STATE OF ODISHA vs RASHMIRANJAN SATPATHY
- Court
- Odisha High Court
WP(C)/13548/2015
ODHC010141162015
2026:OHC:307-DB
ORISSA HIGH COURT : CUTTACK
W.P.(C) No.13548 of 2015
CNR No.ODHC01-014116-2015
In the matter of an Application under Articles 226 and 227
of the Constitution of India, 1950
*
1. State of Odisha
Represented through its
Principal Secretary to Government
Department of Water Resources
Government of Odisha
Bhubaneswar
District: Khordha.
2. Superintending Engineer
Hirakud Dam Circle
At/P.O./P.S.: Burla
District: Sambalpur. … Petitioners
-V ERSUS -
1. Smt. Kumudini Satapathy (Dead)
1(a) Rashmi Ranjan Satpathy
Son of Late Kumudini Satpathy
Aged about 61 years
At: Sourav Vihar, Near Fandi Chhak
P.O.: E.C. Burla, District: Sambalpur.
1(b) Manoranjan Satpathy
Son of Late Kumudini Satpathy
Aged about 54 years
WP(C) No.13548 of 2015 Page 1 of 41
At: Quarter No.E-13/2
Park Lane, Near Old SBI
Burla, P.O.: Burla
District: Sambalpur.
1(c) Jyotimayee Mishra
Aged about 64 years
Daughter of Late Kumudini Satpathy
1(d) Jyoshnamayee Dash
Aged about 62 years
Daughter of Late Kumudini Satpathy,
Serial No.1(c) and 1(d) are:
C/o Rashmiranjan Satpathy
At: Sourav Vihar, Near Fandi Chhak
P.O.: E.C., Burla, District: Sambalpur.
2. Presiding Officer
Labour Court, Sambalpur
District: Sambalpur. ... Opposite parties
Counsel appeared for the parties:
For the Petitioners : Mr. Satyabrata Mohanty,
Additional Government Advocate
Along with
Ms. Sarita Moharana,
Additional Standing Counsel
For the Opposite party : M/s. Basudev Pujari and
No.1 Nitai Sundar Das, Advocates
P R E S E N T:
HONOURABLE
DR. JUSTICE SANJEEB K PANIGRAHI
AND
HONOURABLE
MR. JUSTICE MURAHARI SRI RAMAN
WP(C) No.13548 of 2015 Page 2 of 41
Date of Hearing : 11.11.2026 :: Date of Judgment : 18.11.2026
UDGMENT
J
URAHARI RI AMAN
M S R
.—
Assailing the legality and sanctity of Order No.12, dated
21.12.2013 passed by the learned Presiding Officer,
Labour Court, Sambalpur in consideration of application
dated 01.09.2012 [registered as Industrial Dispute Misc.
1
Case No.1/88(SC)-782] of Kumudini Satpathy , wife of
Sachidananda Satpathy, the Department of Water
Resources and Superintending Engineer of Hirakud Dam
Circle, Sambalpur, filed the present writ petition
beseeching grant of following relief(s):
“In the circumstances stated above, it is humbly prayed
that this Hon’ble Court may graciously be pleased to
admit the writ petition, call for the LCR and issue Rule NISI
calling upon the opposite parties to show cause as to why
the Order passed by the Presiding Officer, Labour Court,
Sambalpur in I.D. Misc. Case No.1/88 (SC)-782 vide
Annexure-7 shall not be set aside;
And, if the opposite parties fail to show cause or shows
NISI
false/insufficient cause, make the said Rule absolute;
And, pass such other Order/Orders as this Hon’ble Court
may deem fit just and proper in the facts and
circumstances of the present case;
1
Legal heirs of Kumudini Satpathy were brought on record by way of
substitution vide Order dated 25.02.2025, as she had expired on 21.12.2019,
during the pendency of this writ petition.
WP(C) No.13548 of 2015 Page 3 of 41
And, for this act of kindness, the petitioner shall remain
duty bound ever pray.”
Facts:
2. The facts of the case as adumbrated in the writ petition
shows that:
2.1. The Hirakud Dam Project was initially entrusted to the
Central Waterways, Irrigation and Navigation
Commission and the workmen engaged therein were
drawing the scale of pay etc. as permissible to employees
in the work-charged establishment of the Central Public
Works Department.
2.2. The State Government took over the Project with effect
from 01.04.1960 and it was understood that the work-
charged staff recruited prior to 01.04.1960 would be
allowed to continue in the scale of pay and conditions of
service as were applicable to them as at 31.03.1960 and
that retrenchment should take place only when their
services were not required by the said Project, as per
Order No.HKD-5-A-23-51-2438 dated 08.09.1961 of the
Government of Odisha. On the other hand, so far as the
persons, who took up employment subsequent to
01.04.1960, they were paid pay scales applicable to
employees under work-charged establishment of the
Odisha Government and not the scale of pay of the
Central Government.
WP(C) No.13548 of 2015 Page 4 of 41
2.3. In order to remove the anomaly/disparity amongst those
employees, i.e., those engaged in the establishment prior
to 01.04.1960 and employed in the project subsequent
thereto, the Government of Odisha conceived the idea of
terminating the services of those employees, who were
working in the work-charged establishment prior to
01.04.1960 and offering them service in the new scales
of pay applicable to the employees of Government of
Odisha. Therefore, the affected workmen raised
industrial dispute, being I.D. Case No.3 of 1964, wherein
it was held that the Odisha Government had the right to
terminate the services of the workmen which would not
tantamount to retrenchment.
2.4. The said decision was challenged by the workmen and
ultimately the workmen carried the matter to the Hon’ble
Supreme Court of India in Civil Appeal No.348 of 1974
(The Workmen of Hirakud Project Vrs. The Management of
Hirakud Dam Project, Hirakud) and Civil Appeal No.349
of 1974 (The Workmen Vrs. The Management of
Superintending Engineer, Public Health, Sambalpur and
Chief Medical Officer, Hirakud Dam Project, Hirakud),
Odisha , which came to be disposed of by a common
Order dated 13.08.1985, whereby it was held that the
workmen working in the work-charged establishment of
Hirakud Dam Project prior to 01.04.1960 were entitled
to the same scales of pay and other conditions of service
as before, as if they were employees of the work-charged
WP(C) No.13548 of 2015 Page 5 of 41
establishment of the Central Public Works Department.
The Order dated 13.08.1985 passed in the said Civil
Appeal No.348 of 1974 and Civil Appeal No.349 of 1974
reads thus:
“ The Hirakud Workmen Association claiming to represent
about 1200 workmen working in the work-charged
establishment of the Hirakud Dam Project since before
01.04.1960 is the appellant in Civil Appeal No.348 of
1974. The Project was initially entrusted to the Central
Water ways, Irrigation and Navigation Commission and
the workmen were drawing the scales of pay etc.
permissible to employees in the work-charged
establishment of the Central Public Works Department.
With effect from 01.04.1960, the State Government took
over the project and it was understood that the work-
charged staff recruited prior to 01.04.1960 should be
allowed to continuing the same scales of pay and
conditions of services as were applicable to them on
31.03.1960 and that retrenchment should take place only
when their services were not required by the said Project.
This is evident from the order of the Government of Orissa
th
No.H.K.D-5A-23-51/2438 dated 8 September, 1961. In
regard to persons who took up employment subsequent to
01.04.1960, they were paid pay scales applicable to
employees of work-charged establishment of the Orissa
Government and not the scales of pay of the Central
Government. In order to remove this disparity within
those who were employees in the establishment
prior to 01.04.1960 and those who came to be
employed in the project subsequent to 01.04.1960,
the Government of Orissa conceived the idea of
terminating the services of those employees who
were working in the work-charged establishments
prior to 01.04.1960 and offering them service in the
WP(C) No.13548 of 2015 Page 6 of 41
new scales of pay applicable to the employees of the
Government of Orissa. The workmen naturally raised
an industrial dispute and after they had made journeys
upto the High Court and Supreme Court and back to the
Industrial Tribunal, it has now been held by the Tribunal
that the Orissa Government had the right to terminate the
services of the workmen. The notice of termination
given to the workmen has been placed before us and
on a perusal of the name, we cannot possibly held
that it is not a case of retrenchment as canvassed
by a series of cases of this Court ending with 1984
(1), Labour Law Journal, P.110. We are unable to
agree with the conceived of the Tribunal that the
termination of the services of these employees was not
retrenchment. It is not disputed that if it is retrenchment,
the termination was not proper in which even the
workmen would be entitled to the previous scales of pay.
We therefore allow this appeal and declare that the
workmen working in the work-charged
establishment of the Hirakud Project from before
01.04.1960 are entitled to the same scales of pay
and other conditions of service as before as if they
were employees of the work-charged establishment
of the Central Public Works Department .
There will be a similar order in Civil Appeal No.349 of
1974.
In Civil Appeal No.349/74 a further question was raised
whether on the completion of three years of service the
employees do not become eligible for confirmation. We do
not express any opinion on this question as the material
before us is not sufficient coming to a conclusion either
way. We however, notice that it was stated before the
Tribunal that the matter was under active consideration of
WP(C) No.13548 of 2015 Page 7 of 41
the Government. We do hope that the State Government
has favourably considered the matter.
The appeals are accordingly allowed with costs.”
2.5. The Government of Odisha in the erstwhile Irrigation
and Power Department (Civil Establishment Branch)
vide Order dated 09.02.1963 intimated the Chief
Engineer, Hirakud Dam Project that the work-charged
employees should be retrenched in batches in order to
facilitate payment of compensation etc . and
retrenchment should be completed by 31.03.1963. The
retrenched personnel should, however, be brought under
the State Government scale of pay in comparable posts
and their present emoluments be protected as far as
practicable, provided that it does not exceed the
corresponding pay scale fixed by the State Government.
The relevant portion of the said Letter/Order No.2765-
IF-2/63-HKD, dated 09.02.1963 is extracted hereunder:
I am directed to refer to item No.94(11) of the minutes of
“
the XXXV meeting of the Hirakud Control Board hold on
19.12.1962 on the subject mentioned above, and to
convey the approval of the Government for termination of
services of those work-charged staff who are on receipt of
Central Government scales of pay and Dearness
allowance with immediate effect except some key
personnel working in the Power House at present. The
work-charged staff should be retrenched in batches in
order to facilitate quick payment of compensation etc. and
st
the retrenchment should be completed by 31 March,
1963. The retrenched personnel should, however, be
brought under the State Government scales of pay in
comparable posts and their present emoluments be
WP(C) No.13548 of 2015 Page 8 of 41
protected as far as practicable provided that it does not
exceed the maximum of the State Government scale in
which they are fitted.
I am also to state that a list showing the names of the key
personnel of the Power house who cannot be replaced,
should be prepared for continuing in the Project on
contract basis under the existing terms and conditions for
a period of 3 years during which other personnel should
be trained to replace them.”
2.6. The Hon’ble Supreme Court of India in the Civil
Miscellaneous Petitions vide Nos.18620-21 of 1987,
arising out of Civil Appeal Nos.348 of 1974 and 349 of
1974 vide Order dated 09.02.1988 directed as follows:
“ It is directed that the Presiding Officer, Labour Court,
Sambalpur (Orissa) shall, after examining the matter,
pass appropriate orders for implementation of this
. It is further directed
Court’s Order dated 13.08.1985
that whenever the employees found entitled to some
amount of arrears, they shall also be paid in addition to
arrears, 10% per annum interest on the arrears from the
date and the orders of this Court which remain due for
more than a year. The Labour Court shall hear both the
parties and pass appropriate orders implementing the
judgment of this Court. The Labour Court shall submit its
report to this Court after passing the appropriate orders
as expeditiously as possible preferably within four
months.
The employees found entitled to some arrears shall
be paid admitted amounts as expeditiously as
possible .”
2.7. Pursuant to the aforesaid Order dated 09.02.1988
passed by the Hon’ble Supreme Court of India, the
WP(C) No.13548 of 2015 Page 9 of 41
learned Labour Court, Sambalpur in Industrial Dispute
Misc. Case No.1 of 1988 (SC) titled “ The Workmen of
Hirakud Dam Project Vrs. The Management of Hirakud
passed the following Order
Dam Project and Others”,
(No.8) dated 25.05.1989:
1. This is one of the few misc. cases filed by the
“
various work-charged employees of the Hirakud
Dam Project for adjudication of their claim in the
light of the Order dated 13.08.1985 passed by the
Hon’ble Supreme Court in Civil Appeal No.348 & 349
of 1974. Since the management represented by a
Common Counsel have filed their W.S. raising
several objections, for expeditious disposal of the
matter, the following norms are provided for the
guidance of the parties.
2. As it transpires from record the construction of the
Hirakud Dam Project was originally taken up by
Central Works Irrigation and Commission and
Workers recruited for the purpose were allowed to
draw the Central Scale of pay other benefits as
admissible under the Central Public Works
Department Code. Subsequently the State
Government in consultation with the
Government of India took over the project with
effect from 01.04.1960 on the condition that
there would be no change in the pay and
allowance of the work-charged employees
recruited by the Central Government prior to
such taken over. Subsequently the State
Government of Orissa made some additional
recruitments to the work-charged establishment of
the Project and they were treated as State
Government employees. In view of this there here
WP(C) No.13548 of 2015 Page 10 of 41
appeared some disparity in the scale of pay of
worker engaged in the similar jobs of the
establishment. To get rid of such anomaly the
Executive Engineer in pursuance of a decision
taken by the State Government issued notices
of termination of services of the work-charged
staffs borne in the central scale of pay in the
year 1963 and to being parity in the pay scale
reemployed some of them in the State scale. As
a result an industrial dispute bearing No.3/1964
was raised on behalf of the affected workmen before
the Industrial Tribunal, Bhubaneswar and
ultimately it was carried to the Hon’ble Supreme
Court in Civil Appeal Nos.348 and 349 of 1974, as
admitted by both parties.
The Hon’ble Court in
their common Order dated 13.08.1985 held
that the termination of the workers ( sic. not)
amounted to retrenchment and accordingly
declared that the workmen working in the
work-charged establishment of the Hirakud
Dam Project from before 01.04.1960 are
entitled to the same scale of pay and other
condition of service as before as if they were
employees of the workcharged establishment of
the Central Public Works Department. The
Hon’ble Court in their subsequent Order dated
12.08.1987 directed the Assistant Labour
Commissioner, Sambalpur to ensure
implementation of their above order. After
receipt of a reply from the concerned Assistant
Labour Commissioner the Hon’ble Court in their
Order dated 09.02.1998 again directed this
Court to ensure implementation of their Order
dated 13.08.1985 and that is how the matter
is pending before this Court.
WP(C) No.13548 of 2015 Page 11 of 41
3. Since admittedly the Order dated 13.08.1985 of the
Hon’ble Court is the outcome of the dispute raised in
Industrial Disputes Case No.3 of 1964 it therefore
follows that a direction has only been given to this
Court to examine the claim application of those of the
workers who are in service on and before
01.04.1960 and were issued with termination notice
in the year 1963. But as I found the management
instead of implementing the above order of the
Hon’ble Court has filed lengthy counters
objecting the claim of the workmen on various
grounds. In the W.S. the management has not
only challenged the propriety of the proceeding
but has also sought for examination of the
matter which have eighter been pleaded of
ought to have been pleaded before the said
court. Since the scope of the present enquiry is
quite limited in nature and when this Court
has only been directed to ensure
implementation of the order of the Hon’ble
Court, it is felt that examination of the
objection raised by the management is beyond
the scope of this enquiry and therefore needs
no examination except those of the objections
which are directly connected with the claim of
the workmen. Therefore in the light of the Order
dated 13.08.1985 passed by the Hon’ble Court it is
hereby ordered that the claim applications of the
workers fulfilling the following conditions are alone
entertainable with the scope of this enquiry.
1. He must be in the service as on 31.03.1960 as
well as on 01.04.1960.
2. He must have been issued with a termination
notice of a kind the substance of which have
WP(C) No.13548 of 2015 Page 12 of 41
been extracted in the Award of I.D. Case
No.3/1964 or of any other alike notice issued
with specific reference to the decision of the
Government of Orissa in their Irrigation &
Power Department letter No.2765-IF-2/63-
HKD.
3. In pursuance of such notice he must have been
adjusted against a post in the State
Government without there being any break in
his service.
4. In the W.S. the management has contended that the
muster roll and many other relevant documents
relating to the employees are not traceable ever
since the closure of the Dam and therefore it has
become difficult on their part to calculate the claims
of the workers. In the order dated 30.11.1988 this
court has been pleased to direct the workmen group
to file their retrenchment notice in original. The
management is therefore directed while calculating
the claim of the workers in the light of the norms
fixed above they can make good use of the notice
produced by the workmen group. In case where such
notices have not been produced by the concerned
workers for the reasons beyond his control, the
management can make use of his service book while
calculating his claim. In other cases where such
notice of service book is not available the parties are
directed to separate those cases to be disposed of
according to their merit. So also in cases where a
particular employee has been transferred after
notice of 1963 to similar other establishment under
the control of the Works Department, his claim is
also to be calculated by the concerned management
WP(C) No.13548 of 2015 Page 13 of 41
for such of the period during which he has to work
under him.
5. The notices by which the services of the
workers were terminated indicates that after
so being terminated the concerned employee
was to be adjusted against a comparable State
Government post so as to protect his salary. It
is placed before this Court by the management
that in cases where equivalent post were not
available in the State Cadre, the employees
were adjusted against a promotional post or a
higher post so as to give them protection in so
far as their pay is concerned. It is, therefore,
ordered that in such cases the management is
to calculate the claim of the workers without
regard being paid to the post against which he
was adjusted.
The Hon’ble Court in their Order
dated 13.08.1985 have directed that the
employees of the work-charged establishment
are only entitled to the same scale of pay and
other condition of service as before as if they
were employees of the work-charged
establishment of the Central Public Works
Department.
6. In view of this the workers are to get the same
scale of pay and service benefits as they were
getting immediately prior to the notice. The
pay and D.A. which the workers were getting
immediately prior to such notice or on the date
of such notice is to be taken as the basis for
calculating their claim. In case where a
workman has been promoted after being
absorbed in State scale, his pay is only to be
fixed in the promotional post while calculating
WP(C) No.13548 of 2015 Page 14 of 41
his benefits. This is to be done without prejudice, to
be other available right of the workmen.
7.
In their claim petitions the workmen have claimed–
(1) Bonus, (2) Cost of soap, (3) Duster, (4) Uniform,
(5) Cost of shoes, (6) Cycle allowance, (7) L.T.C.
allowance, (8) House rent, Water rent, electricity. The
workmen group in their claim petitions have not
specifically mentioned as to how they are entitled for
the same or if they were getting such benefits
earlier. In case they were getting such benefits
earlier, the management is also to calculate the
same in the ratio prescribed by the Government from
time to time and if not he is to file his objection as to
how the workers are not entitled for the same. These
norms as laid down above will also be applicable to
those of the claim petition which have been
registered separately under Section 33C(2) of the
Industrial Disputes Act either on individual
application of the workers or otherwise. All the
parties to the proceeding are accordingly hereby
directed to cooperate with the Court in screening the
application in the light of the norms fixed at para
No.3. For this purpose the management is directed to
point out as to which of the applicant workers were
in service from before 01.04.1960. It is after
submission of such a report a list of eligible
workmen would be prepared and accordingly the
management is to calculate the claim within 15 days
from that date.
Later: All office bearers representing the
management are present. The representative of the
workmen group is also present. The management
filed applications for further adjournment of the case
on the ground that after appointment of their
WP(C) No.13548 of 2015 Page 15 of 41
previous counsel as judge of the High Court of
Orissa, no other substitute has been provided to
them by the Government to conduct the case. Heard.
Time is no doubt allowed till 09.06.1989. But in the
meantime the management should do over to
expedite the matter, put up on 09.06.1989 for further
order.”
2.8. The opposite party No.1 (Kumudini Satpathy, wife of the
deceased employee, Sachidananda Satpathy, filing an
application dated 01.09.2012 (Annexure-5) before the
learned Labour Court, Sambalpur, purportedly taking
cue from Order dated 09.02.1988 of the Hon’ble
Supreme Court of India (Annexure-3), claimed that her
husband, initially joined as “Time Keeper” in the
Hirakud Dam Project with effect from 09.03.1950 under
the work-charged establishment of the Central Public
Works Department, and subsequently promoted to the
post of Lower Division Clerk with effect from 22.09.1954
and retired from service on superannuation with effect
from 31.08.1980 from the Office of the Superintending
Engineer, Hirakud Dam Circle, Burla, was entitled to the
benefits enumerated in Order dated 13.08.1985 by the
Hon’ble Supreme Court. The deceased opposite party
No.1 filed an application dated 01.09.2012 titled “Late
Sachidananda Satpathy, Filed through Smt. Kumudini
Satpathy (wife) Vrs. Superintending Engineer, Hirakud
Dam Circle, Burla and Others”, registered as I.D. Misc.
Case No.1 of 1988 (SC), before the learned Labour Court,
Sambalpur purportedly under Section 33C(2) of the
WP(C) No.13548 of 2015 Page 16 of 41
Industrial Disputes Act, 1947, with the following
fact/averment(s) and prayer(s) taking cue from Order
dated 13.08.1985 of the Hon’ble Supreme Court of India
passed in Civil Appeal Nos.348 of 1974 and 349 of 1974:
“1. That the applicants husband late Sachidananda
Satpathy was working under Hirakud Dam Project
prior to date 01.04.1960. He was appointed as Time
Keeper with effect from 09.03.1950 which is coming
under Work Charged Establishment of C.P.W.D
under Central Government Scale of Pay and
condition of service by the Government of India and
continued. Then my husband service has been
promoted to the post of Lower Division Clerk
with effect from date 22.09.1954 F.N. He was
retired on superannuation from Government service
with effect from 01.09.1980 from the Office of the
Superintending Engineer, Hirakud Dam Circle, Burla
and expired on 20.06.1983. That my husband is
one of among from those 1200 workmen of
Hirakud Dam Project.
2. That before Hon’ble Supreme Court Passed the
Order dated 13.08.1985, my husband was not in
condition to pray the Hon’ble Court for identification
for which they could not file the present application
earlier due to ignorance and as such the applicant
pray for condition of delay.
*
P RAYER
Under the above premises the applicant pray the
Hon’ble Court to be kind enough to identify my
husband Late Sachidananda Satpathy to the eligible
WP(C) No.13548 of 2015 Page 17 of 41
to get the benefit of the order of Hon’ble Supreme
Court passed in C.A. No.348-49/74 and for this act
of kindness, the applicant is duty bound shall ever
pray.”
2.9. Refuting the entitlement and the grant of relief in
connection with the claim set up by the deceased
opposite party No.1, the petitioner-Management filed its
objection dated 16.11.2013 before the learned Labour
Court in I.D. Misc. Case No.1 of 1988 (SC) which runs as
follows:
That the petition filed by the petitioner claiming the
“1.
benefit of the order passed by the Hono’ble Supreme
Court of India in Civil Appeal Nos.348 of 1974 and
349 of 1974 is not maintainable in law.
2. That the husband of the applicant Late
Sachidanand Satpathy was appointed as
Lower Division Clerk in regular establishment
by the Order of the Superintending Engineer,
Development Circle Burla vide Order
No.1010/16470-72 dated 20.09.1954 in the
scale of pay of Rs.55-3-85-EB-4-125-5-130/- and
he joined in the office of the Executive Engineer
Left Bank Building Division on dated
23.09.1954 F.N. Subsequently he was promoted to
the post of Upper Division Clerk in Division Office
with effect from 01.04.1960 vide Order of the Chief
Engineer Letter dated 01.04.1960 in scale of pay
Rs.70-2-80-4-100/-. Afterwards he was promoted to
the post of Circle Upper Division Clerk in the scale of
pay of Rs.90-5-120/- as per the order of the
Superintending Engineer Hirakud Dam Circle vide
his Letter No.4497 dated 07.09.1961 and joined as
WP(C) No.13548 of 2015 Page 18 of 41
such on 11.09.1961 F.N. continued as such till his
superannuation on 31.08.1980. Since the
workman Late Sachidanand Satpathy was in
regular establishment (not in work-charged
establishment) when the State Government took
over the Project from 01.04.1960, the applicant
is not entitled for the benefit claimed in the
case.
3.
That it is submitted that Hon’ble Supreme Court of
th
India passed Order dated 13 August 1985 in Civil
Appeal Nos.348 of 1974 and 349 of 1974 in respect
of workmen engaged in work-charged establishment
only, not in respect of regular establishment. Hence
the applicant cannot get the benefit of the above
order of the Hon’ble Supreme Court of India. The
deceased employee Sachidanand Satpathy was not
amongst the 1200 work-charged employees in
whose favour Hon’ble Supreme Court passed the
th
order on dated 13 August 1985.
In view of the above facts, the application is liable to
be dismissed with cost.”
2.10. The learned Labour Court, Sambalpur taking into
consideration the arguments advanced on behalf of the
parties and also the materials produced by the
respective parties, passed the following Order dated
21.12.2013:
“ This order arises out of an application filed by one
Smt. Kumudini Satpathy, praying to identify her
husband late Sachidananda Satpathy to be eligible
to get the benefits of the Order of the Hon’ble
Supreme Court passed in C.A. No.348 & 349 of
1947.
WP(C) No.13548 of 2015 Page 19 of 41
2. It is the case of the applicant that her husband
was working under Hirakud Dam Project as
time Keeper with effect from 09.03.1950 which
comes under work-charged establishment of
CPWD. He was promoted to the post of L.D.C.
with effect from 22.09.1954 and retired with
effect from 01.09.1980 on superannuation
from the office of Superintending Engineer,
Hirakud Dam Circle, Burla (the O.P.). According
to the applicant, the benefit of the Hon’ble Apex
Court’s Order dated 13.08.1985 has been allowed
by this Court to other applicants and therefore, her
petition should be allowed.
3. The Opposite-party filed objection to the
application stating inter alia that the late
husband of the applicant was appointed as
L.C. Clerk in the regular establishment by the
order of the opposite party vide Order
No.1010/16470-72 Dtd.20.9.1954 and he joined
in the service on 23.9.1954. Subsequently, he
was promoted to the post of U.D. Clerk with effect
from 01.04.1960. Thereafter he was promoted to the
post of Circle UD Clerk with effect from 11.09.1961
and continued as such till his superannuation on
31.08.1980. According to the O.P., the husband
of the applicant was not working in the work-
charged establishment when the State
Government took over the Project with effect
from 01.04.1960 and therefore, he is not
entitled to the benefit of the order of the
.
Hon’ble Apex Court
4. In support of her case, the applicant filed a copy of
Service Register maintained by the Hirakud Dam
Project authorities. As per this document, Sri
WP(C) No.13548 of 2015 Page 20 of 41
Sachidananda Satapathy (husband of the applicant)
worked as Time Keeper in the year 1950 and
received his usual pay and D.A. It also reveals
from this document that he was promoted to
work as Lower Division Clerk and relieved from
2
the earlier job with effect from 22.09.1956 .
The applicant also relies upon a copy of Memo
No.3908/10E-5 Dated 27.03.1950 issued by the
Executive Engineer, Mechanical Division,
Hirakud which reveals that the husband of the
applicant was appointed as Time Keeper on
work-charged basis on a salary of Rs.50 plus
usual D.A. (in place of one Sri Samual Rao who
th
left service) with effect from 9 March, 1950.
These documents are not disputed by the
Opposite party. Therefore, it can safely be said
that the husband of the applicant was serving under
the work-charged establishment of Hirakud Dam
Project from the month of March, 1950.
5. On being called upon, the opposite party has filed
the duplicate service book of Sachidananda
Satpathy maintained in 3 volumes. As per the
Volume-I, Sri Sachidananda Satapathy born on
31.08.1922, was appointed as Lower Division
Clerk in the Office of the Executive Engineer,
Left Bank Building Division with effect from
20.09.1954. He received annual increments. On
31.12.1958 he was relieved from the said Office and
joined as Lower Division Clerk in the office of the
Executive Engineer, Canal Division No.II on
01.01.1959. It further reveals from the Volume-I of
the service book that a six months notice was served
2
Apparent error; the copy of Service Register of Hirakud Dam Project enclosed
with the application dated 01.09.2012 filed by Kumudini Satpathy in I.D. Misc.
Case No.1 of 1988 (SC) reveals the date as “w.e.f. 22-9-54”.
WP(C) No.13548 of 2015 Page 21 of 41
upon him intimating that his services are no more
required after 31.03.1960 A.N. On 31.03.1960 has
was transferred to Main Dam Division and
appointed as Upper Division Clerk with effect from
01.04.1960. The volume No.II and III of the service
book are the records regarding continuation of his
service. It reveals from the Leave Account
maintained by the opposite party that the husband
of the applicant retired from service with effect from
31.08.1980. It is crystal clear from the
documents that the husband of the applicant
was initially appointed under the work-
charged establishment of the Hirakud Dam
Project wherein he was getting Central pay
scale. His service under the said establishment was
terminated on 31.03.1960 and on the next day i.e.
01.04.1960 he was appointed by the State
Government. By the time of his retirement, he was
getting State Scale of Pay. The Hon’ble Apex Court
vide Order dated 13.08.1985 in C.A. No.348 & 349
of 1974 declared that the employees of the work-
charged establishment who are allowed to continue
service after the Project was taken over by the State
Government, are entitled to Central scale of pay and
other benefits applicable to the CPWD employees.
Therefore, the husband of the applicant is entitled to
the benefits as per the order of the Hon’ble Apex
Court in the aforesaid Civil Appeals.
6. In view of the discussions made above, the
application is allowed on contest. The opposite party
is directed to make a computation of the entitlement
of pecuniary benefits entitled to the husband of the
applicant as per the order of the Hon’ble Apex Court
dated 13.08.1985 in the C.A. Nos.348 and 349 of
1974 and pay the said amount to the applicant
WP(C) No.13548 of 2015 Page 22 of 41
within a period of 3 months. The case is accordingly
disposed of.”
2.11. Dissatisfied thereby, the present writ petition has been
filed at the behest of the Department of Water Resources
of Government of Odisha and the Superintending
Engineer, Hirakud Dam Circle, Sambalpur.
Hearing:
3. Sri Basudev Pujari, learned Advocate appearing for the
substituted legal heirs of Kumudini Satpathy (being
dead since 21.12.2019) submitted that the facts are
undisputed. Though no counter-affidavit has been filed
by the opposite parties, a memo dated 10.11.2026 has
been filed by the learned counsel which reads as follows:
“Order dated 21.12.2013 passed by Presiding Officer,
Labour Court, Sambalpur is under challenge. The Order
was passed in I.D. Case No.1 of 1988. Hence the urgency.
In spite of scores of memos, the matter has not been
listed.”
3.1. As the writ petition has been pending since 2015 and, in
the meanwhile, the wife of the deceased employee of
Hirakud Dam Project has also left for heavenly abode
and in her place legal heirs, being substituted by Order
dated 25.02.2025 and are represented by Sri Basudev
Pujari, learned Advocate, this matter is heard finally.
3.2. Heard Sri Satyabrata Mohanty, learned Additional
Government Advocate appearing for the petitioners
WP(C) No.13548 of 2015 Page 23 of 41
assisted by Smt. Sarita Moharana, learned Additional
Standing Counsel and Sri Basudev Pujari, learned
Advocate appearing for the opposite party No.1, as
substituted by legal heirs.
3.3. After hearing is concluded, the matter stood reserved for
preparation and pronouncement of judgment/order.
Arguments and rival contentions:
4. Unfurling the factual details, Sri Satyabrata Mohanty,
learned Additional Government Advocate, submitted that
the terms of taking over by the State Government with
respect to 1,200 workmen out of 2,300 working in the
work-charged establishment engaged prior to
01.04.1960 being questioned in I.D. Case No.3 of 1964
before the learned Labour Tribunal, Sambalpur, an
Award was passed on 27.01.1965 with the findings that
the action was taken by the Management in pursuance
of Government Letter dated 09.12.1963 and that
workmen working in the work-charged establishment
engaged before 01.04.1960 would be entitled to their
original conditions of service including scales of pay and
D.A. and were to be treated as continuing in service. The
Award dated 27.01.1965 being challenged in a writ
petition, being registered as O.J.C. No.58 of 1965 before
this Court, the same was disposed of on 05.04.1968 with
the direction to the learned Labour Tribunal to dispose
of reference afresh. Upon remand, an Award was passed
WP(C) No.13548 of 2015 Page 24 of 41
on 30.09.1972 dismissing the claim of the workmen.
Eliciting facts, it is submitted by the learned Additional
Government Advocate that the Award dated 05.04.1968
was carried to the Hon’ble Supreme Court of India and
said Hon’ble Court disposed of Civil Appeal bearing
Nos.348 of 1974 and 349 of 1974, on 13.08.1985 by
declaring that “the workmen working in the work-charged
establishment of the Hirakud Project from (sic. on or)
before 01.04.1960 are entitled to the same scale of pay
and other conditions of service as before as if they were
employees of the work-charged establishment of Central
.
Public Works Department”
4.1. It is further submitted that though the husband of
Kumudini Satpathy was initially engaged as Time Keeper
on 09.03.1950 under the work-charged establishment,
he was brought over to the regular establishment by way
of promotion in the post of Lower Division Clerk by
Order dated 20.09.1954. Sachidananda Satpathy joined
in the said post on 23.09.1954. Stemming on statement/
objection dated 16.11.2013 filed by the Superintending
Engineer, Hirakud Dam Circle (Annexur-6), it is
arduously contended that
“since the workman-late
Sachidananda Satpathy was in regular establishment
(not in work-charged establishment) when the State
Government took over the Project from 01.04.1960, the
applicant (Kumudini Satpathy) is not entitled for the
.
benefit claimed in the case”
WP(C) No.13548 of 2015 Page 25 of 41
4.2. Contending that the deceased employee had already
enjoyed the security, regular pay scales, promotions,
and retirement benefits extended to a permanent
Government servant since his promotion as a Lower
Division Clerk in the regular establishment, Sri
Satyabrata Mohanty, learned Additional Government
Advocate, assisted by Smt. Sarita Moharana, learned
Additional Standing Counsel, further urged with
vehemence that the deceased employee (Sachidananda
Satpathy) retired on 31.08.1980 and passed away on
20.06.1983 without ever raising a claim during his
lifetime. Nevertheless, his wife, Kumudini Satpathy
(substituted opposite party No.1), has set up a stale
claim to avail benefits applicable strictly to employees in
the work-charged establishment as of
31.03.1960/01.04.1960, in terms of the Order dated
13.08.1985 passed by the Hon’ble Supreme Court of
India in The Workmen of Hirakud Project Vrs. The
Management of Hirakud Dam Project, Hirakud (C.A. Nos.
348 & 349 of 1974) . It is emphatically submitted by the
counsel for the petitioners that the employee being
appointed to the regular establishment as a Lower
Division Clerk on 20.09.1954, and enjoyed regular
scales of pay applicable to the State Government
employees and also the promotions until retirement from
service, the decision of the Hon’ble Supreme Court of
WP(C) No.13548 of 2015 Page 26 of 41
India is wholly inconsequential of the facts and in the
circumstances.
4.3. Sri Satyabrata Mohanty, learned Additional Government
Advocate flagged an issue that the provisions of Section
33C(2) of the Industrial Disputes Act, 1947, is activated
as a measure to recover arrears/due from employer and
such execution proceeding pre-supposes a definite,
quantified, pre-existing undisputed entitlement.
Quintessentially it is submitted that, the learned Labour
Court transgressed its jurisdiction by adjudicating a
fresh substantive entitlement when the foundational
employment status was contested and disputed.
Drawing attention in this regard to a document titled
“List of Documents filed by the opposite parties” dated
16.11.2013 filed on 18.11.2013 before the learned
Labour Court indicating production of authentic
duplicate service book (Volumes I to III) qua
Sachidananda Satpathy maintained in the regular
course of business along with objection dated
16.11.2013 (Annexure-6), it is vehemently contended
that the finding returned, being de hors the record and
beyond the weight of evidence on record, the impugned
Order dated 21.12.2013 suffers from a manifest error by
ignoring material facts, and is, therefore, perverse and
liable to be set aside.
5. Sri Basudev Pujari, learned Advocate appearing for
substituted legal heirs of the opposite party No.1, wife of
WP(C) No.13548 of 2015 Page 27 of 41
the deceased employee, would submit that the
declaration of entitlement of the employee, who joined as
Time Keeper under work-charged establishment prior to
01.04.1960, i.e., the date of taking over by the State
Government, on the basis of fact-finding by the learned
Labour Court being rendered in consonance with the
Order dated 13.08.1985 passed by the Hon’ble Supreme
Court of India in the case of The Workmen of Hirakud
Project Vrs. The Management of Hirakud Dam Project,
Hirakud, C.A. Nos.348 & 349 of 1974 , cannot be faulted.
5.1. The petitioners are required to compute the entitlement
of pecuniary benefits as directed in the Order dated
21.12.2013 in consideration of application dated
01.09.2012 filed by Kumudini Satpathy and such
computation of entitlement is to be made in terms of the
observations contained therein that
“the employees of
the work-charged establishment, who are allowed to
continue service after the Project was taken over by the
State Government, are entitled to Central Scale of Pay and
other benefits applicable to the Central Public Works
.
Department employees”
5.2. It is submitted that the fruits of the relief granted in the
Order dated 21.12.2013 could not be enjoyed by
Kumudini Satpathy, who expired on 21.12.2019 during
WP(C) No.13548 of 2015 Page 28 of 41
pendency of this case, as this Court passed interim
3
Order dated 21.03.2017.
5.3. It is, therefore, insisted upon by the learned Advocate
that the entitlement as granted by the learned Labour
Court be directed to be computed and disbursed in
favour of the legal heirs of Kumudini Satpathy.
Analysis and discussions:
6. The paper enclosed with the writ petition and minute
scrutiny of pleadings would go to show that I.D. Misc.
Case No.1 of 1988 (SC), before the learned Labour Court,
Sambalpur purportedly under Section 33C(2) of the
Industrial Disputes Act, 1947, was filed by Kumudini
Satpathy after coming to know about the Order dated
13.08.1985 of the Hon’ble Supreme Court of India
passed in Civil Appeal Nos.348 of 1974 and 349 of 1974,
which were being pursued by the Workmen of Hirakud
Dam Project against the Management of Hirakud Dam
Project, Hirakud. Reading of the said application it
comes to fore that a plea of ignorance has been taken to
the effect that the husband (Sachidananda Satpathy) of
Kumudini Satpathy was unaware of said decision of the
Hon’ble Supreme Court of India and, therefore, they
could not fi le the application. The plea of such
3
This Court on 21.03.2017 passed the following order in Misc. Case No.13140 of
2013:
“In the interim, the operation of the impugned Order dated 21.12.2013, passed by
the Presiding Officer, Labour Court, Sambalpur, in I.D. Misc. Case No.1/88 (SC)-
782 under Annexure-7, shall remain stayed till the next date.”
WP(C) No.13548 of 2015 Page 29 of 41
ignorance could not be taken so lightly inasmuch as the
service book of Sachidananda Satpathy clearly depicts
the fact that he was promoted to the post of Lower
Division Clerk in the regular establishment much prior
to 01.04.1960 and accepting such promotion he joined
the said post and thereafter he was also promoted to the
post of Upper Division Clerk. It is indicative of the fact
that knowing fully well that Sachidananda Satpathy was
in the regular establishment as on 01.04.1960, and the
decision of the Hon’ble Supreme Court of India cited
above is applicable to such employees who were
continuing in the work-charged establishment prior to
01.04.1960.
6.1. Whereas the decision of the Hon’ble Supreme Court of
India in Civil Appeal Nos.348 of 1974 and 349 of 1974
was rendered on 13.08.1985 and Sri Sachidananda
Satpathy died on 20.06.1983, the application, registered
as I.D. Misc. Case No.1/88 (SC), filed before the learned
Labour Court, Sambalpur bears the date “01.09.2012”
(See, Annexure-5).
6.2. The sequence of events demonstrate that the plea of
ignorance of decision rendered by the Supreme Court of
India as taken by Kumudini Satpathy in the application
is a falsity. In other words, the relief granted to the other
workmen, who were continuing under the work-charged
establishment prior to 01.04.1960 by the Hon’ble
Supreme Court of India, notwithstanding Sachidananda
WP(C) No.13548 of 2015 Page 30 of 41
Satpathy joined in the promotional post of Lower
Division Clerk in regular establishment, his wife, much
after his death claims parity of pay scale.
6.3. Legal position so far as fence sitters approaching the
Court with inordinate delay was discussed lucidly by a
co-ordinate Bench of this Court in the case of Dr.
Karunakar Sahoo Vrs. State of Odisha, W.P.(C) No.20648
of 2016, & batch, vide Judgment dated 27.06.2017,
which is reproduced hereunder:
“There is no denial about the fact that the fence sitter
cannot be allowed to get the benefit of judgment by
invoking the jurisdiction of court of law after lapse of long
delay. But simultaneously it is also settled that when a
particular set of employee is given relief by the court, all
other identical set of persons need to be treated alike by
extending the benefit, not doing so would amount to
discrimination and would be violative of Article 14 of the
Constitution of India.
This principle needs to be applied in service matter more
emphatically as the service jurisprudence from time to
time postulates that all similarly situated persons should
be treated similarly. Therefore, the normal rule would be
that merely because other similarly situated persons did
not approach the court earlier they are not to be treated
differently. However, this principle is subject to well
recognized exceptions in the form of laches and delays as
well as acquiescence. Those persons who did not
challenge the wrongful action in their cases and
acquiesced into the same and woke up after long delay
only because of the reason that their counterparts who
had approached the Court earlier in time succeeded in
WP(C) No.13548 of 2015 Page 31 of 41
their efforts, then such employees cannot claim that the
benefit of the judgment rendered in the case of similarly
situated persons be extended to them. They would be
treated as fence-sitters and laches and delays, and / or
the acquiescence would be a valid ground to dismiss their
claim. However, this exception may not apply in those
cases where the judgment pronounced by the Court was
judgment in rem with intention to give benefit to all
similarly situated persons, whether they approached the
court or not. With such a pronouncement the obligation is
cast upon the authorities itself to extend the benefit
thereof to all similarly situated persons. Such a situation
can occur when the subject matter of the decision touches
upon the policy matters, like scheme of regularization and
the like. On the other hand, if the judgment of the court
was in personam holding that benefit of the said
judgment shall accrue to the parties before the court and
such an intention is stated expressly in the judgment or it
can be impliedly found out from the tenor and language of
the judgment, those who want to get the benefit of the
said judgment extended to them shall have to satisfy that
their petition does not suffer from either laches and
delays or acquiescence, reliance in this regard may be
made to the judgment rendered by Hon ’ ble Apex Court in
the case of State of Uttar Pradesh & Others Vrs. Arvind
Kumar Srivastava & Others, reported in (2015) 1 SCC 347
= (2014) 12 SCR 193.”
6.4. Be that as it may. The case at hand is a case where the
employee, Sachidananda Satpathy, before the State
Government had taken over the Project in the year 1960
having joined in the promotional post of Lower Division
Clerk in the regular establishment, his wife after his
death is not entitled to claim the same relief as is
WP(C) No.13548 of 2015 Page 32 of 41
granted pursuant to decision of the Hon’ble Supreme
Court of India rendered in the case of employees of the
Project under work-charged establishment.
7. With aforesaid background facts and arguments
advanced by the learned counsel for the respective
parties, it is noteworthy to take note of the following
undisputed factors germane to adjudicate the
contentious issue raised by the petitioners-State
Government:
a. Sachidananda Satpathy joined as Time Keeper
under the work-charged establishment on
09.03.1950, but on promotion, he joined in the
post of Lower Division Clerk on 20.09.1954 in the
regular establishment and subsequently, on
11.09.1961 he got promoted to the post of Upper
Division Clerk in the regular establishment.
b. With effect from 01.04.1960 the State Government
took over the Hirakud Dam Project from Central
Waterways, Irrigation and Navigation Commission.
c. By Order dated 09.02.1988, the Hon’ble Supreme
Court of India in Misc. Case Nos.18620-18621 of
1987 directed for implementation of Order dated
13.08.1985 passed in Civil Appeal Nos.348-349 of
1974.
WP(C) No.13548 of 2015 Page 33 of 41
d. A claim has been set up by the wife (Kumudini
Satpathy) of the employee (Sachidananda Satpathy)
by way of filing application dated 01.09.2012 before
the learned Labour Court, Sambalpur admitting the
factum of her husband being promoted to the post
of Lower Division Clerk with effect from 22.09.1954
and got retired with effect from 01.09.1980 from
the Office of Superintending Engineer, Hirakud
Dam Circle, Burla and expired on 20.06.1983. By
way of said application she sought for extension of
benefits as directed in the Order dated 13.08.1985
passed in Civil Appeal Nos.348-349 of 1974 of the
Hon’ble Supreme Court of India.
7.1. Sri Basudev Pujari, learned Advocate in the written note
of submission made it clear that in view of Order dated
09.02.1988 of the Hon’ble Supreme Court of India
passed in the Civil Miscellaneous Petitions vide
Nos.18620-21 of 1987, arising out of Civil Appeal
Nos.348 of 1974 and 349 of 1974 disposed of on
13.08.1985, the learned Labour Court has set out in the
Order No.8, dated 25.05.1989 certain conditions to be
fulfilled as follows in order to examine the matter and
find entitlement to arrears:
a. The employee must be in the service as on
31.03.1960 as well as on 01.04.1960.
WP(C) No.13548 of 2015 Page 34 of 41
b. He must have been issued with a termination
notice of a kind the substance of which have been
extracted in the Award of I.D. Case No.3/1964 or of
any other alike notice issued with specific reference
to the decision of the Government of Odisha in
Irrigation & Power Department letter No.2765-IF-
2/63-HKD, dated 09.02.1963.
c. In pursuance of such notice he must have been
adjusted against a post in the State Government
without there being any break in his service.
7.2. From the factual position obtained on record, it could be
discerned that the opposite party No.1 did not place any
document to show that the employee-Sachidananda
Satpathy was retrenched by a notice with specific
reference to the decision of the Government of Orissa in
their Irrigation & Power Department letter No.2765-IF-
2/63-HKD, dated 09.02.1963. Nonetheless, it is
admitted position that Sachidananda Satpathy though
joined in the work-charged establishment initially to
work as “Time Keeper”, as is apparent from Office Order
vide Memo No.3908/IOE-5, dated 27.03.1950
(Annexure-5), subsequently he got promoted to the post
of Lower Division Clerk on 22.09.1954, i.e., much prior
to 01.04.1960 in the regular establishment. This fact is
supported by the copy of the service book as furnished
by Kumudini Satpathy-opposite party along with the
application dated 01.09.2012 and observation made in
WP(C) No.13548 of 2015 Page 35 of 41
the Order dated 21.12.2013 by the learned Labour
Court, which reads as under:
On being called upon, the opposite party has filed
“5.
the duplicate service book of Sachidananda
Satpathy maintained in 3 volumes. As per the
Volume-I, Sri Sachidananda Satpathy born on
31.08.1922, was appointed as Lower Division Clerk
in the Office of the Executive Engineer, Left Bank
Building Division with effect from 20.09.1954. He
received annual increments. On 31.12.1958 he was
relieved from the said Office and joined as Lower
Division Clerk in the Office of the Executive Engineer,
Canal Division, No.II on 01.01.1959. ...”
7.3. In course of hearing of the instant matter on earlier
occasion, this Court by Order dated 18.05.2017, having
perused the records produced by the learned Additional
Government Advocate, made the following observation:
“The original service book of the husband of opposite
party No.1 namely Sachidananda Satpathy was
produced by learned Additional Government Advocate,
which on perusal reveals that the employee was
regularly appointed as a Lower Division Clerk since
1954 in the regular establishment . The said service
book was returned to learned Additional Government
Advocate in Court itself.
Learned counsel appearing for opposite party No.1 seeks
some time to obtain instruction in the matter.
Put up this matter after Vacation.”
7.4. Perusal of above papers available on record clinches the
issue that the employee-Sachidananda Satpathy on
WP(C) No.13548 of 2015 Page 36 of 41
31.03.1960/01.04.1960, i.e., the date of taking over the
Hirakud Dam Project by the State Government, was
working as Lower Division Clerk in regular
establishment. Notwithstanding opportunity granted to
Sri Basudev Pujari, learned Advocate in course of
hearing on 18.05.2017 seeking for an adjournment to
place on record necessary instruction, nothing is
forthcoming from the contesting substituted opposite
parties to contradict such fact that Sachidananda
Satpathy worked in the regular establishment in the
promotional post of Lower Division Clerk as on
31.03.1960/01.04.1960 and thereafter got further
promotion to the post of Upper Division Clerk.
7.5. It is abundantly manifest from Order dated 13.08.1985
of the Hon’ble Supreme Court of India in Civil Appeal
Nos.348 of 1974 and 349 of 1974 that the protection
granted is available to the work-charged employees
engaged prior to 01.04.1960 and allowed to continue in
terms of Order No.HKD-5-A-23-51-2438, dated
08.09.1961 of the Government of Odisha. For benefit of
understanding, the following lines are reproduced from
said order:
“The Project was initially entrusted to the Central Water
ways, Irrigation and Navigation Commission and the
workmen were drawing the scales of pay etc. permissible
to employees in the work-charged establishment of the
Central Public Works Department. With effect from
01.04.1960, the State Government took over the project
WP(C) No.13548 of 2015 Page 37 of 41
and it was understood that the work-charged staff
recruited prior to 01.04.1960 should be allowed to
continuing the same scales of pay and conditions of
services as were applicable to them on 31.03.1960.
*
In order to remove this disparity within those who were
employees in the establishment prior to 01.04.1960 and
those who came to be employed in the project subsequent
to 01.04.1960, the Government of Orissa conceived the
idea of terminating the services of those employees who
were working in the work-charged establishments prior to
01.04.1960 and offering them service in the new scales of
pay applicable to the employees of the Government of
Orissa.”
7.6. It is unambiguous that the decision of the Hon’ble
Supreme Court of India was confined to the employees
who were working in the work-charged establishments
prior to 01.04.1960.
7.7. On a diligent consideration of the documents made
available on record and a meticulous reading of the
observation of this Court made in the Order dated
18.05.2017 upon perusal of original service book, it is
evident that Sachidananda Satpathy was not working in
the work-charged establishment on 01.04.1960. Rather
it remained uncontroverted by Sri Basudev Pujari,
learned Advocate representing the legal heirs of the
deceased opposite party (wife of the employee), that as at
31.03.1960 and on 01.04.1960 said Sachidananda
Satpathy was working under regular establishment.
WP(C) No.13548 of 2015 Page 38 of 41
7.8. Therefore, the submission of Sri Basudev Pujari, learned
Advocate that “all the documents produced in the writ
petition clinchingly support the decision of the Labour
cannot be countenanced. This Court finds force in
Court”
the submission of the learned Additional Government
Advocate that
“the employee was appointed to the regular
establishment as a Lower Division Clerk on 20.09.1954
and enjoyed regular State Government Scales of Pay and
and was relieved to join the
promotions until retirement”
said post on 22.09.1954.
Conclusion:
8. In the wake of discussions made supra , the decision of
the Hon’ble Supreme Court of India vide Order dated
13.08.1985 read with Order dated 09.02.1988 rendered
in the case of The Workmen of Hirakud Dam Project Vrs.
The Management of Hirakud Dam Project, Hirakud , Civil
Appeal Nos.348 of 1974 and 349 of 1974 and Civil
Miscellaneous Petition Nos. 18620-18621 of 1987, has no
application to the present fact-situation.
8.1. This Court in the case of Paltronics Allied Industries Pvt.
Ltd. Vrs. State of Odisha, W.A. No. 1448 of 2026, decided
on 12.11.2026 [2026:OHC:293-DB] , laid down as follows:
“It is no longer res integra that the ratio of the judgment is
to be culled out in the context it is so used. A little
difference or an additional fact may invite a different
conclusion and, therefore, the Court must read the
WP(C) No.13548 of 2015 Page 39 of 41
judgment in its entirety in order to find out the ratio
decidendi. The Court should not use a sentence or word
from the judgment to decipher the ratio, nor the judgment
should be read in a piecemeal manner. It is no gainsaying
that the judgment rendered by the Court cannot be read
as a statute and every word or expression used therein is
to be interpreted under the rigour of the interpretative
tools. See paragraph 12 of Union of India Vrs. Arulmozhi
Iniarasu, (2011) 9 SCR 1.”
8.2. Examining Kumudini Satpathy’s application dated
01.09.2012 filed before the learned Labour Court,
Sambalpur (Annexure-5) alongside the
petitioners’
objection dated 16.11.2013 (Annexure-6) and this
Court’s Order dated 18.05.2017 unequivocally
establishes that Sachidananda Satpathy was working as
a Lower Division Clerk as on 31.03.1960 under regular
establishment. Such a fact is fortified by copy of service
book enclosed to the application dated 01.09.2012
furnished before the learned Labour Court by the
petitioner (See, Annexure-5 of writ petition). The decision
rendered by the learned Labour Court that as
Sachidananda Satpathy was initially engaged as Time
Keeper under the work-charged establishment prior to
01.04.1960, he was entitled to the benefit in terms of
Order dated 13.08.1985 read with Order dated
09.02.1988 passed in The Workmen of Hirakud Dam
Project Vrs. The Management of Hirakud Dam Project,
Hirakud , Civil Appeal Nos.348 of 1974 and 349 of 1974
and Civil Miscellaneous Petition Nos. 18620-18621 of
WP(C) No.13548 of 2015 Page 40 of 41
1987, is perverse, based on erroneous appreciation of
evidence on record and misapplication of conscientious
mind. Hence, it is held that the opposite parties-legal
heirs are not entitled to the relief(s) claimed in
application dated 01.09.2012 (Annexure-5) filed by
Kumudini Satpathy, wife of Sachidananda Satpathy
before the learned Labour Court, Sambalpur.
9. Ergo, the Order dated 21.12.2013 passed in Misc. Case
No.1 of 1988 (SC)— No.782 by the learned Labour Court,
Sambalpur is set aside. The writ petition filed by the
Department of Water Resources and Superintending
Engineer, Hirakud Dam Circle, Sambalpur thus
succeeds.
10. As a sequel thereto, the writ petition is disposed of and
pending Interlocutory Application(s), if any, shall stand
disposed of, but in the circumstances there shall be no
order as to costs.
(MURAHARI SRI RAMAN)
JUDGE
D R . S ANJEEB K PANIGRAHI I agree.
.—
(Dr. SANJEEB K PANIGRAHI)
JUDGE
Signature Not
Verified
Digitally Signed
Signed by: ASWINI KUMAR
SETHY
Designation: Personal
Assistant (Secretary in-charge)
Reason: Authentication
Location: ORISSA HIGH
COURT, CUTTACK
Date: 18-Nov-2026 20:10:00
High Court of Orissa, Cuttack
th
The 18 November, 2026//Aswini/MRS/Laxmikant
WP(C) No.13548 of 2015 Page 41 of 41