SOUTH EASTERN COALFIELDS LTD. vs M/S SHYAM LAL AGRAWAL, CONTRACTOR
- Court
- Chhattisgarh High Court
1
CGHC010446862026 2026:CGHC:47908
NAFR
HIGH COURT OF CHHATTISGARH AT BILASPUR
WP227 No. 1433 of 2026
1 - South Eastern Coalfields Ltd. Through Chairman-Cum-Managing Director,
Secl, Seepat Road, Bilaspur (C.G.)
2 - General Manager (Civil) Secl, Seepat Road, Bilaspur (C.G.)
3 - General Manager Secl, Gevra Area, Post Gevra, District Korba (C.G.).
... Petitioner(s)
versus
M/s Shyam Lal Agrawal, Contractor Through Its Partner Anand Agrawal, R/o
A-401, Maruti Solitaire, Kachna Road, Khamardih, Raipur (C.G.)
... Respondent(s)
(Cause-title taken from Case Information System)
For Petitioner(s) : Mr. Harpreet Singh Ahluwalia, Advocate.
Hon’ble Shri Justice Ravindra Kumar Agrawal, J.
Order on Board
20/11/2026
1. The present petition has been filed under Article 227 of the Constitution
of India, assailing the order dated 08.09.2026 passed by the learned
Commercial Court (District Judge Level), Nava Raipur (in short, the
“Commercial Court”) in Execution Case No. 29/2025, whereby the
learned Executing Court has disposed of the objection (I.A. No.
02/2026) regarding limitation for execution of the award dated
18.09.2010.
2. The petitioner’s case is that the arbitral award was passed on
18.09.2010 in favour of the respondent by the sole arbitrator, whereby
2
an amount of Rs. 42,29,600/- was awarded in favour of the
respondent. The petitioner challenged the award dated 18.09.2010 by
filing an application under Section 34 of the Arbitration and Conciliation
Act, 1996 (hereinafter referred to as the “Arbitration Act”), which was
filed on 16.12.2010 and ultimately came to be dismissed on
18.04.2017. Thereafter, the petitioner filed an appeal before this Court
under Section 37 of the Arbitration Act, which was also dismissed on
17.06.2025. Thereafter, the respondent/award holder initiated
execution proceedings, being Execution Case No. 29/2025, on
16.09.2025 before the learned Commercial Court, seeking
enforcement of the arbitral award dated 18.09.2010 and recovery of
the awarded amount of Rs. 42,29,600/- along with interest of Rs.
56,86,436/- accrued on the principal sum from 18.09.2010 to
18.08.2025. In the execution proceedings, the petitioner raised an
objection regarding the maintainability of the execution proceedings on
the ground of limitation, contending that the same were barred by
limitation as provided under Article 136 of the Limitation Act, 1963. The
said objection was rejected by the learned Commercial Court. Hence,
this petition.
3. Mr. Harpreet Singh Ahluwalia, learned counsel appearing for the
petitioner, would submit that the learned Executing Court has
misconstrued the unamended Section 36 of the Arbitration Act. It is
submitted that the learned Executing Court proceeded on the premise
that the unamended provision created an embargo upon execution of
an arbitral award until expiry of the period for filing an application under
Section 34 of the Arbitration Act, or where such application had been
filed, until its rejection. Such interpretation is contrary to the law
3
declared by the Hon’ble Supreme Court in Hindustan Construction
Company Ltd. v. Union of India , (2020) 17 SCC 324, wherein the
effect of the unamended Section 36 of the Arbitration Act was
considered and it was held that mere filing of a petition under Section
34 of the Arbitration Act did not result in an automatic stay of the arbitral
award. It is submitted that the Hon’ble Supreme Court also overruled
the earlier decisions taking the contrary view and clarified the legal
position concerning the effect of filing a Section 34 application.
4. He would also submit that the learned Commercial Court has erred in
excluding the period from 18.09.2010 to 23.10.2015 while computing
the limitation for execution of the arbitral award dated 18.09.2010. The
execution application was instituted only on 16.09.2025, beyond the
period of twelve years prescribed under Article 136 of the Limitation
Act, 1963. The pendency of proceedings under Sections 34 and 37 of
the Arbitration and Conciliation Act, 1996, by itself, could not furnish
any statutory basis for excluding the aforesaid period, particularly in
view of the law declared by the Hon'ble Supreme Court in Hindustan
Construction Company Ltd. v. Union of India. The learned Commercial
Court could not extend the statutory period of limitation merely on
equitable considerations or on the ground that the award-holder had
acted in accordance with the legal position prevailing at the relevant
time. Therefore, the execution application was liable to be dismissed as
barred by limitation.
5. I have heard learned counsel for the petitioner and perused the
documents annexed with the petition as well as the impugned order.
6. The issue of limitation for initiating execution proceedings in respect of
an arbitral award passed prior to the amendment incorporated in
4
Section 36 of the Arbitration and Conciliation Act, 1996, with effect from
23.10.2015, has already been decided by this Court vide order dated
14.05.2026 passed in W.P.(227) No. 590 of 2026, in the following
terms:-
“11. The main question for determination is the time from
which the period of twelve years prescribed under Article 136
of the Limitation Act, 1963 begins to run for the execution of
an award made on 24.06.2013, where the application under
Section 34 of the Arbitration Act challenging the award was
filed before the Arbitration and Conciliation (Amendment) Act,
2015 (in short, “the Amendment Act of 2015”) and remains
pending.
12. It is necessary here to note the provision of Section 36 of
the Arbitration Act, as it stood before 23.10.2015, which reads
as under:-
“36. Enforcement.- Where the time for making an
application to set aside the arbitral award under section
34 has expired, or such application having been made,
it has been refused, the award shall be enforced under
the Code of Civil Procedure, 1908 (5 of 1908) in the
same manner as if it were a decree of the Court.”
13. The then-prevailing provision came to be considered by
the Hon’ble Supreme Court in National Aluminium Co. Ltd.
v. Pressteel & Fabrications (P) Ltd. , (2004) 1 SCC 540,
wherein it was held that mere filing of an application under
Section 34 operated as an automatic stay on the enforcement
of the arbitral award, irrespective of the merits of the
challenge and without any discretion vested in the Court to
permit enforcement during the pendency of such proceedings.
The said position was reiterated in National Buildings
Construction Corpn. Ltd. v. Lloyds Insulation (India) Ltd. ,
(2005) 2 SCC 367, and Fiza Developers and Inter-Trade (P)
Ltd. v. AMCI (India) Pvt. Ltd. , (2009) 17 SCC 796, and
continued to hold the field during the period relevant to the
present case.
14. The aforesaid legal position was also noted by the Law
th
Commission of India in its 246 Report submitted in August,
2014. The Law Commission expressed concern that the
automatic suspension of an arbitral award merely upon filing
of an application under Section 34 substantially impeded the
successful party from realizing the benefit of the award. It,
therefore, recommended an amendment to Section 36 of the
Arbitration Act so as to do away with the automatic bar on
enforcement arising from the mere filing of a Section 34
application.
5
15. Pursuant to the aforesaid recommendation, Section 36 of
the Arbitration Act was substituted by the Arbitration and
Conciliation (Amendment) Act, 2015, with effect from
23.10.2015. The substituted provision reads as under:
"36. Enforcement. - (1) Where the time for making an
application to set aside the arbitral award under Section
34 has expired, then, subject to the provisions of sub-
section (2), such award shall be enforced in
accordance with the provisions of the Code of Civil
Procedure, 1908 (5 of 1908), in the same manner as if
it were a decree of the court.
(2) Where an application to set aside the arbitral award
has been filed in the Court under Section 34, the filing
of such an application shall not by itself render that
award unenforceable, unless the Court grants an order
of stay of the operation of the said arbitral award in
accordance with the provisions of sub-section (3), on a
separate application made for that purpose.
(3) Upon filing of an application under sub-section (2)
for stay of the operation of the arbitral award, the Court
may, subject to such conditions as it may deem fit,
grant stay of the operation of such award for reasons to
be recorded in writing…"
16. Section 26 of the Amendment Act of 2015 contains the
transitional arrangement governing the applicability of the
amendments. It stipulates that, save where the parties
otherwise agree, the Amendment Act shall not apply to arbitral
proceedings commenced before 23.10.2015, whereas it shall
apply to arbitral proceedings commenced on or after the said
date. Significantly, the transitional provision refers specifically
to “arbitral proceedings” and does not expressly deal with
proceedings before the Court, including applications under
Sections 34 and 36 of the Arbitration Act arising out of an
arbitral award.
17. The applicability of the amended Section 36 to
proceedings under Section 34 which were instituted and
remained pending prior to 23.10.2015 was authoritatively
considered by the Hon’ble Supreme Court in Board of
Control for Cricket in India v. Kochi Cricket Private
Limited and Others, 2018 (6) SCC 287. The Court
interpreted Section 26 of the 2015 Amendment Act and held
that the provision draws a distinction between “arbitral
proceedings” and “court proceedings” arising therefrom. The
restriction contained in the first part of Section 26 was held to
operate only in respect of arbitral proceedings commenced
before 23.10.2015 and not to court proceedings, including
proceedings under Section 34. The Court accordingly held
that the amended Section 36 of the Arbitration Act would
govern the enforcement of an arbitral award notwithstanding
6
that the Section 34 proceedings had been instituted prior to
23.10.2015. In para 39, it has been observed that:-
“39. Section 26, therefore, bifurcates proceedings, as
has been stated above, with a great degree of clarity,
into two sets of proceedings arbitral proceedings
themselves, and court proceedings in relation thereto.
The reason why the first part of Section 26 is couched
in negative form is only to state that the Amendment
Act will apply even to arbitral proceedings commenced
before the amendment if parties otherwise agree. If the
first part of Section 26 were couched in positive
language (like the second part), it would have been
necessary to add a proviso stating that the Amendment
Act would apply even to arbitral proceedings
commenced before the amendment if the parties agree.
In either case, the intention of the legislature remains
the same, the negative form conveying exactly what
could have been stated positively, with the necessary
proviso. Obviously, "arbitral proceedings" having been
subsumed in the first part cannot re-appear in the
second part, and the expression "in relation to arbitral
proceedings" would, therefore, apply only to court
proceedings which relate to the arbitral proceedings.
The scheme of Section 26 is thus clear: that the
Amendment Act is prospective in nature, and will apply
to those arbitral proceedings that are commenced, as
understood by Section 21 of the principal Act, on or
after the Amendment Act, and to court proceedings
which have commenced on or after the Amendment Act
came into force.”
18. The Hon’ble Supreme Court further held that the
substituted Section 36 regulates the mode and conditions
governing enforcement of an arbitral award before the Court
and is, therefore, procedural in nature, rather than a
provision affecting any substantive right of the parties arising
from the arbitration. Consequently, the amended Section 36
was held applicable to court proceedings pending on
23.10.2015, including proceedings under Section 34,
irrespective of the date on which the arbitral proceedings or
the Section 34 proceedings had commenced. Thus, the
applicability of the amended Section 36 to pending court
proceedings flows from its procedural character and the
interpretation placed by the Supreme Court on Section 26 of
the 2015 Amendment Act, which does not extend the
restriction contained in its first part to proceedings before the
Court.
19. Subsequently, the Arbitration and Conciliation
(Amendment) Act, 2019 introduced Section 87 into the
Arbitration Act, with effect from the date on which the said
Amendment Act received the assent of the President. The
newly inserted provision reads as under:
7
"87. Unless the parties otherwise agree, the
amendments made to this Act by the Arbitration and
Conciliation (Amendment) Act, 2015 shall—
(a) not apply to--
(i) arbitral proceedings commenced before the
commencement of the Arbitration and
Conciliation (Amendment) Act, 2015;
(ii) court proceedings arising out of or in relation
to such arbitral proceedings irrespective of
whether such court proceedings are
commenced prior to or after the commencement
of the Arbitration and Conciliation (Amendment)
Act, 2015;
(b) apply only to arbitral proceedings commenced on
or after the commencement of the Arbitration and
Conciliation (Amendment) Act, 2015 and to court
proceedings arising out of or in relation to such arbitral
proceedings."
20. At the same time, Section 15 of the 2019 Amendment Act
omitted Section 26 of the 2015 Amendment Act with
retrospective effect from 23.10.2015. Read together with
Section 87, the amendment sought to restore the pre-2015
legal position in respect of court proceedings arising out of
arbitral proceedings commenced before 23.10.2015.
Consequently, the automatic stay regime was sought to be
applied to such proceedings irrespective of the date on which
the related court proceedings were instituted, thereby
seeking to undo the effect of the law declared in Kochi
Cricket (supra) and revive the position under the
unamended Section 36.
21. The validity of Section 87, along with the retrospective
omission of Section 26 of the 2015 Amendment Act, was
subsequently examined by the Hon’ble Supreme Court in
Hindustan Construction Co. Ltd. (supra). The Hon’ble
Supreme Court struck down Section 87 and the omission of
Section 26 as manifestly arbitrary and violative of Article 14
of the Constitution. In the course of its consideration, the
Court also clarified that the earlier interpretation of Section
36, under which mere filing of a Section 34 application
resulted in an automatic stay of enforcement, was not a
correct interpretation of the unamended provision; the
decisions adopting such construction, including National
Aluminium (supra) and the decisions following it, were held
to be per incuriam. In Hindustan Construction Co. Ltd.
(supra) it has been held that:-
1
“38. Thus, the reasoning of the judgments in NALCO ,
and Fiza Developers & Inter-Trade (P) Ltd. Z being per
1 (2004) 1 SCC 540
8
incuriam in not noticing Sections 9, 35 and the second
part of Section 36 of the Arbitration Act, 1996, do not
commend themselves to us and do not state the law
correctly. The fact that NALCO has been followed in
National Buildings Construction Corpn. Ltd. v. Lloyds
Insulation (India) Ltd. does not take us any further, as
National Buildings Construction Corpn. Ltd. in following
NALCO, a per incuriam judgment, also does not state
the law correctly. Thus, it is clear that the automatic
stay of an award, as laid down by these decisions, is
incorrect. The resultant position is that Section 36-even
as originally enacted-is not meant to do away with
Article 36(2) of the UNCITRAL Model Law, but is really
meant to do away with the two bites at the cherry
doctrine in the context of awards made in India, and the
fact that enforcement of a final award, when read with
Section 35, is to be under the CPC, treating the award
as if it were a decree of the court.
*
41. Given the fact that we have declared that the
judgments in NALCO, National Buildings Construction
2
Corpn. Ltd. and Fiza Developers have laid down the
law incorrectly, it is also clear that the amended Section
36, being clarificatory in nature, merely restates the
position that the unamended Section 36 does not stand
in the way of the law as to grant of stay of a money
decree under the provisions of the CPC.”
22. The Hon’ble Supreme Court further observed that Section
87 was manifestly arbitrary as it sought to revive the very
mischief of automatic stay which the 2015 Amendment,
th
pursuant to the recommendations of the 246 Law
Commission Report, had intended to eliminate, without any
discernible justification for such retrospective revival.
Accordingly, Section 87 and the omission of Section 26 were
struck down in their entirety. The Court, in Hindustan
Construction Co. Ltd. (supra), clarified that:
“66. The result is that Kochi Cricket judgment will
therefore continue to apply so as to make applicable
the salutary amendments made by the 2015
Amendment Act to all court proceedings initiated after
23-10-2015.”
23. Consequently, upon Section 87 being struck down, the
legal position declared in Kochi Cricket (supra) continues to
hold the field. The substituted Section 36 is, therefore,
applicable to court proceedings relating to enforcement of
arbitral awards, including proceedings under Sections 34 and
36, instituted or pending on or after 23.10.2015, irrespective
of the date on which the arbitral proceedings commenced, the
2 (2009)17 SCC 796
9
award was made, or the application under Section 34 was
instituted. The protection contained in the first part of Section
26 of the 2015 Amendment Act remains confined to the
arbitral proceedings themselves, which, where commenced
prior to 23.10.2015, continue to be governed by the law
applicable at the commencement of such proceedings.
24. Against the aforesaid legal backdrop, two distinct issues
arise for consideration, which require to be separately
examined. The first is whether the mere filing of an application
under Section 34 operated, in law, as an automatic stay upon
enforcement of the arbitral award. This issue stands
conclusively answered in the negative by the judgment in
Hindustan Construction (supra). The second, and distinct,
issue is as to when the award became enforceable for the
purposes of Article 136 of the Limitation Act, namely, the point
in time from which the award-holder acquired the legal right to
seek execution of the award. The determination of the latter
issue requires examination of the legal position governing
enforceability during the intervening period, notwithstanding
the subsequent declaration in Hindustan Construction
(supra).
25. The further question, therefore, is as to what remedy was
legally available to an award-holder in the factual and legal
circumstances prevailing in 2013 or 2015, prior to the
pronouncement of Hindustan Construction (supra) in 2020.
The question of the correct legal interpretation of the
unamended Section 36, as subsequently declared by the
Hon’ble Supreme Court, is distinct from the question of the
remedy that was actually available to an award-holder during
the period when the earlier judicial interpretation held the
field. The answer to one question cannot, by itself, be
determinative of the other.
26. Insofar as the period commencing from 23.10.2015 is
concerned, the position emerges directly from Kochi Cricket
(supra), without the necessity of invoking the subsequent
judgment in Hindustan Construction (supra). Since the
present proceedings were pending on 23.10.2015, the
substituted Section 36 governed their enforcement. Under
Section 36(2), the mere pendency of an application under
Section 34 did not render the award unenforceable;
enforcement could be stayed only upon an express order
passed on a separate application seeking such stay. In the
absence of any material showing that such an application was
made or any order of stay was granted, the award was legally
capable of being enforced from 23.10.2015. Accordingly, for
the purposes of Article 136 of the Limitation Act, the period of
limitation commenced from 23.10.2015.
27. During the period from 24.06.2013 to 22.10.2015, the law
declared in National Aluminium (supra) and the decisions
following it held the field and was binding upon all Courts by
10
virtue of Article 141 of the Constitution. Consequently, an
application seeking enforcement of the award during the said
period would have been governed by that prevailing
interpretation of Section 36 and would have encountered the
embargo recognised therein. The subsequent declaration in
Hindustan Construction (supra) that the earlier line of
decisions was rendered per incuriam does not retrospectively
alter the legal remedy that was available to the award-holder
during the period when those decisions constituted the
binding law. The subsequent correction of the legal position,
therefore, cannot be construed as having conferred upon the
award-holder a remedy which, under the law then prevailing
and binding on the Courts, could not have been effectively
pursued.
28. The distinction assumes significance in the context of
Article 136 of the Limitation Act, which prescribes the
commencement of limitation from the date on which the
decree or order “becomes enforceable”, and not necessarily
from the date on which it is passed. The Hon’ble Supreme
Court in Deep Chand v. Mohan Lal , (2000) 6 SCC 259,
Hameed Joharan v. Abdul Salam , (2001) 7 SCC 573, and
Akkayanaicker v. A.A.A. Kotchadainaidu , (2004) 12 SCC
469, has explained that the relevant date is the point in time
from which the decree-holder acquires the legal right and
practical ability to enforce the decree. Although those cases
dealt with impediments arising from the terms of the
respective decrees, the underlying principle is equally
relevant where enforcement is rendered unavailable by a
binding rule of law. In the present case, during the period from
24.06.2013 to 22.10.2015, the prevailing and binding
interpretation of Section 36 placed an absolute embargo upon
enforcement of the award during the pendency of the Section
34 proceedings. Thus, the award-holder could not have
effectively invoked the process of execution during that
period. The principle embodied in the maxim lex non cogit ad
impossibilia (the law does not compel a person to do the
impossible) also supports the conclusion that a period during
which enforcement was legally unavailable ought not to be
reckoned as a period during which the award was capable of
being enforced for the purposes of Article 136 of the
Limitation Act.
29. The aforesaid conclusion also draws support, by way of
analogy, from Section 15(1) of the Limitation Act, 1963, which
excludes from computation the period during which execution
of a decree remains stayed by an injunction or order. The
provision reflects the broader principle that a period during
which the enforcement of an adjudicated right is legally
interdicted should not operate to the prejudice of the person
entitled to enforce it. In the present case, from 24.06.2013 to
22.10.2015, the award-holder was governed by a binding
judicial interpretation of Section 36 under which enforcement
of the award during the pendency of proceedings under
11
Section 34 stood effectively foreclosed. The subsequent
declaration in Hindustan Construction (supra), holding that
the earlier interpretation did not correctly state the law, cannot
retrospectively render the remedy of execution practically
available during the period when such remedy stood judicially
barred. Accordingly, the said period deserves to be excluded
while determining the date on which the award became
enforceable for the purposes of Article 136 of the Limitation
Act.
30. The aforesaid construction is also consistent with the
th
object underlying the 2015 Amendment. The 246 Report of
the Law Commission of India had specifically noticed that the
then prevailing regime of automatic stay upon the filing of a
Section 34 application had “virtually paralyzed” the successful
party from realizing the benefit of the award. If limitation under
Article 136 were nevertheless permitted to run during the very
period in which enforcement of the award was judicially
foreclosed, the award-holder could be deprived of the fruits of
an award solely by the passage of time during the pendency
of the challenge. Such an interpretation could lead to a
situation where, notwithstanding the ultimate rejection of the
Section 34 challenge and the consequent affirmation of the
award, the award becomes incapable of execution merely
because the challenge remained pending for more than
twelve years, without any corresponding default on the part of
the award-holder. The consequence would be particularly
incongruous where the delay in disposal of the Section 34
proceedings is attributable, wholly or substantially, to the
award-debtor itself. Such a construction would permit the
pendency of a statutory challenge to operate, by mere efflux
of time, as a means of defeating an otherwise enforceable
award, which would be inconsistent with the legislative object
underlying the amendments to Sections 34 and 36 and
cannot be readily attributed to Parliament in the absence of
clear language to that effect.
31. The aforesaid interpretation also accords with the
underlying object of the law of limitation, which is to require
diligence in pursuing enforceable rights and to prevent stale
claims, rather than to defeat a right during a period when its
enforcement is legally unavailable. Where the right in
question remains subject to adjudication in proceedings
lawfully instituted and pursued before the competent forum, it
would be incongruous to construe limitation in a manner that
extinguishes the remedy of enforcement before the
adjudicatory process itself has culminated. Where the
language of a statutory provision reasonably admits of more
than one interpretation, the construction resulting in an
anomalous or inequitable consequence, and frustrating the
scheme of the statute, is ordinarily to be avoided. In the
present case, permitting the period under Article 136 to expire
while the challenge to the award remained pending, and while
enforcement was governed by the prevailing legal regime,
12
would result in the award-holder losing the remedy of
execution without any default attributable to it. Such a
consequence, in the absence of clear statutory language
compelling it, cannot be regarded as consistent with the
scheme of Sections 34 and 36 of the Arbitration Act read with
Article 136 of the Limitation Act.
32. This Court is conscious that equitable considerations or
mere hardship cannot, by themselves, furnish a ground for
extending or altering a period of limitation prescribed by
statute. The principle of limitation, however, operates on the
premise that the remedy sought to be exercised was legally
available to the party during the period sought to be
computed. In the present case, the award-holder cannot be
said to have remained inactive or negligent during the period
in question; rather, enforcement of the award was governed
by a binding judicial interpretation which rendered such
enforcement unavailable during the pendency of the Section
34 proceedings. The period during which the remedy stood so
foreclosed, therefore, stands on a different footing from a
case where an enforceable right was available but was not
pursued. To reckon that period against the award-holder
would, in substance, attribute to it a failure to exercise a
remedy which the Courts, bound by the prevailing law, were
not competent to permit.
33. For the reasons recorded hereinabove, this Court holds
that the arbitral award became enforceable, for the purposes
of Section 36(2) of the Arbitration Act, with effect from
23.10.2015, when the substituted provision came into force
and operated in terms of the law declared in Kochi Cricket
(supra). The period from 24.06.2013 to 22.10.2015, during
which enforcement of the award stood effectively foreclosed
by the binding judicial interpretation then prevailing, cannot be
reckoned for determining the commencement of limitation
under Article 136 of the Limitation Act. Accordingly, the period
of twelve years prescribed under Article 136 commenced from
23.10.2015 and would expire on 23.10.2027. Since the
execution petition has been instituted before expiry of the said
period, the same is within limitation. The objection raised by
the award-debtor on the ground of limitation is, therefore,
rejected.
*
*
44. Accordingly, the impugned order dated 17.03.2026
passed by the learned Commercial Court (District Judge
Level), Nava Raipur, in Execution Case No.35 of 2025,
insofar as it rejects the objections raised by the petitioner,
does not call for interference in the exercise of the
supervisory jurisdiction of this Court. The petition is
accordingly dismissed .
13
7. Since the facts and issue involved in the present case is identical to
that of WP2227 No.590/2026 , this appeal may also be dismissed in the
same terms.
8. Having considered the rival submissions made by learned counsel for
the petitioner and having gone through the materials on record, it is
evident that the facts and issue involved in this petition is identical to
WP227 No. 590/2026, this Court deems it appropriate not to take a
view other than what has been taken in WP227 No. 590/2026, decided
on 14.05.2026.
9. Accordingly, the present writ petition is dismissed in terms of the order
dated 14.05.2026 passed by this Court in WP227 No. 590/2026.
Sd/-
(Ravindra Kumar Agrawal)
Judge
Alok