IN THE HIGH COURT OF MADHYA PRADESH
AT JABALPUR

BEFORE
HON'BLE SHRI JUSTICE VIVEK RUSIA,
ACTING CHIEF JUSTICE
&
HON'BLE SHRI JUSTICE PRADEEP MITTAL
th
ON THE 24 OF AUGUST, 2026
WRIT PETITION No. 34703 of 2026
SUFIYAN KHAN
Versus
THE STATE OF MADHYA PRADESH AND OTHERS
Appearance:
Shri Ravi Prakash Dwivedi, Advocate for the petitioner.
Shri Abhijeet Awasthi, Dy Advocate General for the State.
Shri Manoj Kushwaha, Advocate for respondent No. 3.
ORDER
Per: Pradeep Mittal, J.
The present PIL has been filed seeking the following reliefs:-

"a) Issue an appropriate writ, order or direction in the nature of
Mandamus directing the respondent authorities, particularly the
Municipal Council, Shahdol, to ensure that the road
proposed/under construction from Budhar Chowk to Balpurwa
Bus Stand, Shahdol, having an approximate width of 18 metres, is
planned, constructed and completed only after making adequate,
safe, continuous and properly demarcated footpaths an integral
and inseparable component of the said road infrastructure.
b) Issue an appropriate writ, order or direction directing the
respondent authorities to forthwith examine and review the
sanctioned plan, technical design, DPR, alignment and
construction plan of the aforesaid road, and to suitably
modify/augment the same, if necessary, so as to incorporate a
functional pedestrian corridor of adequate width and continuity on
both sides of the road, consistent with applicable engineering,
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
2 WP-34703-2026
urban-planning and accessibility norms.
c) Issue an appropriate writ, order or direction commanding the
respondent authorities to ensure that the footpaths so provided are
continuous, accessible, reasonably unobstructed, properly
surfaced, safely connected with pedestrian crossings and duly
demarcated, so that pedestrians are not compelled to enter or share
the main carriageway with motorised vehicles.
d) Direct the respondent authorities to ensure that the pedestrian
infrastructure is designed and executed in a manner facilitating
safe and convenient access for children, women, elderly persons
and persons’ with disabilities, including necessary accessibility
features and barrier-free pedestrian movement in accordance with
applicable norms.
e) Issue appropriate directions requiring the respondent authorities
to duly demarcate, protect and safeguard the footpath after its
construction and to take effective measures to prevent its
occupation by encroachments, unauthorised parking, construction
material or any other unauthorised use.
f) Issue a direction to the respondent authorities to ensure that the
entire road project is executed in conformity with the law declared
by the Hon’ble Supreme Court in Maniyar Iliyyaz @ Shaik Riyaz
& Anr. v. P. Ayyappan & Ors., Civil Appeal Nos. 4665-4666 of
2025, decided on 19.06.2026, recognising the fundamental right to
walk and the corresponding public duty to provide, demarcate,
maintain and safeguard footpaths.
g) Issue a writ of mandamus by directing the respondent
authorities do,decide the pending representation Annexure P-1
dated 10.08.2026 and 11.08.2026, of the petitioner in the light of
the judgment passed by Hon’bie Apex Court of India in the case
of Maniyar Iliyyaz @ ‘Shaik Riyaz & Anr. v. P. Ayyappan & ‘ors:
Civil Appeal Nos. 4665-4666 of 2025, decided on 19.06.2026, in
the interest of justice."

2. That the petitioner submits that the proposed Budhar Chowk–
Balpurwa Bus Stand Road, Shahdol, is an important urban public road
intended to cater to substantial vehicular as well as pedestrian movement.
The proposed width of approximately 18 metres and its connectivity with the
New Bus Stand, Shahdol, make the project significant for the movement and
safety of a large section of the public.
3. That the New Bus Stand is regularly used by local residents,
students, workers, women, elderly persons and other members of the public
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
3 WP-34703-2026
for inter-city and local transportation, resulting in substantial pedestrian

movement in and around the proposed road. It is, therefore, essential that
adequate pedestrian infrastructure be incorporated into the road project.
4. That, as per the Shahdol Development Plan, 2026, particularly
the provision relating to the proposed road at page 23, there is no adequate or
specific provision apparent for a continuous and properly demarcated
footpath for pedestrians. The petitioner submits that such omission requires
reconsideration at the present stage of construction.
5. That the road is presently under construction and, therefore, the
respondent authorities have a valuable and practical opportunity to
incorporate a properly designed pedestrian corridor before the carriageway,
drains, utility poles and other allied infrastructure are permanently
established. Failure to do so at this stage may make subsequent corrective
measures difficult, costly and disruptive.
6. That a public road cannot be planned exclusively from the
perspective of motorised traffic. Pedestrians are legitimate users of public
roads, including school-going children, women, elderly persons, persons
with disabilities, workers and other vulnerable road users. Their safety and
accessibility must, therefore, form an integral part of the planning and
execution of the road project.
7. That the mere availability of an 18-metre-wide carriageway
cannot, by itself, satisfy the requirement of safe pedestrian infrastructure. In
the absence of a separate, continuous and obstruction-free footpath,
pedestrians would be compelled to walk on or alongside the vehicular
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
4 WP-34703-2026
carriageway, thereby exposing themselves to an avoidable risk of accidents,

injury and loss of life.
8. That the petitioner submits that a footpath is not an optional or
post-construction civic amenity but an essential component of properly
planned urban road infrastructure. Its width, alignment, continuity,
accessibility, drainage, crossings and protection from encroachment and
obstruction ought to be determined and incorporated at the planning and
construction stage itself.
9. That the issue has acquired constitutional significance in view of
the judgment of the Hon’ble Supreme Court in Maniyar Iliyyaz @ Shaik
Riyaz & Anr. v. P. Ayyappan & Ors., Civil Appeal Nos. 4665–4666 of
2025, decided on 19.06.2026, wherein the Hon’ble Supreme Court
recognised the right to walk as a fundamental right and held that such right
includes the right to use demarcated footpaths, with a corresponding duty
upon the concerned authorities to endeavour to provide, maintain and
safeguard pedestrian infrastructure.
10. That, in view of the aforesaid declaration of law, the respondent
authorities are required to ensure that the proposed road is designed and
executed in a manner that meaningfully accommodates pedestrian movement
and does not subordinate pedestrian safety entirely to vehicular convenience.
11. The petitioner further submits that the obligation of the
respondent authorities does not end with the construction of the footpath.
The pedestrian corridor must also remain continuous, accessible, safe and
free from unauthorised parking, encroachment, construction material, utility
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
5 WP-34703-2026
installations and other obstructions so that it remains available for its

intended public purpose.
12. That the petitioner has no private, personal, commercial or
pecuniary interest in raising the present grievance. The petition concerns the
protection of pedestrian safety and enforcement of the constitutional and
public-law obligations of the Respondent authorities in respect of public
infrastructure and, therefore, raises a genuine issue of public interest.
13. That the failure to provide adequate pedestrian infrastructure
would affect an indeterminate and substantial class of citizens who may use
the proposed road and the New Bus Stand. The grievance is thus continuing
in nature and affects the public at large.
14. That the petitioner submits that the present stage of construction
constitutes the most appropriate and least disruptive stage for directing the
respondent authorities to review the sanctioned plan and road design and,
wherever necessary, incorporate a sufficiently wide, continuous, properly
demarcated, safe, accessible and obstruction-free footpath.
15. That unless appropriate directions are issued at this stage, the
respondent authorities may complete the road without adequate pedestrian
infrastructure, thereby creating a fait accompli and making subsequent
corrective construction difficult and financially burdensome for the public
exchequer.
16. That the petitioner, therefore, submits that the respondent
authorities ought to be directed to examine and suitably modify the existing
road plan and design, if necessary, so as to provide a functional pedestrian
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
6 WP-34703-2026
corridor as an integral part of the Budhar Chowk–Balpurwa Bus Stand Road,

consistent with the fundamental right to walk, public safety, applicable
planning norms and the law declared by the Hon’ble Supreme Court.
17. That the petitioner accordingly seeks appropriate intervention of
this Court to ensure that the ongoing public road project is executed in a
manner that protects pedestrian rights, promotes safe and inclusive urban
mobility and serves the larger public interest.
18. Per contra the respondents deny the contents of the petition to
the extent they allege that the proposed Budhar Chowk–Balpurwa Bus Stand
Road is being constructed without due consideration of pedestrian safety or
in violation of any fundamental or statutory right. The Respondents submit
that the project is being executed in accordance with the sanctioned plan,
administrative approvals, applicable technical requirements, available right
of way and prevailing site conditions. The mere width of the road, proximity
to the New Bus Stand, or absence of a specific reference to a footpath at
page 23 of the Shahdol Development Plan, 2026, does not, by itself,
establish any illegality or constitutional violation. The petitioner has also
failed to produce any technical report, site assessment or expert material
demonstrating that the proposed road design is inherently unsafe or would
necessarily compel pedestrians to use the carriageway.
19. The respondents submit that the technical design and execution
of the road fall within the domain of the competent planning, municipal and
engineering authorities and are required to be determined with reference to
applicable norms, technical feasibility and site conditions. No specific
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
7 WP-34703-2026
illegality, arbitrariness, violation of a mandatory statutory provision or

infringement of a fundamental right has been established by the petitioner.
Any direction for alteration of an ongoing public infrastructure project,
without establishing such violation, may cause delay, additional expenditure
and public inconvenience. The respondents nevertheless remain committed
to ensuring pedestrian safety and shall act in accordance with law,
sanctioned plans, applicable technical standards and the directions of the
competent authorities. Accordingly, the writ petition, being premature and
unsupported by cogent material, is liable to be dismissed.
20. Having heard the learned counsel for the parties and upon
perusal of the material available on record, we are of the considered view
that the grievance raised by the petitioner essentially concerns the planning,
design and execution of the proposed Budhar Chowk–Balpurwa Bus Stand
Road, particularly the provision of pedestrian infrastructure. However, the
petitioner has failed to place before this Court any cogent technical,
documentary or expert material demonstrating that the sanctioned road
design is illegal, arbitrary, inherently unsafe, or contrary to any mandatory
statutory, regulatory or constitutional provision.
21. We are conscious of the constitutional importance of the
Directive Principles of State Policy contained in Part IV of the Constitution,
particularly Articles 36 to 38, which embody the constitutional commitment
towards public welfare, social and economic justice and the promotion of a
just social order. At the same time, Article 37 expressly provides that the
provisions contained in Part IV are not enforceable by any Court, though
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
8 WP-34703-2026
they constitute fundamental principles in the governance of the country and

impose a duty upon the State to apply them in making laws and policies.
These principles may undoubtedly guide the authorities in matters of public
infrastructure and welfare; however, in the absence of a demonstrated
violation of an enforceable legal or fundamental right, they cannot furnish a
basis for this Court to substitute its own technical assessment for that of the
competent authorities.
22. The concern expressed by the petitioner regarding pedestrian
safety and public convenience is undoubtedly a matter of legitimate public
interest. Nevertheless, the desirability of providing a particular form or
extent of pedestrian infrastructure, by itself, does not establish arbitrariness,
illegality or infringement of an enforceable right. No material has been
placed before us to establish that the respondent authorities have acted
contrary to the sanctioned plan, applicable technical standards or statutory
requirements, or that the proposed road is inherently unsafe.
23. It is also well settled that the technical design, alignment,
dimensions and execution of public infrastructure fall primarily within the
domain of the competent planning, engineering and administrative
authorities. The scope of judicial review is directed towards examining the
legality and fairness of the decision-making process and does not ordinarily
extend to substituting the Court's own technical opinion for that of the
specialised authorities, unless the decision is shown to be arbitrary,
unreasonable, mala fide or contrary to law.
24. After construction of the proposed road, it would be feasible to
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
9 WP-34703-2026
consider and make appropriate provision for pedestrian movement, based

upon a duly prepared technical design, alignment, dimensions, and execution
plan in accordance with the requirements of the competent planning
authority. At present, however, the petitioner has not placed on record any
approved planning design, alignment, technical proposal, or other material to
demonstrate the feasibility or necessity of such a provision. The petition is
therefore premature and has been filed without any proper or finalized
planning in this regard.
25. At present, there is no properly constructed road at the site. The
proposed road is yet to be constructed, and only after its construction will it
be possible, on the basis of the actual alignment, dimensions, and technical
requirements, to consider and make appropriate provision for pedestrian
movement.
26. In view of the facts and circumstances of the present case, and
having regard to the constitutional scheme embodied in Articles 36 to 38 of
the Constitution of India, the nature of the project, the technical
considerations involved, and the absence of any cogent material establishing
illegality, arbitrariness, or infringement of any enforceable fundamental or
statutory right, we find no ground warranting interference under Article 226
of the Constitution of India.
27. Accordingly, the writ petition is dismissed. However, the
dismissal of the petition shall not absolve the Respondent authorities from
their continuing obligation to execute, maintain and regulate the road project
in accordance with law, the sanctioned plan, applicable technical standards
Signature Not Verified
Signed by: MANVENDRA
SINGH PARIHAR
Signing time: 31-08-2026
11:46:05

NEUTRAL CITATION NO. 2026:MPHC-JBP:65703
10 WP-34703-2026
and the constitutional principles of public welfare and pedestrian safety. No

order as to costs.