State of Orissa v. B.N.
Agarwalla , (1997) 2 SCC 469], this Court has again
followed G.C. Roy [ Irrigation Deptt., State of Orissa v. G.C.
Roy , (1992) 1 SCC 508] and Hindustan Construction Co.
Ltd. [ Hindustan Construction Co. Ltd. v. State of J&K ,
(1992) 4 SCC 217] with respect to the power of the
arbitrator to award pendente lite interest and it was held
that the arbitrator has the power to award interest. In
Harish Chandra [ State of U.P. v. Harish Chandra & Co. ,
(1999) 1 SCC 63] this Court interpreted Clause 1.9 which
provided that no claim for interest or damages will be
entertained by the Government in respect to any monies or
balances which may be lying with the Government. It was
held that there was no provision which could be culled out
against the contractor not to claim interest by way of
damages before the arbitrator on the relevant items placed
for adjudication. In Ferro Concrete Construction (P)
Ltd. [ State of Rajasthan v. Ferro Concrete Construction (P)
Ltd. , (2009) 12 SCC 1 : (2009) 4 SCC (Civ) 604] this Court
considered Clause 4 containing a stipulation that no
interest was payable on amount withheld under the
agreement. It was held that Clause 4, which dealt with
rates, material and workmanship, did not bar award of
interest by the arbitrator on claims of the contractor made
in the said case. In Sayeed Ahmed [ Sayeed Ahmed &
Co. v. State of U.P. , (2009) 12 SCC 26 : (2009) 4 SCC
(Civ) 629] this Court has emphasised that award of interest
would depend upon nature of the clause in the agreement.
In Bright Power Projects (India) (P) Ltd. [ Union of
India v. Bright Power Projects (India) (P) Ltd. , (2015) 9
23
| SCC 695 : (2015) 4 SCC (Civ) 702] this Court has<br>considered the expression “unless otherwise agreed by<br>parties” employed in Section 31(7)(a) of the 1996 Act and<br>laid down that in case contract bars claim of interest the<br>contractor could not have claimed interest. The provision<br>of Section 31(7)(a) of the 1996 Act is binding upon the<br>arbitrator. In Sree Kamatchi Amman Constructions [Sree<br>Kamatchi Amman Constructions v. Railways, (2010) 8<br>SCC 767: (2010) 3 SCC (Civ) 575] similar view has been<br>taken. | ||
|---|---|---|
| 29. Now we come to the question of correctness of<br>decision of this Court rendered by a Bench of two Judges<br>in Engineers-De-Space-Age [Port of Calcutta v. Engineers-<br>De-Space-Age, (1996) 1 SCC 516] which has been<br>referred for our consideration in which this Court after<br>consideration of G.C. Roy case [Irrigation Deptt., State of<br>Orissa v. G.C. Roy, (1992) 1 SCC 508] has observed thus:<br>(Engineers-De-Space-Age case [Port of<br>Calcutta v. Engineers-De-Space-Age, (1996) 1 SCC 516] ,<br>SCC pp. 519-20, paras 3-4) | ||
| “3. … It will appear from what the Constitution<br>Bench stated to be the legal position, that<br>ordinarily a person who is deprived of his money<br>to which he is legitimately entitled as of right is<br>entitled to be compensated in deprivation thereof,<br>call it by whatever name. This would be in terms<br>of the principle laid down in Section 34 of the<br>Code of Civil Procedure. Their Lordships pointed<br>out that there was no reason or principle to hold<br>otherwise in the case of an arbitrator. Pointing out<br>that arbitrator is an alternative forum for<br>resolution of disputes arising between the parties,<br>it said that he must have the power to decide all<br>disputes and differences arising between the<br>parties and if he were to be denied the power to<br>award interest pendente lite, the party entitled<br>thereto would be required to go to a court which<br>would result in multiplicity of proceedings, a<br>situation which the court should endeavour to<br>avoid. Reliance was, however, placed on the<br>observation in sub-para (iii) wherein it is pointed<br>out that an arbitrator is a creature of an |
24
agreement and if the agreement between the
parties prohibits the payment of interest pendente
lite the arbitrator must act in accordance
therewith. In other words, according to Their
Lordships the arbitrator is expected to act and
make his award in accordance with the general
law of the land but subject to an agreement,
provided, the agreement is valid and legal. Lastly,
it was pointed out that interest pendente lite is not
a matter of substantive law, like interest for the
period anterior to reference. Their Lordships
concluded that where the agreement between the
parties does not prohibit grant of interest and
where a party claims interest and that dispute is
referred to the arbitrator, he shall have the power
to award interest pendente lite for the simple
reason that in such a case it is presumed that
interest was an implied term of the agreement
between the parties; it is then a matter of exercise
of discretion by the arbitrator. The position in law
has, therefore, been clearly stated in the
aforesaid decision of the Constitution Bench.
4. We are not dealing with a case in regard to
award of interest for the period prior to the
reference. We are dealing with a case in regard
to award of interest by the arbitrator post
reference. The short question, therefore, is
whether in view of sub-clause ( g ) of Clause 13 of
the contract extracted earlier the arbitrator was
prohibited from granting interest under the
contract. Now the term in sub-clause ( g ) merely
prohibits the Commissioner from entertaining any
claim for interest and does not prohibit the
arbitrator from awarding interest. The opening
words “no claim for interest will be entertained by
the Commissioner” clearly establishes that the
intention was to prohibit the Commissioner from
granting interest on account of delayed payment
to the contractor. Clause 13 has to be strictly
construed for the simple reason that as pointed
out by the Constitution Bench, ordinarily, a person
who has a legitimate claim is entitled to payment
within a reasonable time and if the payment has
25
| been delayed beyond reasonable time he can<br>legitimately claim to be compensated for that<br>delay whatever nomenclature one may give to his<br>claim in that behalf.” | ||
|---|---|---|
| 30. In Sayeed Ahmed [Sayeed Ahmed & Co. v. State of<br>U.P., (2009) 12 SCC 26 : (2009) 4 SCC (Civ) 629] the<br>decision in Engineers-De-Space-Age[Port of<br>Calcutta v. Engineers-De-Space-Age, (1996) 1 SCC 516]<br>has been considered and it was observed that it cannot be<br>used to support an outlandish argument that bar on the<br>Government or department paying interest is not a bar on<br>the arbitrator awarding interest. This Court expressed<br>doubt as to the correctness of certain observations made<br>in Engineers-De-Space-Age [Port of Calcutta v. Engineers-<br>De-Space-Age, (1996) 1 SCC 516] to the extent that the<br>arbitrator could award interest pendente lite ignoring the<br>express bar in the contract. But this Court did not consider<br>the question further as the case in Sayeed Ahmed<br>[Sayeed Ahmed & Co. v. State of U.P., (2009) 12 SCC 26 :<br>(2009) 4 SCC (Civ) 629] arose under the Arbitration and<br>Conciliation Act, 1996, and there was a specific provision<br>under the new Act regarding the award of interest by the<br>arbitrator. From the discussion made in Sayeed Ahmed<br>[Sayeed Ahmed & Co. v. State of U.P., (2009) 12 SCC 26 :<br>(2009) 4 SCC (Civ) 629] it is apparent that this Court has<br>emphasised that it would depend upon the nature of<br>clause and claim, etc. and it is required to be found on<br>consideration of stipulation whether interest is barred, if<br>yes, on what amounts interest is barred under the<br>contract.” |
The Court then referred to the three-Judge Bench judgment in Tehri
Hydro Development Corporation Ltd. (supra) and finally answered the
reference as follows:-
“ 32. In para 4 in Engineers-De-Space-Age [ Port of
Calcutta v. Engineers-De-Space-Age , (1996) 1 SCC 516]
this Court has observed that bar under the contract will not
be applicable to the arbitrator cannot be said to be
26
observation of general application. In our opinion, it would
depend upon the stipulation in the contract in each case
whether the power of the arbitrator to grant pendente lite
interest is expressly taken away. If answer is “yes” then the
arbitrator would have no power to award pendente lite
interest.
33. The decision in Madnani Construction Corpn.
[ Madnani Construction Corpn. (P) Ltd. v. Union of India ,
(2010) 1 SCC 549 : (2010) 1 SCC (Civ) 168] has followed
the decision in Engineers-De-Space-Age [ Port of Calcutta
v. Engineers-De-Space-Age , (1996) 1 SCC 516]. The
same is also required to be diluted to the extent that
express stipulation under contract may debar the arbitrator
from awarding interest pendente lite. Grant of pendente lite
interest may depend upon several factors such as
phraseology used in the agreement, clauses conferring
power relating to arbitration, nature of claim and dispute
referred to arbitrator and on what items power to award
interest has been taken away and for which period.
34. Thus, our answer to the reference is that if the contract
expressly bars the award of interest pendente lite, the
same cannot be awarded by the arbitrator. We also make it
clear that the bar to award interest on delayed payment by
itself will not be readily inferred as express bar to award
interest pendente lite by the Arbitral Tribunal, as ouster of
power of the arbitrator has to be considered on various
relevant aspects referred to in the decisions of this Court, it
would be for the Division Bench to consider the case on
merits.”
20. The aforesaid judgment was applied by another three-Judge
Bench soon thereafter in Ambica Construction v. Union of India
(“Second Ambica Construction Case”) , (2017) 14 SCC 323. In this
case, the concerned clause, which is clause 2 of the Agreement, reads
as follows:-
“(2) Interest on amounts .— No interest will be payable
27
| upon the earnest money or the security deposit or amounts<br>payable to the contractor under the contract, but<br>government securities deposited in terms of sub-clause (1)<br>of this clause will be repayable with interest accrued<br>thereon.” | ||
|---|---|---|
| [at paragraph 5] | ||
This Court found that the aforesaid clause was no bar, after referring to
paragraph 34 of the First Ambica Construction Case (supra):
| “6. The only contention advanced at the hands of the<br>learned counsel for the appellant, was based on the<br>judgment of this Court in Union of India v. Ambica<br>Construction [Union of India v. Ambica Construction,<br>(2016) 6 SCC 36 : (2016) 3 SCC (Civ) 36], wherein, having<br>examined the legal position declared by this Court by a<br>Constitution Bench in Irrigation Deptt., State of<br>Orissa v. G.C. Roy [Irrigation Deptt., State of<br>Orissa v. G.C. Roy, (1992) 1 SCC 508], it was held as<br>under: (Ambica Construction case [Union of India v.<br>Ambica Construction, (2016) 6 SCC 36 : (2016) 3 SCC<br>(Civ) 36] , SCC p. 59, para 34) | ||
|---|---|---|
| “34. Thus, our answer to the reference is that if<br>the contract expressly bars the award of interest<br>pendente lite, the same cannot be awarded by<br>the arbitrator. We also make it clear that the bar<br>to award interest on delayed payment by itself will<br>not be readily inferred as express bar to award<br>interest pendente lite by the Arbitral Tribunal, as<br>ouster of power of the arbitrator has to be<br>considered on various relevant aspects referred<br>to in the decisions of this Court, it would be for<br>the Division Bench to consider the case on<br>merits.” | ||
A perusal of the conclusions drawn by this Court
in the above judgment, rendered by a three-
Judge Division Bench, leaves no room for any
doubt, that the bar to award interest on the
amounts payable under the contract, would not
28
be sufficient to deny payment of pendente lite
interest. In the above view of the matter, we are
satisfied, that the clause relied upon by the
learned counsel for the Union of India, to
substantiate his contention, that pendente lite
interest could not be awarded to the appellant,
was not a valid consideration, for the proposition
being canvassed. We are therefore satisfied, that
the arbitrator, while passing his award dated 28-
6-1999, was fully justified in granting interest
pendente lite to the appellant.”
21. To complete the litany of case law, we must now refer to a recent
judgment delivered on 03.07.2018 by yet another Division Bench of this
Court in M/s Raveechee v. Union of India (Civil Appeal Nos. 5964-
5965 of 2018). Clause 16.3, with which this judgment was concerned,
was identical in terms with the clause which barred interest in the
Second Ambica Construction Case (supra). This judgment referred to
and followed judgments in Engineers-De-Space-Age (supra), Madnani
Construction (supra) and the three-Judge Bench in the Second
Ambica Construction Case (supra) to hold that such a clause would
not be considered to be a bar to the payment of pendente lite interest.
22. A conspectus of the decisions that have been referred to above
would show that under the 1940 Act, an arbitrator has power to grant
pre-reference interest under the Interest Act, 1978 as well as pendente
lite and future interest. However, he is constricted only by the fact that
an agreement between the parties may contain an express bar to the
29
award of pre-reference and/or pendente lite interest. Since interest is
compensatory in nature and is parasitic upon a principal sum not having
been paid in time, this Court has frowned upon clauses that bar the
payment of interest. It has therefore evolved the test of strict
construction of such clauses, and has gone on to state that unless there
is a clear and express bar to the payment of interest that can be
awarded by an arbitrator, clauses which do not refer to claims before the
Arbitrators or disputes between parties and clearly bar payment of
interest, cannot stand in the way of an arbitrator awarding pre-reference
or pendente lite interest. Thus, when one contrasts a clause such as the
clause in the Second Ambica Construction Case (supra) with the
clause in Tehri Hydro Development Corporation Ltd. (supra), it
becomes clear that unless a contractor agrees that no claim for interest
will either be entertained or payable by the other party owing to dispute,
difference, or misunderstandings between the parties or in respect of
delay on the part of the engineer or in any other respect whatsoever,
leading the Court to find an express bar against payment of interest, a
clause which merely states that no interest will be payable upon
amounts payable to the contractor under the contract would not be
sufficient to bar an arbitrator from awarding pendente lite interest under
the 1940 Act. As has been held in the First Ambica Construction Case
(supra), the grant of pendente lite interest depends upon the
30
phraseology used in the agreement, clauses conferring power relating to
arbitration, the nature of claim and dispute referred to the Arbitrator, and
on what items the power to award interest has been taken away and for
which period. We hasten to add that the position as has been explained
in some of the judgments above under Section 31(7) of the 1996 Act, is
wholly different, inasmuch as Section 31(7) of the 1996 Act sanctifies
agreements between the parties and states that the moment the
agreement says otherwise, no interest becomes payable right from the
date of the cause of action until the award is delivered.
23. In the present case, clause 16 of the General Conditions of
Contract only speaks of any delay in payment not making ONGC liable
for interest. There is nothing in this clause which refers even obliquely
to the Arbitrator’s power to grant interest. This Court finds that the
aforesaid clause is narrower than the clause considered by the three-
Judge Bench in the Second Ambica Construction Case (supra) which
states that no interest will be payable on amounts payable to the
contractor under the contract. Clause 16 in the present case confines
itself only to delay in payment and not to any other amounts payable to
the contractor under the contract. Also, unlike the clause in Tehri Hydro
Development Corporation Ltd. (supra), clause 16 does not contain
language which is so wide in nature that it would interdict an arbitrator
from granting pendente lite interest. It will be remembered that the
31
clause in Tehri Hydro Development Corporation Ltd. (supra) spoke of
no claim for interest being entertained or payable in respect of any
money which may be lying with the Government owing to disputes,
difference or misunderstanding between the parties and not merely in
respect of delay or omission; Further, the clause in Tehri Hydro
Development Corporation Ltd . (supra) goes much further and makes it
clear that no claim for interest is payable “in any other respect
whatsoever.” It is, thus, clear that clause 16 cannot possibly interdict the
payment of pendente lite interest on the facts of the present case.
24. We now come to Shri Viswanathan’s argument that, in any case,
on the facts of the present case, clause 16 is not at all attracted
inasmuch as factually there was no delay in payment as a sum of
Rs.14,999/- per MT had, in fact, been paid for both 1200 MT and 600
MT, but that the balance only became payable on and from the date of
the award. Shri Viswanathan is right, as it is nobody’s case that there
was delay in payment on the facts of this case. It is only after Reliance
went in a Writ Petition before the High Court that it became clear that a
higher price would be payable, which was left to the Arbitrator to
determine vide the High Court’s judgment referring the issue of price to
an arbitrator, which was accepted by ONGC. In this view of the matter, it
is clear that no delay on account of the higher price ever took place as it
became payable only on and from the date of the award, Rs.14,999/-
32
per MT having been paid on time earlier. This being the case, it is clear
that even if clause 16 were to have application, both pre-reference and
pendente lite interest are not barred.
25. Coming to Shri Viswanathan’s appeal, we think that the only
reason given for reducing interest from 18% to 10% being that ONGC is
a Public Sector Undertaking, would not suffice to set aside what was
within the Arbitrator’s discretion. There is no finding that this discretion
has been exercised perversely, given the interest rates at the time of the
award. We thus uphold the grant of interest at the rate of 18% as pre-
reference and pendente lite interest. Considering the fact that ONGC
has deposited the difference in the principal sums payable, and pre-
reference, pendent lite and future interest, all at the rate of 10% being a
sum of Rs.1,09,34,323/- till 21.01.1999, and a sum of Rs.46,86,138/- on
30.04.2003, we make it clear that recovery of interest till the two
aforementioned dates will be at the rate of 18%. Thus, for pre-reference,
pendent lite and future interest, ONGC is to pay the differential amount
of interest of 8% till 21.01.1999 and 30.04.2003 within a period of eight
weeks from today. In the interest of justice, we clarify that on and from
21.01.1999, till payment, future interest is to be paid at 6% per annum
on the balance differential sum of interest, being the difference between
10% and 18%, and similarly, on the balance differential sum of interest
between 10% and 18% on and from 30.04.2003 till payment.
33
Accordingly, the appeal of ONGC is dismissed and the appeal of
Reliance is allowed in terms of this judgment.
………..……………… J.
(R. F. Nariman)
…..…………………… J.
(Indu Malhotra)
New Delhi.
July 20, 2018.
34
ITEM No. 1501 Court No. 9 SECTION III
(For Judgment)
S U P R E M E C O U R T O F I N D I A
RECORD OF PROCEEDINGS
Civil Appeal No. 1110 of 2010
RELIANCE CELLULOSE PRODUCTS LTD. Appellant(s)
VERSUS
OIL AND NATURAL GAS CORPORATION LTD. Respondent(s)
WITH
CIVIL APPEAL NO. 1111 OF 2010
Date : 20.07.2018 These matters were called on for pronouncement
of judgment today.
For Appellant(s) Mr. Shabyasachi Patra, Adv.
Mr. Sanjeev K.Kapoor, Adv.
M/s. Khaitan & Co.
For Respondent(s) Mr. Sandeep Sethi, ASG,
Mr. P.B.Suresh, Adv.
Mr. Vipin Nair, Adv.
Mr. Abhay Pratap Singh, Adv.
Hon'ble Mr. Justice Rohinton Fali Nariman
pronounced the judgment of the Bench comprising His
Lordship and Hon'ble Ms. Justice Indu Malhotra.
In terms of the signed reportable judgment, the
appeal filed by ONGC (C.A. No. 1111 of 2010) is
dismissed and the appeal filed by Reliance Cellulose
Products Ltd. (C.A. No.1110 of 2010) is allowed.
| (Shashi Sareen)<br>ARcumPS | (Saroj Kumari Gaur)<br>Branch Officer |
|---|
35