Sanjeev Kumar Malhotra vs Union Of India & Ors
- Court
- Delhi High Court
$~
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
Reserved on: 11 March, 2026
th
Pronounced on: 30 June, 2026
+ W.P.(C) 11286/2016
SANJEEV KUMAR MALHOTRA .....Petitioner
Through: Ms. Ridhima Malhotra, Advocate.
versus
UNION OF INDIA & ORS .....Respondents
Through: Ms. Saroj Bidawat, SPC with Mr. A.K.
Rohila, Consultant (L&DO)
CORAM:
HON'BLE MR. JUSTICE AMIT SHARMA
JUDGMENT
AMIT SHARMA, J.
1. The present petition under Article 226 of the Constitution of India,
1950, seeks the following prayers: -
“In view of the above submissions and facts it is most
humbly prayed that this Hon'ble Court be pleased to grant a Writ of
Mandamus, Certiorari and/or any other writ, order or direction
thereby requiring the respondents No. 1 and 2 to deal with the
application of the petitioner seeking conversion of property bearing
No.21/24, West Patel Nagar, New Delhi vide application
No.105593 dated 14.4.2011 seeking conversion of the said property
from leasehold to freehold and to grant such request upon payment
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 1 of 32
of a reasonable amount of conversion fee and nominal interest
without imposing any penalties or calculating compound interest in
view of the clear responsibility of said respondents in causing such
delay in the matter by returning even the initial deposit of the
requisite charges as early as in the year 2006 when the petitioner
had initially sought the conversion of property bearing No.21/24,
West Patel Nagar, New Delhi more particularly shown in the site
plan filed from lease hold to freehold one;
And to pass such other or further directions which this
Hon'ble Court may deem fit and proper to meet the ends of justice.
Costs of the proceedings be also granted against the
respondents No.l and 2 and in favour of the petitioner.”
2. The present petition is filed under Article 226 of the Constitution for
seeking directions to the respondent Nos.1 and 2 to convert the property
bearing no. 21/24 West Patel Nagar, New Delhi, from leasehold to freehold
on the payment of reasonable charges.
BRIEF BACKGROUND
3. Brief facts, as stated in the petition, necessary for the disposal of the
present petition are as under: -
i) It is stated that the petitioner is the co-owner of property bearing
No.21/24, West Patel Nagar, New Delhi, (for short, ‘subject property’),
and had acquired such right through succession upon demise of his
father-Late Sh. Mulkh Raj Malhotra. It is further stated that the
petitioner is holding ½ half share in the subject property along with
respondent No.3, who is representing interest of her husband-Late Sh.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 2 of 32
Suresh Kumar Malhotra (brother of the petitioner). Third shareholder-
Smt. Sudesh Kapoor (sister of the petitioner) had relinquished her right
in the subject property in favour of the petitioner and respondent No.3.
It is further stated that respondent No.3 has been impleaded as one of
the respondents as she was reluctant to join the petitioner being the
other co-owner of the property, although no relief is being claimed
against her.
ii) It is stated that the subject property is a leasehold property which
was allotted and owned by Late Mulk Raj Malhotra-father of the
petitioner. Initially, it was leased by way of a duly registered lease deed
dated 31.01.1964 in favour of father of the petitioner. It is the case of
the petitioner that vide letter dated 17.01.2006, respondent No.2 had
acknowledged the transfer and mutation of names of the petitioner and
respondent No.3 being legal heirs/representatives of Late Mulk Raj
Malhotra, and they were substituted as the lessees in the subject
property as held by their father on the basis of the aforesaid registered
lease deed. It is further stated that property tax and other relevant dues
of the subject property were being constantly paid by the owners to the
concerned authorities.
iii) The petitioner applied for the conversion of the subject property
from leasehold to freehold vide application No.08451 dated 23.01.2006
along with duly supported documents, and payment of conversion
charges of Rs.62,175/- and other dues totalling Rs.70,000/- was
deposited with respondent No.2 by the petitioner, and the receipt of
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 3 of 32
said application was duly acknowledged by respondent No.2 vide
Acknowledgement Slip dated 27.01.2006. It is further stated that
respondent no.2 had written to the petitioner and respondent no.3 vide
letter dated 27.02.2006 asking the petitioner to furnish the completion
certificate of the property, and further claiming that inspection of the
subject property had revealed that petitioner had encroached on
government/public land and that such alleged encroachment be
removed. The petitioner immediately informed respondent no.2 by
letter dated 16.03.2006 that the encroachment had already been
removed and requested the authorities to inspect the property at any
time and further that the proof of removal of such construction was
already submitted to them.
iv) It is further stated that respondent No.2 had sent different letters
various dates to the petitioner, informing him that their duly authorised
representative will inspect the subject property; however, such
inspection was postponed on several occasions as the same can be seen
from letters dated 01.06.2006, 06.06.2006, and 14.07.2006. Thereafter,
on 04.08.2006, respondent no.2 sent a letter in the form of show cause
notice alleging that petitioner was preventing the inspection of the
subject property and the petitioner was also threatened regarding re-
entry into the subject property in the event of petitioner prevented the
inspection. A communication dated 03.10.2006 was also sent to
petitioner by the respondent No.2 mentioning details of alleged illegal
or unauthorised constructions/alterations, and the petitioner was
required to remedy the alleged breaches.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 4 of 32
v) In compliance thereof, the petitioner and respondent no.3 wrote a
letter dated 16.10.2006 thereby apprising respondent no.2 that existing
construction in the subject property was raised by Late Mulk Raj
Malhotra on the basis of duly sanctioned building plan but since the
documents were not traceable at that time, the petitioner undertook to
submit the certified copies of approved/sanction building plan as and
when same were received from concerned authorities.
vi) It is further stated that since the petitioner failed to pay any heed
to the demand of respondent No.2, the latter vide letter dated
08.11.2006 being dissatisfied with the same informed the petitioner that
his application for conversion of subject property from leasehold to
freehold had been rejected and refund, if any, with respect to the same
was taken separately. As per the petitioner, he had deposited
Rs.70,000/- with respondent No.2; however, refund cheque of
Rs.62,175/- was prepared in the joint name of petitioner and Neelam
Malhotra (respondent No.3), despite there being no pressure or demand
from the petitioner. Thereafter, petitioner had sent one request after the
other to respondent Nos.1 and 2 for conversion of the subject property
from leasehold to freehold; however, said respondents continued to
raise one objection or the other for deferring such conversion.
vii) It is further stated owing to family disputes and changing times,
petitioner and respondent no.3 intended to develop the subject property
for their mutual benefit and the petitioner then took the issue of
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 5 of 32
conversion with respondent no.2 and confronted them with
astronomical demand of money and requested them to arrive at a
reasonable settlement; however, the same were in vain. It is further the
case of the petitioner that upon receipt of such renewed request, the
respondent acknowledged the request for conversion; however,
increased the demand for the same to an astronomical amount of
Rs.24,16,362/-.
viii) It is further stated that after waiting for a reasonable demand and
positive action, the petitioner and respondent no.3 once again applied
for the conversion of the subject property from leasehold to freehold by
an application dated 14.04.2011 supported by payment of even date and
same was acknowledged by respondent no.2 through receipt. It is
further stated that said application was duly supported by an affidavit to
fulfil other conditions of respondent(s) and accepting the financial
liability which may be reasonably created by respondent no.2.
Thereafter, respondent no.2 sent a letter/inspection notice dated
18.08.2011 to petitioner raising objections and showing its intention to
inspect the subject property through their surveyor. The said surveyor
inspected the subject property and the objections raised by him at that
time were removed to the satisfaction of respondent no.2 and the
petitioner awaited for the approval of his request for conversion of the
subject property. It is further stated that despite the removal of
objections raised by respondent no.2, said respondent sent a letter dated
10.10.2011/26.09.2011 followed by another letter dated 17.05.2013
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 6 of 32
raising the demand for payment of Rs.24,16,362/- before conversion of
subject property into freehold.
ix) The petitioner, thereafter, made a representation before said
respondent that there was delay in granting his application for
conversion, and therefore, the respondent should not penalise the
petitioner for such delay, which had occurred only due to failure of
respondent no.2 in granting such requests. The petitioner had also
offered to pay amount with the reasonable increase in conversion fee
and had requested the said respondents not to impose penalty for the
delay, which was unintended on his part or compound interest
calculated over the initial demand amount should be removed.
x) It is further stated that owing to aforesaid circumstances, the
petitioner served a legal notice dated 12.05.2016 under Section 80 of
the CPC requiring the respondent Nos.1 and 2 to pass directions for
converting subject property from leasehold to freehold on payment of
such reasonable charges as may be payable without demanding any
interest on the amount of alleged penalties, so to be imposed against the
petitioner and other co-owner of the property. Respondent No.2 instead
of providing relief to the petitioner inflated the demand amount to
₹35,76,629/- by a letter dated 02.09.2016 before granting the request
for conversion. It is further the case of the petitioner that such unilateral
increase by respondent Nos.1 and 2 without giving any opportunity of
being heard to the petitioner shows that they were raising such demands
arbitrarily. It is further stated that the amount arrived at and demanded
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 7 of 32
by respondent No.2 is not on the basis of revised circle rates and
employing other methods and is in clear breach of fundamental rights
of the petitioner. Therefore, the present petition has been filed seeking
the reliefs as noted hereinbefore.
4. The captioned petition was dismissed for non-prosecution vide order
dated 01.11.2018 by learned Predecessor Bench. Thereafter, an application,
CM No.50602/2018 , under Order IX Rule 9 read with Section 151 of the
CPC was filed on behalf of the petitioner seeking restoration of the captioned
petition. The said application was allowed vide order dated 05.12.2018, and
the petition was restored to its original number.
5. During the pendency of the present petition, vide order dated
09.02.2024, learned Predecessor Bench of this Court had directed respondent
Nos.1 and 2 to make fresh inspection of the subject property regarding the
unauthorised construction and encroachment. Thereafter, on 08.05.2024
following order was passed by learned Predecessor Bench: -
“1. The Senior Panel Counsel for the respondents no. 1 and 2 stated that
in pursuance of order dated 09.02.2024, the property in question bearing
no. 21/24, West Patel Nagar, New Delhi was inspected on 09.04.2024
and at that time, although no encroachment was found but unauthorised
constructions were noticed there for which, breach notice has already
been issued on 06.05.2024.
2. The Senior Panel Counsel for the respondents no. 1 and 2 undertakes
to supply the copy of the breach notice to the counsel for the petitioner
within 02 days.
3. It is also stated on behalf of the Senior Panel Counsel for the
respondents no. 1 and 2 that the concerned officers are in the process of
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 8 of 32
assessing the damages which are required to be paid by the petitioners
before conversion of the property in question from leasehold to freehold.
4. Ms. Rekha Aggarwal, Advocate appearing on behalf of the petitioner
stated that the petitioner reserves the right to dispute any assessment on
damages to be made by the respondents no. 1 and 2 in accordance with
law. ”
6. Subsequently, learned counsel for the petitioner has placed on record a
response in respect of breach notice issued on 06.05.2024. Learned SPC for
respondent Nos.1 and 2 has placed on record assessment of the damages in
respect of the subject property in question by way of an affidavit dated
24.02.2025. In the said affidavit it is stated as under: -
“1. That I am presently working as Deputy Land and Development
Officer and am fully conversant with the facts of the case on the basis of
the record maintained and made available in this regard and as such
competent to depose and swear the present affidavit on behalf of
respondents.
2. That the instant affidavit is being filed pursuant to order dated
06/12/2024 whereby Hon'ble Court directed to file an affidavit stating
the details of assessment of damages to be paid by petitioner in respect of
the prope1ty in question.
3. That in pursuance of order dated 09.02.2024, the property in question
bearing no. 21/24, West Patel Nagar, New Delhi was inspected on
09.04.2024 and at that time, although no encroachment was found but
unauthorised constructions were noticed there for which, breach notice
was issued on 06.05.2024.
4. That the petitioner has not filed any reply to the said breach notice till
date.
5. That the petitioner was served with the demand letter vide dated
16.12.2024 after assessing all the damages, interest and for temporary
regularization of the breaches and was directed to make the payment of
Rs. 5825976/- within 30 days from the issuance of the said demand
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 9 of 32
letter, failing which further action under the terms of the lease will be
taken against him without any further reference. (copy of the demand
letter along with calculation sheet is annexed here with as Annexure R-
1.)
6. That the petitioner was also given opportunity of personal hearing if
he had any point to clarify in connection to the said notice within a week
of the date of receipt of this letter. Further, if he is unable to avail this
opportunity of the personal hearing /discussion will not be accepted as a
ground for not taking further action in the matter.”
7. Thereafter, learned SPC for respondent Nos.1 and 2 in pursuance of
order dated 09.07.2025, had placed on record original documents in respect of
the subject property in support of the affidavit filed by the answering
respondents.
SUBMISSIONS ON BEHALF OF THE PETITIONER
8. Learned counsel for the petitioner has made the following submissions
in support of latter’s case: -
i) It is the case of the petitioner that conversion charges which were
initially Rs.70,000/- qua the subject property have escalated to more
than Rs.35 Lakhs now, and the same is clear from the communication
dated 02.09.2016 which has been sent by respondent No.2 to the
petitioner. It is submitted that the same is an arbitrary demand. It is
submitted that respondent Nos.1 and 2 have been wrongly sitting over
the request of the petitioner and respondent No.3 for conversion of the
subject property from leasehold to freehold since 2010 when the
petitioner had first filed application for such conversion. As per
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 10 of 32
petitioner, the objections raised by the said respondents at the relevant
time were duly removed to the satisfaction of the surveyor and a report
to said effect is available in the case file of the subject property.
ii) The petitioner had initially applied for conversion of subject
property in 2006 by completing all formalities and depositing
Rs.70,000/- approx. demanded at that time and thereafter, in 2010, and
despite passage of six years after second application, the respondents
had failed to do the needful. The demand of ₹24,81,862/- including
penalties and compound interest was not only atrocious, but also
unfounded. In view of the fact that delay, if any, in disposing of the
pending request of the petitioner for conversion was not attributable
towards the petitioner and the respondents had arbitrarily by letter
dated 02.09.2016 had increased the demand amount by 40%. It is
pointed out that the objections raised by said respondents with regard to
use of the subject property were removed by the petitioner way back
and the same is evident from the reports made by their officials. It is
further submitted that the demand of ₹35,76,629/- is absolutely illegal
and unfounded and cannot be used as basis for rejecting the petitioner’s
application for conversion of the subject property. It is the case of the
petitioner that the said demand is not being based on any equitable
calculation or lawful bases and is to be revised in a suitable manner for
facilitating the conversion of the subject property.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 11 of 32
iii) It is further submitted that respondents have refused to rely on
the survey reports of their own officials with respect to the removal of
all objections and temporary obstruction in the subject property.
iv) It is pointed out that as per Inspection Report dated 06.05.2024,
there was no encroachment on Government Land; however, some
unauthorised construction was found, in respect of which the lessees
(including the petitioner herein) were served a breach notice dated
08.05.2024. It is further submitted that the alleged unauthorized
construction of 0.0180 yd.² was not an outward extension/expansion,
but is a part of the main area of bedroom on each floor and no
alteration, addition, extension has been done in the bathrooms. It is
further submitted that removing the said menial extent of construction
was not possible owing to the risk involved in its removal as the subject
property is already in dilapidated condition. Insofar as the fresh
authorised construction of a temporary bedroom as mentioned in breach
notice dated 06.05.2025 is concerned it is submitted that the same was
done to meet up the needs of growing family of the petitioner and no
permanent ceiling, construction had been done. It is further pointed out
that petitioner was ready to pay reasonable charges for the same. It is
further the case of the petitioner that respondent no.2 had, without
taking into consideration the objections filed by the petitioner to the
earlier breach notices, issued latest demand notice dated 18.12.2025,
raising the demand of ₹58,00,000/- including earlier demands which
the petitioner had vehemently denied.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 12 of 32
v) It is further submitted that there is no basis whatsoever for
levying charges with retrospective effect from 1974. Respondent No.2
has relied on an inspection notice dated 26.09.1974 and inspection
report dated 15.10.1974 to content that the inspection of the said
property was first carried out in 1974. It is the case of the petitioner that
said inspection notice was addressed to Janaki Devi who was not even
the lessee of the subject property at that time, and thus, the inspection
notice is on the face of it is illegal and in admissible.
vi) It is further submitted that demand notice dated 17.05.2013 is
exorbitant and unfounded. It is submitted that no demand notice was
ever issued in 2006 and as per respondent no.2’s own inspection, in
2011, no encroachment was found on government land. It is further
submitted that the alleged authorised construction of 0.0180 square
yards was constructed by original lessee on the basis of sanctioned
building plans. It is further submitted that the petitioner has expressed
his readiness and willingness to pay reasonable charges for the same by
letter dated 15.10.2011. It is further submitted that the interest
component which is accumulating at compounded rate has now
escalated to more than ₹58 Lakhs and the same is illegal and
unwarranted since the owners of the subject property had way back in
2011 requested department/respondent no.2 to fairly assess the
damages for the relevant period so that their application for conversion
could be processed without any further delay.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 13 of 32
vii) Reliance has been placed on the judgment passed by learned
Division Bench of this Court in Union of India v. Satish Kumar
1
Mehta , to contend that it would not only be procedurally
unreasonable, but even substantially unreasonable to raise back dated
demands with retrospective effect. Reliance has also been placed on the
judgement passed by learned Coordinate Bench in Tek Chand Narula
2
& Ors. v. Union of India , to contend that in said case, L&DO was
held guilty of delay and laches in not crystallising the demands which
the petitioner therein or their predecessor in interest was required to pay
to condone the violation of the covenant(s) of the lease deed. Reliance
has also been placed on the judgement passed by learned Coordinate
3
Bench in L&DO v. Lachami Narain HUF & Ors . , to contend that
L&DO cannot adopt a policy of complete silence for 35 years, and then
raise a demand for damages under presumption of unauthorized
construction, and such an approach would be unfair to the owners.
Reliance has also been placed on the judgement passed by learned
4
Coordinate Bench in Rattan Kaur v. DDA , to contend that it would
be unreasonable and arbitrary for DDA to seek to levy misuse charges
after a gap of 18 years.
viii) In view of the aforesaid facts and circumstances of the present
case, it is prayed that respondent Nos.1 and 2 be directed to convert the
1
2012 SCC OnLine Del 4052
2
2019 SCC OnLine Del 9924
3
2018 SCC OnLine Del 9838
4
2007 VII AD (Delhi) 189
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 14 of 32
subject property bearing no. 21/24 West Patel Nagar, New Delhi, from
leasehold to freehold on the payment of reasonable charges.
SUBMISSIONS ON BEHALF OF RESPONDENT NOS.1 AND 2
(ANSWERING RESPONDENTS)
9. Learned SPC for respondent Nos.1 and 2, while refuting the aforesaid
submissions made on behalf of the petitioner, has made the following
submissions: -
i) The petitioner and the respondent No.3 are the joint lessees of
the property in question and did not allow the property to be inspected
as there is an encroachment and unauthorised constructions by the
petitioner and the respondent No.3. It is submitted that the demand
raised by present respondents is right in terms of lease/conveyance
deed and under the conversion policy of 2003. It is the case of
respondents in terms of clause 7 of the conveyance deed, the petitioner
is bound to allow the inspection of the demised premises. However, the
same was not allowed by co-lessees of the property at different times. It
is submitted that the petitioner is liable to pay all government dues
under the conversion policy of 2003.
ii) It is submitted that subject property was inspected on 15.10.1974
and some authorized construction and encroachment was found
regarding which certain objections were raised under intimation to the
petitioner. It is further submitted that to confirm the status of
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 15 of 32
encroachment, whether the same was removed or not, a letter dated
01.06.2006, was written to the petitioner for inspection of the premises
on 06.06.2006; however, respondent no.3 did not allow the inspection
and stated that the prior information was not received regarding such
inspection. It is further submitted that, thereafter, on several occasions
inspection was not allowed to be conducted. It is further submitted that
the property was inspected by the respondent on 14.08.2006 and breach
of unauthorised constructions and encroachment were found. It is
pointed out that the letter dated 21.03.2006 by the petitioner that they
have already removed encroachment was found wrong. The petitioner
thereafter answered to breach reported on 14.08.2006 stating that
property was constructed in 1969–70 with approved plan from MCD.
However, the said plan was not readily available with the petitioner. It
is pointed out that in the said letter, the petitioner did not reply about
the encroachment whether the same was removed or not.
iii) It is further submitted that under the conversion policy, as the
encroachment was still existing in the subject property, the application
of the petitioner for conversion from leasehold to freehold of the
subject property was rejected vide letter 08.11.2006 and the conversion
charges deposited by the petitioner with conversion application was
also refunded by letter dated 08.11.2006.
iv) The petitioner (along with respondent No.3) again applied for
conversion on 12.04.2011/ 25.04.2011 and intimated the respondents
that they have already removed the encroachment and unauthorised
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 16 of 32
construction. It is the case of the respondent that again notice for
inspection was issued to the petitioner and property was inspected on
23.08.2011 and it was noticed that earlier encroachment reported were
removed but unauthorised constructions was still found on the subject
property. The petitioner showed his willingness by letter dated
15.10.2011 that he is ready to pay the charges for temporary
regularisation of unauthorised construction and also give an
undertaking that they will not encroach upon any public/government
land in future. It is further submitted that thereafter, the respondent
raised government dues by letter dated 17.05.2013 whereby, penalty for
unauthorised occupation charges was claimed from the date when the
property was found under encroachment. The representation from co-
lessee/ respondent no.3 was received on 13.06.2013 with request to re-
examine the demand raised by the respondent. However, after
examination of the representation, it was found that the demand has
been correctly raised.
v) The respondent had denied that they had failed to grant the
request of the petitioner for conversion of the subject property from
leasehold into freehold despite a lapse of period of more than 10 years,
since the first filing of application. It is the case of the respondent that
petitioner himself was not interested in removing encroachment
reported in the subject property and as such the conversion application
filed on 23.01.2006 was rejected under clause 20.10 of the conversion
policy which provided that the property involved in encroachment on
government/public land is not entitled for its conversion from leasehold
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 17 of 32
to freehold. Therefore, respondent no.2 has legally demanded the
government dues against the subject property.
vi) It is further submitted that the petitioner has been served with
demand letter dated 18.12.2024 during the pendency of the present
petition, after assessing all the damages, interest and for temporary
regularisation of the breaches and was directed to make payment of
₹58,25,976/-. It is further submitted that the petitioner has also been
served with a fresh breach notice dated 06.05.2025, with respect to the
unauthorised construction and encroachment on government/public
land. It is further pointed out that the petitioner has not removed the
illegal encroachment on government/public land and had not paid the
damages in terms of the breach notices issued to him. Further, the
inspection of the subject property was done during the pendency of the
present petition only, and prior thereto, the petitioner did not allow the
inspection of the subject property, and owing to this reason, the
application filed by the petitioner for conversion of the subject property
from leasehold to freehold was delayed.
vii) Learned SPC for respondent Nos.1 and 2 in pursuance of order
dated 09.07.2025, had placed on record original documents in respect
of the subject property and had shown the same to the Court during the
course of proceedings. Relying on the said documents, it has been
contended that show cause/demand notice was, in fact, issued to the
petitioner with respect to the alleged unauthorised construction and
encroachment in pursuance of inspection dated 15.10.1974.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 18 of 32
viii) In view of the aforesaid facts and circumstances of the present
case, it is prayed that the present petition may be dismissed.
ANALYSIS AND FINDINGS
10. Heard learned counsel for the petitioner as well as learned SPC for
respondent Nos.1 and 2 and perused the records.
11. For the adjudication of the present petition, following list of dates and
events are relevant: -
Date Event
31.01.1964 Perpetual lease of the subject property granted to Late Mulk
Raj Malhotra, and father-in-law of respondent No.3 by way of
registered lease deed.
26.09.1974 Respondent No.2/L&DO issued an Inspection Notice.
15.10.1974 Inspection report issued by respondent No.2 but no-show
cause notice/demand notice raised regarding the same.
13.05.2000 Father of the petitioner-Mulk Raj Malhotra expired.
17.01.2006 Names of the petitioner and respondent No.3 were substituted
as lessees by respondent No.2. However, no demand was
raised.
23.01.2006 Petitioner applied for conversion of the subject property vide
application No.08451 dated 23.01.2006 duly supported by
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 19 of 32
relevant documents along with payment of conversion
charges of Rs.62,175/- and other dues totalling Rs.70,000/-
were deposited with respondent Nos.1 and 2.
27.02.2006 Respondent No.2 wrote to the petitioner requiring him to
furnish completion certificate of property alleging that
inspection of the property revealed encroachment on
Government/Public Land and advising him to remove the
alleged encroachment.
16.03.2006 Petitioner informed respondent no.2 that aforesaid
encroachment had already been removed and requested the
concerned authorities to inspect the subject property at any
time and the proof of construction was also submitted.
04.08.2006 Respondent no.2 sent a letter to the petitioner in the form of
show cause notice alleging that the petitioner was preventing
the inspection of the subject property and also, threatened him
to re-enter the property in the event of the petitioner
preventing the inspection.
03.10.2006 Respondent no.2 communicated the details of the alleged
illegal or unauthorised constructions/alterations. The
petitioner was asked to remedy the alleged breaches.
16.10.2006 Petitioner and respondent no.3 apprised the concerned
authorities that the existing construction in the subject
property was raised by Late Mulk Raj Malhotra on the basis
of a duly sanctioned plan; however, the documents pertaining
to the same were not reachable at the time and time was
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 20 of 32
sought by the petitioner to submit the certified copies of the
same as in when they will become available.
08.11.2006 Respondent no.2/L&DO rejected the application dated
23.01.2006 of the petitioner for conversion of the subject
property and refunded the amount deposited by the petitioner
14.04.2011 The petitioner made renewed request/Application for
conversion of the subject property from leasehold to freehold
18.08.2011 Inspection notice issued by respondent no.2/L&DO in respect
of the subject property
10.10.2011
Notice issued to the lessee/petitioner to remedy the breaches
/26.09.2011
before exercising right of re-entry with respect to
unauthorised construction/misuse of subject property
17.05.2013 Demand/terms for temporary regularisation of
breaches/NOC/extension of time for completion/execution of
lease deed in respect of subject property whereby, the
petitioner was required to furnish an amount of ₹ 2481862/-
12.05.2016 Notice under Section 80 of the CPC served on the
respondents/Authorities requiring them to pass directions for
converting the subject property from leasehold to freehold
upon payment of reasonable charges without demanding any
interest on the amount of alleged penalties sought to be
imposed on the petitioner and other co-owner of the property
30.08.2016 Demand/terms for temporary regularisation of
breaches/NOC/extension of time for completion/execution of
lease deed/withdrawal of re-entry in respect of subject
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 21 of 32
property whereby, the petitioner was required to furnish an
amount of ₹ 3576629/-
03.11.2016 The present petition was filed seeking directions to the
respondent Nos.1 and 2 to convert the property bearing no.
21/24 West Patel Nagar, New Delhi, from leasehold to
freehold on the payment of reasonable charges.
12. From perusal of the aforesaid dates and events as well as the original
records placed on record by the answering respondents, it emerges that
respondent No.2/L&DO had issued an inspection notice on 26.09.1974 to the
petitioner in respect of the subject property. Inspection report regarding the
same was issued on 15.10.1974. It is pertinent to note here that no demand
was ever raised by respondent no.2 nor any show cause notice was ever sent
to the predecessor in interest of petitioner or respondent no.3 (co-owner/lessee
the subject property) for explaining or rectification of the alleged breaches in
terms of the inspection of the subject property carried out in 1974. The
petitioner moved an application for conversion of the subject property on
23.01.2006. The very first demand notice for regularisation of
breaches/NOC/extension of time for completion/execution of lease deed and
for withdrawal of right of re-entry in respect of subject property/demised
premises was made on behalf of answering respondents on 17.05.2013
whereby, the petitioner was required to furnish an amount of ₹24,81,862/–. A
perusal of the said demand notice shows that the answering respondents had
calculated and claimed the penalties for unauthorised occupation charges,
balance cost of land, revised ground rent and interest thereon to be payable
from when the subject property was found under encroachment vide
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 22 of 32
inspection report dated 15.10.1974 to 22.08.2011 , i.e., one day before the
encroachment found removed on inspection of the premises on 23.08.2011.
13. Admittedly, no demand notice or show cause notice was ever issued to
the petitioner prior to 17.05.2013. Further, there is nothing on record to show
that pursuant to alleged inspection on 15.10.1974, respondent no.2 quantified
the dues qua the alleged breaches in respect of the subject property and any
communication thereof with respect to any demand notice was made to the
then, lessee-Late Mulk Raj Malhotra. It is further pertinent to note that no
demand notice was issued by respondent no.2 even when the petitioner moved
application for conversion for the first time in 2006. There was absolutely no
reference to the alleged earlier breaches at any point in time till 17.05.2013.
14. Perusal of the record further shows that after the first application for
conversion was preferred by the petitioner on 23.01.2006, an inspection was
carried out and vide letter dated 27.02.2006, the petitioner was directed to
furnish completion certificate of the property alleging that in said inspection
there was encroachment on government/public land and the petitioner was
advised to remove the alleged encroachment. On 16.03.2006, the petitioner
informed respondent no.2 that alleged encroachment had already been
removed, and the concerned authorities may inspect the subject property at
any time. Even after this second inspection in 2006, no demand notice for
payment of dues, damages, penalties, etc., was issued by answering
respondents to the petitioner till the issuance of first demand notice was raised
on 17.05.2013. It is only after the issuance of demand notice on 17.05.2013,
the issue of unauthorised construction was first brought to the notice of the
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 23 of 32
petitioner. The petitioner cannot be penalised as no notice was ever given to
him in respect of alleged encroachment since 1974, and it would be illegal
and unwarranted to automatically deem encroachment since 1974. No
explanation has been given by answering respondents as to, why they did not
exercise their rights under lease deed over the said period of 32 years.
Therefore, in absence of any intimation/notice to the lessee, it would be
highly unjust and unfair to presume encroachment and unauthorised
construction from 1974 and thus, there is no basis for claiming such damages
and penalties from the petitioner. Therefore, the demand notice issued by
answering respondents on 17.05.2013 was not in accordance with law
inasmuch as no such demand notice was issued to the petitioner after the
inspection conducted in 1974 till the raising of demand notice dated
17.05.2013.
15. Insofar as the reliance placed by learned SPC for the answering
respondents on the original documents in respect of property shown to this
Court, in terms of order dated 09.07.2025, to claim that show cause/demand
notice was, in fact, issued to the petitioner with respect to the alleged
unauthorised construction and encroachment in pursuance to inspection dated
15.10.1974 is concerned, it is pertinent to note that said documents are in fact
undated and unsigned and are with respect to payment of ground rent and
premium etc., and are not related to the inspection report dated 15.10.1974.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 24 of 32
16. Learned Coordinate Bench of this Court in Tek Chand Narula and
5
Others v. Union of India and Others , wherein L&DO had failed to
crystallise the charges payable for the alleged breaches by way of demand
letter, had observed and held as under: -
“106. The respondents, for the first time, brought on record a
demand which is dated 14 March 2011. In the demand letter, there is
a reference to an earlier demand made on 14 April 1980. While there
is a reference to demand of this date (i.e. 14 April 1980) with the
reply filed to the writ petition, no such demand letter has been
appended to the reply. I must state that in the reply the respondents
have averred that such demand was served on the petitioners in the
suit court. The petitioners in their rejoinder have denied this fact.
Therefore, in my opinion, it was incumbent on the respondents to
place on record the demand letter dated 14 April 1980.
107. In the absence of this demand letter, one can only conclude that
for the first time misuse charges and damages for unauthorized
construction were conveyed to the petitioners on 14 March 2011. The
petitioners, as noticed above, however, challenged the demand by
amending its writ petition being W.P.(C) No. 11388/2009. This writ
petition was, however, disposed of on 26 February 2013 and the matter
was remanded to the L&DO to re-consider the case of the petitioners.
The remand was made based on the submissions advanced by the counsel
for the L&DO in the wake of the judgment of the Division Bench of this
Court in Jor Bagh Association.
108. As indicated above, that judgment of the Division Bench squarely
discussed the Office Order No. 23/1976, in particular, as to whether or
not that Office Order was the source of power for levying misuse charges
and damages for unauthorized construction or, did it provide the mode
and manner of levying misuse charges and/or damages. The Court in that
case, as noticed above, concluded that the source of power lay in the
Government Grants Act and the manner of levy of such charges and
damages was provided in the Office Order No. 23/1976. Therefore, given
this background, it was incumbent on the L&DO to consider the impact
of the Office Order No. 23/1976, in particular, Clause 7 of the said
5
2019 SCC OnLine Del 9924
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 25 of 32
Office Order. A perusal of the order dated 26 August 2014 would show
that there is no discussion whatsoever as to the impact of Clause 7 of the
Office Order No. 23/1976.
109. The L&DO via the order dated 26 August 2014 has only conceded
to reduction of penalty from 10% to 1%.
110. Mr. Jha's argument that the eviction proceedings carried out were
collusive or that the rent shown to have been collected by the petitioners
from its various delinquent tenants was not the actual amount received by
the petitioners are submissions which are bereft of any material. The
L&DO could have asked for relevant documents from the petitioners to
justify its claim that it had recovered from its delinquent tenants a sum of
only Rs. 4,68,732/-. The L&DO failed to make any inquiry in that behalf
and as a matter of fact, passed a perfunctory order on 26 August 2014.
111. The result is that the petitioners' application for mutation and
conversion of the property from leasehold to freehold remains pending.
112. Thus, having regard to the aforesaid, it is, to my mind, clear
that the L&DO has ended up piling the demand by delaying the
crystallization of misuse charges and damages for unauthorized
construction. It is well established that even in situations where a
period of limitation is not prescribed requiring the State or its
instrumentality to discharge its duty within a particular timeframe;
it is obliged in law to discharge its obligations towards the citizens
within a reasonable time.
113. In the context of crystallization of misuse charges and the delay in
freezing the same, the Supreme Court has made the following crucial
observations in the judgement rendered in Delhi Development Authority
v. Ram Prakash, (2011) 4 SCC 180 : AIR 2011 SC 1399.
“21. Having considered the submissions made on behalf
of the DDA and by the respondent appearing in-person,
and also having considered the reasoning of the learned
Single Judge and the Division Bench in repudiating the
claim of misuser charges by the DDA, we are unable to
convince ourselves that the decisions rendered by the
High Court, both by the learned Single Judge as also
the Division Bench, require any interference in these
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 26 of 32
proceedings. The materials on record will show that the
respondent took prompt steps against the tenants for
their transgression. During arguments it was indicated
that, in fact, one of the tenants had already vacated the
portion of the premises occupied by him. It is also very
clear that after issuing the Show-Cause Notices, the
petitioner did not take any follow-up action thereupon.
Instead, after a lapse of 25 years, the petitioner set up a
claim on account of charges for the entire period. It
would be inequitable to allow the petitioner which had
sat over the matter to take advantage of its inaction in
claiming misuser charges.
22. Even as to the contention raised on behalf of the
petitioner that there was no limitation prescribed for
making a demand of arrear charges, the Division Bench
relying on the decision of this Court in State of Punjab
v. Bhatinda District Cooperative Milk Producers Union
Ltd. [(2007) 11 SCC 363], observed that even where no
period of limitation is indicated, the statutory Authority
is required to act within a reasonable time. In our view,
what would construe a reasonable time, depends on the
facts and circumstances of each case, but it would not
be fair to the respondent if such demand is allowed to be
raised after 25 years, on account of the inaction of the
petitioner.”
(Emphasis is mine)
114. Therefore, I have no hesitation in holding that respondent No.
2/L&DO was guilty of delay and laches in not crystallizing the amounts
which the petitioners or their predecessor-in-interest was required to pay
to condone the violation of the covenants of the perpetual lease deed, in
particular, Clause 2(5) and 2(6).
115. Thus, given the foregoing discussion, the two orders of even date
dated 18 October 2007 issued by the L&DO rejecting the petitioners'
application for mutation and conversion of property from leasehold to
freehold are quashed. Likewise, the demand notices dated 14 March
2011 and order dated 26 August 2014 are also quashed. The L&DO is
directed to recalculate the misuse charges and damages for unauthorized
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 27 of 32
construction after giving the benefit of Clause 7 of Office Order No.
23/1976.”
(emphasis supplied)
17. In the present case as well, first demand letter with respect to the
alleged breaches and unauthorised construction was issued to the petitioner on
17.05.2013 claiming damage charges for unauthorised construction, and
penalties from 15.10.1974, the day when the subject property was initially
inspected. It is a matter of record that no show cause notice or demand for
charges was made pursuant to aforesaid inspection in 1974. The next
inspection was carried out on 14.08.2006. However, no demand was raised
after inspection carried out in 2006. The application of the petitioner dated
23.01.2006 for conversion of the subject property was rejected on 08.11.2006.
Thereafter, petitioner made renewed request/application for conversion of the
subject property from leasehold to freehold. Fresh inspection notice was
issued by respondent No.2/L&DO on 18.08.2011, and after inspection on
23.08.2011, breach notice was issued on 10.10.2011/26.09.2011. The first
demand notice was issued to the petitioner on 17.05.2013 which included the
period for 15.10.1974 to 14.08.2006 and from 14.08.2006 till the date of the
said demand notice. Similarly, demand notice dated 30.08.2016 also included
the period from 15.10.1974 to 17.05.2013, and from 18.05.2013 till
30.08.2016.
18. In view thereof, the demand notice dated 17.05.2013 issued by
answering respondents with respect to misuse/unauthorised construction
along with damages and interest from 15.10.1974 till 14.08.2006 (date of first
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 28 of 32
inspection after the mutation in name of petitioner) is not valid in the eyes of
law on account of following reasons: -
i) First inspection of the subject property with respect to
unauthorised construction was done on 15.10.1974. However, as per
the original records no show cause notice/breach notice/demand notice
was issued with respect to the same.
ii) First intimation by respondent No.2 to the petitioner with respect
to breach and unauthorised construction, after the application dated
23.01.2006 of the petitioner for conversion was given on 27.02.2006;
however, no demand notice was raised at that time. The petitioner’s
application dated 23.01.2006 for conversion of the subject property
from leasehold to freehold was rejected on 08.11.2006.
iii) After renewed application for conversion of the petitioner in
2011, inspection was done on 10.10.2011/26.09.2011; however, no
demand notice was raised at that time as well.
iv) No demand notice was raised by the answering respondents qua
misuse/unauthorised construction in the subject property till
17.05.2013. The said demand notice issued to the petitioner included
the period for 15.10.1974 to 14.08.2006 and from 14.08.2006 till the
date of the said demand notice. In these circumstances, the demand
concerning the aforesaid period from 15.10.1974 to 14.08.2006 cannot
be sustained.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 29 of 32
v) For the period 15.08.2006 to demand notice dated 17.05.2013,
the answering respondent will not be entitled to charge any
penalty/interest, as the delay in raising the demand for the said period is
solely attributable to them.
19. Further, the demand notice dated 30.08.2016 is also not valid for the
following reasons: -
i) The said demand notice was issued including the period from
15.10.1974 to 14.08.2006 and from 14.08.2006 till the date of the said
demand notice. As noted above, the answering respondents raised first
demand notice qua misuse/unauthorised construction in the subject
property on 17.05.2013. Therefore, period from 15.10.1974 to
14.08.2006 has to be fully excluded.
ii) Similarly, the penalty/interest charged by the answering
respondents for the period 14.08.2006 till 18.05.2013 also has to be
excluded in view of the aforesaid findings.
iii) The present petition is dated 03.11.2016 and was filed on said
date. Thus, from 18.05.2013 till the filing of the present petition , i.e.,
03.11.2016, the answering respondents can claim damages for
misuse/unauthorised construction along with interest thereon as per
rules applicable.
20. In these circumstances, the demand notices dated 17.05.2013 and
30.08.2016 are set aside.
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 30 of 32
21. During the pendency of the present petition, answering respondents had
issued breach notice dated 06.05.2024 to the petitioner in respect of
inspection done on 09.04.2024, in terms of order dated 09.02.2024 passed
learned Predecessor Bench in the present petition. The petitioner had also
filed a reply dated 09.09.2024 to the said breach notice before answering
respondents/L&DO. Further, answering respondents have also issued latest
demand notice on 18.12.2024 on the basis of the inspection conducted on
09.04.2024 to which replies/objections have been raised on behalf of the
petitioner. In the said demand letter/notice, respondent No.2/L&DO has
claimed damage charges for misuse/unauthorised construction till 14.01.2025
including earlier demand interest balance as well as interest on previous
damage charges for the period from 15.10.1974 to 17.05.2013, and from
18.05.2013 till issuance of this demand notice. Admittedly, the petitioner was
not served with any demand notice prior to 17.05.2013. The present petition
was filed on 03.11.2016. The aforesaid demand letter raised during the
pendency of the present petition for the period till 09.04.2024 is also not
valid, and therefore, the same is also set aside.
22. The respondent No.2/L&DO is at liberty to issue fresh show
cause/breach notice with respect to the damages for misuse/unauthorised
construction from 14.08.2006 till 17.05.2013; however, no interest/penal
charges would be claimed for this period. The respondent No.2 can further
raise demand for the period from 18.05.2013 till 03.11.2016 as per Rules.
Thereafter, for the period from 03.11.2016 till 09.04.2024, respondent No.2
can claim damages/charges for breaches but any interest/penal charges cannot
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26
W.P.(C) 11286/2016 Page 31 of 32
be claimed for this period on account of pendency of the present writ petition.
The answering respondents shall pass a reasoned order regarding the damages
for misuse/unauthorised constriction after providing an opportunity of hearing
to the petitioner within a period of 4 weeks. Thereafter, the application
No.105593 dated 14.04.2011 filed by the petitioner seeking conversion of
property bearing No. 21/24, West Patel Nagar, New Delhi, from leasehold to
freehold shall be decided by the answering respondents within a period of 4
weeks after passing of the reasoned order qua the misuse/unauthorised
charges under intimation to him.
23. Needless to state that, if the petitioner is aggrieved by the order of the
L&DO/respondent No.2, he will at liberty to take recourse to an appropriate
remedy, which may be available to them, in accordance with law.
24. The present petition is disposed of with the aforesaid directions.
25. Pending applications, if any, also stand disposed of accordingly.
26. The original record of the subject property retained with Court may be
returned to the learned SPC for respondent Nos. 1 and 2, Ms. Saroj Bidawat.
27. Judgment be uploaded on the website of this Court, forthwith .
AMIT SHARMA
(JUDGE)
JUNE 30, 2026/kr/ns
Signature Not Verified
Signed By:SHIWANI
NEGI
Signing Date:01.07.2026
18.26