Indian Wind Power Association & Ors. vs Union Of India Through Secretary, Ministry Of Power Mop & Ors.
- Court
- Delhi High Court
* IN THE HIGH COURT OF DELHI AT NEW DELHI
Judgment Reserved on: 03.09.2026
% Judgment Delivered on: 30.09.2026
# CNR No. DLHC010247972025
+ W.P.(C) 5531/2025 & CM APPL. 25158/2025, CM APPL.
25159/2025, CM APPL. 25160/2025 & CM APPL. 4479/2026
INDIAN WIND POWER ASSOCIATION & ORS. .....Petitioners
versus
UNION OF INDIA THROUGH SECRETARY, MINISTRY OF
POWER MOP & ORS. .....Respondents
Advocates who appeared in this case
For the Petitioners : Mr. Jayant Mehta, Senior Advocate
with Mr. Om Shelat, Mr. Pratyush
Singh, Mr. Vishrov Mukerjee, Mr.
Damodar Solanki, Mr. Snehal
Upadhyay, Ms. Juhi, Advocates.
For the Respondents : Ms. Radhika Bishwajit Dubey, CGSC
with Mr. Vivek Nagar, GP, Ms.
Gurleen Kaur Waraich, Mr. Kritarth
Upadhyay, Mr. Vivek Sharma, Mr.
Amulya Dev Sharma and Mr.
Saksham Sharma, Advocates for R-1,
R-2, R-4, R-5 & R-6.
Mr. TVS Raghavendra Sreyas with
Mr. Siddharth Vasudev Advocates.
CORAM:
HON'BLE THE CHIEF JUSTICE
HON'BLE MR. JUSTICE TEJAS KARIA
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 1 of 18
JUDGMENT
TEJAS KARIA, J
CM APPL. 30522/2026
1. The Present Petition has been filed inter alia challenging the
constitutional validity of Regulation 8(1) of the Central Electricity
Regulatory Commission (Deviation Settlement Mechanism and Related
Matters) Regulations, 2022 (“ 2022 Regulations ”); the Suo Motu Orders
dated 26.12.2022, 06.02.2023 and 09.05.2024 issued thereunder by
Respondent No. 3, Central Electricity Regulatory Commission (“ CERC ”);
and the consequential Deviation Settlement Mechanism (“ DSM ”) demands
raised / to be raised by Respondent No. 8, Andhra Pradesh State Load
Despatch Centre (“ APSLDC ”) on the Petitioners.
2. The present Application has been filed by Petitioner Nos. 2 and 3
(“ Applicants ”) under Section 151 of the Code of Civil Procedure, 1908
seeking directions for compliance with interim orders dated 29.04.2025 and
23.05.2025 (“ Interim Orders ”), whereby APSLDC was directed to not take
any coercive action. It is Applicants’ case that despite the Interim Orders,
APSLDC is taking a coercive action of withholding No Objection
Certificate (“ NOC ”) / Standing Clearance for open access, preventing the
Applicants from evacuating power from their respective Wind Power
Projects.
3. It the case of the Applicants that despite operation of the Interim
Order dated 29.04.2025, on 16.05.2025, APSLDC/APTRANSCO, the parent
organisation of APSLDC, directed the Applicants to pay the outstanding
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 2 of 18
DSM demands as a condition for obtaining NOCs for Short-Term Open
Access. Consequently, the Applicants filed an application bearing CM
APPL No. 31959 of 2025 before this Court seeking ad-interim stay on the
email dated 16.05.2025 and directions to the Respondents to not terminate or
withhold the NOC for supply of power through Short-Term Open Access, in
terms of the Interim Order dated 29.04.2025.
4. Accordingly, this Court passed Interim Order dated 23.05.2025 in the
present Petition, whereby APSLDC / APTRANSCO were directed to
reconsider the email dated 16.05.2025 and to comply with the directions
contained in the Interim Order dated 29.04.2025. Thereafter, from May 2025
onwards, APSLDC / APTRANSCO issued NOCs / Standing Clearances to
the Applicants on a month-to-month basis for the full capacity of their
respective Wind Projects.
5. In April 2026, the Applicants applied for the grant of Short-Term
Open Access for the month of May 2026 on the National Open Access
Registry (“ NOAR ”) portal.
6. Vide communication dated 28.04.2026, APSLDC directed the
Applicants to make complete payment of the outstanding DSM amounts for
processing of the application for grant of NOC / Standing Clerance stating
that “ clear the DSM dues for processing the application in NOAR by
30/04/2026 ”.
7. On 30.04.2026, APSLDC granted NOCs to the Applicants for a
period of seven days in May 2026, namely, from 01.05.2026 to 07.05.2026,
citing “ Persistent over-scheduling and significant under-injection by the
Notices in violation of the schedule discipline obligations under the IEGC,
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 3 of 18
2023 — Accumulation of unpaid statutory dues under the CERC (DSM)
Regulations, 2022 / 2024 … ” as the reason therefor.
8. On 30.04.2026, APSLDC issued a show-cause notice (“ Show Cause
Notice ”) to the Applicants, seeking recovery of the outstanding DSM dues
and calling upon them to show cause as to why the NOCs should not be
withheld on account of the alleged “ threat to Grid Security and non-payment
of the entire DSM demands… ”. It further stated that “Upon the constraint to
grid security being demonstrably cured – by the clearance of the
outstanding statutory dues set out in paragraph 5, by the demonstration of
sustained schedule discipline going forward, and by such other corrective
measures as APSLDC may direct – the standing clearance shall be revived
at the earliest … ”.
9. On 07.05.2026, APSLDC issued NOCs to the Applicants for the
period from 08.05.2026 to 31.05.2026 for part of the capacity of the
Applicants’ projects. APSLDC further stated that it had no objection to
issuing NOCs for the full capacity, provided that the Applicants furnished an
undertaking that generation would conform to the schedule and would not
involve abnormal or continuous under-injection.
10. On 14.05.2026, the Applicants furnished the requisite undertaking
(“ Undertaking ”) to APSLDC.
11. From 01.06.2026, APSLDC continued to issue NOCs to the
Applicants on a weekly basis for part of the capacity of the Applicants’
Wind Projects (“ Wind Projects ”). Aggrieved by the continued restriction,
the Applicants filed the present Petition inter alia seeking directions to: -
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 4 of 18
a. APSLDC to not withhold or revoke the NOC / Standing
Clearance for grant of Open Access for May 2026 and subsequent
months in terms of the Interim Orders dated 29.04.2025 and
23.05.2025 passed by this Court;
b. Respondent No. 7, Grid Controller of India to ensure that
uninterrupted access is granted to the Applicants irrespective of
APSLDC’s instructions; and
c. APSLDC to process and grant NOC / Standing Clearance for
Open Access to the Applicants for the entire month of May 2026
and subsequent months, without insisting on complete payment of
DSM amounts.
SUBMISSIONS ON BEHALF OF THE PETITIONERS
12. Learned Senior Counsel made the following submissions on behalf of
the Applicants:
12.1. The Applicants are protected against coercive action under the
2022 and 2024 Regulations. Accordingly, APSLDC cannot
recover the DSM demands from them during the subsistence of
the Interim Orders. Despite the Interim Orders, APSLDC has,
since May 2026, withheld NOCs / Standing Clearances for the
full capacity of the Wind Projects solely due to non-payment of
DSM demands.
12.2. NOCs are sought for the projects’ full installed capacity. Daily
schedules, however, are submitted by the Applicants and
confirmed by APSLDC based on the day’s forecast; the scheduled
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 5 of 18
quantum may be equal to or lower than, but cannot exceed, the
NOC quantum.
12.3. APSLDC’s initial communication dated 28.04.2026 did not refer
to grid security. That ground was raised for the first time in the
Show Cause Notice, without supporting evidence; the Show
Cause Notice further stated that grid security concerns could be
cured by payment of DSM dues, upon which NOCs would be
restored.
12.4. Despite the Undertaking, APSLDC did not issue NOCs for the
full capacity. It must therefore establish the independent and
continuing grid-security constraint that persisted despite
compliance with its stipulated condition.
12.5. Since 01.06.2026, APSLDC has issued weekly NOCs only for
part of the Wind Projects’ capacity, without reasons. Unlike the
May 2026 NOCs, those issued from June 2026 do not cite “ Grid
Security ” as the basis for withholding full-capacity NOCs.
12.6. Any grid-security restriction must be supported by technical data
and an operational constraint linked to its quantum and duration.
APSLDC’s letter dated 09.07.2026, tendered at the hearing on
03.09.2026, merely reiterates the Show Cause Notice and gives no
reason for withholding NOCs from June 2026.
12.7. The record shows that APSLDC restricted the Applicants’ NOCs
for non-payment of DSM dues; grid security was invoked only
subsequently. APSLDC’s own Show Cause Notice and the May
2026 NOCs confirm this basis. Payment of DSM dues could not,
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 6 of 18
in any event, restore frequency, voltage, transmission margins, or
any other operational-security parameter.
12.8. Restricting NOCs to part capacity during the peak wind season
causes irreversible loss of renewable generation by preventing the
Applicants from scheduling higher generation when available.
Apart from violating the Interim Orders, APSLDC’s action is
contrary to:
a. ‘ Must-Run ’ status granted to Wind Projects under Electricity
(Promotion of Generation from Renewable Energy from
Renewable Energy) Rules, 2021 and Regulation 5.2(u) and
6.5(11) of Grid Code 2010.
st th
b. 1 and 5 Proviso to Section 42(2) of the Electricity Act, 2003
which provides that non-discriminatory Open Access is to be
mandatorily provided to a generating company and no
extraneous conditions can be imposed for grant of Open
Access.
12.9. The learned Appellate Tribunal for Electricity (“ APTEL ”) in its
judgment dated 11.09.2025 passed in Tanot Wind Power Venture
Pvt. Ltd. v. RERC & Ors. , Appeal No. 108 of 2018 - has held that
curtailment of renewable generation shall not be considered as
meant for grid security if generation is being curtailed under the
following conditions:
a. System Frequency is in the band of 49.90Hz-50.05Hz; and
b. Voltage is between 380kV-420kV for 400kV systems &
198kV- 45kV for 220kV systems.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 7 of 18
12.10. Under or over-injection, being the difference between actual
generation and the day-ahead schedule, is inherent in wind
generation due to variations in wind speed and velocity. The DSM
framework expressly contemplates and commercially settles
deviations between scheduled and actual injection. A deviation,
by itself, does not establish a grid-security event; were every
deviation to warrant curtailment, the DSM Regulations would
serve no purpose.
12.11. In view of the definition of grid security in Regulation 3(1)(66) of
the IEGC 2023 and APTEL’s directions in Tanot ( supra ),
APSLDC was required to show that grid frequency or voltage fell
outside the prescribed limits from May 2026. No such particulars
have been furnished.
12.12. Only the Applicants’ full-capacity NOCs have been withheld. No
other generator connected to the same sub-station or nearby has
been curtailed on the asserted ground of grid security. A genuine
grid-security constraint would ordinarily affect other projects as
well.
12.13. APSLDC has not disclosed any project, sub-station, or network
specific operational basis for restricting only the Applicants’
NOCs. The continuing restriction is therefore arbitrary and
unsupported by any demonstrated grid-security concern.
12.14. Historical deviations from June to December 2025 cannot
establish a continuing grid-security threat from May 2026.
APSLDC must identify a contemporaneous operational constraint,
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 8 of 18
the security limit breached, and how the restricted NOC quantum
addresses it; absent such evidence, reliance on historical data is
arbitrary and technically unsupported.
12.15. APSLDC’s Reply shows that, from July to December 2025, the
Applicants over-injected in 20–30% of the time blocks during the
period in which intentional over-scheduling and under-injection
are alleged. This data contradicts that allegation.
12.16. APSLDC cannot invoke the CERC (General Network Access)
Regulations, 2022 (“ GNA Regulations ”) to circumvent the
Interim Orders. NOCs issued from June 2026 do not cite “ grid
security ”, indicating that full-capacity NOCs were withheld for
non-payment of DSM dues, contrary to the Interim Orders.
12.17. Deviations are neither deliberate nor avoidable in variable wind
generation, particularly where accurate day-ahead forecasting is
difficult and generators selling power on exchanges cannot revise
their schedules.
12.18. APSLDC’s historical deviation figures are inflated and
inconsistent with Regulation 6(2) of the CERC DSM Regulations.
Applying the prescribed formula yields deviations of only 15–
17%, while wind generators incur no penalty up to 15%. Ordinary
over-scheduling or under-injection does not threaten grid security,
and APSLDC has produced no frequency logs, voltage profiles,
grid reports, or other technical material required under Tanot
( supra ). Past deviations cannot justify continuing commercial
curtailment on grounds of grid security.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 9 of 18
12.19. The GNA Regulations and the Temporary-General Network
Access (“ T-GNA ”) Procedure do not allow NOCs to be withheld
or reduced solely because of past under-injection. Regulation 31.5
of the GNA Regulations and Clause 5(t) of the Revised T-GNA
Procedure allow Standing Clearance to be reduced only when
there are transmission-system constraints or when required for
grid security. Past deviations must therefore be connected to a
current operational constraint.
12.20. Clause 5(t) of the Revised T-GNA Procedure allows curtailment
for grid security. APSLDC’s reliance on Clause 12(a) shows that
the curtailment is linked instead to unpaid DSM dues. DSM
charges are penalties and are not covered by Clause 12(a). In any
event, only the Regional Load Despatch Centre, and not
APSLDC, may exercise that power.
12.21. An NOC is not forecast-based. The schedule is the generator’s
day-ahead estimate and remains within the NOC quantum;
deviation is the difference between scheduled and actual
generation and is settled under the DSM framework. As wind
generation is variable, deviations are unavoidable, and the
Impugned Regulations exempt deviations up to 15%. APSLDC’s
withholding of NOC / Standing Clearance for May 2026 and
subsequent months is therefore inconsistent with the scheduling
and DSM framework.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 10 of 18
SUBMISSIONS ON BEHALF OF APSLDC:
13. The learned Counsel for the APSLDC made the following
submissions on behalf of APSLDC:
13.1. The impugned Demand Notices dated 09.04.2025 calculate
deviation thresholds and penalties under the 2022 Regulations, as
adopted in the APERC Regulations, 2017 by APERC’s order
dated 21.09.2023. APSLDC’s authority to issue the Demand
Notices therefore arises from the APERC Regulations, 2017, and
not from any CERC regulation.
13.2. The Demand Notices relate to the period from 27.05.2024 to
15.09.2024. The 2022 Regulations were repealed on 16.09.2024,
when the 2024 Regulations came into force. Since then, APSLDC
has computed deviation penalties and energy charges under the
2024 Regulations, pursuant to APERC’s order dated 21.09.2023. This
is evident from later demands raised against the Petitioners, which
remain unpaid, and from payments collected from other generators.
13.3. The present Petition challenges only Regulation 8(1) of the 2022
Regulations, which ceased to operate on 16.09.2024. It does not
challenge the APERC Regulations, 2017 or APERC’s order dated
21.09.2023, which remain the source of APSLDC’s authority.
Therefore, no interim relief can extend to deviation penalties or
energy charges raised after September 2024. Even if full-quantum
T-GNA NOCs were withheld to secure payment of DSM dues,
current dues do not arise under the 2022 Regulations and fall
outside the present Petition.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 11 of 18
13.4. The Applicants are intra-State entities in Andhra Pradesh,
connected to the State grid and governed by the APERC
Regulations, 2017, as amended. They are therefore subject to
APSLDC’s powers concerning despatch and deviation settlement.
The adoption of CERC thresholds and penalties into the APERC
Regulations does not confer jurisdiction on CERC. Accordingly,
this Court lacks territorial jurisdiction, as no material cause of
action arose within Delhi and the Petition contains no proper
pleading to that effect. Reliance was placed on State of Goa v.
Summit Online , (2023) 7 SCC 791.
13.5. The absence of material pleadings is significant. In W.P.(C) No.
16060 of 2022, which also challenged the 2022 Regulations, this
Court observed on 08.01.2025 that the petition prima facie “ did
not survive ” because the Regulations were “ no longer in
operation ”. Neither APSLDC nor any State authority or
regulatory commission was a party to that case. Soon thereafter,
the same counsel filed the present Petition, adding APSLDC as a
party and obtaining the Interim Orders.
13.6. Delegated legislation may be stayed only if it is manifestly
arbitrary or unconstitutional. The 2022 Regulations, the APERC
Regulations, 2017, and APERC’s order dated 21.09.2023 were
issued after due consultation and consideration of the technical
issues raised by the Petitioners. The required threshold for interim
interference is therefore not met. Reliance was placed on Bhavesh
v. Union of India, (2000) 5 SCC 471.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 12 of 18
13.7. The Petition does not challenge the T-GNA framework under the
CERC GNA Regulations, the procedure framed under them, or
the recovery of energy charges. The Applicants cannot avoid
those charges by relying on the Interim Orders or seek relief
beyond the Petition. Any dispute concerning APSLDC’s
regulation of NOC quantum lies before APERC under Section
86(1)(f) of the Electricity Act, 2003. In view of this statutory
remedy, writ jurisdiction should not be invoked. Reliance was
placed on Jaipur Vidyut v. M.B. Power , (2024) 8 SCC 513.
13.8. Any writ challenge to APERC’s regulation of NOC quantum
would lie before the Andhra Pradesh High Court, which exercises
supervisory jurisdiction over APERC under Article 227 of the
Constitution. Therefore, relief of the nature sought in this
Application cannot be granted by this Court.
13.9. The Application concerns revocation or withdrawal of NOCs for
non-payment of DSM dues under Regulation 12(a) of the
Procedure for Grant of NOC, 2023. The Applicants now seek full-
quantum NOCs, which would restrict APSLDC’s power under
Regulation 5(t) to regulate the quantum and duration of NOCs
because of transmission constraints or grid-security concerns. The
scope of interim relief cannot be expanded beyond the prayers in
the Application.
13.10. Without prejudice to these submissions, APSLDC’s regulation of
the Applicants’ NOC quantum is not intended to compel payment
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 13 of 18
of DSM dues in breach of the Interim Orders. Despite the
Undertaking, the Applicants continued to seek NOCs for full
capacity, enabling schedules beyond reasonable generation
estimates. The Undertaking was therefore ineffective.
13.11. APSLDC explained the basis for regulating the duration and
quantum of T-GNA NOCs in its detailed letter dated 09.07.2026.
Despite having an opportunity, the Applicants did not address that
letter in their Rejoinder.
13.12. The letter dated 09.07.2026 states that APSLDC regulated the
duration and quantum of the Applicants’ T-GNA NOCs because
of persistent under-injection, which increased after the Interim
Orders. APSLDC states that these measures were necessary to
address repeated schedule deviations, protect grid security, and
reduce stress on the transmission system.
13.13. The Interim Orders do not affect APSLDC’s separate duty to
maintain grid discipline. APSLDC may therefore regulate the
quantum and duration of NOCs under the T-GNA framework to
address the Applicants’ deviations.
13.14. Full-capacity NOCs for an entire month allow the Applicants to
schedule higher day-ahead energy and receive payment for the
scheduled quantum, even if actual injection is lower.
APDISCOMs must then procure the shortfall in the short-term
market. Under the proviso to Regulation 8(1) of the 2022
Regulations, APSLDC may recover these energy charges from the
Applicants. However, relying on the Impugned Orders, the
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 14 of 18
Applicants have not paid those charges despite receiving payment
for the scheduled energy.
13.15. The Applicants have not established any ground for relief, and the
Application should be dismissed. Since the 2022 Regulations
ceased to operate on 16.09.2024, the Interim Order should be
clarified to apply only to deviation penalties raised up to that date
and not to energy charges arising from any actual shortfall
between delivered energy and the Applicants’ Day-ahead
schedules.
ANALYSIS AND FINDINGS
14. We have considered the submissions made on behalf of the Parties
and perused the material placed on record.
15. The principal issue arising for consideration in the present
Application is whether, in view of the Interim Orders, APSLDC is entitled
to withhold or restrict the grant of NOC / Standing Clearance to the
Applicants for Open Access on account of non-payment of the DSM dues
covered by the Interim Orders.
16. By the Interim Orders, this Court directed that no coercive steps be
taken pursuant to the 2022 Regulations until the next date of hearing.
Thereafter, APSLDC, by email dated 16.05.2025, demanded payment of the
outstanding amount and the production of a No Dues Certificate, failing
which the NOC for Short-Term Open Access was proposed to be
terminated. Upon being approached by the Petitioners, this Court, by order
dated 23.05.2025, directed APSLDC to reconsider the email dated
16.05.2025 and comply with the Interim Order dated 29.04.2025.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 15 of 18
17. Thus, the Interim Orders protect the Applicants against coercive
action pursuant to the 2022 Regulations. The order dated 23.05.2025 further
clarifies that APSLDC cannot, contrary to that protection, make payment of
the DSM dues covered by the Interim Orders a condition for the
continuation of the NOC / Standing Clearance.
18. In the present case, APSLDC’s communication dated 28.04.2026
expressly required the Applicants to clear the DSM dues before their
applications for Open Access could be processed. Thereafter, while granting
NOCs only for the period from 01.05.2026 to 07.05.2026, APSLDC
referred, inter alia , to the accumulation of unpaid statutory dues under the
2022 Regulations / 2024 Regulations. The Show Cause Notice likewise
referred to the non-payment of DSM demands and stated that the Standing
Clearance would be revived upon, inter alia , clearance of the outstanding
statutory dues.
19. These communications clearly show that APSLDC restricted the
Applicants’ NOC / Standing Clearance because the DSM dues had not been
paid. While the Interim Orders remain in force, APSLDC cannot make
demand of those dues a condition precedent for granting or continuing the
NOC / Standing Clearance. Doing so would indirectly recover the dues
despite Interim Orders.
20. However, the Interim Orders do not require APSLDC to grant NOC /
Standing Clearance for the Wind Projects’ full installed capacity or for any
fixed period. The Interim Order dated 29.04.2025 only protects the
Applicants from coercive action under the 2022 Regulations, and the Interim
Order dated 23.05.2025 requires APSLDC to respect that protection.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 16 of 18
21. APSLDC has sought to justify the restriction on the ground that over-
scheduling and under-injection adversely affected grid security. The
Applicants disputed this contention and submitted that grid security was
invoked only as an afterthought. It was further submitted by the Applicants
that, despite the furnishing of the Undertaking and the omission of any
reference to grid security in the NOCs issued from June 2026 onwards,
APSLDC continued to issue NOCs only for part of the capacity.
22. For the purposes of adjudicating the present Application, it is not
necessary to determine whether the material relied upon by APSLDC
establishes a continuing threat to grid security and whether NOCs ought to
be granted for the full capacity and for entire month. The scope of the
present Application is limited to ensuring compliance with the Interim Orders.
23. The Interim Orders cannot, however, be construed as requiring
APSLDC to grant NOCs for any specified capacity or duration in case of
existence of other permissible grounds under the applicable regulatory
framework, provided that the NOCs / Standing Clearances are not withheld,
revoked, or restricted on account of unpaid DSM dues covered by the
Interim Orders.
24. APSLDC shall remain at liberty to regulate the grant, capacity, or
duration of the NOC / Standing Clearance on any independent ground
permissible under the applicable regulations, provided that such action is not
founded upon the non-payment of those DSM dues. Likewise, the
Applicants are at liberty to avail any such legal remedies as may be available
to them under the applicable regulations in respect of any grievance relating
to the capacity or duration of the NOC / Standing Clearance.
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 17 of 18
25. In view of the foregoing, the Applicants’ prayer for the grant of NOC
/ Standing Clearance for the full capacity of their Wind Projects for the
entire month cannot be granted in the present Application. APSLDC is,
however, directed to ensure strict compliance with the Interim Orders dated
29.04.2025 and 23.05.2025 by not withholding, revoking or restricting the
NOCs / Standing Clearances on account of unpaid DSM dues covered by the
Interim Orders during their subsistence.
26. With the aforesaid observations and directions, the present
Application stands disposed of.
TEJAS KARIA, J
DEVENDRA KUMAR UPADHYAYA, CJ
SEPTEMBER 30, 2026
HK
Signature Not Verified
Signed By:NEELAM
SHARMA
Signing Date:01.10.2026
14:10:13
W.P.(C) 5531/2025 Page 18 of 18