Iifl Finance Ltd vs Paramvir Developers Pvt Ltd

Court
Bombay High Court

2026:BHC-OS:11426
2-IA-4596-2025.docx

IN THE HIGH COURT OF JUDICATURE AT BOMBAY
rrpillai
ORDINARY ORIGINAL CIVIL JURISDICTION
INTERIM APPLICATION NO. 4596 OF 2025
AND
INTERIM APPLICATION (L) NO. 22220 OF 2025
AND
INTERIM APPLICATION NO. 7764 OF 2025
IN
COMMERCIAL SUIT NO. 126 OF 2025
IIFL Finance Ltd.
A Company incorporated under the
provisions of the Companies Act,
2013, (CIN No.) L67100MH199PLC0939797
having its registered office of IIFL House,
Sun Infotech Park, Road No. 16V, Plot No.
B-223, Thane Industrial Area, Wagle Estate,
Thane 400 604. ...Applicant/
(Org. defendant no.1)
IIFL Home Finance Ltd.
A Company incorporated under the
provisions of the Companies Act,
2013, (CIN NO.) L67100MH1995PLC093797
having its registered office at IIFL House,
Sun Infotech Park, Road No. 16V, Plot No.
B-223, Thanu Industrial Area, Wagle
Estate, Thane 400 604. ...Applicant/
(Org. Defendant No.2)
Vensco Developers LLP
A limited liability partnership
Digitally
signed by
RAJESHWARI
RAMESH
PILLAI
Date:
2026.05.04
18:43:16
+0530
1/45
RAJESHWARI
RAMESH
PILLAI
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

incorporated under the provisions of
the Limited Liability Partnership Act,
2008, having its registered office at 72,
Tower A, Kalapataru Sunrise Kolshet
Road, Chitalsar Manpada, Thane,
Thane – 400 607. ...Applicant/
(Org. Defendant No. 3)
IN THE MATTER BETWEEN
1. Paramvir Developers Pvt. Ltd.
A Company incorporated under the
provisions of the Companies Act,
2013, (CIN No. U70100MH2021PTC364702,
Having registered address at 105, Balkrishna
nd th
Nivas, 2 and 4 Road, Ammore
Comm Premises CHS, Khar West,
Mumbai 400 052
2. Paramvir Real Estate Pvt. Ltd.
A Company incorporated under the
provisions of the Companies Act,
2013, (CIN No. U45201MH202PTC364710,
Having registered address at 105, Balkrishna
nd th
Nivas, 2 and 4 Road, Ammore
Comm Premises CHS, Khar West,
Mumbai 400 052
3. K Mordani Constructions Pvt. Ltd.
A Company incorporated under the
2/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

provisions of the Companies Act,
2013, (CIN No. U70109MH2021PTC364239,
Having registered address at 105, Balkrishna
nd th
Nivas, 2 and 4 Road, Ammore
Comm Premises CHS, Khar West,
Mumbai 400 052.
4. Koel Developers Pvt. Ltd.
A Company incorporated under the
provisions of the Companies Act,
2013, (CIN No. U74900MH2021PTC367663,
Having registered address at 105, Balkrishna
nd th
Nivas, 2 and 4 Road, Ammore
Comm Premises CHS, Khar West,
Mumbai 400 052.
5. Kumar Mordani
Adult, Indian inhabitant, Age :45
Occupation : Business, having office
address at 105, Balkrishna
nd th
Nivas, 2 and 4 Road, Ammore
Comm Premises CHS, Khar West,
Mumbai 400 052.
6. K Mordani Realty
A proprietary concern of plaintiff No.
5, having its registered office at 105,
nd th
Balkrishna Nivas, 2 and 4 Road,
Ammore Comm Premises CHS, Khar
3/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

West, Mumbai 400 052.
7. Paramvir Builders LLP
A limited liability partnership
incorporated under the Limited
Liability Partnership Act, 2008,
having registered office at 105,
nd th
Balkrishna Nivas, 2 and 4 road,
Ammore Comm Premises CHS, Khar
West, Mumbai 400 052.
8. Gayatri Mordani
Adult, Indian inhabitant, Age:42,
Occupation : Business, having office
nd
address at 105, Balkrishna Nivas, 2 and
th
4 Road, Ammore Comm Premises
CHS, Khar West, Mumbai 400 052.
9. Mahek Mordani
Adult, Indian inhabitant, Age : 43,
Occupation : Business having office
nd
address at 105, Balkrishna Nivas, 2 and
th
4 Road, Ammore Comm Premises
CHS, Khar West, Mumbai 400 052.
10. Kishore Mordani
Adult, Indian inhabitant, Age : 46,
Occupation : Business having office
nd
address at 105, Balkrishna Nivas, 2 and
4/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

th
4 Road, Ammore Comm Premises
CHS, Khar West, Mumbai 400 052.
11. Kanayalal Mordani
Adult, Indian inhabitant, Age : 75,
Occupation : Business having office
nd
address at 105, Balkrishna Nivas, 2 and
th
4 Road, Ammore Comm Premises
CHS, Khar West, Mumbai 400 052.
12. K Mordani Real Estate Pvt. Ltd.
A Company incorporated under the
provisions of the Companies Act,
2013, (CIN No. U70200MI-12019PTC321124,
Having registered address at 105, Balkrishna
nd th
Nivas, 2 and 4 Road, Ammore
Comm Premises CHS, Khar West,
Mumbai 400 052.
13. MNK Builders LLP
A limited liability partnership
incorporated under the Limited
Liability Partnership, Act, 2008 having
its registered address at 105,
nd th
balkrishna Nivas, 2 and 4 Road,
Ammore Comm Premises CHS, Khar
West, Mumbai 400 052.
14. Reshma Mordani
5/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

Adult, Indian inhabitant, Age : 73,
Occupation : Business having office
nd
address at 105, Balkrishna Nivas, 2 and
th
4 Road, Ammore Comm Premises
CHS, Khar West, Mumbai 400 052. ...Plaintiffs
VERSUS
1. IIFL Finance Ltd.
A company incorporated under the
Provisions of the Companies Act,
2013, (CIN No.) L67100MH1995PLC093797
having its registered office at IIFL House,
Sun Infotech Park, Road No. 16V, Plot No.
B-223, Thane Industrial Area, Wagle
Estate, Thane 400 064.
2. IIFL Home Finance Ltd.
A company incorporated under the
2013, (CIN No.) U65993MH2006PLC166475
having its registered office at IIFL House,
Sun Infotech Park, Road No. 16V, Plot No.
B-223, Thane Industrial Area, Wagle
Estate, Thane 400 064.
3. Vensco Developers LLP
A Limited Liability partnership
incorporated under the provisions of
the Limited Liability Partnership Act,
6/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

2008, having its registered office at 72,
Tower A, Kalapataru Sunrise Kolshet
Road, Thane, Chitalsar Manpada,
Thane 400 607. …. Defendants
CORAM : GAURI GODSE, J.
RESERVED ON: 23rdDECEMBER 2025
PRONOUNCED ON: 4thAPRIL 2026

JUDGMENT:
1. These applications are filed by the Defendants for
rejection of the plaint under Order VII Rule 11 of the Civil
Procedure Code, 1908 (“CPC”), on the grounds of non-
compliance with Section 12-A of the Commercial Courts Act,
2015 (“said Act”), bar under Section 41 of the Specific Relief Act,
1963 and Section 34 of the The Securitisation And
Reconstruction Of Financial Assets and Enforcement Of
Security Interest Act, 2002 (SARFAESI Act).
2. The suit is filed for specific performance of the Framework
th
Agreement dated 20 December 2024 by discharging the
plaintiffs and the entire Mordani Group from all liabilities in
relation to the loan facilities availed from defendant nos. 1 and 2,
including all security interests created by them, by accepting the
7/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

premises in compliance with the Framework Agreement. The
plaintiffs have also prayed for a declaration that, in view of the
Framework Agreement, no amount is due and payable by the
plaintiffs. The plaintiffs have therefore prayed for directions to
release the securities on the ground of the execution of the
Framework Agreement.
3. In view of the apprehension that defendant nos. 1 and 2
shall take steps in furtherance of the terms and conditions of the
loan documents and take precipitative steps in respect of the
secured assets, the plaintiffs filed the suit without complying with
the mandatory requirement under Section 12-A of the said Act.
Hence, by way of interim relief, the plaintiffs prayed for an
injunction restraining defendant nos. 1 and 2 from dealing with,
transferring, or creating third-party rights in respect of the
plaintiffs’ three projects referred to in the Framework Agreement,
and from not enforcing the security under the loan agreements.
SUBMISSIONS ON BEHALF OF DEFENDANT NO.1:
4. The plaintiffs are all part of the Mordani Group and are
engaged in developing real estate projects. Defendant nos.1
and 2 are non-banking financial companies engaged in the
8/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:23 :::

2-IA-4596-2025.docx

business of providing loans/finance. Defendant no.3 is a real
estate developer and was the nominee developer of defendant
no.1 for the purpose of the transfer of projects under the
Framework Agreement entered into by Mordani Group and
defendant nos. 1 and 2. The agreements were executed by the
Mordani Group to avail loan facilities from defendant nos. 1 and
2 for the development of their real estate projects, including the
projects known as La Maison, Signature Suits, and Celyn
Project.
5. The plaint alleges that defendant nos. 1 and 2 are
th
signatories to a so-called “Framework Agreement” dated 20
December 2024, which purportedly recorded a composite
resolution of all loan facilities. The Framework Agreement forms
part of the plaint and records that the Mordani Group was
st
required to perform its obligations by 31 December 2024, and if
the Mordani Group failed to perform its obligations by the end of
st
business hours on 31 December 2024, the composite
settlement and the Framework Agreement will automatically and
forthwith come to an end and stand revoked, cancelled and
terminated without any act of the parties. In the event of failure,
9/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

the parties will be relegated to the same position they held prior
to the Execution Date, as if the composite settlement had never
been reached or agreed upon, and as if the agreement had
never been executed. Admittedly, Mordani Group did not comply
with its obligations under the Framework Agreement; hence, the
Framework Agreement stood terminated.
6. The suit is allegedly moved with great urgency since
defendant no.2 has allegedly begun taking precipitative steps
and taken possession of the secured asset, and there is a
purported failure on the part of the defendants in complying with
the obligations under the Framework Agreement, and that the
defendants will purportedly misuse the development rights
assigned/transferred/novated in favour of defendant nos. 3
without complying with the terms of the Framework
Agreement/MOU/Profit Sharing Agreement.
7. Admittedly, the plaintiffs have not complied with the
procedure prescribed under Section 12-A of the said Act. It is
well-settled that while examining an objection under Order VII
Rule 11 of the CPC, a meaningful, not a formal, reading of the
plaint must be done to determine whether it warrants the
10/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

exercise of powers of rejection. If the Court finds that the plaint
does not disclose any cause of action or that the suit is barred
by any law, the court has no option but to reject the plaint. To
support his submissions, learned senior counsel for defendant
no. 1 relied upon the Apex Court’s decision in Dahiben v.
1
Arvindbhai Kalyanji Bhanusali .
8. To support the objection on the ground of non-compliance
with the mandatory provision under Section 12-A of the said Act,
he relied upon the Apex Court’s decisions in Patil Automation
2
Private Limited & Ors. v. Rakheja Engineers Private Limited ,
3
Yamini Manohar v. T.K.D. Keerthi and Dhanbad Fuels Private
4
Limited v. Union of India . He submitted that it is observed by the
Apex Court that the plaintiffs have no right to paralyse Section
12-A by making a camouflage prayer for urgent interim relief
under the guise of bypassing the statutory mandate of pre-
litigation mediation. When deception and falsity are apparent or
established, the plaint deserves to be rejected.
9. Learned senior counsel for defendant no. 1, therefore,
1
(2020) 7 SCC 366
2
(2022) 10 SCC 1
3
(2024) 5 SCC 815.
4
2025 SCC Online SC 1129
11/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

submits that it is now well-settled how the expression "urgent
interim relief” is to be construed in the context of Section 12-A of
the said Act. The test under Section 12-A is not whether the
prayer for the urgent interim relief actually comes to be allowed
or not, but whether, on an examination of the nature and the
subject-matter of the suit and the cause of action, the prayer for
urgent interim relief by the plaintiff could be said to be
contemplable when the matter is seen from the standpoint of the
plaintiff. Therefore, urgent interim relief must not be merely an
unfounded excuse by the plaintiff to bypass the mandatory
requirement of Section 12-A of the said Act. He submitted that
the said test was adopted and affirmed by this Court in Image
Developer and Another v. Kamla Landmarc Real Estate Holding
5
Private Limited . It is held that the conduct of the plaintiff
subsequent to the filing of the suit, i.e. the alacrity or lack thereof
with which interim reliefs were applied for, is also a material
criterion when determining whether or not there was "urgency"
justifying non-compliance with Section 12-A.
10. Learned senior counsel for defendant no. 1, therefore,
submits that the court has to examine whether facts and
5
2025 SCC OnLine Bom 3284
12/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

circumstances justify a genuine apprehension as opposed to a
camouflage of an irreparable injury the plaintiffs are likely to
suffer. He therefore submits that the test of urgent interim reliefs
is not met in the facts and circumstances of the present case,
and the plaint deserves to be rejected for non-compliance with
the mandate under Section 12-A of the said Act.
SUBMISSIONS OF DEFENDANT NO. 2:
11. Learned counsel for defendant no. 2 supported the
submissions made on behalf of defendant no. 1 for rejection of
the plaint under Order VII Rule 11 of the CPC, for non-
compliance with the mandatory requirement under Section 12-A
of the said Act. Learned counsel for defendant no. 2 submitted
that the plaint is liable to be rejected also on the ground of the
bar under Section 41 of the Specific Relief Act, 1963 and
Section 34 of the SARFAESI Act. He submitted that the
plaintiffs defaulted in making payments towards the loans
availed from defendant nos. 1 and 2.
12. Defendant no. 2 initiated SARFAESI proceedings against
the plaintiffs, and thereafter, the Framework Agreement was
executed, under which the loans were to be settled. The
13/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

plaintiffs did not comply with the mandatory provision under
Section 12-A of the said Act, on the grounds of seeking interim
relief, relying on the terms and conditions of the Framework
Agreement. However, defendant no. 2 has not signed the
agreement. Hence, in view of the SARFAESI proceedings
initiated by defendant no. 2, relief in this suit against defendant
no. 2 would be barred by the provision of Section 34 of the
SARFAESI Act. To support his submissions, learned counsel for
the plaintiffs relied upon the decision of the Apex Court in
6
Punjab and Sind Bank vs. Frontline Corporation Limited .
13. In the present case, no grave urgency existed to file the
suit without first initiating proceedings under Section 12-A of the
said Act. The possession notice issued by defendant no. 2 under
th
Section 13 of the SARFAESI Act is dated 18 February 2025
th
and was responded to by the plaintiffs on 27 February 2025.
Thus, for two months after the notice was issued, the plaintiffs
took no steps to initiate proceedings under Section 12-A or to file
a suit seeking urgent relief. Hence, in the absence of an
explanation for the delay of two months after receipt of the
possession notice, the plaintiffs would not be entitled to seek
6
(2023) 16 SCC 331
14/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

any exemption for non-compliance under Section 12-A of the
said Act.
14. The prayer in the suit is for specific performance of the
Framework Agreement. Though the agreement is not signed by
defendant no. 2, the plaint proceeds against defendant no. 2
based on the said agreement. Hence, there is no cause of
action against defendant no. 2. The plaint is also therefore liable
to be rejected for no cause of action against defendant no. 2.
Learned counsel for defendant no. 2 referred to a recent
judgment of the Apex Court in Novenco Building and Industry
A/S. vs. Xero Energy Engineering Solutions Pvt. Ltd. and
7
Another . It is held that a plaintiff can be exempted from the
requirement of Section 12-A only when the plaint and the
documents attached to it clearly show a real need for urgent
interim intervention.
SUBMISSIONS ON BEHALF OF DEFENDANT NO. 3:
15. Learned counsel for defendant no. 3 submitted that no
urgent interim relief is contemplated for seeking exemption from
compliance under Section 12-A of the said Act. He supports the
7
2025 SCC Online SC 2278
15/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

submissions made on behalf of defendant nos. 1 and 2 for
rejection of the plaint. He submits that there is no cause of
action pleaded against defendant no. 3. Hence, the plaint is
liable to be rejected qua defendant no. 3 for want of any cause
of action. To support his submissions that the plaint can be
rejected as a whole against defendant no. 3, he relied upon the
decision of the division bench of this court in Sheela Ram
8
Vidhani and Another vs. S.K. Trading Company and Others .
SUBMISSIONS ON BEHALF OF THE PLAINTIFFS:
16. Learned senior counsel appearing for the plaintiffs
th
submitted that the suit was lodged for institution on 7 May
2025, which is before the courts closed for summer vacation on
th
9 May 2025. An application for leave under Clause 12 of the
Letters Patent was moved. The leave application was heard and
th
allowed on 13 June 2025. Thereafter, the interim application for
rd
urgent interim relief was listed before the court on 23 June
rd
2025 and it was adjourned to 3 July 2025. When the
th
application was moved for urgent interim relief on 30 June
2025, the defendants had requested time. Accordingly, time was
8
2021SC Online Bom 864
16/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

granted to file reply and rejoinder. He therefore submits that all
possible steps were taken by the plaintiffs to seek urgent interim
relief.
17. Learned senior counsel submits that even otherwise, the
post-filing conduct cannot be considered while deciding the
objections under Order VII Rule 11 of the CPC. In view of
Orders IV and V of the CPC, the suit once filed is listed before
the court for the issuance of summons. At the stage of issuing
summons, the court can examine the plaint for compliance and
issue summons or consider rejecting the plaint at the threshold
for any non-compliance or any bar as contemplated under Order
VII Rule 11 of the CPC. As per Rule 122 IX-A of Chapter IX-A of
the Bombay High Court (Original Side) Rules, 1980 (“OS Rules”)
applicable to the suits filed in this Court, all interim applications
must be listed on the date assigned by the Registry, provided
that the Court has ordered to list the application on an earlier
date. He pointed out that, as per Rules 7, 8 and 9 of Chapter II
of the Civil Manual, applicable to all the Civil Courts in
Maharashtra, suits and interim applications are listed before the
Courts after they are filed.
17/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

18. Learned counsel for the plaintiffs submits that a plaint can
be rejected at the threshold under Order VII Rule 11(d) of the
CPC, when the suit appears from the statement in the plaint to
be barred by any law. Therefore, the post-filing stages are
irrelevant for deciding the rejection of the plaint on the ground of
non-compliance with the mandatory pre-litigation mediation and
settlement provision under Section 12-A of the said Act. Even
otherwise, in the present case, the mandatory provision is not
complied with on the ground that urgent interim relief is
contemplated in the suit from the plaintiff's standpoint.
19. Learned senior counsel for the plaintiffs submits that the
legal principles regarding non-applicability of bar under Section
12-A of the said Act, when urgent interim relief is contemplated
from the plaintiffs’ standpoint, are well-settled in various
decisions of the Apex court. Hence, in the present case, since
urgent interim relief is prayed by the plaintiffs and the urgency is
pleaded, the plaint cannot be rejected at the threshold by
applying the bar under Section 12-A of the said Act.
20. The learned senior counsel for the plaintiffs submits that if
the post-filing stage of hearing the application for urgent relief is
18/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

delayed, it cannot be a ground for rejection of the plaint for non-
compliance with Section 12-A of the said Act. He submits that no
remedial measures are provided for the injury that is likely to be
caused to the plaintiffs if not permitted to file suit and seek
urgent interim relief on the ground of pre-litigation mediation and
settlement process. When a suit is not permitted to be filed on
the ground of compliance under Section 12-A of the said Act, the
protection of the lis pendens principle would also not apply.
Hence, in a case where urgent interim relief is contemplated,
and the plaintiffs are precluded from filing a suit, the same would
defeat the very object of Section 12-A of the said Act, which
permits the filing of the suit without compliance under Section
12-A of the said Act when urgent interim relief is contemplated.
21. In response to the objections raised on no cause of action
against defendant nos. 2 and 3 on the ground that the
Framework Agreement is not signed by them, learned senior
counsel for the plaintiffs submitted that all the parties have acted
upon the Framework Agreement. Defendant no. 2 is a group
company of defendant no. 1. One project is transferred to
defendant no. 3, after the Framework Agreement is signed, as
19/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

security for the loan availed from defendant nos. 1 and 2. The
settlement amount was agreed upon for three projects.
Accordingly, the steps taken pursuant to the settlement
agreement have been pleaded substantially in paragraphs 30 to
39 of the plaint. The averment in paragraph 40 of the plaint
shows the conduct of the parties that the agreement was to be
kept alive. The issuance of the possession notice under the
SARFAESI Act by defendant no. 2, despite the terms and
conditions of the Framework Agreement executed for settlement
with regard to the three projects, compelled the plaintiffs to file
the suit. Considering the threat of dispossession, the urgency
clause has been pleaded in paragraph 66 of the plaint,
supported by the relevant averments in paragraphs 55 to 58 of
the plaint. Hence, if viewed from the plaintiff’s standpoint, urgent
interim relief is contemplated for not complying with the
mandatory requirement under Section 12-A of the said Act.
22. Learned senior counsel for the plaintiffs relied upon the
decision of this court in Dipti Co-operative Housing Society Ltd
9
vs. Buildcon Sethia Construction . He submits that this court,
after referring to the legal principles settled by the Apex Court on
9
IAL No. 28008 OF 2025 in COMSL No. 22835 of 2025
20/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

bar under Section 12-A of the said Act, held that if the averment
in the plaint and supporting documents reveal that urgent interim
relief is contemplated from the standpoint of the plaintiffs, the
plaint cannot be rejected at the threshold. A similar view was
taken by this court in the decision of Shaikh Mohammed
Rafique and Lakhani Realty LLP vs. Kalina Vihar Darshan Co-
10
operative Housing Society and Others , and Westin Infra World
Private Ltd and Others , and Vistra ITCL India Limited vs.
11
Darvesh Properties Private Ltd. and Others .
23. With reference to the arguments raised on behalf of
defendant no. 2 on the bar under Section 34 of the SARFAESI
Act, learned senior counsel for the plaintiffs referred to prayer
clause (c) of the plaint, which may affect the DRT proceedings.
He, however, submits that in view of the substantive prayers in
the present suit seeking relief of specific performance, the bar
under Section 34 of the SARFAESI Act would not apply in the
present case, as the said prayer clause (c) is a general
consequential prayer. He thus submits that prayer clause (c) is
only a consequential relief. Hence, considering the main reliefs
10
2025 : BHC- OS : 19816
11
Interim Application (L) No. 22747 of 2025 in Commercial Suit (L) No. 13824 of 2025
21/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

in the plaint, it cannot be rejected at the threshold on the ground
of bar under Section 34 of the SARFAESI Act.
ANALYSIS AND CONCLUSIONS :
24. I have carefully perused the pleadings in the plaint. The
plaintiffs have availed various loans from defendant nos. 1 and 2
for the purpose of development of slum rehabilitation schemes
and projects known as La Maison, Signature Suites, and the
Celyn project. The plaintiffs have pleaded the particulars of
various documents executed for availing loans and the deposit
of title documents in respect of a few flats as secured assets for
Loan No. 4. In view of the default of repayment, the loan
account for Loan No. 4 was declared as a non-performing asset
rd
on 3 November 2024 and defendant no. 2 issued notice dated
th
13 November 2024 demanding payment, failing, which different
th
number two would initiate insolvency proceedings. On 14
November 2024, defendant no. 2 issued notice under Section
13(2) of the SARFAESI Act to plaintiff nos. 3, 5, 11 and 14. On
th
30 November 2024, defendant no. 2 issued a legal notice,
under Section 138 of the Negotiable Instruments Act, to plaintiff
no. 14 in respect of the cheque pertaining to loan agreement no.
22/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

4. Defendant no. 2 had also proceeded for invoking arbitration
th
under the loan agreement no. 4. On 9 November 2024,
defendant no. 1 invoked the personal guarantees, executed by
th
plaintiff no. 5 and on 12 December 2024, defendant no. 1
through its Resolution Professional, initiated proceedings under
Section 95 of Insolvency and Bankruptcy Code against plaintiff
nos. 5 and 11.
25. Thereafter, the plaintiffs availed of the Amnesty scheme
floated by the government to revive the slum rehabilitation
projects. As per the scheme, a new developer would be
appointed in respect of the project of La Maison, and defendant
no. 1 would be notified as co-developer for the project.
Simultaneously, along with availing the scheme, the plaintiffs
and defendant no. 1 and 2 decided to amicably resolve the
dispute for all the loan facilities, and accordingly, the Framework
th
Agreement dated 20 December 2024, was executed between
the plaintiffs and defendant nos. 1 and 2. Certain obligations
were to be met under the Framework Agreement.
26. The plaintiffs have further pleaded that defendant no. 3 is
the new developer who has been appointed/nominated by
23/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

defendant no. 1 in respect of the La Maison and Signature
Suites projects, which were previously developed by the
plaintiffs. Therefore, defendant no. 3 also entered into a
Memorandum of Understanding/Profit Sharing Agreement with
plaintiff no. 5 for profit and loss sharing from the said two
projects contingent upon the settlement contemplated under the
Framework Agreement.
27. It is further pleaded that in view of the Framework
Agreement, two projects are assigned and transferred to
defendant no. 3, who is the assignee of defendant nos. 1 and 2.
According to the plaintiffs, the parties acted on the Framework
Agreement, and the defendants availed themselves of its
benefits. Hence, the Framework Agreement has been acted
upon and is subsisting according to the plaintiffs. All these
pleadings on availing the benefit by the defendants pursuant to
the Framework Agreement are specifically pleaded in the plaint.
Various registered agreements are executed between the
plaintiffs and defendant no. 3 for transferring various flats for
compliance with the Framework Agreement and the Profit
Sharing Agreement. The plaintiffs have pleaded willingness to
24/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

transfer the Celyn premises, defendant no. 2, in compliance with
the terms of the agreements.
28. Hence, the substantial prayers in the suit pertain to the
implementation of the Framework Agreement, which, according
to the plaintiffs, is executed by defendant nos. 1 and 2 towards
the settlement of all the loan agreements availed by the
plaintiffs. The plaintiffs have also claimed enforcement / specific
performance of the memorandum of understanding/profit-
sharing agreement with defendant no. 3 in respect of the two
projects mentioned in the Framework Agreement.
29. The plaintiffs have pleaded that the Framework Agreement
was signed by the plaintiffs and defendant nos. 1 and 2,
whereby the parties agreed to a composite amicable settlement
with respect to all the loan facilities availed by the plaintiffs.
According to the plaintiffs, despite availing the benefit under the
Framework Agreement, defendant no. 2 continued the
proceedings under the SARFAESI Act and secured a notice of
possession. The plaintiffs have therefore expressed
apprehension that, despite the terms and conditions of the
Framework Agreement and the security provided with reference
25/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

to the two projects transferred to defendant no. 3, action has
been initiated and precipitated by defendant no. 2.
30. Since all the defendants are affected under the Framework
Agreement, for which specific performance and enforcement are
prayed in the suit, the cause of action is pleaded against all the
defendants. The prayers for enforcement of the terms and
conditions of the Framework Agreement are against defendant
nos. 1 and 2 by directing them to accept the premises as
security in compliance with the Framework Agreement. The
prayers regarding release and discharge of the plaintiffs on
liability and security interest against defendant nos. 1 and 2
pertain to the enforcement and implementation of the terms and
conditions of the Framework Agreement.
31. So far as defendant no. 3 is concerned, specific
performance is prayed against defendant no. 3 for directing
defendant no. 3 to perform its obligations under the profit-
th
sharing agreement dated 20 December 2024 by directing
defendant no. 3 to take all the requisite steps to complete the
effect of the terms and conditions of the profit-sharing
agreement. Based on the allegations of non-performance of the
26/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

th
terms and conditions of the Framework Agreement dated 20
December 2025, executed by defendant nos. 1 and 2, and the
th
profit-sharing agreement dated 20 December 2024, by
defendant no. 3, the plaintiffs have pleaded the cause of action
against all three defendants. Hence, in the alternative, a prayer
for damages is claimed against defendant no. 3 on the ground of
non-performance of the profit-sharing agreement of 2024.
32. Hence, there is also no substance in the arguments made
on behalf of defendant no. 3 that the plaint is liable to be
rejected qua defendant no. 3 for want of any cause of action.
Hence, the decision of this court in Sheela Ram Vadhani would
not be of any assistance to the arguments raised on behalf of
defendant no. 3.
33. A prayer is made against defendant no. 2 to hand over
and return the secured assets on the ground that illegal
possession of the same is taken by defendant no. 2. In view of
all these substantive prayers against all three defendants, the
plaintiffs have prayed for interim relief directing defendant nos. 1
and 2 to complete the compliance of their obligations under the
Framework Agreement and defendant no. 3 under the profit
27/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

sharing agreement and thus restraining them from taking any
benefit of assignment in the two projects, which are subject
matter of the Framework Agreement. Apart from the interim
reliefs for compliance with the terms and conditions of the two
agreements, a restraining order is prayed against defendant
nos. 1 and 2 from enforcing any security interest or personal
guarantee or taking any precipitative steps in relation to secured
assets.
34. It is alleged that, despite availing of the benefit under the
agreements, defendant no. 2 proceeded with the SARFAESI
action. Hence, the plaintiffs have sought relief against defendant
nos. 1 and 2 from taking any precipitative action to enforce the
security under the loan agreements, in view of the settlement
arrived at under the Framework Agreement. In view of the
averments regarding the notice of possession issued under the
SARFAESI Act, it is sought to be argued on behalf of the
defendants that there is a bar under Section 34 of the
SARFAESI Act. However, the substantive prayers in the suit are
regarding the performance of the profit-sharing agreement with
defendant no. 3 and the Framework Agreement with defendant
28/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

nos. 1 and 2, the reliefs of which cannot be dealt with and
decided under the SARFAESI Act.
35. The interim relief is prayed for, with reference to
restraining the defendants from enforcing the security, on the
ground that the plaintiffs’ rights are protected under the profit-
sharing agreement and the Framework Agreement. Hence, at
this preliminary stage, the interim reliefs cannot be related to the
action under the SARFAESI Act for applying the bar under
Section 34 to the present suit, which claims substantive relief of
specific performance. Hence, the plaint cannot be rejected at the
threshold on the ground that the suit would be barred under
Section 34. In Punjab & Sind Bank, the Apex Court held that the
jurisdiction of the civil court is barred in respect of matters which
a DRT or an Appellate Tribunal is empowered to determine in
respect of any action taken or to be taken in pursuance of any
power conferred under the SARFAESI Act.
36. It is argued on behalf of defendant no. 2 that there is no
privity of contract as defendant no. 2 is not a signatory to the
framework agreement. Hence, there is no cause of action qua
defendant no. 2. Therefore, the plaint as a whole must be
29/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

rejected against defendant no. 2. I have already discussed in the
above paragraphs the plaintiffs’ pleadings that the Framework
Agreement was executed by defendant nos. 1 and 2. All the
pleadings in the plaint, as discussed above, also pertain to the
cause of action against defendant no. 2 on the ground that,
despite acting upon the Framework Agreement, defendant no. 2
has initiated and continued the precipitative actions against the
plaintiffs to enforce the security under the loan agreements.
There is sufficient cause of action pleaded against defendant no.
2 based on the various terms and conditions of the Framework
Agreement, and the parties have acted upon it. The relief of
injunction is not restricted or specific qua defendant no. 2, only
pertaining to the SARFAESI Act proceedings. The reliefs of
injunction are in the nature of protecting the secured assets in
view of the Framework Agreement entered into and acted upon
to bring about an overall settlement of all the loan agreements
availed from defendant nos. 1 and 2. Hence, there is no
substance in the arguments that the plaint must be rejected at
the threshold on the ground of a complete bar in view of Section
41(b) of the Specific Relief Act. The pleadings warrant a trial,
and the merits of the cause of action and the reliefs claimed
30/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

cannot be dealt with at this preliminary stage under Order VII
Rule 11 of CPC.
37. So far as the prayer for rejection of the plaint on the
ground of the bar under Section 12-A of the said Act is
concerned, the legal principles regarding the application of the
bar under Section 12-A are no longer res integra.
LEGAL POSITION:
38. The Apex Court in Dhanbad Fuels Pvt. Ltd. referred to the
legal principles settled in Patil Automation and also discussed
the power of the Court to reject the plaint, which is held to be a
drastic measure, as it terminates a civil action at the threshold,
and therefore must be exercised strictly in accordance with the
conditions enumerated under Order VII Rule 11 of the CPC. The
Apex Court held that the use of the word “shall” in Order VII
Rule 11 of the CPC denotes that the courts are under an
obligation to reject the plaint if the conditions specified therein
are satisfied. It is observed that t he word “contemplate”
connotes to deliberate and consider. It is also held that the legal
position that the plaint can be rejected and not entertained
reflects the application of mind by the court as regards the
31/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

requirement of “urgent interim relief”.
39. The Apex Court in Dhanbad Fuels Pvt. Ltd. further
observed that the prayer of urgent interim relief should not act
as a disguise to get over the bar contemplated under Section
12-A. However, at the same time, the mere non-grant of the
interim relief, when the plaint is taken up for admission and
examination, would not justify the rejection of the plaint under
Order VII Rule 11 of CPC. Further, even if after the conclusion of
arguments on the aspect of interim relief, the same is denied on
merits, that would not by itself justify the rejection of the plaint
under Order VII Rule 11.
40. So far as the decision in Kamla Landmarc Real Estate
relied upon by the learned counsel for defendant no.1 is
concerned, the view taken by this court in the said decision
regarding rejection of the plaint is on the facts of that case, and
the test applied is for considering whether the urgent interim
relief is contemplated from the standpoint of the plaintiff in the
said case. It is held that the pleading for claiming exemption
from compliance under Section 12-A should be based on a
strong foundation that has to be tested by the Court by
32/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

considering various factors, including the conduct of the plaintiffs
prior to and post-filing the suit. It is further held that the plaint
should contain details indicating that the plaintiffs could not have
waited for the period specified for the completion of the
mediation process.
41. In view of sub-rule (1) of Rule 1 of Order IV of the CPC, a
suit is instituted by presenting a plaint before the court or the
registering officer, as the case may be. As per sub-rule (2) of the
said Rule 1, every plaint must comply with the rules in Orders VI
and VII as may apply. In a duly instituted suit, a summons may
be issued as per Order V of the CPC. The particulars to be
pleaded in a plaint are provided in Rules 1 to 8 of Order VII,
which specify what has to be stated in a plaint. Rule 9 of Order
VII provides for the procedure to be followed on admitting the
plaint for service of the summons issued by the court. Rule 10
provides for the return of the plaint to the proper court, and Rule
11 of Order VII provides for the rejection of the plaint on the
grounds provided therein. Under Order VII Rule 11(d), where
the suit appears from the statement in the plaint to be barred by
any law, the plaint can be rejected.
33/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

42. Thus, once the suit is filed, it must be listed before the
Court for the issuance of a summons. At the stage of issuing
summons, the Court examines the plaint to verify whether all
compliances have been met and, if so, orders the issue of
summons; otherwise, it may consider rejecting the plaint at the
threshold for any non-compliance or any bar as contemplated
under Order VII Rule 11 of the CPC.
43. As per Rule 122 IX-A of Chapter IX-A of the OS Rules
applicable to the suits filed in this Court, all interim applications
must be listed on the date assigned by the Registry, provided
that the Court has ordered to list the application on an earlier
date. As per Rules 7 to 12 of Chapter II of the Civil Manual,
applicable to all the Civil Courts in Maharashtra, suits and
interim applications are listed before the Courts after their filing.
Thus, the normal rule is to list the suits and interim applications
before the court after filing; however, the Court can always direct
the listing of the suit or an interim application for urgent relief on
any date prior to the routine date assigned by the court’s
registry. It is only due to the huge pendency before the courts
that the immediate listing of the matters in the routine course
34/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

takes time. Hence, the procedural rules and practices followed
in the Courts provide for listing matters out of turn, as directed
by the concerned court, depending on the urgency of the
matters.
44. In Dhanbad Fuels (P) Ltd. , the Apex Court has explained
in paragraphs 49 to 52 how the expression “urgent interim relief”
is to be construed, which reads as under:
“49. Further, it is also pertinent to note that Section 12-A of
the 2015 Act does not contemplate leave of the court for filing a
suit which contemplates an urgent interim relief, as is clear from
the language and words used in the provision. The provision
also does not necessarily require an application seeking
exemption if a suit is being filed without pre-institution mediation.
An application seeking waiver on account of urgent interim relief
setting out grounds and reasons may allay a challenge and
assist the court, but in the absence of any statutory mandate or
rules made by the Central Government, an application per se is
not a condition under Section 12-A of the 2015 Act. Pleadings
on record and oral submissions would be sufficient in ordinary
course.
50. This Court in Yamini Manohar v. T.K.D. Keerthi [Yamini
Manohar v. T.K.D. Keerthi, (2024) 5 SCC 815 : (2024) 3 SCC
(Civ) 436] while interpreting the import of the expression “a suit
which does not contemplate any urgent interim relief” used in
35/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

Section 12-A of the 2015 Act observed that the word
“contemplate” connotes to deliberate and consider. Further, the
legal position that the plaint can be rejected and not entertained
reflects application of mind by the court as regards the
requirement of “urgent interim relief”. The Court further observed
that the prayer of urgent interim relief should not act as a
disguise to get over the bar contemplated under Section 12-A.
However, at the same time, the Court observed that the mere
non-grant of the interim relief at the ad interim stage, when the
plaint is taken up for admission and examination would not
justify the rejection of the plaint under Order 7 Rule 11 CPC, as
interim relief is at times also granted after issuance of notice.
Further, even if after the conclusion of arguments on the aspect
of interim relief, the same is denied on merits, that would not by
itself justify the rejection of the plaint under Order 7 Rule 11.
51. The relevant observations from the said decision in Yamini
Manohar [ Yamini Manohar v. T.K.D. Keerthi , (2024) 5 SCC 815 :
(2024) 3 SCC (Civ) 436] are reproduced hereinbelow: ( Yamini
Manohar case [ Yamini Manohar v. T.K.D. Keerthi , (2024) 5 SCC
815 : (2024) 3 SCC (Civ) 436] , SCC p. 820, paras 10-12)
“ 10. We are of the opinion that when a plaint is filed under
the CC Act, with a prayer for an urgent interim relief, the
Commercial Court should examine the nature and the
subject-matter of the suit, the cause of action, and the prayer
for interim relief. The prayer for urgent interim relief should
not be a disguise or mask to wriggle out of and get over
36/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

Section 12-A of the CC Act. The facts and circumstances of
the case have to be considered holistically from the
standpoint of the plaintiff. Non-grant of interim relief at the ad
interim stage, when the plaint is taken up for
registration/admission and examination, will not justify
dismissal of the commercial suit under Order 7 Rule 11 of the
Code; at times, interim relief is granted after issuance of
notice. Nor can the suit be dismissed under Order 7 Rule 11
of the Code, because the interim relief, post the arguments,
is denied on merits and on examination of the three
principles, namely: ( i ) prima facie case, ( ii ) irreparable harm
and injury, and ( iii ) balance of convenience. The fact that the
court issued notice and/or granted interim stay may indicate
that the court is inclined to entertain the plaint.
11 . Having stated so, it is difficult to agree with the
proposition that the plaintiff has the absolute choice and right
to paralyse Section 12-A of the CC Act by making a prayer
for urgent interim relief. Camouflage and guise to bypass the
statutory mandate of pre-litigation mediation should be
checked when deception and falsity is apparent or
established. The proposition that the Commercial Courts do
have a role, albeit a limited one, should be accepted,
otherwise it would be up to the plaintiff alone to decide
whether to resort to the procedure under Section 12-A of the
CC Act . An “ absolute and unfettered right ” approach is not
justified if the pre-institution mediation under Section 12-A of
37/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

the CC Act is mandatory, as held by this Court in Patil
Automation [ Patil Automation (P) Ltd. v. Rakheja Engineers
(P) Ltd. , (2022) 10 SCC 1 : (2023) 1 SCC (Civ) 545] .
12 . The words “contemplate any urgent interim relief” in
Section 12-A(1) of the CC Act, with reference to the suit,
should be read as conferring power on the court to be
satisfied . They suggest that the suit must “contemplate”,
which means the plaint, documents and facts should show
and indicate the need for an urgent interim relief. This is the
precise and limited exercise that the Commercial Courts will
undertake, the contours of which have been explained in the
earlier paragraph(s). This will be sufficient to keep in check
and ensure that the legislative object/intent behind the
enactment of Section 12-A of the CC Act is not defeated.”
(emphasis supplied)
52. Thus, it becomes clear from a perusal of the aforesaid
decision in Yamini Manohar [ Yamini Manohar v. T.K.D.
Keerthi , (2024) 5 SCC 815 : (2024) 3 SCC (Civ) 436] that the
test under Section 12-A is not whether the prayer for the
urgent interim relief actually comes to be allowed or not, but
whether on an examination of the nature and the subject-
matter of the suit and the cause of action, the prayer of
urgent interim relief by the plaintiff could be said to be
contemplable when the matter is seen from the standpoint of
the plaintiff. Further, what is also to be kept in mind by the
courts is that the urgent interim relief must not be merely an
38/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

unfounded excuse by the plaintiff to bypass the mandatory
requirement of Section 12-A of the 2015 Act.”
emphasis applied by me
45. Therefore, the observations in the judgment in Kamla
Landmarc Real Estate that the foundation in the plaint for non-
compliance with Section 12-A must be tested by the Court by
considering various factors including the prior and post-filing
conduct of a plaintiff must be read in the context of the well-
established legal principles by the Apex Court that the test under
Section 12-A is whether on an examination of the nature and the
subject-matter of the suit and the cause of action, the prayer of
urgent interim relief by the plaintiff could be said to be
contemplable when the matter is seen from the standpoint of the
plaintiff. In Kamla Landmarc Real Estate, it is held that the
foundation in the plaint for non-compliance with Section 12-A
has to be tested by the Court by considering various factors,
including the conduct of the plaintiffs prior to and post-filing the
suit for applying the bar under Section 12-A. Thus, the reference
to the post-filing conduct of the plaintiff is a passing observation.
In view of the legal principles settled by the Apex Court, on the
39/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

test to be undertaken for the applicability of the bar under
Section 12-A, the said observation on post-filing conduct of the
plaintiff cannot be considered as a binding precedent.
46. Therefore, the post-filing stages of the suit would not be
relevant for considering whether the plaint can be rejected under
Order VII Rule 11(d) of the CPC on the ground of non-
compliance with the mandatory provision under section 12-A of
the said Act.
47. The Hon’ble Apex Court, in Yamini Manohar and Dhanbad
Fuels Private Limited, held that the facts and circumstances
should be considered holistically from the standpoint of the
plaintiff. This court, in Westin Infra World, Lakhani Realty LLP
and Dipti Co-operative Housing Society Ltd, following the well-
settled legal principles of the Apex Court, has taken the view
that there cannot be a straitjacket formula when examining the
justification for non-compliance with Section 12-A. After reading
the plaint as a whole, each suit has to be examined in the facts
and circumstances of that case for ascertaining whether non-
compliance with Section 12-A is justified on the ground that
urgent interim relief is contemplated from the plaintiff’s point of
40/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

view. It is held that considering the well-settled legal principles
by the Hon’ble Apex Court in the case of Dahiben, the power
conferred on the court to terminate a civil action is a drastic one
and thus conditions enumerated under Order VII Rule 11 of the
CPC are required to be strictly adhered to.
48. In a recent judgment of the Apex Court in Novenco
Building and Industry , it is held that a plaintiff can be exempted
from the requirement of Section 12-A only when the plaint and
the documents attached to it clearly show a real need for urgent
interim intervention and on a wholesome reading of the plaint
and the material annexed to the plaint ought to disclose the
need for urgent relief. It is held that the court must look at the
plaint, pleadings and supporting documents to decide whether
urgent interim relief is genuinely contemplated, and the court
may also look for immediacy of the peril, irreparable harm, risk
of losing rights/assets, statutory timelines, perishable subject-
matter, or where delay would render eventual relief ineffective.
49. In Novenco Building and Industry , the prayer for injunction
was made in a suit alleging continuing infringement ofpatent

and design rights. The Apex Court held that a prayer for an
41/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

injunction cannot be characterised as mere camouflage to
evade mediation when it was areal grievance founded on the
continuing nature ofinfringement and irreparable prejudice likely

to be caused. It was held that the court must look beyond the
time lag and evaluate the substance of the plea for interim
protection. The Apex Court held in paragraph 24 that“…..The
insistence of pre-institution mediation in asituation ofongoing
infringement, ineffect, would render the plaintiff remediless

allowing the infringer to continue to profit under the protection of
procedural formality. Section 12A ofthe Act was not intended to
achieve such kind ofanomalous result.

CONCLUSIONS:
50. It is therefore a well-settled legal principle that the test for
“urgent interim relief” is whether, on the examination of the
nature of and the subject matter of the suit and the cause of
action, the plaintiff's prayer for urgent interim relief could be said
to be contemplable, when the matter is seen from the standpoint
of the plaintiff. Thus, if the test for urgent interim relief is satisfied
notwithstanding the actual outcome on merits, the suit can be
proceeded with without compliance with Section 12-A.
42/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

51. In the present case, the pleadings in the plaint for seeking
urgent interim relief are based on the precipitative action taken
by the defendants, which, according to the plaintiffs, is in breach
of the profit-sharing agreement executed by defendant no. 3 and
breach of the terms and conditions of the Framework Agreement
executed by defendant nos. 1 and 2. Hence, it is alleged in the
plaint that, despite availing the benefit under the said
agreements, defendant nos. 1 and 2 have sought to enforce the
security and take possession of the secured assets. Hence,
according to the plaintiffs, the possession notice initiated is
illegal, premature and unwarranted in view of the lump-sum
payments of the loans pursuant to the terms and conditions of
the Framework Agreement.
52. According to the plaintiffs, although they agreed and were
willing to allot the Celyn Premises to defendant no. 2, no
response has been received to accept the allotment. Hence, the
plaintiffs issued a legal notice to defendant nos. 1 and 2,
intimating them that their actions constituted derivations from the
terms and conditions of the Framework Agreement on their part,
although the plaintiffs had taken all the necessary steps to
43/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

comply with the terms and conditions and shown readiness and
willingness to transfer the Celyn Premises to defendant nos. 1
and 2. Thus, the plaintiffs have expressed apprehension that,
despite the defendants availing the benefit under the two
agreements, actions are being initiated to realise the secured
assets. Hence, to protect the plaintiffs’ interest in view of the
profit-sharing agreements with defendant no. 3 and the
Framework Agreement with defendant nos. 1 and 2, the suit is
filed for seeking urgent interim relief without complying with the
mandatory requirement under Section 12-A of the said Act.
53. Thus, if seen from the standpoint of the plaintiffs, urgent
interim relief is contemplated in the suit. Hence, by applying the
well-settled legal principles as discussed in the above
paragraphs, when a suit contemplates urgent interim relief, it
cannot be rejected at the threshold by applying the bar under
Section 12-A of the said Act. I have recorded reasons in the
above paragraphs that the bar under Section 34 of the
SARFAESI Act and Section 41 of the Specific Relief Act cannot
be applied for rejection of the plaint at the threshold. Hence, no
ground contemplated under Order VII Rule 11 of the CPC is
44/45
::: Uploaded on - 04/05/2026 ::: Downloaded on - 04/05/2026 19:43:24 :::

2-IA-4596-2025.docx

made out for rejection of the plaint at the threshold.
54. For the reasons recorded above, interim applications for
rejection of the plaint under Order VII Rule 11 of the CPC are
dismissed.
[GAURI GODSE, J.]
45/45