Mr.S.Sekar vs M/s.Vyas Nuilding Pvt. Ltd.

Court
Madras High Court

2026:MHC:4686
THE HIGH COURT OF JUDICATURE AT MADRAS
Order reserved on : 05.11.2026 Order pronounced on : 20.11.2026
CORAM

THE HON'BLE MR. JUSTICE P.B.BALAJI
C.S.No.74 of 2020
S.Sekar .. Plaintiff
Vs.
1.M/s.Vyas Builders Private Limited,
Represented by its Director, Mukesh Goyal,
18/19, Venkata Maistry Street,
George Town, Chennai – 600 001.
2.M/s.Loyal Housing Development Private Limited,
Represented by its Managing Director,
Uma Maheswaran,
th
1402, H Block, 15 Main Road,
Anna Nagar, Chennai – 600 040.
[Amended as per order dated 30.08.2022 in Appl.No.3724 of 2022]
3.Indian Overseas Bank,
Santhome Branch,
By its Manager,
128, Santhome High Road,
Chennai – 600 004. .. Defendants
Prayer: Civil Suit filed under Order VII Rule 1 of CPC and Order IV Rule 1 of
O.S.Rules, praying that
1
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
1.Directing the defendants 1 & 2 to pay a sum of Rs.1,97,94,000/- to the plaintiff
together with interest at 24% p.a on Rs.1,97,94,000/- from the date of plaint till the date
of realization;
2.Directing the defendants to pay the cost of the suit.
For Plaintiff : Mr.V.Manoharan
For Defendants : Mr.Leelesh Sundraram
for M/s.Nathan & Associates for D1
Mr.V.Vishal
for Mr.E.Vijayaraghavan D2
JUDGMENT
This Civil Suit has been instituted for the following reliefs:
Directing the defendants 1 & 2 to pay a sum of Rs.1,97,94,000/- to the plaintiff
together with interest at 24% p.a on Rs.1,97,94,000/- from the date of plaint till the date
of realization; and directing the defendants to pay the cost of the suit.
2.The plaint in brief:
st
(a) The 1 defendant was owning lands admeasuring 4.6 acres in various survey
numbers at Kallikuppam, Korattur village, Ambattur Taluk, Thiruvallore District. The
st
property was under a mortgage with Mapusa Co-operative Bank, Goa. The 1 defendant
was desirous of selling the said lands. The plaintiff, who was already working as a
2
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
st st
consultant for the 1 defendant in respect of lands owned by the 1 defendant at Kolanji
st
village, Ponneri Taluk, undertook to assist the 1 defendant in clearing the mortgage and
st
market the property, measuring 4.6 acres. At the directions of the 1 defendant, the
plaintiff identified two persons by name Mr.Muthusamy and Damodarasamy, who
offered Rs.80 lakhs. The plaintiff and the said Muthusamy personally went over to Goa
for settling the loan account of Mapusa Co-operative Bank. The loan was discharged and
all original documents were secured by the plaintiff. The proposed buyers, Muthusamy
and Damodarasamy failed to keep up their time schedule and hence, their agreement was
cancelled.
st
(b) At that juncture, the 1 defendant decided to develop the property, on his own
account. The plaintiff was appointed as a consultant and co-ordinator for this
development, with an oral understanding that the plaintiff would be given 1/3rd of the
profit earned. The plaintiff has been diligently working on the project for 10 years, right
from 2005, ever since, he took up the assignment as a consultant. The subject property
was in the occupation of 40 trespassers/encroachers, some of whom had even built pucca
houses. Several suits were pending and the plaintiff personally involved himself in
settling all the litigation and ensured that vacant possession was recovered. In the said
process, the plaintiff even put his life in danger. The plaintiff also secured the property
by putting up compound walls, besides co-ordinating with the revenue authorities for
3
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
st
obtaining patta, especially since the documents in favour of the 1 defendant were not
proper and it was only the out and out efforts of the plaintiff that a marketable title itself
st
was made out in favour of the 1 defendant.
st
(c) When the 1 defendant was looking for a promoter, the plaintiff negotiated
nd st
with the 2 defendant and fixed him as a promoter and after negotiations, the 1
nd
defendant and the 2 defendant entered into a Joint Development Agreement on
nd
21.03.2010. The 2 defendant had agreed to construct multi-storied apartments at his
st
cost and hand over 77000 sq.ft of constructed area to the 1 defendant. The remaining
nd
share was to enure to the share of the 2 defendant. The plaintiff was not paid any
st
amount towards the services and when the 1 defendant was confronted regarding the
st
same, the 1 defendant promised to give the plaintiff 9597 sq.ft, comprised in Plot
Nos.2, 43, 15, 18, 75 and 74 in the CMDA approved layout, together with flats
nd st
constructed thereon by the 2 defendant. The plaintiff and the 1 defendant entered into
a Memorandum of Understanding on 11.04.2014.
st
(d) In fact, the 1 defendant also executed a general Power of Attorney on
10.04.2014 in respect of the plots that were supposed to be given to the plaintiff, in lieu
nd
of services rendered by him. The plaintiff further contends that the 2 defendant
constructed flats in Plot Nos.2 and 43 and through the plaintiff, eight sale deeds in
4
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
favour of third party buyers were also executed and the amounts were appropriated by
the plaintiff, in terms of the Memorandum of Understanding (herein after called as
st
MoU) between the plaintiff and the 1 defendant. Even in respect of two said plots,
nd

namely Plot Nos.2 and 43, there was a shortfall of Rs.27 lakhs, which the 2 defendant
nd
has to pay, since the payments in respect of eight flats sold were only made by the 2
nd
defendant. The plaintiff further contends that the 2 defendant did not commence
nd
construction work in Phase II (rear side of the lands) and the 2 defendant was under
financial constraints as well. The project itself came to a halt in December 2017 and as
st
promised by the 1 defendant, the remaining plots of which possession was given to the
plaintiff, were not developed, by putting up construction, as agreed upon between the
st st
plaintiff and the 1 defendant. The plaintiff alleges that the 1 defendant having executed
a general Power of Attorney on 10.04.2014 and also agreeing to sell Plot Nos.2, 43, 15,
18, 74 and 75 to the plaintiff, is liable to put up construction, as per the agreement and
plan and deliver the promised constructed area to the plaintiff.
(e) According to the plaintiff, the cost of construction for putting up the flats, as
agreed under the MoU dated 11.04.2014 has to be met by the defendants 1 and 2. The
cost of construction is taken as Rs.2,000/- per sq.ft, at which rate, the eight flats were
nd
constructed by the 2 defendant. Despite several demands, the defendants have not
come forward to even respond, excepting orally assuring that they will pay and settle the
5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
nd
plaintiff's account shortly. The plaintiff also states that since the 2 defendant did not
rd rd
discharge the project loan obtained from the 3 defendant, the 3 defendant has issued
SARFAESI notice.
rd
(f) According to the plaintiff, the 3 defendant is entitled to recover the amount
due from the defendants and not the plaintiff by proceeding against Plot Nos.2, 43, 15,
rd
18, 75 and 74. The plaintiff also contends that the 3 defendant has not instituted any
case against the defendants 1 and 2, under the SARFAESI Act, as on the date of filing of
the plaint, excepting for issuing oral threats. The plaintiff has therefore instituted the suit
for recovery of a deficit of Rs.27 lakhs in respect of Phase I and cost of construction for
putting up construction in the remaining plots, calculating it at Rs.2,000/- per sq.ft and
arriving at a sum of Rs.1,70,94,000/-, making a total claim of Rs.1,97,94,000/-. The
plaintiff also issued a lawyer's notice by e-mail on 10.01.2018. Despite receipt of the
same, the defendants 1 and 2 did not even bother to send any reply. However the
defendants 1 and 2 promised to settle the plaintiff’s due shortly, but did not keep up their
promises. Hence the present suit.
st
3.The 1 defendant admittedly forfeited his right to file his written statement on
account of not availing of the statutory period available for filing the written statement.
6
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
nd
4.Written statement filed by the 2 defendant:
nd
The 2 defendant however filed a written statement, contending that there is no
nd
agreement between the plaintiff and the 2 defendant and that the plaintiff can proceed
st nd nd
only against the 1 defendant and not against the 2 defendant. The 2 defendant also
nd
contends that there is no privity of contract between the plaintiff and the 2 defendant
st nd
and it is only for the 1 defendant to complain of any act or omission by the 2
defendant and it is not for the plaintiff to claim compensation for the construction not
st nd st
put up, as promised by the 1 defendant. The 2 defendant has also stated that the 1
defendant has illegally and arbitrarily cancelled the Powers of Attorney executed in
nd
favour of the 2 defendant and has violated the provisions of the Indian Contract Act,
st
1872, as well as the Powers of Attorney Act, 1882 and Registration Act, 1908. The 1
defendant has transgressed into the properties allocated and allotted to the share of the
nd nd
2 defendant and sold them without the knowledge of the 2 defendant, committing
clear breach of trust and also violating the terms and conditions of the joint venture
nd
agreement dated 21.03.2010. The 2 defendant has suffered huge losses on account of
st
the breach and default committed by the 1 defendant. In so far as the construction of
nd
flats in Plot Nos.2 and 43, the 2 defendant contends that it was only in pursuance of the
st nd
joint venture agreement between the 1 defendant and the 2 defendant and the sales
st nd
were effected as directed by the 1 defendant alone. Therefore, the 2 defendant cannot
nd
be proceeded against. The 2 defendant therefore prays for dismissal of the suit.
7
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
rd
5.The 3 defendant/Bank has not entered appearance and contested the suit.
rd
However, no relies is sought for against the 3 defendant.
6.Issues framed by this Court on 09.12.2024:
On 09.12.2024, this Court has framed the following issues:
nd
a) Is there any written contract between the plaintiff and the 2
defendant?
nd
b) Is the 2 defendant bound to comply with the terms of
agreement of sale/MOU, dated 11.04.2014?
nd
c) Is the 2 defendant is liable to construct flats to a total extent
of 5698 sq.ft in Plots No.15, 18, 75 & 74 in CMDA approved layout
No.26/11 and handover the same to plaintiff as per agreement of
sale/MOU, dated 11.04.2014?
nd
d) Is the 2 defendant liable to the promise if any made by the
st
1 defendant to the plaintiff?
nd
e) Is the 2 defendant liable to pay construction cost of
Rs.1,70,90,000/- (One Crore Seventy Lakhs Ninety Thousand only) as
alternative for constructing flats, as referred to supra?
nd
f) In what way the 2 defendant can be held liable for the
st
transactions between the plaintiff and the 1 defendant.
nd
g) Is the 2 defendant liable to pay Rs.27,00,000/- being the
alleged balance sale price payable to the plaintiff for the sale of 8 flats
in Plot Nos.2 & 43 in approved lay out No.26/2011?
8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
nd
h) Is the 2 defendant liable to pay interest at the rate of 24%
on the suit amount of Rs.1,97,94,000/- from the date of plaint till
realisation?
nd
i) Is there any cause of action for the suit against the 2
defendant?
j) Whether the plaintiff is entitled for costs of the suit?
k) To what other reliefs, the plaintiff is entitled to?
7.Additional issues framed by this Court on 21.07.2026:
On 21.07.2026, this Court has framed the following additional issues:
(i) Whether the plaintiff is entitled to seek recovery of the suit
claim jointly and severally against the defendants 1 & 2?
(ii) Whether the second defendant is liable to pay a sum of
Rs.27,00,000/- (Rupees Twenty Seven Lakhs only) towards the cost of
completed constructions to the plaintiff for the plot covered under the
memorandum of understanding?
8.Trial:
The parties went to trial and the plaintiff examined himself as P.W.1 and marked
st st
Ex.P1 to Ex.P22. Though the 1 defendant has lost its right to defend the suit, the 1
nd
defendant has cross examined P.W.1. The 2 defendant has also cross examined P.W.1
nd
through its counsel. The 2 defendant himself was examined as D.W.1 and marked
Ex.D1 to Ex.D7. D.W.1 was also cross examined by the plaintiff’s counsel as well.
9
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
9.Arguments of the learned counsel for the plaintiff:
(a) Mr.V.Manoharan, learned counsel appearing for the plaintiff would submit that
st
the plaintiff has rendered yeoman services to the 1 defendant and has toiled for more
st
than a decade to even ensure that the property belonging to the 1 defendant became
marketable. He would further state that enormous time, money and efforts have been
spent by the plaintiff in discharging pending loans, clearing encumbrances and setting
right revenue records. Though the learned counsel for the plaintiff fairly submitted that
st
the agreement to remunerate the plaintiff was only oral, the 1 defendant had promised
to pay 1/3rd to the plaintiff in the share of profits made from the project. He would
st
however state that the MoU, Ex.P4 was reduced to writing, in and by which, the 1
defendant has agreed to sell Plot Nos.2, 43, 15, 18, 75 & 74 to the plaintiff. He would
nd
further state that though the 2 defendant was not privy to the MoU between the
st nd
plaintiff and the 1 defendant, the 2 defendant was fully aware of the understanding
nd
between the plaintiff and the 2 defendant and in fact, he had put up constructions in
two of the plots viz., Plot Nos.2 and 43 and was actively involved in the sale of eight
st
flats to third party purchasers, as undertaken by the 1 defendant under Ex.P3 and Ex.P4.
(b) It is therefore the submission of the learned counsel for the plaintiff that when
nd nd
2 defendant was the person who had negotiated for the sale of eight flats, the 2
10
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
nd
defendant was fully aware of the liability and the 2 defendant has to make good the
deficit of Rs.27 lakhs from and out of the sale of eight flats in the Phase I of the
construction. The learned counsel for the plaintiff would further state that in respect of
nd
remaining flats, admittedly, the 2 defendant did not put up any constructions
whatsoever and therefore, the plaintiff is entitled to maintain the present suit for
recovery of the cost of construction that was agreed to be put up on the said flats. He
would further state that the suit claim has been quantified only at the rates on which the
nd
construction was put up by the 2 defendant in respect of the admittedly developed and
constructed eight flats in Plot Nos.2 and 43.
nd
(c) The learned counsel for the plaintiff would further state that though the 2
nd
defendant has disputed his liability in the written statement, the 2 defendant has
st
admitted to the fact that all payments paid to the 1 defendant have been made through
st
cash/RTGS/NEFT/cheque, as demanded by the plaintiff and also the 1 defendant
nd
respectively. The learned counsel for the plaintiff therefore contends that when the 2
nd
defendant pleads discharge and that no amount is due to the plaintiff, the 2 defendant
ought to have filed at least the statement of account, leave alone bank statements to
prove the alleged payments in full and final settlement. He would further state that under
nd
Ex.P19, a notice was also served on the 2 defendant’s counsel for production of said
accounts and bank statements, which has not been complied with as well. He would
11
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
nd
therefore state that adverse inference has to be drawn against the 2 defendant and the
nd
2 defendant should be called upon to make good the deficit of Rs.27 lakhs. He would
st
further state that the 1 defendant, having lost its right to even file a written statement,
st
cannot now plead that the MoU between the plaintiff and the 1 defendant is not a valid
document or that it has not been signed under due authority after necessary Board
st
Resolutions having been passed. He would further state that it is not the case that the 1
st
defendant has not executed Ex.P3 and Ex.P4 and therefore, the 1 defendant, who has
lost his right to defend the suit by filing a written statement cannot contend that Ex.P3
and Ex.P4 cannot be looked into, for want of deficit stamp duty and registration.
(d) As regards the plea of limitation, the learned counsel for the plaintiff
nd
contended that as late as 2018, the 2 defendant was making payments to the plaintiff in
respect of flats sold after construction in two of the flats and therefore, the question of
limitation also does not arise.
(e) As regards the plea of inadmissibility of Ex.P4, MoU between the plaintiff and
st
the 1 defendant, the learned counsel for the plaintiff contends that the said document
has been marked without any objection and in terms of Section 36 of the Stamp Act, it is
not open to the defendants to now challenge the admissibility of the said document, on
the ground that it is deficiently stamped. In support of the his submission, the learned
12
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
counsel for the plaintiff has relied on the decision of the Hon’ble Supreme Court in
Muruganandam Vs. Muniyandi (Died) through Lrs , reported in 2025 INSC 652 , where
the Hon’ble Supreme Court held that an unregistered document can be received in
evidence of a contract in a suit for specific performance. The document can be brought
on record when it is intended to be used only as a proof of an oral agreement of sale,
which is permissible under Section 49 of the Registration Act. He also relied on the
decision of the Hon’ble Supreme Court in R.Hemalatha Vs. Kashthuri , in Civil Appeal
No.2535 of 2023 dated 10.04.2023 , where again the Hon’ble Supreme Court relying on
Section 49, held that an unregistered agreement of sale is admissible and can be filed
before the Court, while seeking the relief of specific performance. The learned counsel
for the plaintiff has also relied on the decision of the Hon’ble Supreme Court in
Muddasani Venkata Narsaiah (D) through LR’s Vs. Muddasani Sarojana , reported in
2016 (12) SCC 288 , where the Hon’ble Supreme Court held that denial for want of
nd
knowledge is no denial at all. This decision is relied on for saddling the 2 defendant
with liability to meet the suit claim. He would also rely on the decision of the Hon’ble
Supreme Court in Jaspal Kaur Cheema and another Vs. M/s.Industrial Trade Links and
others, etc. , reported in (2017) 6 S.C.R. 479 , where the Hon’ble Supreme Court held that
in terms of Order VIII Rule 3 of CPC, the defendant is required to deny or dispute the
statements made in the plaint categorically and any evasive denial would amount to an
admission or the allegation made in the plaint in terms of Order VIII Rule 5 of CPC.
13
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
Lastly, the learned counsel for the plaintiff relied on the yet another decision of the
Hon’ble Supreme Court in Thangam and another Vs. Navamani Ammal , reported in
(2024) 3 S.C.R 146 , where the Hon’ble Supreme Court again dealt with admissions and
denials in pleadings and the importance of compliance of Order VIII Rule 5 of CPC on
the part of the defendant to effectively defend the plaint pleadings and allegations.
st
10.Arguments of the learned counsel for the 1 defendant:
st
Per contra, Mr.Leelesh Sundaram, learned counsel appearing for the 1 defendant
st
would contend that though the 1 defendant has forfeited its right to file a written
st
statement under the Commercial Courts Act, nevertheless the 1 defendant has
effectively cross examined P.W.1 and brought out the facts that the agreements under
which the plaintiff has filed the suit, namely, Ex.P3 and Ex.P4, for want of proper stamp
duty and registration cannot be enforced before this Court and thereby disentitling the
plaintiff to recover the suit claim. He would further state that the suit is also hopelessly
barred by limitation. Even according to the plaint averments, the project was abandoned
nd
by the 2 defendant in 2015 and the suit ought to have been filed within a period of
three years and when it has been filed only in the year 2020, it is contended by the
st
learned counsel for the 1 defendant that the suit is hopelessly barred by limitation. He
would further state that P.W.1 himself admitted that the MoU contemplated transfer of
ownership and therefore, the document is compulsorily registerable in the eye of law. He
14
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
would also contend that there is absolutely no proof to establish the theory of
remuneration pleaded by the plaintiff and the quantification also has not been proved. In
st
such circumstances, it is contended by the learned counsel for the 1 defendant that the
st
1 defendant is not liable to meet the suit claim, especially the plaintiff has not
established the plaint allegations.
nd
11.Argument of the learned counsel for the 2 defendant:
nd
Mr.V.Vishal, learned counsel for the 2 defendant would contend that the plaintiff
has no proprietary right or interest to seek for the cost of construction in lieu of alleged
failure to construct flats, especially in the light of the admitted fact that the plaintiff does
nd
not have any privity of contract with the 2 defendant. He would further state that
nd
merely because few of the flats were developed and consideration was paid by the 2
st nd
defendant to the plaintiff, it was only on behalf of the 1 defendant, with whom the 2
defendant had a Joint Venture Agreement and not as a result of any direct contract
nd
between the plaintiff and the 2 defendant. He would therefore state that the suit has to
nd
necessarily fail against the 2 defendant, including the claim of Rs.27 lakhs to be the
deficit due and payable under Phase I in respect of eight flats sold, having been
constructed in two of the plots viz., Plot Nos.2 and 43.
15
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
12.I have carefully considered the submissions advanced by the learned counsel
for the parties.
13.Issues a) to j) and additional issues (ii):
nd
I will first decide whether the defendant is entitled to a decree against the 2
defendant. Admittedly, the plaintiff has a written contract styled as MoU entered into
st
only with the 1 defendant on 11.04.2014. No doubt, one of the clauses in the said MoU
nd
states that the 2 defendant will have to put up construction in plots set apart for the
st
plaintiff, in lieu of the services rendered by the plaintiff to the 1 defendant.
Unfortunately, for the plaintiff, the said covenant cannot, by any stretch of imagination,
nd
bind the 2 defendant. If really the plaintiff was contemplating construction to be put up
nd st
by the 2 defendant at the behest of the 1 defendant, the plaintiff ought to have been
nd
diligent in ensuring that the 2 defendant was roped in as a party to the said agreement.
Alternatively, the plaintiff should have joined the execution of the Joint Venture
Agreement between the defendants. Both of these have not been done. Therefore, as
nd
rightly contended by the 2 defendant, there is no privity of contract between the
nd
plaintiff and the 2 defendant.
nd
14.As regards the payments made to the plaintiff by the 2 defendant, from and
nd
out of the sale of plots in two of the plots bearing Plot Nos.2 and 43, at best the 2
16
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
st
defendant was paying the amounts on behalf of the 1 defendant with whom he had a
nd
Joint Venture Agreement. Mere fact that the payments went from the 2 defendant to the
nd
plaintiff and that the 2 defendant has admitted to the same in the written statement,
nd
would not imply that the 2 defendant has agreed to construct flats for the plaintiff and
nd
that for failure, the 2 defendant should pay the cost of construction to the plaintiff by
st
way of compensation. The plaintiff is entitled to proceed against the 1 defendant with
nd
whom he has a written contract and especially when the 2 defendant has pointed
st st
fingers at the 1 defendant and has even gone to the extent of alleging that the 1
defendant has breached the Joint Development Agreement, I do not see how, in the
nd
absence of a contract to the contrary, the plaintiff is entitled to proceed against the 2
nd
defendant. The suit therefore filed seeking as against the 2 defendant is clearly not
maintainable in the eye of law. These issues are answered accordingly.
15.Additional Issue (i):
st
As regards the liability of the 1 defendant, as already noticed herein above, by
st
not filing the written statement in time, the 1 defendant has forfeited its right to contest
st
the suit on merits. However, it did not prevent the 1 defendant from cross examining
st
the plaintiff and demolishing the case of the plaintiff. In such attempt, the 1 defendant
has cross examined the plaintiff and from the cross examination of the plaintiff,
st st
Mr.Leelesh Sundaram, learned counsel for the 1 defendant contends that the 1
17
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
defendant has been able to demonstrate that the MoU is unregistered and therefore
cannot be enforced in the eye of law and also that the suit is hopelessly barred by
limitation. In this regard, firstly, it is to be borne in mind that having not filed the written
statement and challenged the validity of the MoU entered into between the plaintiff and
st
the 1 defendant, especially after having allowed the said document in original to be
st

marked as Ex.P4, without any objection whatsoever, it is too late in the day for the 1
defendant to contend that the agreement cannot be looked into and that it is deficitly
stamped and not registered. Section 36 of the Stamp Act comes into play and clearly
st
imposes a bar for the 1 defendant to challenge the document on the ground that it has
been deficitly stamped.
16.As regards the argument that the MoU entered into between the plaintiff and
st st
the 1 defendant requiring registration, simultaneous to the execution of MoU, the 1
defendant also executed a registered Power of Attorney in respect of the plots that are
subject matter of the said MoU. Therefore, there is no transfer of title or interest under
the MoU. In such view of the matter, I do not see why the said MoU should not be
admitted before the Court of law and claim be made thereunder. I do not see any force in
st
the arguments of the learned counsel for the 1 defendant in that regard.
18
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
17.Even as regards the question of limitation, the plaintiff has filed the bank
accounts and has been able to demonstrate that as late as in 2018, payments have come
towards the sale of flats put up in a couple of plots, out of the total agreed plots over
which construction had to be put up. Therefore, the cause of action was still surviving
and the suit has been filed within three years from 2018. I am unable see how the suit
can be dismissed on the ground of bar of limitation.
18.Similarly, the contentions that the MoU, Ex.P4 has not been signed by proper
st
authority and that since the 1 defendant being a Limited Company and there has been
no Board Resolution, all these contentions should have been raised by filing an
st
appropriate written statement alone and without doing so, the 1 defendant cannot take
advantage of the fact that the plaintiff admits that the Board Resolution was not filed
before the Court. In fact, to a question put to P.W.1 that whether he has filed the Board
st

Resolution before the Court, he has only replied, stating that it was retained by the 1
defendant/Company. I do not even find a suggestion put consequent to the said response
by P.W.1 that there was no such Board Resolution, as contended by the plaintiff. In such
view of the matter, having forfeited its right to even defend the suit by filing the written
st
statement, I am unable to see how the 1 defendant can attempt to pick holes by taking
such technical objections. On the contrary, in fact, the questions that have been put to
st
P.W.1 by the learned counsel for the 1 defendant clearly indicate that the execution of
19
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
st
Ex.P4, MoU is clearly admitted by the 1 defendant. In such view of the matter, I am
st
unable to accept any of the arguments advanced by the 1 defendant in this regard.
19.Even as regards the quantification of the suit claim, the plaintiff has adopted
the cost of construction for the flats to be up only at the rates at which two of the plots
were developed. Therefore, I do not see why the plaintiff should be non suited, on the
ground that the plaintiff has not proved quantification of the suit claim. Also in respect
of deficit of Rs.27 lakhs, the plaintiff has been able to substantiate the by production of
bank statements and there is absolutely nothing to contradict the veracity of the bank
statements and the liability subsisting to the tune of Rs.27 lakhs. In the light of the
above, from the evidence oral and documentary available on record and the pleadings,
nd
especially the plaint and written statement of the 2 defendant, I am satisfied that the
st
plaintiff is entitled to a decree as against the 1 defendant alone. The additional issue (i)
is answered accordingly.
20.The decisions that have been relied on by the learned counsel for the plaintiff
and the ratio extracted herein above, insofar as the importance of pleadings would also
squarely apply to the facts of the present case.
20
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
st
21.In fine, the Civil Suit is decreed for Rs.1,97,94,000/- as against the 1
defendant, together with interest at 12% per annum on the said amount from the date of
plaint, till the date of decree and thereafter, at the rate of 6% per annum from the date of
st
decree, till the date of realization. The 1 defendant shall pay the plaintiff’s costs of the
nd
suit. The suit is dismissed as against the 2 defendant. However, there shall be no order
nd
as to costs, insofar as the 2 defendant is concerned.
20.11.2026
Neutral Citation Case : Yes / No
Speaking / Non-speaking order
Index : Yes/No
ata
List of Witness on the side of the plaintiff:
P.W.1 – Mr.S.Sekar
List of Exhibits on the side of the plaintiff:
Sl. No. Exhibits Description
1. Ex.P1 Photocopy of joint venture agreement dated 21.03.2010 between
D1 and D2.
2. Ex.P2 Photocopy of general power of attorney deed dated 24.07.2012
between D1 and D2.
3. Ex.P3 Original general power of attorney deed dated 10.04.2014
between D1 and plaintiff.
4. Ex.P4 Original memorandum of understanding dated 11.04.2014
between D1 and plaintiff.
5. Ex.P5 Photocopy of construction agreement dated 24.01.2015.
21
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
6. Ex.P6 Photocopy of sale deed dated 05.02.2015.
7. Ex.P7 Email copy of legal notice dated 10.01.2018.
8. Ex.P8 Copy of legal notice with postal acknowledgment dated
14.02.2019.
9. Ex.P9 Copy of legal notice with original postal slip dated 04.04.2019.
10. Ex.P10 Copy of legal notice and original postal slip dated 18.07.2019.
11. Ex.P11 Computer generated copy of SBI Bank Current Account
Statement from 01.01.2014 to 31.12.2014.
12. Ex.P12 Computer generated copy of SBI Bank savings account statement
from 01.01.2014 to 31.12.2014.
13. Ex.P13 Computer generated copy of SBI Bank savings account statement
from 21.03.2015 to 31.12.2015.
14. Ex.P14 Computer generated copy of SBI Bank savings account statement
from 09.10.2016 to 31.12.2016.
15. Ex.P15 Computer generated copy of SBI Bank savings account statement
from 12.05.2017 to 31.12.2017.
16. Ex.P16 Computer generated copy of SBI Bank savings account statement
from 01.01.2018 to 31.12.2018.
nd
17. Ex.P17 Email to plaintiff from 2 defendant dated 29.03.2016.
nd
18. Ex.P18 Email from plaintiff to 2 defendant dated 05.07.2016.
nd
19. Ex.P19 Office copy of the Letter sent by Plaintiff counsel to 2 defendant
counsel dated 25.02.2025.
20. Ex.P20 Online certified copy of the sale deed executed by his General
power agent Mr.S.Sekar on behalf of M/s.Vyas Builders in favour
of Mr.P.Seeni Kannan dated 05.02.2015 in Doc.No.522/2015.
21. Ex.P21 Online certified copy of the Construction agreement executed
between Mr.P.Seeni Kannan M/s.Loyal Housing Development
Private Limited dated 24.01.2015 in Doc.No.521/2015.
22. Ex.P22 Certified copy of the bank statements of Mr.S.Sekar issued by the
State Bank of India for the period 01.01.2014 to 31.12.2018.
List of Witness examined on the side of the Defendants:
D.W.1 – Mr.U.Logeshwaran
22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
List of exhibits marked on the side of the Defendants:
Sl.Nos. Exhibits Description
1. Ex.D1 Certified copy of the deed of general power of attorney dated
23.08.2017.
2. Ex.D2 Certified copy of the Memorandum of Deposit of title deeds dated
21.01.2013.
3. Ex.D3 Certified copy of the cancellation of Power of Attorney dated
07.06.2024 in Doc.No.3932/2024.
4. Ex.D4 Certified copy of the Registered Memorandum of Deposit of Title
Deeds by M/s.Vyas Builders Private Limited, represented by its GPA,
M/s.Loyal Housing Development Private Limited, in favour of Indian
Overseas Bank, registered as Doc.No.2703 of 2017 by SRO,
Villivakkam dated 05.06.2017.
5. Ex.D5 Photocopy of the un-registered supplementary Joint Venture Agreed by
and between M/s.Vyas Builders Private Limited and M/s.Loyal
Housing Developments Private Limited dated 22.08.2017.
6. Ex.D6 Certified copy of the Registered cancellation of General Power of
Attorney by M/s.Vyas Builders Private Limited in favour of M/s.Loyal
Housing Developments Private Limited, registered as
Doc.No.2027/2019 by SRO, Villivakkam dated 08.04.2019.
7. Ex.D7 Certified copy of the Registered cancellation of General Power of
Attorney by M/s.Vyas Builders Private Limited in favour of M/s.Loyal
Housing Developments Private Limited, registered as
Doc.No.2119/2019 by SRO, Villivakkam dated 11.04.2019.
20.11.2026
23
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )

2026:MHC:4686
P.B.BALAJI. J,
ata
Pre-delivery order made in
C.S.No.74 of 2020
20.11.2026
24
https://www.mhc.tn.gov.in/judis ( Uploaded on: 23/11/2026 03:50:56 pm )