Raj Doshi Exports Private Limited vs Om Galaxy Apartments Chs Ltd.
- Court
- Bombay High Court
2026:BHC-OS:12925
IA.4657.2025 + IA.6622.2025 .doc
Ajay
IN IN THE THE HIGH HIGH COURT COURT OF OF JUDICATURE JUDICATURE AT AT BOMBAY BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION ORDINARY ORIGINAL CIVIL JURISDICTION
INTERIM APPLICATION NO.4657 OF 2025
IN
SUIT NO.217 OF 2025
Raj Doshi Exports Pvt. Ltd.
Applicant /
Original
Defendant No.1
IN THE MATTER BETWEEN
Om Galaxy Apartment CHS Ltd. .. Plaintiff
Versus
Raj Doshi Exports Pvt. Ltd. and Ors.
..
Respondents /
Defendants
..
WITH
INTERIM APPLICATION NO.6622 OF 2025
IN
SUIT NO.217 OF 2025
Om Galaxy Apartment CHS Ltd.
Applicant /
Original Plaintiff
IN THE MATTER BETWEEN
Om Galaxy Apartment CHS Ltd. .. Plaintiff
Versus
Raj Doshi Exports Pvt. Ltd.
..
Respondents /
Defendants
....................
Mr. Pralhad Paranjape a/w. Mr. Sudhanva S. Bedekar, Mr. Aditya
Lele and Mr. Swapnil Shanbhag. Advocates for Applicant.
..
Mr. Mayur Khandeparkar a/w. Mr.Prerak A. Sharma and Mr.
Aishwary Manjrekar i/b. Prerak A. Sharma. Advocates for
Defendant No.1.
Mr. Apurva Dalal, AGP for Defendant No.3 – Corporation.
......…...........
CORAM : MILIND N. JADHAV, J.
DATE : JUNE 08, 2026.
JUDGEMENT.:
1. Heard Mr. Paranjape, learned Advocate for Applicant, Mr.
Khandeparkar, learned Advocate for Defendant No.1 and Mr. Dalal
1
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
learned AGP for Defendant No.3 – Corporation.
2. Suit is filed on 11.07.2024. Interim Application No.4657 of
2025 is filed by Defendant No.1 under Order VII Rule 11 of Civil
Procedure Code, 1908 (for short "CPC") seeking rejection of Plaint.
Interim Application No.6622 of 2025 of CPC is filed by Plaintiff seeking
interim reliefs. By consent of parties Interim Application No.6622 of
2025 is heard finally for interim reliefs. Parties shall be referred to as
Plaintiff and Defendant for convenience. Lis is essentially between
Plaintiff and Defendant No.1.
3. Plaintiff is a registered Cooperative Housing Society
comprising of 21 members occupying flats in a building situated on
Plot No.231, Cadastral Survey No.582, Mahim Division, T.H. Kataria
Marg, S. Keer Marg, Matunga (West), Mumbai – 4000016 (for short
“larger land”). Defendant No.2 was owner of larger land and by
Agreement dated 01.02.1995 assigned right, title and interest of
subject land to Defendant No.1 – Developer. Larger land admeasures
6067 square meters out of which Plaintiff – Society claims ownership
of 938 square meters. Plaintiff – Society’s building is constructed upon
234.27 square meters and it is in possession of 441 square meters.
However in the Suit proceedings Plaintiff claims entitlement to 938
square meters out of the larger land (6067 square meters).
2
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
4. Briefly stated, Defendant No.2 was original owner of larger
land and applied to Municipal Corporation of Greater Mumbai for
approvals of development of the larger land (6067 square meters).
After receiving requisite approval and Commencement Certificate, on
04.05.1982 Defendant No.2 began construction on the larger land as
per sanctioned plan. On 02.11.1983, Executive Engineer “G” North
Ward issued No Objection Certificate and pursuant to all approvals,
Defendant No.2 sold flats in the proposed to be constructed thereon
buildings between 1983 – 1984 and entered into requisite agreements
as per Maharashtra of Ownership of Flats Act, 1963 (for short
“MOFA”) with flat purchasers.
4.1. On 15.10.1987, Executive Engineer, Building Proposals of
the Corporation issued Occupation Certificate and flat purchasers took
possession of their respective flats. On 06.01.1990, Sub – Registrar of
Cooperative Societies issued Registration Certification to Plaintiff –
Society registering it as a Cooperative Housing Society. In or about
1995, Defendant No.2 transferred right, title and interest of the entire
larger land in favour of Defendant No.1. On 30.10.2002, Plaintiff –
Society addressed notice to Defendant No.1 seeking conveyance of the
Suit property.
4.2. In or about 2006, certain occupants on larger land filed Writ
Petition in this Court seeking redevelopment of larger land. This Court
decided the Writ Petition and order passed by this Court was
3
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
challenged before the Supreme Court in Civil Appeal No.9878 of 2016.
By order dated 12.04.2017 Supreme Court directed Defendant No.1 to
develop entire larger property (6067 square meters) within a period of
42 months from 12.04.2017. In view of non-compliance of order dated
12.04.2017, the tenants / occupants on larger land filed Contempt
Petition (Civil) No.442 of 2021 wherein Supreme Court passed order
dated19.04.2022 directing Defendant No.1 to develop entire larger
land within 36 months.
4.3. Defendant No.1 addressed letter dated 10.05.2022 informing
Plaintiff – Society that Defendant No.1 will not include Plaintiff in its
redevelopment scheme. Being aggrieved, Plaintiff filed Miscellaneous
Application No.1946 of 2022 in Supreme Court for seeking exclusion
of the Suit property allegedly belonging to Plaintiff and prevent sale or
permissions to be granted with respect to Suit property. This
Application which was rejected by order dated 19.09.2022. Plaintiff –
Society thereafter filed Application before the District Deputy
Registrar, C.S.M.D City – I, Mumbai under MOFA seeking Unilateral
Conveyance of the Suit property which also came to be rejected by
order dated 17.05.2024.
4.4. Plaintiff then addressed email dated 23.05.2024 to
Defendant No.1 drawing Defendant No.1’s attention to the danger
caused by lack of safety measures in view of demolition carried out by
4
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
Defendant No.1 on the larger property. Plaintiff addressed Notice
dated 30.05.2024, calling upon Defendant No.1 to refrain from
usurping Plaintiff’s right, title and interest in Suit property. In reply,
Defendant No.1 addressed letter dated 10.06.2024 clarify its intention
to continue with development on the larger property (6067 square
meters) which included the Suit property as per the orders of the
Supreme Court. Hence, the present Suit.
5. Mr. Paranjape, learned Advocate for Plaintiff / Applicant
would submit that Plaintiff – Society has filed the captioned Interim
Application for injunction to restrain Defendants from utilizing the
Floor Space Index (for short “FSI’) potential / TDR co-relating to 938
square meters of land (Suit property) forming part of the larger land
(6067 square meters) along with the building structure standing
thereon and to restrain Defendants from development in any manner
which would affect the right, title and interest of Plaintiff - Society in
the Suit property.
5.1. He would submit that Plaintiff building was constructed in
1983 – 1984 is entitled to conveyance of area of 938 square meters
which is the Suit claim and injunction is sought for such area against
Defendants.
5.2. He would submit that Defendant purchased other parcels of
land within the larger land but never developed them. He would
5
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
submit that sanctioned plan dated 1983 unequivocally shows that
permissible FSI of larger land was 1.33 and was fully consumed during
construction of Plaintiff’s building. He would submit that as per
sanctioned plan, Plaintiff - Society's B Wing building was proposed to
have built – up area of 2494 square meters. He would submit that
Plaintiff - Society's B Wing building was to comprise of two wings i.e.
North Wing and South Wing each having area of 1247 square meters
however only South Wing was constructed.
5.3. He would submit that since built up area of Plaintiff’s
building is 1247 square meters and permissible FSI stood consumed
then corresponding base area of Plaintiff’s building i.e. the footprint
and appurtenant thereto admeasures 938 square meters. He would
submit that Plaintiff is rightful owner of this base area admeasuring
938 square meters and Defendants cannot claim Plaintiff is entitled to
only plinth and base area of Plaintiff’s building which admeasures
234.27 square meters as this would imply that Occupation Certificate
dated15.10.1987 was wrongly granted which is not the case. He would
submit that Plaintiff is further entitled to area of 703.122 square
meters as well since this right accrued to and vested in Plaintiff in
1990.
5.4. He would submit that Plaintiff's building was constructed
under the Development Control and Permission Regulations 1967,
where the permissible FSI was 1.33. As per sanctioned plan of 1983,
6
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
proposed constructed area of Plaintiff's building was 2494 square feet
however, Plaintiff's building has built-up area of 1247 square meters
with FSI of 1.33 as per Area Statement which includes building
footprint of 234.27 square meters and appurtenant area of 703.122
square meters.
5.5. He would submit that Plaintiff - Society is claiming
appurtenant area under mandatory Clause 13 of Agreement for Sale at
Form V of MOFA, where conveyance must be given of the aliquot land.
He would refer to and rely upon the decisions passed by this Court in
1
the cases of Marathon Era Co-operative Housing Society Vs.
Competent Authority and Akshay Girikunj-3 Co-Operative Housing
2
Society Vs. State Of Maharashtra to contend that where development
potential of land is consumed in construction, corresponding land mass
/ area must necessarily be conveyed with the building and failure to do
so would entail portions of the constructed built up area wholly illegal
in law.
5.6. He would submit that in the sanctioned plans of 2023,
Defendant No.1 unlawfully depicted appurtenant land admeasuring
703.122 square meters to Plaintiff - Society's building, as Recreational
Ground (for short "RG"). He would submit that sanctioned plans of
2023 are different from sanctioned plans of 1983 and Defendant No.1
1
2024 SCC Online Bom 1115
2
Writ Petition (L) No.603 Of 2023
7
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
did not disclose sanctioned plans of 2023 to Plaintiff nor did it obtain
consent of Plaintiff before taking approvals from Planning Authority. In
this regard he would refer to and rely upon the decision of this Court
in the case of Malad Kokil Co-operative Housing Society us. Modern
3
Construction Co. Ltd. . He would submit that therefore encroachment
on Plaintiff's appurtenant land of 703.122 square meters is unlawful.
5.7. He would submit that Plaintiff - Society obtained Occupancy
Certificate on 15.10.1987 and Society was formed on 06.01.1990
therefore under Section 11 read with Rule 9 of MOFA, Plaintiff is
entitled to conveyance of builder's right, title and interest in Suit
property as this right cannot be defeated indefinitely as claimed by
Defendant No.1 on the ground of ongoing development. In this regard
he would refer to and rely upon decisions passed by this Court in the
cases of Neelkanth Heights Cooperative Housing Society Vs. Abhinav
4
Real Estate Private Limited ; Mahalaxmi City (Type-D) Cooperative
Housing Society Limited Vs. The Competent Authority and District
5
Deputy Registrar, Cooperative Societies, Raigad - Alibag ; ACME
6
Enterprises Vs. Deputy Registrar Co-operative Societies ; Flagship
Infrastructure Limited Vs. Competent Authority and; Dosti Corporation
7
Vs. Sea Flama Co-operative Housing Society
3
(2013) 2 Bom CR 414
4
Writ Petition No.165 OF 2025
5
Writ Petition No. 1345 Of 2026
6
Interim Application No.4859 Of 2025 in Suit No.151 Of 2025
7
2016 5 Mh. LJ 102
8
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
5.8. He would submit that since Plaintiff - Society's building plans
was sanctioned in 1983 with FSI of 1.33 and Defendant No.1's building
plans were sanctioned in 2023 with FSI of 4, both projects are entirely
different. He would submit that statutory obligation under Section 11
of MOFA read with Rule 9 of the MOFA Rules is continuing hence
Plaintiff - Society's claim is not barred by limitation. In this regard he
would refer to and rely upon a decision of the Supreme Court in the
case of Samruddhi Co-operative Housing Society v. Mumbai
8
Mahalaxmi Construction .
5.9. He would submit that Defendant No.1 seeks to deny Plaintiff
its right, title and interest of Suit property by misconstruing order
dated 19.04.2022 passed by the Supreme Court. He would submit that
the aforementioned order was passed specifically with respect to
redevelopment of existing chawls and hutments on larger land of
which Plaintiff – Society is not a part of. He would submit that Order
dated 19.04.2022 cannot be used to defeat Plaintiff - Society's FSI
rights which stood crystallized as far back as 1990.
5.10. He would submit that Defendant No.1 filed application
under Order VII Rule 11 of the CPC for rejection of present Plaint. He
would submit that this application ought to be rejected as Plaintiff
sufficiently pleaded its cause of action.
8
2022 4 SCC 103
9
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
5.11. He would submit that dismissal of Miscellaneous Application
No.1346 of 2022 cannot operate as res judicata and order dated
19.09.2022 passed by the Supreme Court rejecting Plaintiff's
application for clarification / modification of order dated 19.04.2022
passed in Contempt Petition No. (C) No. 442 of 2021 since it arose
from contempt proceedings to which Plaintiff was not a party, and it is
not a "Suit" within Section 11 CPC. He would further submit that Order
dated 19.04.2022 dismissed Plaintiff’s application in limine and did not
decide its merits. It is settled proposition that Plaintiff's substantive
rights cannot be taken away by a dismissal in limine. He would refer to
and rely upon a decision of the Supreme Court in the case of Workmen
9
Of Cochin Port Trust vs Board Of Trustees Of The Cochin Port and
10
Sham Rajendra Agrawal vs Ghanshyam Hajarilal Sharma And Anr .
5.12. He would submit that Defendant's own development plans
demonstrate that area of 1537 square meters accruing to the Society
was considered while exploiting the development potential of the plot
therefore, it is his admission that Plaintiff is entitled to a built-up area
of 1537 square meters which corresponds to a base area of 1157
square meters. He would submit that permitting Defendants to utilize
this area would defeat Plaintiff - Society's rights, since FSI of 1.33 has
accrued for the plot and on land corresponding to the Plaintiffs'
9
(1978) 3 SCC 119
10
(2007) 4 Mh. L.J 691
10
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
entitlement. He would submit that Defendants cannot utilize FSI
already accrued/ accruing in future for the Society's land if they fail to
convey the property to the Society since FSI would be utilized by the
Society had the conveyance been executed to them.
5.13. He would submit that Defendant No.1 cannot make out a
case that it will execute conveyance after redevelopment of the entire
layout on the basis of order dated 19.04.2022 passed by Supreme
Court.
5.14. He would submit that root of the matter is that Defendant
No.1 cannot construct on built-up area calculated on the basis of
development plans sanctioned in 2023, neither as per plot area basis
nor incentive basis, on Plaintiff - Society's area of 938 square meters.
He would submit that in sanctioned development plan of 2023,
Defendant No.1 has wrongly calculated total permissible built-up area
on incentive basis at 44,572.91 square meters by including the Plaintiff
- Society's built-up area i.e. 1537.10 square meters. He would submit
that Plaintiff - Society's built-up area is therefore to be excluded from
the permissible built-up area calculations of Defendant No.1 and only
after such exclusion, the Defendant No.1 can calculate FSI on the land
area on the basis of the remainder of 5129 square meters. He would
submit that Defendant cannot first calculate the built up area on the
entire 6067 square meters and then deduct Plaintiff - Society's built up
11
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
area and such a calculation would amount to usurping Plaintiff -
Society's future FSI. He would submit that that no prejudice will be
caused to the Defendants on exclusion of the Plaintiff's base area of
938 square meters. The balance of convenience is therefore entirely in
favour of the Plaintiff.
5.15. He would submit that if Plaintiff - Society's vested right in
the base area of 938 square meters is not protected and if Defendant
No.1 is allowed to carry out construction on Plaintiff - Society's land
appurtenant area, Plaintiff - Society's will not be able to justify its
existing built up area of 1247 square meters accruing to it as rightful
owner of the said 938 square meters. He would submit that Plaintiff
would also not be able to undertake any redevelopment activity in
future in terms FSI accruing to it under present development
regulations and irreparable injury and loss would be caused to
Plaintiff.
5.16. He would submit that Supreme Court in its Order dated
19.04.2022 directed Defendants to redevelop the entire larger plot of
6067 square meters. He would submit that since Plaintiff is excluded
by Defendants from the aforesaid direction, Plaintiff - Society's
building and land appurtenant thereto along with its accrued FSI
potential ought to be excluded and protected for benefit of Plaintiff -
Society's future development. He would submit that Defendants should
12
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
therefore be precluded from utilising Plaintiff's substantive rights while
enjoying all benefits available under the present cluster development
scheme under Regulation 33(9) of DCPR.
5.17. He would submit that present case therefore warrants
injunctive relief restraining Defendant No.1 from utilizing area
corresponding to 938 square meters forming part of the Plaintiff's plot
and any FSI accruing thereto.
6. PER CONTRA, Mr. Khandeparkar, learned Advocate for
Defendant No.1 would submit that all reliefs prayed for by Plaintiff
have been rejected by Supreme Court in order dated 19.09.2022
passed in Miscellaneous Application No.1346 of 2022 in Contempt
Petition (Civil) No.442 of 2021 filed in Civil Appeal No.9878 of 2016
and therefore Plaintiffs are precluded from re-litigating the same
before this Court. In this regard he would refer to and reply upon
11
decision in the case of Union of India Vs. Mohanan Nair to contend
that even though a decision unaccompanied by reasons cannot be law
laid down by Supreme Court, the same still holds binding effect of
precedent and draws a curtain on litigation between the parties.
6.1. He would submit that Plaintiff Society was at all material
times aware that development was proposed in phases and that
additional construction would be undertaken. He would submit that
11
(2020) 5 SCC 421
13
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
Defendant No.2, namely Galaxy Builders (erstwhile owner), had
executed identical Agreements for Sale with all flat purchasers,
including Plaintiffs, under provisions of MOFA. He would submit that
Clause 28 of these Agreements expressly grants Developer the right to
demolish existing structures and construct new building(s) on larger
land until conveyance of land is affected in favour of Society.
6.2. He would further submit that Clause 13 records that
ownership, possession, and control of land and common areas shall
remain with Developer until lawful conveyance and that rights of flat
purchasers are confined only to their respective flats and Clause 38
further reserves the Developer’s right to make additions, raise storeys,
and construct additional structures as permitted by the competent
authorities.
6.3. He would submit that Schedule to these Agreements also
records that the larger property comprises of a single and indivisible
plot admeasuring 5879.65 square meters, and therefore Plaintiffs
cannot seek conveyance of Suit property as a separate portion. He
would submit that Plaintiff’s allegations are misconceived and contrary
to the express terms of these Agreements thus, Plaintiff society will be
entitled to conveyance along with the other proposed societies after
development of the entire larger plot is completed and thus, this Suit is
pre-mature and in the teeth of the orders dated 19.04.2022 and
14
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
19.09.2022 passed by the Supreme Court.
6.4. He would submit that present Plaint is filed based on
premature cause of action and hence cannot warrant action by this
Court since no present cause of action is disclosed. He would draw my
attention to the prayers of present Plaint at page No.35 where Plaintiff
- Society has sought declaration in its favour that it is the true and
rightful owner of Suit property along with its building structure
thereon. He would submit that Plaintiff further prays for declaration in
respect of aforementioned area and structures thereon. He would
submit that Plaintiff - Society has relied upon sanctioned plan of 1983
and Occupation Certificate of 1987 in respect of Plaintiff - Society's
building to contend that (i) original sanction plan was for multiple
buildings, (ii) Plaintiff’s building is one wing of a larger building
comprising of 2 wings, and (iii) North Wing was never constructed. He
would submit that Occupancy Certificate issued by Corporation is Part
Occupation Certificate and Plaintiff – Society was fully aware that
Conveyance would take place only after the entire layout is developed
and this is deciphered not only from sanctioned plan but also from the
Clause Nos. 2 and 4 of Agreement of Sale under MOFA appended to
Plaint at Exhibit ‘E’ page No.51 executed between individual flat
owners of Plaintiff Society and predecessor – in – title of Defendant
No.2.
15
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
6.5. He would submit that Supreme Court passed order dated
19.04.2022 directing Defendant No.1 to undertake redevelopment of
larger land admeasuring 6067.96 square meters, and further directed
that entire land is to be conveyed in favour of one or more Co-
operative Housing Society/ies which shall be formed by the existing
tenants/occupants and new flat purchasers as provided under DCPR
2034 read with Appendix III. He would submit that Supreme Court
postponed conveyance of the larger land until completion of
redevelopment of larger land admeasuring 6067.96 square meters. He
would submit that Plaintiff – Society approached the Supreme Court
seeking its alleged entitlement to be excluded from the ambit of
redevelopment of larger land however this prayer was rejected by
order dated 19.09.2022. He would submit that Supreme Court thereby
effectively reiterated postponement of conveyance of entire larger land
as directed until completion of development of the entire land is
completed.
6.6. He would submit that Supreme Court laid down a timeline
for development of the larger land (6067 square meters) in its order
dated 19.04.2022. He would submit that till redevelopment of the
larger land is completed and conveyance becomes due as per directions
of the Supreme Court, no cause of action accrues in favour of Plaintiff -
Society. He would refer to and rely upon the decision of Supreme
16
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
12
Court in the case of Vithalbhai (P) Ltd. vs. Union Bank of India
wherein the Supreme Court held that in cases where cause of action
has not matured on the date of institution of the Suit, Court must
reject the Plaint with liberty to Plaintiff to file a fresh Suit on its
maturity. He would therefore submit that present Plaint deserves to be
dismissed under the provisions of Order VII Rule 11 of CPC for which a
separate Application has been filed.
6.7. He would submit that no new land parcel has been added to
the larger land and that change in area has occurred solely on account
of a variation under the Town Planning Scheme, pursuant to which
area of larger land stood increased from 5878 square meters to 6067
square meters. He would submit Plaintiff's contention that new land
parcel has been added is incorrect. He would submit that subject
property is a single plot and Property Register Card reflects the same.
He would submit that Plaintiff’s case that permissible FSI applicable to
Plaintiff - Society's building is 1.33 is untenable and incorrect. He
would submit that Plaintiff is well aware of the fact that the FSI of 1.33
sanctioned on 02.11.1983 for construction of structures, pertains to the
entire plot admeasuring 5879.65 square meters at the then time and
not exclusively to Plaintiff's building or the area on which it is
constructed. He would submit that apart from Plaintiff – Society’s
building area admeasuring 1247.46 square meters built up area, two
12
(2005) 4 SCC 315
17
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
other buildings were proposed to be constructed on the larger land i.e.
North Wing admeasuring 1247.46 square meters built up area, and
"Galaxy Building" having built up area of 1216.67 square meters. He
would submit that all existing tenanted structures were retained under
the same approval. Thus, the sanctioned FSI of 1.33 accounted for the
cumulative built-up area of the North Wing, South Wing, Galaxy
Building, as well as all other structures on the larger land, hence FSI of
1.33 was not exclusively applicable to the Plaintiff's building area.
6.8. He would refer to and rely upon the decision of this Court in
the case of Marathon Era CHSL V/s Competent Authority & District Dy.
13
Registrar & Ors to contend that in a multi-building layout, FSI is
computed on the entire layout and its internal allocation to any
particular construction is unrelated to a specific smaller area. He would
submit that Plaintiff cannot contend that merely because it allegedly
occupies 1247 square meters constructed / built up area, FSI of 1.33
should be applied to its 938 square meters of plot area i.e. Suit
property, because it is well known and established that FSI granted is
sanctioned on the entire plot and not on any internal or notional sub-
divided plot. He would submit that internal allocation of FSI qua larger
land to Plaintiff – Society’s building disrupts FSI balance, therefore
Plaintiff – Society’s claim for proportionate share in land on the basis
of 1.33 FSI allegedly attributable to itself is impermissible and without
th
13
Writ Petition No.180 of 2018 decided on 18 April 2024
18
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
any foundation in law.
6.9. He would submit Plaintiff – Society’s own case is that
footprint of their building admeasures 234.27 square meters in Survey
Report dated 29.09.2025 prepared by Surveyor, Mr. Amol Bhandari.
He would submit that despite this Plaintiff has claimed additional area
of 703.122 square meters by using reverse FSI logic and seeks
entitlement to land appurtenant to its building structure. He would
submit that Plaintiff has further alleged that Defendants have
encroached upon this area, however this allegation is completely
incorrect and misconceived since construction presently being carried
out forms part of the ongoing development and is undertaken strictly
in accordance with the order dated 19.04.2022 passed by Supreme
Court, as well as with requisite permissions, approvals and sanctioned
plans granted by Planning Authority.
6.10. He would submit that Plaintiff cannot claim unentitled land
appurtenant to its building structure as alleged, as such a concept is
not contemplated under Government Resolution dated 22.08.2018. He
would submit that said Government Resolution provides that rights of
a Cooperative Housing Society are limited to the proportionate built-up
area consumed in relation to the sanctioned FSI. He would submit that
in the present case, entire larger land is required to be developed as
one composite and indivisible land parcel in view of the specific
19
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
directions of the Supreme Court. He would submit that Part
Occupation Certificate itself is conditional and contemplates further
development of the remaining structures on the larger land and
compliance with layout requirements and other statutory obligations.
He would submit that Plaintiffs cannot seek demarcation of any
portion of land or claim land appurtenant to their structure since this
explicitly contravenes directions passed by Supreme Court in the order
dated 19.04.2022 especially when Plaintiff’s plea to carve out such
portion is rejected by the Supreme Court. He would submit that claim
of Plaintiff is therefore contrary to the applicable Regulations, legal
provisions and orders passed by Supreme Court and this Court.
6.11. He would submit that Plaintiffs were clearly aware that
North Wing was proposed as part of overall development and that
Occupation Certificate granted to their building is only Part Occupation
Certificate. He would submit that Agreements for Sale executed with
flat purchasers of Plaintiff Society under MOFA also expressly disclosed
that the project was to be developed further and that additional
construction would be undertaken. He would submit that Plaintiff -
Society's building was therefore never proposed as a standalone
structure but it was a part of a larger layout with other structures on
the same composite plot. Therefore he would submit that Plaintiffs'
contention that Defendants have encroached upon the Suit property is
wholly misconceived as the larger land (6067 square meters) is
20
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
required to be developed as one composite land parcel.
6.12. He would submit that since Plaintiffs having chosen not to
participate in the ongoing redevelopment however, Defendant No.1 is
required to comply with directions imposed by Planning Authority in
the Partial Occupation Certificate dated 15.10.1987 including
construction of RG and remaining development. He would submit that
ongoing development is in compliance with the directions of the
Supreme Court passed in order dated 19.04.2022 and cannot by any
stretch be termed as encroachment. He would submit that Partial
Occupation Certificate granted to Plaintiffs' building clearly records
that there is no objection to occupy Plaintiff – Society’s building subject
to certain conditions, namely that (i) structures proposed to be
demolished shall be demolished before commencing Phase II, (ii) RG
and internal road shall be developed on site within two months, and
(iii) remaining IOD conditions shall be complied with before seeking
further Occupation Certificate. He would therefore submit that
Plaintiffs cannot object to the ongoing development which is being
carried out to fulfill the very conditions subject to which their Part
Occupation Certificate was granted. He would submit that any
obstruction by Plaintiffs to such development is wholly untenable and
contrary to the terms of the said Part Occupation Certificate as well as
directions contained in the Supreme Court order.
21
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
6.13. He would submit that, there are two permissible methods for
computation of FSI, namely: (i) FSI calculated on the basis of the plot
area; or (ii) incentive FSI calculated on the basis of the Built-Up Area
(BUA) of the rehabilitation component under Regulation 33(9) DCPR
2034. He would submit that under Regulation 33(9), permissible FSI is
4.00 or FSI required for rehabilitation of the existing occupiers plus
incentive FSI, whichever is higher. He would submit that owing to
financial non-viability of the project under plot-area-based
computation, scheme has been implemented under the second method,
i.e., incentive FSI linked to rehabilitation. He would submit that FSI
generated under this option does not arise from land component but
flows directly from the statutory framework and has been granted
strictly in accordance with DCPR 2034 Regulation 33(9)(6). He would
submit that FSI sanctioned is the FSI required for tenants/members
and sale FSI corresponding to such rehab, thus FSI is strictly linked to
number of consenting occupiers being rehabilitated only and not on
plot area basis wherein Plaintiff has refused to join development. He
would hence submit that the question of usurping FSI belonging to
Plaintiff does not arise. He would submit that sanctioned FSI is for
rehabilitation of consenting occupiers and corresponding incentive
thereof for purpose of sale and Defendant No.1 has not received any
Sale Incentive FSI for rehabilitation of the dissenting 21 Plaintiff –
Society members and the corresponding sale incentive FSI thereof,
22
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
hence the question of FSI usurpation does not arise.
6.14. He would submit that total sanctioned FSI for the entire
larger land area is 39,150.55 square meters, out of which 1,537.10
square meters represents Plaintiff’s retained built up area. He would
submit that total FSI permissible on the larger land (6,067.96 square
meters) is 37,613.45 square meters but due to height restrictions, only
36,291.02 square meters is actually consumed resulting in effective FSI
of 5.98. He would submit that if Plaintiff’s claim for conveyance of 938
square meters i.e. Suit property is considered, it is computed by
dividing 1,247.46 square meters by 1.33 which is the FSI structure of
the entire plot.
6.15. He would submit that both A and B Wings of Plaintiff –
Society’s building have built up area of 20,699.39 square meters which
at FSI 5.98 would be 3,460.76 square meters approximately. He would
submit that Wings C and D having built up area of 15,591.63 square
meters at FSI 5.98 would be 2,605.62 square meters approximately. He
would submit that Plaintiff’s claim is of 938 square meters if
considered would determine the total plot area admeasuring 7,004.38
square meters which clearly exceeds the actual plot area of 6,067.96
square meters clearly demonstrating that reverse FSI division to carve
out independent land parcels is mathematically untenable and
computation sought to be advanced by Plaintiff is therefore
23
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
fundamentally flawed.
6.16. He would submit that it is incorrect for the Plaintiff to
contend that it will be rendered incapable of accounting for, justifying,
or sustaining its built-up area. He would submit that sanctioned layout
plan expressly takes into consideration Plaintiff's existing building
standing thereon. He would submit that the Planning Authority has
taken cognizance of Plaintiff’s entitlement while granting sanction to
the plans submitted by Defendant No.1 and has adequately protected
Plaintiff's building structure.
6.17. He would submit that effective FSI under the sanctioned
scheme is approximately 5.98, when total permissible built-up area is
computed over plot area of 6,067.96 square meters. He would submit
that out of total sanctioned built-up area, built-up area attributable to
Plaintiff – Society is only 1,247.46 square meters which constitutes
merely 0.21 FSI when proportionately calculated, therefore Plaintiffs
cannot seek to appropriate FSI by relying upon sanctioned plans of
1983, when revised sanctioned plans of 2023 govern the present
development on the entire larger land.
6.18. He would submit that on various occasions Defendant No.1
addressed letters dated 13.09.2021. 17.09.2021, 29.09.2021 and
10.05.2022 offering Plaintiff's – Society an opportunity to participate
in the redevelopment however, Plaintiff - Society, vide its letters dated
24
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
24.06.2022, and 28.06.2022, expressly refused to participate in the
said redevelopment project.
6.19. He would submit that on basis of the documents produced
on record as well as submissions advanced, Plaintiff has failed to make
out a case for grant of interim reliefs as prayed for and would therefore
urge this Court to reject the request for interim relief to Plaintiff –
Society.
7. I have heard the learned advocates appearing for parties and
with their able assistance perused the record of the case. Submissions
made by learned advocates at the bar have received due consideration
of the Court.
8. It is Plaintiff – Society’s case that present Suit is filed against
Defendants on the ground that Plaintiff – Society is entitled to Suit
property situated within and on the larger land which is being
developed by Defendant No.1, however they have refused to include
Plaintiff – Society in the development despite Plaintiff – Society
showing interest in the same and Defendant No.1 has encroached upon
Suit property and allegedly utilized Plaintiff’s FSI for development of
larger land. This is the thrust and conclusion of Plaintiff’s case as
argued and found in paragraph Nos.15 to 23A of the Plaint which is
vehemently denied by the Defendant No.1.
25
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
9. At the outset, it is seen that the larger land has previously
undergone multiple rounds of litigation which have reached the
Supreme Court. It is seen that Suit Plaint makes reference to litigation
before the Supreme Court in paragraph Nos.4(xv) and (xvi) where
order dated 19.04.2022 was passed by the Supreme Court. Paragraph
Nos.12 and 14 of this order are relevant in this Context and read thus:-
12. The tenants have been eagerly waiting for the construction
of flats since more than 25 years. After hearing the learned
counsel for the parties on several occasions, we are convinced
that there is gross negligence on the part of the builder in not
complying with the directions of this Court dated 29.09.2016
and 12.04.2017. Ordinarily, we would have proceeded to hold
the builder guilty of Contempt of Court and to impose suitable
punishment. As construction of the buildings promptly would
subserve the interest of the tenants/occupiers, we directed the
builder/developer to file an undertaking to the effect that the
redevelopment project would be completed in a stipulated time
frame. This was done after getting a clearance from MHADA
and MCGM that the condition for sub division of the plot would
not be insisted upon. In compliance of the said direction, an
affidavit was filed on 14.03.2022 by M/s. Raj Doshi Exports Pvt.
Ltd. to the following effect:
“2. Raj Doshi Exports Pvt. Ltd. will undertake to complete
the redevelopment on entire land adm. 6067.96 sq mtrs.
being Final Plot No. 231, Cadastral Survey No. 582 at
Mahim Division, situated at T.H. Kataria Marg, Mahim,
Mumbai-400016, known as “Jariwala Compound” as one
single plot and subdivision will not be insisted upon by
MHADA/MCGM. Page 10 of 16
3. The Redevelopment will be done in accordance with
regulation 33(7) and/or (9) DCPR-2034.
4. The Deponent will submit the plan for amendment
before the MCGM in accordance with DCPR 2034 within 4
weeks from the date of the order in case this Hon’ble
Court will please to direct the deponent for that and after
that the MCGM will be required to approve the plans
within 8 weeks from the date of submission of such plans.
In so doing, the MCGM/MHADA will continue all
concessions, orders, NOCs and permissions granted from
time to time in respect of applicant’s application made
over the last 6 years from 2016 and will not vary the same
and the Deponent will not be required to reapply for the
same. The Deponent shall comply only with the terms and
26
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
conditions as mentioned in the NOC dated 09.05.2017
issued by MHADA and the conditions of the previous NOC
dated 22.11.2016 which stood deleted by this Hon’ble
Court’s Order dated 12.04.2017, shall not be insisted upon
by MCGM/MHADA.
5. That within 30 days of the receipt of approvals, in case
this Hon’ble Court will please to direct the
tenants/occupants to vacate the premises held by them
and on such vacation, the tenants/occupants of building
102-A shall be paid Rs. 25,000/month to each eligible
tenant who has vacated their respective premises till such
time their new premises are ready Page 11 of 16 and
possession is offered in lieu of their existing area as and by
way of Permanent Alternate accommodation.
6. That all eligible tenants/occupants will be provided
appropriate accommodation admeasuring minimum 508
sq. ft. carpet area (including fungible area) in redeveloped
building. The MCGM shall allow incentive FSI on the
rehab area which will be provided to the existing tenants
i.e. on minimum 508 sq. ft. (inclusive of fungible).
7. That the deponent will execute Permanent Alternate
Accommodation Agreement (PAA agreement) in terms of
DCPR 33(7) and/or 33(9) read with appendix 3 within 8
weeks from the receipt of all approvals.
8. That the Deponent shall execute conveyance deed of
the entire land admeasuring 6067.96 sq. mtrs., as owners
thereof, in favour of the one or more Co-operative housing
society/ies which shall be formed of existing
tenants/occupants and the new flat purchasers as
provided under DCPR 2034 r/w Appendix III ignoring the
acquisition of portion of land admeasuring 2807.15 sq.
mtrs. out of larger land admeasuring 6067.96 sq. mtrs. In
pursuance thereof, the plot will not be required to be
subdivided and insisted by MHADA/MCGM and MHADA
will communicate the aforesaid to MCGM forthwith.
9. That the MCGM will sanction the plans to maintain
carpet to built up area ratio as mentioned in decision
dated 02/08/2004 of the State Government taken in
presence of Hon’ble Chief Minister. Page 12 of 16 10.That
both MHADA and MCGM will implement orders of this
Hon’ble Court dated 29.09.2016 & 12.04.2017 and
decision taken by Chief Minister on 02/08/2004 and will
not raise any objection in development of project. 11.That
the deponent builder and its agencies undertakes through
Chairman to complete rehabilitation of all tenants within
36 months from the date of vacation of all the eligible
tenants/occupants.” …
xxxxxx
27
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
14. The claim of MHADA for title over 2807.15 sq. meters of
land is unsustainable. One of the objections raised by MHADA
before this Court which was rejected by the order dated
12.04.2017 was that the builder has to pay back the land cost of
Rs. 29 Crores for the land admeasuring 2807.15 sq. mtrs. The
second objection was that the project was to be a joint venture
as was agreed during the meeting conducted by the Chief
Minister. In the order dated 12.04.2017, this Court has
categorically held that a portion of the decision of the Chief
Minister stood superseded by subsequent events and by the
order dated 29.09.2016 in as much as the re-development of the
subject property was to be carried out by builder/developer
solely. In other words, it was held that the entire property was
to be handed over to the builder/developer and that MHADA
was not entitled to the land Page 14 of 16 cost of Rs. 29 Crores.
As there can be no manner of doubt about the said finding
recorded by this Court in the order dated 12.04.2017, it is
totally unreasonable on the part of MHADA in insisting that it
should be permitted to execute Lease Deed in favour of the
proposed Cooperative Housing Society qua 2807.15 sq. mtrs.
15. As mentioned above, the builder is guilty of delaying the
construction by not taking suitable steps in complete
disobedience of the orders passed by this Court based on its
undertaking. Equally, MHADA is also responsible for creating
hurdles, initially by imposing unreasonable conditions of sub
division of the plots and issuance of property cards in the NOC
dated 22.11.2016 and later in insisting that MHADA still has
ownership over 2807.15 sq. meters of land. We are of the
considered opinion that the builder as well as the concerned
authorities of MHADA are guilty of non-compliance of the
directions of this Court. They are warned that any further
disobedience of the directions given by this Court shall be
viewed seriously. The undertaking filed by the
builder/developer on 14.03.2022 is taken on record which shall
be scrupulously complied with by all concerned.
10. From the above it is seen that Supreme Court by order dated
19.04.2022, directed Defendant No.1 to develop the larger land as one
single plot and sub-division would not be insisted upon after accepting
the undertaking dated 14.03.2022 filed by Defendant No.1. It is seen
that Supreme Court further observed that upon completion of
redevelopment, larger land will be conveyed as one single plot to
multiple Cooperative Housing Societies and/or federation of Societies
28
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
that may be formed by the existing occupants and/or flat purchasers in
the future. It is seen that in response to the above, Plaintiff being
aggrieved filed Miscellaneous Application No.1946 of 2022 before
Supreme Court seeking modification of the aforementioned order to
the extant of seeking demarcation of Suit property allegedly belonging
to Plaintiff and restrain Defendant No.1 from creating third party
rights on Suit property. It is seen that Supreme Court passed order
dated 19.09.2022, which is appended to Exhibit “L” page No. 150 of
Plaint, rejecting the prayers and contentions raised by Plaintiff –
Society in limine thereby cementing the directions contained in the
order dated 19.04.2022. In this regard I would like to refer to and rely
upon a decision of the Supreme Court in the case of Union of India Vs.
Mohanan Nair (Supra) which states that orders passed by the Supreme
Court which do not entail reasons will be binding upon all parties.
Paragraph No.48 thereof is reproduced hereunder for ease of
reference:-
48. Article 141 of the Constitution of India provides that the
law declared by the Supreme Court shall be binding on all
courts within the territory of India i.e. the pronouncement of
the law on the point shall operate as a binding precedent on all
courts within India. Law declared by the Supreme Court has to
be essentially understood as a principle laid down by the court
and it is this principle which has the effect of a precedent. A
principle as understood from the word itself is a proposition
which can only be delivered after examination of the matter on
merits. It can never be in a summary manner, much less be
rendered in a decision delivered on technical grounds, without
entering into the merits at all. A decision, unaccompanied by
reasons can never be said to be a law declared by the Supreme
Court though it will bind the parties inter se in drawing the
curtain on the litigation. In Union of Indiav. All India Services
29
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
Pensioners' Assn.[Union of India v. All India Services
Pensioners' Assn., (1988) 2 SCC 580 : 1988 SCC (L&S) 651] ,
the Supreme Court held that (SCC p. 585, para 6) “when
reasons were made by the Supreme Court for dismissing the
SLP, the decision becomes one which attracts Article 141 of the
Constitution which provides that the law declared by the
Supreme Court shall be binding on all the courts within the
territory of India.”
11. It is seen that Plaintiff – Society was not a party to the
proceedings before the Supreme Court in Contempt Petition No. 442 of
2021, however Plaintiff Society filed Miscellaneous Application No.442
of 2022 appended at Exhibit “K” page No.138 seeking modification of
the order dated 19.04.2022 passed by the Supreme Court to carve
itself out. Perusal of the prayers in the said Misc. Application would
show that they are identical as sought for by Plaintiff in the present
Suit Plaint. It is seen that Miscellaneous Application No.1946 of 2022
was dismissed by Supreme Court by order dated 19.09.2022. This
rejection is binding upon the Plaintiff as well as the Defendant No.1
since it closes the curtain on litigation between the parties for good. It
is seen that since the Supreme Court in no uncertain terms accepted
undertaking given by Defendant No.1 that larger land will be
developed as a single plot of land and will not be sub – divided into
smaller plots and only after development it would be conveyed to one
or more Housing Societies which the flat purchasers may form.
Plaintiff Society refused to join in the development. It is seen that
Defendant No.1 is undertaking development and though Plaintiff –
30
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
Society’s building is situated on a portion of the larger land, since the
entire larger land is not developed, Plaintiff cannot seek conveyance at
this stage as it will be in contravention of the orders dated 19.04.2022
and 19.09.2022 passed by the Supreme Court.
12. It is further seen that it is Plaintiff’s allegation that Defendant
No.1 is consuming Plaintiff – Society’s potential FSI by utilising the
same for development on the balance area of the larger land which
would inhibit Plaintiff – Society to initiate redevelopment. It is seen
that Defendant No.1 opted for Rehabilitation + Incentive method for
computation of FSI under Regulation 33(9) of DCPR 2034 for which
rehabilitation of existing occupiers plus incentive FSI, whichever is
higher is given. It is seen that Plaintiff – Society has not joined the
redevelopment project therefore none of its members can be
rehabilitated. Hence only existing tenants can be rehabilitated. In light
of the above, Defendant No.1 cannot claim FSI from the land share /
land occupied by Plaintiff No.1 – Society, however it is claiming its FSI
from the statutory scheme enumerated under Regulation 33(9) of
DCPR. Therefore since Plaintiff – Society did not join the
redevelopment of larger land (6067 square meters), it can receive no
FSI incentive. It is seen that Planning Authority i.e. Corporation verifies
total built up area before sanctioning any approval and since all
structures of occupants were demolished except Plaintiff – Society’s
building structure which remained, Planning Authority has considered
31
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
Plaintiff – Society’s existing built up area in the overall FSI before
approval of Rehabilitation plus Incentive FSI scheme for development
of the larger property / land. Therefore, under the Rehabilitation plus
Incentive FSI scheme, Plaintiff – Society’s area is considered in the
Sanctioned plans by the Corporation as this is a statutory requirement
since Plaintiff – Society did not participate in the redevelopment
process. Therefore it is seen that no rehabilitation incentive is
computed on Plaintiff – Society’s area. In view of the above, I cannot
accept the submissions of Mr. Paranjape that Defendant No.1 has
usurped FSI of Plaintiff – Society since Plaintiff – Society is situated on
the larger land and since the entire larger land is being developed
without any sub division, then FSI of larger land, including land upon
which Plaintiff – Society’s building is standing, is to be considered in
the calculation of FSI. Hence no case of usurpation of FSI is made out.
13. It is seen that Plaintiff claims entitlement to Suit property on
the basis of an approved Sanction plan of 1983 which forms one of the
approvals received by Defendant No.2 to construct Plaintiff’s building
at the then time. It is seen that besides this document, Plaintiff has not
placed any registered document to show that Suit property belongs to
Plaintiff. It is seen that Plaintiff has appended letter dated 01.07.2022
at Exhibit “J” page No. 134 to show Defendant No.1’s unwillingness to
demarcate Suit property and compliance with other requisitions.
However, perusal of this letter would show that Advocate for
32
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
Defendant No.1 has informed Plaintiff that there is no sub division of
the larger land and Plaintiff ought to wait for development to be
completed in order to join the Federation of Societies that may be
formed later. This clearly shows that Defendant No.1 is not averse to
allowing Plaintiff Society to demarcate Suit property, however the
same can only take place after directions of the Supreme Court in its
twin orders dated 19.04.2022 and 19.09.2022 are carried out i.e.
larger land is to be fully developed as one single land and after that,
conveyance would be executed to individual Society / Societies.
Further there is a serious dispute of how much area the Plaintiff is
entitled to out of the larger land since its claim of 938 square meters is
seriously contested by the Defendant No.1.
14. In view of the above observations and findings, interim relief
cannot be granted to Plaintiff. Prima facie , Defendant No. 1 is to
convey larger land (6067.96 square meters) only after completion of
the redevelopment as per directions of the Supreme Court passed in
twin orders dated 19.04.2022 and 19.09.2022. Therefore, in light of
the twin Supreme Court orders dated 19.04.2022 and 19.09.2022, no
case has been made out for grant of injunction by Plaintiff and hence
Interim Application No.6622 of 2025 deserves to fail.
15. In view of the above observations and findings and
considering the twin orders dated 19.04.2022 and 19.09.2022 which
33
::: Uploaded on - 12/06/2026 ::: Downloaded on - 12/06/2026 17:24:03 :::
IA.4657.2025 + IA.6622.2025 .doc
are final, decisive and binding upon all parties, the directions
contained therein cannot be overturned by granting injunction and
Plaintiff cannot seek conveyance of Suit property as it would be in
complete and absolute contravention of the said twin Supreme Court
orders and thereby interfere with Defendant No.1’s pursuance of the
directions contained in twin Supreme Court orders.
16. In that view of the matter, Interim Application No.6622 of
2025 filed by Plaintiff fails as it is concluded that twin orders passed by
the Supreme Court clearly direct Defendant No.1 to execute
conveyance of entire larger land only after development of the same is
complete and since it is ongoing, Plaintiff cannot seek conveyance of
Suit property at this stage and the Misc. Application of the Plaintiff
having been dismissed.
th
17. List Suit No.217 of 2025 on 10 July 2026.
18. In view of the above, Interim Application No.6622 of 2025
stands rejected and disposed of.
[ MILIND N. JADHAV, J. ]
Ajay
Digitally signed
by AJAY
TRAMBAK
UGALMUGALE
Date: 2026.06.12
16:55:01 +0530
AJAY
TRAMBAK
UGALMUGALE
34