M/S JANAPRIYA RMC PVT LTD vs THE STATE OF KARNTAKA

Court
Karnataka High Court

- 1 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


TH
RESERVED ON 17 SEPTEMBER 2026

IN THE HIGH COURT OF KARNATAKA AT BENGALURU

TH
DATED THIS THE 24 DAY OF NOVEMBER, 2026

PRESENT

THE HON'BLE MR. VIBHU BAKHRU, CHIEF JUSTICE

AND

THE HON'BLE MRS. JUSTICE K.S. HEMALEKHA

WRIT PETITION NO.36581 OF 2025 (GM-MM_S)










C/W

WRIT PETITION NO.34982 OF 2025 (GM-MM_S)



IN W.P. NO.36581/2025

BETWEEN:

M/S. JANAPRIYA RMC PVT. LTD.,
REPRESENTED BY ITS DIRECTOR
SRI M.M. ANANDKUMAR,
S/O M.L. NARAYANASWAMY,
AGED ABOUT 56 YEARS,
HAVING ITS OFFICE AT NO.39,
ND
2 MAIN ROAD, SHREYA COLONY,
TH
JP NAGAR, 7 PHASE, J.P. NAGAR,
KOTHNUR, BENGALURU-560 078.
…PETITIONER

(BY MS. KUSUMA R. PRASAD, ADVOCATE FOR
SRI. LAKAMAPURMATH CHIDANANDAYYA, ADVOCATE)

AND:

1. THE STATE OF KARNTAKA
REPRESENTED BY ITS SECRETARY,
COMMERCE & INDUSTRIES DEPARTMENT
(SSI, MINES & TEXTILES),
VIKASA SOUDHA, BENGALURU-560 001.







Digitally signed
by
MAHALAKSHMI
B M
Location: High
Court of
Karnataka

- 2 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


2. THE DIRECTOR
DEPARTMENT OF MINES & GEOLOGY,
KHANIJA BHAVAN, RACE COURSE ROAD,
BENGALURU-560 001.

3. THE DEPUTY DIRECTOR
DEPARTMENT OF MINES & GEOLOGY,
SIDLAGHATTA ROAD,
CHIKKABALLAPURA-562 101.

4. P.K. ANAND
S/O. MR. P.S. KRISHNASETTY,
AGED ABOUT 54 YEARS,
RESIDING AT G/F-003,
AFFINITY HARMONY,
SILVER OAK STREET,
REMANASHREE CALIFORNIA GARDENS,
PUTTENAHALLY, YELAHANKA,
BENGALURU-560 064.

(AMENDMENT CARRIED OUT AS PER
COURT ORDER DATED 11.09.2026)
…RESPONDENTS

(BY SMT. NILOUFER AKBAR, AGA FOR R-1 TO R-3;
SRI. MAHENDRA S.S., ADVOCATE FOR IMPLEADING APPLICANT/
RESPONDENT NO.4)

THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND
227 OF THE CONSTITUTION OF INDIA PRAYING TO CALL FOR THE
RECORDS WHICH ULTIMATELY RESULTED IN NOT EXECUTING
THE LEASE DEED IN FAVOUR OF THE PETITIONER IN TERMS OF
NOTIFICATION DATED 03.01.2015 BEARING
NO.DMG/CMD/NOTIFICATION/26/2014-2015/4839-4842 VIDE
ANNEXURE-G AND ETC.

IN W.P. NO.34982/2025

BETWEEN:

M/S. JANAPRIYA RMC,
ST
NO.90, BASEMENT-01, 1 MAIN,
ANJENYA TEMPLE, ASHWATH NAGAR,
ND
RMV EXTENSION, 2 STAGE,
BENGALURU - 560094.
REPRESENTED BY ITS PARTNER

- 3 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


MR. GAJENDRA BABU .R
S/O MR. RAJANNA,
AGED ABOUT 41 YEARS.
...PETITIONER

(BY SRI. MAHENDRA S.S., ADVOCATE)

AND:

1. THE STATE OF KARNATAKA,
REPRESENTED BY ITS PRINCIPAL SECRETARY (MINES),
DEPARTMENT OF COMMERCE AND INDUSTRIES,
ST
VIKASA SOUDHA, 1 FLOOR,
BENGALURU - 560001.

2. THE DIRECTOR,
DEPARTMENT OF MINES AND GEOLOGY,
KHANIJA BHAVAN, RACE COURSE ROAD,
BENGALURU - 560001.

3. THE DEPUTY DIRECTOR
DEPARTMENT OF MINES AND GEOLOGY,
JILLADALITHA BHAVAN,
PATTENAHALLI, SIDLAGATTA ROAD,
CHIKKABALLAPURA - 562101.
...RESPONDENTS

(BY SMT. NILOUFER AKBAR, AGA)

THIS WRIT PETITION IS FILED UNDER ARTICLE 226 OF THE
CONSTITUTION OF INDIA PRAYING TO ISSUE A WRIT OF
CERTIORARI QUASHING AND SETTING ASIDE THE ORDER DATED
29.08.2025 BEARING NO. DMG/DD/KQL/267/2025-26/2521
RD
(ANNEXURE-A), ISSUED BY THE 3 RESPONDENT AND ETC.

THESE WRIT PETITIONS HAVING BEEN HEARD AND
RESERVED FOR ORDERS, COMING ON FOR PRONOUNCEMENT
THIS DAY, ORDERS WAS PRONOUNCED AS UNDER:

CORAM: HON'BLE MR. VIBHU BAKHRU ,CHIEF JUSTICE
and
HON'BLE MRS. JUSTICE K.S. HEMALEKHA

- 4 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


C.A.V. ORDER

(PER: HON'BLE MRS. JUSTICE K.S. HEMALEKHA)

1. These two writ petitions, which were heard together, concern
Quarry Lease No.267 [ QL No.267 ] for building stone over an extent
of 7 acres 20 guntas of Government land in Survey No.11 of
Jonnalakunte Village, Chikkaballapur Taluk and District [ the
subject land ].
2. The petitioner in W.P. No.34982/2025 (GM-MM-S), M/s
Janapriya RMC [ the Firm ] is a partnership firm in whose favour QL
No.267 was executed on 13.09.2019.
3. The petitioner in W.P. No.36581/2025 (GM-MM-S), M/s.
Janapriya RMC Private Limited [ the Company ], is a company
incorporated under the Companies Act, 1956. On its application
dated 07.01.2014, the grant of the quarry lease over the subject
land was sanctioned by a Notification dated 03.01.2015 [ the Grant
Notification ].
4. The Firm has filed W.P. No.34982/2025 assailing the order
dated 29.08.2025 bearing No.DMG/DD/KQL/267/2025-26/2521
passed by the Deputy Director, Department of Mines and Geology
[ DMG ], Chikkaballapur, whereby QL No.267 was cancelled under

- 5 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Section 19 of the Mines and Minerals (Development and
Regulation) Act, 1957 [ MMDR Act ], on the ground that the lease
had been executed in favour of an entity which had never applied
for the grant. The Firm also seeks a declaration that the lease is
valid and subsisting for a period of twenty years, restoration of its
access to the Integrated Lease Management Scheme [ ILMS ]
Portal, issuance of Mineral Dispatch Permits [ MDPs ] and
permission to continue quarrying operations.
5. The Company, on the other hand, has filed W.P.
No.36581/2025 (GM-MM-S), seeking a writ of mandamus directing
the respondent authorities to execute a Quarry Lease Deed in its
favour pursuant to the Grant Notification dated 03.01.2015 and the
order dated 20.08.2019 passed by the Division Bench of this Court
in W.P. No.23884/2019 (GM-MM-S). The State of Karnataka, the
Director and the Deputy Director of DMG are common respondents
in both the petitions. Sri. P. K. Anand, a Director of the Company
and an erstwhile partner of the Firm has been impleaded as
respondent No.4 in W.P. No.36581/2025.
6. The controversy essentially centres on the Amendment
Notification dated 11.09.2019, whereby the Senior Geologist,
purportedly invoking Rule 19-D of the Karnataka Minor Mineral

- 6 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Concession Rules, 1994 [ KMMC Rules ], substituted the Firm in
place of the Company as the beneficiary of the original sanction.
7. The principal question is whether such substitution
constituted a change in the name or particulars of the original
applicant or, in substance, amounted to a transfer of the benefit of
the sanction in favour of a distinct entity. Although both petitions
arise from the same transactions, the reliefs sought are mutually
exclusive and require separate consideration.
Prefatory facts
8. The Company was incorporated on 13.09.2011 under the
Companies Act, 1956. Its Articles of Association identified five first
Directors, namely, Sri M. Udayababu, Sri Anjaneyulu Ediga, Sri
Anand Kumar M., Sri Ananda Palyam Krishnasetty (Sri P. K.
Anand) and Sri Ziegen Balg Mathew. Sri M. Udayababu and Sri
Anand Kumar M. are the sons of Sri M.L. Narayana Swamy.
9. On 07.01.2014, the Company submitted an application in
Form AQL bearing Application No.03/2013-14 to the Senior
Geologist, DMG, Chikkaballapur, seeking a grant of quarrying
lease for building stone for a period of 10 years over an extent of
15 acres in Survey No.11 of Jonnalakunte Village, Chikkaballapur

- 7 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Taluk. A spot inspection was conducted on 04.06.2014. The
Assistant Commissioner, Chikkaballapur Sub-Division, by
communication dated 18.06.2014, reported that the land was
classified as “Government Hill”, measuring 220.25 acres in all, that
the applied area contained boulders and stones, was not reserved
for any public purpose and conveyed no objection to the proposed
grant. The Forest Department also reported that the area was not
forest land.
10. Pursuant to the decision taken by the District Task Force
Committee at its meeting held on 21.11.2014, the Senior Geologist
issued the Grant Notification dated 03.01.2015 under Rule 27 of
the KMMC Rules, sanctioning a quarry lease for building stone in
favour of the Company over an extent of 7 acres 20 guntas for a
period of ten years. The Grant Notification stipulated, inter alia , that
quarrying operations could not commence merely on the strength
of the Grant Notification and could be undertaken only after
execution of the lease deed in Form E. It further required the
execution of a formal lease deed within the prescribed period and
compliance with the applicable environmental clearance
requirements.

- 8 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


11. By order dated 21.08.2015, the Senior Geologist cancelled
the Grant Notification and rejected the application on the ground
that the lease deed had not been executed within the prescribed
period. The Company, represented by Sri M. Udayababu, preferred
Revision Petition No.212/2015 under Rule 53(1) of the KMMC
Rules before the Joint Director, DMG, South Zone, Mysore. The
Company explained that the delay in execution of the lease deed
was attributable to the non-receipt of environmental clearance. The
Revisional Authority allowed the revision petition, set aside the
cancellation order and directed the competent officer to take steps
for the grant of the quarrying lease after collecting the arrears, if
any, subject to the Company obtaining environmental clearance.
Subsequently, on 20.03.2019, a Partnership Deed was executed
constituting ‘M/s. Janapriya RMC’, the Firm, purportedly by five
Directors of the Company. Under the deed, each partner was
allotted 20% of the capital of ` 5,00,000/-. The business of the Firm
was stated to be the manufacture of jelly of different sizes and
allied products. Its office was at No.93, M.L. Narayanaswamy
Nilaya, Annapurneshwari Layout, J.P. Nagar, Chunchugatta,
Bangalore, which was also the registered office of the Company.
The Company disputes that Sri Anand Kumar M. was ever a

- 9 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


partner of the Firm and alleges that the partnership deeds are
fabricated.
12. On 12.04.2019, a letter on the letterhead of the Company,
signed by Sri M. Udayababu, was addressed to the Senior
Geologist, DMG, Chikkaballapur, requesting that the lease be
registered in the name of the Firm instead of the Company. The
reason assigned was the requirement to obtain GST registration,
and the request was stated to be based on the advice allegedly
furnished by the Company's auditor and GST officials. The
communication asserted that the name of the Company, as
notified, had been changed to that of the Firm and invoked Rule
19-D of the KMMC Rules. The departmental records, however, do
not disclose any resolution of the Board of Directors authorizing
Sri. M. Udayababu to seek substitution of the Firm in place of the
Company.
13. On 20.04.2019, the State Level Environment Impact
Assessment Authority, Karnataka issued the environmental
clearance bearing No.SEIAA 17 MIN 2019 for quarrying building
stone over the subject land. The clearance was addressed to ‘M/s.
Janapriya RMC at Survey No.42/8, Minukunte Village, Jala Hobli,
Yalahanka, Bengaluru’, which was the address of the Company.

- 10 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Significantly, the online application for environment clearance was
submitted on 13.01.2019, prior to the constitution of the Firm on
20.03.2019.
14. On 06.06.2019, the Company represented by Sri M.
Udayababu as its Director instituted W.P. No.23884/2019 (GM-
MM-S) before this Court seeking a direction to execute the quarry
lease deed pursuant to the Grant Notification. During the pendency
of the said petition, the Firm was reconstituted under the
Reconstitution Partnership Deed dated 20.06.2019. Four of the
original members, namely, Sri P. K. Anand, Sri Ziegen Balg
Mathew,Sri Anand Kumar M. and Sri Anjaneyulu Ediga, retired
from the Firm. Sri R. Gajendra Babu and Sri B. Muninarayana
were inducted as incoming partners, while Sri M. Udayababu
continued as a partner. Under the reconstituted partnership,
Sri R. Gajendra Babu held 50% interest, Sri. B. Muninarayana held
45% interest and Sri M. Udayababu retained 5% interest.
15. Thus, prior to execution of QL No.267, 95% of the
partnership interest had come to vest in persons who were neither
Directors of the Company nor Partners of the Firm when the
communication dated 12.04.2019 was submitted. The Firm was
registered with the Registrar of Firms, Jayanagar, on 15.07.2019.

- 11 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


16. By order dated 20.08.2019 in W.P. No.23884/2019 (GM-MM-
S), the Division Bench of this Court held that the order of the
Revisional Authority setting aside the cancellation had the effect of
reviving the Grant Notification dated 03.01.2015. The Division
Bench also rejected the State's contention founded on Rule 8-B of
the KMMC Rules, as amended with effect from 12.08.2016, holding
that the Company's application dated 07.01.2014 was not pending
on the date of the amendment, as it had already been disposed of
by issuance of the Grant Notification.
17. Since environmental clearance had been obtained, the
Division Bench directed the third respondent therein, namely, the
Senior Geologist, DMG, Chikkaballapur, to execute the lease deed
in favour of the petitioner therein namely, the Company, within two
months from the date on which a copy of the order became
available, subject to the verification of compliance with all
procedural requirements in accordance with law. The order did not
refer to the Firm or to the communication dated 12.04.2019.
18. On 11.09.2019, the Senior Geologist issued an Amendment
Notification bearing No.DMG:SGC/QL/2019-20/2711-2714 in Form-
GL. Referring to the amendment of the KMMC Rules with effect
from 12.08.2016, the communication dated 12.04.2019 and the

- 12 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


order of the Division Bench dated 20.08.2019, the notification
extended the proposed period of quarry lease from ten years to
twenty years under sub-rule (1) of Rule 8-A.
19. It further purported to substitute M/s. Janapriya RMC in place
of M/s. Janapriya RMC Private Limited by invoking Rule 19-D of
the KMMC Rules. The Amendment Notification required execution
of the lease deed within three months.
20. The departmental note-sheet particularly paragraph Nos.56
to 65, records that the communication dated 12.04.2019 was
considered under Rule 19-D and that the Amendment Notification
was prepared by changing the name of grantee from ‘M/s.
Janapriya RMC Private Limited’ to ‘M/s. Janapriya RMC’. It also
refers to a communication dated 09.09.2019 authorizing
Sri. R. Gajendra Babu to execute the lease deed. The note sheet
does not disclose consideration of the reconstitution of the Firm
under the reconstitution of Partnership Deed dated 20.06.2019.
21. On 12.09.2019, Sri. R. Gajendra Babu, describing himself as
‘authorized partner’ of the Firm, furnished copies of the Deed of
Reconstitution and certificate of registration and requested
execution of lease deed. On the following day, namely, 13.09.2019,

- 13 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


QL No.267 was executed in Form-E in favour of the Firm
represented by its Managing Partner, Sri. R. Gajendra Babu for a
period of 20 years commencing from 13.09.2019. The lease deed
was registered as Document No.3087/2019-20.
22. In November 2019, the Firm instituted O.S. No.341/2019
before the Civil Court at Chikkaballapur against Sri P. K. Anand, Sri
Ziegen Balg Mathew, Sri Ashwatha B. and Sri Anand C.M.and
obtained an ad interim order of injunction dated 16.11.2019
restraining interference with the lease area. Subsequently,
affidavits addressed to the Senior Geologist were sworn by
Sri Anand Kumar M. and Sri Anjaneyulu Ediga on 26.11.2019 and
by Sri M. Udayababu on 21.11.2019, affirming the constitution and
reconstitution of the Firm, the retirement of outgoing partners and
the interest of the continuing partners in QL No.267. However, all
these affidavits were executed after the issuance of the
Amendment Notification and execution of the lease deed. The
Company disputes the genuineness of the affidavit attributed to Sri.
Anand Kumar M.
23. It is also relevant to note that the GST registration of the
Company was cancelled suo motu with effect from 28.10.2019. The
records further indicate that the last annual general meeting of the

- 14 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Company was held on 28.09.2017 and Sri. M. Udayababu died on
29.03.2022. Nevertheless, the status of the Company continues to
be shown as ‘Active’, in the records of the Registrar of Companies.
24. On 17.02.2024, the Company, through Sri Anand Kumar M.
as its Director submitted a representation to the respondent
authorities contending that the Firm was a different entity which
had never applied for grant of the quarry lease and that the
Amendment Notification had been issued without notice to the
Company. It sought cancellation of the Amendment Notification and
QL No.267 and execution of the lease deed in its own favour.
25. By communication dated 17.05.2024, the Deputy Director
sought the opinion of the Director, DMG. The Office of the Director,
by Memorandum dated 18.02.2025, expressed the view that a
mere change of name could be considered under Rule 19-D of the
KMMC Rules, whereas the change in constitution of the business
organisation and reconstitution of the Firm amounted to a transfer
under sub-rule (5) of Rule 19-A of the KMMC Rules. It was
observed that such a transfer was not permissible at the stage of
the Grant Notification, and the competent authority was directed to
take action in accordance with the Rules.

- 15 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


26. By order dated 04.04.2025, the Deputy Director cancelled
QL No.267 without issuing notice to the Firm. Aggrieved thereby
the Firm preferred W.P. No.12382/2025 (GM-MM-S). By order
dated 15.05.2025, this Court set aside the cancellation order on the
ground that the Firm had not been afforded an opportunity of
hearing and directed reconsideration of the matter after issuance of
a show-cause notice and hearing the affected party.
27. Pursuant thereto, the Deputy Director issued a show-cause
notice dated 06.06.2025 to the Firm, stating that the quarry lease
had been executed in favour of an entity other than the original
applicant and that such substitution amounted to an impermissible
transfer at the stage of the Grant Notification. Referring to Section
19 of the MMDR Act, the Firm was called upon to show cause as to
why QL No.267 should not be cancelled.
28. During the pendency of the proceedings before the Deputy
Director, the Firm instituted W.P. No.18830/2025 (GM-MM-S)
seeking restoration of QL No.267 in the ILMS and issuance of
MDPs. By order dated 25.07.2025, this Court declined to entertain
the writ petition at that stage, directed the Firm to submit its
explanation to the show-cause notice and directed the authority to
pass appropriate orders after hearing it, clarifying that nothing

- 16 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


stated therein would be construed as an expression of opinion on
the merits.
29. Pursuant to an enquiry notice dated 01.08.2025, Sri. R.
Gajendra Babu appeared on behalf of the Firm on 07.08.2025 and
submitted a written explanation. The Firm contended that the
substitution had been intimated prior to the execution of the lease
deed and was permissible under Rule 19-D; that Rule 19-A
governed the transfer of an executed lease and was, therefore,
inapplicable; and that Sri Anand Kumar M., having affirmed the
reconstitution of the Firm by affidavit dated 26.11.2019, was
estopped from disputing the lease.
30. Upon consideration of the explanation, the Deputy Director
passed the impugned order dated 29.08.2025, cancelling QL
No.267. The authority concluded that the Firm was not the original
applicant, that the Company had continued to exist under its
original name and that substitution of the Firm in place of the
Company could not be treated as a change of name under Rule
19-D of the KMMC Rules. It consequently held that execution of
lease deed in favour of the Firm was contrary to the KMMC Rules
and attracted Section 19 of the MMDR Act.

- 17 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


31. Thereafter on 12.11.2025, the Company, through Sri Anand
Kumar M., submitted a representation seeking execution of the
lease deed in its favour pursuant to the Grant Notification and the
order dated 20.08.2019 passed by the Division Bench in W.P.
No.23884/2019 (GM-MM-S). The Firm instituted W.P.
No.34982/2025 challenging the cancellation of QL No.267 and the
Company instituted W.P. No.36581/2025 seeking execution of the
lease deed in its favour.
32. During the pendency of W.P. No.36581/2025, Sri. P. K.
Anand sought impleadment contending that the Company was
defunct and that the Board authorisation relied upon by Sri Anand
Kumar M. for instituting the writ petition was not genuine. The
Company disputed these allegations and maintained that the
resolution dated 10.10.2023 had been duly executed and that P. K.
Anand had subsequently aligned himself with the Firm. By order
dated 11.09.2026, Sri P. K. Anand was impleaded as respondent
No.4.
Impugned order dated 29.08.2025
33. The Deputy Director, while passing the impugned order
considered the history of the grant, the complaint submitted by the

- 18 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Company, the Memorandum dated 18.02.2025 issued by the Office
of the Director, the earlier orders of this Court and explanation
furnished by the Firm. The Deputy Director recorded that the
original application had been submitted by the Company, whereas
the quarry lease deed had been executed in favour of the Firm,
which had not filed any application for the grant of the lease. The
Deputy Director further observed that Rule 19-D contemplated
changes in the name, nationality or other particulars of the original
applicant or concession holder. Since the Company continued to
exist under its original name and the Firm was a separately
constituted partnership, the substitution could not be regarded as a
mere change of name. The Deputy Director accordingly concluded
that the Amendment Notification dated 11.09.2019 and
consequential execution of QL No.267 in favour of the Firm were
contrary to the KMMC Rules. Invoking Section 19 of the MMDR
Act, the Deputy Director cancelled QL No.267 with immediate
effect.
Contention of parties
34. The learned counsel appearing for the Firm, the petitioner in
W.P. No.34982/2025, submitted that the impugned order was
without jurisdiction and contrary to the KMMC Rules. It was

- 19 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


contended that the request for substitution of the Firm in place of
the Company had been made on 12.04.2019, before execution of
the lease deed and was permissible under Rule 19-D. According to
the Firm, Rule 19-A regulates transfer of an existing quarry lease
and does not apply to the stage preceding its execution. Reliance
was placed on the State of Rajasthan and Another Vs.
1
UltraTech Cement Limited , and M/s. Srinivasa Granites Vs.
2
The State of Karnataka and others .
35. It was further contended that Rule 19-A (5) of the KMMC
Rules, which expressly treats a change in the partners of a
partnership firm as a transfer, was substituted only with effect from
30.06.2020 and could not be retrospectively applied to the
Amendment Notification and the lease deed executed in
September 2019. Reliance was placed on Federation of Indian
3
Mineral Industries and others Vs. Union of India and another .
36. Learned counsel further submitted that, once the lease deed
had been executed and registered, the competent authority
became functus officio and could not review its own decision in the
absence of any express statutory power. Reliance was placed on

1
Division Bench Special Appeal (Writ) No.987/2021 in S.B. Civil Writ Petition
No.356/2017 D.D. 31.01.2023
2

W.P. No.48547/2016 (GM-MM-S) D.D. 05.07.2019
3
(2017) 16 SCC 186

- 20 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


Patel Narshi Thakershi and others Vs. Shri Pradyumansinghji
4
Arjunsinghji and Kalabharati Advertising Vs. Hemant
5
Vimalnath Narichania and others .
37. It was also contended that the impugned order was passed
at the dictation of the Director, without independent application of
mind. The remedy of revision under Rule 53 was stated to be
inefficacious in these circumstances. The learned counsel also
contended that the State had accepted dead rent and royalty from
the Firm for more than five years and was therefore, precluded
from cancelling the lease by principles of estoppel and legitimate
expectation. It was further submitted that Sri Anand Kumar M., who
had allegedly retired from the Firm and acknowledged its
reconstitution through an affidavit dated 26.11.2019, could not
subsequently dispute the validity of the lease.
38. Learned counsel appearing for respondent No.4 in W.P.
No.36581/2025, contended that the Company had become defunct
and that the writ petition had been instituted without valid
authorization. The genuineness of the Board resolution relied upon
by Sri Anand Kumar M. was disputed. It was further submitted that
Sri Anand Kumar M. had relinquished his interest in the Firm and

4

(1971) 3 SCC 844
5
(2010) 9 SCC 437

- 21 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


after receiving his share, furnished consent for grant of lease in
favour of the Firm.
39. Per contra, learned counsel appearing for the Company, the
petitioner in W.P. No.36581/2025 submitted that the original
application dated 07.01.2014 and the Grant Notification dated
03.01.2015 stood exclusively in the name of the Company. The
Division Bench by order dated 20.08.2019 in W.P. No.23884/2019
(GM-MM-S) had specifically directed the execution of the lease
deed in favour of the Company. It was contended that the KMMC
Rules did not authorise transfer of the benefit of a Grant
Notification to a third party and that Rule 19-D of the KMMC Rules
could not be invoked for substituting a distinct entity in place of the
original applicant.
40. Learned counsel further submitted that communication dated
12.04.2019 was addressed by Sri. M. Udayababu without
authorization from the Board of Directors and that the Amendment
Notification had been issued without notice to the Company. It was
alleged that the Firm had obtained the lease through
misrepresentation and collusion with the then Senior Geologist.
The Company also disputed the genuineness of the partnership
deeds and affidavits attributed to Sri Anand Kumar M. It was further

- 22 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


contended that upon cancellation of QL No.267, the respondent
authorities are bound to execute the lease deed in favour of the
Company in compliance with the order of the Division Bench dated
20.08.2019. The Company maintained that it continued to exist as
a corporate entity and the objection raised by respondent No.4
concerning its internal management could not defeat its rights
under the original sanction.
41. Learned Additional Government Advocate supported the
impugned order dated 29.08.2025. It was submitted that the Firm
was never the original applicant and that Rule 19-D did not permit
substitution of the Company by a distinct partnership firm. The
Amendment Notification dated 11.09.2019 and consequential lease
deed were therefore contrary to the KMMC Rules. It was
contended that the lease was liable to be treated as void under
Section 19 of the MMDR Act.
Issues for consideration
42. In the light of the rival submissions, the following questions
arise for consideration:
“1. Whether the substitution of M/s. Janapriya RMC,
a partnership Firm, in place of M/s. Janapriya RMC
Private Limited, the original applicant and beneficiary

- 23 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


of the Grant Notification dated 03.01.2015, amounts to
a change of name under Rule 19-D of the KMMC
Rules or constitutes a transfer of the benefit of the
grant to a distinct entity?
2. Whether the Amendment Notification dated
11.09.2019 and consequential execution of QL No.267
dated 13.09.2019 in favour of the Firm are legally
sustainable and whether the Deputy Director was
justified in cancelling the lease by order dated
29.08.2025?

3. Whether the Company is entitled to a writ of
mandamus directing execution of the quarry lease
deed in its favour pursuant to the Grant Notification
dated 03.01.2015 and the Division Bench order dated
20.08.2019?”

Reasons and Conclusion
43. The principal contention advanced on behalf of the Firm is
that Rules 19-D and 19-A of the KMMC Rules operate in mutually
exclusive fields and that, prior to the execution of the quarry lease
deed, no subsisting leasehold interest existed that could be
transferred.
44. In support of the said contention, reliance is placed upon the
decision of the Division Bench of the Rajasthan High Court in
UltraTech Cement Limited ( supra ). It is therefore necessary to
examine whether the absence of an existing leasehold interest
would authorize substitution of an altogether different entity in place

of the original applicant under Rule 19-D.

- 24 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


45. There can be no dispute with the proposition that a Grant
Notification or a letter of intent does not, by itself, create an
executed leasehold interest. The statutory provisions governing
transfer of an existing quarry lease may, therefore, stand on a
different footing from those governing the grant of a quarry lease.
However, the absence of an executed leasehold interest does not
confer any right upon the original applicant to transfer the benefit of
the Grant Notification to another entity, nor does it authorize the
competent authority to substitute a different applicant without
statutory sanction.
46. Rule 19-D of KMMC Rules reads as under:

" 19-D. Change of name, nationality, etc. to be
intimated .-(1) An applicant or the holder of a minor mineral
concession shall intimate to the Competent Authority within
sixty days any change that may take place in his name,
nationality or other particulars furnished to the Competent
Authority.

(2) If the holder of a minor mineral concession
fails without sufficient cause to furnish the information
referred to in sub-rule (1) the Competent Authority may
impose a fine which may extend to such amount as notified
by the Government from time to time and in the case of
continued contravention of the provisions of sub-rule (1), the
Competent Authority may terminate the minor mineral
concession:

Provided that no such order shall be made without
giving the concession holder a reasonable opportunity of
stating his case."

- 25 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


47. Sub-rule (1) of Rule 19-D requires an applicant or the holder
of a minor mineral concession to intimate to the competent
authority, within 60 days, any change in its name, nationality or
other particulars furnished to the authority. The language of the
provision is significant. It refers to changes in particulars of the
applicant or concession holder and not to substitution of the
applicant or concession holder itself. The provision presupposes
the continued identity of the person or entity whose particulars are
sought to be altered.
48. The submission that the expression ‘other particulars’, by
ejusdem generis
applying the principles of , includes the conversion
of a private limited company into a partnership firm cannot be
accepted. The principles of statutory interpretation cannot be
invoked to enlarge the scope of the provision beyond its language
and purpose. The expression ‘other particulars’ must be
understood in the context of the particulars furnished by the same
applicant. It cannot be interpreted as authorizing substitution of a
different entity in place of the original applicant.
49. In the present case, M/s. Janapriya RMC Private Limited, the
original applicant did not undergo a mere change of name. The
Company continued to exist under its original corporate identity.

- 26 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


M/s. Janapriya RMC, on the other hand, was constituted as a
partnership firm only on 20.03.2019 long after the application dated
07.01.2014 and the Grant Notification dated 03.01.2015. The two
entities are distinct. The constitution of a partnership firm by the
persons who were directors of the Company cannot be equated
with the change in the Company's name or particulars.
50. The distinction becomes more apparent from the subsequent
reconstitution of the Firm on 20.06.2019, whereby four of its
original partners retired and two new partners were inducted. The
incoming partners together acquired 95% interest in the Firm.
Thus, the entity in whose favour the lease deed was ultimately
executed was not only distinct from the Company but had also
undergone a substantial change in its own constitution before
execution of the lease deed.
51. The contention that there was nothing capable of being
transferred before execution of the lease deed proceeds on an
incomplete premise. Although no leasehold interest had been
created by an executed lease deed, the original Grant Notification
had been issued in favour of the identified applicant, namely, the
Company. The benefit of the sanction, subject to compliance with
the statutory requirements, could not be conferred upon another

- 27 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


entity merely by describing the transaction as a change of name.
The absence of an existing leasehold interest does not dispense
with the requirement that the lease be executed in favour of the
applicant lawfully entitled to the grant.
52. The decision in UltraTech Cement Limited ( supra ) is
distinguishable on material facts. The case concerned the effect of
Court-approved schemes of demerger and amalgamation, pursuant
to which the assets and liabilities of the original applicant company
had been vested in its successor by operation of law. The
authorities had also recognised the corporate restructuring and
continued to extend the letter of intent. The present case does not
concern statutory vesting of the rights of one company in its
successor pursuant to the scheme of amalgamation or demerger.
The Company continues to exist independently while the Firm was
separately constituted. The principle recognised in UltraTech
Cement Limited ( supra ) cannot therefore be extended to hold that
Rule 19-D of the KMMC Rules authorizes substitution of a
partnership firm in place of an existing company.
53. The reliance placed on M/s. Srinivasa Granites ( supra ) is
also misplaced. In that case, the original applicant and lessee was
a partnership firm and the question concerned the effect of its

- 28 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


subsequent reconstitution. The Court held on the facts of that case
that reconstitution did not amount to transfer of the quarry lease to
another person. In the present case, however, the original applicant
was a private limited company, whereas the lease deed was
executed in favour of a separately constituted partnership firm. The
controversy is therefore not confined to the reconstitution of the
original applicant or lessee but concerns substitution of the original
applicant itself.
54. The contention founded on the subsequent amendment to
sub-rule (5) of Rule 19-A of the KMMC Rules also requires
consideration. The provision expressly reads as under:
“ 19-A. Transfer of quarry lease or licence.– (1) x x x
(5) The following cases shall also be treated as
transfer.–
(i) change from one form of business organisation to
another form of business organisation i.e.,
partnership, limited liability partnership, private
limited company, public limited company or any law
to another form of business organisation;
(ii) change in partner of a partnership firm;
(iii) the transfer of shares in a company, resulting in the
change of control of management or ownership right
of the said company;
(iv) merger or amalgamation of the lessee’s or
licensee’s company into another company; and

- 29 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


(v) change of a private limited company to limited
company:
Provided that in case of death of any partner or director in a
firm or company and mutation has been made in favour of
his legal heir, it shall not be treated as transfer but if
application of mutation is not made, it shall be treated as
transfer.”
(emphasis supplied)

55. The provision expressly treating a change from one form of
business organisation to another, or a change in the partner of a
partnership firm, as a transfer was introduced in its present form
with effect from 30.06.2020.
56. In Federation of Indian Mineral Industries ( supra ) the
Supreme Court explained the principle governing retrospective
operation of subordinate legislation, including that the delegated
legislation cannot ordinarily be given retrospective effect unless
authorized by the parent statute, expressly or by necessary
implication. The said proposition is not in dispute.
57. The question, therefore, is not whether the reconstitution of
the Firm constituted a transfer within the meaning of Rule 19-A (5),
as subsequently amended, but whether the Competent Authority
possessed the power under Rule 19-D to substitute the Firm in
place of the Company. For the reasons already recorded, Rule 19-

- 30 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


D did not confer any such power. Consequently, the Amendment
Notification dated 11.09.2019 was issued without authority under
the said provision.
58. The submission that QL No.267 was executed for the first
time directly in favour of the Firm on 13.09.2019, does not cure the
defect. The original application and the Grant Notification were in
favour of the Company. Execution of the lease deed in favour of a
different entity without lawful basis for substituting the original
applicant cannot be validated merely because no earlier lease
deed had been executed.
59. We are therefore of the considered view that the transaction
was not a mere change of name or particulars within the meaning
of Rule 19-D of the KMMC Rules. It amounted, in substance, to an
attempted transfer of the benefit of the Grant Notification from the
Company to the Firm, for which Rule 19-D furnished no authority.
The contentions advanced on behalf of the Firm regarding the
mutually exclusive operation of Rules 19-D and 19-A of the KMMC
Rules, the absence of an existing leasehold interest and the
prospective operation of the subsequent amendments do not
establish the legality of the substitution.

- 31 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


60. The Amendment Notification dated 11.09.2019 was thus
founded on an erroneous understanding of Rule 19-D. The
competent authority treated the substitution of a distinct partnership
firm in place of the original applicant, namely, the Company as a
mere change of name. Such an interpretation is contrary to the
scope and object of the provision. The consequential execution of
QL No.267 in favour of the Firm was, therefore, not in accordance
with the statutory framework governing grant of quarry lease.
61. In view of the foregoing reasons, the finding recorded by the
Deputy Director that the Firm was not the original applicant and
that its substitution under Rule 19-D was impermissible is legally
sustainable. Further, the cancellation of the quarry lease executed
in favour of the Firm also does not automatically establish the
Company's present entitlement to an unconditional direction for
execution of the lease deed. The validity of the lease executed in
favour of the Firm and the Company's claim for enforcement of the
original sanction are distinct questions. The former falls to be
determined with reference to the statutory provisions governing
substitution, whereas the latter requires consideration of the
Company's present entitlement in compliance with the conditions
governing the execution of the lease deed.

- 32 -
WP No. 36581 of 2025
C/W WP No. 34982 of 2025


62. In the circumstances, no ground is made out for issuing a
fresh writ of mandamus in favour of the Company in the present
proceedings. Accordingly, both the writ petitions are liable to be
dismissed and are, accordingly, dismissed.
63. The pending interlocutory application also stands disposed
of.


Sd/-
(VIBHU BAKHRU)
CHIEF JUSTICE


Sd/-
(K.S. HEMALEKHA)
JUDGE


MBM