ORDER
Heard on admission.
The appeal being arguable, is admitted for hearing.
The parties are prepared to argue the matter finally. Therefore, the
matter is heard finally.
The land of the respondent/land loser was acquired for the purpose of
construction of Mahoba-Khajuraho section of Lalitpur-Singrauli Railway
Line Project. Vide award dated 04.11.2019, the compensation has been
awarded to the tune of Rs.17,70,620/- to the respondent/land loser that has
been enhanced by the Reference Court to the value of Rs.37,37,480/- and
upon deducting the compensation already awarded by the Collector, the net
enhancement amount is Rs.19,66,860/-.
2. The counsel for the appellant Railways has vehemently argued that the
Reference Court has erred in holding the land to be irrigated land and has
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
2 FA-1254-2025
further erred in granting multiplier of 2.0 on the land. As the land was
acquired by the State Government, though for the purposes of Railways,
therefore, the appropriate government would be the State Government and
not the Central Government and, therefore, the notification dated 09.02.2016
laying down the multiplying factor for rural areas by the Central Government
would not apply in the present case.
3. The aforesaid question of multiplication factor has been considered in
detail by this Court in FA No.2308 of 2024 in the following terms:-
"Heard on admission.
The appeal being arguable is formally admitted for hearing.
Learned counsel for rival parties are ready to argue the matter finally.
Therefore, the appeal has been heard finally.
2. The challenge in the present appeal is made by the Railways to the
award passed by the Reference Court/Authority in the matter of reference
sent to the said Court for adjudicating the sufficiency of compensation
awarded to the land loser.
3. The land was acquired from the land loser for the project of Sidhi-
Singrauli Railway Line section, part of larger Lalitpur-Singrauli project. The
land of the respondent having survey No.1008, area 3.060 hectare in Village
Khamahariya, Tehsil Chitrangi, District Singrauli was acquired in part. The
acquired land is area 0.027 hectare along with attached assets.
4. The award was passed on 13.07.2020 for the work of Railway section in
question, which is part of the larger project of Lalitpur-Singrauli Railway
Line.
5. The land loser was granted compensation by the Collector, being
dissatisfied with which the land loser approached the Reference
Court/Authority after seeking reference in terms of Section 64 of Right to
Fair Compensation and Transparency in Land Acquisition, Rehabilitation
and Resettlement Act, 2013 (‘LARR Act’ for short).
6. Upon reference the Reference Court/Authority has adjudicated the
sufficiency of compensation and has found that the valuation made by the
Valuation Committee as accepted by the Collector is proper, but the benefit
of multiplication factor of 2.0 has erroneously been denied to the land loser
in terms of notification of Central Government dated 09-02-2016
which should have been allowed to the land loser as the land was situated in
a rural area and the project is of Railways which is a Central Government
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
3 FA-1254-2025
establishment and hence the notification of Central Government would be
applicable. Therefore, the award has been enhanced by granting benefit of
multiplication factor of 2.0 on the entire amount of compensation awarded
by the Collector. In this manner, the valuation of land and house attached to
the land, which was earlier Rs.59,55,603/- for house and Rs.2,97,000/- for
land, has been enhanced by multiplying it by a factor of 2.0.
7. Against the aforesaid award by the Reference Court, the Railways is
before this Court in appeal under Section 74 of LARR Act.
8. Learned counsel for Railways has vehemently argued that the factor of
2.0 awarded by the Reference Court is erroneous because the acquisition
was initiated by the State Government, though at the requisition of the
Railways. Since the acquisition is initiated by the State Government and
may be the ultimate requiring agency might be the Railways but the
multiplication factor as applicable for State Government projects would be
applicable and the State Government has not prescribed any higher
multiplication factor in terms of Section 30(2) of LARR Act and the
notification dated 09.02.2016 which is issued by Central Government would
be applicable where the acquisition is made by Central Government and not
in the cases where acquisition is made by the State Government though for
the purpose of Central Government utilities and projects.
9. It has been vehemently argued that the notification No. 425 (A) dated
09.2.2016 issued by the Ministry of Rural Development, Government of
India, has been subsequently clarified by the circular dated 14.12.2017
issued by the same Ministry. By the said circular, it has been clarified that
the said circular shall apply only in relation to acquisitions in Union
Territories (except Puducherry), and not for other lands situated in other
States. It is argued that by this notification, lands acquired in any of the
States shall not get the benefit of multiplication factor of 2.0. Vehement
reliance is placed on definition of "Appropriate Government" under the
LARR Act.
10. It was vehemently argued that the case of Badrilal Dhakad v. Union of
India reported in 2022 SCC OnLine MP 280 is in the matter of acquisitions
for lands under National Highways Act, and shall not be applicable for
Railways.
11. Per contra, learned counsel for the land loser have vehemently
supported the award on the assertion that the question of multiplication
factor of 2.0 being applicable on Railways projects though the acquisition is
made by the State Government has been conclusively decided by this Court
in various judgements and hence the matter is squarely covered by
the aforesaid judgements. Therefore, no further interference in the matter
needs to be made.
12. This Court has heard learned counsel for the rival parties at length and
perused the record.
13. The question that whether when the land has been acquired by the State
Government though the acquisition is for the project of Central Government
i.e. the Railway project then whether the multiplication factor of 2.0 notified
by the Central Government would be applicable or not has been subjected to
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
4 FA-1254-2025
interpretation time and again by various coordinate Benches of this Court
Court as well as by a Division Bench of this Court.
14. The aforesaid issue in the matter of Railways has already been decided
by a coordinate Bench of this Court in F.A. No. 1373/2023 (Deputy Chief
Engineer (Construction) Vs. Sajruddin Ali and others, in the following
terms:-
"This appeal, under Section 74 of the Right to Fair
Compensation and Transparency in Land Acquisition
Rehabilitation and Resettlement Act, 2013 (for short "Act of
2013"), has been filed against the Award dated 31.03.2023
passed by Principal District Judge, Sheopur (M.P.) in Land
Acquisition Case No. MJC/37/2022.
2. Facts necessary for disposal of this appeal, in short, are that
certain lands have been acquired for the purpose of laying
down Meter Gauge in place of Narrow Gauge Railway Line.
The lands, under the ownership of various persons situated in
villages Bardhabujurg, Raipura & Dantarda Khurd, have been
acquired. From village Dantarda Khurd around 2.200
hectares, from village Raipura 2.394 hectares and from
village Bardhaburjurg about 17.555 hectares, in total 28.689
hectares of land was acquired under the Act of 2013. The
Award was passed by Land Acquisition Officer on
08.10.2021. The matter was agitated under Section 64 of the
Act of 2013 and Reference Court has applied the factor of
"2", whereas according to appellant Reference Court should
have applied the factor of "1", as notified by the State
Government.
3. In the present appeal, solitary ground has been raised by
appellant that in place of factor of "2", factor of "1" should
have been applied. By referring to Section 26 of the Act of
2013, it is submitted by counsel for appellant that guidelines
have been provided under the aforesaid Section for
determination of market value of land by Collector. It is
submitted that as per Section 26(2) of the Act of 2013, the
market value calculated as per sub-section (1) shall be
multiplied by a factor to be specified in the first schedule. By
referring to Section 3(e) of the Act of 2013, it is submitted
that since the land which has been acquired is situated in the
territory of State of Madhya Pradesh, therefore, Section 3(e)(i)
would apply and thus it is submitted that notification issued
by the State Government providing the factor "1" for
multiplier as per Section 26(2) of the Act of 2013, would
apply. Thus, it is submitted that Reference Court has wrongly
applied the multiplier of "2" by treating the factor as "2" as
notified by the Central Government.
4. Per contra, appeal is vehemently opposed by counsel for
claimants. It is submitted that since lands were acquired for
the purpose of Union of India, therefore, Section 3(e)(v)
would apply and thus, the notification issued by the Central
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
5 FA-1254-2025
Government would apply according to which multiplier/factor
of "2" is applicable.
5. Heard learned counsel for the parties.
6. Section 26 of the Act of 2013 reads as under:-
26. Determination of market value of land by Collector.
(1) The Collector shall adopt the following criteria in
assessing and determining the market value of the land,
namely:-
(a) the market value, if any, specified in the Indian Stamp Act,
1899 (2 of 1899) for the registration of sale deeds or
agreements to sell, as the case may be, in the area, where the
land is situated; or
(b) the average sale price for similar type of land situated in
the nearest village or nearest vicinity area; or
(c) consented amount of compensation as agreed upon under
sub-section (2) of section 2 in case of acquisition of lands for
private companies or for public private partnership projects,
whichever is higher:
Provided that the date for determination of market value shall
be the date on which the notification has been issued under
section 11.
Explanation 1. - The average sale price referred to in clause
(b) shall be determined taking into account the sale deeds or
the agreements to sell registered for similar type of area in the
near village or near vicinity area during immediately
preceding three years of the year in which such acquisition of
land is proposed to be made.
Explanation 2. - For determining the average sale price
referred to in Explanation 1, one-half of the total number of
sale deeds or the agreements to sell in which the highest sale
price has been mentioned shall be taken into account.
Explanation 3. - While determining the market value under
this section and the average sale price referred to in
Explanation 1 or Explanation 2, any price paid as
compensation for land acquired under the provisions of this
Act on an earlier occasion in the district shall not be taken
into consideration.
Explanation 4. - While determining the market value under
this section and the average sale price referred to in
Explanation 1 or Explanation 2, any price paid, which in the
opinion of the Collector is not indicative of actual prevailing
market value may be discounted for the purposes of
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
6 FA-1254-2025
calculating market value.
(2) The market value calculated as per sub-section (1) shall
be multiplied by a factor to be specified in the First Schedule.
(3) Where the market value under sub-section (1) or sub-
section (2) cannot be determined for the reason that-
(a) the land is situated in such area where the transactions in
land are restricted by or under any other law for the time
being in force in that area; or
(b) the registered sale deeds or agreements to sell as
mentioned in clause (a) of sub-section (1) for similar land are
not available for the immediately preceding three years; or
(c) the market value has not been specified under the Indian
Stamp Act, 1899 (2 of 1899) by the appropriate authority, the
State Government concerned shall specify the floor price or
minimum price per unit area of the said land based on the
price calculated in the manner specified in sub-section (1) in
respect of similar types of land situated in the immediate
adjoining areas:
Provided that in a case where the Requiring Body offers its
shares to the owners of the lands (whose lands have been
acquired) as a part compensation, for acquisition of land, such
shares in no case shall exceed twenty-five per cent. of the
value so calculated under sub-section (1) or sub-section (2) or
sub-section (3) as the case may be:
Provided further that the Requiring Body shall in no case
compel any owner of the land (whose land has been acquired)
to take its shares, the value of which is deductible in the value
of the land calculated under sub-section (1):
Provided also that the Collector shall, before initiation of any
land acquisition proceedings in any area, take all necessary
steps to revise and update the market value of the land on the
basis of the prevalent market rate in that area:
Provided also that the appropriate Government shall ensure
that the market value determined for acquisition of any land
or property of an educational institution established and
administered by a religious or linguistic minority shall be
such as would not restrict or abrogate the right to establish
and administer educational institutions of their choice.
Section 3(e) of the Act of 2013 reads as under:
3. Definitions.
- In this Act, unless the context otherwise requires,-
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
7 FA-1254-2025
(a) to (d) xxx xxx xxx
(e) "appropriate Government" means,-
(i) in relation to acquisition of land situated within the
territory of, a State, the State Government;
(ii) in relation to acquisition of land situated within a Union
territory (except Puducherry), the Central Government;
(iii) in relation to acquisition of land situated within the Union
territory of Puducherry, the Government of Union territory of
Puducherry;
(iv) in relation to acquisition of land for public purpose in
more than one State, the Central Government, in consultation
with the concerned State Governments or Union territories;
and
(v) in relation to the acquisition of land for the purpose of the
Union as may be specified by notification, the Central
Government:
Provided that in respect of a public purpose in a District for an
area not exceeding such as may be notified by the appropriate
Government, the Collector of such District shall be deemed to
be the appropriate Government; ......
7. The only controversy involved in the present case is that
which is the "appropriate Government", whether State
Government or Central Government?
8. The undisputed fact is that the entire land is situated within
the State of Madhya Pradesh and entire land has been
acquired for the benefit of Railways which is Union of India.
It is clear from Section 3(e)(i) that if the land is situated
within the territory of the State of Madhya Pradesh, then
notification issued by the State Government would apply.
However, in the present case, although the land is situated
within the State of Madhya Pradesh but it has been acquired
for the purposes of Union. Therefore, as per Section 3(e)(v) of
Act of 2013, notification issued by the Central Government
would apply. It is not the case of appellant that Central
Government has not notified the multiplier of "2".
Furthermore, Division Bench of this Court in the case of
Badrilal Dhakad and Others Versus Union of India and Others
reported in 2022 SCC Online MP 280 has held as under:-
16. As per the definition under section 2(b) of the Act of 2013
the State Government would be the appropriate Government
in relation to the acquisition of land situated within the
territory of State. The Central Government would be the
appropriate government in relation of acquisition of land
situated within Union territory except for Pondichery and in
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
8 FA-1254-2025
relation to acquisition of land for the public purpose in more
than one State, the Central Government shall consult with the
concerned State Government or the Union territory and under
section 2(e)(v) of the Act of 2013 in relation to the acquisition
of land for the purpose of the Union, as may be specified by
notification, the appropriate Government would be the
Central Government. Since the land of the petitioners is
situated within the State Government, therefore, the
respondents are treating State Government as appropriate
Government and applying the notification dated 29.9.2014
under section 26(2) of Act of 2013 which gave a cause of
action to the petitioners to challenge the validity of the said
notification but if it is held that in this acquisition the
appropriate Government is the Central Government then the
notification issued by the Central Government dated 9.2.2016
would apply in which the multiplier is 2.00 (two) for the rural
area. As per 1st Schedule, the following components provided
in the table shall constitute the minimum compensation
package to be given to the landowners whose land is
acquired. Serial no. 2 is the factor by which the market value
is to be multiplied in the case of rural areas and for which the
appropriate government is required to notify the factor based
on the distance of the project from the urban area. The Central
Government has issued a notification prescribing the factor
2.00(two) whereas State of M.P. by way of impugned
notification dated 29.9.2014 has fixed the multiplier
1.00(one) but the NHAI which is the instrumentality of the
Central Government, therefore, by virtue of 2(e)(v) of Act of
2013 the Central Government shall be the appropriate
Government, hence the notification dated 9.2.2016 issued by
the Central Government would apply. In such a situation, the
validity of the notification issued by the State Government is
not required to be examined or adjudicated because the same
is not applicable in the case of the petitioners. Since the
petitioners have already preferred appeals before the
Arbitrator u/s 3G(5), therefore, it is for the Arbitrator to
consider and decide the multiplier in view of the findings
given hereinabove instead of setting aside the award and
remanding the matter to the competent authority.
9. Under these circumstances, this Court is of considered
opinion that Reference Court did not commit any mistake by
applying the multiplier of "2" as notified by the Central
Government. No other argument is advanced by counsel for
appellant.
10. It is not out of place to mention here that the claimants
have also filed appeals for enhancement of compensation
amount. Since the question of factor is covered in all the
appeals and the claimants are satisfied with the factor of "2'
which has been applied by Reference Court and this Court has
also come to a conclusion that factor of "2" would apply for
multiplier as provided under Section 26(2) of Act of 2013,
therefore, by keeping the question of determination of market
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
9 FA-1254-2025
value, as provided under Section 26(1) of the Act of 2013 as
challenged by the claimants, open, the Award dated
31.03.2023 passed by Principal District Judge, Sheopur
(M.P.) in Land Acquisition Case No. MJC/37/2022 is hereby
affirmed so far as it relates to application of factor "2" for
multiplier as required under Section 26(2) of the Act of 2013.
11. With aforesaid observations, appeal fails and is hereby
dismissed."
15. The present appeal also raises the same and similar issue of application
of multiplying factor of 2.0 for land which has been acquired for the
purposes of Union. It has been held by the coordinate Bench that as per
Section 3(e)(v) of the Act of 2013, appropriate government in relation to
acquisition of land for the purpose of Union shall be Central Government
and it has been held by coordinate Bench of this court in the aforesaid
judgement that even if acquisition is made by the State but once the
acquisition is made for the purposes of railways, then the multiplying factor
of 2.0 would be applicable. The coordinate Bench applied the case of
Badrilal Dhakad (supra) and held it applicable for acquisitions for Railways
also.
16. The Division Bench of this Court in batch of Writ Petitions in the case
of Badrilal Dhakad (supra) has held that for the acquisitions made by an
authority for purposes and projects of Central Government, like construction
of National Highways by National Highways Authority of India (NHAI),
the multiplication factor of 2.0 as per notification dated 09.02.2016 would
be applicable. The Division Bench has held as under:-
"15. The petitioners have challenged the validity of the
notification dated 29.9.2014 issued by the Government of
M.P. because the same has been applied in their cases for the
calculation of the compensation. It is not in dispute that the
Central Government has appointed Sub Divisional Officer
(Revenue) as ‘the competent authority for hearing the
objection under section 3C of the NH Act of 1956. The
Central Government has acquired the land of petitioners and
others for NHAI for the construction of the national highway.
Under section 3A of the NH Act if the Central Government is
satisfied that for a public purpose any land is required for the
building, maintenance, management or operation of a national
highway or part thereof, it may, by notification in the Official
Gazette, declare its intention to acquire such land. The
competent authority appointed by the Central Government
shall cause the substance of the notification to be published in
two local newspapers, one of which will be in a vernacular
language. The national highway is a central Government
project undertaken by the NHAI for which the land situated
in the State of M.P. has been acquired, meaning thereby for
the project of central Government land situated in the State of
M.P. are being acquired. In such a situation who would be the
appropriate Government under section 2(e) of the Act of
2013. If the central Government is appropriate then all the
notifications issued by the Central Government would apply
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
10 FA-1254-2025
in multiplier factor 2(two), hence in that situation the
petitioners have not required to challenge the validity of the
notification dated 9.2.2016 issued by the State Government
because the same would not apply.
16. As per the definition under section 2(b) of the Act of 2013
the State Government would be the appropriate Government
in relation to the acquisition of land situated within the
territory of State. The Central Government would be the
appropriate government in relation of acquisition of land
situated within Union territory except for Pondichery and in
relation to acquisition of land for the public purpose in more
than one State, the Central Government shall consult with the
concerned State Government or the Union territory and under
section 2(e)(v) of the Act of 2013 in relation to the acquisition
of land for the purpose of the Union, as may be specified by
notification, the appropriate Government would be the
Central Government. Since the land of the petitioners is
situated within the State Government, therefore, the
respondents are treating State Government as appropriate
Government and applying the notification dated 29.9.2014
under section 26(2) of Act of 2013 which gave a cause of
action to the petitioners to challenge the validity of the said
notification but if it is held that in this acquisition the
appropriate Government is the Central Government then the
notification issued by the Central Government dated 9.2.2016
would apply in which the multiplier is 2.00(two) for the rural
st
area. As per 1 Schedule, the following components provided
in the table shall constitute the minimum compensation
package to be given to the landowners whose land is
acquired. Serial no. 2 is the factor by which the market value
is to be multiplied in the case of rural areas and for which the
appropriate government is required to notify the factor based
on the distance of the project from the urban area. The Central
Government has issued a notification prescribing the factor
2.00(two) whereas State of M.P. by way of impugned
notification dated 29.9.2014 has fixed the multiplier
1.00(one) but the NHAI which is the instrumentality of the
Central Government, therefore, by virtue of 2(e)(v) of Act of
2013 the Central Government shall be the appropriate
Government, hence the notification dated 9.2.2016 issued by
the Central Government would apply. In such a situation, the
validity of the notification issued by the State Government is
not required to be examined or adjudicated because the same
is not applicable in the case of the petitioners. Since the
petitioners have already preferred appeals before the
Arbitrator u/s 3G(5), therefore, it is for the Arbitrator to
consider and decide the multiplier in view of the findings
given hereinabove instead of setting aside the award and
remanding the matter to the competent authority."
17. Therefore, the law on this point is well settled that if the acquisition is
made for project of Railways which is a Central Government organization
then even if the acquisition is made by the State Government for the
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
11 FA-1254-2025
purposes of the Central Government then the multiplication factor of 2.0 for
rural area would be applicable in terms of notification dated 09.02.2026.
18. The clarification circular dated 14.12.2017 has been considered in
Review Petition filed by Central Government in case of Badrilal Dhakad
(supra), in RP No. 665 of 2022 (NHAI Vs. Badrilal) , decided on
14.10.2022). The said circular/Office Memorandum has been discarded in
the following terms :-
2. The present review petitions are filed solely on the ground
thatNHAI has failed to bring on record letter F.No.
13013/02/2016-LRD issued on 8.5.2017 (sic 14.12.2017) by
the Government of India, Ministry of Rural Development,
Department of Land Resources, New Delhi to all the Chief
Secretaries/Administrators of all State/Union
Territoriesclarifying the position in respect of applicability of
multiplying factor provided in First Schedule to the Right to
Fair Compensation and Transparency in Land Acquisition
Rehabilitation and Resettlement.
xx xx xx
5. In exercise of powers u/s. 30(2) of the Act of 2013, the
Central Government by way of Notification dated 13.2.2015
(sic 9.2.2016) published in the Gazette of India
(Extraordinary) has notified that in the case of the rural area
the factor multiplier shall be 2 (two). When the factor
multiplier for rural area 2 (two) has been notified by the
Government of India by way of Gazette Notification for the
land situated in a rural area, then the Government of India by
way of letter/circular cannot modify the Notification without
publishing in the official gazette. It is not the case of the
NHAI that the letter dated 9.2.2016 (sic 14.12.2017) has not
been passed in the exercise of powers u/s. 30(2) of the Act of
2013. Hence, this letter shall not supersede or dilute the effect
of the Notification dated 9.2.2016. Notification dated
9.2.2016 nowhere distinguish that this shall apply only to the
land situated in Union Territory. Therefore, the ground on
which the review is sought is wholly misconceived.
19. Nothing turns in favour of the appellant on basis of Section 3 (e) that
defines appropriate Government in the following manner :-
(e) “appropriate Government” means,—
(i) in relation to acquisition of land situated within the
territory of, a State, the State Government;
(ii) in relation to acquisition of land situated within a Union
territory (except Puducherry), the Central Government;
(iii) in relation to acquisition of land situated within the Union
territory of Puducherry, the Government of Union territory of
Puducherry;
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
12 FA-1254-2025
(iv) in relation to acquisition of land for public purpose in
more than one State, the Central Government, in consultation
with the concerned State Governments or Union territories;
and
(v) in relation to the acquisition of land for the purpose of the
Union as may be specified by notification, the Central
Government:
Provided that in respect of a public purpose in a District for an
area not exceeding such as may be notified by the appropriate
Government, the Collector of such District shall be deemed to
be the appropriate Government;
2 0 . The circular/OM dated 14.12.2017 has been issued only reading the
definition upto Section 3 (e) (ii), and conveniently omitting to read Section
3(e)(v), as per which for acquisitions of land for purposes of Union, the
Central Government shall be the appropriate Government. Railways is a
purpose of the Union. The expression in 3 (e) (v) "purpose of the Union as
may be specified by notification" shall mean the purpose as shall be notified
in the notification declaring intention to acquire under section 11 of the
LARR Act.
21. The counsel for Union of India further relied on a notification dated
29.9.2014 issued by the State Government of Madhya Pradesh, as per which
a notification has been issued by Government of Madhya Pradesh, notifying
the Collector of District as "appropriate government" for the of the LARR
Act, in respect of public purpose in a district, for area not exceeding Ten
Thousand hectares. The said notification is as under:-
"Bhopal, the 29th September 2014
No. F 16-15(1)-2014-VII-Sec. 2A- In exercise of the powers
conferred by the proviso to clause (e) of Section 3 of the
Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013 (No.
30 of 2013), the State Government hereby notifies that the
Collector shall be deemed to be the appropriate Government
for the purpose of this Act, in respect of a public purpose in a
district for an area not exceeding ten thousand hectares.
By order and in the name of the Governor of Madhya
Pradesh"
22. By this notification, the Collector shall exercise the powers of
appropriate Government in cases where the land area being acquired is less
than 10000 hectares. This hardly helps the appellant, because in this case,
what is to be seen that where the land is acquired for purpose of Union, then
irrespective of the fact that acquisition is undertaken by which Government,
the appropriate Government shall be the Central Government. This is the
plain meaning of Section 3 (e) (v), as held by the Division Bench in Badrilal
Dhakad (supra).
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
13 FA-1254-2025
23. This Court therefore, is not persuaded to take any different view. It
arrives at a conclusion that the multiplication of 2.0 was applicable in the
present case. But now it is required to be seen that whether the
multiplication factor of 2.0 has been correctly applied by the Reference
Court in the present case or not. It is seen that in the present case the area of
land acquired is very minuscule that is 0.027 hectare which would be only
around 270 Sq. Meter. On the aforesaid land a house was constructed and
initially the Valuation Committee had valued the land as Rs.19,537/- and
the house at Rs.43,27,344/-. Thereafter objections were made by the land
losers before the Collector and the Collector had got a re-evaluation of
the land and house carried out and as per the re-evaluation report, the house
was valued at Rs.59,55,603/- and the land was valued at Rs.2,97,000/-.
24. Therefore, out of the total compensation awarded by the Collector, the
major portion is valuation of the house which is around Rs.59.55 lakh
and the valuation of land is only about Rs.2.97 lakh.
25. The Reference Court has awarded 2.0 multiplication factor on the
valuation of house as well as the valuation of land and this is something
which is to be adjudicated by this Court.
26. The LARR Act, 2013 provides in Section 26 the methodology
determination of market value of land by the Collector. As per Section 27
the determination of compensation has to be by calculating the amount of
compensation of land and also all assets attached to the land. Section 28
contains parameters to be considered by the Collector. Section 29 relates
to determination of things attached to the land or building and Section 30
relates to award of solatium. The relevant provisions are as under :-
"26. Determination of market value of land by Collector.– (1) The Collector
shall adopt the following criteria in assessing and determining the market
value of the land, namely:—
(a) the market value, if any, specified in the Indian Stamp Act, 1899 (2 of
1899) for the registration of sale deeds or agreements to sell, as the case
may be, in the area, where the land is situated; or
(b) the average sale price for similar type of land situated in the nearest
village or nearest vicinity area; or
(c) consented amount of compensation as agreed upon under sub-section (2)
of section 2 in case of acquisition of lands for private companies or for
public private partnership projects,
whichever is higher:
Provided that the date for determination of market value shall be the date on
which the notification has been issued under section 11.
Explanation 1.—The average sale price referred to in clause (b) shall be
determined taking into account the sale deeds or the agreements to sell
registered for similar type of area in the near village or near vicinity area
during immediately preceding three years of the year in which such
acquisition of land is proposed to be made.
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
14 FA-1254-2025
Explanation 2.—For determining the average sale price referred to in
Explanation 1, one-half of the total number of sale deeds or the agreements
to sell in which the highest sale price has been mentioned shall be taken into
account.
Explanation 3.—While determining the market value under this section and
the average sale price referred to in Explanation 1 or Explanation 2, any
price paid as compensation for land acquired under the provisions of this
Act on an earlier occasion in the district shall not be taken into
consideration.
Explanation 4.—While determining the market value under this section and
the average sale price referred to in Explanation 1 or Explanation 2, any
price paid, which in the opinion of the Collector is not indicative of actual
prevailing market value may be discounted for the purposes of calculating
market value.
(2) The market value calculated as per sub-section (1) shall be multiplied by
a factor to be specified in the First Schedule.
(3) Where the market value under sub-section (1) or sub-section (2) cannot
be determined for the reason that—
(a) the land is situated in such area where the transactions in land are
restricted by or under any other law for the time being in force in that area;
or
(b) the registered sale deeds or agreements to sell as mentioned in clause (a)
of sub-section (1) for similar land are not available for the immediately
preceding three years; or
(c) the market value has not been specified under the Indian Stamp Act,
1899 (2 of 1899) by the appropriate authority,
the State Government concerned shall specify the floor price or minimum
price per unit area of the said land based on the price calculated in the
manner specified in sub-section (1) in respect of similar types of land
situated in the immediate adjoining areas:
Provided that in a case where the Requiring Body offers its shares to the
owners of the lands (whose lands have been acquired) as a part
compensation, for acquisition of land, such shares in no case shall exceed
twenty-five per cent, of the value so calculated under sub-section (1) or sub-
section (2) or sub-section (3) as the case may be:
Provided further that the Requiring Body shall in no case compel any owner
of the land (whose land has been acquired) to take its shares, the value of
which is deductible in the value of the land calculated under sub-section (1):
Provided also that the Collector shall, before initiation of any land
acquisition proceedings in any area, take all necessary steps to revise and
update the market value of the land on the basis of the prevalent market rate
in that area:
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
15 FA-1254-2025
Provided also that the appropriate Government shall ensure that the market
value determined for acquisition of any land or property of an educational
institution established and administered by a religious or linguistic minority
shall be such as would not restrict or abrogate the right to establish and
administer educational institutions of their choice.
27. Determination of amount of compensation.– The Collector having
determined the market value of the land to be acquired shall calculate the
total amount of compensation to be paid to the land owner (whose land has
been acquired) by including all assets attached to the land.
28. Parameters to be considered by Collector in determination of award .–In
determining the amount of compensation to be awarded for land acquired
under this Act, the Collector shall take into consideration—
firstly, the market value as determined under section 26 and the award
amount in accordance with the First and Second Schedules;
secondly, the damage sustained by the person interested, by reason of the
taking of any standing crops and trees which may be on the land at the time
of the Collector's taking possession thereof;
thirdly, the damage (if any) sustained by the person interested, at the time of
the Collector's taking possession of the land, by reason of severing such land
from his other land;
fourthly, the damage (if any) sustained by the person interested, at the time
of the Collector's taking possession of the land, by reason of the acquisition
injuriously affecting his other property, movable or immovable, in any other
manner, or his earnings;
fifthly, in consequence of the acquisition of the land by the Collector, the
person interested is compelled to change his residence or place of business,
the reasonable expenses (if any) incidental to such change;
sixthly, the damage (if any) bona fide resulting from diminution of the
profits of the land between the time of the publication of the declaration
under section 19 and the time of the Collector's taking possession of the
land; and
seventhly, any other ground which may be in the interest of equity, justice
and beneficial to the affected families.
29. Determination of value of things attached to land or building .–(1) The
Collector in determining the market value of the building and other
immovable property or assets attached to the land or building which are to
be acquired, use the services of a competent engineer or any other specialist
in the relevant field, as may be considered necessary by him.
(2) The Collector for the purpose of determining the value of trees and
plants attached to the land acquired, use the services of experienced persons
in the field of agriculture, forestry, horticulture, sericulture, or any other
field, as may be considered necessary by him.
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
16 FA-1254-2025
(3) The Collector for the purpose of assessing the value of the standing
crops damaged during the process of land acquisition, may use the services
of experienced persons in the field of agriculture as may be considered
necessary by him.
30. Award of solatium.– (1) The Collector having determined the total
compensation to be paid, shall, to arrive at the final award, impose a
“Solatium” amount equivalent to one hundred per cent. of the compensation
amount. Explanation.—For the removal of doubts it is hereby declared that
solatium amount shall be in addition to the compensation payable to any
person whose land has been acquired.
(2) The Collector shall issue individual awards detailing the particulars of
compensation payable and the details of payment of the compensation as
specified in the First Schedule.
(3) In addition to the market value of the land provided under section 26, the
Collector shall, in every case, award an amount calculated at the rate of
twelve per cent. per annum on such market value for the period
commencing on and from the date of the publication of the notification of
the Social Impact Assessment study under sub-section (2)of section 4, in
respect of such land, till the date of the award of the Collector or the date of
taking possession of the land, whichever is earlier."
27. The notification dated 09.02.2016 has been issued by the Central
Government which is in the following terms and is issued under section
30(2) of LARR Act:-
"S.O. 425(E). In exercise of the powers conferred by column no. 3 of serial
no. 2 of the First Schedule read with sub-section (2) of section 30 of the
Right to Fair Compensation and Transparency in Land Acquisition,
Rehabilitation and Resettlement Act, 2013 (No. 30 of 2013), the Central
Government, hereby, notifies that in case of rural areas, the factor by which
the market value is to be multiplied shall be 2.00 (two)."
28. The first Schedule to Section 30 (2) contains entry (2), which provides
that the factor which the market value is to be multiplied in case of rural
area would be 1.00 to 2.00 based on the distance of project from urban
areas, as may be notified by the appropriate Government. The Central
Government has notified a uniform multiplication factor of 2.0 irrespective
of distance from urban areas and now it is to be seen by this Court that
whether that multiplication factor though was applicable, but whether it has
been correctly operated by the Reference Court.
29. As already noted above, Section 26 relates to determination of market
value of land by the Collector and as per Section 26(2) the market value
calculated as per Section 26(1) shall be multiplied by a factor to be specified
in the First Schedule. Therefore, the authority to lay down a multiplication
factor and of multiplying the value by such multiplication factor flows from
Section 26 which relates to valuation of "land".
30. Section 27 relates to determination of amount of compensation and it
provides that Collector having determined the market value of land to be
acquired shall calculate the total amount of compensation to be paid to the
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
17 FA-1254-2025
land owner by including all assets attached to the land. Therefore, it is clear
by scheme of the LARR Act that firstly value of land would be adjudicated
under Section 26 and then assets would be valued as per Section 27 and then
the total compensation shall be arrived at by the Collector.
31. The expression "land" has been defined vide Section 3 (p) as under:-
(p) “land” includes benefits to arise out of land, and things attached to the
earth or permanently fastened to anything attached to the earth.
As per the aforesaid definition, land does not include the assets available
or constructed on land. It would only include the things attached to the
earth, or permanently fastened to anything attached to earth. Buildings,
tubewells, wells, electrical installations, machineries, etc. would not fall
within this definition. Building is not "attached" to earth. It is "constructed"
on earth. Land location and value increases upon it being in vicinity to
urban areas, but value of construction remains the same, whether it is rural,
or urban area. The basic purpose of providing multiplication factor is to give
appreciation to land value for it being in vicinity of urban areas. This is as
per the language of Schedule-I itself, that provides that multiplication value
shall depend on distance of project from urban area.
32. Section 30 provides for award of solatium and Section 30(2) provides
that the Collector shall issue individual awards detailing the particulars of
compensation payable and the details of payment of compensation as
specified in schedule-I. The manner in which Schedule-I has been framed,
also leads to same conclusion.
33. The compensation is to be determined in tabular form as per this
Schedule. As per item No.1, firstly market value of land is to be take. Then
the value as per multiplication factor in rural and urban areas are to be taken
as per item No.2 and 3. Then value of assets attached, then solatium, etc. are
to be calculated. The provision of multiplication factor in item Nos.2 and 3
clearly indicates that the factor is only for value of land, and not for attached
assets. Schedule-I is as under :-
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
18 FA-1254-2025
34. It is also clear that the Schedule-I has been laid down under Section
30(2) which provides that the Collector shall issue award detailing the
particulars of compensation payable and the payment of compensation, but
the authority to lay down the multiplication factor flows from Section 26(2)
which relates to valuation of land.
35. Hence, from the aforesaid scheme of LARR Act, 2013 it would be clear
that the multiplication factor is only for the value of land and not for the
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
19 FA-1254-2025
value of assets attached to the land which may be building or or any other
assets.
36. In view of above, it would become clear that the multiplication factor
would not be calculable in case of the buildings attached to the land or
constructed on the land, but it would be only for the component of land in
compensation which would be relatable to Section 26(2) of LARR Act.
Therefore, in the considered opinion of this Court, the multiplication factor
of 2.0 was only to be reckoned on the component of land price i.e. Rs.
2,97,000/- and not on the component of value of house i.e. Rs.59,55,603/-.
37. Hence, in the opinion of this Court, the Reference Court has errred in
enhancing the compensation by applying multiplying factor of 2.0 on the
land as well as on the constructed house.
38. Therefore, the appeal is partly allowed and the impugned order passed
by the Reference Court is modified to the extent that the multiplication
factor of 2.0 would be calculable only on the component of land assessed by
the Collector to the extent of Rs.2,97,000/- and not on the component of
value of house which was assessed by the Collector to the tune of
Rs.59,55,603/-.
39. In the above terms, the appeal stands partly allowed and disposed off."
4. Therefore, there is no reason to take any different view in this matter so
far as the question of multiplication factor is concerned. The multiplication
factor of 2.0 is upheld. There is no acquisition of assets in the present case
and the only acquisition is for the land of the respondent and, therefore, the
multiplication factor is upheld.
5. So far as the question of land being irrigated is concerned, it is seen that
the Reference Court has considered in detail the position that the land is
irrigated by borewell. In revenue khasra Exhibit P-5 the land has been
recorded as irrigated land and the such record of the land being irrigated
being in revenue record, has some presumption of correctness, unless the
correctness of the entry is demolished by evidence. The Reference Court had
to accept the entry in the revenue record as the presumption of correctness of
revenue entry is laid down in Section 117 of MPLR Code which has to be
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026
18:29:48
NEUTRAL CITATION NO. 2026:MPHC-JBP:62272
20 FA-1254-2025
presumed to be correct, until the contrary is proved. The Railways failed to
prove to the contrary and, therefore, the entry of land to be irrigated land in
the revenue record has rightly been believed by the Reference Court.
6. It is further seen that in Survey No.266, there is a borewell from which
Survey Nos.266/2, 266/3, 266/4 and 266/5 used to be irrigated for which a
categorical finding of fact has been returned by the Reference Court which
does not appear to be perverse looking to the documents available in the
record of Reference Court.
7. Therefore, no reasons are made out to hold that the order passed by the
Reference Court suffers from any illegality or perversity.
8. The appeal, therefore, fails and is dismissed.
(VIVEK JAIN)
JUDGE
psm
Signature Not Verified
Signed by: PREM SHANKAR
MISHRA
Signing time: 14-08-2026