Dharam Singh vs The State Of Madhya Pradesh
- Court
- Madhya Pradesh High Court
- Decided on
- 16-03-2026
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
1 WP-2209-2018
IN THE HIGH COURT OF MADHYA PRADESH
AT GWALIOR
BEFORE
HON'BLE SHRI JUSTICE AMIT SETH
th
ON THE 16 OF MARCH, 2026
WRIT PETITION No. 2209 of 2018
DHARAM SINGH
Versus
THE STATE OF MADHYA PRADESH AND OTHERS
Appearance:
Shri Mudit Goswami - Advocate for the petitioner.
Ms. Smrati Sharma - Dy. Govt. Advocate for the respondents/State.
Shri Sartaj Singh Tomar - Advocate for respondents No. -2,4 & 5.
ORDER
1. With the consent of parties, the matter is heard finally .
2. The writ petition already stands dismissed against respondent No.6 on
12.03.2020 for non-compliance of peremptory order dated 06.01.2020.
3. The instant writ petition filed under Article 226/227 of the Constitution of
India seeks following reliefs:-
“ a. That, the respondent be direct to after demolishing the Puliya
from the Survey No.204 be construct over the Survey
No.192/193 as sanctioned by the department and the cost of the
said work be recover from the all responsible person.
b. That, the inquiry be set up against the responsible person.
c. That, any other just and proper relief, warranting under the
facts and circumstances of the case be also given to the petitioner
including cost, in the ends of justice.”
4. The learned counsel appearing for the petitioner submits that for the
construction of a road under the Pradhan Mantri Gram Sadak Yojna, under
Signature Not Verified
Signed by: VANDANA
VERMA
Signing time: 18-Mar-26
10:49:41 AM
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
2 WP-2209-2018
package No.3731, in village Lund, District Sheopur, the road was required to pass
through lands bearing Survey Nos. 192 & 193, and as a part of construction of the
road, the culvert was required to be constructed on Khasra Nos.192 & 193
whereas, at the time of execution, the culvert was constructed on land bearing
survey No.204. Since the petitioner is the owner of agricultural land bearing
Survey No.203 and was using land bearing Survey No.204 to approach his fields,
on account of the alleged illegal deviation in the construction plan and
construction of the culvert on land bearing Survey No.204, the rights of the
petitioner are adversely affected.
5. He further submits that the petitioner had submitted a representation to
the Collector in the said regard on 14.06.2016 (Annexure P/2), in response
whereof, the Collector, Sheopur, vide communication dated 25.06.2016, directed
the Tehsildar, Badoda to hold an inquiry into the matter and inform the Collector
in the said regard. He further submits that even as per Annexure P/10, while
considering the complaint of the petitioner in Jan Sunwai, the Tehsildar, Badoda
submitted a report dated 21.11.2017 stating that the culvert has been constructed
on land bearing survey No.204; however, the same neither affects the land of the
petitioner nor there is any objection by the villagers to the said construction.
6. The learned counsel appearing for the petitioner, by placing reliance on the
Pachnama dated 31.01.2017 placed on record with the return filed by the
respondents No.2, 4 and 5, submits that the SDO has given a contrary report
indicating that the culvert has been constructed on land bearing survey Nos.193
and 192 whereas, the Survey No. 204, being government land, is lying vacant. He
submits that in the teeth of these two conflicting reports, it is evident that the
respondents have deviated from the sanctioned plan for construction of the road
Signature Not Verified
Signed by: VANDANA
VERMA
Signing time: 18-Mar-26
10:49:41 AM
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
3 WP-2209-2018
and culvert and therefore, the relief claimed in the petition deserves to be granted.
7. On the other hand, the learned counsel appearing for the respondents
No.2, 4 & 5 by referring to the return filed, submits that in terms of the directions
issued by the Collector on the complaint made by the petitioner, a spot inspection
was carried out on 31.01.2017 by the SDM, for which the petitioner was also
noticed, but the petitioner deliberately did not participate in the proceedings. The
Panchnama report clearly indicates that the culvert has been constructed on the
identified survey numbers and not on Survey No.204 as alleged by the petitioner.
8. He further submits that the Sarpanch of the village, by communication
dated 20.09.2016 addressed to the General Manager, MPRRDA, Sheopur, clearly
stated that the petitioner is trying to obstruct the construction work by submitting
false complaints.The Panchnama on record also indicates that the petitioner is a
habitual complainant and therefore his complaint deserves to be ignored.
9. He further submits that the work of construction was completed in the
year 2017 itself and since then, the road and the culvert are in place and are being
used by the villagers without any objection and therefore, the petition deserves
dismissal.
10. No other point has been pressed by the learned counsel appearing for the
parties.
11. Heard the learned counsel for the parties and perused the record.
12. The scope of interference in exercise of writ jurisdiction under Article 226
of the Constitution of India in matters pertaining to construction of public roads
and allegations of deviation from the sanctioned plan came up for consideration
before the Apex Court in the case of Union of India vs. Kushala Shetty and Ors.,
(2011) 12 SCC 69 and in paragraphs 25 and 28 of the said judgment the Apex
Signature Not Verified
Signed by: VANDANA
VERMA
Signing time: 18-Mar-26
10:49:41 AM
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
4 WP-2209-2018
Court has as under:-
"25. The plea of the respondents that alignment of the
proposed widening of the national highways was
manipulated to suit the vested interests sounds attractive but
lacks substance and merits rejection because except making a
bald assertion, the respondents have neither given particulars
of the persons sought to be favoured nor placed any material
to prima facie prove that the execution of the project of
widening the national highways is actuated by mala fides
and, in the absence of proper pleadings and material, neither
the High Court could nor this Court can make a roving
enquiry to fish out some material and draw a dubious
conclusion that the decision and actions of the appellants are
tainted by mala fides.
28. Here, it will be apposite to mention that NHAI is a
professionally managed statutory body having expertise in
the field of development and maintenance of national
highways. The projects involving construction of new
highways and widening and development of the existing
highways, which are vital for the development of
infrastructure in the country, are entrusted to experts in the
field of highways. It comprises of persons having vast
knowledge and expertise in the field of highway
development and maintenance. NHAI prepares and
implements projects relating to development and
maintenance of national highways after thorough study by
experts in different fields. Detailed project reports are
prepared keeping in view the relative factors including
intensity of heavy vehicular traffic and larger public interest.
The courts are not at all equipped to decide upon the viability
and feasibility of the particular project and whether the
particular alignment would subserve the larger public
interest. In such matters, the scope of judicial review is very
limited. The court can nullify the acquisition of land and, in
the rarest of rare cases, the particular project, if it is found to
be ex facie contrary to the mandate of law or tainted due to
mala fides. In the case in hand, neither has any violation of
mandate of the 1956 Act been established nor has the charge
of malice in fact been proved. Therefore, the order under
challenge cannot be sustained."
13. Thus, the Apex Court in the case of Kushala Shetty (Supra) has
specifically held that in the matters of road alignment/deviation of public road
from the sanctioned plan during construction, unless a specific case of mala fides
is pleaded and proved, the writ court is ordinarily not required to interfere as the
Signature Not Verified
Signed by: VANDANA
VERMA
Signing time: 18-Mar-26
10:49:41 AM
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
5 WP-2209-2018
matters of road alignment/deviation from the sanctioned plan etc. are the subject
matter of expert bodies dealing with construction, development and various other
aspects pertaining to the vehicular movement etc. on the public road.
14. When the facts of the instant case are examined, the construction of the
road in question, though not done by the National Highways Authority of India
but, is being done by the M.P. Rural Road Development Authority, which is an
independent authority for execution of works of rural roads in the State of
Madhya Pradesh constituted for the purposes of implementation of construction
and up-gradation of rural roads under the Pradhan Mantri Gram Sadak Yojana and
is a society constituted under the M.P. Society Registrikaran Adhiniyam, 1973.
15. The respondent/authority has been primarily conferred with the obligation
of inviting proposals to provide contractual services for one or more consultancy
packages for supervision of civil works mainly pertaining to rural roads under the
supervision consultancy packages and therefore can very well be said to be an
authority comprising of subject experts in the matter of construction of roads and,
therefore, the principles of law laid down by the Apex Court in the case of Dr.
Kushala Shetty (supra) will also have applicability in the matter of construction
of public roads being done by the respondent M.P Rural Road Development
Authority, insofar as the aspect of road alignment or deviation from the sanctioned
plan is concerned.
16. Record indicates that though the petitioner has levelled certain allegations
against the respondent No.6 in the present writ petition, who is the contractor of
respondent Nos.2, 4 and 5 authority, however, for non-compliance of the
peremptory order dated 6.1.2020, the instant petition stands already stands
dismissed against respondent No.6 on 12.03.2020. The said allegations thus
Signature Not Verified
Signed by: VANDANA
VERMA
Signing time: 18-Mar-26
10:49:41 AM
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
6 WP-2209-2018
cannot be permitted to be taken forward.
17. The return filed by the respondents No. 2, 4 and 5 takes a definite stand
as per spot inspection report dated 31.01.2017 (Annexure R/1) that the
construction of the road and culvert has been made on land bearing Survey
Nos.193/192 and not on Survey No.204 as alleged by the petitioner. It is an
undisputed fact that even land bearing Survey No.204 is a government land apart
from land bearing Survey Nos.193 & 192.
18. In response to the complaint made by the petitioner alleging deviation of
road alignment to Survey No.204, a spot inspection was conducted by the
authorities under the supervision of the concerned SDM and inspite of being
noticed, the petitioner did not participate in the spot inspection conducted on
31.01.2017.
19. The return in the matter has been filed by the respondents No. 2,4 and 5
on 16.10.2023, also taking a definite stand that the road is in operation since last
more than five years without there being any objection from the villagers. The
return also takes a definite stand that none of the portion of the land belonging to
the petitioner is affected by the construction of road/culvert.
20. No rejoinder has been filed by the petitioner rebutting the aforesaid stands
taken by the respondents No.2 , 4 and 5 duly supported by the affidavit of the
General Manager, MPRRDA, PIU Sheopur. In the absence of any rebuttal
affidavit/rejoinder on record, this Court has no reason to disbelief the stand taken
by respondents in their return.
21. The reliance placed upon by the petitioner on Annexure P/10 i.e. the
report furnished by the Tehsildar on the complaint made by the petitioner in Jan
Sunwai before the Collector indicating that the culvert has been constructed on
Signature Not Verified
Signed by: VANDANA
VERMA
Signing time: 18-Mar-26
10:49:41 AM
NEUTRAL CITATION NO. 2026:MPHC-GWL:9377
7 WP-2209-2018
land bearing Survey No.204, may also be of no assistance to the petitioner for the
reason that even if it is assumed that the culvert has been constructed on land
bearing Survey No.204 by deviating from sanctioned alignment, the same does
not in any manner affect the rights of the petitioner and does not call for any
interference in view of the proposition of law laid down by the Apex Court in the
case of Dr. Kushala Shetty (supra).
22. Taking overall view in the matter and looking to the fact that the
constructed road is in operation since the year 2017, no case for interference is
made out. The petition being bereft of merits is accordingly dismissed.
23. Pending application, if any, stands disposed of.