Ravinder Yadav vs Govt. Of Nct Of Delhi & Ors.
- Court
- Delhi High Court
$~2(SDB)
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
Date of decision: 20 November, 2026
rd
Uploaded on: 23 November, 2026
# CNR No. DLHC010914712024
+ W.P.(C) 17064/2024
RAVINDER YADAV .....Petitioner
Through: None.
Versus
GOVT. OF NCT OF DELHI & ORS. .....Respondents
Through: Mr. Dhruv Rohatgi, Panel Counsel
(Civil), GNCTD with Mr. Dhruv
Kumar and Mrs Chandrika Sachdev,
Advocates.
Mr. Manu Chaturvedi, Standing
Counsel for MCD with Mr. Anshul
Butani, Adv.
Mr Tushar Sannu, SC, DJB, Ms
Rajbala, Ms Payal Rajput, Mr Shrey
Bhardwaj, Advocates with Mr Manoj
from DJB Department.
CORAM:
JUSTICE PRATHIBA M. SINGH
JUSTICE MANMEET PRITAM SINGH ARORA
Prathiba M. Singh, J. (Oral)
1. This hearing has been done through hybrid mode.
2. Vide order dated 30th June, 2026, this Court directed as under:
“9. Mr. Dhruv Rohatgi, ld. Counsel submits that the
work of the I&FCD commences from the end point
where the road of the Public Works Department
(hereinafter, ‘PWD’) ends in the said area and the
I&FCD has already commenced its work, in respect
W.P.(C) 17064/2024 Page 1 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
whereof photographs have been placed on record.
10. Insofar as the road of the PWD is concerned, Mr.
Manish Singh, Executive Engineer, PWD is present
in Court and submits that the tender has been floated
for the construction of the drain in this area. On
being questioned as to why there has been so much
delay from the last monsoon, he submits that the
specifications had to be finalised and there was
delay in receiving sanction. Mr. Singh submits that
the tender has now been opened and the technical
bid has also been opened.
11. It is completely unacceptable to the Court that
despite the issue having remained pending for the
last two years, the tender is stated to have been
floated only now and even the said tender is yet to be
finalised. The monsoon has already commenced, and
the construction of the drain by the I&FCD in the
further area would serve no meaningful purpose if
the contiguous area does not have any drain. Mr.
Dinesh Prakash, Assistant Engineer and Mr.
Krishan Gopal Meena, Executive Engineer from the
PWD who are not present in Court today shall file
personal affidavits by the next date of hearing
explaining the following:-
i) The timeline for construction of the
drain;
ii) Reasons for the delay; and
iii) As to whether there is co-ordination
with the I&FCD so that there is
continuation in the water flow in the drain
as well.
12. Mr. Dinesh Prakash, Assistant Engineer and Mr.
Krishan Gopal Meena, Executive Engineer from the
PWD shall also be personally present on the next
date of hearing.”
W.P.(C) 17064/2024 Page 2 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
3. A status report has been filed by the Irrigation and Flood Control
Department (hereinafter, ‘I&FCD’ ). As per the same, the construction of the
1,720 metre long road along with drains on both sides in the Najafgarh area
has been completed.
4. Insofar as the Public Works Department (hereinafter, ‘PWD’ ) is
concerned, the decision for construction of the Storm Water drain in the
Najafgarh area is stated to have been taken and tenders have been awarded in
this regard. The details of the same are as under :
“5. That thereafter, a joint site assessment was
carried out by the consultant along with officials of the
Public Works Department and other concerned
departments. Based on the field assessment, the
consultant finalized and submitted the storm water drain
sections. Thereafter, the drain estimates were prepared,
duly scrutinized, and submitted for Administrative
Approval and Expenditure Sanction (A/A & E/S) during
the month of February, 2026.
W.P.(C) 17064/2024 Page 3 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
”
W.P.(C) 17064/2024 Page 4 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
5. As per the affidavit of PWD, the completion of the different stretches
of drains has different timelines. Accordingly, let an updated status report be
filed by the PWD by the next date of hearing, especially in the case of
Najafgarh-Jharoda Road which has a timeline for completion of November,
2026.
6. Further, from the photographs which have been filed on record, it also
appears that some of the shopkeepers are encroaching on the newly
constructed drain and putting up their goods such as soft drinks shelves,
furniture, equipment, etc. Two such images are extracted below:
W.P.(C) 17064/2024 Page 5 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
7. Such encroachment on the drain would again result in clogging and
proper de-silting would not be possible. The drain has been got constructed
after constant supervision and directions by this Court. If encroachment is
permitted to go unchecked, there is a possibility of the area reverting to the
earlier position with severe water logging. It is directed that the IFC&D and
all other authorities shall ensure there is no encroachment on the drain.
Anyone found to violate this direction shall be liable for strict action. Insofar
W.P.(C) 17064/2024 Page 6 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
as these two shopkeepers are concerned, it is directed that the I&FCD shall
identify the said two shopkeepers and they shall be fined a sum of Rs.20,000/-
each to be paid to the Delhi High Court Staff Welfare Fund. The details of the
same are as under:
Name of Account:- Delhi High Court Staff Welfare Fund
Account No:- 15530110074442
Bank: - UCO Bank, Delhi High Court
8. The proof of deposit of costs by the said two shopkeepers shall be
placed on record by the next date of hearing. If the said shopkeepers do not
pay the costs of Rs. 20,000/-, notice shall be served to them for appearance on
the next date of hearing.
9. In addition, the I&FCD shall sensitize the shopkeepers and all the
residences in the area that any encroachment on the drain would attract severe
and stringent action and high penalties.
th
10. List on 28 January, 2027.
PRATHIBA M. SINGH
JUDGE
MANMEET PRITAM SINGH ARORA
JUDGE
NOVEMBER 20, 2026
Rahul/Ck
W.P.(C) 17064/2024 Page 7 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40
W.P.(C) 17064/2024 Page 8 of 8
Signature Not Verified
Signed By:DEVANSHU
JOSHI
Signing Date:23.11.2026
20:08:40