Bank Of India vs B N Enterprise

Court
Bombay High Court

CNR No : HCBM020118952024

2026:BHC-OS:21890
F-J-CARBP-222-2025.doc


IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
IN ITS COMMERCIAL DIVISION
COMMERCIAL ARBITRATION PETITION NO. 222 OF 2025
Bank Of India …Petitioner
Versus
1. B N Enterprise,
2. Mr. Mansukh Shah,
3. Mr. Aakash Shah,
4. Tulsidas Gopalji Charitable & Dhakleshwar
Temple Trust
…Respondents
ASHWINI
JANARDAN
VALLAKATI
Digitally signed by
ASHWINI JANARDAN
VALLAKATI
Date: 2026.10.07
16:15:56 +0530
Mr. Ankit Lohia a/w Mr. Siddha Pamecha, Mr. Jayant Jain, Mr. Amit
Yadav, i/b Thodur Law Associates, for Petitioner.
Mr. Abhinav Chandrachud, Counsel, a/w Mr. Aadil Parsurampuria, i/b
Mr. Yogesh Devnani, for Respondent Nos. 1 to 3.
Mr. Ramashish S. Maurya, for Respondent No. 4.
CORAM: SOMASEKHAR SUNDARESAN, J.
DATE : OCTOBER 7, 2026
JUDGEMENT :
Context and Factual Background:
1. This Petition is filed by Bank of India (“ Bank ”), a nationalised bank,
under Section 9 of the Arbitration and Conciliation Act, 1996 (“ the Act ”), for
Page 1 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


interim protective measures pending commencement of arbitration. The Bank
had a leased office from which its Mahalaxmi Branch was functioning, namely,
8A, Bhulabhai Desai Road, near Mahalaxmi Temple, Mumbai 400026.
Currently, the branch functions from premises at Sambhav Tirth Co-operative
Housing Society Ltd. at Bhulabhai Desai Road, Mumbai after vacating it to
enable redevelopment.
2. The Bank seeks reimbursement of the transit rent it has already paid
and to secure the future payment of transit rent for its temporary alternate
accommodation, which it says Respondent No. 1, M/s B.N. Enterprises, a
partnership firm (“ Developer ”) undertook to bear and to secure its re-
induction into the redeveloped building. Respondent Nos. 2 and 3, Mansukh
H. Shah and Aakash M. Shah respectively, are partners of the Developer.
3. Respondent No. 4, The Tulsidas Gopalji Charitable and Dhakleshwar
Temple Trust (“ TG Trust ”), is a public charitable trust registered under the
Bombay Public Trusts Act, 1950. TG Trust is the owner of the Sanatorium
Building at 8A, Bhulabhai Desai Road, near Mahalaxmi Temple, Mumbai
400026, which stands on land bearing C.S. No. 792 (part) of Malabar and
Cumballa Hill Division, Mahalaxmi, Mumbai 400026, admeasuring about
1,292 sq. mtrs. out of a larger plot of about 6,043.54 sq. mtrs. (“ Subject
Property ”).
Page 2 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


4. A registered Development Agreement dated August 26, 2014 between
TG Trust and the Developer (“ Development Agreement ”), a Memorandum of
Understanding dated March 30, 2022 (“ MOU ”) executed between the
Developer, TG Trust and the Bank; and an Agency Agreement dated December
4, 2021 between the Bank and the Court Receiver, High Court, Bombay
(“Agency Agreement”) lie at the heart of the controversy.
5. The Development Agreement entails grant of development rights by TG
Trust to the Developer over the Subject Property. A power of attorney was
executed in favour of the then partners of the Developer on the same date.
These proceedings concern premises admeasuring 3,926 sq. ft., comprising
the basement (about 979 sq. ft.) and the ground floor (about 2,947 sq. ft.)
(“Subject Premises”) situated on the Subject Property. The Bank is not a
signatory to the Development Agreement.
6. The Subject Premises had been leased by the TG Trust to the Bank by a
Lease Agreement dated October 5, 1964 covering a lease from September 1,
1962 for a term of 25 years. By Lease Deed dated June 4, 1991, the expired
term was revived and renewed from September 1, 1987, for a further 25 years,
until August 31, 2012. What transpired after expiry of the extended term on
August 31, 2012 is in dispute between the Bank and TG Trust. The Bank has
Page 3 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


appended copies of acknowledgements of rent said to have been paid to TG
Trust from 1962 at Exhibit “A” to the Petition.
7. Clause 17 of the Development Agreement is the arbitration clause on
which the Bank bases the captioned Petition while Clause 18 is the jurisdiction
clause. They read as follows:
“17. Arbitration
In the event of any dispute or difference arising hereunder of whatsoever nature
between the parties concerning the meaning or interpretation of this Agreement or the
rights or obligations of the parties, the same shall be referred to Arbitration of Sole
Arbitrator who shall be a retired Judge of the Bombay High Court in case the parties
to the dispute or difference agree upon one or otherwise in accordance with the
provisions of the Arbitration and Conciliation Act, 1996. It is agreed by both parties
that the Arbitration shall be in English language and shall be conducted at Mumbai.
18. Jurisdiction.
The Parties hereto agree that the Courts at Mumbai only shall have jurisdiction in
respect of all matters whatsoever arising out of this Agreement.”
[Emphasis Supplied]
8. The redevelopment could not be completed within a period of three
years as envisaged in the original sanction order of the Charity Commissioner
granted to TG Trust. On the application of TG Trust made at the request of the
Developer, the Charity Commissioner, by order dated April 1, 2017, extended
the time limit for redevelopment by three years. That extension lapsed on
April 1, 2020 without the redevelopment having been commenced. A fresh
Page 4 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


extension was then sought by TG Trust by an application made on December
9, 2021, on revised terms of compensation offered by the Developer.
9. The Bank identified the alternate premises referred to above, in the
same vicinity. This property is custodia legis and in possession of the Learned
Court Receiver of this Court, appointed in Suit No. 332 of 2013. With the
permission of this Court, the Bank entered into the Agency Agreement on
December 4, 2021, to occupy those premises for five years, that is until
December 3, 2026, together with an Undertaking of the same date.
10. Under the Agency Agreement the Bank was required to place a security
deposit of Rs. 50,40,000/- and to pay monthly rent/royalty of Rs. 8,40,000/-.
Neither the Developer nor TG Trust is a party to the Agency Agreement or the
connected Undertaking.
11. The MOU was executed thereafter, on March 30, 2022. On its face, it is
a tripartite instrument: the Developer is described as the party of the First
Part; TG Trust, represented by its authorised Trustee Ashok Laxmidas
Bhansali pursuant to a resolution dated July 13, 2021, as the party of the
Second Part; and the Bank as the party of the Third Part. The MOU records at
Recital K, that pending consideration of such application, the Bank would
necessarily have to be shifted to suitable alternate premises for the
redevelopment to proceed, without naming which party was making the
Page 5 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


representation. The Bank contends that the consensus arrived at between the
Developer and TG Trust was represented to the Bank while TG Trust denies
making any representation to the Bank. The stated object of the MOU,
recorded in Recital L, is to record the terms and conditions for the
rehabilitation and settlement of the Bank. Whether TG Trust is in truth a
party to the MOU is being disputed. The clauses of the MOU principally relied
upon by the Bank are Clauses 5, 10, 11, 13, 15 and 19.
12. Clause 5 reads as follows:
“5. It is further agreed between the Developer and the Bank that the Developer
shall enter into a separate agreement with the Bank, after execution of Lease /Leave
& License/Agency Agreement or any other legally binding Agreement between the
Bank and its lessor/licensor/Agent for alternate premises. The Developer, hereby
acknowledges and agrees to bear expenses and make payment related to the rent only.
The water and electricity charges pertaining to the alternate premises where the Bank
proposes to shift during the transition period will have to be paid by the Bank alone.
For the sake of clarity, it is hereby agreed between the Developer and the Bank that
with effect from the date of taking actual possession of the alternate premises the
Developer shall bear for and on behalf of the Bank the expenses of rent only and
charges related to electricity, water, GST, Society maintenance charges including
property tax etc. in respect of the temporary accommodation will have to be paid by
the Bank only till the time the Bank is put into possession of the new premises after
the completion of redevelopment of the Sanatorium Building. The Bank will handover
the vacant and peaceful possession of the said existing Premises to the TG Trust or to
the Developer within 15 days upon receiving the Order of Extension for
Redevelopment of the Second Schedule property including the Sanatorium Building
Page 6 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


from the Ld. Charity Commissioner.”
[Emphasis Supplied]
13. Therefore, it is apparent that the expense of the rent was payable by the
Developer under the MOU; other expenses and outgoings were to be paid by
the Bank.
14. Clause 10 of the MOU reads as follows:
“10. It is further agreed and acknowledged by the Developer that they will offer the
New Premises on first priority to the Bank, and if the construction is to be completed
in a phased manner, on first phase itself the New Premises will be allotted and the
Bank will be re-inducted in the newly constructed premises subject to the terms and
conditions contained herein. As and when the New Premises for housing the branch
premises is ready in the proposed new building, the same shall be communicated to
the Bank immediately by the Developer and Bank has to shift to the new premises only
after receipt of the Occupancy Certificate. It is clarified that the allotment on rent or
outright sale of the New Premises to the Bank shall only be out of the 60% entitlement
of the Developer.”
[Emphasis Supplied]
15. The Under Clause 10 of the MOU, it was clear that the Bank would be
relocated into the Subject Property after redevelopment soonest and the Bank
would get premises in lieu of the Subject Premises either on rent or on
outright sale (“ New Premises ”). Any further sale was to come out of the sale
component entitlement of the Developer.
Page 7 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


16. Clause 11 of the MOU gives the Bank a right of first refusal in respect of
the New Premises, and further clarifies that any settlement arrived at between
the Bank and the Developer shall be without recourse against TG Trust, which
“ shall not be liable or responsible for any of the obligations undertaken by the
Developer under these presents ”.
17. Clause 12 of the MOU (akin to Clause 10) provides that possession of the
New Premises is to be handed over only after the Occupancy Certificate is
obtained. Clause 13 of the MOU reads as follows:
“13. It is agreed, accepted and acknowledged by the Developer and the Bank that
the present MOU is being entered into between the Parties hereto on the premise that
the Ld. Charity Commissioner shall grant to TG Trust extension of time for joint
development of the said Plot once Fresh Extension Application is made by TG Trust.
In the event, the Ld. Charity Commissioner does not grant extension of time as
contemplated herein, the Developer shall be the solely responsible to discharge the
obligation of granting alternative premises to the Bank in any place nearby the
existing premises having clear road facing excluding the said Plot at its own cost and
expenses to the Bank for the surrender of said Premises. … In the event the Ld.
Charity Commissioner grants extension of time as prayed for in the Fresh Extension
Application, and the Developer obtains IOD for the purpose of redevelopment, TG
Trust shall hand over possession of the said Premises to the Developer to enable the
Developer to give the Bank option of lease or outright purchase as stated
hereinabove.”
[Emphasis Supplied]
Page 8 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


18. What becomes clear, prima facie , is that the obligations owed to the
Bank under the MOU to pay rent for alternate premises and to provide New
Premises were obligations of the Developer owed to the Bank. Even the
redeveloped premises that were to come to the Bank was to be from the
Developer’s sale component. TG Trust was kept out of these rights and
obligations under Clause 11 of the MOU. However, TG Trust was obliged
under Clause 13 of the MOU, to hand over possession of the Subject Premises
to the Developer to enable the Developer to give the Bank the option of a
further lease or an outright purchase.
19. Clause 15 of the MOU is also noteworthy and provides as follows:
Developer and TG Trust state that at the time of execution of this MOU there is no
dispute/litigation of any nature pending with respect to the Development Agreement,
or with respect to the title /ownership of the said Plot. It is further clarified that upon
grant of extension of time by the Ld. Charity Commissioner as stated hereinabove,
there will be no legal impediment for allotting New Premises on lease or outright sale
in the proposed new building to the Bank subject to the terms and conditions recorded
in the Development Agreement.
[Emphasis Supplied]
20. Notably, the MOU contains no arbitration clause. Clause 19 of the MOU
provides as follows:
“19. The stamp duty and registration charges of this MOU, if any, will be paid
solely by Bank herein and the other parties to this MOU shall not be liable to bear the
Page 9 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


same. This MOU has been executed at Mumbai, the property is situated at Mumbai
and hence it is subject to the jurisdiction of the Courts of Law at Mumbai.”
[Emphasis Supplied]
21. On March 31, 2022, one day after the MOU was executed, a sum of Rs.
Rs. 25,00,000/- was paid to the Bank towards the security deposit for the
alternate branch premises. While there was an inconsistency between the
Petition (Paragraph 6.12 stated that TG Trust paid it) and the Rejoinder
(Exhibit B thereto clearly indicates it was paid by the Developer), the payment
is evidently by the Developer.
22. The Bank has been paying rent/royalty, GST and society charges to the
Court Receiver for the period starting from May 1, 2022 in terms of the orders
of this Court, and has debited those amounts to a suspense account pending
reimbursement (Receipts are at Exhibit “I” to the Petition). The Bank’s branch
was shifted to the alternate premises on August 3, 2022 and it continues there
till date.
23. By order dated April 27, 2022 the Charity Commissioner granted the
extension sought for the development of the Subject Property. According to
the Bank, the extension was for three years and expired on April 27, 2025, and
no Intimation of Disapproval (“ IOD ”) has been obtained and redevelopment
has not proceeded. Transit rent not having been paid by the Developer, the
Bank issued legal notice dated December 10, 2022. Two meetings followed, on
Page 10 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


February 8, 2023 and March 9, 2023. According to the Bank, the Developer
promised at those meetings to clear the dues by March 16, 2023. TG Trust
denies having attended either meeting.
24. A further legal demand notice dated January 8, 2024 was issued
through the Bank’s advocates on record to all four Respondents, calling upon
them to reimburse the amount then said to be outstanding, and to pay Rs.
8,40,000/- per month thereafter. The Bank also sought production of the
original property tax receipts of the old premises failing which to pay the
balance security deposit of Rs. 25,00,000/-.
25. The Bank states that a total of Rs. 2,01,67,981.82, inclusive of the
security amount of Rs. 25,00,000/-, stands debited to its suspense account on
account of rent/royalty paid for the alternate premises, and remains
unreimbursed.
26. During the pendency of the Petition, the Bank’s advocates addressed
two letters, both dated June 13, 2025, to the Developer with copies to TG Trust
and to the concerned government and police authorities, seeking inspection of
the old premises in view of the condition of the building. Neither has
responded.
Page 11 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


Contentions of Parties:
27. I have heard Mr. Ankit Lohia, Learned Advocate on behalf of the Bank,
Mr. Abhinav Chandrachud on behalf of the Developer and Mr. Ramashish S.
Maurya on behalf of TG Trust. With their assistance, I have examined the
record. There has been a significant efflux of time since the matter was heard,
but no party has sought to have the matter released, and instead a request was
made to have the order released expeditiously.
28. In a nutshell, the Developer has resisted this Section 9 Petition on the
ground that there is no arbitration agreement between the Developer and the
Bank. This is the core contention with the Developer choosing not to respond
on merits, confining itself to this preliminary objection. TG Trust has
contended that it is not obliged to the Bank at all and that it is ring-fenced
from any obligations to the Bank, all of which are to flow from the Developer.
On the issue of privity to the arbitration agreement, TG Trust is aligned with
the Developer and objects to the Bank securing any protective measures in the
Section 9 jurisdiction.
29. The Bank contends that the Development Agreement and the MOU are
inextricably interconnected, with the MOU amending the Development
Agreement, both serving one composite objective, namely, the redevelopment
of the Subject Property and setting out the terms on which the Bank would be
Page 12 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


given the New Premises in consideration for vacating the Subject Premises.
Therefore, the Bank contends, the arbitration agreement must necessarily
cover the connected disputes under the MOU, signed by both the Bank and TG
Trust.
30. The Developer has contended that Clause 17 of the Development
Agreement is confined to disputes between the Developer and TG Trust and
that too on matters under the Development Agreement. Therefore, Section 8
is not attracted; TG Trust is not a party to the MOU; and no interim relief can
be granted since no final relief could be had in arbitration.
31. TG Trust also contends that the MOU may be tripartite, but all it has
done is grant development rights and none of the assurances held out to the
Bank are owed by TG Trust. The Agency Agreement and the connected
Undertaking too do not entail TG Trust as a party. Therefore, it is contended
that the Bank having left the Subject Premises was purely a bargain between
the Bank and the Developer.
32. The Bank contends it has been lessee of the Subject Premises since
September 1, 1962 under the 1964 and 1991 Leases, which subsist and that
rent has been paid regularly. TG Trust admits the former lease but says both
terms expired – the first on September 1, 1987 and the second on August 31,
2012 with no renewal. TG Trust contends that it has neither demanded nor
Page 13 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


accepted rent and the Bank’s own statements of account are of no avail, and
that the Bank has overstayed its welcome without any rights, thereby losing
privity to claim through TG Trust.
33. The Bank contends that TG Trust and the Developer have colluded,
seeking to deprive the Bank of its rights as a lessee and are in continuing
breach of the Development Agreement read with the MOU, depriving the Bank
of its rights flowing from them.
34. According to the Bank, Clause 5 of the MOU fixes the Developer’s
liability from August 3, 2022 when it shifted out of the Subject Premises and
that beyond the Rs. 25,00,000/- deposited, nothing has been paid. Even the
IOD has not been obtained and the Charity Commissioner’s approvals have
been extended and expired with nothing being done. The Developer contends
that the consideration for paying rent was the handing over of vacant and
peaceful possession of the Subject Premises, which the Bank has not done, and
therefore, there is no obligation to pay rent.
35. The Developer also presses the delay in approaching the Court for
reliefs under Section 9 to be granted. The Developer contends that arbitration
has never been invoked in the three years since the arrears are said to have
begun, showing no intent to arbitrate but intending only to short-circuit the
recovery. Section 9 is exceptional and no urgency is shown, and yet reliefs in
Page 14 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


the nature of final relief are sought. The Bank counters this by contending
Section 9 is available pending invocation and constitution of the tribunal. The
Bank contends that it had acted in good faith on assurances held out at the two
meetings held on February 8, 2023 and March 9, 2023, pursuant to the Bank’s
legal notice dated December 10, 2022.
36. TG Trust contends that the trustees are not separately impleaded and
that the Bank has dishonestly attempted to extract money from a public
charitable trust and to defame the trustees, and seeks damages in response to
the Section 9 Petition.
Analysis and Findings:
37. The core issue to consider arises from the contention that the Bank is
not a signatory to the Development Agreement, which alone contains an
arbitration clause. The MOU, to which the Bank is a signatory and under
which its monetary claim arises, contains no arbitration agreement. The Bank
therefore invokes the jurisdiction of the Section 9 Court on two bases: first ,
that it is a person claiming through or under TG Trust within the meaning of
Section 8(1) of the Act; and second , that the Development Agreement and the
MOU are interconnected agreements executed to achieve a common
commercial goal, so that the arbitration agreement in Clause 17 of the
Development Agreement extends to disputes arising under the MOU.
Page 15 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


38. I have examined the record. The Development Agreement between TG
Trust and the Developer clearly records at Recital (f) the two lease deeds and
that the Bank has continued to occupy the Subject Premises despite the expiry
of the lease and intimation that further extension would not be provided due
to alleged non-payment of dues towards taxes and water charges requiring
vacation of the demised premises. Further Recital (m) records that TG Trust
is getting a negligible amount towards lease rental from the Bank, which is
consistent with the contention of the Bank that it is paying the rental amount
to TG Trust as set out in Exhibit A to the Petition.
39. Clause 3 of the Development Agreement grants development rights to
the Developer on an as is where is basis. Clause 3.4 of the Development
Agreement requires due prior consultation with TG Trust for the Developer to
settle with the tenants on behalf of TG Trust. Clause 3.5 of the Development
Agreement empowers the Developer to negotiate with the Bank and resolve
the terms on which the Bank would vacate the premises and arrive at an
appropriate arrangement or agreement, with no liability on this count
accruing against TG Trust. Lest there be any doubt about whether Clause 3.5
is an authorisation of the Developer as an agent of TG Trust or as a principal,
Clause 3.6 of the Development Agreement clarifies that the “ authorisation ” of
the Developer to deal with tenants and occupants is co-terminus with the
Development Agreement.
Page 16 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


40. Therefore, what is clear is that TG Trust was clearly aware of the
entitlements claimed by tenants and occupants such as the Bank and
authorised the Developer to engage with them. The grant of the authority only
points to the Developer being given the power to deal with and agree to modify
the relationship between TG Trust and such persons and such authority would
only last if the Development Agreement were alive. If the Development
Agreement did not last, it would follow that the relationship would continue
between TG Trust and such persons including the Bank. That apart, what is
clear is that the subject matter of the Development Agreement clearly includes
engaging with Bank and resolving the rights of the Bank, which TG Trust has
acknowledged is paying lease rentals and that such lease rental payments are
low and inadequate.
41. A clear pointer is that TG Trust cannot deny prima facie , without
leading evidence, that TG Trust has treated the Bank as a lessee and not as a
squatter or gratuitous licensee. Evidence would need to be led to answer the
question as to whether a lessee of over 50 years who continues to pay lease
rental with the lessor accepting it, although with a grouse that it is inadequate,
can legitimately deny receipt of lease rentals. Moreover, without undertaking
any eviction proceedings or adopting other due process of law to remove the
Bank despite the view that the expired leases would not be renewed and yet
continuing to accept the rental amounts at the rate set out in the expired lease,
Page 17 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


and also giving limited and co-terminus authorisation to the Developer with
obligation of consultation with TG Trust, it is hard to treat the Bank purely as
a trespasser. The very fact that the Bank finds such a prominent articulation
in the Development Agreement would indicate that subject matter of the
Development Agreement clearly included in its remit the manner of dealing
with the Bank’s continued occupation of the Subject Premises with lease rental
being paid that is perceived to be below market rental value. This is not to say
that TG Trust cannot take steps to evict the Bank but it underlines the fact that
dealing with the Bank was one of the key features of the Development
Agreement which led to the execution of the tripartite MOU and therefore, TG
Trust is cannot simply stand away from the conjoint import of these two
instruments.
42. Clause 7.4 of the Development Agreement again records that cost of re-
housing the Bank and other tenants would have to flow from the 60%
entitlement of the Developer and the 40% entitlement of TG Trust cannot be
dipped into for this purpose. Likewise, the benefits of such settlement would
also belong to the Developer. In short, the terms were a stop-loss provision to
ring-fence TG Trust from the cost and liability of settling with tenants and
lessees but all within the ambit of being co-terminus with the Development
Agreement. In other words, if there was no development taking place
pursuant to the Development Agreement, the tenants would remain TG Trust’s
Page 18 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


liability and the free run given to the Developer was only for purposes of the
redevelopment.
43. Clause 7.5 of the Development Agreement provides that
notwithstanding the termination of the Development Agreement, the
Developer shall be solely liable and responsible to settle and re-house the
claims of tenants and occupants even while Clause 3.6 of the Development
Agreement provides for a co-terminus authorisation to engage. The latter can
potentially be read as covering the right to engage and the former would be a
provision dealing with financial implications of the outcome of such
engagement. Be that as it may, Clause 7.6 of the Development Agreement is a
special provision that concerns how the Bank would be dealt with. It leverages
the Bank’s rights to ensure that IOD is obtained – possession of the Subject
Premises may be taken only after obtaining IOD – and provision of new
premises to the Bank can be done only after the Occupation Certificate is
obtained. The Developer was required to clarify to the Bank that any
settlement with the Bank was subject to ensuring there was no “future
recourse” by the Bank to TG Trust.
44. In this light, it is quite clear, at least at this prima facie stage, that
dealing with Subject Premises, which are an integral part of the Subject
Property that is subject matter of the Development Agreement, is a deeply
Page 19 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


intertwined and integral element of the bargain between the parties. It is in
operation of this bargain that the parties went on to execute the MOU with the
Bank. Evidently, on the face of the record, the MOU is a tripartite instrument
between the Bank, the Developer and TG Trust. For TG Trust’s contention
that the MOU is a bipartite agreement in the sense that the obligations relating
to the Bank are those owed only by the Developer, would at best have to be
subject matter of a final adjudication after examining the evidence. At this
stage what needs to be considered is whether there is subject matter
commonality between the Development Agreement and the MOU, to make the
Bank a veritable party to the Development Agreement thereby giving it privity
to the arbitration agreement.
45. In my view, there is a clear and strong prima facie case of an
inextricably interwoven subject matter commonality between the
Development Agreement and the MOU. Without the Development
Agreement, there is no question of the MOU. The terms on which the
Developer would deal with problems posed by the Bank to TG Trust’s property
was set out in the Development Agreement and the MOU is an outcome of
operating the Development Agreement. Therefore, when one looks at whether
the MOU necessarily flows from the Development Agreement and whether the
MOU was envisaged by the Development Agreement, there is a strong pointer
of deep interconnection between the two. The recitals of the MOU make it
Page 20 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


abundantly clear that “the parties” (which includes TG Trust) acknowledge
that settling the Bank’s interests is vital for the redevelopment, in light of
which they renegotiated their own terms with “ all the parties ” executing the
MOU.
46. I have already set out above the terms of the MOU. Clearly, this was a
mutually beneficial and interconnected bargain among all three parties. One
could have considered that the MOU not having an arbitration agreement is a
distinct and separate bargain necessitating a separate arbitration agreement,
but it is hard to take that view since the MOU entails an updated and
supplemental bargain that flows from the Development Agreement. Under
Clause 13, the surrender of the Subject Premises by the Bank was a surrender
to TG Trust, which enables TG Trust to hand over the same to the Developer.
Clause 15 of the MOU goes a step further to confirm that at the stage of
executing the MOU there is no dispute and there would be no impediment to
giving the redeveloped premises to the Bank subject to the terms and
conditions of the Development Agreement. Clearly, this also strongly brings
the bargain struck by the parties with the Bank within the ambit of
contemplation of disputes, and the terms and conditions of the Development
Agreement is what the relationship was subjected to.
Page 21 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


47. I am unable to hold that the Bank is a rank third party unconnected to
the Development Agreement containing the arbitration agreement. The very
operation of Clause 15 of the Development Agreement is a sharp pointer to the
contrary. Yet, there can be no doubt that the jurisdictional question and the
existential doubt raised over the arbitration agreement would fall within the
domain of the jurisdiction of the Arbitral Tribunal under Section 16 of the Act.
The question for the Section 9 Court to consider is whether pending such
decision, what measures would best protect and preserve the subject matter of
the arbitration agreement, when prima facie , the Section 9 Court is of the view
that the arbitration agreement is attracted.
48. The redevelopment is the subject matter of the arbitration agreement.
The role of the Bank and its entitlements in law form an integral element of
the subject matter of the arbitration agreement. The ex facie tripartite MOU
cannot be brushed aside as a bipartite contract – to even accept the contention
of TG Trust that it is bipartite in the teeth of the tripartite instrument would
necessitate interpretation of the MOU read with the Development Agreement
and that too after evidence is recorded. At this prima facie stage, no
reasonable mind can hold that the MOU is bipartite. That said, the absence of
an explicit arbitration agreement in the MOU is a silence that is filled in by
Clause 15 of the MOU, which records that there would be no impediment in
getting the Bank the new premises subject to the terms of the Development
Page 22 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


Agreement. In other words, prima facie , the Developer and TG Trust held out
to the Bank that the terms of the Development Agreement are available and
enable the provision of the new redeveloped premises to the Bank.
49. TG Trust’s contentions about the Bank would require one to treat the
latter as persona non grata – virtually as a trespasser and interloper who has
no connection at all with the Subject Property. This is difficult to accept. The
Bank has been a lessee for over 50 years and the fact that the Bank is paying
lease rentals that TG Trust does not consider to be commensurate with market
rentals is an explicit and express fact confirmed in writing by TG Trust in the
Development Agreement. After the redevelopment could not be completed
within the deadline permitted by the Charity Commissioner, the Development
Agreement was extended by the MOU, this time comprehensively including
the Bank into the bargain and making it subject of the terms and conditions of
the Development Agreement, which includes the arbitration agreement in
Clause 17 of the Development Agreement. Pursuant to the MOU, alternate
premises were identified and Rs. 25,00,000/- was paid by the Developer – all
consistent with the MOU, which is inextricably connected to the Development
Agreement. In fact, meetings were also held between the Developer and the
Bank and such participation by the Developer, while ring-fencing TG Trust
from liability, was but only because of the authorisation by TG Trust to
negotiate with the Bank. All of this cannot be brushed aside as not deeply
Page 23 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


connected to the subject matter of the Development Agreement. If anything, it
shows inequitable conduct against the Bank.
50. Needless to reiterate, it is still open to TG Trust and the Developer to
invoke Section 16 and call upon the Arbitral Tribunal to rule on its own
competence and jurisdiction on the basis of the existential doubts over the
arbitration agreement. That itself would present mixed questions of fact and
law and may necessitate evidence to be led. Such an exercise is in the domain
of the Arbitral Tribunal. What the Section 9 Court has to see is whether one
can wish out of hand the potential role of the Bank as a veritable party to the
arbitration agreement and from the factual matrix on hand, I am not
persuaded to hold that the Bank can simply not be treated as a veritable party.
51. Not only is there subject matter commonality, but also the transactions
covered by the Development Agreement and the MOU are one comprehensive
composite interwoven whole. The performance of one depends on the
performance of the other. It is prima facie held out that the MOU would
operate only on the basis of the operation of the Development Agreement.
After holding out such promise to the Bank and luring it into executing the
MOU and vacating the Subject Premises, when there is a demonstrable
default, equities are not against the Bank but are in favour of protecting the
1
Bank. The criteria declared in Cox and Kings as factors to be borne in mind
1 Cox and Kings Ltd. v. SAP India (P) Ltd. – (2024) 4 SCC 1
Page 24 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


are all met in the instant case on a prima facie basis – the mutual intent of the
parties, the relationship of the non-signatory to a signatory, the commonality
of subject matter, the composite nature of the transactions and the
performance of the contract.
2
52. Another judgement of the Supreme Court in Adavya Projects further
builds on Cox and Kings – the following extracts from the summary of
conclusions would suffice:
“60.3. The relevant consideration to determine whether a person can be made a
party before the arbitral tribunal is if such a person is a party to the arbitration
agreement. The arbitral tribunal must determine this jurisdictional issue in an
application under Section 16 by examining whether a non-signatory is a party to the
arbitration agreement as per Section 7 of the ACA.
60.4. In the facts of the present appeal, respondent nos. 2 and 3 are parties to the
arbitration agreement in Clause 40 of the LLP Agreement despite being non-
signatories. Their conduct is in accordance with and in pursuance of the terms of the
LLP Agreement, and hence, they can be made parties to the arbitral proceedings.”
[Emphasis Supplied]
53. In the matter in hand, there is strong prima facie evidence of the mutual
intention of the non-signatory Bank to be bound with the signatories, TG Trust
and the Developer to the Development Agreement discernible from the record.
This weighs more in favour of the arbitration being maintainable than against
2 Adavya Projects Pvt. Ltd. v. Vishal Structurals Pvt. Ltd. and Others – 2025 SCC OnLine SC
806
Page 25 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


it. In the peculiar facts of this case, it is reasonable to hold prima facie that a
non-signatory party who is referred to all over the agreement containing the
arbitration clause, after being lured into a bargain on the strength of the
agreement containing the arbitration clause, cannot be lightly deprived of its
privity as a veritable party. Leaving the final decision on veritable party to the
Arbitral Tribunal for consideration under Section 16 of the Act, the Section 9
Court must take note of the strong prima facie case in favour of the non-
signatory being a veritable party and consider what protection would be
appropriate pending arbitration. Therefore, the usual contention ordinarily
made, namely, that a non-signatory third party can be dragged into an
arbitration but such third party cannot invoke arbitration would not apply or
resonate in the peculiar factual matrix of this case. Where a veritable party
who is a non-signatory has been given the comfort of the bargain covered by
the arbitration agreement, it stands to reason that such third party is one
claiming through the parties to the arbitration agreement. The very bargain in
the MOU that is dependent on the Development Agreement is one authorised
by TG Trust, and that too under the very Development Agreement containing
the arbitration agreement.
54. In this light, the jurisdiction clause in the MOU alluding to jurisdiction
of Mumbai courts, can reasonably be read as a pointer to Section 9 Court being
a court in Mumbai rather than a pointer that the arbitration agreement in the
Page 26 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


Development Agreement was positively displaced. The strong interconnected
veritable privity of the Bank to the arbitration agreement in the Development
Agreement cannot be brushed aside in the specific facts of this case.
55. Privity to the Agency Agreement has no relevance to the question on
hand. All that it evidences is that alternate premises were found by the Bank.
If anything, the Agency Agreement underlines the fact that the security deposit
payment based on the bargain contracted in the Agency Agreement was
funded initially by the Developer, consistent with the obligation in the MOU in
order to implement the Development Agreement. Exhibit B to the Rejoinder
by the Bank clearly shows that the Developer paid Rs. 25,00,000/-to the Bank.
Without an actual bargain in hand, there would have been no need for the
Developer to pay Rs. 25,00,000/- and if anything, this links neatly to
demonstrating how the parties understood the provision of alternate
accommodation to the Bank pending extension permission from the Charity
Commissioner, as contracted under the MOU, which in turn was contracted
only to ensure that the Development Agreement ran its course. The MOU was
founded on the authorisation by TG Trust co-terminus with the Development
Agreement to negotiate the terms of resettlement of the Bank to make the
Development Agreement run its course. To turn around and treat this inter-
linked flow of instruments as being disjointed and irrelevant to the larger
Page 27 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


composite and common subject matter would be highly illogical and arbitrary
in the flow of the equitable jurisdiction under Section 9 of the Act.
56. This then leads to the subsidiary questions of whether, arbitration not
yet having been invoked, the requisite urgency for relief as sought under
Section 9 is made out – particularly in terms of the manner in which reliefs are
sought. While I am satisfied that the Section 9 jurisdiction, which is meant to
preserve and protect the subject matter of the arbitration agreement cannot be
brushed aside (indeed without undermining a final view on jurisdiction which
lies with the Arbitral Tribunal under Section 16 of the Act) whether reliefs
sought are interim at all and how it can be moulded to make it sensible and
commercially logical is the burden of the Section 9 Court.
57. Indeed, at this stage, in my view, it cannot be contended that a deposit
must be directed. The Bank has a monetary claim to make but more than
protecting its financial interests, what deserves consideration for interim
protection is its entitlements, clearly recognised in the Development
Agreement, which is dealt with in the MOU. I am not inclined to direct any
deposit of funds at this stage, also factoring in the institutional scale and size
of the Bank and the fact that the Development Agreement not having been
acted upon could most likely lead to its termination, and with it the
authorisation of the Developer to resolve TG Trust’s problems with the Bank
Page 28 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


coming to an end. Instead, what is at grave risk are the rights of the Bank,
which have been duly noted and dealt with by TG Trust and the Developer in
the provisions of the Development Agreement and the MOU, as articulated
above. That apart, the manner of pleadings and conduct of these parties in
these proceedings point to a grave risk to the Bank with these parties literally
washing their hands off the Bank after having secured the Bank’s departure
from the Subject Premises.
58. Therefore, I am inclined to direct that in any redevelopment of the
Subject Property, the Developer shall ensure that an area not less than the
area of the Subject Premises shall be preserved by the Developer from its 60%
sale component, without prejudice to this minimum reservation being
enhanced by any factor of FSI enhancement that may come about in terms of
any sanctioned plan that may be developed. At this stage, without even an
IOD in hand, TG Trust and the Developer have managed to contrive a vacation
of the Subject Premises – all on the strength of the Development Agreement
read with the MOU. Therefore, if the Development Agreement were to run its
course, the Bank’s interests must be protected.
59. It is likely that the Developer and TG Trust may do nothing on the
redevelopment for the foreseeable future and also not terminate the
Development Agreement. In that eventuality, preservative measures would
Page 29 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


need to be considered. I leave that consideration to the Arbitral Tribunal.
Evidently, the Arbitral Tribunal can only be formed under Section 11 of the Act
considering the outright denial of existence of privity to the arbitration
agreement by the Developer and TG Trust. Therefore, I have to put the Bank
to terms on invocation of arbitration and the filing of a Section 11 Application.
If the Bank does not file a Section 11 Application within a period of three
months from the upload of this Order on the Court’s website, the protective
measure granted hereby would stand vacated. If such Section 11 Application is
filed, the protection by way of the reservation of redeveloped area would
continue until the Arbitral Tribunal, when eventually appointed at any stage of
the Section 11 proceedings, has had occasion to consider the continuation,
dilution, enhancement or vacation of such interim relief.
Summary of Conclusions:
60. To summarise:
A] I am unable to agree that there is any case for an outright denial
of privity of the Bank as a veritable party to the arbitration agreement in
Clause 17 of the Development Agreement. On the contrary, the subject
matter commonality and the composite nature of the bargains struck in
the Development Agreement and the MOU make out a strong case for
existence of the Bank’s privity to the arbitration agreement rather than
Page 30 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


the absence of such privity;
B] The aforesaid finding is without prejudice to the Arbitral
Tribunal’s statutory power to consider the question of jurisdiction and
competence under Section 16 of the Act;
C] Whether TG Trust owes anything to the Bank under the MOU is a
wrong question to ask because TG Trust is the owner of the relationship
with the Bank, and in that capacity, it has authorised the Developer to
solve the problematic relationship TG Trust has with the Bank. Such
authorisation is co-terminus with the Development Agreement in light
of Clause 3.6 of the Development Agreement, and by executing the
tripartite MOU, TG Trust has blessed the arrangement between the
Developer and the Bank, taking care to ensure that there is no financial
liability on TG Trust. The absence of financial liability does not wash
away the strained and problematic legal relationship between TG Trust
and the Bank, which can only be solved by adjudication of evidence;
D] Prima facie , the Developer’s obligation to fund the Bank’s transit
rent has been triggered and indeed by its own conduct, the Developer
has paid the sum of Rs. 25,00,000/- towards the initial security deposit
and has defaulted thereafter. This is not a pure bipartite dispute
between the Developer and the Bank but a dispute that is composite
among the parties, since the Developer has only acted pursuant to the
Page 31 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


authorisation granted by TG Trust to the Developer to strike a bargain
with the Bank co-terminus with the Development Agreement;
E] On urgency and the necessity to direct deposit of funds, I am not
inclined to use the Section 9 jurisdiction and instead I leave it to the
Arbitral Tribunal to fashion whatever interlocutory arrangement
appeals to it under Section 17 of the Act, even while it may consider a
challenge under Section 16 of the Act, if mounted before it. However,
the Bank is at grave risk of being treated as a persona non grata despite
being lured to part with the Subject Premises on the strength of the
Development Agreement; with no progress in the development and yet,
the Developer and TG Trust in one voice, it is untenable to treat the
Bank like a trespasser with no interest in the Subject Property despite its
occupation of the Subject Premises being articulated extensively and
dealt with all across the Development Agreement and the MOU, leading
to the Agency Agreement being brought into existence and the
Developer even funding a portion of payment that the Bank had to make
for the alternate accommodation; and
F] Therefore, it is necessary to ensure that the Developer does not
part with, alienate, or create any third-party interest of any nature
whatsoever over at least such portion of the redeveloped premises that
is equivalent to the area of the Subject Premises occupied by the Bank at
Page 32 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


the time of execution of the Development Agreement, without prejudice
to enhancement of such area by any factor of FSI enhancement
thereafter, and before vacating the Subject Premises on August 3, 2022
in good faith reliance on the obligations contained in the MOU;
G] To ensure that the matters are not kept in a limbo, it would be
appropriate to direct TG Trust to apply to the Charity Commissioner for
an extension of time for implementation of the redevelopment within a
period of three months from today. If such an application is made, then
until a decision by the Charity Commissioner, there can be no cloud
over extension of the Development Agreement. If no such application is
made, it would be a pointer to TG Trust not being really interested in
pursuing the redevelopment with the Developer as contracted under the
Development Agreement.
61. Meanwhile to ensure full access to information so that the parties can
engage in well-informed litigation, all parties shall be entitled to jointly
conduct an inspection of the Subject Property in general and the Subject
Premises in particular, since no demolition would have been undertaken
without an IOD. Such inspection shall be provided by the Developer and TG
Trust to the Bank within two weeks from today. Should such inspection not be
provided, the Bank shall be entitled to approach the Learned Court Receiver
pursuant to this Order to ensure oversight and supervision for conduct of such
Page 33 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


inspection, if necessary, with police protection. The deadline to approach the
Court Receiver for such assistance shall commence from the expiry of two
weeks from today if inspection has not been provided by then and the
inspection under the oversight of the Court Receiver shall be conducted within
two weeks of the Bank approaching the Court Receiver.
Summary of Directions:
62. The directions issued in this Order are listed below:
A] In the redevelopment of the Subject Property, the Developer shall
reserve, out of its 60% sale component, an area not less than the area of
the Subject Premises, namely about 3,926 sq. ft. comprising the
basement admeasuring about 979 sq. ft. and the ground floor
admeasuring about 2,947 sq. ft. This minimum reservation is without
prejudice to its enhancement by any factor of FSI enhancement that
may come about under any sanctioned plan. The Developer shall not
part with, alienate, encumber or create any third-party interest of any
nature whatsoever in respect of the area so reserved;
B] TG Trust shall, within three months from the date of upload of
this Order on the Court’s website, apply to the Charity Commissioner for
extension of time for implementation of the redevelopment;
C] The Developer and TG Trust shall provide the Bank a joint
Page 34 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


inspection of the Subject Property in general and the Subject Premises
in particular within two weeks from the date of upload of this Order on
the Court’s website. If inspection is not so provided, the Bank shall be at
liberty to approach the Learned Court Receiver of this Court, who shall
oversee and supervise the conduct of such inspection, if necessary, with
police protection, and such inspection shall be conducted within two
weeks of the Bank approaching the Court Receiver;
E] The Bank shall, within three months from the date of upload of
this Order on the Court’s website, invoke arbitration and file an
application under Section 11 of the Act. If it does not do so, the
protective measures at [A] above shall stand vacated without further
reference to this Court. If it does, those measures shall continue until
the Arbitral Tribunal, as and when constituted, has had occasion to
consider their continuation, dilution, enhancement or vacation;
F] No deposit of funds is directed. Such measures are left to be
agitated before the Arbitral Tribunal under Section 17 of the Act;
G] This Order will not preclude the Developer and TG Trust to apply
to the Arbitral Tribunal under Section 16 of the Act, questions as to the
existence of the arbitration agreement and the Bank’s privity to it; and
H] Nothing in this Order shall be construed as a final expression of
opinion on the existence of the arbitration agreement, on the status of
Page 35 of 36
October 7, 2026
Ashwini Vallakati
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 16:28:12

F-J-CARBP-222-2025.doc


the Bank as a party to it, or on the merits of the claims and defences of
any party, all of which shall be decided uninfluenced by the prima facie
views expressed herein.
63. The Section 9 Petition is finally disposed of in the aforesaid terms.
64. In the peculiar facts of the case, there shall be no order as to costs,
deferring consideration of costs for this round of litigation to the Arbitral
Tribunal, as and when it is constituted.
65. All actions required to be taken pursuant to this order shall be taken
upon receipt of a downloaded copy as available on this Court’s website.

[ SOMASEKHAR SUNDARESAN, J.]