Residents Welfare Association vs The Administrative Officer, Office Of Dy. Commisisoner, Mcd & Anr.
- Court
- Delhi High Court
$~41
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
% Date of decision: 29 July, 2026
# CNR No. DLHC010375782025
+ W.P.(C) 8366/2025 & CM APPL. 36418/2025
RESIDENTS WELFARE ASSOCIATION .....Petitioner
Through: Mr. Mohan Lal Sharma, Advocate.
versus
THE ADMINISTRATIVE OFFICER, OFFICE
OF DY. COMMISISONER, MCD & ANR. .....Respondents
Through: Mr. Tushar Sannu, Standing counsel
for MCD with Mr. Devvrat Tiwari
and Mr. Ritik Anmol, Advocates for
R-1/MCD.
Mr. Deepank Yadav and Mr. Nishant,
Advocates for R-2.
CORAM:
HON'BLE MR. JUSTICE AMIT BANSAL
AMIT BANSAL, J. (Oral)
1. The present writ petition has been filed seeking quashing of the
th
permission letter dated 25 April, 2025 issued by respondent no.1/MCD in
favour of respondent no.2/ M/s Indus Tower Pvt. Ltd., for setting up a
Ground Base Monopole (hereinafter referred to as ‘GBM’) in the park of the
residential society at Pocket-11, DDA Janta Flats, Jasola Vihar, New Delhi .
2. The petitioner in the present case is the Residents Welfare Association
of residents residing in DDA Janta Flats at Jasola Vihar, New Delhi –
110025 (hereinafter referred to as the ‘Society’).
Signature Not Verified
Signed By:VIVEK
MISHRA
Signing Date:01.08.2026
18:38:41
W.P.(C) 8366/2025 Page 1 of 5
th
3. Notice in the present petition was issued on 4 June, 2025.
4. On the same date, an order was passed to maintain status quo in
respect of erection of the GBM.
5. It is submitted on behalf of the petitioner that residents of the Society
were not consulted for construction of the said GBM and the construction of
the said GBM would affect the health and lives of the residents of the
Society. It also reduces the area of the park which is used by the residents
for walking, playing, jogging etc.
6. A short affidavit in response to the petition has been filed on behalf of
the respondent no.1/MCD, wherein it is stated that an application was
received from respondent no.2 for setting up a GBM. Pursuant thereto,
MCD conducted a joint survey with officials of respondent no.2 and
permission was granted.
7. It is further stated that permission has been granted in terms of the
policy for ‘ Setting up Communication Cellular Mobile Towers on Wheels
(COW)/MBTS ’ and ‘ Setting up Mobile Towers on land/buildings/properties
th
owned and managed by MCD ’ dated 19 September, 2022. In terms of the
aforesaid policy, mobile towers can be set up in public places such as parks,
subject to the condition that the maximum area per mobile tower shall be
allotted up to 50 sq. meters with a maximum width of 8 meters.
8. It is stated that in terms of the aforesaid policy, permission has been
granted to respondent no.2 for setting up the GBM.
9. Counter-affidavit has been filed on behalf of respondent no.2/M/s
Indus Tower Pvt. Ltd. wherein it is stated that the permission has been
granted in favour of respondent no.2 in terms of the applicable policy. It is
stated that only an area of 13.9 sq. meters has been granted to the respondent
Signature Not Verified
Signed By:VIVEK
MISHRA
Signing Date:01.08.2026
18:38:41
W.P.(C) 8366/2025 Page 2 of 5
no.2 for setting up a GBM whereas the policy permits area up to 50 sq.
meters.
10. I have heard the counsel for the parties.
11. Establishment of a robust telecom infrastructure, including mobile
towers, is a matter of critical public interest to ensure seamless connectivity.
Accordingly, telecommunication services have been included under “public
utilities” as defined under Section 2(44-A) of the Delhi Municipal
Corporation Act, 1957 along with other utilities such as water supply,
sewerage and drainage, gas distribution systems, etc. This is an
acknowledgement of the fact that telecommunication services and the
equipment required for providing the same are essential public requirements.
12. Keeping this in mind, MCD has come out with a policy for
installation of GBM in the area under its jurisdiction. In terms of the said
policy, the permission has been given to respondent no.2 to set up the GBM.
The relevant clause 3 of the said policy is set out below:
Signature Not Verified
Signed By:VIVEK
MISHRA
Signing Date:01.08.2026
18:38:41
W.P.(C) 8366/2025 Page 3 of 5
13. It is manifest from the aforesaid policy that mobile towers can be set
up in parks subject to a cap of 50 sq. meters area and the width of 8 meters.
14. Undisputedly, the land in question is a public park which vests with
the MCD. The permission has been granted by MCD in terms of the
aforesaid policy for the purposes of setting up a GBM for an area of 13.9 sq.
meters which is only a small portion of the park.
15. This Court in exercise of its jurisdiction under Article 226 of the
Constitution of India, cannot question the decision of MCD for granting
permission for installation of the GBM at the subject park. There is no
allegation of mala fide in the said decision as the said installation is towards
public utility.
16. This Court has already taken the view that insofar as public utility
services are concerned, this Court cannot get into issues with regard to
th
location of the same. [Ref. Order passed on 17 April, 2026 in W.P.(C)
5151/2020 titled as Raj Banti & v. BSES Rajdhani Power Limited and
th
order passed on 24 April, 2026 in W.P.(C) 5579/2026 titled as Manoj
Malik v. Delhi Devlopment Authority ]
17. The contention of the petitioners regarding alleged health hazards
posed by the mobile tower are in the nature of bald allegations and are not
backed by any material. In Kapil Choudhary v. Union of India , 2016 SCC
OnLine Del 2558, this Court, after due consideration of the issue, held as
follows:
“ 12. In view of the above, it is clear that there is no scientific data available to
show that installation of mobile phone towers and the emission of the waves
by the said towers is in any way harmful for the health or hazardous to the
health of citizens . There is no conclusive data to the said effect. The petitioner
has not been able to produce any data whatsoever showing any such harmful
Signature Not Verified
Signed By:VIVEK
MISHRA
Signing Date:01.08.2026
18:38:41
W.P.(C) 8366/2025 Page 4 of 5
effects on the health of human beings. The petitioner has also not been able to
show violation of any norms by the respondent.
*
14. The writ petition being without merit is dismissed. ”
[emphasis supplied]
18. In view of the discussion above, I do not find any merit in the present
writ petition. Accordingly, the petition is dismissed and the interim order
stands vacated.
19. The pending application stands disposed of.
AMIT BANSAL, J
JULY 29, 2026
Rzu
Signature Not Verified
Signed By:VIVEK
MISHRA
Signing Date:01.08.2026
18:38:41