TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT LTD vs THE STATE OF KARNATAKA
- Court
- Karnataka High Court
- 1 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
TH
DATED THIS THE 20 DAY OF AUGUST, 2026
BEFORE
THE HON'BLE MR. JUSTICE R. NATARAJ
WRIT PETITION NO. 23020 OF 2022 (BDA)
C/W
WRIT PETITION NO. 22858 OF 2022 (BDA),
WRIT PETITION NO. 23037 OF 2022 (BDA),
WRIT PETITION NO. 23059 OF 2022 (BDA),
WRIT PETITION NO. 23097 OF 2022 (BDA),
WRIT PETITION NO. 23101 OF 2022 (BDA),
WRIT PETITION NO. 23102 OF 2022 (BDA),
WRIT PETITION NO. 23103 OF 2022 (BDA),
WRIT PETITION NO. 23106 OF 2022 (BDA),
WRIT PETITION NO. 23811 OF 2022 (BDA),
WRIT PETITION NO. 23826 OF 2022 (BDA)
IN WP No. 23020/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD
BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH CHANDRA BHANDARI
…PETITIONER
Digitally
signed by
HEMALATHA J
Location:
HIGH COURT
OF
KARNATAKA
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
- 2 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR,
BANGALORE-560 032
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR
BANGALORE-560 032
…RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
.
ORDER VIDE NO BDA/EE(N)/AEE-3/T-831/2022-23 DATED
19.09.2022 AT ANNEXURE-D ISSUED BY RESPONDENT NO.3 AND
ETC.
IN WP NO. 22858/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
- 3 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
MR. SURESH BHANDARI
MANAGER
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4.
THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/ AEE-3/ND/T-830/2022-23 DATED
19.09.2022 AT ANNEXURE-D AND ETC.
- 4 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
IN WP NO. 23037/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH CHANDRA BHANDARI
PRESIDENT
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
- 5 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/AEE-3/T-896/2022-23 DATED
29.09.2022 AT ANNEXURE-D AND ETC.
IN WP NO. 23059/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH CHANDRA BHANDARI
PRESIDENT
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1.
THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
- 6 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/AEE-3/T-888/2022-23 DATED
28.09.2022 AT ANNEXURE-D AND ETC.
IN WP NO. 23097/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH CHANDRA BHANDARI
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1.
THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
- 7 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/AEE-3/T-891/2022-23 DTD 28.09.2022
AT ANNEXURE-D ISSUED BY RESPONDENT NO.3 AND ETC.
IN WP NO. 23101/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH BHANDARI
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
- 8 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4.
THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)AEE-3/ND/T-827/2022-23 DATED
19.09.20 AT ANNEXURE-D AND ETC.
IN WP NO. 23102/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
- 9 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH CHANDRA BHANDARI
PRESIDENT
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227
OF THE CONSTITUTION OF INDIA PRAYING TO QUASH THE
PROVISIONAL ORDER VIDE NO.BDA/EE(N)/AEE-3/T-892/2022-23
DATED 28.09.2022 AT ANNEXURE-D ISSUED BY RESPONDENT NO.3
- 10 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
AND ETC.
IN WP NO. 23103/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH BHANDARI
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4.
THE EXECUTIVE ENGINEER
NO.3, NORTH SUB-DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
- 11 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO BDA/EE(N)/AEE-3/ND/T-829/2022-23 DATED
19.09.2022 AT ANNEXURE-D AND ETC.
IN WP NO. 23106/2022
BETWEEN:
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR AUTHORIZED SIGNATORY
MR. SURESH CHANDRA BHANDARI
PRESIDENT
...PETITIONER
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1.
THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
- 12 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB-DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/AEE-3/T-895/2022-23 DATED
28/29.09.2022 AT ANNEXURE-D ISSUED BY RESPONDENT NO.3 AND
ETC.
IN WP NO. 23811/2022
BETWEEN:
1. VINOD MOOLACHEERY
S/O KOLIKKARA KUNHIRAMAN
AGED ABOUT 50 YEARS
R/AT NO. 146, 2C CROSS,
OMBR LAYOUT, BANASWADI
BANGALORE-560 033
2. TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR PRESIDENT AND
AUTHORISED SIGNATORY
MR. SURESH BHANDARI
...PETITIONERS
(BY SRI. SRIDHAR G., ADVOCATE)
- 13 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2. THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4.
THE EXECUTIVE ENGINEER
NO.3, NORTH SUB-DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/AEE-3/ND/T-889/2022-23 DATED
RD
28.09.2022 AT ANNEXURE-E ISSUED BY 3 RESPONDENT AND ETC.
IN WP NO. 23826/2022
BETWEEN:
1. KIZHAKKEPAT BHASKARAN RAVINDRANATH MENO
S/O KANJIRAMPARA BHASKARAN NAIR
AGED ABOUT 67 YEARS
- 14 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
2. MALINI MENON
W/O KIZHAKKEPAT BHASAKARAN RAVINDRANATH MENON
AGED ABOUT 59 YEARS
1 AND 2 PETITIONERS RESIDING AT S-4,
SPENCER COURT, 5, SPENCER ROAD
FRAZER TOWN BANGALORE-560005
3.
TOTAL ENVIRONMENT BUILDINGS SYSTEMS PVT. LTD.,
A REGISTERED COMPANY UNDER
THE COMPANIES ACT, 1956
HAVING THEIR OFFICE AT NO.78,
ITPL ROAD, EPIP ZONE
WHITEFIELD, BANGALORE-560 066
REPRESENTED BY THEIR PRESIDENT AND
AUTHORISED SIGNATORY
MR. SURESH CHANDRA BHANDARI
...PETITIONERS
(BY SRI. SRIDHAR G., ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
DR. AMBEDKAR VEEDHI,
BANGALORE-560001
BY ITS CHIEF SECRETARY
2.
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
KUMARA PARK WEST
BENGALURU-560 020
REPRESENTED BY ITS COMMISSIONER
3. THE ASSISTANT EXECUTIVE ENGINEER
NO.3, NORTH SUB DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
4. THE EXECUTIVE ENGINEER
NO.3, NORTH SUB-DIVISION
THE BANGALORE DEVELOPMENT AUTHORITY (BDA)
R.T. NAGAR, BANGALORE-560 032
...RESPONDENTS
- 15 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
(BY SMT. POOJA M. KOORSE, HIGH COURT GOVERNMENT PLEADER
FOR RESPONDENT NO.1;
SRI. MURUGESH V. CHARATI, ADVOCATE FOR RESPONDENT NOS.2
TO 4)
THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL
ORDER VIDE NO.BDA/EE(N)/AEE-3/ND/T-828/2022-23 DATED
RD
19.09.2022 AT ANNEXURE-E ISSUED BY 3 RESPONDENT AND ETC.
THESE PETITIONS, COMING ON FOR PRELIMINARY HEARING
IN ‘B’ GROUP, THIS DAY, ORDER WAS MADE THEREIN AS UNDER:
CORAM: HON'BLE MR. JUSTICE R. NATARAJ
ORAL ORDER
The petitioner in W.P No.23020/2022 has sought for the
following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/T-
831/2022-23 dated 19.09.2022 at Annexure-D
issued by Respondent No.3;
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-1002/2022-23
dated 27.10.2022 at Annexure-F.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
2. The petitioner in W.P. No.22858/2022 has sought for
the following reliefs:
- 16 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
“ a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/ND/T-
830/2022-23 dated: 19.09.2022 at Annexure-D.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-1004/2022-23
dated 27.10.2022 at Annexure-F.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
3. The petitioner in W.P. No.23037/2022 has sought
for the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/T-
Annexure D
896/2022-23 dated 29.09.2022 at .
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-1001/2022-23
Annexure F
dated 27.10.2022 at .
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
4. The petitioner in W.P. No.23059/2022 has sought for
the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/T-
888/2022-23 dated 28.09.2022 at Annexure-D.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-992/2022-23
dated 27.10.2022 at Annexure-F.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
- 17 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
5. The petitioner in W.P. No.23097/2022 has sought
for the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/T-
891/2022-23 dated 28.09.2022 at Annexure-D
issued by Respondent No.3.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-997/2022-23
dated 27.10.2022 at Annexure-F issued by
Respondent No.4.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
6. The petitioner in W.P. No.23101/2022 has sought
for the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/ND/T-
827/2022-23 dated 19.09.2022 at Annexure-D.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-994/2022-23
dated 27.10.2022 at Annexure-F.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
7. The petitioner in W.P. No.23102/2022 has sought
for the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/T-
892/2022-23 dated 28.09.2022 at Annexure-D
ISSUED BY RESPONDENT No.3.
- 18 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-998/2022-23
dated 27.10.2022 at Annexure-F ISSUED BY
RESPONDENT No.4.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
8. The petitioner in W.P. No.23103/2022 has sought
for the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/ND/T-
829/2022-23 dated 19.09.2022 at Annexure-D.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-1003/2022-23
dated 27.10.2022 at Annexure-F.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
9. The petitioner in W.P. No.23106/2022 has sought
for the following reliefs:
“a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/T-
895/2022-23 dated 28/29.09.2022 at Annexure-D
ISSUED BY RESPONDENT No.3.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-1000/2022-23
dated 27.10.2022 at Annexure-F ISSUED BY
RESPONDENT NO.4.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
- 19 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
10. Petitioners in W.P. No.23811/2022 have sought the
following reliefs:
“ a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/ND/T-
889/2022-23 dated 28.09.2022 at Annexure-E
rd
issued by 3 Respondent.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-993/2022-23
th
dated 27.10.2022 at Annexure-G issued by the 4
Respondent.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
11. Petitioners in W.P. No.23826/2022 have sought the
following reliefs:
“ a. Issue a writ of certiorari or any writ quashing the
provisional order vide No.BDA/EE(N)/AEE-3/ND/T-
828/2022-23 dated 19.09.2022 at Annexure-E
rd
issued by 3 Respondent.
b. Issue a writ of certiorari or any writ quashing the
confirmation order No.BDA/EE(N)/T-995/2022-23
th
dated 27.10.2022 at Annexure-G issued by the 4
respondent.
c. Grant costs and such other reliefs as this Hon'ble
Court deems fit to do, in the circumstances of the
case, in the interests of justice and equity.”
12. M/s.Total Environment Buildings Systems Pvt. Ltd.
is the petitioner in W.P. Nos.23020/2022, 222858/2022,
23037/2022, 23059/2022, 23097/2022, 23101/2022,
- 20 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
23102/2022, 23103/2022 and 23106/2022 and it is arrayed
as petitioner No.2 in W.P. No.23811/2022 and petitioner No.3
in W.P. No.23826/2022. It claims to be the owner of various
survey numbers in Bettahalasuru village, Jala Hobli, Yelahanka
Taluk, Bengaluru, sought a development plan, which was
sanctioned following which a request was made for a partial
occupancy certificate which too was granted on 17.12.2019 and
30.04.2022. Petitioner claims that the respondent No.3 -
Assistant Executive Engineer of Bangalore Development
Authority visited the site and found that there were violations
of the development plan and hence, issued provisional orders
impugned in these petitions. The petitioner replied to the same
and contended that there is no violation of the development
plan. However, the respondent No.4 issued confirmation
orders, which are impugned in these petitions directing the
demolition of the additional construction put up. Being
aggrieved by the same, the petitioner(s) are before this Court
in these petitions.
13. The Petitioner No.1 in W.P No.23811/2022 is a
purchaser of a villa from petitioner No.2 and the petitioner
- 21 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
Nos.1 and 2 in W.P. No.23826/2022 are the purchasers of a
villa from petitioner No.3. They are also aggrieved by the
provisional orders issued by the respondent No.3 and the
confirmation orders issued by the respondent No.4 in terms of
which, the respondent No.4 had directed the demolition of the
additional construction put up by M/s Total Environment
Buildings Systems Pvt. Ltd.
14. When these petitions are listed for preliminary
hearing in 'B' group, the learned counsel for the petitioner(s)
contends that a modified development plan was submitted and
the same was sanctioned by the respondent Nos.2, 3 and 4
thereby condoning the violations that were pointed out in the
provisional order. He, therefore, submits that the impugned
provisional order and the confirmation order directing
demolition are liable to be set at nought in view of the modified
development plan sanctioned by the respondent No.2.
15. The learned counsel for the respondent Nos.2 to 4
does not dispute the fact that a modified development plan in
respect of the subject villas was sanctioned by the respondent
No.2. He, however, contended that the right of the respondent
- 22 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
No.2 to inspect the building constructed by the petitioner(s) be
reserved.
16. In view of the aforesaid submission, the impugned
provisional orders issued by the respondent No.3 and the
confirmation orders issued by the respondent No.4 cannot
stand as the respondent No.2 has sanctioned a modified
development plan in respect of the subject villas. Accordingly,
the following Order is passed:
ORDER
(i). W.P No.23020/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-831/2022-23 dated 19.09.2022 issued by
the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-1002/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(ii). W.P. No.22858/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/ND/T-830/2022-23 dated 19.09.2022 issued
by the respondent No.3 and the Confirmation
- 23 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
Order bearing No.BDA/EE(N)/T-1004/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(iii). W.P. No.23037/2022 is allowed. The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-896/2022-23 dated 29.09.2022 issued by
the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-1001/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(iv). W.P. No.23059/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-888/2022-23 dated 28.09.2022 issued by
the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-992/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(v). W.P. No.23097/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-891/2022-23 dated 28.09.2022 issued by
the respondent No.3 and the Confirmation
- 24 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
Order bearing No.BDA/EE(N)/T-997/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(vi). W.P. No.23101/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/ND/T-827/2022-23 dated 19.09.2022 issued
by the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-994/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(vii). W.P. No.23102/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-892/2022-23 dated 28.09.2022 issued by
the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-998/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(viii). W.P. No.23103/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/ND/T-829/2022-23 dated 19.09.2022 issued
by the respondent No.3 and the Confirmation
- 25 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
Order bearing No.BDA/EE(N)/T-1003/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(ix). W.P. No.23106/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-895/2022-23 dated 28/29.09.2022 issued
by the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-1000/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(x). W.P. No.23811/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/T-889/2022-23 dated 28.09.2022 issued by
the respondent No.3 and the Confirmation
Order bearing No.BDA/EE(N)/T-993/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(xi). W.P. No.23826/2022 is allowed . The
Provisional Order bearing No.BDA/EE(N)/AEE-
3/ND/T-828/2022-23 dated 19.09.2022 issued
by the respondent No.3 and the Confirmation
- 26 -
HC-KAR
NC: 2026:KHC:45179
WP No. 23020 of 2022
C/W WP No. 22858 of 2022
WP No. 23037 of 2022
AND 8 OTHERS
CNR: KAHC010528662022
Order bearing No.BDA/EE(N)/T-995/2022-23
dated 27.10.2022 issued by the respondent
No.4 are quashed.
(xii). It is, however, open for the respondents Nos.
2, 3 and 4 to inspect the building constructed
by the petitioner(s) and ascertain whether the
construction put up by the petitioner(s) is in
accordance with the modified sanctioned plan
and if it is not, it is open for the respondent
Nos.2, 3 and 4 to take suitable action in
accordance with law.
Sd/-
(R. NATARAJ)
JUDGE