Full Judgment Text
Reportable
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
CIVIL APPEAL NO.4910 OF 2015
[Arising out of SLP (Civil) No. 22273 of 2012]
Petroleum and Natural Gas Regulatory Board … Appellant
Vs.
Indraprastha Gas Limited & Ors. … Respondents
J U D G M E N T
Dipak Misra, J.
The present appeal, by special leave, calls in question the
legal defensibility and the tenability of the judgment and order
JUDGMENT
dated 01.06.2012 passed by the High Court of Delhi in W.P.(C)
No. 2034 of 2012 whereby the Division Bench has ruled that
Petroleum and Natural Gas Regulatory Board (for short, “the
Board”) is not empowered to fix or regulate the maximum
retail price at which gas is to be sold by entities such as
Indraprastha Gas Ltd, to the consumers and further the Board
Page 1
2
is also not empowered to fix any component of network tariff
or compression charge for an entity having its own
distribution network. On the aforesaid foundation, the High
Court has opined that the provisions of Petroleum and Natural
Gas Regulatory Board (Determination of Network Tariff for City
or Local Natural Gas Distribution Networks and Compression
Charge for CNG) Regulations, 2008 (hereinafter referred to as
“the Regulations”) as far as it is construed to empower the
Board to fix the tariff is unsustainable and accordingly as a
sequitur the order dated 9.4.2012 to the extent of fixing the
maximum retail price or requiring the respondents to disclose
the entire tariff and the compression charges to its consumers,
is not in consonance with the Petroleum and Natural Gas
JUDGMENT
Regulatory Board Act, 2008 (for brevity “the Act”), and
accordingly quashed the same.
Page 2
3
2. The facts which are essential to be adumbrated are that
the respondent invoked the jurisdiction under Article 226 of
the Constitution assailing the order dated 9.4.2012 issued by
the Board under Section 22 of the Act determining the
network tariff and compression charges for CNG in respect of
Delhi City Gas Distribution (CGD) network of the petitioner at
Rs.38.58 per MMBtu and Rs.2.75 per kg. respectively w.e.f.
01.04.2008 and directing the petitioner therein to recover the
said network tariff and compression charges for CNG
separately through an invoice, without any premium or
discount on a non-discriminatory basis and to appropriately
reduce the selling price of CNG from the date of issuance of
the order. Be it noted, the Board left the modalities and time
JUDGMENT
frame for refund of differential network tariff and the
compression charges for CNG recovered by the petitioner
therein w.e.f. 1.4.2008 in excess from its consumers to be
decided subsequently. The said order was criticized on many
a ground. The principal contention was that the Board does
not have the power to direct the writ petitioner, the respondent
Page 3
4
no. 1 herein, while charging its consumers, to disclose the
network tariff and the compression charges and also to fix the
said network tariff and compression charges in any particular
manner.
3. The said stand was resisted by the learned counsel for
the Board contending, inter alia, that Regulations 3 and 4 of
the Regulations apply to the entities like the writ petitioner;
that the Board has the power to ask the writ petitioner, the
respondent herein, to submit the network tariff and
compression charges for CNG as per the Quality Regulations
for approval of the Board; that the entity having accepted the
said term as a condition for obtaining exclusivity is bound by
the contractual obligation with the Board and is now estopped
JUDGMENT
from challenging the power of the Board; that the objects and
reasons of the Act is to protect interests of the consumers and
regard being had to the statutory context when an action is
taken, no flaw could be found with the same; that Sections
2(i), (m) and (w) of the Act are all intended to ensure that the
consumer is not exploited; that Section 2(zn) of the Act defines
Page 4
5
the transportation rate and in the interpretative expanse, the
order passed by the Board is absolutely defensible; that as per
Section 11(e), the Board is empowered to regulate, inter alia,
the transportation rates; that Section 61(2), especially, clauses
(n), (t), (za) empower the Board to make regulations qua
transportation tariff and any other matter which is required to
be or may be specified by the Regulations or in respect of
which provision is to be made by the Regulations; that keeping
in view the objective of the Act, the Regulations permit the
Board to fix the network tariff and the compression charges
and the action of the Board so fixing the network tariff and the
compression charges cannot be interfered with; and that the
Regulations framed by the Board are consistent with the Act.
JUDGMENT
4. The High Court observed that the question for
adjudication was basically whether the Act authorises the
Board to pass such an order and whether the intention of the
legislature is to confer the power of price fixation on the Board.
The High Court referred to Section 11 of the Act and came to
hold that:-
Page 5
| 6<br>“We thus conclude that PNGRB Act does not<br>confer any power on the Board to fix/regulate<br>price of gas as has been done vide the impugned<br>order dated 9th April, 2012. Having held so, we<br>do not deem it necessary to deal with the other<br>Regulations impugned in the writ petition and<br>suffice it is to state that any provision therein<br>having the effect of empowering the Board to fix<br>the price or the network tariff or compression<br>charges for CNG, as long as not transportation<br>rate, is beyond the competence of the Board and<br>ultra vires the PNGRB Act and of no avail.” | ||
|---|---|---|
| And again:- | ||
| “We thus allow this writ petition to the extent of<br>holding that the Petroleum and Natural Gas<br>Regulatory Board is not empowered to fix or<br>regulate the maximum retail price at which gas is<br>to be sold by entities as the petitioner, to the<br>consumers. We further hold that the Board is<br>also not empowered to fix any component of<br>network tariff or compression charge for an entity<br>such as the petitioner having its own distribution<br>network. The provisions of the Regulations<br>JUDGMENT<br>(supra) in so far as construed by the Board to be<br>so empowering it are held to be bad/illegal.<br>Accordingly, the order dated 9th April, 2012 to the<br>extent so fixing the maximum retail price or<br>requiring the petitioner to disclose the network<br>tariff and compression charges to its consumers<br>is struck down/quashed.” | ||
| 5. Criticizing the judgment and order passed by the High<br>Court, Mr. Arvind Datar, learned senior counsel for the<br>appellant, has raised the following submissions:- | ||
Page 6
7
(a) There is a presumption of validity of
subordinate legislation, and as long as the parent
Act enables the framing of regulations they are
valid. When section 2(zn), 22(1), 61(2)(e), 61(2)(t) of
the Act empower the Board to frame regulations for
all three categories, namely, common carrier,
contract carrier and city or local natural gas
distribution network, the Regulations are valid. The
High Court has incorrectly held that these
regulations are ultra vires the parent Act without
referring to any specific section or provision. That
apart, on a reading of the provisions of the Act it is
also noticeable that there is no postulate that the
JUDGMENT
power to frame the transportation
rate/transportation tariff can only be exercised only
when the city network becomes a common carrier or
contract carrier.
(b) While the city networks get market exclusivity
for 3/5 years, they get infrastructure exclusivity for
Page 7
8
25 years with further extension of 10 years at a time
and the fixation of transportation rate/
transportation tariff has to be determined for the
network of pipelines irrespective of whether they are
common carriers, contract carriers or city networks.
The Act and Regulations contemplate fixation of
transportation rate/transportation tariff even at the
stage of city network. It is quite clear that when the
city network becomes a common carrier after the
exclusivity period, the said transportation rate
which is determined at the city network stage itself,
would apply for carrying the gas of other suppliers
under section 21(2).
JUDGMENT
(c) The High Court has erroneously opined that
the transportation rate provided for is the rate to be
charged by one entity under the Act from another
for transporting/carrying/moving gas of the other,
for such a conclusion is completely contrary to the
definition contained in section 2 (zn). The
Page 8
9
transportation rate has to be determined even for
city networks under sections 22(1), 61(2)(e) and
61(2)(t) and that is the rate which can also be
claimed from other gas suppliers but that does not
mean that no transportation rate can be determined
unless and until the pipeline becomes a common
carrier. The High Court has flawed in holding
that any provision therein having the effect of
empowering the Board to fix the price or the
Network Tariff or the Compression Charges for
CNG, as long as not transportation rate, is beyond
the competence of the Board and ultra vires the
Act, and it is because though the Board cannot fix
JUDGMENT
the selling price or monitor the selling price as
natural gas has not been notified, yet the Board has
the power, and indeed the duty, to fix the network
tariff and compression charges (which are nothing
but the transportation rate/transportation tariff)
under the Act.
Page 9
10
(d) The High Court has committed gross illegality
in its analysis while stating that the Board is not
empowered to fix any component of Network Tariff
or Compression Charge for any entity such as the
respondent herein having its own distribution
network. It has also faulted in opining that the
provisions of the Regulations insofar as construed
by the Board to be so empowering it are illegal.
These findings recorded by the Division Bench are
contrary to the provisions of the Act, for the Board
can fix the transportation rate/transportation tariff
and the fact that the rate will become applicable
after expiry of the period of exclusivity does not
JUDGMENT
make the Regulations themselves bad or illegal and
it is absolutely clear that source of power comes
from the provisions engrafted under Sections 2(zn),
22(1), 61(2)(e) and 61(2)(t) of the Act as they confer
power on the Board to frame regulations for all
three categories.
Page 10
11
(e) The omission of ‘city network’ in Section 11(e)
(ii) is only accidental, and if the provisions of the Act
are read as a whole, the power of the Board is clear
as crystal for determining the transportation
rate/transportation tariff for all categories. If the
contention of the respondents is accepted, it will
amount to rewriting the provision as “transportation
rates after city network becomes a common carrier
or contract carrier”.
(f) The view expressed by the High Court to the
extent that the Board is not empowered to fix any
component of Network Tariff or Compression charge
for an entity such as the respondent that has its
JUDGMENT
own distribution network is fallacious, for the said
findings are not in accord with to the provisions of
the Act, and if the submissions are accepted, the
Regulations will become applicable only after the
period of exclusivity. The Central Government had
supplied subsidized gas to the authorised entities to
Page 11
12
ensure that consumers do not have to pay a high
cost for both piped natural gas (used for domestic
purposes) and compressed natural gas (used for
transportation) and has made it mandatory for the
respondents to disclose the break up. Quite apart
from that, Section 21(1) that stipulates right of first
use after the exclusivity period and Section 21(2)
which provides that other entities are liable to pay
minimum transportation rate for using the common
carrier, do not indicate that the Board has no power
to fix the transportation rate/ tariff during the
exclusivity period or that it would apply to only the
gas transported for other entities. The respondent
JUDGMENT
company is obliged to indicate the transportation
rate/tariff as soon as it is determined. Even if the
respondent’s contention is accepted, the rate/tariff
has to be indicated after the exclusivity period not
only for the gas of other entities but also for the gas
that is supplied by the authorised entity itself.
Page 12
13
Section 20(4) mandates the Board to fully protect
consumer interest while granting exclusivity to the
city network and the consumer interest is protected
by the Board determining the transportation tariff
being applicable to and being indicated for all the
gas transported in the city network, whether it
belongs to other entities or to the entity owning and
operating the city network.
6. Mr. Harish Salve and Mr. Parag S. Tripathi, learned
senior counsels, resisting the submissions raised by Mr.
Datar, learned senior counsel for the appellant-Board, have
raised the following contentions.
(A) As per the schematic intendment of the Act,
JUDGMENT
after the expiry of period of exclusivity under
Section 20(4), the Board, if decides, in exercise of
the statutory powers under Section 20-22, can
declare the network as a common/contract carrier,
and then alone, in respect of third party suppliers of
gas, who seek to use the excess capacity in the
Page 13
14
pipeline of the network, the Board may fix the
st
transportation rate, which the 1 respondent may
charge from such a third party supplier. The
consumers of natural gas, whether of the first
respondent, or of the third party supplier of gas,
does not enter into the scene at all and has no role
to play whatsoever. The transportation in question
whether by the network while supplying to its
consumers or by a common/contract carrier in
respect of the third party suppliers are the rates
and costs of transportation relevant only to the
owner/supplier of the gas and the said rate has no
meaning or relevance as far as the consumer, who
JUDGMENT
is the purchaser of such gas, is concerned, other
than the fact that the transportation expenses
would also form a part of the consolidated final
price which would be raised and recovered by
respondent as also third party supplier from the
respective consumers.
Page 14
15
(B). The definition of Common Carrier in Section
2(j) and Contract Carrier in Section 2(m) postulate
certain conditions and the definition of city or local
natural gas distribution network in Section 2(i) does
not contain the said crucial twin conditions. That
apart, Section11(a) and Section 11(e) permit the
issuance of regulations which determine access and
the transportation rate for Common Carrier or
Contract Carrier, and the said provision limits the
power of the Board to issue regulations only in
respect of access to the network and not for the
transportation rate for the network and, therefore,
the stand of the appellant that there is an
JUDGMENT
accidental omission is unacceptable because the
intention of the legislature is absolutely clear and
unambiguous.
(C). The power can only be exercised in respect of
common carrier/contract carrier if it is a network in
respect of which the power is sought to be exercised
Page 15
16
and then also as a first step the network must be
declared or authorised as a common carrier or a
contract carrier within the meaning of Sections
20-22; and, therefore, as far as a network is
concerned, there is no right to determine
transportation rate. Such power is specifically
limited in respect of common/contract carrier under
Section 11(e)(ii). The very concept of transportation
rate which is defined in Section 2(zn) makes it clear
that it is the rate for moving each unit of petroleum,
petroleum products or natural gas as may be fixed
by the Regulations and Section 21(2) which uses the
expression ‘transportation rate’, has three elements,
JUDGMENT
which makes it clear that the transportation rate
has relevance only in respect of the rates payable by
a third party entity, which is utilizing the excess
capacity in the existing pipeline of a
common/contract carrier and the Board does not
have the power to determine the transport rate.
Page 16
17
(D). The Board has been empowered by
Regulations to determine the exclusivity period
under Section 20(4) of any pipeline. The effect of
this declaration of exclusivity is that under Sections
20 – 22, during the period of exclusivity, the Board
is disabled from declaring such pipeline, whether
existing or a new one, as a common/contract
carrier; and once a pipeline is declared to be a
common carrier/contract carrier, it is required to
make available its excess capacity as a part of the
open access regime, to any third party supplier of
gas. Such a third party may either be an importer
or purchaser or a producer of gas seeking to
JUDGMENT
transport its gas using the pipeline of any other
entity. Therefore, critical scanning of Section 20 to
22 do not confer any power on the Board to fix the
transportation tariff. Section 22(1) makes it clear
that the right to fix transportation tariff is subject to
other conditions of the Act and when the provisions
Page 17
18
contained in Sections 2(j), 2(m), 2(i), 2(zn), 11(e),
11(f)(iii), 11(f)(vi) and 22(2) are read in a conjoint
manner, it is graphically clear that the Board has
not been conferred the power to fix the transport
tariff by the legislature and, therefore, it cannot do
so by a regulation. The reliance by the Board on
Section 61(2) (q) & (t) is misplaced, for Section 61(1)
of the Act permits the Board to make regulations
consistent with the Act and the Act which confers
power on the Board to frame the Regulations does
not empower it to do so. That apart, Section 61
deals with the general regulation making power of
the Board in terms of the Sections specified in the
JUDGMENT
Act; and Section 61(2)(q) and (t) relate back to
Section 22(1) which itself is “subject to” the other
provisions of the Act and, hence, even if Section
61(t) is read with Section 22(1), it would not
override Section 11(e) read with Section 2(zn) and
21(2) of the Act.
Page 18
19
7. In reply to the aforesaid submissions, Mr. Datar, learned
senior counsel has canvassed the following propositions:-
(I) The contentions urged by the respondent are
untenable, for the transportation rate has to be
determined on the basis of voluminous data, which
has to be collected, collated and analyzed and
unless the rate is fixed even during the five year
period, there will be no rate available for the
common carrier at the end of the exclusivity period
and it will be absurd to suggest that the entire
exercise has to begin only after the city network
becomes a common carrier. The transportation rate
has to be determined for a network of pipelines
JUDGMENT
under Section 2(zn) and is not a separate
determination for city networks, common carrier or
contact carrier as the object of determining the rate
is also to determine the rate at which the cost of
transportation is permitted to be recovered and it
has to be done in a reasonable manner as
Page 19
20
mandated under Section 22(2)(b). The omission of
“city or local gas distribution network” in Section
11(e)(ii) is clearly accidental because in the Act as
well as Regulations, three categories viz. common
carrier, contract carrier and city or local gas
distribution network have been used together, and
the purpose becomes manifest on a perusal of
Section 61(2)(e) which specifically refers to Section
11(e).
(II) The Board as a regulator has the obligation to
ensure that the consumers are not exploited and
under Section 20(4) the Board grants monopoly for
25 years with further extension of 10 years at a time
JUDGMENT
and barring unforeseen circumstances, such a
network will have exclusive infrastructure monopoly
for several decades. Therefore, in the factual
matrix, the Board has a duty to ensure that
consumer interest is protected during the monopoly
period, as mandated under Section 20(4) and that
Page 20
21
can be done by ensuring the investment by the gas
company in the transportation infrastructure of the
city network is recovered in a reasonable manner for
all the gas transported in the city network over the
economic life of the network. It is not the stand of
the Board that it does not have the power to
monitor the Maximum Retail Price (MRP) however,
the transportation rates/tariff would indicate it is
the price charged to the consumer so that it does
not result in excessive profiteering and under these
circumstances, it is the duty of the respondent to
reveal the transportation prices to the Board as well
as to the consumers.
JUDGMENT
(III) Section 20(4) gives the right to the Board to
grant exclusivity to the city or local natural gas
distribution network for such period as the Board
may decide and once it has the power to give
exclusivity to a city or local natural gas distribution
network owning entity so that only it can lay, build
Page 21
22
and operate such network in a geographical area
and under these circumstances it becomes the duty
of the Board and as per the stipulations under
Section 20(4) it has to be done in a transparent
manner protecting the consumer interest. In
addition to it, the duty is cast on the Board under
Section 20(5) to be guided by the objectives of
promoting competition among the entities, avoiding
infructuous investment, maintaining or increasing
supplies or for securing equitable distribution or
ensuring adequate availability of natural gas
throughout the country and, therefore, the Board
can determine the transportation rate/tariff. If the
JUDGMENT
stand of the respondent is accepted, the consumers
would never know the transportation rate, since it is
possible that in many cases there may not be any
other gas supplier who is using the network of
pipelines after the exclusivity period.
Page 22
23
8. Having enumerated the submissions in reply by the first
respondent, we must record the submissions of the second
respondent, that is, Union of India. The following
proponements have been urged by Ms. Pinky Anand, learned
ASG.
(i) There is no legislative intent for allowing the
Board to determine the pricing of gas, i.e. the price
which the entity charges from the ultimate
customers. The Act, while protecting the interests
of the consumers, has not empowered the Board to
fix the price at which the entities will sell the
petroleum products or natural gas to the
consumers, for the MRP is to be fixed by the entity.
JUDGMENT
(ii) As regards the applicability of transportation
tariff determined through the Regulations, it is clear
from the provisions of the Act that such
transportation tariff is applicable only in respect of
an outside entity that is willing to use the CGD
network and that such tariff is payable by that
Page 23
24
entity to CGD network operator. The transportation
tariff notified through the Board Regulations is not
applicable for CGD entity when it transports its own
gas for supply to individual customers.
(iii) The Board is merely authorised to monitor
prices and is required to ensure fair competition
amongst entities that are supplying CNG or PNG to
the end consumers. The Act provides for fair
competition by allowing entry to a third party for
supplying gas to the end consumers on a
non-discriminatory open access basis and in the
said process the third party is required to pay
transportation tariff to the CGD operator at the
JUDGMENT
rates notified by the Board. The purpose of
notification of the said rate is to prevent the CGD
operator from putting up any kind of entry barrier
in the form of a higher transportation tariff for the
third party.
Page 24
25
(iv) Section 22 of the Act read with Section 20, 21
and 2(zn) of the Act, the Board is empowered to
regulate the transportation rate or transportation
tariff only for a city or local natural distribution
network subject to the provisions as provided in the
Act. When such city or local natural gas
distribution network is declared as a common
carrier or a contract carrier by the Board and it is
used by any other entity on common carrier or
contract carrier basis, then only as per the
provisions of the Act, the Board is only entitled to
fix, by regulations, the transportation rate or the
transportation tariff which the entity owning and
JUDGMENT
operating as a city or local natural gas distribution
network would charge from other entities which use
its network on common carrier or contract carrier
basis for transporting their gas.
(v) The Board is not empowered to fix the price at
which entities will market or sell the notified
Page 25
26
petroleum products or natural gas. The MRP is to
be fixed by the entity. The Board shall only monitor
the prices and take corrective measures to prevent
restrictive trade practices by the entities. As
regards regulation of the activities of transmission
and distribution of petroleum products and natural
gas, the Board will oversee access to pipelines and
city or local natural gas distribution networks on
non-discriminatory, common carrier/contract
carrier principle for ensuring a level playing field for
all entities. That apart, the concept of allowing
capacity in a city or local natural gas distribution
network to be used by any third party entity on
JUDGMENT
non-discriminatory common carrier/contract carrier
principle shall incetivize emergence of independent
marketers of natural gas. Such independent
marketers shall enter into transportation contracts
with the entity, owning and operating the city or
local natural gas distribution network for
Page 26
27
transportation of their gas. This, in turn, will foster
fair trade and competition in marketing amongst
entities
(vi) The Board is entitled to fix the transportation
rate for gas transmission and distribution in all
cases where gas is transported on common carrier
or contract carrier principle. The transportation
rate so fixed by regulator shall be paid by the third
party entities to the entity, owning and operating
the city or local natural gas distribution network for
transporting their gas on common carrier/contract
carrier principle. Thus, by observing
non-discriminatory open access to pipelines and
JUDGMENT
city or local natural gas distribution networks on
common carrier/ contract carrier principle at the
transportation rates fixed by regulations, a level
playing field shall be ensured for all the entities
engaged in marketing and sale of natural gas. In
such a market condition, gas-on-gas competition
Page 27
28
and the inter-fuel competition will lead to
emergence of fair trade and competition amongst
entities, which in turn, will protect the interest of
consumers.
9. Mr. K.K. Venugopal, learned senior counsel appearing for
the intervenor, Central U.P. Gas Ltd., has contended that the
Board does not have the power to fix MRP and the distribution
entity has a fundamental right to carry on the trade, subject to
restriction under Article 19(1)(g) of the Constitution and in the
case at hand, the Act, does not confer any power on the Board
to fix the MRP, but on the other hand, it expressly provides for
the MRP to be fixed by the entity themselves as per Section
2(x) of the Act. Learned senior counsel would contend that
JUDGMENT
once the Board has no jurisdiction/ authority to fix the MRP,
it is not entitled to fix any element/ component of the MRP as
it would bring an anomalous situation. The submission of the
Board that the distribution entity can charge the MRP, but it
has the power to regulate the component, that is, the
transportation charges is a futile exercise, a brutum fulmen,
Page 28
29
for the simple reason that however low may be the component
of MRP determined by the Board, the authorised entity can
virtually ignore the same. It is argued by him that the Board
is a creature of the Act and it can only exercise its functions in
accordance with and within the four corners of the said Act
and it cannot prescribe what it calls network tariff and
compression charge under the Regulations, because the
statute refers to fixation of “transportation tariff/
transportation rate” but does not mention of ‘network tariff’ or
‘compression charges’. In the absence of any power conferred
under the Act to frame regulations in that regard, the
Regulations clearly transgress the enactment and hence, the
Regulations to that extent are ultra vires. It is urged by him
JUDGMENT
that ‘network tariff’ is not the same as ‘transportation rate’
and the Board cannot assume such an authority by employing
a different analogy. Placing reliance on Section 11(e)(ii), it is
argued by the learned senior counsel that the said provision
which provides for Board’s function and empowers the Board
to frame regulations, employs the words ‘transportation rates
Page 29
30
for common carrier or contract carrier’ and they remotely do
not purport to fix rates for ‘network tariff’ or ‘compression
charges’ for city gas distribution network. In addition, it is
propounded by him that reliance on Sections 21(2) and 22(1)
and all other provisions are absolutely misconceived and the
assumption that the Board as a regulator to look after
consumer interests, cannot travel beyond the statutory limit.
10. Dr. Jatin Thukral, who has been allowed to intervene,
has referred to the background of the Act and on that
foundation has canvassed that “transportation rate” is
inseparably related to open access for every commercial gas
distribution entities to either common carrier or contract
carrier or city or local natural gas distribution regard being
JUDGMENT
had to the manner in which the said words have been
employed by the legislature in various provisions of the Act. It
is his further submission that Section 61(2)(t) is controlled by
sub-section 22(1) which in turn is guided by Section 22(2) and
all the provisions are associated with common or contract
carriers only and by no stretch of imagination, it confers any
Page 30
31
power on the Board to fix transportation rate, as it is only
referable to the rate charged by one commercial entity from
any commercial entity for using its gas transportation
networks. In essence, his submission is that the appeal is
devoid of merit and deserves to be dismissed.
11. Before we proceed to appreciate the rivalised contentions
raised at the Bar, it is seemly to state that in terms of Section
22 of the Act, the Board has framed the Regulations. Placing
reliance on the Regulations, the Board has issued the order
dated 9.4.2012, which deals with the Network Tariff for City or
Local Natural Gas Distribution Network and Compression
Charge for CNG in respect of the Delhi CGD Network of
Indraprastha Gas Limited (IGL). Clause 1 deals with the
JUDGMENT
Regulatory Framework. Clause 1.1 reads as follows:-
“1.1 In terms of Sections 22 of the PNGRB Act,
2006, the Board is entrusted with the
responsibility to lay down the transportation
tariff for city or local natural gas distribution
network. As per the relevant provisions of the
PNGRB (Authorizing Entities to Lay, Build,
Operate or Expand City or Local Natural Gas
Distribution Networks) Regulations, 2008 read
with the said statutory provisions, the Board is
empowered to determine the Network Tariff and
Page 31
32
Compression Charge for CNG to be charged by
the entity laying, building, operating or
expanding City or Local Natural Gas Distribution
Network either before the appointed day or on a
day subsequent thereto.”
After so stating, the Board has proceeded to provide the
methodology for determination of the network tariff and
compression charge for the CGD network which has been
stipulated in the Regulation dated 19.3.2008. The relevant
part of the order, we may profitably reproduce:-
“3.19 As per the provisions of the
PNGRB (Determination of Network Tariff for City
or Local Natural Gas Distribution Networks and
Compression Charge for CNG) Regulations, 2008
the actual performance with respect to the capital
and operating costs during the previous review
period against the identified parameters shall be
monitored and the variations shall be adjusted in
the calculations on a prospective basis
considering the remaining period of economic life
of the CGD project.
JUDGMENT
3.20 After the above mentioned
adjustments, the reconciliation of which is
provided in Annexure-2, the network tariff and
compression charge for CNG in respect of the
Delhi CGD network of IGL is given in the table
below:
Page 32
| 33<br>Sl No. Particulars Network Tariff Compression<br>(Rs/MMBTU) Charge for CNG<br>(Rs./Kg)<br>1 Submitted by 104.05 6.66<br>IGL<br>2 As determined by 38.58 2.75<br>the Board after<br>moderations<br>4. Decision<br>4.1 While the PNGRB (Determination of Network<br>Tariff for City or Local Natural Gas Distribution<br>Networks and Compression Charge for CNG)<br>Regulations, 2008 were notified on 19th March<br>2008, for the purpose of ease in calculations, the<br>applicable network tariff and compression charge<br>for CNG determined by the Board shall be<br>applicable from 1st April, 2008. Accordingly, the<br>Network Tariff and the Compression Charge for<br>CNG in respect of the Delhi CGD Network of IGL<br>shall be Rs.38.58 per MMBTU and Rs.2.75 per<br>KG respectively with effect from 1st April, 2008.<br>4.2 As per the provisions of the PNGRB<br>JUDGMENT<br>(Authorizing Entities to Lay, Build Operate or<br>Expand City or Local Natural Gas Distribution<br>Networks) Regulations, 2008, IGL shall recover<br>the Network Tariff and Compression Charge for<br>CNG separately through an invoice without any<br>premium of discount on a non-discriminatory<br>basis. Further, in conformity with the decision<br>conveyed vide letter dated 23.5.2011 mentioned<br>in para 2.3 above, the difference between the<br>Network Tariff and Compression Charge for CNG<br>submitted by IGL and that determined by the<br>Board as given in the table above would be<br>reflected through appropriate reduction in selling | ||||
|---|---|---|---|---|
| Sl No. | Particulars | Network Tariff<br>(Rs/MMBTU) | Compression<br>Charge for CNG<br>(Rs./Kg) | |
| 1 | Submitted by<br>IGL | 104.05 | 6.66 | |
| 2 | As determined by<br>the Board after<br>moderations | 38.58 | 2.75 | |
Page 33
34
prices from the date of issuance of this Order.
The modalities and time frame for refund of
differential Network Tariff and the Compression
Charge for CNG for the period from 01.4.2008 till
the date of issuance of this Order shall be
decided and advised by the Board subsequently.”
12. As the factual matrix uncurtains, the issuance of the said
st
order compelled the 1 respondent to approach the High Court
seeking its quashment principally on the ground that such a
power has not been conferred by the Act and the Board, by
framing the resolutions cannot arrogate such power to itself in
the absence of the source of power. That was the substratum
of challenge before the High Court where the Board failed to
st
support and sustain its order and the 1 respondent
succeeded in its assail and the contentions raised before this
JUDGMENT
Court are fundamentally embedded on the said fulcrum. Mr.
Datar, learned senior counsel, apart from many a provision,
has also commended us to the objects and reasons of the Act
to highlight the role of the Board as a regulator. In view of the
said submission, we think it apt to refer to the objects and
reasons of the Act. It reads as follows:-
Page 34
35
“An Act to provide for the establishment of
Petroleum and Natural Gas Regulatory Board to
regulate the refining, processing, storage,
transportation, distribution, marketing and sale
of petroleum, petroleum products and natural
gas excluding production of crude oil and natural
gas so as to protect the interests of consumers
and entities engaged in specified activities
relating to petroleum, petroleum products and
natural gas and to ensure uninterrupted and
adequate supply of petroleum, petroleum
products and natural gas in all parts of the
country and to promote competitive markets and
for matters connected therewith or incidental
thereto.”
13. Bearing the purpose of the Act in mind, we shall refer to
the relevant provisions of the Act. Section 1(4) provides that
the Act applies to refining, processing, storage, transportation,
distribution, marketing and sale of petroleum, petroleum
products and natural gas excluding production of crude oil
JUDGMENT
and natural gas. Section 2(d) of the Act defines authorised
entity to mean that any entity registered by the Board under
Section 15 to market any notified petroleum, petroleum
products or natural gas, or to establish and operate liquefied
natural gas terminals.
Page 35
36
14. Section 2(i) of the Act on which emphasis has been laid
defines “city or local natural gas distribution network”,
relevant part of it reads as under:-
“2(i) “city or local natural gas distribution
network” means an interconnected network of
gas pipelines and the associated equipment used
for transporting natural gas from a bulk supply
high pressure transmission main to the medium
pressure distribution grid and subsequently to
the service pipes supplying natural gas to
domestic, industrial or commercial premises and
CNG stations situated in a specified geographical
area.”
15. Section 2(j) and 2(m) define ‘common carrier’ and
‘contract carrier’ respectively. They read as follows:-
“2(j) “common carrier” means such pipelines for
transportation of petroleum, petroleum products
and natural gas by more than one entity as the
Board may declare or authorise from time to time
on a nondiscriminatory open access basis under
sub-section (3) of section 20, but does not
include pipelines laid to supply-
JUDGMENT
(i) petroleum products or natural gas to a
specific consumer; or
(ii) crude oil;
Explanation – For the purposes of this clause, a
contract carrier shall be treated as a common
carrier, if –
Page 36
37
(a) such contract carrier has surplus capacity
over and above the firm contracts entered
into; or
(b) the firm contract period has expired.
2(m) “contract carrier” means such pipelines for
transportation of petroleum, petroleum products
and natural gas by more than one entity
pursuant to firm contracts for at least one year
as may be declared or authorised by the Board
from time to time under sub-section (3) of section
20.”
16. The aforesaid definitions basically deal with pipelines and
they are regulated under the Act. The dictionary clause
speaks of the nature of activity. There is a noticeable
difference between common carrier pipeline and contract
carrier pipeline on one hand and “a city of local natural gas
distribution network” on the other. On a perusal of the
JUDGMENT
definitions of the common carrier and contract carrier, it is
demonstrable that they refer to pipelines for transportation of
petroleum or petroleum products and natural gas by more
than one entity. The definition “city or local gas distribution
network” means an interconnected network of gas pipelines
and the associated equipment used for transporting natural
Page 37
38
gas from a bulk supply high pressure transmission main to
the medium pressure distribution grid and subsequently to
the service pipes supplying natural gas to domestic, industrial
or commercial premises and CNG stations situated in a
specified geographical area. It deals with specified
geographical area. It does not refer to a pipeline or transport
of natural gas. It is specifically a pipeline network for
transport of natural gas to its own consumers. This being the
position, as per the dictionary clause, it is pertinent to refer to
Section 20 that provides for declaring, laying, building, etc. of
common carrier or contract carrier and city or local natural
gas distribution network. The said provision is as follows:-
“20 Declaring, laying, building, etc., of
common carrier or contract carrier and city or
local natural gas distribution network:-
(1) If the Board is of the opinion that it is
necessary or expedient, to declare an
existing pipeline for transportation of
petroleum, petroleum products and natural
gas or an existing city or local natural gas
distribution network, as a common carrier
or contract carrier or to regulate or allow
access to such pipeline or network, it may
give wide publicity of its intention to do so
and invite objections and suggestions within
a specified time from all persons and
JUDGMENT
Page 38
39
entitles likely to be affected by such
decision.
(2) For the purposes of sub-section (1), the
Board shall provide the entity owning, the
pipeline or network an opportunity of being
heard and fix the terms and conditions
subject to which the pipeline or network
may be declared as a common carrier or
contract carrier and pass such orders as it
deems fit having regard to the public
interest, competitive transportation rates
and right of first use.
(3) The Board may, after following the
procedure as specified by regulations under
section 19 and sub-sections (1) and (2), by
notification,-
(a) declare a pipeline or city or local natural
gas distribution network as a common
carrier or contract carrier; or
(b) authorise an entity to lay, build, operate
or expand a pipeline as a common
carrier or contract carrier; or
(c) allow access to common carrier or
contract carrier or city or local natural
gas distribution network; or
(d) authorise an entity to lay, build, operate
JUDGMENT
or expand a city or local natural gas
distribution network.
(4) The Board may decide on the period of
exclusivity to lay, build, operate or expand a
city or local natural gas distribution
network for such number of years as it may
by order, determine in accordance with the
principles laid down by the regulations
made by it, in a transparent manner while
fully protecting the consumer interests.
(5) For the purposes of this section, the Board
shall be guided by the objectives of
Page 39
40
promoting competition among entities,
avoiding in fructuous investment,
maintaining or increasing supplies or for
securing equitable distribution or ensuring
adequate availability of petroleum,
petroleum products and natural gas
throughout the country and follow such
principles as the Board may, by regulations,
determine in carrying out its functions
under this section.”
On a reading of the aforesaid provision, it is clear as day
that the Board has been conferred with the power to declare
an existing pipeline for transportation of petroleum, petroleum
products and natural gas or an existing city or local natural
gas distribution network as a common carrier or contract
carrier and regulate or allow access to such pipeline or
network. Sub-Section (1) prescribes for giving wide publicity
JUDGMENT
of the Board’s intention. Sub-Section (2) stipulates affording
of opportunity of hearing to the pipeline or network for fixing
terms and conditions subject to which pipeline or network be
declared as common carrier or contract carrier. The Board
has been authorised, after following due procedure as
specified by Regulations under Section 19 and under
sub-Sections (1) and (2) by notification to declare a pipeline or
Page 40
41
city or local natural gas distribution network as a common
carrier or contract carrier and do certain acts. Sub-Section (4)
enables the Board to decide on the period of exclusivity to lay,
build, operate or expand a city or local natural gas distribution
network for such number of years. The objectives by which
the Board is to be guided are promoting competition among
entities, avoiding infructuous investment, maintaining or
increasing supplies or securing equitable distribution or
ensuring adequate availability of petroleum, etc.
17. Section 21 deals with right of first use, etc. The said
provision reads as follows:-
“21. Right of first use, etc. :-
(1) The entity laying, building, operating or
expanding a pipeline for transportation of
petroleum and petroleum products or
laying, building, operating or expanding a
city or local natural gas distribution
network shall have right of first use for its
own requirement and the remaining
capacity shall be used amongst entities as
the Board may, after issuing a declaration
under section 20, determine having regard
to the needs of fair competition in marketing
and availability of petroleum and petroleum
products throughout the country: Provided
that in case of an entity engaged in both
JUDGMENT
Page 41
42
marketing of natural gas and laying,
building, operating or expanding a pipeline
for transportation of natural gas on common
carrier or contract carrier basis, the Board
shall require such entities to comply with
the affiliate code of conduct as may be
specified by regulations and may require
such entity to separate the activities of
marketing of natural gas and the
transportation including ownership of the
pipeline within such period as may be
allowed by the Board and only within the
said period, such entity shall have right of
first use.
(2) An entity other than an entity authorised to
operate shall pay transportation rate for use
of common carrier or contract to the entity
operating it as an authorised entity.
(3) An entity authorised to lay, build, operate or
expand a pipeline as contract carrier or to
lay, build, operate or expand a city or local
natural gas distribution network shall be
entitled to institute proceedings before the
Board to prevent, or to recover damages for,
the infringement of any right relating to
authorization.
JUDGMENT
Explanation:- For the purposes of this
sub-section, “infringement of any right” means
doing of any act by any person which interferes
with common carrier or contract carrier or causes
prejudice to the authorised entity.”
The aforesaid provision stipulates the right of first use
and also prescribes certain conditions.
Page 42
43
18. Section 22 on which reliance has been placed deals with
transportation tariff. The said provision is reproduced below:-
“22. Transportation tariff :-
(1) Subject to the provisions of this Act, the
Board shall lay down, by regulations, the
transportation tariffs for common carriers or
contract carriers or city or local natural gas
distribution network and the manner of
determining such tariffs.
(2) For the purposes of sub-section (1), the
Board shall be guided by the following,
namely:-
(a) the factors which may encourage
competition, efficiency, economic use of
the resources, good performance and
optimum investments;
(b) safeguard the consumer interest and at
the same time recovery of cost of
transportation in a reasonable manner;
(c) the principles rewarding efficiency in
performance;
JUDGMENT
(d) the connected infrastructure such as
compressors, pumps, metering units,
storage and the like connected to the
common carriers or contract carriers;
(e) benchmarking against a reference tariff
calculated based on cost of service,
internal rate of return, net present
value or alternate mode of transport;
(f) policy of the Central Government
applicable to common carrier, contract
carrier and city or local distribution
natural gas network.”
Page 43
44
On a plain reading of the aforesaid, it is manifest that the
Board has the power to provide by Regulations the
transportation tariff for common carrier or contract carrier or
city or local natural gas distribution network and the manner
of distribution of such tariffs.
19. The question that arises for consideration is whether
reading of the aforesaid provisions namely, Sections 20 to 22
of the Act, it can be construed that they confer any power on
the Board to fix the transportation tariff of a consumer of
natural gas. We have also referred to sub-Section (4) of
Section 20 which confers the power on the Board to decide the
period of exclusivity and the network of a common/contract
carrier. Section 21, as indicated earlier, deals with the right of
JUDGMENT
first use. The transportation tariff, which finds place in
Section 22(1), commences with the words “subject to the
provisions of this Act”. The said provision confers power on
the Board to lay down, by regulation, the transportation tariff
for common carriers or contract carriers or city or local
Page 44
45
natural gas distribution network and the manner of
determination of such tariffs.
20. At this stage, it is necessary to appositely understand the
said expression. In The Commissioner of Wealth Tax,
Andhra Pradesh, Hyderabad v. Trustees of H.E.H. Nizam’s
1
Family (Remainder Wealth Trust), Hyderabad this Court
was dealing with the expression “subject to” in the context of
the Wealth Tax Act, 1957. Section 3 of the said Act imposed
the charge of wealth tax subject to other provisions of the Act.
In that context, the Court opined that Section 3 has to be
made expressly subject to Section 21 and it must yield to that
Section insofar as the latter makes a special provision for
assessment of a trustee of a trust. In Ashok Leyland Ltd. v.
JUDGMENT
2
State of T.N. and Another , it has been held that “subject to”
is an expression whereby limitation is expressed. In K.R.C.S.
Balakrishna Chetty and Sons & Co. v. The State of
1
(1977) 3 SCC 362
2
(2004) 3 SCC 1
Page 45
46
3
Madras , this Court was interpreting Section 5 of the Madras
General Sales Tax Act, 1939 wherein the Legislature had
appended the expression “subject to” and while interpreting
the said words, the Court ruled that they are meant to
effectuate the intention of law and the correct meaning of the
expression is “conditional one”.
21. In South India Corporation (P) Ltd. v. Secretary,
4
Board of Revenue, Trivandrum and another , the
Constitution Bench has ruled that the expression “subject to”
in the context convey the idea of a provision yielding place to
another provision or other provision to which it was made
subject to. In B.S. Vadera and another v. Union of India
5
and others , this Court while dealing with the expression “any
JUDGMENT
rule so made shall have effect, subject to provisions of any Act
occurring in the proviso to Article 309” ruled that:-
3
AIR 1961 SC 1152
4
AIR 1964 SC 207
5
AIR 1969 SC 118
Page 46
47
“24. It is also significant to note that the proviso
to Article 309, clearly lays down that ‘any rules
so made shall have effect, subject to the
provisions of any such Act'. The clear and
unambiguous expressions, used in the
Constitution, must be given their full and
unrestricted meaning, unless hedged-in, by any
limitations. The rules, which have to be ‘subject
to the provisions of the Constitution, shall have
effect, ‘subject to the provisions of any such Act'.
That is, if the appropriate legislature has passed
an Act, under Article 309, the rules, framed
under the proviso, will have effect,-subject to that
Act; but, in the absence of any Act, of the
appropriate legislature, on the matter, ‘in our
opinion, the rules, made by the President, or by
such person as he may direct, are to have full
effect, both prospectively, and, retrospectively.
Apart from the limitations, pointed out above,
there is none other, imposed by the proviso to
Article 309, regarding the ambit of the operation
of such-rules.”
22. Regard being had to the aforesaid interpretation, we have
JUDGMENT
to scan the anatomy of Section 11 of the Act, for it has
immense signification. The said provision deals with the
functions and powers of the Board. The said provision is
extracted below:-
“ 11 Functions and powers of the Board
The Board shall-
(a) protect the interest of consumers by fostering
fair trade and competition amongst the
entities;
Page 47
48
(b) register entities to-
(i) market notified petroleum and petroleum
products and, subject to the contractual
obligations of the Central Government,
natural gas;
(ii) establish and operate liquefied natural gas
terminals;
(iii) establish storage facilities for petroleum,
petroleum products or natural gas
exceeding such capacity as may be specified
by regulations;
(c) authorise entities to-
(i) lay, build, operate or expand a common
carrier or contract carrier;
(ii) lay, build, operate or expand city or local
natural gas distribution network;
(d) declare pipelines as common carrier or
contract carrier;
(e) regulate, by regulations,-
(i) access to common carrier or contract carrier
so as to ensure fair trade and competition
amongst entities and for that purpose
specify pipeline access code;
(ii) transportation rates for common carrier or
contract carrier;
(iii) access to city or local natural gas
distribution network so as to ensure fair
trade and competition amongst entities as
per pipeline access code;
JUDGMENT
(f) in respect of notified petroleum, petroleum
products and natural gas-
(i) ensure adequate availability;
Page 48
49
(ii) ensure display of information about the
maximum retail prices fixed by the entity for
consumers at retail outlets;
(iii) monitor prices and take corrective measures
to prevent restrictive trade practice by the
entities;
(iv) secure equitable distribution for petroleum
and petroleum products;
(v) provide, by regulations, and enforce, retail
service obligations for retail outlets and
marketing service obligations for entities;
(vi) monitor transportation rates and take
corrective action to prevent restrictive trade
practice by the entities;
(g) levy fees and other charges as determined by
regulations;
(h) maintain a data bank of information on
activities relating to petroleum, petroleum
products and natural gas;
(i) lay down, by regulations, the technical
standards and specifications including safety
standards in activities relating to petroleum,
petroleum products and natural gas,
including the construction and operation of
pipeline and infrastructure projects related to
downstream petroleum and natural gas
sector;
JUDGMENT
(j) perform such other functions as may be
entrusted to it by the Central Government to
carry out the provisions of this Act.”
Sub-section (e) of Section 11 of the Act is pertinent to
appreciate the controversy. It empowers the Board to regulate,
Page 49
50
by regulations, in respect of certain aspects. Section 11(e) (ii)
confers power on the Board to determine transport rates for
common carrier or contract carrier. Sub-section (f) of Section
11 allows the Board to regulate in respect of notified
petroleum, petroleum products and natural gas and
sub-section (e) (iii) of Section 11 empowers the Board to
regulate, by regulations, access to city or local natural gas
distribution network so as to ensure fair trade and competition
amongst entities as per pipeline access code. It is relevant to
note here that the High Court, while appreciating the language
employed in the said provision has held that:-
“We are of the opinion that none of the aforesaid
clauses can be construed as prescribing price
control/regulation as a function of the Board.
Clause (a) supra while prescribing protection of
interest of consumers limits the same to, by
fostering fair trade and competition amongst
entities engaged in distributing, dealing,
transporting, marketing gas. The function of the
Board thereunder is of regulating the inter se
relationship of entities under the Act and not to
regulate/control the relationship between the
entities under the Act and the consumers.
Similarly, Clause (f) while prescribing function of
monitoring prices limits the same to taking
corrective measures to prevent restrictive trade
practices by the entities. Thus only if the Board
JUDGMENT
Page 50
51
finds that the marketers of gas in a particular
area have formed a cartel or are indulging in any
other restrictive trade practices, is the Board
empowered to monitor prices. Such is not the
case of the Board in the present instance. The
petitioner even though till date the exclusive
marketer of gas in Delhi, has not been accused of
any restrictive trade practice and the power
exercised also is not in the name of monitoring
price. Another sub-clause of clause (f) of Section
11 confers function on the Board to ensure
display of information about Maximum Retail
Price. Again, had the intent of the legislature
been to confer the power on the Board to fix the
Maximum Retail Price, nothing prevented the
legislature from providing so expressly. Instead,
functions of enforcing retail service obligations
and marketing service obligations only have been
conferred by the legislature. The definition of
retail service obligations and marketing service
obligations in Sections 2(zk) and (w) also do not
include obligation to sell at the prices fixed by the
Board.”
23. The aforesaid analysis of the High Court is in consonance
JUDGMENT
with the provision and the expression “subject to” as used in
Section 22 for the said provision makes it graphically clear
that Section 22 has to yield to Section 11 of the Act which
deals with the powers and functions of the Board. Section 11
(e) only uses the words “common carrier” or “contract carrier”.
Even if one applies the concept of “subject matter”, in
Page 51
52
essentiality it is the “common carrier” and the “contract
carrier”. The dictionary clause of the said expression conveys
a different meaning and it does not include an entity which
utilizes the pipelines for its own use. The submission of Mr.
Datar is that after exclusivity period is over, the Board has the
power also cannot be treated to be correct, for such a power
has not been conferred on the Board under Section 11. As is
perceptible the provision deals with the entity when it engages
itself as a part of its pipeline as a common carrier or contract
carrier and not the consumers. It is submitted by the learned
senior counsel appearing for the respondent that a person
owning his own carrier, after the exclusivity period may have
the potentiality to enter into business of the “common carrier”
JUDGMENT
or “contract carrier” and at that juncture to maintain the
competitive prospects, regard being had to the consumer
interest, the Board may determine the price of the same, but a
significant one, that does not clothe the Board with the power
to command the entity to put/reflect it as a part of the bill to
Page 52
53
the consumer. It is urged that the Board does not have the
power to fix the tariff charges in that regard.
24. Mr. Datar, learned senior counsel would submit that
when the Board is established under a statute and has the
power to regulate solely because there is no mention of entity
that owns its own pipeline, it is inapposite to say that the
Board cannot determine the price and indicate the cost
incurred in this regard in the bill given to the consumer. It is
his further submission that the consumer has a right to know.
Learned senior counsel would go to the extent of saying that it
is a casus omissus and, therefore, the court must adopt the
principle of purposive interpretation and it can do so filling up
the gap to have the necessitous fruitful interpretation. Mr.
JUDGMENT
Salve and Mr. Tripathi, per contra, would submit that the
legislature has deliberately not done it and, in any case, the
Court should not read such a concept into it. Ms. Pinky
Anand, learned ASG relying on the affidavit filed by the Union
of India, would submit that the legislature has not given the
said power to the Board. It is seemly to state that even if a
Page 53
54
stand is taken by the Union of India, in respect of an
interpretation of a statutory provision, that does not mean
that the same is the correct interpretation because it is well
settled in law that no one can speak on behalf of the
legislature. It is the court which is the final interpreter.
Keeping that in view, we have to scrutinize whether in such a
situation this Court can implant words in the provision, as
canvassed by Mr. Datar.
25. In this regard we may, with profit, refer to certain
6
authorities in the field. In CST v. Parson Tools and Plants ,
the Court has held that if the legislature wilfully omits to
incorporate something of an analogous law in a subsequent
statute, or even if there is a casus omissus in a statute, the
JUDGMENT
language of which is otherwise plain and unambiguous, the
court is not competent to supply the omission by engrafting on
it or introducing in it, under the guise of interpretation, by
analogy or implication, something what it thinks to be a
general principle of justice and equity. To do so ‘would be
6
(1975) 4 SCC 22
Page 54
55
entrenching upon the preserves of legislature’. In Board of
Muslim Wakfs v. Radha Kishan , it has been observed that:-
“While it is true that under the guise of judicial
interpretation the court cannot supply casus
omissus, it is equally true that the courts in
construing an Act of Parliament must always try
to give effect to the intention of the legislature. In
7
Crawford v. Spooner the Judicial Committee
said:
“We cannot aid the legislature’s defective
phrasing of an Act, we cannot add and
mend and by construction, make up
deficiencies which are left there.”
To do so would be to usurp the function of the
legislation. At the same time, it is well settled
that in construing the provisions of statute the
courts should be slow to adopt a construction
which tends to make any part of the statute
meaningless or ineffective. Thus, an attempt
must always be made to reconcile the relevant
provisions so as to advance the remedy intended
by the statute.”
JUDGMENT
26. In this context, we may usefully refer to the authority in
8
CIT v. National Taj Traders wherein it has been clearly laid
down that two principles of construction i.e. one relating to
7
(1846) 6 Moore PC 1 : 13 ER 562
8
(1980) 1 SCC 370
Page 55
56
casus omissus and the other in regard to reading of the
statute as a whole have been well settled. The Court has
reproduced few passages from Maxwell on Interpretation of
Statutes at pages 33 and 47, as has been stated in Canada
9
Sugar Refining Co. Ltd. v. R., by Lord Davey and
proceeded to state thus:-
“In other words, under the first principle a casus
omissus cannot be supplied by the Court except
in the case of clear necessity and when reason for
it is found in the four corners of the statute itself
but at the same time a casus omissus should not
be readily inferred and for that purpose all the
parts of a statute or section must be construed
together and every clause of a section should be
construed with reference to the context and other
clauses thereof so that the construction to be put
on a particular provision makes a consistent
enactment of the whole statute. This would be
more so if literal construction of a particular
clause leads to manifestly absurd or anomalous
results which could not have been intended by
the Legislature. “An intention to produce an
unreasonable result”, said Danckwerts, L.J., in
Artemiou v. Procopiou (1966 1 QB 878), “is not to
be imputed to a statute if there is some other
construction available”. Where to apply words
literally would “defeat the obvious intention of the
legislation and produce a wholly unreasonable
result” we must “do some violence to the words”
JUDGMENT
9
1898 AC 735
Page 56
57
and so achieve that obvious intention and
produce a rational construction. [Per Lord Reid in
Luke v. IRC (1966 AC 557) where at p. 577 he
also observed: “this is not a new problem, though
our standard of drafting is such that it rarely
emerges”.] In the light of these principles we will
have to construe sub-section (2)( b ) with reference
to the context and other clauses of Section 33-B.”
10
27. In S.P. Gupta v. Union of India , after referring to
various authorities, it has been held:-
“Thus, on a full and complete consideration of
the decisions classified under the various
categories, the propositions that emerge from the
decided cases of this Court and other foreign
courts are as follows:
“Where the language of a statute is clear and
unambiguous, there is no room for the
application either of the doctrine of casus
omissus or of pressing into service external
aids, for in such a case the words used by the
Constitution or the statute speak for
themselves and it is not the function of the
court to add words or expressions merely to
suit what the courts think is the supposed
intention of the legislature. …””
JUDGMENT
28. In Bharat Aluminium Co. v. Kaiser Aluminium
11
Technical Services Inc. it has been opined thus:
10
(1981) Supp. SCC 87
11
(2012) 9 SCC 552
Page 57
58
“...... that it is not the function of the court to
supply the supposed omission, which can only be
done by Parliament. In our opinion, legislative
surgery is not a judicial option, nor a
compulsion, whilst interpreting an Act or a
provision in the Act. The observations made by
12
this Court in Nalinakhya Bysack would tend to
support the aforesaid views, wherein it has been
observed as follows:
“ 9 . … It must always be borne in mind, as
said by Lord Halsbury in Commissioners for
13
Special Purposes of Income Tax v. Pemsel ,
that it is
not competent to any court to
proceed upon the assumption that the
legislature has made a mistake. The court
must proceed on the footing that the
legislature intended what it has said. Even if
there is some defect in the phraseology used
by the legislature the Court cannot, as
14
pointed out in Crawford v. Spooner , aid the
legislature’s defective phrasing of an Act or
add and amend or, by construction, make up
deficiencies which are left in the Act. Even
where there is a casus omissus, it is, as said
by Lord Russell of Killowen in Hansraj Gupta
v. Official Liquidators of Dehra Dun-Mussoorie
15
Electric Tramway Co. Ltd. , for others than
the courts to remedy the defect.””
JUDGMENT
12
AIR 1953 SC 148
13
1891 AC 531, at p. 549 (HL)
14
(1846-49) 6 Moo PC 1 : 13 ER 582 : 4 MIA 179 : 18 ER 667
15
(1932-33) 60 IA 13 : AIR 1933 PC 63
Page 58
59
After so stating the Court has referred to the
observations made by Lord Diplock in Duport Steels
16
Ltd. wherein it has been ruled thus:
“… the role of the judiciary is confined to
ascertaining from the words that Parliament has
approved as expressing its intention what that
intention was, and to giving effect to it. Where the
meaning of the statutory words is plain and
unambiguous it is not for the Judges to invent
fancied ambiguities as an excuse for failing to give
effect to its plain meaning because they
themselves consider that the consequences of
doing so would be inexpedient, or even unjust or
immoral . In controversial matters such as are
involved in industrial relations there is room for
differences of opinion as to what is expedient,
what is just and what is morally justifiable.
Under our Constitution it is Parliament’s opinion
on these matters that is paramount.”
(emphasis supplied)
29. Recently, in Sarah Mathew v. Institute of Cardio
JUDGMENT
17
Vascular Diseases , while interpreting Section 468 CrPC, the
Court has opined:-
“It is argued that a legislative casus omissus
cannot be supplied by judicial interpretation. It is
submitted that to read Section 468 CrPC to mean
16
(1980) 1 WLR 142 : (1980) 1 All ER 529 (HL)
17
(2014) 2 SCC 62
Page 59
60
that the period of limitation as period within
which a complaint/charge-sheet is to be filed,
would amount to adding words to Sections 467
and 468. It is further submitted that if the
legislature has left a lacuna, it is not open to the
court to fill it on some presumed intention of the
legislature. Reliance is placed on Shiv Shakti
18 19
Coop. Housing Society , Bharat Aluminium and
several other judgments of this Court where
doctrine of casus omissus is discussed. In our
opinion, there is no scope for application of
doctrine of casus omissus to this case. It is not
possible to hold that the legislature has omitted
to incorporate something which this Court is
trying to supply. The primary purpose of
construction of the statute is to ascertain the
intention of the legislature and then give effect to
that intention. After ascertaining the legislative
intention as reflected in the Forty-second Report
of the Law Commission and the Report of the
JPC, this Court is only harmoniously construing
the provisions of Chapter XXXVI along with other
relevant provisions of the Criminal Procedure
Code to give effect to the legislative intent and to
ensure that its interpretation does not lead to any
absurdity. It is not possible to say that the
legislature has kept a lacuna which we are trying
to fill up by judicial interpretative process so as
to encroach upon the domain of the legislature.
The authorities cited on doctrine of casus
omissus are, therefore, not relevant for the
present case.”
JUDGMENT
18
(2003) 6 SCC 659
19
(2012) 9 SCC 552
Page 60
61
30. We have referred to the aforesaid passage as the
Constitution Bench has given emphasis on primary purpose of
construction of statute to ascertain the intention of the
legislature, harmonious construction of the various provisions
of the CrPC and for ensuring that the interpretation does not
lead to any absurdity. That apart, the Court has also
categorically observed that it is not a case where it can be said
that legislature has kept a lacuna which the Court is trying to
fill up by judicial interpretative process so as to encroach upon
the domain of the legislature. In the case at hand, in the
schematic context of the Act and upon reading the legislative
intention and applying the principle of harmonious
construction, we do not perceive inclusion of the entities
JUDGMENT
which are not “common carriers” or “contract carriers” would
be permissible. They have deliberately not been included
under Section 11 of the Act by the legislature and the said
non-inclusion does not lead to any absurdity and, therefore,
there is no necessity to think of any adventure.
Page 61
62
31. We must take note of certain situations where the Court
in order to reconcile the relevant provision has supplied words
and the exercise has been done to advance the remedy
intended by the statute. In Surjit Singh Kalra v. Union of
20
India , a three-Judge Bench perceiving the anomaly, held:-
“True it is not permissible to read words in a
statute which are not there, but “where the
alternative lies between either supplying by
implication words which appear to have been
accidentally omitted, or adopting a construction
which deprives certain existing words of all
meaning, it is permissible to supply the words”
(Craies Statute Law , 7th edn., p. 109). Similar are
the observations in Hameedia Hardware Stores v.
21
B. Mohan Lal Sowcar where it was observed that
the court construing a provision should not easily
read into it words which have not been expressly
enacted but having regard to the context in which
a provision appears and the object of the statute
in which the said provision is enacted the court
should construe it in a harmonious way to make
it meaningful. An attempt must always be made
so to reconcile the relevant provisions as to
advance the remedy intended by the statute.
(See: Sirajul Haq Khan v. Sunni Central Board of
22
Waqf .)”
JUDGMENT
20
(1991) 2 SCC 87
21
(1988) 2 SCC 513, 524-25
22
1959 SCR 1287 : AIR 1959 SC 198
Page 62
63
32. We have referred to the aforesaid authority as Mr. Datar
has respectfully urged that omission in Section 11 is
accidental. The test that has been laid down in Surjit Singh
Kalra (supra) and other decisions of this Court, we are afraid,
do not really support the submission of Mr. Datar. By no
stretch of imagination, we can conceive that non-conferment of
power on the Board, in particular regard, is accidental. The
legislative intention is absolutely clear and simple and, in fact,
does not call for adoption of any other construction to confer
any meaning to the existing words. Thus, the said submission
leaves us unimpressed.
33. Having dealt with this facet, it is appropriate to refer to
JUDGMENT
Section 61, which deals with the power of the Board to make
Regulations. Sub-section (1) of Section 61 stipulates that the
Board may, by notification, make regulations consistent with
the Act and the Rules made thereunder to carry out the
provisions of the Act. Sub-section (2) of Section 61 stipulates
that without prejudice to the generality of the foregoing power,
such Regulations may provide for all or any of the following
Page 63
64
matters and the matters have been enumerated thereafter.
Mr. Datar has emphasised on Section 61(2)(t), which reads as
follows:-
“(t) the transportations tariffs for common
carriers or contract carriers or city or local
natural gas distribution network and the manner
of determining such tariffs under sub-section (1)
of section 22.”
34. On a scrutiny of the said provision, we notice that it
deals with transportation tariff for “common carrier” and
“contract carrier” or “city or local natural gas distribution
network” and the determination has to be done as per
sub-section (1) of Section 22. Be it noted, in pursuance of the
said provision, regulations, namely, Petroleum and Natural
Gas Regulatory Board (Determination of Network Tariff for City
JUDGMENT
or Local Natural Gas Distribution Networks and Compression
Charge for CNG) Regulations, 2008 which we have already
referred to as “the Regulations” have been framed. Emphasis
has been laid on Regulation 2(e) and 2(g), which read as
follows:-
“(e) “compression charge for CNG” means a
charge (excluding statutory taxes and levies) in
Page 64
65
Rs./Kg for online compression of natural gas into
compressed natural gas (hereinafter referred to
as CNG) for subsequent dispensing to consumers
in a CNG station.
(g) “Network tariff” means the weighted average
unit rate of tariff (excluding statutory taxes and
levies) in rupees per million British Thermal
Units (Rs./MMBTU for all the categories of
consumers of natural gas in a CGD Network.”
35. Regulation 4 reads as follows:-
“ 4. Determination of network tariff and compression
charge for CNG.
The network tariff and compression charge for CNG in
respect of an entity covered clause (a) or clause (b) of
sub-regulation (1) of regulation 3 shall be determined as
per the procedure at Schedule A.”
In addition to the aforesaid there are various Regulations
dealing with the procedure of determination. Mr. Datar,
learned senior counsel, would submit that Section 61 of the
JUDGMENT
Act has to be read in consonance with the objects and reasons
of the Act and when the Board has the power to frame
regulations to carry out the purposes of the Act, it has framed
the Regulations in accordance with the legislation and the
High Court has totally flawed in declaring it as ultra vires.
Page 65
66
36. We have already dealt with the purport of Section 11,
adverted to the facet how the words “subject to” have to be
interpreted, functions of the Board, and provisions relating to
exclusivity, definitions of “common carrier” and the “contract
carrier”. Section 61 is a provision that enables the Board to
frame Regulations. If on reading of the statute in entirety,
such a power does not flow, a delegated authority cannot
frame a regulation as that would not be in accord with the
statutory provisions nor would it be for the purpose of carrying
on the provisions of the Act. In St. Johns Teachers
Training Institute v. National Council for Teacher
23
Education it has been observed that:-
“A regulation is a rule or order prescribed by a
superior for the management of some business
and implies a rule for general course of action.
Rules and regulations are all comprised in
delegated legislations. The power to make
subordinate legislation is derived from the
enabling Act and it is fundamental that the
delegate on whom such a power is conferred has
to act within the limits of authority conferred by
the Act. Rules cannot be made to supplant the
provisions or the enabling Act but to supplement
JUDGMENT
23
(2003) 3 SCC 321
Page 66
67
it. What is permitted is the delegation of
ancillary or subordinate legislative functions, or,
what is fictionally called, a power to fill up
details.”
24
37. In Kunj Behari Lal Butail v. State of H.P. it has
been ruled that it is very common for the legislature to provide
far a general rule-making power to carry out the purpose of
the Act. When such a power is given, it may be permissible to
find out the object of the enactment and then see if the rules
framed satisfy the test of having been so framed as to fall
within the scope of such general power confirmed. If
rule-making power is not expressed in such a usual general
form then it shall have to be seen if the rules made are
protected by the limits prescribed by the parent Act. In State
JUDGMENT
25
of Karnataka v. H. Ganesh Kamath it has been stated
that it is a well-settled principle of interpretation of statutes
that the conferment of rule-making power by an Act does not
enable the rule-making authority to make a rule which travels
24
(2000) 3 SCC 40
25
(1983) 2 SCC 402
Page 67
68
beyond the scope of the enabling Act or which is inconsistent
therewith or repugnant thereto.”
38. In Sukhdev Singh v. Bhagatram Sardar Singh
26
Raghuvanshi
“....statutory bodies cannot use the power to
make rules and regulations to enlarge the powers
beyond the scope intended by the legislature.
Rules and regulations made by reason of the
specific power conferred by the stature to make
rules and regulations establish the pattern of
conduct to be followed”.
39. In General Officer Commanding-in-Chief v. Subhash
27
Yadav , it has been held as follows:-
“.....before a rule can have the effect of a
statutory provision, two conditions must be
fulfilled, namely, (1) it must conform to the
provisions of the statute under which it is
framed; and (2) it must also come within the
scope and purview of the rule-making power of
the authority framing the rule. If either of these
two conditions is not fulfilled, the rule so framed
would be void.”
JUDGMENT
26
(1975) 1 SCC 421
27
(1988) 2 SCC 351
Page 68
69
40. Similar view has been expressed in State of T.N. v. P.
28 29
Krishnamurthy and in Union of India v. Srinivasan
wherein it has been held that:-
“...If a rule goes beyond the rule-making power
conferred by the statue, the same has to be declared
ultra vires. If a rule supplants any provision for
which power has not been conferred, it becomes
ultra vires. The basic test is to determine and
consider the source of power which is relatable to
the rule. Similarly, a rule must be in accord with
the parent statute as it cannot travel beyond it.”
30
41. In Dr. Indramani Pyarelal Gupta v. W.R. Natu , the
Court has held that one of the tests to determine whether a
statutory body is vested with a particular power is to see
whether exercise of such power is contra-indicated by any
specific provision of the enactment bringing such statutory
JUDGMENT
body into existence. In Tata Power Company Limited v.
31
Reliance Energy Limited , it has been ruled that save and
28
(2006) 4 SCC 517
29
(2012) 7 SCC 683
30
AIR 1963 SC 274
31
(2009) 16 SCC659
Page 69
70
except for the exercise of regulatory power which is specifically
recognized by the statute, it is not open to the regulatory body
to exercise a power which is not incorporated in the statute.
42. In this context, it is fruitful to refer to the authority in
32
Academy of Nutrition Improvement v. Union of India .
The two-Judge Bench was dealing with the issue of
constitutional validity of Prevention of Food Adulteration
(Eighth Amendment) Rules, 2005. After discussing at length
from various angles, the Court held that:-
“Statutes delegating the power to make rules
follow a standard pattern. The relevant section
would first contain a provision granting the
power to make rules to the delegate in general
terms, by using the words “to carry out the
provisions of this Act” or “to carry out the
purposes of this Act”. This is usually followed by
another sub-section enumerating the
matters/areas in regard to which specific power
is delegated by using the words “in particular and
without prejudice to the generality of the
foregoing power, such rules may provide for all or
any of the following matters”. Interpreting such
provisions, this Court in a number of decisions
has held that where power is conferred to make
subordinate legislation in general terms, the
subsequent particularisation of the
JUDGMENT
32
(2011) 8 SCC 274
Page 70
71
matters/topics has to be construed as merely
illustrative and not limiting the scope of the
general power. Consequently, even if the specific
enumerated topics in Section 23(1-A) may not
empower the Central Government to make the
impugned rule (Rule 44-I), making of the rule can
be justified with reference to the general power
conferred on the
Central Government under
Section 23(1), provided the rule does not travel
beyond the scope of the Act.
“But even a general power to make rules or
regulations for carrying out or giving effect to
the Act, is strictly ancillary in nature and
cannot enable the authority on whom the
power is conferred to extend the scope of
general operation of the Act. Therefore, such a
power ‘will not support attempts to widen the
purposes of the Act, to add new and different
means to carrying them out, to depart from or
vary its terms’.”
Rule 44-I is not a rule made or required to be
made to carry out the provisions of the Act,
having regard to its object and scheme. It has
nothing to do with curbing of food adulteration or
to suppress any social or economic mischief.”
JUDGMENT
On the basis of the aforesaid analysis, the Court opined
that:-
“We have already noticed that as at present there
is no material to show that universal salt
iodisation will be injurious to public health (that
is to the majority of populace who do not suffer
from iodine deficiency). But we are constrained to
Page 71
72
hold that Rule 44-I is ultra vires the Act and
therefore, not valid.”
43. In the case at hand, the Board has not been conferred
such a power as per Section 11 of the Act. That is the
legislative intent. Section 61 enables the Board to frame
Regulations to carry out the purposes of the Act and certain
specific aspects have been mentioned therein. Section 61 has
to be read in the context of the statutory scheme. The
regulatory provisions, needless to say, are to be read and
applied keeping in view the nature and textual context of the
enactment as that is the source of power. On a scanning of
the entire Act and applying various principles, we find that the
Act does not confer any such power on the Board and the
JUDGMENT
expression “subject to” used in Section 22 makes it a
conditional one. It has to yield to other provisions of the Act.
The power to fix the tariff has not been given to the Board. In
view of that the Board cannot frame a Regulation which will
cover the area pertaining to determination of network tariff for
city or local gas distribution network and compression charge
for CNG. As the entire Regulation centres around the said
Page 72
73
subject, the said Regulation deserves to be declared ultra
vires, and we do so.
44. Ex consequenti, we find no substance in this appeal and
accordingly the same stands dismissed without any order as
to costs.
.................................J.
[Dipak Misra]
..................................J.
[Uday Umesh Lalit]
New Delhi
July 1, 2015
JUDGMENT
Page 73