KARNATAKA INCOME TAX DEPARTMENT HOUSE BUILDING CO OPERATIVE SOCIETY LIMITED vs STATE OF KARNATAKA
- Court
- Karnataka High Court
- 1 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
TH
DATED THIS THE 20 DAY OF AUGUST, 2026
®
PRESENT
THE HON'BLE MR. JUSTICE D K SINGH
AND
THE HON'BLE MS. JUSTICE TARA VITASTA GANJU
WRIT APPEAL NO. 321 OF 2025 (LA-BDA)
C/W
WRIT APPEAL NO. 633 OF 2025 (LA-BDA)
IN WA No. 321/2025
BETWEEN:
1. THE COMMISSIONER
BANGALORE DEVELOPMENT AUTHORITY
KUMARA PARK WEST
BANGALORE-560 020.
2. SPECIAL LAND ACQUISITION OFFICER
BANGALORE DEVELOPMENT AUTHORITY
KUMARA PARK WEST
BANGALORE-560 020.
…APPELLANTS
(BY SRI. G.S.KANNUR, SENIOR COUNSEL FOR
SRI. MURUGESH.V.CHARATI, ADVOCATE)
AND:
1. STATE OF KARNATAKA
DEPARTMENT OF HOUSING AND URBAN
DEVELOPMENT,
M.S. BUILDING,
BENGALURU -560001
REPRESENTED BY ITS SECRETARY
2. SRI. PRAKASH N.BALDOTA
AGED ABOUT 75 YEARS
Digitally
signed by
VASANTHA
KUMARY B
K
Location:
HIGH
COURT OF
KARNATAKA
- 2 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
S/O N.R.BALDOTA
R/AT #2472, 25TH CROSS,
BSK II STAGE,
BANGALORE-560070
(SENIOR CITIZEN BENEFIT IS CLAIMED)
3. THE KARNATAKA INCOME TAX DEPARTMENT
HOUSE BUILDING CO-OPERATIVE SOCIETY LTD.,
CENTRAL REVENUE,
QUEENS ROAD,
SHIVAJINAGAR,
BANGALORE-560001
REPRESENTED BY ITS SECRETARY
…RESPONDENTS
(BY SRI. M.N.SUDEV HEGDE, AGA FOR R1;
SRI. A.RAVISHANKAR, FOR C/R2 (V/K FILED);
SRI. B.N.PRAKASH., ADVOCATE FOR R3;)
THIS WRIT APPEAL IS FILED U/S 4 OF THE KARNATAKA
HIGH COURT ACT PRAYING TO SET-ASIDE THE ORDER DATED
27/01/2025 PASSED BY THE HON'BLE LEARNED SINGLE JUDGE
IN WP NO.16071/2021 AND ALLOW THE WRIT APPEAL BY
DISMISSING THE WRIT PETITION, ETC.
IN WA NO. 633/2025
BETWEEN:
1. KARNATAKA INCOME TAX
DEPARTMENT HOUSE BUILDING
CO OPERATIVE SOCIETY LIMITED
CENTRAL AVENUE,
QUEENS ROAD,
SHIVAJINAGAR,
BENGALURU AND
REPRESENTED BY ITS SECRETARY
MR. K.E.RAJAN.
...APPELLANT
(BY SRI. PRAKASH B N., ADVOCATE)
AND:
1. STATE OF KARNATAKA
DEPARTMENT OF HOUSING AND
- 3 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
URBAN DEVELOPMENT,
M.S. BUILDING,
BENGALURU-560001
AND REPRESENTED BY ITS SECRETARY.
2. THE COMMISSIONER,
BENGALURU DEVELOPMENT AUTHORITY,
KUMARAPARK WEST,
BENGALURU-560 020.
3. SPECIAL LAND ACQUISITION OFFICER,
KUMARAPARK WEST,
BENGALURU DEVELOPMENT AUTHORITY,
BENGALURU-560020.
4. SRI. PRAKASH N. BALDOTA,
AGED 75 YEARS,
S/O SRI. N.R. BALDOTA,
NO.2472, 25TH CROSS,
BSK II STAGE,
BENGALURU-560 070.
...RESPONDENTS
(BY SRI A. RAVISHANKAR., ADVOCATE FOR C/R4;
SRI G.S. KANNUR, SENIOR COUNSEL FOR
SRI MURUGESH.V.CHARATI, ADVOCATE FOR R2 & R3;
SRI M.N. SUDEV HEGDE, AGA FOR R1)
THIS WRIT APPEAL IS FILED U/S 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO CALL FOR THE
RECORDS IN WP NO.16071/2021 AND SET ASIDE THE
IMPUGNED ORDER DATED 27/01/2025 PASSED IN WP
NO.16071/2021 BY THE LEARNED SINGLE JUDGE AND
DISMISS THE SAID WRIT PETITION, ETC.
THESE APPEALS HAVING BEEN HEARD AND RESERVED
FOR JUDGMENT ON 24.07.2026, COMING ON FOR
- 4 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
PRONOUNCEMENT THIS DAY, HON'BLE Ms. JUSTICE
TARA VITASTA GANJU PRONOUNCED THE FOLLOWING:
CORAM: HON'BLE MR. JUSTICE D K SINGH
and
HON'BLE MS. JUSTICE TARA VITASTA GANJU
CAV JUDGMENT
(PER: HON'BLE Ms. JUSTICE TARA VITASTA GANJU)
I PREFACE:
1. The present intra-Court appeals arise out of the judgment
and order dated 27.01.2025 passed by the learned Single
Judge in W.P.No.16071/2021 allowing the writ petition,
whereby the acquisition proceedings in respect of the
petitioner’s land, initiated for the formation of Banashankari V
Stage Layout under the provisions of the Bangalore
Development Authority Act, 1976 (for short, ‘the BDA Act’),
came to be quashed. Aggrieved by the said judgment, the
Bangalore Development Authority (for short ‘the BDA’) has
preferred appeal in W.A.No.321/2025 whereas the Karnataka
Income Tax Department House Building Co-Operative Society
Limited has preferred the appeal in W.A.No.633/2025.
2. The parties are referred to as per their ranking before the
writ Court for the sake of convenience.
- 5 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
II FACTS OF THE CASE:
3. The BDA issued preliminary notification under Section
17(1) of the BDA Act on 29.12.1988 proposing to acquire land
measuring 1851 acres 39 guntas and final notification under
Section 19(1) of the BDA Act on 09.05.1994 proposing to
acquire land measuring 1458 acres 21 guntas for formation of
Banashankari V Stage Layout, a residential development
scheme sanctioned under the provisions of the BDA Act. The
acquisition proceedings were initiated with the object of
implementing a planned residential layout for the benefit of the
general public.
4. The petitioner is the owner of the land measuring 2 acres
21 guntas bearing Sy.No.89 of Uttarahalli Village, Bengaluru
South Taluk forming part of the lands notified for acquisition
under the aforesaid scheme. The records disclose that
acquisition proceedings were initiated many years ago,
however, the implementation of the Banashankari V Stage
Layout did not proceed in the manner originally contemplated.
Large extents of the notified lands remained under litigation,
denotified or otherwise unavailable for execution of the
sanctioned scheme. The material placed on record further
indicates that only a limited extent of land was ultimately
- 6 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
developed for the purpose for which the acquisition had
originally been undertaken.
5. The BDA had issued a New Housing Policy, wherein it is
indicated that, in the event of incomplete acquisition made by
the BDA, owner of the land, is permitted to develop 12% of the
total built up area to be given to the BDA or handing over 30%
of the developed sites to the BDA. It is also stated that, this
Court in WP.No.21975/1994 and connected writ petitions
disposed of on 19.09.1996, quashed the Final Notification dated
09.05.1994 on the ground that sanction of the Government had
not been obtained, as contemplated under Section 18 of the
BDA Act. Subsequently, after obtaining sanction, the
Declaration came to be issued again on 16.09.1997 under
Section 19 of the BDA Act.
6. The petitioner has made representation dated
15.10.1996, seeking approval of the layout plan and pursuant
to the same the respondent-BDA has issued reply dated
06.11.1996, seeking certain clarification. It is further stated
that, the representation was made by the petitioner to drop the
acquisition proceedings insofar as the subject land was
considered in the resolution dated 28.07.1997, vide subject
- 7 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
No.199/97 and it was resolved to grant approval for formation
of layout subject to conditions.
7. The petitioner has thereafter challenged the acquisition
proceedings in WP.No.3334/2000 and this Court vide order
dated 08.07.2002 has dismissed the petition. Feeling
aggrieved, the petitioner has filed W.A.No.4391/2002 however,
the same was withdrawn on 12.06.2008, and a direction was
given to the petitioner to work out his remedy in terms of the
resolution dated 20.06.2000, passed by the respondent-BDA.
The petitioner has once again approached this Court in
W.P.No.10165/2008, in respect of the subject land and this
Court disposed of the petition without interfering with the
acquisition proceedings and the said order was assailed in
W.A.No.336/2010 and vide order dated 02.04.2014 permitted
the petitioner to withdraw the petition and to avail the remedy
before the respondent No.2.
8. It is further case of the petitioner that though the
petitioner is in possession of the land in question and no
mahazar has been drawn as required under law, the
respondent-BDA has executed Registered Sale Deed
dated 31.07.2021, in favour of respondent No.4 and being
- 8 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
aggrieved by the same, the petitioner has filed the impugned
writ petition i.e., W.P.No.16071/2021 wherein the petitioner
has asserted that notwithstanding the acquisition proceedings,
the actual physical possession of the lands was never taken by
the BDA in accordance with law and that the petitioner has
continued to remain in possession and enjoyment of the land,
which fact was reflected in the revenue records. The petitioner
further contended that the possession mahazar relied upon by
the BDA was a cyclostyled document prepared without any
witnesses on the spot and, therefore, could not be accepted as
conclusive proof of lawful possession.
9. The BDA asserted that awards had been passed and
possession of the schedule property had been taken through
the drawing of a possession mahazar on 02.08.1999
whereupon the land vested absolutely in the State Government
and thereafter in the BDA free from all encumbrances.
According to the BDA, once such vesting had taken place,
neither the continued entries in the revenue records nor the
alleged physical occupation of the petitioner could disentitle the
legal effect of vesting under the land Acquisition Act, 1894.
- 9 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
10. The acquisition relating to Banashankari V Stage Layout
has been the subject matter of several rounds of litigation
before this Court over a considerable period of time. In several
of those proceedings, this Court has examined the extent of
implementation of the Scheme, the applicability of Section 27
of the BDA Act and the legal consequences flowing from the
failure of the Authority to substantially execute the sanctioned
development scheme within the prescribed period. The learned
Single Judge has referred extensively to those earlier decisions
while adjudicating the impugned writ petition. Consequently,
the writ petition came to be allowed quashing the acquisition
proceedings insofar as the petitioner’s land is concerned.
III FINDINGS OF THE LEARNED SINGLE JUDGE:
11. The learned Single Judge, upon consideration of the
acquisition records, the possession mahazar, the revenue
documents, the official resolutions of the BDA concerning the
Banashankari V Stage Scheme and the submissions advanced
by the learned counsel, has examined the validity of the
acquisition proceedings in view of the provisions of the BDA
Act.
- 10 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
12. At the outset, the learned Single Judge addressed the
preliminary objection regarding the maintainability of the writ
petition. The contention of the BDA that the writ petition was
barred on account of the earlier proceedings instituted by the
petitioner was rejected. It was held that the challenge raised in
the writ petition was not directed against the acquisition
notifications on grounds that had already been adjudicated in
the previous rounds of litigation, but was founded upon the
alleged failure of the Authority to substantially implement the
sanctioned development scheme, the dispute relating to lawful
taking of possession and the subsequent execution of the
registered sale deed in favour of the fourth respondent. The
learned Single Judge was therefore of the opinion that the writ
petition disclosed a fresh cause of action.
13. The learned Single Judge while examining the scope and
effect of Section 27 of the BDA Act and analysing the statutory
provisions and the decisions rendered by the Supreme Court as
well as this Court, held that the legislative intent underlying
Section 27 of the BDA Act is to ensure that lands compulsorily
acquired for a sanctioned development scheme are utilised
within a reasonable period and that the Authority does not
indefinitely retain private property without substantially
- 11 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
implementing the scheme for which the acquisition was
undertaken. Upon considering the extent of land acquired, the
land actually developed, the lands denotified, those involved in
litigation and the undeveloped parcel of land, the learned Single
Judge held that only a small portion of the acquired land had
been utilised for the sanctioned Scheme. It was accordingly
held that the Scheme had not been substantially implemented
within the statutory period, thereby attracting the
consequences contemplated under Section 27 of the BDA Act.
14. The learned Single Judge further held that the mahazar
had been made in the printed-cyclostyle form, which does not
indicate the name and address of witnesses and the revenue
entries continued to reflect in the name of the petitioner. Thus,
the learned Single Judge held that possession cannot be said to
have be taken. The learned Single Judge also examined the
Resolution Nos.67/2000 and 199/1997 correspondence and
other official records of the BDA. These documents were found
to indicate that the Scheme had not been fully implemented
and that the Authority's own records did not support its claim
that the acquisition had been completely acted upon.
- 12 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
15. The learned Single Judge further referred to the earlier
decisions of this Court concerning lands acquired under the
very same Banashankari V Stage Scheme and held that those
decisions had already considered the implementation of the
Scheme and the applicability of Section 27 of the BDA Act. As
no distinguishing feature was shown by the BDA, the learned
Single Judge held that the present case was governed by the
principles laid down in the earlier judgments.
16. Having held that the Scheme had not been substantially
implemented and that lawful possession had not been
established, the learned Single Judge concluded that the
registered sale deed executed by the BDA in favour of the
fourth respondent could not be sustained. It was held that the
validity of the conveyance was dependent upon the legality of
the acquisition proceedings and the continued subsistence of
the public purpose underlying the acquisition. In view of the
same, the learned Single Judge held that the acquisition
proceedings, insofar as they related to the petitioner, were
liable to be quashed.
- 13 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
IV SUBMISSIONS ON BEHALF OF THE BDA:
17. Sri. G. S. Kannur, learned Senior Counsel, assisted by Sri.
Murugesh V. Charati, learned counsel appearing for the
respondent–Bangalore Development Authority, submitted that
the acquisition proceedings culminating in the acquisition of the
petitioner's land were conducted strictly in adherence to the
provisions of the BDA Act and the Land Acquisition Act, 1894. It
was submitted that the acquisition forms part of the
Banashankari V Stage Layout Scheme, which was conceived for
a public purpose, namely, the planned development of the city
of Bengaluru by formation of a residential layout with the
necessary civic amenities and infrastructure.
18. The learned Senior Counsel appearing for the appellant-
BDA submitted that the learned Single Judge has proceeded on
an erroneous premise by examining the implementation of the
Banashankari V Stage Scheme with reference to the petitioner's
individual parcel of land. It was submitted that Section 27 of
the BDA Act requires consideration of whether the Scheme, as
a whole, has been substantially executed and not whether
every individual parcel comprised in the Scheme has been
developed. The Banashankari V Stage Scheme covered a large
extent of land spread over several villages and had, in fact,
- 14 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
been substantially implemented, resulting in the formation of a
full-fledged residential layout. Therefore, the fact that certain
parcels, including that of the petitioner, remained undeveloped
or were subject to litigation could not lead to the conclusion
that the entire Scheme had lapsed.
19. It was further submitted that the learned Single Judge
failed to give due effect to the earlier judgments of the
Coordinate Benches concerning the very same Banashankari V
Stage Scheme, wherein the Scheme had been held to have
been executed and substantially implemented. Learned Senior
Counsel placed reliance upon the judgment in
W.A.No.391/2019 and submitted that the Court had specifically
held that merely because acquisition proceedings in respect of
some parcels had been quashed, the entire Scheme would not
lapse. It was therefore contended that the said finding could
not have been disregarded while examining the petitioner's
claim under Section 27 of the BDA Act.
20. On the question of possession, learned Senior Counsel
submitted that the acquisition proceedings in respect of the
petitioner's land had proceeded in accordance with law and that
an award had been passed, possession had been taken and a
- 15 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
notification under Section 16(2) of the Land Acquisition Act,
1894 had been published on 02.08.1999. The possession
mahazar, read with the other contemporaneous records, was
relied upon to contend that possession had been duly taken.
21. Learned Senior Counsel therefore submitted that the
learned Single Judge had conflated the question of substantial
execution of the Scheme with the question of possession of the
petitioner's individual land. According to him, even if there were
any dispute regarding possession of the individual parcel, such
dispute could not constitute a ground for holding that the
Banashankari V Stage Scheme itself had lapsed under Section
27 of the BDA Act. The impugned judgment was accordingly
sought to be set aside.
V SUBMISSIONS ON BEHALF OF THE KARNATAKA
INCOME TAX DEPARTMENT HOUSE BUILDING CO
OPERATIVE SOCIETY LIMITED :
22. Sri. Uday Holla, learned Senior Counsel assisted by
Sri. Prakash B N, learned counsel appearing for the appellant-
Society submitted that the learned Single Judge erred in
allowing the writ petition without appreciating the earlier
rounds of litigation concerning the very same acquisition. It
was submitted that the writ petition was barred by the
- 16 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
principles of res judicata, as the petitioner had earlier
challenged the acquisition of Sy.No.89 in W.P.No.3334/2000,
which was dismissed on 08.07.2002 after recording a specific
finding that possession had been taken, as evidenced by the
notification under Section 16(2) of the Land Acquisition Act.
The subsequent W.A.No.4391/2002 filed by the petitioner was
withdrawn. The petitioner once again approached this Court in
W.P.No.10165/2008 which was also dismissed and the appeal
arising therefrom in W.A.No.336/2010 was withdrawn. Thus,
the acquisition proceedings had attained finality and could not
be reopened in the present proceedings.
23. It was further submitted that the learned Single Judge
erred in holding that the doctrine of res judicata was
inapplicable on the ground of liberty allegedly reserved in
W.A.No.336/2010. The learned counsel submitted that no such
liberty was granted to reopen the acquisition proceedings which
had already been upheld. The learned Single Judge also erred
in relying upon the BDA resolution dated 20.06.2000 to hold
that possession had not been taken, since the said resolution
related to lands other than the subject land, proceedings
concerning which were then subject to an order of stay.
- 17 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
24. Learned counsel further submitted that the finding
regarding possession was contrary to the earlier judgments of
this Court. The notification under Section 16(2), the possession
mahazar and the other acquisition records established that
possession had been taken on 02.08.1999, resulting in vesting
of the land. The subsequent revenue entries in the petitioner's
name could not override the findings already recorded by this
Court. It was therefore contended that the learned Single Judge
could not have reopened the question of possession by
undertaking a fresh examination of the mahazar and revenue
records.
25. Learned counsel further submitted that the writ petition
was liable to be dismissed on the ground of delay and laches.
The final notification was issued on 16.09.1997, the earlier
appeal was withdrawn on 05.01.2010, whereas the present writ
petition was filed only in 2021. It was therefore submitted that
the petitioner, having repeatedly challenged the same
acquisition proceedings, could not be permitted to reopen the
matter after such prolonged delay. The impugned judgment is
accordingly sought to be set aside.
- 18 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
VI SUBMISSIONS ON BEHALF OF THE PETITIONER-
LANDOWNER:
26. Sri. A. Ravi Shankar learned Counsel appearing for the
petitioner/landowner has supported the judgment and order
passed by the learned Single Judge and submitted that no
ground whatsoever is made out warranting interference in the
present appeal.
27. The learned counsel submitted that the BDA had failed to
establish that the acquisition proceedings had culminated in
taking of actual and effective possession of the petitioner's
land. It was contended that the petitioner continued to remain
in possession of the land and that the land had never been
utilised for formation of the Banashankari V Stage Layout
Scheme. According to the learned counsel, the mere
preparation of a possession mahazar or the issuance of a
notification under Section 16(2) could not, in the facts of the
present case, substitute actual taking of physical possession.
28. The learned counsel further submitted that the material
relied upon by the BDA to establish possession was inadequate
and that the possession mahazar did not establish that the
petitioner had been dispossessed or that the BDA had assumed
effective physical control over the land. The continued reflection
- 19 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
of the petitioner's name in the revenue records was also relied
upon as a circumstance supporting the petitioner's case that
possession had never been taken.
29. The learned counsel further submitted that the
Banashankari V Stage Scheme, insofar as the petitioner's land
was concerned, had not been implemented within the statutory
period contemplated under Section 27 of the BDA Act. It was
submitted that the BDA could not rely upon development
undertaken in other portions of the Scheme to defeat the
petitioner's claim when the petitioner's land itself had neither
been taken into effective possession nor utilised for the purpose
for which it was acquired.
30. Reliance was also placed upon the earlier judgments
concerning the acquisition of lands forming part of the
Banashankari V Stage Scheme to contend that the acquisition
proceedings in respect of the petitioner's land had not been
validly completed. It was therefore submitted that the learned
Single Judge had correctly appreciated the material on record
and had rightly concluded that the acquisition could not be
sustained. The learned counsel accordingly sought dismissal of
the appeal.
- 20 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
VII POINT FOR DETERMINATION:
31. We have heard the learned Senior Counsel appearing for
the appellant-BDA, the learned Senior Counsel appearing for
the appellant-Society and the learned counsel appearing for the
respondent-landowner and have carefully perused the records
placed before us. The only question that arises for our
consideration is:
“Whether the Banashankari V Stage Layout
Scheme, as a whole, can be said to have been
lapsed under Section 27 of the BDA Act on the
ground that the land of the petitioner forming
part of the said Scheme was not developed or
that possession thereof was not established to
have been taken in the manner contended by
the BDA.”
VIII ANALYSIS AND FINDINGS:
32. The land of the petitioner forms part of the larger
Banashankari V Stage Layout Scheme sanctioned by the BDA.
The question, therefore, is not merely whether the petitioner's
individual parcel of land was developed or possession of that
particular parcel was taken within the period prescribed under
Section 27 of the BDA Act. The principal question is whether
- 21 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
the Banashankari V Stage Layout Scheme, considered as a
whole, was substantially executed within the meaning of
Section 27 of the BDA Act.
33. Section 27 of the BDA Act provides that where, within a
period of five years from the date of publication in the Official
Gazette of the declaration under Section 19(1), the Authority
fails to execute the Scheme substantially, the Scheme shall
lapse and the provisions of Section 36 shall become
inoperative. The expression “execute the Scheme substantially”
is therefore the statutory test. The provision does not state that
every parcel comprised in the Scheme must be developed, nor
does it prescribe that every acquisition forming part of the
scheme must culminate in possession and development within
the stipulated period.
34. The expression “substantially” necessarily imports an
assessment of the scheme in its entirety. A development
scheme cannot be dissected into individual parcels and its
validity cannot be determined with reference to one such
parcel. The nature, extent, object and manner of
implementation of the scheme have to be considered before
arriving at a conclusion as to whether there has been
- 22 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
substantial execution. This principle was considered by the
Division Bench of this Court in the case of M. MARIDEV AND
OTHERS V. STATE OF KARNATAKA AND OTHERS [2009
SCC OnLine Kar 219]
while considering the implementation of
the Nagarabhavi II Stage Housing Scheme, it examined the
extent of the Scheme, the area over which the layout had
actually been formed and the allotment of sites and held that,
having regard to the magnitude of the housing Scheme, the
Scheme had been substantially implemented. It was specifically
held that Section 27 of the BDA Act operates only where there
is no substantial implementation of the Scheme.
35. The aforesaid principle has been reiterated by the
Division Bench of this Court in the case of BANGALORE
DEVELOPMENT AUTHORITY vs STATE OF KARNATAKA
[W.A.No.914/2024 ] wherein it was held that the
implementation of the Scheme has to be considered from the
perspective of the entire Scheme and not a particular piece of
land. It was further held that where a substantial portion of the
Scheme had been implemented, the fact that the particular
land which was the subject matter of the proceedings had not
been developed could not, by itself, result in the scheme being
- 23 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
treated as having lapsed. The relevant paragraph is extracted
hereunder:
“ 19. It is pertinent to notice that in the
case of M. Maridev and others Vs. State
of Karnataka and others, 2009 SCC
OnLine Kar 219 a Coordinate Bench of
this Court considered as to whether the
acquisition proceedings in respect of the
"Nagarabhavi II Stage Layout " is vitiated
due to non-formation of the layout visaa-
vis the property which was the subject
matter of the said writ proceedings.
Considering the said contention, this
Court held that the acquisition
proceedings had not lapsed as
implementation of scheme of acquisition
is required to be considered from the
perspective of the entire scheme and not
a piece of land. The relevant portion of
the said judgment reads as under: -
45. Section 27 of the BDA Act
operates only where there is no
substantial compliance or
implementation of the scheme.
But in the instant case, when the
fact remains that out of 604
acres and 23 guntas, the 2nd
respondent had already formed a
layout over an extent of 564
acres and 39 guntas of land and
house sites have been distributed
to various allottees, which
establishes that the scheme is
substantially executed, in our
considered opinion, it is not
permissible for the
appellants/petitioners to contend
that the scheme had lapsed,
particularly, when the award had
already been passed and that the
owners/occupants had already
been dispossessed from the
- 24 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
impugned land in question.
Considering the magnitude of the
housing scheme, we are satisfied
that the scheme i s substantially
implemented and therefore,
Section 27 is not attracted. ”
36. The principle is also consistent with the decisions of
earlier Division Bench in the case of BANGALORE
DEVELOPMENT AUTHORITY vs DR. H.S.
HANUMANTHAPPA [ILR 1996 KAR 542] and A.
KRISHNAMURTHY (since deceased) by LRs. vs
BANGALORE DEVELOPMENT AUTHORITY [1996 (3) Kar LJ
306] , which recognise that substantial implementation of a
development scheme has to be examined with reference to the
scheme and the extent of its implementation, and not by
treating the development of an isolated parcel as determinative
of the fate of the entire scheme.
37. This interpretation also accords with the nature of a
development scheme under the BDA Act. A scheme for
formation of a residential layout over a large extent of land
necessarily involves several interdependent activities, including
acquisition, formation of roads, development of civic amenities,
and formation of sites and allotment of the sites thereof. Such
activities cannot necessarily be completed simultaneously in
- 25 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
respect of every parcel. The Legislature, while enacting Section
27, has consciously used the expression “substantially”, and
not “completely” or “entirely”. The distinction is important. If
every individual parcel were required to be developed within
the statutory period, the expression “substantially” occurring in
Section 27 would lose much of its meaning. A single parcel
remaining undeveloped, could then be relied upon to contend
that the entire development scheme had failed. Such an
interpretation would not only be inconsistent with the language
of Section 27 but would also ignore the very nature of a large-
scale development Scheme.
38. The Banashankari V Stage Layout Scheme was
sanctioned for formation of a residential layout over an extent
of 1458 acres 21 guntas, covering several villages. The material
placed before us does not indicate that no developmental
activity took place pursuant thereto. On the contrary, the
scheme resulted in the formation of a residential layout and
substantial development of the area covered by it. This factual
position assumes significance in view of the earlier judgment of
the Division Bench of this Court in the case of SMT.
MADDURAMMA AND OTHERS vs STATE OF KARNATAKA
AND OTHERS [W.A.No.391/2019] which held that the
- 26 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
Banashankari V Stage Layout Scheme had been executed and
had become a full-fledged residential layout and further
rejected the contention that merely because acquisition
proceedings in respect of some portions of the land had been
quashed, the entire Scheme would consequently lapse. The
relevant paragraph has been extracted hereunder:
“ 30. As far as submissions made by the
learned counsel for the appellant that as
per Section 27 of BDA Act, 2013, the
scheme has lapsed is concerned, same
cannot be accepted for the reason that
the Banashankari 5th Stage scheme is
executed and it is a full fledged
residential layout. Therefore, just
because the acquisition proceedings of
some portion of lands in writ petitions
filed before this Court are quashed, that
does not mean that the entire scheme
has lapsed. It is an undisputed fact that
Banashankari 5th Stage layout is
executed. The acquisition proceedings
might have been quashed insofar as
some portion of lands is concerned in
respect of some landowners but it cannot
be said that the entire scheme has
lapsed. Therefore, even under Section 27
of Act, 2013 also, the appellants cannot
seek the benefit of the said contention
that the entire scheme has lapsed. Thus,
the appellants are not entitled for
reverting of the lands to them. It is an
undisputed fact that the land of the
appellants was also utilized under the
scheme and sites were formed and was
- 27 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
allotted in favour of respondent No.4
subsequently it was sold to respondent
Nos. 5 and 6. Undisputed factual matrix
depicts that the scheme has already been
executed. Therefore, under the
circumstances the writ appeal being
found devoid of merits, it is liable to be
dismissed. ”
39. The significance of MADDURAMMA ( supra ) lies not
merely in the result of that appeal but the manner in which this
Court approached the Section 27 of the BDA Act. The Division
Bench did not examine the implementation of the Banashankari
V Stage Scheme as to whether each individual parcel forming
part of the scheme had been developed. The finding was with
reference to the Scheme as a whole, viz., the Banashankari V
Stage Layout Scheme had been executed and was a full-
fledged residential layout.
40. The earlier decisions relied upon by the learned Single
Judge arose out of proceedings concerning particular parcels of
land forming part of the Banashankari V Stage Scheme.
However, the factual findings recorded in those proceedings
concerning the particular parcels cannot be elevated into a
declaration that the entire Banashankari V Stage Scheme was
never substantially executed. The distinction between an
- 28 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
individual acquisition and the execution of the scheme as a
whole is fundamental.
41. Applying the aforesaid principle to the facts before us, the
circumstance that the petitioner's land was not developed
cannot be treated as conclusive of the question whether the
Banashankari V Stage Scheme was substantially executed. The
petitioner's land constituted only a parcel forming part of a
scheme extending over 1458 acres 21 guntas. The
implementation of the Scheme must therefore be assessed by
considering the development actually undertaken pursuant to
the sanctioned Scheme as a whole.
42. The material placed before us has been considered
cumulatively. The extent of the Scheme, the formation of the
Banashankari V Stage layout, the development of substantial
portions thereof, the allotment of sites and the findings already
recorded by Coordinate Benches of this Court concerning the
very same scheme are all relevant and when considered
together, they do not support the conclusion arrived at by the
learned Single Judge that the Scheme remained substantially
unexecuted.
- 29 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
43. The distinction between the development Scheme and the
acquisition proceedings has been authoritatively explained by
the Supreme Court in the case of OFFSHORE HOLDINGS
vs
PVT. LTD. BANGALORE DEVELOPMENT AUTHORITY
[(2011) 3 SCC 139] . The Supreme Court held that the
acquisition stands on a footing distinct from the Scheme
formulated under the BDA Act. On a conjunctive reading of
Sections 27 and 36, the Supreme Court held that even where a
Scheme lapses, the acquisition does not necessarily lapse and
that the consequence depends upon the stage reached in the
acquisition proceedings. The principle assumes significance
here because the learned Single Judge proceeded from the
finding regarding possession of the petitioner's land to the
conclusion that the Scheme had lapsed and thereafter treated
the acquisition as having consequently failed. Once the premise
that the scheme itself had lapsed is found to be unsustainable,
the consequential conclusion regarding lapse of acquisition
cannot survive on that basis.
44. In the present case, the learned Single Judge has
principally relied upon the fact that the petitioner's land
remained undeveloped, the possession mahazar was not valid
and the revenue records continued to reflect the petitioner's
- 30 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
name. However, Section 16(2) of the Land Acquisition Act,
1894, expressly provides that a notification published in the
Official Gazette regarding taking of possession shall be the
evidence of such fact. The statutory evidentiary effect of such
notification, therefore, cannot be overlooked.
45. The Supreme Court in the case of P.K. KALBURQI vs
STATE OF KARNATAKA [(2005) 12 SCC 489] has held that
a notification under Section 16(2) constitutes evidence of the
fact of taking possession. The same principle has been
reiterated in N.A.L. LAYOUT RESIDENTS ASSOCIATION vs
BANGALORE DEVELOPMENT AUTHORITY [(2018) 12 SCC
400] . In the present case, the notification issued under Section
16(2), read with the possession mahazar establishes that
possession of the petitioner's land was taken on 02.08.1999.
Consequently, the land stood vested in the State free from all
encumbrances in terms of Section 16(1) of the Land Acquisition
Act.
IX CONCLUSION:
46. The litigation history of the present case assumes
considerable significance. The petitioner has repeatedly
approached this Court challenging the acquisition of the subject
- 31 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
land. The petitioner specifically sought deletion of Sy.No.89 of
Uttarahalli Village from the acquisition proceedings and also
challenged the final notification issued under Section 19(1) of
the BDA Act by filing writ petition in W.P.No.3334/2000. The
said writ petition was dismissed on 08.07.2002, wherein this
Court recorded a specific finding that the possession of the land
had been taken, as evidenced by the notification issued under
Section 16(2) of the Land Acquisition Act. The petitioner
thereafter carried the matter in W.A.No.4391/2002, which
came to be withdrawn on 12.06.2008. The petitioner again
approached this Court in W.P.No.10165/2008, which was also
dismissed, and the writ appeal arising therefrom in
W.A.No.336/2010, was again withdrawn. Thus, there has
already been multiple rounds of litigation questioning the very
acquisition of the subject land by the petitioner himself and the
findings recorded in the said proceedings had remained
undisturbed. Despite the above, the petitioner instituted the
impugned writ petition in the year 2021, seeking to reopen
substantially the same acquisition proceedings and to reagitate
the same question which had already been considered in the
earlier proceedings. The aforesaid litigation history is therefore
not a mere incidental circumstance, but a material aspect
- 32 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
bearing directly upon the maintainability of the subsequent
challenge and the finality attaching to the earlier findings.
47. The learned Single Judge, however, proceeded to
reconsider the question of possession and the validity of the
acquisition without giving due weight to the earlier rounds of
litigation and the findings already recorded therein. The
subsequent proceedings could not be permitted to become a
means of reopening issues which had already been heard and
decided. The repeated invocation of the jurisdiction of this
Court, after the earlier proceedings having been concluded, is a
circumstance which required consideration while examining the
maintainability of the present case, particularly when the
challenge was directed against an acquisition dating back to the
year 1997.
48. The learned Single Judge also erred in treating the
petitioner's individual land as determinative of the question
whether the Banashankari V Stage Scheme had substantially
been executed. The Coordinate Benches of this Court have
already held that the Scheme had been substantially and
comprehensively implemented. Consequently, the statutory
consequence contemplated under Section 27 of the BDA Act
- 33 -
WA No. 321 of 2025
C/W WA No. 633 of 2025
could not have been invoked to declare that the Banashankari
V Stage Scheme had lapsed. The finding of the learned Single
Judge is therefore liable to be set aside. Accordingly, the
appeals filed by the BDA and the Society are allowed and the
judgment and order dated 27.01.2025 passed by the learned
Single Judge is set aside.
49. The BDA is directed to take appropriate steps, in
accordance with law, for removal of the encroachment by the
National Public School upon the land acquired for the purposes
of the BDA, at the cost of the owners of the said school, if not
already removed.
50. Pending interim applications if any, do not survive for our
consideration and are accordingly disposed.
Sd/-
(D K SINGH)
JUDGE
Sd/-
(TARA VITASTA GANJU)
JUDGE
NG/KS
CT:SN