M/S ZUARI INFRAWORLD INDIA LIMITED vs C V SAJEEVAN

Court
Karnataka High Court

- 1 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024


IN THE HIGH COURT OF KARNATAKA AT BENGALURU


TH
DATED THIS THE 11 DAY OF SEPTEMBER, 2026

PRESENT

THE HON'BLE MR. JUSTICE D K SINGH

AND

THE HON'BLE MR. JUSTICE H.SHANTHI BHUSHAN

CIVIL CONTEMPT PETITION NO. 604 OF 2024

BETWEEN:

M/S ZUARI INFRAWORLD INDIA LIMITED
ZUARI GARDEN CITY, HULIKERE
SRIRANGAPATNA TALUK,
MANDYA DISTRICT
REPRESENTED BY ITS
AUTHORISED SIGNATORY
MR. SRINIVAS B.S
…COMPLAINANT
(BY SRI. THOMAS V PETER.,ADVOCATE)

AND:

1. C.V. SAJEEVAN,
OFFICIAL LIQUIDATOR,
M/S MANDYA NATIONAL PAPER MILLS,
HIGH COURT OF KARNATAKA,
TH
12 FLOOR, RAHEJA TOWERS,
M.G. ROAD, BENGALURU – 560 001.
.. DELETED V/O DT.27.11.2024










Digitally
signed by
MALA K N
Location:
HIGH COURT
OF
KARNATAKA

2. SHRI PARASHURAM,
THE TAHSILDAR TALUK,
OFFICE SRIRANGAPATNA TALUK,
MANDYA DISTRICT.

3. SHRI. ANATHRAJU,
BLOCK EDUCATION OFFICER,
EDUCATION DEPARTMENT,
SRIRANGAPATNA TALUK,
MANDYA DISTRICT.
…ACCUSED

- 2 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

4. STATE OF KARNATAKA,
REPRESENTED BY ITS SECRETARY,
VIDHANA SOUDHA,
BENGALURU .
…PROFORMA RESPONDENT

(BY SRI.BHAIRAV KUTTAIAH, AGA FOR PROFORMA R4;
V/C/O DATED 27/11/24, A1 IS DELETED,
SRIRANGAPATNA TALUK, THE TAHSILDAR,
SRIRANGAPATNA TALUK, MANDYA –SD;
A3-M.R.ANANTHARAJU,
BLOCK EDUCATION OFFICER,
EDUCATION DEPARTMENT,
SRIRANGAPATNA TALUK, MANDYA - SD)

THIS CCC IS FILED UNDER SECTIONS 11 AND 12 OF THE
CONTEMPT OF COURTS ACT, 1971, R/W ARTICLE 215 OF THE
CONSTITUTION OF INDIA, PRAYING TO INITIATE AND TAKE ACTION
AGAINST THE ACCUSED NO.2 AND 3 FOR WILFUL DISOBEDIENCE OF
THE ORDER, DATED 20.12.2023, PASSED BY THIS HON’BLE COURT
IN C.A. NO.253/2018 IN COP 112/1194 AND ETC.,

THIS PETITION, COMING ON FOR ORDERS, THIS DAY, ORDER
WAS MADE THEREIN AS UNDER:

CORAM: HON'BLE MR. JUSTICE D K SINGH
AND
HON'BLE MR. JUSTICE H.SHANTHI BHUSHAN

ORAL ORDER

(PER: HON'BLE MR. JUSTICE H.SHANTHI BHUSHAN)
This contempt petition is preferred by the Complainant
under Sections 11 and 12 of the Contempt of Courts Act, 1971,
read with Article 215 of the Constitution of India, alleging willful
disobedience, defiance and non-compliance of the directions
issued by the learned Single Judge of this Court in the order

- 3 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

dated 20.12.2023 passed in Company Application No.253/2018
arising out of Company Petition No.112/1994.
(i) Facts of the complainant:
2. The complainant, M/s.Zuari Infraworld India
Limited, has instituted the present Civil Contempt Petition
alleging willful disobedience of the order dated 20.12.2023
passed by this Court in Company Application No.253/2018 in
Company Petition No.112/1994. It is the case of the
complainant that, under the said order, Respondent No.2–
Tahsildar, Srirangapatna Taluk, was directed to effect
necessary changes in the revenue records in respect of the
property conveyed to the complainant, whereas Respondent
No.3–Block Education Officer was directed to deliver and hand
over physical possession of the property purchased by the
complainant, which was stated to be in his possession.
3. According to the complainant, notwithstanding
receipt of the certified copy of the order and subsequent
representations dated 04.03.2024 and 04.04.2024 addressed
to Respondent No.2, and representations dated 25.04.2024 and

- 4 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

20.05.2024 addressed to Respondent No.3, no steps were
taken to comply with the directions.
4. Alleging that the respondents had deliberately failed
to act upon the directions issued by this Court, the complainant
has sought initiation of contempt proceedings against them.
(ii) Order in Company Application No.253/2018:

5. The records would indicate that the complainant
had earlier approached this Court by filing Company Application
No.253/2018 under Rules 6 and 9 of the Companies (Court)
Rules, 1959, seeking completion of survey work, correction of
revenue records and delivery of physical possession of the
property purchased from M/s. Mandya National Paper Mills, a
company in liquidation. The complainant had purchased an
extent of 73.65 acres situated at Hulikere, Belagula Hobli,
Srirangapatna Taluk, Mandya District, in a public auction for a
consideration of Rs.36 crores, pursuant to which a sale deed
dated 12.12.2007 came to be executed in favour of M/s. Anil
Kumar M.N. Developers Pvt. Ltd, the predecessor of the
complainant/Company . Subsequently, on noticing a shortfall of

- 5 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

3 acres 20 guntas, Company Application No.533/2014 was filed
and, pursuant to the order dated 21.08.2014 passed therein, a
Deed of Rectification dated 14.10.2014 came to be registered.
6. The grievance of the complainant was that, despite
the communications addressed by the Official Liquidator to the
Tahsildar on 14.10.2014 and 08.01.2015, the revenue entries
had not been suitably altered and the possession of the portion
occupied by the Government School had also not been handed
over.
7. Upon consideration of the rival submissions,
including the affidavit filed by the Tahsildar dated 04.10.2023,
this Court, vide order dated 20.12.2023, partly allowed the
application and directed Respondent No.2 to make necessary
changes in the revenue records in terms of the order dated
21.08.2014 and the registered Deed of Rectification dated
14.10.2014. Respondent No.3 was further directed to deliver
and hand over physical possession of the property purchased
by the applicant, which was in his possession. The Court
stipulated two weeks for compliance by Respondent No.2 from
the date of receipt of a copy of the order and four weeks for

- 6 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

Respondent No.3 from the date of change in the revenue
records.
(iii) Reply statement of Respondent Nos.2 and 3:
8. Respondent Nos.2 and 3, namely the Tahsildar and
the Block Education Officer, Srirangapatna Taluk, have filed
their reply statement dated 03.11.2025, admitting the passing
of the order dated 20.12.2023 and the directions contained
therein. They have also admitted receipt of the representations
made by the complainant on 04.03.2024, 04.04.2024,
25.04.2024 and 20.05.2024. Their principal defense, however,
is that there has been no willful disobedience of the order. It is
stated that they had earlier challenged the order dated
20.12.2023 by filing OSA No.19/2024 on 13.09.2024. The said
appeal was subsequently withdrawn on 29.01.2025 on the
ground of certain technical defects. Thereafter, they filed
Company Application No.35/2025 on 06.02.2025, which was
presented before the Registry on 16.02.2025, seeking recall of
the order dated 20.12.2023. They contend that the issues
raised in the said application are pending consideration and

- 7 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

that the contempt proceedings ought not to be proceeded with
without examining those objections.
9. So far as the direction relating to correction of the
revenue records is concerned, Respondent No.2 contends that
the lands in question had ceased to be agricultural lands and
had already been converted for non-agricultural purposes. It is
further contended that MUDA had sanctioned the plan for
development of residential villas and, therefore, the Tahsildar
had no jurisdiction under the Karnataka Land Revenue Act,
1964, to effect the changes sought by the complainant. In
support of this contention, reliance is placed on the affidavit
dated 04.10.2023 filed by the Tahsildar in Company Application
No.253/2018 itself. It is their further case that the said aspects
were not properly considered while passing the order dated
20.12.2023 and form part of the grounds urged in Company
Application No.35/2025. On that basis, they maintain that the
failure to make entries in the revenue records cannot be
characterised as deliberate disobedience of the order of this
Court.

- 8 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

10. With regard to the direction for delivery of physical
possession, Respondent No.3 contends that the Government
School situated in an extent of 3 acres 20 guntas is established
and maintained by the Government of Karnataka and that the
Block Education Officer is neither in possession of the property
in his individual capacity nor competent to hand over
Government property. It is further contended that the Official
Liquidator, by his communication dated 19.08.2008 addressed
to the Engineer and Valuer, had specifically excluded the land
occupied by the school, quarters and water tank from the
extent put up for sale. Reliance is also placed on the
subsequent communications dated 09.09.2008 and
26.09.2008, as well as the sketches prepared in connection
with the rectification deed, to contend that the school premises
formed part of the excluded extent of 17 acres 19 guntas and
were never intended to be conveyed to the original purchaser.
11. They allege that the complainant has relied upon a
different sketch forming part of the Deed of Rectification dated
14.10.2014 and has thereby included the school premises
within its claim of 3 acres 20 guntas. It is their specific stand

- 9 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

that the Block Education Officer is not the competent authority
to surrender the school premises and that the alleged
discrepancy in the extent and identity of the land requires
examination in Company Application No.35/2025. On these
grounds, both respondents deny having committed any willful
disobedience and seek dismissal of the contempt petition.
12. We have heard Sri.Thomas V. Peter, learned
counsel for the Complainant and learned Additional
Government Advocate for respondent No.4/State. Upon
consideration of the pleadings, the records placed before this
Court and the submissions advanced on behalf of the
complainant and the State, the point that arises for our
consideration in this contempt petition is:
“Whether Respondent Nos.2 and 3/contemnors
have willfully disobeyed the directions issued by this
Court in the order dated 20.12.2023 passed in
Company Application No.253/2018, as alleged by
the complainant?”
iv) Reasons:
13. The complainant filed a memo dated 14.11.2024,
stating that the allegation of willful disobedience was confined
to Respondent Nos.2 and 3, namely, the Tahsildar and the

- 10 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

Block Education Officer, in respect of the order dated
20.12.2023 passed in Company Application No.253/2018 in
Company Petition No.112/1994. It was further stated that no
relief was sought against Respondent No.1, M/s.Mandya
National Paper Mills, represented by the Official Liquidator. On
that basis, the complainant sought permission to delete
Respondent No.1 from the array of parties. This Court accepted
the memo by order dated 27.11.2024 and directed that
Respondent No.1 be deleted.
14. Thereafter, Respondent Nos.2 and 3 filed an
application under Section 151 of the Code of Civil Procedure,
supported by an affidavit, seeking recall of the order dated
27.11.2024. Their case is that the Official Liquidator was not an
unnecessary party. On the contrary, his presence was required
to place before this Court the circumstances in which the lands
of the company in liquidation were sold, the extent actually
offered for sale and the manner in which the sale deed and
subsequent rectification deeds came to be executed. They
contend that the complainant had itself chosen to delete the
Official Liquidator, though the dispute concerning the identity

- 11 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

and extent of the property originated from the sale conducted
by his office.
15. The circumstances leading to this application cannot
be considered in isolation. Respondent Nos.2 and 3 point out
that the Official Liquidator was the contesting respondent in
Company Application No.533/2014, pursuant to which the order
dated 21.08.2014 came to be passed. The subsequent order
dated 20.12.2023 in Company Application No.253/2018
directed the Tahsildar to make changes in the revenue records
in terms of the earlier order and the registered Deed of
Rectification dated 14.10.2014. It is, therefore, necessary to
examine the stand subsequently taken by the Official Liquidator
in Company Application No.35/2025, particularly because that
application concerns the very sale and rectification documents
on which the complainant relies in the present contempt
proceedings.
16. The reply statement filed by the Official Liquidator
in Company Application No.35/2025 assumes considerable
relevance. The statements made therein, particularly in
paragraphs-5, 18, 23, 34 and 35 have been relied upon by

- 12 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

Respondent Nos.2 and 3. The Official Liquidator has referred to
the circumstances in which the extent of 73.65 acres was
identified for sale and has maintained that the sale was on an
“ as is where is" basis. The material placed along with the reply
statement refers to the exclusion of the Government school,
the quarters allotted to former employees, the water tank and
the road while arriving at the extent available for sale.
17. The Official Liquidator has also relied upon the
correspondence exchanged in 2008 and the valuation material,
including the letter dated 19.08.2008 addressed to the
Chartered Engineer and Valuer, which records that the extent
available for sale was 73.65 acres after excluding the land
occupied by the quarters, water tank and school and road. The
subsequent correspondence dated 26.09.2008 is also relied
upon in support of that stand. The relevant statements made
by the official liquidator in his reply statement dated
31.07.2025 are extracted below:
"5. It is respectfully submitted that the Company
in liquidation also held certain land in its name, which
was originally acquired and allocated by the Government
of Mysore vide Government Gazette Notification dated
20.04.1961. The total extent of the land measured

- 13 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

91.13 acres. Out of this Hon’ble Court was pleased to
grant permission for the sale of 73.65 acres. This figure
was arrived at after deducting the following portions of
land:
•
Government School -3.56 acres
•
Quarters for former employees -12.24
acres (already sold to them vide Order dated
16.07.2004 in C.A. No. 12/02 and others)
•
Water Tank - 0.24 acres
•
Road -1.44 acres
These details were brought to the knowledge of the
Official Liquidator following the submission of a report
by the Chartered Engineer and Government-approved
Valuer appointed by this Hon'ble Court. The valuer’s
report, referred to as the “first report”, included a sketch
plan which clearly excluded the areas earmarked for the
school, employee quarters, water tank, and road thus
identifying 73.65 acres as the net area available for
sale. It is pertinent to note that, on the right-hand side
of the sketch annexed to the report, the valuer has
graphically illustrated the manner in which the total land
area was reduced by deducting the aforementioned
exclusions, and how the valuation was accordingly
derived, as recorded in OLR No. 495/2007. Copy of OLR
No. 495/2007 along with its annexures is herewith
marked and enclosed as ANNEXURE - R1.
xxxxxxxxxxxxxxxxxxx
18. That the Official Liquidator respectfully submits
for the attention of this Hon’ble Court that, around the
year 2013, the auction purchaser now known as Zuari
Infra World India Limited, did not disclose to either the
Official Liquidator or this Hon’ble Court that the MUDA
Plan Scheme had been approved for a total area of
73.65 acres on 30.03.2013 and 20.06.2013, as
referenced by the Applicant in paragraph 9 under the
heading “MUDA plan sanctioned on the basis of the

- 14 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

Rectification Deed .” In fact, the Official Liquidator
became aware of the MUDA approval only upon the filing
of the counter affidavit dated 04.10.2023 by the
Tahsildar, Srirangapatna, in C.A. No. 253 of 2018, and
subsequently, in greater detail through the present
application. It is respectfully submitted that, had this
material fact been brought to the notice of this Hon’ble
Court at the relevant time, the order dated 21.08.2014
passed in C.A. No. 533 of 2014 would not have been
passed particularly if the contentions now raised by the
Applicant are found to be true as there would have been
no shortfall in the land sold. It is respectfully contended
that Zuari Infra World India Limited obtained the said
order by suppressing this crucial information from both
the Official Liquidator and this Hon’ble Court. In light of
the above, the Official Liquidator respectfully prays that
this Hon’ble Court may be pleased to direct the
concerned revenue authorities (State Government) to
delete from all sale deeds the survey numbers
pertaining to the school, water tank, quarters, and road,
as these properties were never intended to form part of
the sale.
xxxxxxxxxxxxxxxxxxxxxx
23. At this juncture, the Official Liquidator
respectfully submits for the consideration of this
Hon’ble Court certain discrepancies that have arisen
in relation to the surveyor’s report. Although the report
was accompanied by a sketch illustrating the alleged
shortfall in the property, and includes detailed
demarcations such as gates and roads, it
conspicuously omits any representation of the
government school or water tank - neither are shown in
the sketch nor listed in the index table annexed to the
report. It is further observed that an area of 14.20
acres was deducted from the total extent of 87.85
acres, whereas the second report records the total land
area as 87.25 acres, reflecting an inconsistency in
measurements. Another issue the Official Liquidator
wishes to bring to the attention of this Hon’ble Court is
that, in the first survey report, the total area earmarked

- 15 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

for the employee quarters (Quarter A, Quarter B and
Quarter C) was indicated as 12.24 acres, as reflected in
the note to the sketch appended thereto. However, in
the sketch attached to the third report, the same
quarters are shown as occupying 14.20 acres
(equivalent to 14acres and 8 guntas), thereby revealing
a discrepancy of area that warrants scrutiny by this
Hon’ble Court. It is pertinent to reiterate that the areas
earmarked for the school, water tank, roads, and
quarters were never intended to form part of the land
offered for sale. Despite this, the third report has
included portions of these areas-marked in red-as part
of the alleged shortfall and has proposed their transfer.
A comparative analysis of the first and third sketches
reveals that a portion of the red-marked shortfall in the
third report corresponds to land belonging to the school
and the water tank (with the school being the larger
segment), while a smaller portion seems to be
overlapping with the area devoted for quarters which is
earmarked for selling to the ex-employees of MNPM,
pursuant to the Order dated 16.07.2004 in
C.A.No.12/2002 and connected matters. The official
Liquidator has tabulated the aforementioned
discrepancies in the following comparative table, ad this
Hon’ble Court I respectfully requested to consider the
same. A copy of the order dated 16.07.2004 is
herewith marked and enclosed as ANNEXURE-30.
xxxxxxxxxxxxxxxxxxxx
34. That the Official Liquidator respectfully submits
that, the property in question was sold on an “as is
where is whatever there is” basis, after affording the
auction purchaser a fair opportunity to inspect the
property prior to purchase. It was expressly stipulated in
the terms and conditions of sale that, once the
opportunity for inspection was provided, the purchaser
could not subsequently claim non-inspection as a ground
for any grievance. The terms further clarify that, even if
the purchaser was not physically present on the date of
inspection, it would be deemed that the inspection had
been duly carried out. In light of the foregoing, the
belated Application filed by the auction purchaser in

- 16 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

2014, several years after the execution and registration
of the sale deed, for the removal of Karab land or for the
exclusion of certain portions allegedly included in error,
is devoid of merit and unsustainable in law.
Furthermore, the Official Liquidator submits for the
consideration of this Hon’ble Court that, upon obtaining
appropriate directions, the Official Liquidator shall
proceed to deal with the land belonging to the company
in liquidation, including the portion where the
government school or any remaining fall-out land such
as the water tank is situated, as such land was never
intended to be included in the sale.
35. It is the respectful submission of the Official
Liquidator that the survey numbers pertaining to the
government school, water tank, employee quarters, and
road, as reflected in the Sale Deed dated 12.12.2007,
the Rectification Deed dated 26.09.2008, and the Re-
Rectification Deed dated 14.10.2014, were never
intended to form part of the original sale in 2007. If
such survey numbers have been inadvertently included
in any of the aforementioned sale deeds, the same are
liable to be removed, as these portions were specifically
excluded from the scope of the original sale in 2007.
The Official Liquidator further submits that the total
extent of land sold to M/s. Zuari Developers Pvt. Ltd.
(the auction purchaser, initially known as M/s. Anil
Kumar M.N. Developers Pvt. Ltd.), including any Karab
land, is liable to be restricted to 73.65 acres, after duly
excluding the areas pertaining to the school, water tank,
employee quarters, and road, in accordance with the
intent and terms under which the sale was originally
conducted.”


18. The significance of these documents is not merely in
the description of the property. The material referred to by the
Official Liquidator identifies the Government school, quarters

- 17 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

for former employees, water tank and road as portions
excluded while arriving at the net extent of 73.65 acres. In
particular, the reply statement refers to the school measuring
about 3 acres and 56 guntas and disputes the complainant's
claim that the said area formed part of the property purchased
by it. It is also the stand of the Official Liquidator that the
quarters had already been dealt with in favour of former
employees and were not available for being included in the sale
to the complainant. These are not insignificant discrepancies
which can be brushed aside in a contempt proceeding. They
concern the very identity and extent of the land which the
complainant now seeks to secure through the present
proceedings.
19. The Official Liquidator has further referred to the
earlier sale documents and the rectification proceedings. His
reply statement questions the manner in which the subsequent
rectification deeds came to include survey numbers and extents
which, according to him, were not intended to form part of the
original sale. The Official Liquidator has also questioned the
inclusion of the school, water tank, quarters and road in the

- 18 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

documents relied upon by the complainant. It is in this
background that Respondent Nos.2 and 3 contend that the
complainant, after having obtained the order dated 20.12.2023,
sought deletion of the Official Liquidator from the contempt
proceedings, even though his explanation concerning the
original sale was directly relevant to the controversy. The Court
is conscious that these are disputed assertions. Nevertheless,
the material placed on record makes it clear that the claim
cannot be treated as a simple case of administrative inaction or
deliberate refusal to obey an unambiguous direction.
20. In V.S. Palanivel v. Sri Lakshmi Hotels (P) Ltd.
1
(Liquidator) , the Supreme Court has held that, it was for the
Auction Purchaser as an intending bidder to have conducted a
due diligence at its own end, gather all the relevant information
pertaining to the subject property which included the status of
the property and the liabilities attached to it, weigh all the pros
and cons and only thereafter participate in the auction process.
The Court further held that after participating in the e-auction
with open eyes, the auction purchaser could not subsequently
raise objections concerning the known attachment of the

1
(2025) 1 SCC 559

- 19 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

property, particularly when the auction was conducted on the
aforesaid basis. In paragraph-79, it is observed thus:
“79. In the light of the notice for sale and the replies
furnished to the auction-purchaser well before the bidding
process had commenced, we are of the considered view
that it was for the auction-purchaser as an intending
bidder to have conducted a due diligence at its own end,
gather all the relevant information pertaining to the
subject property which included the status of the property
and the liabilities attached to it, weigh all the pros and
cons and only thereafter participate in the auction
process. After having participated in the e-auction with its
eyes wide open, the auction-purchaser cannot be heard to
state that payment of the balance sale consideration was
linked with the lifting of the attachment order passed by
the Income Tax Department when it knew all along that
the auction was being conducted on an “as-is-where-is”,
“as-is-what-is” and “whatever-there-is” basis.”


21. In the instant case, what is required to be noticed is
that, the complainant had purchased the property under the
sale deed dated 12.12.2007, for a consideration of Rs.36 crores
and the sale was stated to be on an “as is where is" basis .
The Official Liquidator's reply in Company Application
No.35/2025 refers to the opportunity afforded to the purchaser
to inspect the property and to the extent of land identified for
sale. The sale deed and the subsequent rectification
documents, however, have given rise to competing claims
regarding the survey numbers and the actual extent conveyed.

- 20 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

The Official Liquidator has sought to explain these discrepancies
in his reply statement. Whether that explanation is ultimately
acceptable, and whether the complainant is entitled to any
further extent of land, are matters to be examined in the
appropriate company proceedings. They cannot be conclusively
determined by invoking the contempt jurisdiction.
22. It is also necessary to bear in mind the nature of
the directions contained in the order dated 20.12.2023. The
Tahsildar was directed to make necessary changes in the
revenue records in terms of the order dated 21.08.2014 in
Company Application No.533/2014 and the registered Deed of
Rectification dated 14.10.2014. The Block Education Officer was
directed to hand over possession of the property purchased by
the complainant which was in his possession. The present
controversy, however, concerns whether the school land and
the other excluded portions formed part of the property
conveyed to the complainant at all. The respondents have
placed material to show that the school, water tank, quarters
and road were treated as excluded portions while arriving at
the saleable extent. In such circumstances, a direction to hand

- 21 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

over possession cannot be read as requiring the respondents to
deliver land which, according to the records relied upon by
them, was never part of the property sold to the complainant.
23. The complainant's decision to seek deletion of the
Official Liquidator, followed by the present dispute over the
recall of that order, is also a circumstance which has to be
viewed along with the proceedings in Company Application
No.35/2025. It would be unsafe, however, to record a finding
of deliberate suppression or mala fides merely on the basis of
the deletion memo. What is evident is that the complainant
sought to proceed with the contempt petition against the
Tahsildar and the Block Education Officer, while the Official
Liquidator, whose office had conducted the sale and executed
the conveyance documents, was no longer on record. The
material now relied upon by the respondents demonstrates why
his stand cannot be ignored while examining the nature of the
property conveyed and the extent of the directions capable of
being implemented.

- 22 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

2
24. In Tirupathi Rao v. M. Lingamaiah , The
Supreme Court held that even where disobedience of an order
is not disputed, the Court may accept a defence of impossibility
to comply with the order and conclude that action to punish for
contempt need not be initiated. The Court emphasised that the
alleged contemnor must bring the valid grounds for inability to
comply to the Court's notice without delay. The relevant
observation, as reproduced in the Judgement at paragraph 77,
reads:
“77. Therefore, it would be correct to state that the
court's power when dealing with the question of
contempt, in a sense, is discretionary. It cannot be
gainsaid that even in cases where disobedience of the
order of the court is not disputed, the court may also
accept a defence, if raised, of impossibility to comply with
an order and come to the conclusion that since it is
impossible to enforce its order, action to punish may not
be initiated. That apart, refusal may be justified by grave
concerns of public policy. Much would depend on the facts
and circumstances of the case, the nature of the
contempt under enquiry, etc. which would enable the
court to exercise its discretion either way. However, to
demonstrate his bona fides, the contemnor ought to bring
any valid defence for his disability to comply with the
court's direction to its notice without wasting any time.
Whatever be the position before it, nothing stands in the
way of the High Court from passing an order to ensure
that nothing impedes the course of justice.”


2
(2024) 20 SCC 188

- 23 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

25. The aforesaid principle has to be read with the
subsequent decision of the Hon’ble Supreme Court in Israr
3
Ahmad Khan v. Amarnath Prasad , The Supreme Court
clarified that an alleged contemnor who considers an order to
be impracticable or impossible to implement must take
recourse to appropriate proceedings promptly and within the
prescribed period of limitation. A plea of administrative hurdles
or impossibility may not be available where the alleged
contemnor has failed to approach the appropriate Court in time.
In paragraph 26, the Supreme Court observed:
“26. As pointed out in Subedar Devassy P.V.
(supra), if an alleged contemnor is of the view that the
Order apropos which contempt is alleged is, inter alia,
impracticable or impossible, it will have to take recourse
to appropriate proceedings. We may add that a defence
of administrative hurdles or even impossibility to
perform what has been ordered, may not be open to an
alleged contemnor, if he/she has not moved the
appropriate Court by recourse to appropriate
proceedings in time, promptly and within the prescribed
period of limitation, subject to condonation, if and as
applicable, on sufficient cause being shown. As narrated
above, even the defective Review Petition in the present
case was filed after lapse of time granted for
implementation/obedience of the Order dated
20.05.2025. We say no more on this count.”


3
2026 SCC OnLine SC 322

- 24 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

26. The principles emerging from the aforesaid
decisions are that an operative judicial direction cannot be
disregarded at the unilateral choice of the person bound by it. A
party who considers compliance impossible, impracticable or
beyond its authority must ordinarily approach the Court for
appropriate clarification, modification or other relief without
delay. The mere filing of a belated appeal, review or recall
application does not, by itself, suspend the operation of the
order or erase the period of non- compliance. At the same time,
the contempt Court must examine whether the alleged breach
is willful, whether the direction is capable of being implemented
as framed, and whether the defence raised is genuine and
supported by material. The question is not whether the original
order was correct, but whether its terms have been deliberately
disobeyed.
27. The contempt jurisdiction cannot be converted into
a proceeding for deciding disputed title, survey boundaries or
the true extent of land conveyed under a sale deed. Nor can it
be used to secure possession of property when the very
question whether such property formed part of the sale remains

- 25 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

seriously disputed. The respondents may be required to comply
with the order of this Court; but a failure to deliver property
which is not shown to have been conveyed, or which is claimed
by the respondents to have been excluded from the sale,
cannot, without more, be characterised as willful disobedience.
The distinction between inability to comply with a direction in
respect of a disputed property and a deliberate defiance of the
Court's order must be maintained.
28. In these circumstances, this Court is not satisfied
that the complainant has established willful and deliberate
disobedience of the order dated 20.12.2023 by Respondent
Nos.2 and 3. The dispute regarding the school land measuring
about 3 acres and 20 guntas, the quarters of former
employees, the water tank and the road, together with the
discrepancies alleged in the sale and rectification deeds,
requires consideration in the substantive company proceedings.
The contempt petition is not the forum to resolve those issues.
The complainant cannot obtain, through contempt proceedings,
a determination of its entitlement to lands whose inclusion in
the original sale is itself in dispute.

- 26 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

29. There is, however, a further concern. The
complainant has pursued the claim for the alleged shortfall of 3
acres and 20 guntas and has relied upon the rectification deed
dated 14.10.2014. At the same time, the Official Liquidator's
reply in Company Application No.35/2025 places on record a
different account of the extent offered for sale and the portions
expressly excluded. The complainant's entitlement to the
disputed portions cannot be presumed merely because a
direction for correction of revenue entries and delivery of
possession came to be issued on 20.12.2023. The parties must
work out their respective claims in the appropriate proceedings,
on the basis of the sale records, valuation reports, sketches
and registered documents. This Court expresses no final
opinion on the title or entitlement of either side to those
disputed portions.
30. We are constrained to observe that the affidavit
sworn by the Block Education Officer (Respondent No.3) cannot
be accepted. The explanations tendered and the averments set
out therein are visibly calculated, contradictory, and clearly
motivated by extraneous considerations best known to the

- 27 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

deponent. When public officers are called upon to explain
compliance with judicial mandates, they owe an undivided duty
of transparency to the Court. Having chosen instead to set up a
tenuous and oblique defense, the affidavit filed by Respondent
No.3 deserves to be disregarded in its entirety.
31. Even though the Block Education Officer has filed an
affidavit stating that he would hand-over the school, we are of
the view that it is not his business to hand-over the school, as
the School does not belong to him, it belongs to the State
Government. His affidavit cannot be considered in view of he
not being the owner of the land in which school is situated, but
he is only a custodian of the school. The affidavit filed by the
Block Education Officer is for the extraneous reasons best
known to him. Hence, the affidavit filed by the Block Education
Officer cannot be considered.
32. The right to education is a fundamental right
enshrined under Article 21A of the Constitution of India. Under
the guise of claiming 3 acres 20 guntas of land, the
complainant has sought to misuse contempt jurisdiction to
acquire the grounds of a functioning government school. This

- 28 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

stands in direct contravention of the record, wherein the Official
Liquidator in Company Application No. 35/2025 has
unequivocally placed on record that the school, water tank,
quarters, and road were excluded from the original auction
sale. For prosecuting an unmerited petition that seeks to
undermine a constitutional guarantee and appropriate public
utilities, the contempt petition is liable to be dismissed with
costs of Rs.5,00,000/- payable by the complainant.
33. For the reasons stated above, the essential
requirement of willful disobedience, which must be established
before a person can be proceeded against for contempt, is not
made out.
34. As regards costs, this Court finds that the
complainant has pursued the contempt proceedings in a
manner which has required the respondents to place before this
Court the underlying sale records and the subsequent
proceedings concerning the very extent of land claimed. The
dispute is not a simple one of non-compliance with a clear
direction. The complainant sought to secure, through contempt
proceedings, possession of portions whose inclusion in the sale

- 29 -
HC-KAR
NC: 2026:KHC:49774-DB
CCC No. 604 of 2024


CNR: KAHC010336442024

is seriously disputed and which the material produced by the
respondents shows were treated as excluded from the saleable
extent, in the garb of acquiring 3 acres the complainant intends
to knock off the school.
35 . Accordingly, the Contempt Petition stands closed
with costs of Rs.5,00,000/- (Rupees Five Lakhs).
The costs of Rs.5,00,000/- (Rupees Five Lakhs) imposed
on the complainant shall be deposited with the Armed Forces
Battle Casualties Welfare Fund, Canara Bank Savings Bank
Account No.90552010165915 IFSC Code: CNRB0019055 within
six weeks from the date of the order being uploaded on the
High Court website.
Pending interlocutory applications, if any, stand disposed
of.
Sd/-
(D K SINGH)
JUDGE

Sd/-
(H.SHANTHI BHUSHAN)
JUDGE
KNM/List No.: 1 Sl No.: 13