ARCHANA AGARWAL vs STATE OF WEST BENGAL AND ANR

Court
Calcutta High Court


IN THE HIGH COURT AT CALCUTTA
CRIMINAL REVISIONAL JURISDICTION
APPELLATE SIDE

PRESENT:
THE HON’BLE JUSTICE UDAY KUMAR

CRR 3796 OF 2022

ARCHANA AGARWAL
-VS-
STATE OF WEST BENGAL & ANR.

For the Petitioner : Mr. Mainak Bose, Ld. Sr. Adv.
Mr. Lokesh Sharma, Ld. Adv.
Mr. Deokinandan Sharma, Ld. Adv.

For the K.M.C : Ms. Puja Goswami, Ld. Adv.

Reserved on : 28.08.2026
Pronounced on : 10.09.2026

UDAY KUMAR, J.: –
1. Urban development is neither a private enterprise of unbridled whim nor an
arena where financial clout can subordinate collective safety; it is a sacred
compact governed by the rule of law, structural discipline, and public
welfare. When municipal regulations crafted to safeguard human lives, civic
infrastructure, and environmental equilibrium are treated as mere
inconveniences to be bypassed by clever drafting or a veneer of partial
permits, the judiciary cannot remain a silent spectator. The matter at hand
presents a classic, albeit alarming, manifestation of this modern urban
malady: an instance where a restricted, minor municipal permission for
roof repairs was weaponized as a legal shield to raze an entire load-bearing
structure and erect an unauthorized, un-engineered multi-storied concrete

2
CRR 3796 OF 2022

skeleton in a congested heritage lane of Kolkata. This Court is tasked with
examining whether the concurrent verdicts of conviction, sentencing, and
remedial demolition rendered by the courts below suffer from any
perversity, manifest illegality, or misreading of evidence so as to warrant
revisional interference.
2. The genesis of these proceedings traces back to Premises No. 167,
Muktaram Babu Street, Ward No. 25, Borough No. IV, Kolkata, a densely
populated urban fabric characterized by narrow access ways and delicate
civic infrastructure. On December 15, 2014, the petitioner-accused,
Archana Agarwal, acquired ownership of the said premises, subsequently
getting her name mutated in the assessment records of the Kolkata
Municipal Corporation (KMC). Seeking to undertake building works, the
petitioner approached the municipal authorities and obtained Sanction
Plan No. 21/Br-IV/2018-19 (Exbt. 1) on December 19, 2018. On its face
and by its explicit technical design, this sanction was strictly and narrowly
confined to the "reconstruction of roofs only" of an existing two-storied
structure, backed by the professional oversight of a Licensed Building
Surveyor (LBS) and an Empanelled Structural Engineer (ESE).

3. However, reality on the ground bore no resemblance to the paper sanction.
On April 16, 2019, Mr. Gopal Kumar Paul, Assistant Engineer (Building) of
Borough No. IV (PW-1), conducted a spot inspection of the premises. What
he uncovered was a total subversion of the municipal permit: the entire
original building had been systematically demolished down to its base, and
a completely fresh, unverified structural framework comprising heavy RCC
columns and tie beams was being aggressively raised without any
structural stability certificates, soil testing, or LBS/ESE supervision.

3
CRR 3796 OF 2022

Recognizing the imminent peril this un-engineered construction posed, not
only of sudden structural collapse but also of choking local drainage,
sewerage, water supply, and emergency fire access in a congested lane, the
Assistant Engineer promptly lodged a written complaint at the Girish Park
Police Station on May 2, 2019. This set the criminal machinery in motion,
culminating in Girish Park P.S. Case No. 45 of 2019.

4. Following a thorough investigation, the Investigating Officer (PW-7)
submitted Charge Sheet No. 28/2020 on November 30, 2020, against the
petitioner under Section 401A of the Kolkata Municipal Corporation Act,
1980 (hereinafter referred to as ‘KMC Act’ in short). The case was
subsequently endorsed for trial before the Learned Municipal Magistrate,
nd
2 Court, Kolkata. During the ensuing trial, the prosecution adduced oral
testimonies from eight key witnesses, spanning municipal engineers, the
LBS, local independent residents, and police investigators, and formally
exhibited fifteen crucial documentary pieces, including the sanction plan,
case reports, stop-notice service returns, and inspection books. When
examined under Section 313 of the Code of Criminal Procedure, the
accused offered a bare denial of culpability, asserting she acted strictly
within the sanction, yet failed to lead any affirmative defence evidence or
structural reports.
5. The Learned Trial Court, vide its considered judgment dated June 24,
2022, found the petitioner guilty under Section 401A of the KMC Act,
sentencing her to simple imprisonment for two years and a fine of Rs.
50,000/-, with a default stipulation, alongside invoking Sections 583 and
584 of the KMC Act read with Section 452 Cr.P.C. to order the physical
demolition of the unlawful structure through the Municipal Commissioner.

4
CRR 3796 OF 2022

Aggrieved by the conviction, sentence, and demolition mandate, the
petitioner preferred a Criminal Appeal under Section 374(3) Cr.P.C.
(Criminal Appeal / GR Case No. 42 of 2020), urging thirty-four distinct
grounds touching upon alleged evidentiary gaps, photographic omissions,
and procedural misapplications. The First Appellate Court, vide its
comprehensive judgment dated September 19, 2022, meticulously re-
evaluated the entire mosaic of evidence, upholding the findings of guilt and
the quantum of sentence while prudently refining the demolition directive
to ensure strict alignment with the KMC Act, Building Rules, and
overarching High Court procedural safeguards. Unyielding, the petitioner
has now brought the matter before this Revisional Court, inviting judicial
scrutiny over concurrent findings of fact and law.
6. Mr. Mainak Bose, Learned Senior Advocate for the petitioner submitted that
the concurrent judgments and orders of conviction and sentence passed by
the courts below are vitiated by gross perversity, a fundamental misreading
of the evidence, and an erroneous application of municipal criminal
jurisprudence, warranting immediate interference under revisional
jurisdiction. He vehemently argued that the entire prosecution case rests
on the false premise that the petitioner executed an unauthorized, illegal
construction, whereas the petitioner actually held a valid and subsisting
Sanction Plan (Exbt. 1) issued by the Kolkata Municipal Corporation (KMC)
for the reconstruction of the premises at No. 167, Muktaram Babu Street.
The learned Senior Advocate contended that the execution of supportive
structures, such as RCC columns and tie beams, during the reconstruction
of a pre-existing multi-storied building is an essential engineering necessity
and cannot be criminalized as "unauthorized construction."

5
CRR 3796 OF 2022

7. Furthermore, Mr. Bose argued that to sustain a conviction under Section
401A of the KMC Act, the prosecution must independently establish that
the construction actively endangered human life or caused severe
disruption to public utilities, but the prosecution failed to adduce any
scientific audit, material strength report, soil test, or expert structural
evaluation, relying instead on vague visual inspections. He pointed out that
the testimony of prosecution witnesses is plagued by material
contradictions, noting that PW-1 (Assistant Engineer) admitted during
cross-examination that no specific dimensions or measurements of the
alleged deviation were recorded in the initial case report, site photographs
(Exbt. 12) lacked proper premises identification, and the Licensed Building
Surveyor (PW-5) admitted to having no documentation proving that work
exceeded the sanctioned framework.
8. He further submitted that both courts gravely erred in law by shifting the
evidentiary burden onto the defence to prove structural safety, ignoring the
principle that the initial burden rests squarely on the prosecution, and
committed a procedural illegality by invoking Section 584 of the KMC Act
(directing demolition) in the final judgment when no such specific charge
had been framed at the inception of the trial.
9. Lastly, Mr. Bose urged that assuming minor procedural variations existed,
the imposition of two years' imprisonment coupled with an arbitrary order
of total demolition is shockingly disproportionate, as the lower courts
mechanically applied generalized environmental precedents ( Shanti Sports
Club , Friends Colony ) without establishing any actual, tangible public
hazard, ignoring that minor or remediable deviations under municipal law
ought to be addressed through compounding provisions rather than a

6
CRR 3796 OF 2022

draconian penal demolition axe against a private homeowner. It is further
argued that the proceedings are not maintainable due to conflicting parallel
actions, noting a prior KMC notice dated May 28, 2024, issued on the same
set of allegations, and asserting that the prosecution was improperly
initiated without direct authorization from the Municipal Commissioner.
Placing reliance on the statutory framework of Section 621(2) of the KMC
Act and decisions of this Hon’ble Court in Shyam Sundar Singh v. State of
West Bengal (C.R.R. 2034 of 2018 decided on 08.04.2024) and Sri
Sachindranath Biswas v. State of West Bengal (C.R.R. 2033 of 2018 decided
on 29.03.2022), learned counsel submits that the subsequent filing of
regularization applications and payment of compounding fees extinguish
further penal proceedings.
10. Per contra, Ms. Puja Goswami, learned Advocate for the opposite parties
(State and KMC) stoutly defended the concurrent findings of both trial and
appellate courts, submitting that the revisional application is devoid of
merit and deserves outright dismissal. She submitted that both the Trial
Court and the First Appellate Court concurrently evaluated the entire body
of evidence comprising eight prosecution witnesses and fifteen exhibits and
arrived at a definitive finding of guilt, and in the absence of any patent
perversity, glaring procedural defect, or absolute misreading of evidence,
this Revisional Court ought not to re-weigh or re-appreciate factual findings
as a second court of appeal. She further contended that the defence's
attempt to hide behind Sanction Plan (Exbt. 1) is a deliberate distortion of
facts because the sanction was strictly limited to the reconstruction of roofs
only for an existing structure, whereas the petitioner completely demolished
the original load-bearing walls and illegally raised an un-engineered, brand-

7
CRR 3796 OF 2022

new multi-storied concrete skeleton instead of executing permissible
repairs. This total transformation is firmly corroborated by the testimony of
the Licensed Building Surveyor (PW-5), who formally withdrew her
supervision upon discovering the illegal demolition.
11. Ms. Goswami further submitted that the un-engineered replacement of
structural components in a densely congested urban lane like Muktaram
Babu Street inherently creates an imminent threat to human life and
chokes essential municipal services like drainage, sewerage, water supply,
and emergency fire tender access, and these civic hazards were conclusively
established through the testimonies of municipal engineers (PW-1, PW-6),
the Empanelled Structural Engineer (PW-8), and local independent
residents (PW-2, PW-3), thereby satisfying all statutory ingredients of
Section 401A. Finally, Ms. Goswami argued that Section 584 of the KMC
Act, read with Section 452 of the Cr.P.C., explicitly empowers the court to
order the dismantling of unlawful structures upon conviction, and the
appellate court exercised sound judicial prudence by ensuring that the
demolition directive operates in harmony with the KMC Act, Building Rules,
and overarching judicial safeguards, while the sentence of two years'
imprisonment falls well within statutory parameters and is fully justified
given the deliberate defiance of municipal laws. Addressing the petitioner's
subsequent reliance on a regularization order of the Special Officer
(Building), KMC dated July 5, 2024, brought on record via supplementary
affidavit, she contended, drawing strength from the dictum of the Hon'ble
Supreme Court in G. Mohandas v. State of Kerala & Ors. [2025 SCC OnLine
SC 1434] , that subsequent administrative regularization or compounding

8
CRR 3796 OF 2022

does not wipe out or nullify an already established criminal conviction for
an offense previously committed.
12. Upon a rigorous and anxious consideration of the rival submissions
advanced by the learned counsel for the contesting parties, and upon an
independent, meticulous scrutiny of the lower court records, the following
core questions stand for determination before this Revisional Court:
Firstly , whether a restricted, minor municipal permit for
"reconstruction of roofs only" can legally shield the total demolition
of an existing structure and the un-engineered erection of a brand-
new multi-storied concrete framework;
Secondly , whether the prosecution successfully established the
statutory ingredients of a public safety and civic hazard under
Section 401A of the KMC Act without relying on speculative visual
assessments;
Thirdly , what effect, if any, subsequent regularization applications,
compounding provisions under Section 621(2) of the KMC Act, and
supervening administrative orders have on an already established
criminal conviction and sentence; and
Fourthly , whether procedural and evidentiary safeguards including
the initial burden of proof, framing of charges, and invocation of
remedial demolition powers under Section 584 of the KMC Act read
with Section 452 of the Cr.P.C. were compromised, and whether the
sentence and demolition orders are disproportionate.

9
CRR 3796 OF 2022

13. Addressing the first core question, whether a restricted, minor municipal
permit for "reconstruction of roofs only" can legally shield the total
demolition of an existing structure and the un-engineered erection of a
brand-new multi-storied concrete framework, this Court must anchor its
analysis firmly upon the factual substratum as it unspools from the ocular
and documentary evidence on record. The bedrock of the prosecution's case
rests upon the stark and irreconcilable variance between the permission
granted and the actual execution on site. The petitioner secured Sanction
Plan No. 21/Br-IV/2018-19 (Exbt. 1) that was narrowly, explicitly, and
unambiguously restricted to the "reconstruction of roofs only" of an existing
two-storied structure situated at Premises No. 167, Muktaram Babu Street.
However, the spot inspections conducted by Assistant Engineer Gopal
Kumar Paul (PW-1) and Sub-Assistant Engineer Dilwar Hossain (PW-6),
which stood fully corroborated by the formal withdrawal of the Licensed
Building Surveyor Chhandita Mitra (PW-5) and the expert testimony of
Empanelled Structural Engineer Rupak Kumar Banerjee (PW-8), laid bare
an outright, wholesale demolition of the original load-bearing structure. In
the place of mere roof repairs, a fresh, unverified skeleton featuring heavy
reinforced cement concrete (RCC) columns and tie beams was aggressively
raised.
14. The statutory framework governing this core controversy finds expression
primarily within the provisions of the Kolkata Municipal Corporation Act,
1980. Section 401A of the said Act creates a substantive penal offence for
undertaking or carrying on construction of any building in contravention of
the provisions of the Act or the rules made thereunder, specifically targeting
unauthorized works that create a hazard to human life, safety, or public

10
CRR 3796 OF 2022

utilities. Furthermore, Sections 583 and 584 of the KMC Act empower the
Municipal Magistrate, upon recording a conviction, to direct the Municipal
Commissioner to physically demolish or dismantle the unlawful structure,
a mechanism read harmoniously with Section 452 of the Code of Criminal
Procedure. The foundational intent behind these legislative enactments is
the preservation of urban discipline, civic safety, and structural integrity.

15. The petitioner's audacious plea that the erection of heavy RCC columns and
tie beams is an automatic legal corollary or structural necessity to
"reconstruction" is factually and structurally untenable under established
municipal jurisprudence. Reconstructing a roof within an existing
structural envelope is vastly distinct from razing an entire building down to
its foundation and casting a brand-new, unverified structural framework.
This core deception was further cemented by the independent testimonies
of local residents (PW-2 and PW-3), leaving both the trial and appellate
courts entirely justified in concluding that the petitioner abused a minor
repair permit to execute major unauthorized construction. Obtaining such
a restricted permit was, in essence, an idle formality unless the true
intention was to create a paper trail to mask future illegality.

16. This judicial evaluation is fortified by the unbroken stream of binding
precedents from the Hon'ble Supreme Court regarding urban
lawlessness. In the landmark pronouncement of Dipak Kumar Mukherjee
v. Kolkata Municipal Corporation and Ors. [(2013) 5 SCC 336] at
paragraph 29 of the report, the Apex Court underscored the societal
catastrophe wrought by illegal building practices:

11
CRR 3796 OF 2022

“29. … Unauthorised construction of buildings not only destroys the
concept of planned development which is beneficial to the public but
also places unbearable burden on the basic amenities and facilities
provided by the public authorities. At times, construction of such
buildings becomes hazardous for the public and creates traffic
congestion. Therefore, it is imperative for the public authorities
concerned not only to demolish such construction but also impose
adequate penalty on the wrongdoer.”
17. Similarly, in Friends Colony Development Committee v. State of Orissa &
Ors. [(2004) 8 SCC 733] and Shanti Sports Club & Anr. v. Union of India
[(2009) 15 SCC 705], the Supreme Court reiterated that illegal and
unauthorized constructions cannot be condoned, ignored, or regularized
lightly, as they directly subvert public order, collective safety, and urban
discipline.
18. Applying these settled principles, statutory provisions, and factual findings
to the matter at hand, this Court has no hesitation in holding that a
restricted, minor municipal permit for "reconstruction of roofs only" cannot
under any principle of law, equity, or engineering serve as a legal shield or
blanket authorization to completely demolish an existing load-bearing
building and construct an un-engineered multi-storied concrete skeleton.
The concurrent findings of the courts below on this core issue are entirely
correct, free from any perversity or misreading of evidence, and fully
sustainable in law.
19. Adverting to the second core question, this Court must evaluate the legal
sufficiency of the prosecution’s evidence against the statutory thresholds
regarding public safety and civic hazards. The petitioner vehemently
contended that the prosecution case suffered from a fatal evidentiary
vacuum because no scientific audit, material strength report, soil test, or

12
CRR 3796 OF 2022

expert structural evaluation was produced, relying instead on subjective
visual inspections.
20. The statutory framework governing this aspect is anchored in Section 401A
of the KMC Act, 1980, which targets unauthorized construction creating
hazards to human life, safety, or public utilities (such as drainage,
sewerage, water supply, and emergency fire access). To secure a conviction
under this provision, the prosecution must establish:
(i) the execution of building works is in contravention of the
sanctioned plan;
(ii) the identity of the person responsible as the recorded owner
or builder; and
(iii) the inherent danger or adverse impact on public safety and
municipal infrastructure arising from such un-engineered
construction.
Upon conviction under Section 401A of the KMC Act, consequential
enforcement mechanisms are provided under Sections 583 and 584 of
the KMC Act , read harmoniously with Section 452 of the Code of
Criminal Procedure , which empower the court to direct the Municipal
Commissioner to execute physical demolition.
21. Upon scrutinizing the record, this Court finds that the prosecution
discharged its initial burden of proof comprehensively through robust
ocular, documentary, and expert testimony. The record establishes that the
prosecution adduced oral testimonies from eight key witnesses, including
Assistant Engineer Gopal Kumar Paul (PW-1), Sub-Assistant Engineer

13
CRR 3796 OF 2022

Dilwar Hossain (PW-6), the withdrawing Licensed Building Surveyor
Chhandita Mitra (PW-5), and Empanelled Structural Engineer Rupak
Kumar Banerjee (PW-8), alongside local independent residents (PW-2 and
PW-3), supported by fifteen formal exhibits. This collective body of evidence
conclusively demonstrated that the un-engineered substitution of the entire
structural framework with heavy RCC columns and tie beams in a densely
congested heritage lane like Muktaram Babu Street inherently created an
imminent peril of structural collapse and choked delicate municipal
infrastructure. The argument that the prosecution was legally bound to
produce a laboratory material-strength report or soil test is fallacious;
where ocular and technical testimonies of municipal experts establish an
overt, blatant, and dangerous deviation, specialized scientific audits are not
a mandatory prerequisite to prove obvious structural hazards.
22. This Court therefore answers the second question in affirmative, holding
that the prosecution has discharged its burden, proving the statutory
ingredients of Section 401A of the KMC Act, and the Trial Court as well as
the First Appellate Court, have meticulously weighed the entire body of
evidence to reach concurrent findings of guilt against the petitioner.

23. Adverting to the third core question specifically, what effect, if any,
subsequent regularization applications, compounding provisions under
Section 621(2) of the KMC Act, 1980, and supervening administrative
orders have on an already established criminal conviction and sentence—
this Court must carefully examine the legal interface between civil-
municipal compounding mechanisms and criminal penal liability. The
petitioner sought to press a supplementary affidavit bringing on record a
regularization order of the Special Officer(Building), KMC dated July 5,

14
CRR 3796 OF 2022

2024, alongside applications for compounding under Section 621(2) of the
KMC Act, vehemently arguing that the submission of regularization fees
and the initiation of compounding processes operate to extinguish, abate,
or render ineffective ongoing penal proceedings and concurrent convictions.
24. The statutory architecture of the Kolkata Municipal Corporation Act, 1980,
explicitly delineates the scope of compounding. Section 621(2) of the KMC
Act provides a statutory mechanism for the compounding of certain
municipal offences upon the payment of prescribed compounding or
regularization fees, which, under specific administrative parameters, bars
further departmental or municipal proceedings with respect to the
compounded infraction. However, this administrative mechanism must be
construed in harmony with substantive penal provisions such as Section
401A and Section 584 of the KMC Act, which target the grave public safety
hazards and calculated violations of urban discipline.
25. The core legal question of whether subsequent regularization or
administrative compounding can retroactively set aside, wipe out, or nullify
a validly recorded criminal conviction has been decisively answered by the
Hon'ble Supreme Court in G. Mohandas (supra). The Supreme Court
established an unyielding dichotomy between civil compounding and
criminal culpability, holding unequivocally that subsequent regularization
applications or administrative compounding mechanisms cannot
retroactively erase, nullify, or grant amnesty from criminal liability for an
offence already committed.
26. Applying this binding ratio to the present matter, the third question in
answered in the negative; the subsequent submission of regularization fees
or the invocation of compounding provisions under Section 621(2) of the

15
CRR 3796 OF 2022

KMC Act does not and cannot extinguish, nullify, or wipe out the prior
criminal conviction and sentence validly recorded under Section 401A. Civil
and municipal compounding mechanisms operate exclusively in the
administrative and revenue spheres, whereas a criminal conviction
addresses the completed infraction of public safety, deceit, and defiance of
the rule of law. Permitting a violator to utilize post-facto regularization as a
retroactive amnesty shield would fundamentally defeat the deterrent
objective of criminal jurisprudence, rewarding bad faith and encouraging
the strategic abuse of minor municipal permits. Accordingly, the
supervening regularization order presented via the supplementary affidavit
provides no legal foundation to interfere with the concurrent findings of
guilt and sentencing.
27. Adverting to the fourth core question concerning procedural safeguards, the
burden of proof, the framing of charges for demolition, and the
proportionality of the sentence, this Court must evaluate the legal
parameters governing revisional jurisdiction and penal enforcement. The
petitioners have challenged the introduction of demolition orders under
Section 584 of the KMC Act in the final judgment when no separate
substantive charge for demolition had been framed at the inception,
arguing that this improperly shifted the burden of proof onto them.
28. The legal parameters governing this Revisional Court are strictly delineated
under Section 397 read with Section 401 of the Code of Criminal Procedure.
A Revisional Court does not function as a second court of appeal to re-
weigh evidence or re-appreciate factual findings unless the concurrent
judgments of the courts below suffer from patent perversity, gross illegality,
or a complete misreading of the record. Consequential enforcement

16
CRR 3796 OF 2022

mechanisms are provided under Sections 583 and 584 of the KMC Act,
read harmoniously with Section 452 of the Code of Criminal Procedure,
which empower the court, upon conviction, to direct the Municipal
Commissioner to execute physical demolition.
29. Regarding the procedural challenges, this Court finds no merit in the
petitioner's contentions. The courts below did not improperly shift the
burden of proof onto the defence; rather, once the prosecution successfully
established a prima facie case of unauthorized construction and public
hazard through unimpeached evidence, the evidentiary onus lawfully
shifted to the defence under the general principles of evidence to
demonstrate compliance or lawful execution, which the defence failed to
discharge beyond a bare denial of the petitioner recorded under Section 313
Cr.P.C. Furthermore, the contention that Section 584 of the KMC Act
cannot be invoked unless a separate charge for demolition is framed at the
trial's inception is legally flawed. Demolition under Section 584 is a
statutory, consequential remedial mandate that attaches automatically
upon conviction for an unauthorized building offence, rather than a distinct
substantive penal charge requiring separate framing under the Code of
Criminal Procedure.
30. This procedural and substantive competence finds firm backing in the
jurisprudence of the Hon'ble Supreme Court, which has consistently held
that criminal courts possess inherent and statutory jurisdiction to issue
remedial dismantling orders at the culmination of a trial involving illegal
building infractions. The Apex Court, in various decisions, has delineated
the strict boundaries of sentencing and penal enforcement in socio-
economic and public safety offenses, establishing that crimes affecting

17
CRR 3796 OF 2022

public welfare, municipal discipline, and collective safety do not merit
procedural leniency or soft indulgence. When an un-engineered structure is
raised in calculated defiance of municipal regulations within a high-density
zone, the statutory machinery under Section 401A and Section 584
operates as an integrated legal deterrent to protect human life.
31. Turning to the final challenge regarding the proportionality of the sentence,
the imposition of two years of simple imprisonment coupled with a fine of
Rs. 50,000/-, alongside an order of physical demolition this Court notes
that a suggestion was posed to exempt the substantive imprisonment while
keeping the monetary fine intact. In light of the established judicial
benchmarks in Friends Colony (supra) , Shanti Sports Club (supra) , and
Dipak Kumar Mukherjee (supra) , this Court finds that exempting the
substantive imprisonment while retaining only the fine would be legally
unsound and contrary to the deterrent mandate of municipal criminal
jurisprudence. When a violator engages in the calculated subversion of
municipal safety laws weaponizing a restricted roof-repair permit to
completely raze an existing structure and erect an un-engineered multi-
storied concrete skeleton in a congested heritage lane like Muktaram Babu
Street, reducing the sentence to a mere monetary fine would allow
wrongdoers to "buy their way out" of criminal culpability. The concurrent
finding on the sentence of two years' simple imprisonment and the fine
imposed by the Trial Court, as affirmed and refined by the First Appellate
Court, do not suffer from any disproportionate excess or legal perversity,
and the modified demolition directives ensuring strict compliance with
procedural safeguards are fully warranted.

18
CRR 3796 OF 2022

32. The comprehensive analysis of the statutory provisions, factual matrix, and
judicial precedents yields the following definitive conclusions on the points
of law arising in this revision:
First , a restricted, minor municipal permit for "reconstruction of
roofs only" cannot under any principle of law, equity, or engineering
serve as a legal shield or blanket authorization to completely
demolish an existing load-bearing structure and construct an un-
engineered multi-storied concrete framework.
Second , the prosecution is not legally required to produce
specialized laboratory material-strength reports or soil tests where
consistent ocular, documentary, and expert testimonies of
municipal engineers establish an overt, blatant, and dangerous
public safety hazard under Section 401A of the KMC Act.
Third , subsequent administrative regularization or the payment of
compounding fees under Section 621(2) of the KMC Act cannot
retroactively erase, nullify, or set aside a validly recorded criminal
conviction and sentence for an offence already completed.
Fourth , consequential remedial demolition orders under Section
584 of the KMC Act read with Section 452 of the Cr.P.C. are valid
statutory mandates that attach automatically upon conviction and
do not require a separate substantive charge to be framed at the
inception of the trial.

19
CRR 3796 OF 2022

Fifth , in cases of calculated, hazardous unauthorized construction,
substantive penal imprisonment coupled with remedial demolition is
essential to uphold urban discipline and collective safety, precluding
any unwarranted commutation of sentence.
33. Accordingly, for the detailed reasons recorded hereinabove, this Revisional
Court finds no patent perversity, manifest illegality, or misreading of
evidence in the impugned judgments. The criminal revisional application is
devoid of merit and stands dismissed.
34. The concurrent judgments of conviction and sentence passed by the
Learned Trial Court and affirmed by the First Appellate Court under
Section 401A of the Kolkata Municipal Corporation Act, 1980, are hereby
affirmed .
35. The Municipal Commissioner shall act strictly in adherence to the
procedural safeguards established by law, and only after the expiry of the
statutory period of appeal.
36. Let this judgment be placed on record as the final expression of this Court
on the interplay between municipal compounding provisions and criminal
accountability under the Kolkata Municipal Corporation Act, 1980, and let
a copy of this judgment along with the Trial Court Records be transmitted
down to the learned courts below forthwith for necessary information and
immediate compliance.
37. Interim order, if any, stands vacated.
38. There shall be no order as to costs.
39. Case diary, be returned to the Learned Counsel for the State.

20
CRR 3796 OF 2022

40. Urgent photostat certified copy of this judgment, if applied for, be supplied
to the parties upon compliance with all requisite formalities.

(Uday Kumar, J.)

LATER

Prayer for stay made by the learned counsel for the petitioner is
heard and rejected.
(Uday Kumar, J.)