The State Of Maharashtra Through The Special Land Acquisition Officer vs Shri. Raja Zuga Joshi Deceased Through Lrs. Venubai Rajaram Joshi And Ors.

Court
Bombay High Court

2026:BHC-AS:19089
KVM
1/55
FA 714 OF 2018.doc

IN THE HIGH COURT OF JUDICATURE AT BOMBAY
Digitally signed
by KANCHAN
VINOD
MAYEKAR
Date:
2026.04.22
21:22:29 +0530
KANCHAN
VINOD
MAYEKAR
CIVIL APPELLATE JURISDICTION
FIRST APPEAL NO. 714 OF 2018
ALONGWITH
CROSS OBJECTION (ST) NO. 31025 OF 2025
IN
FIRST APPEAL NO. 714 OF 2018
The State of Maharashtra )
(Through The Special Land Acquisition )
Officer, Metro Center No.1, Panvel, )
Tal. Panvel, Dist. Raigad) ) ….. Appellant
(Orig. Opponents)
VERSUS
Raja Zuga Joshi )
Since deceased through Legal Heirs, )
1. Venubai Rajaram Joshi, )
Age 48 yrs., Occu. Household, )
R/at Padaghe, Tal. Panvel, )
Dist. Raigad. )
2. Rohidas Rajaram Joshi, )
Age 33 yrs., Occu. Service, )
R/at Padaghe, Tal. Panvel, )
Dist. Raigad. )
3. Uttam Rajaram Joshi, )
Age 30 yrs., Occu. Agriculture, )
R/at Padaghe, Tal. Panvel, )
Dist. Raigad. )
4. Sitarabai Sawalaram Mhatre, )
Age 36 yrs., Occu. Household, )
R/at Bamandongari, Tal. Panvel, )
Dist. Raigad. )
5. Lilabai Parshuram Tambade, )
Age 27 yrs., Occu. Household, )
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
2/55
FA 714 OF 2018.doc

R/at Dhakta Khanda, Tal. Panvel, )
Dist. Raigad. )
6. Shakuntala Ravindra Patil, )
Age 24 yrs., Occu. Household, )
R/at Dhakta Khanda, Tal. Panvel, )
Dist. Raigad. )
7. Ranjana Rajaram Joshi, )
Age 19 yrs., Occu. Household, )
R/at Padaghe, Tal. Panvel, )
Dist. Raigad. ) ….. Respondents
(Orig. Claimants)
Mr. A.R.Patil, Additional G.P. for the State/Appellant.
Adv. Shriram S. Kulkarni a/w. Adv. Sujay Palshikar, Adv. Monish K. Vig
for the Respondent Nos. 1 to 3, 5 and 7.
CORAM : RAJESH S. PATIL, J.
RESERVED ON : 16 DECEMBER, 2025
PRONOUNCED ON : 17 APRIL, 2026

JUDGMENT :
This judgment has been divided into parts to facilitate analysis.
Table of Contents
A. Introduction....…………………………………………………….03
B. Factual Matrix.…………………………………………………….04
C. Outline of the submissions……………………………………….07
1. Submissions of Claimants………………………...………07
2. Submissions of Respondent – State……………………...14
D. Points for Determination.………………………………………...18
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
3/55
FA 714 OF 2018.doc

1. Legal Principles and Factors to determine compensation of
acquired land.………………………………………………18
2. Factors to be neglected in determining compensation....26
3. The principles of Public Funds in process of acquiring
land for public purposes.………………………………….27
4. On whom the burden of proof lies ?..………………..…..29
5. Determination of fair market rate through comparative
sales method……………………………………..………...29
6. Evidence Led……..…………………………...……………34
7. Leasehold vs. Freehold…………………………………….37
8. Notification of the year 1970 for New Bombay Project...39
9. Notification of the year 1986 for New Bombay Project...41
10. Letter of Law & Judiciary ………………………………...45
11. Comparison of market rate @Rs. 20/- & 25/- …......…..46
12. Illustration with 30% hike per year………………………48
13. Market Rate Comparison – 1986 Notification…….…….50
E. Conclusion……………..…….…………………………………….54
[A] Introduction:
This First Appeal has been preferred by the State of
Maharashtra, under Section 54 of the Land Acquisition Act, 1894 (for
short “the Act”), challenging the judgment and award passed by the
Joint Civil Judge, Senior Division, Alibaug on 31 October, 2014
thereby granting compensation to the original claimant at the rate of
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
4/55
FA 714 OF 2018.doc

Rs.1,500/- per sq.mtr. for acquisition of the land alongwith other
statutory benefits. After the Appeal by the State was admitted, the
claimants have filed their Cross Objections in the First Appeal.
[B] Factual Matrix :
i) In 1970, the Government of Maharashtra acquired large
chunks of land in 96 villages of Raigad and Thane Districts for
implementing ‘New Bombay Project’. In the present proceedings, the
land under acquisition is in Village Padghe, Taluka Panvel, District
Raigad, admeasuring around 3640 sq.mtrs. A notification under
Section 4 was initially issued in the year 1970, under the provisions of
the Act. However, as the State did not take any steps to acquire the
land within the statutory period, the acquisition lapsed.
ii) Once again, on 24 September 1986, the Special Land
Acquisition Officer (for short ‘SLAO’) published a notification under
Section 4 of the Act for acquiring the subject land. Thereafter on 11
September, 1989, the SLAO passed his award under Section 11 of the
Act, granting total compensation of Rs.14,560/-.
iii) Being dissatisfied with the Award, the original claimant
preferred Reference under Section 18 of the Act and prayed for
enhancement of compensation @ Rs.5,000/- per sq.mtr. before Civil
Judge Senior Division, Alibaug. In the said reference, the State
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
5/55
FA 714 OF 2018.doc

Government filed its Written Statement. As the matter proceeded
further, the claimant no.1 – Rohidas Raja Joshi, entered the witness
box and filed his affidavit in evidence. The claimant no.1 was cross
examined by the advocate appearing for the State of Maharashtra.
Thereafter, the claimants examined their witness no.2, being the
Valuer & Civil Engineer – Ms.Manjiri A. Joshi. Through her testimony,
her Valuation Report – Exhibit ‘28’ and the location Map - Exhibit ‘29’
of the acquired land was brought on record. The said Valuer was cross
examined by the advocate appearing for the State. After the evidence
was closed on behalf of the claimant, the State did not examine any
witness on their behalf. Therefore, the matter proceeded further for
arguments.
iv) After the advocate for both the parties were heard, the Jt.
Civil Judge Senior Division, Alibaug by his Award dated 31 October,
2014, partly allowed the Reference and granted enhanced
compensation @ Rs.1,500/- per sq.mtr. for the acquired land
alongwith other statutory benefits.
v) The State of Maharashtra, being dissatisfied with the
enhanced compensation, filed their First Appeal in the year 2015,
alongwith delay condonation application in this Court. After the delay
was condoned, the First Appeal No. 714 of 2018 filed by the State was
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
6/55
FA 714 OF 2018.doc

admitted on 2 May, 2018. The original claimants then on 10
September 2025 filed their Cross Objections, which was numbered as
Cross Objection Stamp No. 31025 of 2025.
vi) In the meanwhile, Supreme Court in the matter
pertaining to the acquisition of land of Village Roadpali, Taluka
Panvel, District Raigad which is adjoining to Village Padghe in
reference to Section 4 notification of the year 1986, in Babibai Babu
Patil Vs. State of Maharashtra in Civil Appeal No(s). 1564-1565 of
st
2016 on 31 October, 2017 remanded the matter alongwith group of
matters, back to this Hon’ble Court to be heard afresh. Later even the
other Special Leave Petitions which challenged the assessment of
market value decided by this Court of land acquisition of near by
villages which also pertained to Section 4 notification of the same year
1986 were also remanded back, to be reheard by this Hon’ble Court.
Both the Counsel jointly submitted that after remand, none of these
matters have been finally decided.
vii) As this First Appeal and Cross Objections therein were
ripe for final hearing, by consent of learned advocates appearing for
both sides, this matter is taken up for final hearing.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
7/55
FA 714 OF 2018.doc

[C] Outline of the submissions :
I have heard learned counsel for both the sides,
comprehensively. Also, with their assistance, I’ve gone through
the documents placed on record.
1. Submissions of Claimants -
i) Mr. Shriram Kulkarni, learned advocate for the claimant
opened his arguments with first referring to the judgment of State of
Maharashtra vs. Ashok Wani, First Appeal No. 1119 of 1997 , passed
by the Division Bench of Bombay High Court. According to
Mr.Kulkarni, the Additional Government Pleader agreed before the
Bench of Former the Chief Justice of Bombay High Court Shri
Swatanter Kumar that the rate of notification of the year 1986 should
be Rs.1,725/- per sq.mtr. Since Supreme Court has remanded all the
matters pertaining to notification of the year 1986 of “New Bombay
Project”, therefore this Court should now freshly decide the rate to be
granted based on the evidence which is led before this Court, on
matter to matter basis.
ii) He then referred to the affidavit of evidence of the PW
No.1 – Mr.Rohidas Raju Joshi. In para no.4 of the said affidavit of
evidence, the distance and vicinity of the land under acquisition has
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
8/55
FA 714 OF 2018.doc

been mentioned. He submitted that there is no cross on this aspect by
the advocate appearing for the State. Therefore, the said fact become
an admitted part of the evidence. Further in para no.7, there is
mention about Taloja Industrial Estate being next to the land under
acquisition at a distance of 4 k.m. from the acquired land and that the
steel market is at village Kalamboli, which is very near to the acquired
land. He, therefore, submitted that there is no dispute that the land in
the Village Padghe, has a non agricultural NA potentiality.
iii) He thereafter referred to the affidavit of evidence of PW
NO.2 – Ms.Manjiri Joshi, who is a valuer. He referred to para no.22
which mentions about two industrial estate, very near to the acquired
land. He also referred to para nos.23 to 25, which was regarding
comparison method of valuation based on two lease instances. As far
as Weigh Bridge lease instance is concerned, the rate allotted was
Rs.1,873.28 per sq.mtr. and as far as second lease instances is
concerned of Shakti Constructions, the rate was Rs.2,727/- per sq.mtr.
iv) He harped that in both the instances, the land was
leasehold and comparing it with the acquired land, the same was of
freehold land therefore according to him, even as per the valuation
report, the value of the acquired land should be much more higher.
v) He submitted that though his own valuer Ms.Joshi has
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
9/55
FA 714 OF 2018.doc

valued the acquired land at Rs.3,800/-, according to him, the correct
valuation of the acquired land should be atleast Rs.5,000/- per sq.mtr.
vi) He further submitted that the present land pertaining to
village Padghe. He submitted that this Court has allotted uniform rate
to the acquisition of land village-wise and many a times, even the
adjoining village has got the same rate.
vii) The issue whether the Government after acquisition has
put a land in a particular use to their benefit is not really a matter of
concern because what matter is, for what purpose the Government has
acquired the particular land of a village and if the part of it after
acquisition is used to a particular use, for example commercial
building has been built up by the Government through it’s Planning
Authority, CIDCO or either MMRDA and another part of land in the
village is kept open for the purpose of garden/recreation purpose.
That will not mean that the land for which the garden is reserved,
would get much less rate comparing the land on which the
commercial building has been built.
viii) He submitted that though valuer has for the purpose of
development, deducted 33%, and 15% for location, according to him
the said deduction is too high. He submitted that this Court in its
judgment including Division Bench as far as the development is
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
10/55
FA 714 OF 2018.doc

concerned, has deducted 10% of the market value which has been
derived at. He referred to para no.26 and para no.27 of the evidence.
He submitted that in the cross-examination of the valuer in para
no.14, there is reference that lease instances which were brought on
court, was tendered as regards the Weigh Bridge and as regards to
Shakti Constructions, the land was acquired “by offer”. He further
submitted that the land of Weigh Bridge and Shakti Constructions are
at lower level from the national highway no.4 – Mumbai-Pune. He
further submitted that as far as the lease agreement of the Shakti
Constructions is concerned with CIDCO, there were restrictions
imposed and lease was for the period of 60 years.
ix) He further submitted that if the average of the lease deed
instance are taken, the amount would be Rs.3,800/- per sq.mtr. He
submitted that the valuer has deducted the amount twice on the count
of 33% and 15% in Shakti Construction, Lease Deed.
x) He further submitted that village Padghe is within the
commercial zone. Therefore, the deduction at the most could have
been 10%. In any case even if the third instant is not taken into
consideration and only the first two instances are taken, then after
adding the same, an average of two can be taken and deduction can
be only 10%. Therefore, the rate at the most would be Rs.3,732/- per
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
11/55
FA 714 OF 2018.doc

sq.mtr.
xi) He further submitted that evidence was led for freehold
land and on the said evidence, no cross was conducted. The valuer
has standardized the thing and has submitted that the lessee gets
60%, and 40% goes to the lessor.
xii) He further submitted that as far as deduction is
concerned, he referred to the judgment of Supreme Court passed in
C.R. Nagaraja Shetty and harped on para 12 of the said judgment
which says that positive evidence on the deduction should be led.
xiii) He further submitted that Section 51-A of the Act allows
the claimant can file certified copy of the lease deed/sale deed and in
such a situation, there will be no need to examine any party to prove
the document of sale deed/lease deed.
xiv) He further submitted that the letter of the year 2007
issued by Law and Judiciary Department, shows that the rate of
Rs.1,725/- per sq.mtr. for land of village Roadpali has been accepted
by the State. He further submitted that in the judgment of Trimbak
Thakur , the rate of Rs.1,725/- per sq.mtr. has been accepted. Against
the said judgment of Division Bench of Bombay High Court, CIDCO
carried the matter to the Supreme Court. And the Special Leave
Petition in Supreme Court was dismissed. Therefore, the rate of
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
12/55
FA 714 OF 2018.doc

Rs.1,725/- per sq.mtr. has been upheld by the Supreme Court.
xv) He thereafter showed the development plan of the year
1994. He referred to the lease instance of Shakti Construction which
was a residential/commercial plot and the rate fixed was Rs.2,727/-
per sq. mtr.
xvi) He placed reliance on the order passed by the Supreme
Court on 25 July, 2016 in Special Leave Petition (Civil) No. 13455 of
2016 passed in Changa Kanu Thakur vs. State of Maharashtra
whereby the SLP was dismissed thereby confirming the judgment of
Division Bench of this Court passed by Hon’ble Shri Justice Oak
concerning land situated in village Bambavi. The notification dated
24 September, 1986 the Division Bench of Bombay High Court had
fixed a rate of Rs.1,725/- per sq.mtr. in Changa K. Thakur (supra).
Therefore, now the said rate gets confirmed.
xvii) He further filed on record, the additional written
submissions wherein he had given four options in order to decide the
market rate in the present proceedings.
xviii) He submitted that the land has a levelled ground and at
the distance of 2 k.m. the lands are NA Lands and the Panvel City is 5
k.m. away. He further submitted that neighbour is all developed land.
Therefore, even the subject land has high potential.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
13/55
FA 714 OF 2018.doc

xix) While concluding, Mr.Kulkarni submitted that as per the
judgment of Babibai (supra) this court is supposed to fairly consider
the entire evidence on record. And thereafter decide what rate would
be applicable. He submitted that in evidence two lease evidence were
produced and both the lease documents have been exhibited.
xx) The leading authorities relied upon by Mr. Shriram
Kulkarni on behalf of the claimant are as follows :-
a) State of Maharashtra vs. Ashok Wani–2008 (6)ALL MR 65
b) Sabhia Mulla vs. Special Land Acquisition Officer,
AIR 2012 SC 2709
c) Abdul Aziz Patel vs. Special Land Acquisition Officer,
First Appeal No. 875 of 1985.
d) Chimanlal Hargovinddas vs. Special Land
Acquisition Officer, Poona, (1988) 3 SCC 751.
e) State of Maharashtra vs. Nakul G. Patil ,
First Appeal No. 112 of 2009
f) Babibai Babu Patil vs. State of Maharashtra,
Civil Appeal No(s).1564/65 of 2016.
g) The State of Maharashtra vs. Trimbak Jana Thakur –
First Appeal No. 646 of 1995
h) Nama Padu Hudar vs. State of Maharashtra
1993 (3) BCR 54.
i ) C.R. Nagaraja Shetty vs. Special Land Acquisition
Officer and Estate Officer, 2009 (11) SCC 75.
j) Shaji Kuria Kose vs. Indian Oil Corporation
(2001) 7 SCC 650 .
k) Manohar vs. State of Maharashtra, (2025) SCC OnLine
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
14/55
FA 714 OF 2018.doc

SC 1519
l) Trishila Jain vs. State of Uttaranchal , AIR 2011 SC
2458
m) Mehta Ravindra Rai Ajit Rai vs. State of Gujarat
AIR 1989 SC 2051
n) Judgment of Single Judge of Bombay High Court
in The Special Land Acquisition Officer (3)
Mumbai Suburban District & J.P.Shah vs.
The Deputy General Manager, MTNL in LAR No.
4 of 1999.
2. Submissions of Respondent - State
i) In response Additional Government Pleader Mr. A. R.
Patil, appeared and firstly submitted that section 4 notification was
issued on 24 September, 1986 and on the said date, the region around
the acquired land was not developed. He submitted that the
compensation which is granted to the claimant should not be a
bonanza. He submitted that no evidence was led by the claimant to
prove the market rate of the acquired land.
ii) He also showed me Section 24 of the Act and more
th th
particularly the provisions of 5 and 6 clauses which deal with what
shall not be taken into consideration for determining compensation.
iii) He further submitted that in land acquisition proceedings,
one has to understand that if two adjacent lands are acquired and
after acquisition, if one piece of land is used for garden and another
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
15/55
FA 714 OF 2018.doc

piece of land is used for airport, the compensation payable would not
defer, since what has to be seen is the position of land, on the date it is
acquired and not what is the future use of the acquired land.
iv) He further submitted that N.A. potentiality of the land is
one of the factors to be considered while compensation is fixed, out of
other factors which have to be seen. He submitted that the Special
Leave Petition of the CIDCO was rejected on the ground that there was
a delay in filing the Special Leave Petition. Therefore the Supreme
Court has not on merits accepted the rate of Rs.1,725/- per sq.mtr.
v) He further submitted that the State has not accepted the
rate of Rs.1,725/- per sq.mtr. and the Supreme Court has remanded
the matter back to the High Court to decide on merits the
compensation to be payable to the acquired land. Even in Lok Adalat
as far as notification of 1986 is concerned, the State has not settled
any claims of the acquired land at the rate of Rs.1,725/- per sq. mtr.
vi) He further submitted that future use of the land should
not be considered as a guiding principle. He submitted that even
though there is no cross examination, still the court has to look into
whether the claimant is able to prove the market value and the
th
provisions of clause 5 of Section 24 has to be looked into.
vii) He submitted that ultimately it is the public who would
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
16/55
FA 714 OF 2018.doc

have to pay for the compensation to be payable of the acquired land.
He submitted that where large chunk of land are acquired, belting
system may not be applicable. He argued that just because the land is
nearby and in same node, the rates cannot be unilateral. He further
argued that the lands are divided according to their location and
hence different rates are applied.
viii) He further stated the rate of lease plots should not be
considered as relied upon in the present proceedings. The lease
agreement referred by the claimants are pursuant to the tender bill
floated. Therefore, the same cannot be relied upon while deciding the
market value. He submitted that these lease instances were discarded
by the Division Bench of the Bombay High Court. There is a reference
of three lease instances by the Supreme Court in the judgment of
Lalchand (supra).
ix) He submitted that in Changa K. Thakur (supra), it was
the claimant who had gone to Supreme Court challenging the rate
granted by this Court and in any case, after the Supreme Court
passing the order in case of Changa K. Thakur (supra) on 25 July,
2016, Supreme Court in the case of Babibai (supra) which pertains to
the land of village Padghe remanded the matter back to the Bombay
High Court by its order dated 31 October, 2017. This will be relevant
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
17/55
FA 714 OF 2018.doc

since in the present proceedings of Raja Joshi, the land is from village
Padghe. He submitted that ultimately what Supreme Court has done
is important since Supreme Court has raised a doubt as to the rate
arrived at Rs.1,725/- per sq.mtr.
x) To buttress his submissions, learned Additional
Government Pleader referred to following authorities of Supreme
Court and Bombay High Court :-
1) Chimanal Hargovinddas vs. Special Land
Acquisition Officer, Poona - 1988 (3) SCC 751
2) Manipur Tea Co. Pvt. Ltd. vs. Collector of
Hailakanda - (1997) 9 SCC 673
3) Kiran Tandon vs. Allahabad Development
Authority - (2004) 10 SCC 745 .
4) Food Corporation of India vs. Makhan Singh -
(1992) 3 SCC 67 .
5) Bhule Ram vs. Union of India & Anr. -
(2014) 11 SCC 307 .
6) Hookiyar Singh & Ors. vs. Special Land
Acquisition Officer, Moradabad & Anr. -
(1996) 3 SCC 766
7) Rajashekhar Taradandi & Ors. vs. Assistant
Commissioner and Land Acquisition Officer &
Ors. - (1996) 9 SCC 642
8) Mohammad Raofuddin vs. Land Acquisition
Officer - (2009) 14 SCC 367 .
9) Bijendra vs. State of Maharashtra – (2018) 11
SCC 180
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
18/55
FA 714 OF 2018.doc

10) Administrator General of West Bengal vs. Collector,
Varanasi (1988) 2 SCC 150
11) Kasturi vs. State of Haryana - (2003) 1 SCC 354
12) Kanvarsi Kanwar Singh vs. Union of India -
(1998) 8 SCC 136
13) Lalchand vs. Union of India – (2009) 15 SCC 769
14) Omprakash vs. Union of India of the Supreme
Court - (2004) 10 SCC 627
15) General Manager, Oil And Natural Gas
Corporation Limited vs. Rameshbhai Jivanbhai
Patel & Anr.. - (2008) 14 SCC 745.
16) Nama Padu Hudar vs. State of Maharashtra -
1993 (3) BCR 54.
17) State of Maharashtra vs. Ishwarsharan
Bhargava – 2008 (3) Mh.L.J. 331
18) Dinkar Balu Bhopi vs. State of Maharashtra –
First Appeal No. 1082 of 2005
[D] Points for Determination :
The only question argued before me was the assessment of the
market value of the acquired land as on the date of the notification
issued under Section 4 of the Act .
1. Legal Principles and Factors to determine compensation of
acquired land.
i) Section 23 of the Act, lays down matters to be considered
in determining compensation. Apart from Section 23, one has to also
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
19/55
FA 714 OF 2018.doc

see Section 24, which states matters to be neglected in determining
compensation.
ii) The following judgments defines the law on the subject.
(a) Supreme Court in the judgment of Chimanlal
Hargovinddas (supra), laid down 14 factors in order to decide the
methodology for valuation of acquired land. Para nos. 4 and 8 read
as under :
4. The following factors must be etched on the mental
screen:
(1) A reference under Section 18 of the Land Acquisition Act is
not an appeal against the award and the Court cannot take into
account the material relied upon by the Land Acquisition officer in
his Award unless the same material is produced and proved before
the court.
(2) So also the Award of the Land Acquisition officer is not to be
treated as a judgment of the trial court open or exposed to
challenge before the Court hearing the Reference. It is merely an
offer made by the Land Acquisition officer and the material utilised
by him for making his valuation cannot be utilised by the Court
unless produced and proved before it. It is not the function of the
Court to suit in appeal against the Award, approve or disapprove its
reasoning, or correct its error or affirm, modify or reverse the
conclusion reached by the Land Acquisition officer, as if it were an
appellate court.
(3) The court has to treat the reference as an original proceeding
before it and determine the market value afresh on the basis of the
material produced before it.
(4) The claimant is in the position of a plaintiff who has to show
that the price offered for his land in the award is inadequate on the
basis of the materials produced in the Court. Of course the materials
placed and proved by the other side can also be taken into account
for this purpose.
(5) The market value of land under acquisition has to be
determined as on the crucial date of publication of the notification
under Section 4 of the Land Acquisition Act (dates of Notifications
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
20/55
FA 714 OF 2018.doc

under Sections 6 and 9 are irrelevant).
(6) The determination has to be made standing on the date line
of valuation (date of publication of notification under Section 4) as
if the valuer is a hypothetical purchaser willing to purchase land
from the open market and is prepared to pay a reasonable price as
on that day. It has also to be assumed that the vendor is willing to
sell the land at a reasonable price.
(7) In doing so by the instances method, the Court has to
correlate the market value reflected in the most comparable
instance which provides the index of market value.
(8) Only genuine instances have to be taken into account. (Some
times instances are rigged up in anticipation of Acquisition of land).
(9) Even post notification instances can be taken into account (1)
if they are very proximate,(2) genuine and (3) the acquisition itself
has not motivated the purchaser to pay a higher price on account of
the resultant improvement in development prospects.
(10) The most comparable instances out of the genuine instances
have to be identified on the following considerations:
(i) proximity from time angle,
(ii) proximity from situation angle.
(11) Having identified the instances which provide the index of
market value the price reflected therein may be taken as the norm
and the market value of the land under acquisition may be deduced
by making suitable adjustments for the plus and minus factors vis-a-
vis land under acquisition by placing the two in juxtaposition.
(12) A balance-sheet of plus and minus factors may be drawn for
this purpose and the relevant factors may be evaluated in terms of
price variation as a prudent purchaser would do.
(13) The market value of the land under acquisition has there after
to be deduced by loading the price reflected in the instance taken as
norm for plus factors and unloading it for minus factors.
(14) The exercise indicated in clauses (11) to (13) has to be
undertaken in a common sense manner as a prudent man of the
world of business would do. We may illustrate some such
illustrative (not exhaustive) factors:
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
21/55
FA 714 OF 2018.doc

Plus factorsMinus factors
1.smallness of size.1.largeness of area.
2.proximity to a<br>road.2.situation in the interior<br>at a distances from the<br>Road.
3.frontage on a<br>road.3.narrow strip of land<br>with very small frontage<br>compared to death.
4.nearness to<br>developed area.4.lower level requiring the<br>depressed portion to be<br>filled up.
5.regular shape5.remoteness from<br>developed locality.
6.level vis-a-vis<br>land6.some special under<br>acquisition.<br>disadvantageous factor<br>which would deter a<br>purchaser.
7.special value for<br>an owner of an<br>adjoining<br>property to<br>whom it may<br>have some very<br>special<br>advantage.

(15) The evaluation of these factors of course depends on the facts
of each case. There cannot be any hard and fast or rigid rule.
Common sense is the best and most reliable guide. For instance,
take the factor regarding the size. A building plot of land say 500 to
1000 sq. yds cannot be compared with a large tract or block of land
of say l000 sq. yds or more. Firstly while a smaller plot is within
the reach of many, a large block of land will have to be developed
by preparing a lay out, carving out roads, leaving open space,
plotting out smaller plots, waiting for purchasers (meanwhile the
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
22/55
FA 714 OF 2018.doc

invested money will be blocked up) and the hazards of an
entrepreneur. The factor can be discounted by making a deduction
by way of an allowance at an appropriate rate ranging approx.
between 20% to 50% to account for land required to be set apart
for carving out lands and plotting out small plots. The discounting
will to some extent also depend on whether it is a rural area or
urban area, whether building activity is picking up, and whether
waiting period during which the capital of the entrepreneur would
be looked up, will be longer or shorter and the attendant hazards.
(16) Every case must be dealt with on its own facts pattern
bearing in mind all these factors as a prudent purchaser of land in
which position the Judge must place himself.
(17) These are general guidelines to be applied with
understanding informed with common sense.
8. …... It is common knowledge that when a large block of land
is required to be valued, appropriate deduction has to be made for
setting aside land for carving out roads, leaving open spaces, and
plotting out smaller plots suitable for construction of buildings. The
extent of the area required to be set apart in this connection has to
be assessed by the Court having regard to shape, size and situation
of the concerned block of land etc. There cannot be any hard and
fast rule as to how much deduction should be made to account for
this factor. It is essentially a question of fact depending on the facts
and circumstances of each case. It does not involve drawing upon
any principle of law. It cannot be said that the High Court has
committed any error in forming the opinion that having regard to
the facts and circumstances of the case 25% deduction was
required to be made in this connection. The High Court cannot be
faulted on this score.
[ Emphasis supplied ]
(b) In the judgment of Manipur Tea Co. Pvt. Ltd. vs. Collector
of Hailakandi, (1997) 9 SCC 673 , the Supreme Court held that it was
for the claimants to prove as to what would be the reasonable
compensation which the land is capable of fetching in the open
market. The question would be whether the land under acquisition, if
put to private sale in an open market, would be capable of securing
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
23/55
FA 714 OF 2018.doc

the same price as offered by way of compensation under acquisition.
Paragraph no.4 of the said judgment reads as under :-
4. .......... It is settled law that the burden is on the claimants to
prove by adducing cogent, reliable and acceptable evidence the
market value under Section 23(1) of the Act. The burden does not
shift over to the Government but it is the duty of the court to assess
the evidence adduced by the claimants and determine the
compensation on the touchstone of prudent purchaser in the open
market, i.e., whether he would offer market value at the rates
proposed by the court. The evidence has to be put to the test
whether the sale deed or the evidence adduced would offer the
market value higher than that which has been determined by the
Land Acquisition Officer. The compensation awarded by the Land
Acquisition Officer is an offer that binds the Government but it is
not conclusive. It is for the claimants to prove as to what would be
the reasonable compensation which the land is capable of fetching
in the open market. The question is whether the land under
acquisition, if put to the private sale in an open market, would be
capable of securing the same price as offered by way of
determination of the compensation after compulsory acquisition.
Considered from this perspective, the court considered the
evidence adduced and determined the compensation. ........
[ Emphasis supplied ]
(c) Supreme Court in the judgment of Kasturi & Ors. vs. State
of Haryana, (2003) 1 SCC 354 , held that in absence of evidence
merely saying that the area adjoining his land is a developed area, is
not enough, it does not give the land the character of a developed
area. Para no.7 reads as under :-
7. ……… So the amount of expenses that may be incurred in
developing the area also varies. A claimant who claims that his land
is fully developed and nothing more is required to be done for
developmental purposes, must show on the basis of evidence that it
is such a land and it is so located. In the absence of such evidence,
merely saying that area adjoining his land is developed area, is not
enough particularly when the extent of the acquired land is large
and even if a small portion of the land is abutting the main road in
the developed area, does not give the land character of a developed
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
24/55
FA 714 OF 2018.doc

area. In 84 acres of land acquired even if one portion on one side
abuts the main road, the remaining large area where planned
development is required, needs laying of internal roads, drainage,
sewer, water, electricity lines, providing civic amenities etc. However,
in cases of some land where there are certain advantages by virtue
of the developed area around, may help in reducing the percentage
of cut to be applied, as the developmental charges required may be
less on that account. There may be various factual factors which
may have to be taken into consideration while applying the cut in
payment of compensation towards developmental charges, may be
in some cases it is more than 1/3 and in some cases less than 1/3. It
must be remembered that there is difference between a developed
area and an area having potential value, which is yet to be
developed. The fact that an area is developed or adjacent to a
developed area will not ipso facto make every land situated in the
area also developed to be valued as a building site or plot,
particularly when vast tracts are acquired, as in this case, for
development purpose.
[ Emphasis supplied ]
(d) Supreme Court in the judgment of Bhule Ram Vs. Union
of India – (2014) 11 SCC 307 , while considering the ratio laid down
in the earlier judgments including that of Sabhia Mulla (supra), held
that, while determining market value, the potential value, the locality,
situation, size and shape of the land and market value of other lands
in the same locality or adjacent has to be seen. Para no.8 to 12 read
as under :
8. The market value of the land is to be assessed as per Section
23 of the Act. Valuation of immovable property is not an exact science,
nor can it be determined like an algebraic problem, as it abounds in
uncertainties and no straitjacket formula can be laid down for arriving
at exact market value of the land. There is always a room for
conjecture, and thus the court must act reluctantly to venture too far in
this direction. The factors such as the nature and position of the land
to be acquired, adaptability and advantages, the purpose for which the
land can be used in the most lucrative way, injurious affect resulting in
damages to other properties, its potential value, the locality, situation
and size and shape of the land, the rise or depression in the value of
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
25/55
FA 714 OF 2018.doc

the land in the locality consequent to the acquisition etc., are relevant
factors to be considered. Section 23 mandates that the market value of
the land is to be assessed at the time of notification under Section 4 of
the Act. Therefore, value which has to be assessed is the value to the
owner who parts with his property and not the value to the new owner
who takes it over. …...
9. The concept of guess work is not unknown to various fields of
law as it applies in the cases relating to insurance, taxation,
compensation under the Motor Vehicles Act, 1988 as well as under the
Labour Laws. The court has a discretion applying the guess work to the
facts of the given case but it is not unfettered and has to be reasonable
having connection to the facts on record adduced by the parties by way
of evidence. …...
10. In Trishala Jain & Anr. v. State of Uttaranchal & Anr. , AIR
2011 SC 2458, this Court held that in case the parties do not lead any
evidence on record it is difficult for the court to award compensation
merely on the basis of imagination/conjectures, etc. The Act provides
for compensation for acquisition of land and deprivation of the
property which is reasonable and just. …...
11. The market value of the land should be determined taking
into consideration the existing geographical situation of the land,
existing use of the land, already available advantages, like proximity to
National or State Highway or road and/or notionally or intentionally
renowned tourist destination or developed area, and market value of
other land situated in the same locality or adjacent or very near to
acquired land and also the size of such a land. (Vide: Viluben Jhalejar
Contractor v. State of Gujarat, AIR 2005 SC 2214; Karnataka Housing
Board v. Land Acquisition Officer, (2011) 2 SCC 246; Bilkis v. State of
Maharashtra & Ors., (2011) 12 SCC 646 and Sabhia Mohammed Yusuf
Abdul Hamid Mulla v. Land Acquisition Officer & Ors., AIR 2012 SC
2709).
12. Where huge tract of land had been acquired and the same is
not continuous, the court has always emphasised on applying the
principle of belting system for the reason that where different lands
with different survey numbers belonging to different owners and
having different locations, cannot be considered to be a compact block.
Land having frontage on the highway would definitely have better
value than lands farther away from highway. (Vide: Andhra Pradesh
Industrial Infrastructure Corporation Limited v. G. Mohan Reddy &
Ors., (2010) 15 SCC 412).
[ Emphasis supplied ]
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
26/55
FA 714 OF 2018.doc

2. Factors to be neglected in determining compensation
i) Additional Government Pleader placed reliance on
Clauses fifthly and sixthly of Section 24 of the Act. The provisions of
Section 24 of the Act refers to matters not to be considered in
th th
determining compensation. Clauses 5 and 6 of Section 24 read as
under :-
“ Section 24. Matters to be neglected in
determining compensation.-
first ,…
….
….
Fifthly, any increase to the value of the land acquired
likely to accrue from the use to which it will be put;
Sixthly , any increase to the value of the other land of
the person interested likely to accrue from the use to
which the land acquired, will be put;
…. ”
(a) Supreme Court in the judgment of Hookiyar Singh & Ors.,
vs. Special Land Acquisition Officer, Moradabad & Anr., (1996) 3 SCC
th
766 held that Section 24 clause 5 prohibits taking into consideration
future use of the land which is put into acquisition. It further held
that the court must not indulge in feats of imagination but sit in the
armchair of a prudent purchaser in open market and put a question to
itself whether it would offer the same price. Para no. 6 of the said
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
27/55
FA 714 OF 2018.doc

judgment reads as under :-
6. It is settled law that the burden of proof of market
value prevailing as on the date of publication of Section 4(1)
notification is always on the claimants. …… Section 24 clause
fifthly prohibits taking into consideration future user to which the
land will put when acquired. Considered from the fluctuation in
the prices placed on record and large area involved in the
acquisition, situation of the lands, actual user of the lands as
agricultural lands and on the totality of the facts in this case,
treating all the lands as agricultural lands, we are of the considered
view that the market value of the land per acre would be Rs
35,000. The claimants are accordingly entitled to this amount. …...
[Emphasis supplied]
3. The principles of Public Funds in process of acquiring land
for public purposes
i) Additional Government Pleader emphasized that Land
Acquisition compensation is not to be treated as a bonanza to the land
owner.
(a) He relied on the judgment of Supreme Court in Food
Corporation of India vs. Makhan Singh & Anr., (1992) 3 SCC 67
which held that it is the duty of the Court while ascertaining
compensation to see that it is just, not merely to the individual whose
property is taken, but to the public which has to pay for it, even if it be
a public corporation set up for public needs. Paragraph no. 4 of the
said judgment reads as under :-
4. The purpose of the Land Acquisition Act is to empower the
Government to acquire land only for public purposes or for a
company, and, where it is for a company, the acquisition is subject
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
28/55
FA 714 OF 2018.doc

to the provisions of Part VII. Public purposes being such diverse in
nature the Governments of the time have been undertaking large-
scale acquisitions to promote and achieve the common good. The
Act is neither a tool in the hands of the Government to deprive any
person his land without payment of its market value, solatium at
the prescribed rate and statutory interest, nor a bonanza to a land
owner whose land has been acquired, permitting him to get a
fanciful inflated price. The Act therefore provides a machinery to
determine the market value of the land as existing on the date of
the notification under Section 4 of the Act. Section 15 of the Act
mandates that in determining the amount of compensation, the
Collector shall be guided by the provisions as contained in Sections
23 and 24. Section 23 contains a list of positives to be taken into
account by the court determining compensation. The first
requirement is that the court must take into consideration the
market value of the land on the date of the publication of the
notification under sub-section (1) of Section 4 of the Act. This is
the reason why courts have looked for comparable sales of lands at
or close to the date of the notification under Section 4(1) of the Act
to discover a basis towards determining compensation. Somewhere
in the process, where difficulties crop up, the courts employ the
rule of thumb, since compensation has to be assessed and arms
cannot be raised in despair. It is the bounden duty of the court
while ascertaining compensation to see that it is just, not merely to
the individual whose property is taken, but to the public which is to
pay for it; even if it be a public corporation set up for public needs.
[Emphasis supplied]
(b) Similarly, in the judgment of Mohammad Raofuddin vs.
Land Acquisition Officer, (2009) 14 SCC 367 , the Supreme Court held
that the compensation to be determined must be just and fair and not
merely to the individual but also to the public who has to pay for it.
Para no.14 of the said judgment reads as under :-
14. Thus, comparable sale instances of similar lands in the
neighbourhood at or about the date of notification under Section
4(1) of the Act are the best guide for determination of the market
value of the land to arrive at a fair estimate of the amount of
compensation payable to a landowner. Nevertheless, while
ascertaining compensation, it is the duty of the Court to see that
the compensation so determined is just and fair not merely to the
individual whose property has been acquired but also to the public
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
29/55
FA 714 OF 2018.doc

which is to pay for it.
[Emphasis supplied ]
4. On whom the burden of proof lies ?
(a) Supreme Court in the judgment of Kiran Tandon vs.
Allahabad Development Authority & Anr., (2004) 10 SCC 745 held
that it is the claimant who has to prove that the price offered for
acquisition of his land is inadequate for which he has to produce
materials on record in Court. Para no.10 of the said judgment reads
as under :-
10. Before examining the merits of the contentions raised, it will
be useful to bear in mind the legal principle in the matter of
determination of compensation. The Collector's award under
Section 11 is nothing more than an offer of compensation made by
the Government to the claimants whose property is acquired. The
burden of proving that the amount of compensation awarded by
the Collector is inadequate lies upon the claimant and he is in the
position of a plaintiff. The court has to treat the reference as an
original proceeding before it and determine the market value
afresh on the basis of the material produced before it. The claimant
is in the position of a plaintiff who has to show that the price
offered for his land in the award is inadequate on the basis of the
materials produced in the court. The material produced and proved
by the other side will also be taken into account for this purpose.
(See Chimanlal Hargovinddas v. Special Land Acquisition Officer
(1988) 3 SCC 751, and Periyar and Pareekanni Rubbers Ltd. v.
State of Kerala (1991) 4 SCC 195)
[ Emphasis supplied ]
5. Determination of fair market rate through comparative
sales method
i) If the sale transaction of the year in which notification
was issued are not available, and the sale transaction of earlier years
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
30/55
FA 714 OF 2018.doc

are available on record, apex court has dealt with the issue in
following judgment.
(a) In the judgment of Om Prakash Vs. Union of India
reported in (2004) 10 SCC 627 , Supreme Court held that escalation
@ 12% p.a. progressively while considering earlier transaction to be
reasonable increase to arrive at the fair market value. Para no.8, 11
and 12 read as under:
8. While the appellant claimants urged that after the
notification issued on 8-12-1982, the lands in question had
acquired great commercial potentiality and that this fact had been
lost sight of by the High Court in assessing the fair market value as
on the date of the notification under Section 4 of the Act, the
learned counsel for the Union of India contends that, despite the
change in the master plan, there was hardly any change in the land
use between 8-12-1982 and 2-6-1983 when the notification under
Section 4 of the Act was issued. The land had been continued to be
used for agricultural and allied purposes and there was no
commercial exploitation of the land at all despite it being allowed
as a result of change in the master plan.
11. In the circumstances, the High Court was justified in working
out the fair market value of the lands in question on the basis of
Rs.16,750/- per bigha as on 30-10-1963. The High Court noticed
that in several judgments of this Court escalation at different and
varying rates i.e. 6% per annum from 1959 to 1965, @ 10% per
annum for every year from 1966 to 1973 and @ 12% per annum
from 1975 had been considered to be reasonable increase to arrive
at the fair market value, assuming that the pace of escalation
during this period was normal for the entire period from 1959
onwards. Since no material was placed on record to show that
there was any abnormality during the period, the High Court
applied the same principle to the facts and circumstances before it,
and accepted increase of 10% every year progressively from 1963
to 1973 and thereafter @ 12% every year progressively upto the
date of acquisition. The High Court noticed in the judgment that if
escalation is allowed on this basis, the fair market value would be
Rs.1,28,889 per bigha. In case progressive increase is allowed @
10% for the entire period, the amount will work out to Rs.1,08,397
per bigha. Allowing appreciation @ 12% for every year, not
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
31/55
FA 714 OF 2018.doc

cumulatively, but at a flat rate of 12% per annum from 1963 to
1983, the amount would work out to Rs.56,112 per bigha. The
High Court in its judgment under appeal pointed out that the
market value of Rs.16,750/- per bigha fixed in the case of
Dharambir vs. Union of India RFA No. 554 of 1992 decided on
23.09.1996 was not in respect of commercial land but only of
agricultural land. That the market value of agricultural land is
much lower than that of land suitable for commercial purposes, is
trite. After having worked out the market value of the lands on
various bases and keeping in view the fact that between 8-12-1982
and 2-6-1983, the lands in question had at least some commercial
potentiality, the High Court decided that the fair market value of all
categories of lands situated in the villages in question as on the
date of acquisition should be fixed at Rs.82,255 per bigha.
12. Having heard the learned counsel and perused the judgment,
we find it difficult to disagree with the exercise carried out by the
High Court. We think that the High Court was justified in assessing
the market value at a higher rate on account of some increased
potentiality of the lands. If at all, the High Court has erred on the
safer side in fixing the market value at Rs.82,255 per bigha. In the
circumstances, we are unable to accept the contention advanced by
the claimants-appellants and the Union of India in their respective
appeals. Taking an overall view of the matter, we are satisfied that
the judgment of the High Court requires no interference under
Article 136 of the Constitution of India.
[ Emphasis supplied ]
(b) Supreme court in the judgment of ONGC Vs. Rameshbhai
Patel reported in (2008) 14 SCC 745 , held that if no evidence of
comparable sales is available, then the market value can be fixed on
the basis of the market value fixed in the earlier acquisitions. Further
it held that for rural areas the rate can be 7.5% and for urban areas
the rate can be 10% to 15%. Para no.9, 13, 14, 18 and 19 read as
under:
9. We also find from the evidence of one of the claimants –
Laljibhai examined as CW1, that the boundaries of Santhal,
Kasalpura and Modipur villages are adjacent to the acquired lands;
and that the lands of one Ramanbhai Keshavlal of Santhal Village
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
32/55
FA 714 OF 2018.doc

acquired on 6-1-1987 (subject matter of Ex.15) and the acquired
lands were in neighbouring areas divided only by three or four
agricultural fields. …… We are therefore of the view that in the
absence of any evidence relating to sale transactions or acquisitions
relating to the village of Ijapura itself, and having regard to the
evidence relating to proximity of Santhal lands, Ex.15 offered a
reasonable basis for determining the market value of the acquired
lands in Ijapura. In view of Ex.15 relating to neighbouring Santhal,
Ex.16 relating to Chalsana loses relevance.
13. Primarily, the increase in land prices depends on four factors:
situation of the land, nature of development in surrounding area,
availability of land for development in the area, and the demand
for land in the area. In rural areas unless there is any prospect of
development in the vicinity, increase in prices would be slow,
steady and gradual, without any sudden spurts or jumps. On the
other hand, in urban or semi-urban areas, where the development
is faster, where the demand for land is high and where there is
construction activity all around, the escalation in market price is at
a much higher rate, as compared to rural areas. In some pockets in
big cities, due to rapid development and high demand for land, the
escalations in prices have touched even 30% to 50% or more per
year, during the nineties.
14. On the other extreme, in remote rural areas where there was
no chance of any development and hardly any buyers, the prices
stagnated for years or rose marginally at a nominal rate of 1% or
2% per annum. There is thus a significant difference in increases in
market value of lands in urban/semi-urban areas and increases in
market value of lands in the rural areas. Therefore if the increase in
market value in urban/semi-urban areas is about 10% to 15% per
annum, the corresponding increases in rural areas would at best be
only around half of it, that is about 5% to 7.5% per annum. This
rule of thumb refers to the general trend in the nineties, to be
adopted in the absence of clear and specific evidence relating to
increase in prices. Where there are special reasons for applying a
higher rate of increase, or any specific evidence relating to the
actual increase in prices, then the increase to be applied would
depend upon the same.
18. The increase in market value is calculated with reference to
the market value during the immediate preceding year. When
market value is sought to be ascertained with reference to a
transaction which took place some years before the acquisition, the
method adopted is to calculate the year to year increase. As the
percentage of increase is always with reference to the previous
year’s market value, the appropriate method is to calculate the
increase cumulatively and not applying a flat rate. The difference
between the two methods is shown by the following illustration
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
33/55
FA 714 OF 2018.doc

(with reference to a 10% increase over a basic price of Rs.10/- per
square metre):
YearBy flat rate increase<br>methodBy cumulative increase<br>method
1987 (Base Year)10.0010.00
198810 + 1 = 11.0010.00 + 1.00 = 11.00
198911 + 1 = 12.0011.00 + 1.10 = 12.10
199012 + 1 = 13.0012.10 + 1.21 = 13.31
199113 + 1 = 14.0013.31 + 1.33 = 14.64
199214 + 1 = 15.0014.64 + 1.46 = 16.10

19. We may also point out that application of a flat rate will lead
to anomalous results. This may be demonstrated with further
reference to the above illustration. In regard to the sale transaction
in 1987, where the price was Rs.10 per square metre, if the annual
increase to be applied is a flat rate of 10%, the increase will be
Rs.1 per annum during each of the five years 1988, 1989, 1990,
1991 and 1992. If the price increase is to be determined with
reference to sale transaction of the year 1989 when the price was
Rs.12 per square metre, the flat rate increase will be Rs.1.20 per
annum, for the years 1990, 1991 and 1992. If the price increase is
determined with reference to a sale transaction of the year 1990
when the price was Rs.13 per square metre, then the flat rate
increase will be Rs.1.30 per annum for the years 1991 and 1992. It
will thus be seen that even if the percentage of increase is constant,
the application of a flat rate leads to different amounts being added
depending upon the market value in the base year. On the other
hand, the cumulative rate method will lead to consistency and
more realistic results. Whether the base price is Rs.10/- or
Rs.12/10 or Rs.13/31, the increase will lead to the same result.
The logical, practical and appropriate method is therefore to apply
the increase cumulatively and not at a flat rate.
[Emphasis supplied]
The above discussion gives a broad background on which the
market rate of the land which is acquired is to be calculated.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
34/55
FA 714 OF 2018.doc

6. Evidence Led
i) In the present proceedings the claimants have examined
two witnesses. The claimant’s witness no. 1 – Rohidas in para 9 states
that Roadpali and Padghe are adjacent village. It is true that at the
time of acquisition, the lands under reference were paddy and varkas.
It is true that in the year 1986, there was no industrial unit in our
village. It is true that nearest railway route from Roadpali – Panvel.
ii) Similarly the Claimant’s witness no.2 – Valuer - Manjiri
Joshi in her evidence mentioned that Panvel city is 5.6 kms away
from village Padghe. In paragraph no. 27 she states the land under
reference was acquired on 24/09/1986 and lands, involved in the said
First Appeals also were acquired on 24/09/1986 for the same
purpose. The above referred High Court decisions indicate that lands
from the same village i.e. Roadpali, acquired on the same date in 1986
having similar topographical features and infrastructural facilities
have fetched a market value of Rs.1,725/- per sq.mtr. and hence form
a good piece of Evidence for substantiating the market value of the
land in question. In paragraph no. 38 she states that, it is true to say
that the land under reference is surrounded by agricultural lands. The
land under reference was a paddy land. It is not true to say that at the
preparation of valuation report, I have taken into consideration the
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
35/55
FA 714 OF 2018.doc

present situation. It is not true to say that the land under reference is
not abutting any State or National highway. It is true to say that the
acquired land is at the distance of 2 k.m. from the extended limit of
Panvel Municipal Council. It is true to say that the land under
reference is surrounded by agricultural lands. The land under
reference was paddy land. It is true to say that no independent water
and electricity facility was available to the acquired land. The nearest
gaothan to land under reference is the gaothan of village Roadpali. It
is at same distance. The nearest railway station to the acquired land is
at Navade and at Panvel. Panvel Railway station is at a distance of 4.5
km. It is true to say that Panvel S.T. Stand is at a distance of 4.5 k.m.
from the land under reference. It is true to say that prominent
industrial estate Taloja is the nearest industrial estate to the land
under reference. It is at a distance of 3 k.m. from the land under
reference. Steel Market at Kalamboli is at a distance of 2 k.m. from the
acquired land. It is true to say that there was no industrial unit at
village Roadpali. It is not true to say that beyond gaothan area of
village Roadpali, there was no N.A. development. It is true to say that
in the year 1986, the frequency of railway was very less. It is not true
to say that Diva-Panvel railway does not pass through village Roadpali.
It is true to say that in the year 1986 Belapur-Panvel railway track was
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:07 :::

KVM
36/55
FA 714 OF 2018.doc

not available. It is true to say that the land under reference was partly
agricultural and partly varkas. It is true to say that the land under
reference was yielding paddy crop and depended upon monsoon. It is
true to say that for paddy crop saturation of water is necessary and for
that land required bunds. It is true to say that there was bunding to
the acquired land. It is true to say that acquired land is at low level
from Mumbai-Pune National Highway No. 4. It is true to say that the
landmarks distance mentioned in the report by me are aerial
distances. In para 40 – it is stated that I have referred to the lease
instances from the village Kalamboli. It is true that the land in the
said lease instances were given by tender system. The plots in the
lease contracts were given for non-agricultural use. It is true to say
that the area of the plots in the said lease instances was comparatively
small. It is true to say that after acquiring lands CIDCO has converted
the lands for commercial purpose. It is true to say that the CIDCO has
leased out the plots on competitive bidding basis. It is not true to say
that in competitive bidding method of lease the rates are always
higher. It is not true to say that the lease instances are not comparable
to the land under reference.
iii) Therefore, In the present proceedings what has been
referred by the claimant and the expert witness in form of a valuer, is
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
37/55
FA 714 OF 2018.doc

to the two lease instances, as sale instances were not available since
all the 96 villages are covered under the “New Bombay Project” after
the first notification of the year 1970, no sale was permitted. It not
only in the present proceeding but all the other proceedings also this
Court has held that from 1970 no sale deeds were available. So what
was available was only two lease deeds which were referred in
practically all matters.
7. Leasehold vs. Freehold
i) The issue of determining market value of a freehold
property with reference to a premium for a leasehold plot, is no more
res integra.
(a) Supreme Court in the judgment of Lal Chand vs. Union of
India (2009) 15 SCC 769, held that it is not advisable to rely upon the
allotment/auction rates in determining the market values of adjoining
freehold lands. It is very difficult to arrive at the market value of a
freehold property with reference to the premises for a leasehold plot.
Paragraph nos. 25, 26 and 27 read as under :-
25. Some development authorities allot plots on
freehold basis, that is by way of absolute sale. Some development
authorities like DDA allot plots on leasehold basis. Some have
premium which is almost equal to sale price, with a nominal
annual rent, whereas others have lesser premium, and more
substantial annual rent.
26. There are standard methods for determining the
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
38/55
FA 714 OF 2018.doc

annual rental value with reference to the value of a freehold
property. There are also standard methods for determining the
value of freehold (ownership) rights with reference to the annual
rental income in regular leases. But it is very difficult to arrive at
the market value of a freehold property with reference to the
premium for a leasehold plot allotted by DDA. As the period of
lease is long, the rent is very nominal, some times there is a
tendency among public to equate the lease premium rate
(allotment price) charged by DDA, as being equal to the market
value of the property.
27. However, in view of the difficulties referred to
above, it is not safe or advisable to rely upon the allotment
rates/auction rates in regard to the plots formed by DDA in a
developed layout, in determining the market value of the adjoining
undeveloped freehold lands. The DDA brochure price has therefore
to be excluded as being not relevant.
[ Emphasis supplied ]
(b) Similarly, Division Bench of this Court in State of
Maharashtra vs. Ishwarsharan Kedarnath Bhargava – 2008 (3) Mh.L.J.
331 , while dealing with land of village Rabale District Thane meant
for New Bombay Project, the Bench held that lease instances does not
create transferrable title or interest in the acquired land. Para no. 11
reads as under :-
11. Now, we would proceed to examine the merits of the
present case in the light of the above settled principles of law. The
Claimants admittedly did not produce on record any sale instance
either prior to the date of the notification or immediately thereafter
which could give an idea as to what was the price of the land which
a willing buyer was ready to pay and a willing seller was ready to
offer. The lease instances produced firstly relate to a period much
prior to the date of notification and secondly they create no
transferable title or interest in the acquired land. To some extent it
can safely be concluded that the claimants have failed to discharge
the onus placed upon them in its entirety. They have primarily
relied upon the oral evidence and certain awards/judgments which
were produced by them before the Reference Court. Witness No.3,
Ashok Chandrashekhar Vaidya, who claims to be an Architect and
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
39/55
FA 714 OF 2018.doc

Valuer, stated that he had inspected different gat numbers in village
Rabale for valuation purposes and he referred to certain lease deeds
of the plots abutting Thane-Belapur Road. In his statement, he
made reference to a petrol filling station which was in operation
since 1956 and stated that the lease deed was executed at the rate
of Rs. 400/- per month which was again increased to Rs.2,250/- per
month. He prepared his valuation report which is at Exhibit-40. In
his examination-in-chief he stated that the soil of the land was hard
and infrastructure facilities like water, electricity and road transport
were available. In his cross-examination he conceded that he had no
notes about the data collected for valuation purposes and also that
he had not considered the sale instances quoted in the award of
Land Acquisition Officer and that he had added interest at the rate
of 7 per cent .
[ Emphasis supplied ]
8. Notification of the year 1970 for “New Bombay Project”
(a) In the judgment of Nama Hudar Vs . State of Maharashtra
reported in 1993(3) BCR 54 , the Division Bench of Bombay High
Court, while fixing market value for village Kamothe and Panvel, fixed
the rate @ Rs.20/- per sq.mtr. and Rs.25/- per sq.mtr. respectively.
Supreme court accepted this test and applied in two of its decision.
(b) Similarly in State of Maharashtra Vs. Prakash Deodhar
(2008) 5 BCR 708 , and granted @ Rs.25/- per sq.mtr. Para no.17
reads as under :-
17. The Claimants would be entitled to compensation for
acquisition of their lands as under :-
(a) Lands falling within 750 metres of the National Highway –
Rs.25/- per sq. metre.
(b) Land falling within 750 to 1500 metres of the National
Highway – Rs.23/- per sq. metre.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
40/55
FA 714 OF 2018.doc

(c) Land falling beyond 1500 metres of the National Highway
– Rs.21/- per sq. metre.
(c) Supreme Court in the judgment of Avinash Naik Vs. State
of Maharashtra (2009) 11 SCC 171 granted @ Rs. 10/- per sq.mtr. for
notification of the year 1970.
(d) Supreme Court in the case of Sabhia Mohammed Yusuf
Abdul Hamid Mulla (Dead) By Lrs. & Ors. Vs. Special Land Acquisition
Officer, (2012) 7 SCC 595 , while dealing with land of Village
Roadpali, granted compensation @ Rs.25/- per sq.mtr.
(e) Ambaji Dharma Pardeshi vs. State of Maharashtra – Civil
Appeal No. 5088 – 5089/2013 – which pertains to village Wadghar,
the Supreme Court fixed rate @ Rs.25/- per sq.mtr.
(f) While considering all these judgments in the case of
Yashwant Bhagat vs. State of Maharashtra, First Appeal No. 644 of
2019 , with relation to a land of village Karanjade I have granted
compensation @ Rs.25/- per sq.mtr.
Therefore as far as notification of the year 1970 for New
Bombay Project is concerned, for village Padghe @ Rs.25/- per sq.mtr.
was granted by this Court and the Supreme Court.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
41/55
FA 714 OF 2018.doc

9. Notification of the year 1986 for “New Bombay Project”
(a) In State of Maharshtra Vs. Shantaram Tandel - First
Appeal No.24 of 1995 , single judge of this Court accepted the rate of
1970 notification and granted escalation of 10% per annum.
(b) Division Bench of this Court in the judgment delivered in
First Appeal No. 646 of 1995 - Trimbak Thakur vs. State of
Maharashtra has granted compensation at the rate of Rs. 1,725/- per
sq. mtr. The acquired land in the Trimbak Thakur (supra) case is
situated in Village Roadpali. The said land as per the judgment
appears to be also a freehold land. While deciding the rate of
Rs.1,725/- per sq.mtr., the Division Bench of this Court held in Para
no. 23, 24 and 25 as under :-
23. …… There were no sale-deeds executed right from 1970 to
1984 and it was only already developed land which was given on
perpetual lease by the authorities / Corporation for commercial or
other purpose. Mainly, three instances are available on record
which have been proved in accordance with law and have to be
considered for determining the fair market value of the lands. First
instance is an allotment letter dated 16th October 1984 vide which
an area of 420 square metres being plot No. 413 at Kalamboli, Navi
Mumbai, was allotted on 60 years' lease for total premium of
Rs.7,06,777. This instance was proved by the witness No.1
Shrikrishna, who stated and who gave rate of the plot at
Rs.1873.28 per square metre. The letter of allotment showed that
water and power supplies were available; and charges were to be
paid directly by the allottee to the authorities concerned. Another
witness Karyal, on behalf of the Claimants, also made a reference
to this instance; and also stated that CIDCO had developed
wholesale steel market in the year 1980 by planning an area of 305
hectares. In his statement he has further stated that in regard to the
sale to Anusuya for the purpose of petrol pump the land was leased
out by way of tender; and it was at the rate of Rs. 240 per square
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
42/55
FA 714 OF 2018.doc

meter. The other instance is a lease-deed dated 2nd May, 1986
which was proved and placed on record. In the submission of this
witness, the instance was, where the plot in question was given at a
premium of Rs.345.87 per square metre; and this was with regard
to the plot admeasuring 2250.24 square metre. Still another
instance which was proved by the Claimants is with regard to the
plot which was admeasuring 1466 square meters given for a weigh
bridge at the rate of Rs.2727 per square metre.
24. All the above instances relate to village Kalamboli. From
Exhibit 15, the map, it is clear that the location of these lands is
nearer to the highway and is part of the already developed area,
i.e., steel market or industrial area. Certainly, the lands in question
are neither developed to that extent nor entire lands abut the
national highway. The instances that have been referred to by the
acquiring authority related to the lands which are much farther
away from the acquired lands and the developed area. The
respondents did not lead any evidence before the learned reference
Court, and only relied upon the record of the acquiring authority.
On the basis of the instances proved by the Claimants, it is clear
that there has been an increasing trend in the values of the lands
surrounding the acquired lands; but that itself would not entitle the
Claimants for the same compensation for which the property was
leased out or leasehold rights were created by the Corporation.
These lands were given after they were fully developed where
commercial development had taken place, water and electricity
were available, roads and other essential amenities were duly
provided for and that all would form part of the costs of
development, which have to be deducted from the compensation to
be given to the claimants. The Court would also have to consider
that in the award in LAR No.172 of 1996, the learned reference
Court had awarded R.90 per square metre in the year 1977. The
lands in question were acquired 7 years later i.e. in the year 1984.
Merely three instances referred to by the Claimants as well as a
petrol pump instance can hardly form the basis for determination
of the compensation. Since we have found that the instances
referred to are of the lands which are fully developed they cannot
be taken into consideration and therefore, we have taken the
average of two instances referred to in paragraph 23 above; and
have computed the amount of compensation by deducting 25%.
That is how the compensation has been worked out by us at the
rate of Rs.1725/- per square metre with statutory benefits as
contemplated under Sections 23 and 23(1A) of the Land
Acquisition Act.
25. In the result, the Appeals are dismissed. Consequently, the
Cross Objections are partly allowed. All Civil Applications stand
disposed of. No order as to costs.
[ Emphasis supplied ]
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
43/55
FA 714 OF 2018.doc

(c) In the judgment of Trimbak Joma Thakur (supra)
Supreme Court on 10 March, 2015 while considering the case of
CIDCO has remanded the matter back to this Court. In the Special
Leave Petition (Civil) No. 21331-21370 of 2009 which was filed by the
CIDCO, in the judgment passed in group of matters by the Division
Bench of the Bombay High Court in which the lead case was Trimbak
Joma Thakur (supra), the Supreme Court rejected the SLP on the
ground of delay.
(d) The Division Bench of this Court in the judgment of Ashok
Wani vs State of Maharashtra in First Appeal No. 1119 of 1997
followed the judgment delivered in Trimbak Thakur matter and
admitted that the rate granted by this Court in Trimbak Thakur of
Rs.1,725/- per sq.mtr. is the correct and appropriate rate. However,
since what was asked from the Court was only Rs.500/- per sq.mtrs.,
the Court did not grant Rs.1,725/- per sq.mtr. But granted Rs.500/-
per sq.mtr. It is pertinent to note here that in Ashok Wani (supra), the
acquired land was a village Padghe and the notification is of 1986. In
the present proceedings also the land under acquisition is from village
th
Padghe and the notification is of 24 September 1986. Therefore this
judgment becomes most relevant judgment for the present
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
44/55
FA 714 OF 2018.doc

proceedings.
(e) In the case of Babibai alongwith group of other matters,
including that of Wani’s matter, Supreme Court by its order dated 31
October, 2017, considering the Full Bench judgment of this Court on
the issue whether the claimant could amend their claim which was
earlier held by the Division Bench of this Court cannot be done. The
Supreme Court held that, as held by the Full Bench of Bombay High
Court, the claim can be amended. The CIDCO’s SLP was dismissed on
the ground of delay and latches.
(f) In the judgment of Division Bench of the Bombay High
Court in case of State of Maharashtra vs. Trimbak Joma Thakur
reported in 2007 (6) All M.R. 827 alongwith group of matters, the
Bench was dealing with the land pertaining to Village Roadpali, while
dismissing the State’s appeal considering the two lease instances of
1984 and 1986, the Court granted rate of Rs.1,725/- per sq.mtr. with
statutory benefits as contemplated under Sections 23 and 23 (1A) of
the Act.
(g) Supreme Court in Special Leave Petition (Civil) No.
21303-21329 of 2009 filed by CIDCO, challenging the judgment of
Bombay High Court in the lead case of Ashok Laxman Wani (supra) by
its order dated 10 March 2015 dismissed the SLP on the ground of
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
45/55
FA 714 OF 2018.doc

delay.
(i) Additional Government Pleader had submitted that the
State has not accepted the rate of Rs.1,725/- per sq.mtr. and the
Supreme Court has remanded the matter back to the High Court to
decide on merits the compensation to be payable to the acquired land.
Even the Lok Adalat as far as notification of 1986 is concerned, the
State has not settled any claims of the acquired land at the rate of
Rs.1,725/- per sq. mtr.
10. Letter of Law & Judiciary
(i) On behalf of the claimant, a copy of the letter of the year
2007 issued by Law and Judiciary Department, which shows that the
rate of Rs.1,725/- per sq.mtr. for land of village Roadpali was referred
to. The letter dated 3 September, 2007, for ease of reference is
reproduced hereinbelow :-
GOVERNMENT OF MAHARASHTRA
No. 999/M. Br.,
Law and Judiciary Department
Mantralaya, Mumbai – 400 032
rd
Date : 3 September, 2007
To,
The Government Pleader,
High Court,
Mumbai – 400 032
Subject :- F.A.No. 646 of 1995 in
L.A.R. No. 96/1989 & 21 other matters
The State of Maharashtra ….. Appellant
Vs.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
46/55
FA 714 OF 2018.doc

Trimbak Joma Thakur & ors. ….. Respondents
(District : Raigad)
Sir,
With reference to your letter Red. No. 1525/07,
dtd.21.08.2007 on the subject noted above, I am directed to inform
you that Government has decided to acquiesce in the decision dated
21.06.2007 of Hon’ble High Court, Mumbai in the above noted
cases.
Yours faithfully,
sd/-
(H.M.Suryavanshi)
Superintendent (Legal)
Copy forwarded with compliments for information and necessary
action to :-
1. The District Government Pleader, Raigad-Alibag
2. The Collector, Raigad-Alibag,
3. The Deputy Secretary, Revenue & Forests Department,
Mantralaya, Mumbai 32.
4. The Special Land Acquisition Officer, Metro Centre No.2, Panvel,
Dist : Raigad,
5. The Chief Land & Development Officer, CIDCO, CIDCO Bhavan,
Navi Mumbai,
6. Select file (2 Copies).
Hence, this letter shows that the State has accepted the rate @
Rs.1,725/- per sq.mtr. for notification of 198, pursuant to the
judgment of this court in State of Maharashtra Vs. Trimbak Joma
Thakur in First Appeal No. 646 of 1995.
11. Comparison of market rate @ Rs.20/- & Rs.25/-
Mr. Patil Addl. Govt. Pleader, has handed over a table to indicate
that if rate is fixed @ Rs.25/- per sq.mtr. in the year 1970 is accepted
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
47/55
FA 714 OF 2018.doc

then if 10% rise per annum cumulatively is considered, then in the
year 1986 the rate will be Rs.120/- per sq.mtr. and further he handed
over a table to indicate rate if Rs.20/- per sq.mtr. in the year 1970 is
considered as a fair rate and 10% rise per annum cumulatively is
considered, then in the year 1986 the rate will be Rs.115 per sq.mtr.
For ease of reference the said two tables are reproduced hereinbelow :
YearRate (10% rise p.a.<br>cumulatively) in RupeesRate (10% rise p.a.<br>cumulatively) in Rupees
19702520
197127.5022
197230.2524.5 (24.2)
197334 (33.27)27 (26.95)
197437.5 (37.4)30 (29.7)
197541.2533
197645.5 (45.37)36.5 (36.3)
197750 (50.05)40.5 (40.15)
19785545 (44.55)
197960.5054.5 (54.45)
198067 (66.55)60 (59.95)
198174 (73.70)73 (72.6)
198281.50 (81.40)80.5 (80.3)
198390 (89.65)86 (88.55)
19849995 (94.85)
1985109 (108.90)104.5
1986120 (119.90)115 (114.95)

::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
48/55
FA 714 OF 2018.doc

12. Illustration with 30% hike per year
(i) According to me, if Rs.25/- is considered as base rate in
the year 1970, then at 30% hike per year following will be the rate :-
YearAmount (30 % hike)
197025
197132.5
197242.25
197354.92
197471.39
197592.80
1976120.64
1977156.83
1978203.87
1979265.03
1980344.54
1981447.90
1982582.27
1983756.95
1984984.03
19851279.24
19861663.01

(a) Supreme Court on 25 July, 2016 in Special Leave Petition
(Civil) No. 13455 of 2016 in Changa Kanu Thakur vs. State of
Maharashtra filed by the claimant dismissed the SLP thereby
confirming the judgment of Division Bench of this Court concerning
land situated in village Bambavi. The Bombay High Court while
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
49/55
FA 714 OF 2018.doc

dealing with notification dated 24 September, 1986 fixed a rate of
Rs.1,725/- per sq.mtr. Therefore, the said rate can be confirmed in
the present proceedings.
(b) Thereafter Supreme Court in the case of Babibai which
pertains to the land of village Padghe remanded the matter back to the
Bombay High Court by its order dated 31 October, 2017. This will be
relevant since in the present proceedings, the land is from village
Padghe.
(c) Bokadvira though this matter is pending before Supreme
Court, Bokadvira belonging from Taluka – Uran, District – Raigad and
the distance between Bokadvira and Padghe is 32 kms.
(d) In the judgment of Division Bench of Bombay High Court
in case of State of Maharashtra vs. Nakul Govind Patil & Ors., this
Court was dealing the land pertaining to village Kolikopar, by its
judgment dated 27 August, 2015 granted rate at Rs.1,380/- per
sq.mtr.
(e) Division Bench of Bombay High Court while dealing with
the case of State of Maharashtra vs. Vitthal Shankar Gharat – First
Appeal No. 1360 of 2013 with Cross Objection (St) No. 10147 of 2017
dealing with the land of the village Donagri, Post Bokadvila, granted
rate of Rs.200/- per sq.mtr. alongwith statutory benefits.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
50/55
FA 714 OF 2018.doc

(f) Supreme Court in the judgment of State of Maharashtra
vs. Parvatibai Shankar Kini – Civil Appeal No. 6901-6902 of 2018
alongwith group of matters dealing with the land pertaining to village
Wadghar and Bokadvila remitted the matter back to the High Court.
(g) Similarly in the case of Single Bench of this Court in case
of State of Maharashtra vs. Anabai Bhaskar Patil , while dealing with
the land of village Bokadvila, granted a rate of Rs.1,725/- per sq.mtr.
alongwith statutory benefits.
(h) Against the decision of Bombay High Court, the applicant
Anabai Bhaskar Patil moved to the Supreme Court by way of Civil
Appeal No. 7125 – 7126 of 2018 . The said matter is still pending for
hearing.
13. Market Rate Comparison – 1986 Notification
th
Hence, as far as Notification U/s. 4 of the Act, dated 24
September 1986 is concerned, following are the relevant matters in
which the market rate needs to be considered :-
Sr.<br>No.VillageMarket value<br>granted per<br>sq.mtr.Bombay High CourtSupreme Court
1.RoadpaliRs.1,725/-Trimbak Joma Thakur vs.<br>State of Maharashtra, Division<br>Bench considered 2 lease<br>instances and on the basis of<br>Rs.25/- fixed for notification<br>of 1970, fixed Rs.1,725/- perSLP (C)No.<br>21331-21370<br>of 2009<br>CIDCO by<br>Order dated<br>10 March,

::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
51/55
FA 714 OF 2018.doc

sq.mtr. by judgment dated 21<br>June, 2007.2015<br>dismissed.
2.WadgharRs.1,725/-State vs. Shankar Gulave,<br>FA/1310/2005 a/w group of<br>matters order dated 2 July<br>2015.___________
3.BambaviRs.620/-State vs. Changa Kana<br>Thakur, FA/403/2001,<br>considering village Bambavi<br>is adjacent to village Ulwe,<br>wherein the rate is fixed @<br>Rs.12/- per sq.mtr. of<br>notification 3 February 1970.<br>For Village Roadpali and<br>Wadghar the rate fixed was<br>Rs.25/- for the notification of<br>4 Feb 1970 which increased to<br>Rs.1725/- per sq.mtr. as on 24<br>September 1986. Hence, for<br>village Bambavi for<br>notification as on 3 February<br>1970 the rate fixed @ Rs.12/-.<br>Therefore, considering the<br>rate of village Roadpali and<br>Wadghar the rate will be<br>Rs.828/- per sq.mtrs.<br>considering the land is<br>landlocked, 25% deduction<br>the rate would be Rs.620/- per<br>sq.mtr.SLP No.<br>13455/2016,<br>filed by the<br>Claimant, by<br>Order dated<br>25 July 2016<br>the SLP was<br>dismissed as<br>the Supreme<br>Court found no<br>merits.
4.KolikoparRs.1,380/-State of Maharashtra vs.<br>Nakul Patil in FA/112/2009.SLP pending
5.BokadvilaRs.1,725/-State of Maharashtra Vs.<br>Anabai Bhaskar PatilSLP pending

(i) Mr. Kulkarni has referred to large number of authorities to
substantiate his contention on general principles of calculating market
rate. Few of those authorities are already discussed in earlier
paragraphs. The remaining authorities referred by Mr.Kulkarni are
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
52/55
FA 714 OF 2018.doc

discussed hereinbelow :-
(a) Mr. Kulkarni referred to the judgment of Supreme Court
in case of Shaji Kuriakose & Anr. vs. Indian Oil Corporation Ltd. & Ors.
reported in (2001) 7 SCC 650 . In my view the ratio laid down in the
judgment will not be applicable to the present proceedings since it has
been held in the said judgment that in case of dis-similarity in respect
of locality, shape, size and nature of the land between the land
covered by sale and the land acquired, court can proportionality
reduce the value of the land acquired. Therefore, the said findings
would have no bearing to the present proceedings.
(b) In C.R.Nagaraja Shetty vs. Special Land Acquisition
Officer and Estate Officer , reported in (2009) 11 SCC 75 , the said
judgment refers to the enhancement of compensation wherein while
deducting development charges the High Court had not discussed the
reason for such deduction nor had the High Court relied upon any
piece of evidence for that purpose, therefore without any positive
evidence, the High Court was not justified in deducting the
development charges.
(c) As far as the latest judgment of the Supreme Court in case
of Manohar vs. State of Maharashtra reported in (2025) SCC OnLine
SC 1519 , the Court held that while granting compensation on the
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
53/55
FA 714 OF 2018.doc

basis of the highest exemplar sale deed which showed market value of
Rs.72,900/-per acre for deduction of 20% was appropriate. This
judgment will have no relevance in the findings recorded.
(d) As far as the judgment of Trishila Jain vs. State of
Uttaranchal reported in AIR 2011 SC 2458 is concerned, the same
referred to the belting system. The Court granted market value on the
date of issuance of Section 4 (1) of the Act deducting 10% therefrom
considering the surrounding development area and location and
potential of the land. Again in my view the judgment would have no
bearing on the present proceedings.
(e) As far as the judgment of Mehta Ravindra Rai Ajit Rai vs.
State of Gujarat reported in AIR 1989 SC 2051 is concerned, same
pertaining to sale deed being produced on record. Hence, the same
would not be applicable to the present proceedings.
(f) As far as the judgment of Single Judge in the case of
Special Land Acquisition Officer No.3, Mumbai and Jayantilal P. Shah
(Claimant) and Deputy General Manager, MTNL, Acquiring Body a
Court has only laid down certain guidelines to calculate the market
rate.
(ii) In my opinion, the ratio laid down in these authorities are
not helpful to the cause canvassed by Mr. Kulkarni.
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
54/55
FA 714 OF 2018.doc

[E] Conclusion
(i) This Court while granting compensation, has granted the
rate of Rs.1,725/- per sq. mtr. to near-by villages. In the present
proceedings also, according to me Rs. 1,725/- per sq. mtr. would be
the appropriate rate to be applied. No doubt the reference Court while
dealing with this issue has referred to the judgment of Trimbak
Thakur (supra) and Ashok Wani (supra) but however the Court held
that the land under acquisition is 160 meters away from the land
acquired in Trimbak Thakur (supra) case and therefore from
Rs.1,725/- per sq.mtr. the rate came down to Rs.1,500/- per sq.mtr.
According to me, method applied by the learned District Court is not
the correct method and the rate of Rs.1,725/- per sq.mtr. is a correct
rate on which the compensation should be granted.
(iii) Hence, the First Appeal filed by the State stands dismissed
and the Cross Objections filed by the claimant succeeds with the
enhancement compensation granted @ Rs.1,725/- per sq.mtr. The
claimant will also entitled to the statutory benefits including interest.
Hence, the proceedings stands disposed of with following directions :-
(i) First Appeal No 714 of 2018 stands
dismissed and Cross Objection (St) No. 31025 Of 2025
is partly allowed. The impugned judgment and award
::: Uploaded on - 22/04/2026 ::: Downloaded on - 22/04/2026 21:44:08 :::

KVM
55/55
FA 714 OF 2018.doc

dated 31 October, 2014 is modified accordingly. The
total market value of the acquired land is fixed at
Rs.1,725/- per sq.mtr. (inclusive of market value
offered by the Special Land Acquisition Officer).
(ii) In addition, the claimant will be entitled to
the statutory benefits under Sections 23(1-A), 23(2)
and 28 of the Land Acquisition Act, 1894.
(iii) The exercise of determining the
compensation payable as per the modified award shall
be carried out by the Reference Court within a period
of three months from the date, on which the writ of
this judgment is received by the said Court.
(iv) Excess amount shall be deposited by the
State Government within a period of three months
from the date on compensation amount is determined
by the Reference Court.
[RAJESH S. PATIL, J.]