Full Judgment Text
CA 504/2020
1
Reportable
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
Civil Appeal No 504 of 2020
Arising out of SLP(C) No 15430 of 2019
The New India Assurance Co. Ltd. …Appellant
Versus
Sri Buchiyyamma Rice Mill and Anr. …Respondent(s)
J U D G M E N T
Dr Dhananjaya Y Chandrachud, J
1 Leave granted.
2 This appeal arises from a judgment of the National Consumer Disputes
1
Redressal Commission dated 4 February 2019, by which the decision of the State
2
Consumer Disputes Redressal Commission was reversed and the insurer was di-
rected to pay a sum of Rs 29,23,503 together with interest at the rate of nine per
cent per annum from the date of repudiation of claim i.e. 15 October 2007.
Signature Not Verified
Digitally signed by
Chetan Kumar
Date: 2021.10.26
10:46:11 IST
Reason:
1 “NCDRC”
“SCDRC”
2
CA 504/2020
2
3 The first respondent has a rice mill situated in East Godavari District of
Andhra Pradesh. The claim of the first respondent was in terms of three standard
fire and special perils insurance policies, to cover specified risks in respect of plant
and machinery, the building, the godowns, stock of rice, paddy, and the boiling
units in the year 2004-2005. On 19 April 2005, the first respondent reported that
while the rice mill was in operation, a lorry which was in the process of reversing,
collided with the boiler unit, as a result of which the boiler unit collapsed in its en-
tirety together with sixteen storage tanks including a paddy bin and an elevator.
The damage was estimated at Rs 76 lakhs. A First Information Report was lodged
on 21 April 2005, and a telegraphic intimation was furnished to the appellant on
the same day. Initially, the appellant deputed Mr V Satya Sai Baba, an insurance
surveyor to conduct a preliminary survey of the damage. The report of the prelimi-
nary survey was submitted on 25 April 2005 wherein, it was stated that it was un-
likely that the incident had taken place in the manner in which the insured had
claimed. The survey report indicated several reasons in support of these findings,
which are extracted below:
“1. According to the information given by the lorry driver of
ADB7047 while he is reversing the lorry towards the paddy
boiling unit he suddenly heard some noise and jumped from
the lorry and observed the collapsing of the paddy boiling
unit.
2. After observing the collapsed paddy boiling unit and
alleged impact truck ADB7047 jointly the following
observations were clearly observed.
a. The alleged impact truck rear portion collapsed boiling unit
structures are having reasonable distance, which means
CA 504/2020
3
there is no direct impact of alleged truck and structures.
Photo no 10 shows the clear picture.
b. A huge MS sheet of the paddy boiling bin is hanging in
between the alleged truck and collapsed structure.
c. No damages bending or twisting of the back portion of the
body of the alleged impact vehicle were found and the body is
in good condition.
3. The alleged impact truck was found far away from the
structure. Hence the structure collapsed due to alleged
impact by truck is to be thoroughly investigated. The same
was informed immediately to the insurer.
4. Based on collapsed structure observations I found the
boiling unit columns are flatten like compressed ‘s’ and not
collapsed unevenly. After observing this type of collapse,
which might be occurred only during structural failure
cases. Hence a structural expert opinion is also required
in order to ascertain the real cause of damage. This
information was also informed to the insurer
immediately.
5. The undersigned observed the insured premises of boiling
unit area. The majority of the operations carried from other
side of alleged impact truck location. The clear axes of
loading, unloading and other operations are carrying to boiling
unit from that side only. The present alleged impact truck
found location was found to be not accessible for the above
operation.
6. The insured boiling unit was originally designed for 8 bins
and extended to 16 bins during 2004 ending. This extension
work was carried without proper balancing the structure at full
load, which might be the one of the cause of failure of boiling
unit structure.
7. Total paddy boiling unit structure including tanks was
collapsed.
8. All boiling tanks were with paddy under process at the time
of collapse.”
(Emphasis supplied)
CA 504/2020
4
4 The preliminary surveyor had opined that it would be appropriate if a struc-
tural expert was called upon to ascertain the real cause of damage. Consequently,
a report was submitted to the insurer on 25 November 2006, by Professor K Ram-
babu of Andhra University College of Engineering, Department of Civil Engineer-
ing, Visakhapatnam. The report of the structural expert indicated that (i) there was
no external impact noted on any of the failed columns; (ii) the storage capacity of
the system had been breached; (iii) the incident was as a result of exceeding the
load carrying capacity of the column section resulting in the collapse of the entire
paddy boiling structure. The appellant deputed M/s Surya Teja Associates in order
to investigate into the matter. In their report dated 8 December 2006, which was
replete with photographs, the investigator arrived at the finding that though the
boiling mill was erected in 1999 with a 32 tons capacity, at the time of collapse, the
mill was overloaded to the extent of 184.5 tons. An Insurance Regulatory
3
Development Authority licenced surveyor, Mr V Abbu Rao was also deputed by
the insurer to carry out the survey and make an assessment of the losses. The
surveyor submitted a final survey report dated 29 June 2007. Based on an
evaluation of the nature of damage, the surveyor noted that (i) no external impact
or damage to the failed columns had been noted; (ii) the MS sheet of the paddy
bin was hanging in between the vehicle and the collapsed structure which belied
the claim that the body of boiling unit had collapsed as a result of collision with the
lorry. The surveyor concluded with the finding that the boiling tank structure had
collapsed due to overload and not due to the impact of a collision with a lorry.
“IRDA”
3
CA 504/2020
5
5 Based on the report of the surveyor, the insurer repudiated the claim on 15
October 2007. This led to the institution of a consumer complaint before the
SCDRC. The SCDRC dismissed the complaint on 16 March 2012. In arriving at
this finding, the SCDRC relied upon the following circumstances:
(i) In the telegraphic communication addressed on 19 April 2005 by the
insured to the insurer, there was merely a reference to the accident
without any details of an alleged collision with a lorry;
(ii) The appellant’s complaint was lodged at 9 pm on 29 April 2005, more
than two days after the damage to the unit;
(iii) If the lorry had collided with the boiler unit with such a great impact as
claimed, there would have been extensive damage to the vehicle, but
no evidence of any damage to the vehicle had been produced;
(iv) The insured had not produced any material evidence to support the
plea that injuries had been caused to a worker at the site;
(v) Though the incident is alleged to have been videographed, no material
evidence had been produced; and
(vi) The report of the insurance company surveyor (RW 3) as well as of the
Professor in the Department of Civil Engineering (RW 4) indicated that
the damage had been caused not as a result of the external impact of
a vehicular collision but because the weight of the mill was beyond the
CA 504/2020
6
load carrying capacity of the column section. The SCDRC also relied
on the report of the Chief Investigator (RW 5), who had found that at
the time of the incident, the mill was loaded to the extent of 184.5 tons
of paddy as against its original capacity of 32 tons.
6 The above findings of the SCDRC have been reversed by the NCDRC. In
doing so, the NCDRC has come to the conclusion that (i) the report of the surveyor
was submitted nearly one and half years after the incident; and (ii) the second
survey report was submitted beyond a period of two years. This according to the
NCDRC was in breach of the Insurance Regulatory and Development Authority of
India (Protection of Policyholders’ Interests) Regulations 2002, more particularly,
Regulation 9, which prescribes a period of thirty days for completion of the survey.
Relying on the report of the Inspector of the Factories Department, the NCDRC
awarded the respondent’s claim in the amount of Rs 29,23,503 together with
interest.
7 In assailing the judgment of the NCDRC, Mr K K Bhat, learned counsel
appearing on behalf of the appellant submitted that there was a fundamental
misconception on the part of the NCDRC in coming to its conclusion. The first
survey which was conducted was in the nature of a preliminary survey. It was
submitted that the inspection took place on 19 April 2005 at 3 pm, soon after the
incident was reported, and a report was submitted within less than a week
thereafter on 25 April 2005. A further report was obtained from the structural expert
at the Department of Civil Engineering, Andhra University College of Engineering,
CA 504/2020
7
since the preliminary survey had set out the need for obtaining a structural opinion.
The Chief Investigator submitted his report on 8 December 2006 and the final
survey report itself was submitted on 29 June 2007. The final survey report which
had been submitted was also of a surveyor who had inspected the site on 21 April
2005. Learned counsel while relying upon the decision of this Court in Sri
Venkateswara Syndicate v Oriental Insurance Company Limited and
4
Another , submitted that in the present case the insurer had valid reasons for
obtaining a preliminary report after which a structural opinion and the report of an
investigator was sought. It was urged that the final survey report did not arrive at a
position at variance with the conclusion of the earlier reports. Hence, this is not a
case where the insurer has appointed a succession of surveyors merely for the
purpose of obtaining a favourable opinion. On the contrary, all the reports which
had been submitted to the insurer are consistent. This Court has in the above
judgment clarified that there is no prohibition per se on more than one surveyor
being appointed, though this cannot be done as a matter of routine only to obtain a
favourable opinion.
8 On the other hand supporting the judgment of the NCDRC, Ms K Radha,
learned counsel appearing on behalf of the respondent submitted that the survey
reports which were obtained by the insurer were after a considerable lapse of time.
The delay which has taken place in the submission of the reports would
substantially dilute their evidentiary value. Hence, it was urged that the NCDRC
(2009) 8 SCC 507
4
CA 504/2020
8
had taken a cogent view of the matter in affirming the claim of the insured in terms
of the three insurance policies.
9 The rival submissions fall for consideration.
10 In order to adjudicate upon the dispute, it is relevant to refer to Section 64-
UM(2) of the Insurance Act 1938:
“64-UM. (2) No claim in respect of a loss which has occurred
in India and requiring to be paid or settled in India equal to or
exceeding twenty thousand rupees in value on any policy of
insurance, arising or intimated to an insurer at any time after
the expiry of a period of one year from the commencement of
the Insurance (Amendment) Act, 1968, shall, unless
otherwise directed by the Authority, be admitted for payment
or settled by the insurer unless he has obtained a report, on
the loss that has occurred, from a person who holds a licence
issued under this section to act as a surveyor or loss
assessor (hereafter referred to as ‘approved surveyor or loss
assessor’):
Provided that nothing in this sub-section shall be deemed to
take away or abridge the right of the insurer to pay or settle
any claim at any amount different from the amount assessed
by the approved surveyor or loss assessor.
(3) The Authority may, at any time, in respect of any claim of
the nature referred to in sub-section (2), call for an
independent report from any other approved surveyor or loss
assessor specified by him and such surveyor or loss assessor
shall furnish such report to the Authority within such time as
may be specified by the Authority or if no time-limit has been
specified by him within a reasonable time and the cost of, or
incidental to, such report shall be borne by the insurer.
(4) The Authority may, on receipt of a report referred to in sub-
section (3), issue such directions as he may consider
necessary with regard to the settlement of the claim including
any direction to settle a claim at a figure less than, or more
than, that at which it is proposed to settle it or it was settled
and the insurer shall be bound to comply with such directions:
CA 504/2020
9
Provided that where the Authority issues a direction for
settling a claim at a figure lower than that at which it has
already been settled, the insurer shall be deemed to comply
with such direction if he satisfies the Authority that all
reasonable steps, with due regard to the question whether the
expenditure involved is not disproportionate to the amount
required to be recovered, have been taken with due dispatch
by him:
Provided further that no direction for the payment of a lesser
sum shall be made where the amount of the claim has
already been paid and the Authority is of opinion that the
recovery of the amount paid in excess would cause undue
hardship to the insured:
Provided also that nothing in this section shall relieve the
insurer from any liability, civil or criminal, to which he would
have been subject but for the provisions of this sub-section.”
11 Section 64 UM (1) of the Insurance Act 1938, speaks of licensing of
surveyors and loss assessors. In the present case, we are not concerned with
sub-section (1). Sub-section (2) mandates that no claim in respect of a loss which
has occurred in India and requiring to be paid in an amount equal to or exceeding
Rs 20,000 in value on any policy of insurance shall be admitted for payment,
unless the insurer obtains a report of a surveyor or loss assessor who holds a
license issued under sub-section (1) of Section 64 UM. Sub-section (3) empowers
IRDA with the power to obtain an independent report from any other surveyor in
respect of a claim of the nature referred to in sub-section (2). Sub-section (4)
envisages that the regulatory authority may issue such directions as it may
consider necessary on receipt of the report referred to in sub-section (3). The
proviso to sub-section (2) reserves to the insurer the right to pay or settle the claim
CA 504/2020
10
for an amount different from the amount assessed by the surveyor or loss
assessor.
12 The impugned judgment of the NCDRC has incorrectly analysed the basis
by the insurer for the appointment of surveyors for the purpose of inspection and
assessment. The record to which we have adverted to earlier would indicate that
immediately upon receipt of an intimation of the incident, the insurer initially
appointed a surveyor to submit a preliminary survey report. The inspection was
carried out on 19 April 2005 close on the heels of the incident. The report of the
preliminary surveyor found serious anomalies in the claim of the insured in regard
to the genesis of the incident. It was on the suggestion of the surveyor that the
appellant obtained an opinion from a structural expert from the Department of Civil
Engineering, Andhra University College of Engineering. The insurer thereafter
proceeded to obtain the opinion of an investigator on 8 December 2006, and
eventually, a final survey report was submitted on 29 June 2007. The purpose of
the final survey was to determine, on the basis of the material which had emerged
during the course of an inspection the cause of the incident, and to assess the
extent of damage and loss.
13 In Sri Venkateswara Syndicate (supra), the issue before this Court was
whether the insurer can appoint successive surveyors for getting the loss and
damage assessed before settling the claim of the insured. The two judge Bench
while explaining the purpose of a report of the surveyor observed thus:
CA 504/2020
11
“31. The assessment of loss, claim settlement and relevance
of survey report depends on various factors. Whenever a loss
is reported by the insured, a loss adjuster, popularly known
as loss surveyor, is deputed who assesses the loss and
issues report known as surveyor report which forms the
basis for consideration or otherwise of the claim.
Surveyors are appointed under the statutory provisions and
they are the link between the insurer and the insured when
the question of settlement of loss or damage arises. The
report of the surveyor could become the basis for
settlement of a claim by the insurer in respect of the loss
suffered by the insured. ”
(Emphasis supplied)
This Court held that the report of a surveyor must be given due importance and
that there should be sufficient grounds for explaining a disagreement with an
assessment made by a report of the surveyor. Yet at the same time, under Section
64-UM(2) of the Insurance Act 1938, it is not open to the insurer to merely appoint
a succession of surveyors with a view to obtain a tailor-made report. It is open to
the insurer to appoint another surveyor for valid reasons bearing on the
deficiencies found in the survey report and the reasons which must be indicated by
the insurer. In this backdrop, the two judge Bench while holding that there is no
absolute prohibition on the insurer appointing more than one surveyor observed
thus:
“33. Scheme of Section 64-UM, particularly of sub-sections (2),
(3) and (4) would show that the insurer cannot appoint a second
surveyor just as a matter of course. If for any valid reason the
report of the surveyor is not acceptable to the insurer may
be for the reason if there are inherent defects, if it is found to
be arbitrary, excessive, exaggerated, etc., it must specify
cogent reasons, without which it is not free to appoint the
second surveyor or surveyors till it gets a report which
would satisfy its interest. Alternatively, it can be stated that
there must be sufficient ground to disagree with the findings
of surveyor/surveyors. There is no prohibition in the
Insurance Act for appointment of second surveyor by the
CA 504/2020
12
insurance company, but while doing so, the insurance
company has to give satisfactory reasons for not accepting
the report of the first surveyor and the need to appoint
second surveyor. ”
...
“35. In our considered view, the Insurance Act only mandates that
while settling a claim, assistance of a surveyor should be taken
but it does not go further and say that the insurer would be bound
by whatever the surveyor has assessed or quantified; if for any
reason, the insurer is of the view that certain material facts
ought to have been taken into consideration while framing a
report by the surveyor and if it is not done, it can certainly
depute another surveyor for the purpose of conducting a
fresh survey to estimate the loss suffered by the insured. ”
(Emphasis supplied)
14 While determining whether the appointment of a second or successive
surveyor is justified, one must take into consideration the necessity of doing so
and it must be weighed in the context of relevant facts and circumstances
including the deficiencies or omissions in the report of the first surveyor. Each case
must be independently considered based on relevant facts and circumstances.
There ought to be cogent reasons for appointing a second surveyor.
15 At this point, we may take note of a two judge Bench decision of this Court
in New India Assurance Company Limited v Protection Manufacturers Private
5
Limited , where a submission was made that under Section 64-UM of the
Insurance Act 1938, prior to the appointment of a subsequent surveyor, the insurer
ought to have gone to the Regulatory Authority and under sub-section (3), it was
for the Regulatory Authority to call for an independent report from any other
2010 7 SCC 386
5
CA 504/2020
13
surveyor. It was argued that the subsequent report of the surveyor must be
disregarded on the above ground. This Court made a passing reference to the
submission and accepted the contention. However, the facts of the above case are
distinguishable from the present case. In the above case, the insurance company
appointed another surveyor, who based on a cursory investigation determined the
damages suffered by the insured in an amount close to the assessment made out
by the insurer. This Court disregarded the subsequent report describing it as a
tailor-made report, motivated and intended to benefit the insurer. Significantly, in
the present case all the survey reports have spoken in one voice. The theory of
the insured that the collapse of the entire boiler unit of the mill was due to the
impact of a collision with a reversing lorry is belied by the cogent reasons which
form the basis of the repudiation of the claim by the insurer. As a matter of fact, it
is significant that in the first intimation by the insured of the incident, there was no
reference to an alleged collision of the boiler unit with the lorry. This fact was
noticed by the SCDRC. That apart, it is evident from the survey reports that the
column section did not contain any evidence of an impact damage that would be
sustained by collision with a lorry. The lorry had evidently suffered no damage at
all, something that would have been unlikely if there was an impact with the boiler
unit with such a high force. These reasons were the foundation of the order of the
SCDRC.
16 In the present case, as we have noted, the process which was followed by
the insurer was not designed to obtain a report which would adopt a position
CA 504/2020
14
adverse to the claim of the insured. There exist no mala fides on part of the
insurer. On the contrary, it is evident from the record that the reports which have
been relied upon maintained a consistent line of reasoning in regard to the nature
and genesis of the incident. In this backdrop, we are of the view that the NCDRC
has not acted reasonably in overturning the considered decision of the SCDRC.
Cogent reasons were given by the SCDRC for rejecting the claim of deficiency of
service on the part of the insurer. On the basis of the material which has emerged
from the record, we find the opinion of the SCDRC to be correct. The view which
has been taken by the NCDRC is not consistent with the statement of legal
position as contained in the judgment of this Court in Sri Venkateswara
Syndicate (supra) and is contrary to the material evidence on the record.
17 For the above reasons, we allow the appeal and set aside the impugned
judgment of the NCDRC dated 4 February 2019. The consumer complaint filed by
the respondent shall accordingly stand dismissed. There shall be no order as to
costs.
…………...…...….......………………........J.
[Dr Dhananjaya Y Chandrachud]
…..…..…....…........……………….…........J.
[Ajay Rastogi]
New Delhi;
January 21, 2020
CA 504/2020
15
ITEM NO.15 COURT NO.8 SECTION XVII-A
S U P R E M E C O U R T O F I N D I A
RECORD OF PROCEEDINGS
Civil Appeal No.504/2020
THE NEW INDIA ASSURANCE CO. LTD. Appellant(s)
VERSUS
SRI BUCHIYYAMMA RICE MILL & ANR. Respondent(s)
Date : 21-01-2020 This appeal was called on for hearing today.
CORAM :
HON'BLE DR. JUSTICE D.Y. CHANDRACHUD
HON'BLE MR. JUSTICE AJAY RASTOGI
For Appellant(s) Mr. K.K. Bhat, Adv.
Mr. Ranjan Kumar Pandey, AOR
For Respondent(s) Mrs. K. Radha, Adv.
Mr. K. Maruthi Rao, Adv.
Mrs. Anjani Aiyagari, AOR
UPON hearing the counsel the Court made the following
O R D E R
Leave granted.
The appeal is allowed in terms of the signed
reportable judgment.
(Chetan Kumar) (Saroj Kumari Gaur)
A.R.-cum-P.S. Court Master
(Signed reportable judgment is placed on the file)