<div> <br /> $~52 <br /> * <b>IN THE HIGH COURT OF DELHI AT NEW DELHI </b><br /> <b><i>th</i></b><br /> <b><i>Date of decision: 6</i></b> <b><i> April, 2026 </i></b><br /> <b><i>th</i></b><br /> <b><i>Uploaded on: 9</i></b> <b><i> April, 2026</i></b> <i> </i><br /> + <b>W.P.(C) 1784/2026 & CM APPL. 19514/2026, CM APPL. </b><br /> <b>21293/2026, CM APPL. 21294/2026, CM APPL. 21295/2026</b> <br /> SAROJ (WIDOW OF KHEMCHAND) .....Petitioner <br /> Through: Mr. K.C. Mittal, Mr. Yugansh Mittal, <br /> Mr. Keshav Poonia and Mr. Madhur <br /> Gupta, Advs. (M: 9911256665). <br /> Mr. Vinod Dahiya, Mr. Kuldeep Antil, <br /> Mr. Bhaskar, Mr. Ankit Malik, Advs. <br /> Ms. Priya Darshini, Advocate. <br /> versus <br /> <br /> STATE OF NCT OF DELHI THROUGH ITS CHIEF SECRETARY <br /> & ORS. .....Respondents <br /> Through: Mr. Chetan Sharma ASG, Mr. Sanjay <br /> Kumar Pathak SC <br /> (L&B/GNCTD/UOI//LAC), Mr. <br /> Sameer Vashisht SC(C), Mr. Amit <br /> Gupta, M. Dheeraj Kumar Singh, Adv, <br /> Mr. Saurabh Malhotra, Mr. A. N. <br /> Saini, Mrs K. Kaomudi Kiran, Mr. <br /> Sunil Kumar Jha, Mr. M. S. Akhtar, <br /> Ms. Joohu Kumari Advocates with <br /> Mr. S. S. Parihar, DM (CN), Mr. <br /> Mukesh Meena CE (PWD), Mr. <br /> Prashant, Addl Secretary, GNCTD, <br /> Mr. Rajiv Ranjan, ADM/LAC (CN), <br /> Mr. Harpinder Singh, EE (PWD) and <br /> Mr. Manoj Kumar Patwari CN district <br /> for R-1,2 and 3 (M: 9899387799). <br /> Mr. Shashi Pratap Singh and Ms. <br /> Shagun Sabharwal, Advocates for <br /> DDA (M: 7340989053). <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 1 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <b>CORAM:</b> <br /> <b>JUSTICE PRATHIBA M. SINGH</b> <br /> <b>JUSTICE MADHU JAIN </b><br /> <b> </b><br /> <b>JUDGMENT </b><br /> <b> </b><br /> <b>Prathiba M. Singh, J. </b><br /> <b> </b><br /> 1. This hearing has been done through hybrid mode. <br /> 2. The present petition has been filed by the Petitioner -Mrs. Saroj <br /> (Widow of Mr. Khemchand), seeking the following prayers: <br /> <i>“a. Issue a writ of Certiorari, or any other appropriate </i><br /> <i>writ, order or direction, quashing and setting aside the </i><br /> <i>Public Notice dated 21.01.2026 issued by Respondent </i><br /> <i>No. 2, being wholly illegal, without jurisdiction, </i><br /> <i>arbitrary, and unenforceable in law; and </i><br /> <i> </i><br /> <i>b. Issue a writ of mandamus thereby directing the </i><br /> <i>Respondents to provide the documents based on which </i><br /> <i>the Petitioners/occupiers are being dispossessed from </i><br /> <i>the land of which they are in peaceful, settled and </i><br /> <i>undisturbed possession from past 5 Decades; and </i><br /> <i> </i><br /> <i>c. Issue a writ of Mandamus, or any other appropriate </i><br /> <i>writ, order or direction, declaring that the alleged </i><br /> <i>acquisition proceedings in respect of land bearing </i><br /> <i>Khasra Nos. 12 min and 13 min, Village Haiderpur, </i><br /> <i>Shalimar Bagh, Delhi, pursuant to Award No. 40/1980-</i><br /> <i>81 and Award No. 50/1980-81, stand lapsed by </i><br /> <i>operation of Section 24(2) of the Right to Fair </i><br /> <i>Compensation and Transparency in Land Acquisition, </i><br /> <i>Rehabilitation and Resettlement Act, 2013; and </i><br /> <i> </i><br /> <i>d. Issue a writ of Mandamus directing that in the event </i><br /> <i>the Respondents seek to acquire the subject land for any </i><br /> <i>public purpose, the same shall be done only by initiating </i><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 2 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <i>fresh acquisition proceedings strictly in accordance </i><br /> <i>with the provisions of the Right to Fair Compensation </i><br /> <i>and Transparency in Land Acquisition, Rehabilitation </i><br /> <i>and Resettlement Act, 2013, after following due process </i><br /> <i>of </i> <i>law </i> <i>and </i> <i>upon </i> <i>payment </i> <i>of </i> <i>compensation, </i><br /> <i>rehabilitation, </i> <i>and </i> <i>resettlement </i> <i>as </i> <i>mandated </i><br /> <i>thereunder, and not on the basis of the lapsed and </i><br /> <i>extinguished acquisition proceedings. </i><br /> <i> </i><br /> <i>e. Issue a writ of Mandamus directing the Respondents, </i><br /> <i>their officers, agents, and any person acting on their </i><br /> <i>behalf, to forthwith refrain from taking any coercive </i><br /> <i>action, including but not limited to eviction, demolition, </i><br /> <i>dispossession, sealing, or interference with possession, </i><br /> <i>of the Petitioners in respect of the subject land and the </i><br /> <i>structures standing thereon; and </i><br /> <i> </i><br /> <i>f. Issue a writ of Mandamus restraining the Respondents </i><br /> <i>from acting upon, enforcing, or giving effect to the </i><br /> <i>impugned Public Notice dated 21.01.2026, or from </i><br /> <i>asserting any right, title, or interest over the subject </i><br /> <i>land on the basis of the lapsed acquisition proceedings; </i><br /> <i>and </i><br /> <i> </i><br /> <i>g. Pass an interim order directing the Respondents to </i><br /> <i>maintain status quo with respect to possession, nature, </i><br /> <i>and title of the subject land during the pendency of the </i><br /> <i>present writ petition; and </i><br /> <i> </i><br /> <i>h. Pass and order directing the Respondents to maintain </i><br /> <i>status quo regarding possession, change of land use and </i><br /> <i>creation of third party rights till fresh acquisition </i><br /> <i>proceedings under the RFCTLARR Act of 2013; and </i><br /> <i> </i><br /> <i>i. Award costs of the present petition in favour of the </i><br /> <i>Petitioners; and </i><br /> <i> </i><br /> <i>j. Pass such other and further order(s) or direction(s) as </i><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 3 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <i>this Hon’ble Court may deem fit and proper in the facts </i><br /> <i>and circumstances of the present case, in the interest of </i><br /> <i>justice.” </i><br /> <br /> <b><i>Factual Background </i></b><br /> 3. The brief background of the present case is that, the Petitioner claims <br /> to be the Special Power of Attorney holder of 98 occupants/owners/ <br /> possessors <i>(hereinafter, ‘occupants’)</i> of land in <i>Khasra</i> No. 12(min) and <br /> 13(min) of Village Haiderpur, Shalimar Bagh, Delhi <i>(hereinafter, ‘the subject </i><br /> <i>land’)</i> . The list of occupants who have made the Petitioner their special power <br /> of attorney is annexed with the present petition as <b><i>Annexure P-2</i></b> . <br /> 4. The Petitioner herself is stated to be in possession of a built-up <br /> residential property, measuring approximately 150 square yards, comprising <br /> a three-storey structure on the subject land. It is stated that the said property <br /> has been divided amongst her three sons, who are living along with their <br /> respective families at the said property. <br /> 5. The case of the Petitioner is that she has been residing with her sons <br /> and their families and has been in continuous possession of the property on <br /> the subject land, since 1962, following her marriage into the family. She <br /> further states that she has been regularly paying the property tax, and that her <br /> late husband’s name is duly recorded in the <i>Khasra Girdawari/Fard</i> for the <br /> year 1973–1974. <br /> 6. Notifications under Section 4 of the Land Acquisition Act, 1894 <br /> <i>(hereinafter, 'Act, 1894')</i> being <i>F15(III)/59-LSG</i> dated 13 November, 1959 <br /> and <i>F.15(245)/60-LSG/L&H </i> dated 24th October, 1961, were issued for <br /> acquisition of the subject land, for the public purpose of <i>'Planned </i><br /> <i>Development of Delhi'</i> . This was followed by two declarations under Section <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 4 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> 6 of the Act, 1894, being <i>No. F.4(5)/63-L&H(i)</i> and <i>No. F.4(5)/63-L&H(ii)</i> , <br /> dated 6th December, 1996. <br /> 7. With a considerable gap, sometime in 1980-1981, the awards being <br /> <b><i>Award No. 40/1980-1981</i></b> dated 14th July, 1980 and <b><i>Award No. 50/1980-1981</i></b> <br /> dated 18th July, 1980 <i>(hereinafter, the awards’)</i> were passed under Section <br /> 11 of the Act for acquisition of the subject land. <br /> 8. The acquisition was for Delhi Development Authority <i>(hereinafter, </i><br /> <i>‘DDA’)</i> , and the compensation amount is stated to have been deposited by the <br /> DDA. <br /> 9. According to the Petitioner, the occupants of the subject land have been <br /> in physical possession of the properties on the subject land and have obtained <br /> electricity, water connections, voter identity cards, ration cards and have also <br /> paid house tax, establishing continuous possession of the said properties on <br /> the subject land. <br /> 10. Further, it is also stated by the Petitioner that, post the acquisition, the <br /> physical possession of the subject land was never taken or handed over to the <br /> DDA. The stand of the residents is that several attempts have been made by <br /> them to seek reversion of the land to the occupants. In this context, reference <br /> is made by the Petitioner to the <i>‘Minutes of Meeting’ </i> dated 19th April, 2010, <br /> wherein a delegation from the Shalimar Bagh <i>gaon </i> had met the then Hon’ble <br /> Lieutenant Governor, wherein it was agreed as under: <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 5 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 6 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> 11. In terms of the above, a decision was taken by the Hon’ble LG that the <br /> widening of the road in the Shalimar Bagh area was to be done in a manner <br /> that would not affect the occupants of the subject land. For this purpose the <br /> road widening was to be re-aligned or shifted. An assurance was also given <br /> that the properties of the occupants would not be demolished. On the strength <br /> of the above assurance, it is the case of the Petitioner that the re-alignment of <br /> the road was to be done by the authorities, and until then the Petitioners were <br /> not to be disturbed. <br /> 12. The further case of the Petitioner is that the demarcation of the subject <br /> land was conducted without the actual occupants being taken into confidence, <br /> and in the absence of any further re-alignment plan, no houses were to be <br /> demolished. <br /> st<br /> 13. Surprisingly, on 21 January, 2026 the impugned public notice was <br /> issued by the Land Acquisition Collector/ADM, District Central North, Delhi <br /> and was received by the occupants, stating that Road No. 320, Shalimar Bagh, <br /> Village Haiderpur, Delhi <i>(hereinafter, ‘Road No. 320’)</i> is proposed to be <br /> widened to 30 meters and objections were invited. <br /> 14. Aggrieved by the impugned public notice and the awards, the present <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 7 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> petition has been filed by the occupants through the Petitioner. <br /> th<br /> 15. On 9 February, 2026, the Court had considered the matter, and after <br /> some hearing, the following directions were issued: <br /> <i>“[...] </i><br /> <i>18. </i> <i>The Court has heard the ld. Counsels for the </i><br /> <i>parties and perused the records. There are serious issues </i><br /> <i>of maintainability in the present case, as the present </i><br /> <i>petition is filed in a representative capacity by one lady </i><br /> <i>i.e., Mrs. Saroj, who claims to be holding Special Power </i><br /> <i>of Attorney for 98 occupants of residential buildings and </i><br /> <i>commercial establishments in the Shalimar Bagh area. </i><br /> <i>The manner in which the present petition has been filed </i><br /> <i>is to be examined by this Court. </i><br /> <i>19. </i> <i>A perusal of the communications reveals that </i><br /> <i>some amount of compensation has been disbursed and </i><br /> <i>details of the same ought to be placed by the LAC. </i><br /> <i>20. </i> <i>According to ld. Counsel for the LAC, </i><br /> <i>references under Section 18 of the Act, 1894 have also </i><br /> <i>been made. However, the exact status of the said </i><br /> <i>references is not known. </i><br /> <i>21. </i> <i>At this stage, the concerned ADM, who is </i><br /> <i>present in Court, before whom the hearings are being </i><br /> <i>held, submits that the occupants are not cooperating, </i><br /> <i>despite the notices having been issued. It is submitted </i><br /> <i>that they refuse to submit the requisite documents, on the </i><br /> <i>ground that the documents are with their Counsel. </i><br /> <i>22. </i> <i>In this background, the Court has to examine: </i><br /> <i>(i) The status of the Petitioner and the 98 occupants and </i><br /> <i>determine the maintainability of the present writ petition; </i><br /> <i>(ii) The exact amount of compensation disbursed and the </i><br /> <i>persons who received the said compensation. </i><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 8 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <i>23. </i> <i>Under these circumstances, the Court is </i><br /> <i>inclined to pass the following directions: </i><br /> <b><i>(A) </i></b> <b><i>Affidavit to be filed by the Petitioner and </i></b><br /> <b><i>persons claiming rights over the land </i></b><br /> <i>(i) </i> <i>The Petitioner along with the 98 occupants who </i><br /> <i>are being represented, shall comply with the necessary </i><br /> <i>procedural formalities of this Court, by depositing the </i><br /> <i>requisite Court fees. </i><br /> <i>(ii) </i> <i>The said occupants shall also file affidavits in </i><br /> <i>support of the petition stating their respective lineage, if </i><br /> <i>any, and also how they claim rights in the properties in </i><br /> <i>question. </i><br /> <i>(iii) Let the said affidavits be filed by all the Petitioner </i><br /> <i>and the occupants along with the requisite Court fee, by </i><br /> <i>28th February, 2026. </i><br /> <b><i>(B) </i></b> <b><i>Hearing before the concerned ADM </i></b><br /> <i>st</i><br /> <i>(i) </i> <i>In respect of the impugned notice dated 21</i> <i> </i><br /> <i>January 2026 or related notices, the Petitioner and the </i><br /> <i>98 occupants shall appear before the concerned ADM. </i><br /> <i>(ii) </i> <i>The concerned ADM shall grant hearings to the </i><br /> <i>Petitioner and the 98 occupants. The hearings shall be </i><br /> <i>carried out commencing from 10th February, 2026 </i><br /> <i>onwards. </i><br /> <i>(iii) </i> <i>The Petitioner and the 98 occupants shall place </i><br /> <i>before the concerned ADM the requisite documents </i><br /> <i>showing how they are claiming their rights over the </i><br /> <i>properties. </i><br /> <i>(iv) </i> <i>After perusing the concerned documents and </i><br /> <i>hearing the Petitioner and 98 occupants, the concerned </i><br /> <i>ADM shall place a report before the Court, by the next </i><br /> <i>date of hearing. </i><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 9 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <b><i>(C) Relevant documents to be furnished by LAC </i></b><br /> <i>Let the copy of the notification under Section 4 and </i><br /> <i>Section 6 of the Act, 1894 as also the Awards be placed </i><br /> <i>before the Court, by Mr. Sanjay Kumar Pathak, ld. SC by </i><br /> <i>th</i><br /> <i>28</i> <i> February 2026. Let the copy of the same be </i><br /> <i>furnished to the ld. Counsel for the Petitioner als</i> o.” <br /> 16. In the above order, the Court noted that there were serious disputes as <br /> to the title of the Petitioner and others whom she was representing. Further, <br /> even compensation was disbursed to some of the owners, post the acquisition. <br /> Some persons had also filed claims which references were pending. The ADM <br /> who was hearing objections had submitted that the occupants were not <br /> cooperating despite notices having been issued. Under such circumstances the <br /> Court had directed the Petitioner and the 98 occupants to file affidavits <br /> establishing their rights. Further the ADM was directed to grant a hearing after <br /> the occupants have filed their documents as to how they claim rights. The <br /> ADM was to then file a report before this Court. The LAC was to place on <br /> record the Section 4 and Section 6 notifications. <br /> 17. Pursuant thereto, the matter was listed for hearing on 25th March, 2026. <br /> On the said date, certain documents were handed over on behalf of the Land <br /> Acquisition Collector, in which the report/notice dated 16th March, 2026 <br /> issued by the ADM was also considered. The said report revealed that there <br /> were a total of 157 occupants of the subject land. One of the contentions raised <br /> by the Petitioner was that some part of the widening of Road No. 320 is to <br /> take place in <i> Khasra </i> No.11(min) of Village Haiderpur, Shalimar Bagh, Delhi, <br /> which has not been acquired till date. The Court had also perused the maps <br /> and photographs of Village Haiderpur, Shalimar Bagh, Delhi which were <br /> handed over by ld. Counsels for the parties. After hearing the parties, the <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 10 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> Court had directed as under: <br /> <i>“[...] </i><br /> <i>9. </i> <i>Let the ADM conduct a specific survey for </i><br /> <i>widening of the road in the Shalimar Bagh Area. </i><br /> <i>10. </i> <i>The ADM shall also furnish a list of the </i><br /> <i>occupants whose premises are to be demolished for the </i><br /> <i>purpose of road widening. The said list shall include the </i><br /> <i>corresponding property numbers, along with the names </i><br /> <i>of the occupants of the respective properties. The same </i><br /> <i>shall be placed before the Court by the next date of </i><br /> <i>hearing. </i><br /> <i>11. </i> <i>The Petitioners shall cooperate with the ADM </i><br /> <i>as also any other officials who may be accompanying </i><br /> <i>the ADM. </i><br /> <i>th</i><br /> <i>12. </i> <i>List on 6</i> <i> April, 2026 in </i> <b><i>supplementary list</i></b> <i>. </i><br /> <i>13. </i> <i>In the meantime, no coercive measures shall be </i><br /> <i>taken without the permission of this Court.” </i><br /> 18. In terms of the above order, the ADM was directed to conduct a specific <br /> survey in respect of the widening of the road. Further the ADM was directed <br /> to file a list of occupants who would be affected by the road widening along <br /> with the proper numbers etc., <br /> 19. Thereafter, the matter has been taken up for hearing today. On behalf <br /> of the Petitioner, Mr. K.C. Mittal, Mr. Vinod Dahiya, ld. Counsels and Ms. <br /> Priya Darshini, a resident of the subject land, have been heard. They have <br /> been duly instructed by Mr. Anil Kumar, Secretary of the Shalimar Bagh <br /> Resident Welfare Association. <br /> 20. On behalf of the Respondents, Mr. Chetan Sharma, ld. ASG, Mr. <br /> Sanjay Kumar Pathak, ld. Counsel for the Land Acquisition Collector, Mr. <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 11 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> Sameer Vashisht, ld. Counsel for GNCTD and Mr. Shashi Pratap Singh, ld. <br /> Counsel for the DDA have been heard. They were assisted by the <br /> representative Counsels and officials from the respective Departments. <br /> 21. The following documents have been handed over by the parties: <br /> (i) General Development Plan of Shalimar Bagh, Block C&D, Layout <br /> Plan dated 16th June, 1987 <i>(hereinafter, the ‘layout plan of 1987’); </i><br /> (ii) Schematic Plan of Road No. 320 and the surrounding area <br /> <i>(hereinafter, ‘the schematic plan’)</i> ; <br /> (iii) <i>Akasa</i> <i>Shajra</i> of Shalimar Bagh Village; <br /> (iv) Integrated Transit Corridor Development & Street <br /> Network/Connectivity Layout plan dated 23rd January, 2017; <br /> (v) Relevant pages from the Field Book Village record; <br /> (vi) Relevant provisions of Master Plan for Delhi, 2021 distinguishing <br /> between <i>arterial roads, collector roads, local streets</i> . <br /> 22. Further, a video concerning the subject land in Shalimar Bagh village <br /> has been placed on record in a pendrive by the ld. Counsels for the <br /> Respondents. The documents and the video in the pendrive, having been <br /> produced before the court, are taken on record. <br /> <b><i>Submissions on behalf of the parties</i></b> <br /> 23. Mr. K.C. Mittal, ld. Counsel for the Petitioner has made the following <br /> submissions: <br /> (i) Reliance is placed upon the reply filed by the Petitioner to the status <br /> report filed by the DDA to argue that the Shalimar Bagh village is <br /> part of the colonies which have been agreed for regularization under <br /> the Master Plan of Delhi, 2021. It is submitted that the <br /> regularization of the Shalimar Bagh village having been done, and <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 12 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> the map having been notified, it would not be permissible for the <br /> Respondents to dispossess the Petitioner/occupants. <br /> (ii) As per the reply of the Petitioner to the status report filed by the <br /> DDA, the Ministry of Urban Development <i>vide</i> letter dated 5th <br /> October, 2007 had issued the Revised guidelines for Regularisation <br /> of Unauthorised Colonies of Delhi <i>(hereinafter, ‘2007 guidelines’)</i> . <br /> Pursuant to the said regularisation and the fact that it is stated that <br /> the Shalimar Bagh village is covered under the 2007 guidelines, it <br /> is stated that the provisional certificates for regularization were also <br /> issued to the occupants. Thus, it is submitted that the <br /> Petitioner/occupants enjoy the protection of the 2007 guidelines. <br /> (iii) Further, reliance is also placed upon the ‘ <i>Layout plan of Shalimar </i><br /> <i>Village at property bearing Khasra No.-11,12,13, Shalimar </i><br /> <i>Village, Delhi-88’ </i> which has been annexed as Annexure-E to the <br /> reply filed by the Petitioner to the status report filed by the DDA, <br /> to contend that Road No. 320 is shown as a 10 meter road. <br /> (iv) In addition, reliance is also placed upon the status report of DDA, <br /> as per which, the DDA has accepted that an assurance was given by <br /> the Hon’ble Lieutenant Governor. <br /> (v) It is also submitted that the Master Plan for Delhi, 2021 in fact, <br /> creates a distinction between three categories of roads <i>i.e.,</i> <i>arterial </i><br /> <i>roads</i> , <i>collector roads</i> and <i>local streets</i> . It is only the <i>arterial roads </i><br /> which have to be beyond 30 meters wide. The <i>right of way</i> for <br /> <i>collector roads</i> would be between 12 to 30 meters. The right of way <br /> for local streets is between 9-12 meters. According to the <i>Schematic </i><br /> <i>Plan </i> which has been placed on record, the width of Road No.320 <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 13 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> is 19.50 meters. However, it is submitted that the Road No. 320 <br /> being a <i>collector road</i> , the right of way has to be between 12 to 30 <br /> meters and need not be 30 meters. Thus, the impugned public notice <br /> deserves to be quashed. <br /> (vi) Furthermore, it is also submitted that the Master Plan for Delhi, <br /> 2021 and the zonal plan are different plans. The Respondents do not <br /> have any basis for widening the Road No. 320 and that too when <br /> there are so many families which are likely to be affected in the <br /> process. <br /> (vii) Reliance is also placed upon the decision of the ld. Division Bench <br /> of this Court in <b><i>Banwari Lal Sharma v. Union of India and Ors.</i></b> <b> </b><br /> <b>2013 SCC OnLine Del 2179</b> , wherein the Division Bench of this <br /> Court has granted protection to residents of unauthorised colonies <br /> under National Capital Territory of Delhi (Special Provisions) Act, <br /> 2007, even though there was an encroachment on public land. <br /> 24. On behalf of the Respondents, Mr. Chetan Sharma ld. ASG along with <br /> Mr. Pathak has made submissions on the following aspects: <br /> (i) Reliance is placed upon the status report filed by the ADM-cum-<br /> LAC, which was filed in compliance to the orders dated 9th <br /> February, 2026 and 25th March, 2026. As per the said report, the <br /> entire subject land is acquired land. <br /> (ii) Further, it is also submitted that the challenge to the acquisition of <br /> the subject land has already been dismissed by this Court <i>vide </i><br /> judgement dated 25th February, 1997 in <b><i>Writ Petition (C) 730/1980 </i></b><br /> titled <b><i> ‘M/s Prem Chand Ramesh Chand v. Delhi Development </i></b><br /> <b><i>Authority and Another</i></b> and connected matters. The relevant portion <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 14 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> of the judgement dated 25th February, 1997 is set out below: <br /> <i>“[...] </i><br /> <i>Apart from above, the petitioner is not entitled to any </i><br /> <i>discretionary and equitable relief for the reasons which </i><br /> <i>we would presently notice. The petitioner has not filed </i><br /> <i>any document of title on record except only a copy of </i><br /> <i>Khasra girdhawari for 1979-80. It cannot and has not </i><br /> <i>been urged to be a document of title. This khasra </i><br /> <i>girdhawari only shows that there are some godowns on </i><br /> <i>the land in question. The petitioner is not the recorded </i><br /> <i>owner. The recorded owner of the land are different </i><br /> <i>persons. The petitioner has not even disclosed in the writ </i><br /> <i>petition as to when the structures / godowns were </i><br /> <i>constructed. It has also not been disclosed in the writ </i><br /> <i>petition that in respect of land in question Section 4 and </i><br /> <i>Section 6 notifications had been issued. </i> <b><i>It could not be </i></b><br /> <b><i>disputed that the alleged constructions were made after </i></b><br /> <b><i>issue of the said notifications. The petitioner has also </i></b><br /> <b><i>not disclosed as to whether the recorded owners filed </i></b><br /> <b><i>or not objections under Section 5-A of the Land </i></b><br /> <b><i>Acquisition Act</i></b> <i>. These material facts were suppressed </i><br /> <i>and not disclosed with a view to secure interim </i><br /> <i>protection from this court. The demolition and </i><br /> <i>dispossession could not take place because of the </i><br /> <i>interim orders and, therefore, it does not now lie in the </i><br /> <i>mouth of the petitioner to contend that the acquisition is </i><br /> <i>not complete since possession has not been taken. We </i><br /> <i>feel that the writ petitions deserve dismissal on the short </i><br /> <i>ground of suppression of material facts. </i><br /> <i> </i><br /> <b><i>For the reasons aforesaid, all the writ petitions are </i></b><br /> <b><i>dismissed with costs. Counsel fee quantified at </i></b><br /> <b><i>Rs.5,000/- in each case.</i></b> <i>” </i><br /> <br /> The aforesaid judgement was assailed by the occupants before the <br /> Supreme Court by <b><i>SLP Civil No. 022806-022818/1997</i></b> , which is <br /> th<br /> stated to be dismissed on 7 January, 2000. Thus, it is submitted <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 15 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> that the acquisition of the subject land being upheld, the occupants <br /> do not have a right to challenge the same. The only right that they <br /> would have is one of compensation and nothing more. <br /> (iii) Further, it is pointed out that in terms of the Master Plan for Delhi, <br /> 2021, there is an encroachment of approximately 24 meters on Road <br /> No. 320. It is stated that the subject land, being a government land, <br /> has been encroached upon with 5 to 6 storey buildings raised over <br /> it, without any authorization whatsoever. <br /> (iv) It is also highlighted by means of a video, that the proposed road <br /> widening is necessary to create a proper right of way for <br /> ambulances, school buses and other critical vehicular traffic. It is <br /> contended that during peak hours, the area experiences severe <br /> traffic congestion, leaving no space for smooth vehicular <br /> movement. It is also stated that such unauthorized constructions are <br /> significantly hampering connectivity, including access to key <br /> infrastructure projects and public utility services in Delhi. <br /> (v) Additionally, it is also submitted that the total number of properties <br /> which would be affected by the widening of the Road No. 320 is <br /> approximately 143, and most of them do not have any valid legal <br /> title to the subject land. <br /> (vi) Finally, it is urged that in respect of the protection under National <br /> Capital Territory of Delhi (Special Provisions) Act, 2007, the same <br /> would not be available to the Petitioner/occupants in terms of the <br /> judgment of this Court in <b><i>Delhi Development Authority v. Ram </i></b><br /> <b><i>Rati (Now Deceased) Through Lr’s and Others, </i></b> <b>2018 SCC </b><br /> <b>OnLine Del 11390</b> . <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 16 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> 25. On behalf of the DDA, the submissions of Mr. Shashi Pratap Singh, ld. <br /> Counsel, are as follows: <br /> (i) There are different levels of plans that are created by the DDA for <br /> the purpose of planned development of the city of Delhi. The <br /> Master Plan for Delhi, 2021 is a notional plan and does not go into <br /> details of each colony. At the second level is the zonal development <br /> plan and then comes the layout plan which is also known as the <br /> general development plan. <br /> (iii) In the present case, insofar as Shalimar Bagh Village is concerned, <br /> the layout plan of 1987, which was prepared by the DDA and has <br /> th<br /> been approved way back on 16 June, 1987, shows that Road No. <br /> 320 is to be a 30 meter road. <br /> (iv) It is further submitted that the layout plan of 1987 itself records that <br /> there are various unauthorised structures which have been built on <br /> the road no. 320. <br /> (v) It is also submitted that after the layout plan is approved, on the <br /> basis of the said layout plan, the Unified Traffic & Transportation <br /> Infrastructure (PLG.& ENGG.) <i>(hereinafter, ‘UTTIPEC’)</i> approves <br /> the road widening. It is stated that in the present case, the approval <br /> happened in 2016. In this context, reliance is placed upon the <br /> nd<br /> ‘Minutes of the 52 UTTIPEC Governing body meeting’ held on <br /> 13th January, 2016 which shows that the <i>‘Corridor from RUB </i><br /> <i>Shalimar Bagh to outer Ring Road’</i> was approved and the same is <br /> in terms of the zonal development plan. <br /> 26. At this stage, Mr. Vinod Dahiya, ld. Counsel for the Petitioner submits <br /> that a substantial portion of widening of Road No. 320, in fact, falls in <i>Khasra </i><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 17 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> No. 11(min) of Village Haiderpur, Shalimar Bagh, Delhi. He contends that <br /> this land does not form a part of the acquired land, and, therefore, the road <br /> widening is completely contrary to law. <br /> 27. Insofar as the argument raised by Mr. Vinod Dahiya, ld. Counsel is <br /> concerned, Mr. Manoj Kumar, the <i>patwari</i> is present in Court. The <i>akasa </i><br /> <i>shajra </i> of the Shalimar Bagh Village from the revenue record has been placed <br /> on record. The same is in Urdu and has been interpreted by the <i>patwari.</i> The <br /> relevant extract of the same is extracted below: <br /> <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 18 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <br /> 28. The <i>patwari</i> has been <i> </i> asked to explain as to what the highlighted <br /> portion means. He has categorically and unequivocally informed the Court <br /> that the original <i>akasa shajra </i> in his records, reflects that the highlighted <br /> portion of the land as an extension of <i>Khasra</i> No. 12. The same is also <br /> reflected in the copy of the field book records which have been placed before <br /> the Court. The relevant portion of the field book record is set out below: <br /> <br /> <br /> <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 19 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 20 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <b><i>Analysis and directions </i></b><br /> 29. The Court has heard ld. Counsels for the parties and has perused the <br /> records. <br /> 30. There is no doubt that when there is unregulated growth of population <br /> within cities, there is constant friction that exists between the interest of the <br /> residents and occupants of an area and the infrastructure which is <br /> correspondingly to be created. The subject land, in respect of which the <br /> present petition has been filed, is part of land which the Respondents are <br /> intending to use for the purpose of widening of the Road No. 320. <br /> 31. The Court has perused four different maps as also the video which has <br /> been placed on record in order to assess the requirement of the Respondents. <br /> There is no doubt that the carriage ways on one side is wide and on the other <br /> side where there is unauthorised encroachment, is quite narrow. In this regard, <br /> the relevant portion of the schematic plan, depicting the current situation is <br /> set out below: <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 21 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <br /> 32. A perusal of the schematic plan shows that a railway line and land run <br /> contiguous to Road No. 320 which is depicted in black colour and is shown <br /> as 19.5 meters wide. On the side where the Shalimar Bagh village lies, the <br /> encroachment by the occupants is shown to be 10.5 meters and is depicted in <br /> red. <br /> 33. Further, the video of the Shalimar Bagh village which has been placed <br /> on record would also show that there is a wide carriageway and footpath on <br /> one side. However, on the side where the occupants are living and where the <br /> road is sought to be expanded, the road has only one lane for vehicular traffic <br /> and the other lane is occupied by parked cars. There is also no footpath. <br /> Ambulances, school buses and traffic has to flow through this road to reach <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 22 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> the two underpasses as also GT Karnal road. In this regard, the relevant <br /> extracts from the video are set out below: <br /> <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 23 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> <br /> The above video and images are taken on a non-working day but the Court is <br /> informed that on working days, the vehicular traffic creates a traffic jam and <br /> it takes substantial time for traffic to pass through this small patch of road due <br /> to encroachments on the left side by shops, residents, parked vehicles, etc., <br /> 34. The Court has heard the matter in great detail on three different <br /> occasions. The Court is also conscious of the fact that there are several <br /> families which may be living in the patch of the subject land, which is to be <br /> used for the road widening purpose, for many years. However, in so far as the <br /> nature of the subject land is concerned, it is clear that the same is a public <br /> land. <br /> 35. The subject land was acquired way back in the 1960s, and the <br /> acquisition of the subject land has also been upheld by the Supreme Court. It <br /> is possible that the Respondents are proceeding in a phased manner, <br /> undertaking development as and when required, and that appears to be the <br /> position in the present case as well. <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 24 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> 36. The occupants in the Shalimar Bagh village may have tried to acquire <br /> some title in the patch of subject land, and they may be using it for various <br /> purposes including residential, commercial, building guest houses, <i>etc.</i> <br /> However, the Court is informed that in the near vicinity of the subject land, <br /> there is a private hospital <i>i.e.,</i> MAX hospital, government hospital, <br /> institutional area where the Delhi Police has an integrated complex operation <br /> and a proposed educational institution which is 30 meters away from the <br /> subject land. The same is also visible in the schematic plan extracted above. <br /> 37. Moreover, a perusal of the video as also the maps would show that in <br /> the particular stretch, the road follows a zigzag course due to encroachments <br /> and the unavailability of land for expansion. The said road also leads to two <br /> underpasses in the Shalimar Bagh area, and connects to the Outer Ring Road, <br /> and further links traffic to the GT Karnal road bypass. <br /> 38. The Court is convinced that the widening of Road No. 320 is an <br /> important infrastructural development that cannot be delayed and ought to be <br /> permitted in an expeditious manner, so as to ensure that Road No. 320 <br /> becomes adequately accessible for critical emergency vehicles, such as <br /> ambulances, fire services as also vehicular traffic including school buses etc., <br /> which may need to access or pass through the area. <br /> 39. The Shalimar Bagh area is a highly populated area, however, while <br /> striking a balance between the needs of occupants and infrastructural <br /> development, it must be borne in mind that the land in question is a public <br /> land, and the encroachment by the occupants is completely illegal and <br /> contrary to law. <br /> 40. Further the argument that the subject patch of land is in Khasra no.11 <br /> is completely belied, as the Patwari who was present in Court, has presented <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 25 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> the two documents viz., the <i>akasa shajra</i> and the Field book which shows that <br /> the patch of land falls in <i>Khasra </i> no.12 The urdu symbol ‘ ’ <br /> <br /> ب<br /> is supposed to be read as ‘ <i>Ba’</i> , which is pronounced as <i>‘be:’</i> . The same is to <br /> be interpreted in terms of the <i>akasa shajra</i> and the field book records <br /> produced by the Patwari as an ‘ <i>Extension of Khasra No.12</i> ’. <br /> 41. Considering the needs of the occupants, the ADM, <i>vide</i> the impugned <br /> public notice had rightly invited objections from the occupants of the <br /> unauthorised structures encroaching the subject land. The said objections <br /> were to be furnished by the occupants within 15 days. The same is recorded <br /> in the impugned public notice which is set out below: <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 26 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 27 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> <br /> 42. Initially, when the writ petition was filed, most of the occupants neither <br /> filed their objections nor did they appear before the ADM/LAC. However, <br /> upon orders being passed by this Court, the occupants appeared with their <br /> requisite documents and a detailed status report has since been filed, in respect <br /> of the hearings conducted by the ADM. <br /> 43. A perusal of the detailed chart, annexed to the status report of the LAC, <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 28 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> recording the hearing of 157 cases by the ADM <i>(hereinafter, ‘the chart’)</i> , <br /> reveals that most of the documents relied upon by the occupants, pertain only <br /> to post 1990s, and in some cases they belong to the 1980s. However, there are <br /> no documents prior to the initiation of the acquisition proceedings of the <br /> subject land, when notifications under Section 4 of the Act, 1894 were issued <br /> th th<br /> on 13 November 1959 and 24 October 1961. <br /> 44. Further, the chart would also reveal that most of the occupants claim <br /> rights only through GPAs, which may not even be registered. In most cases, <br /> there are no sale deeds and the title in respect of all the occupants seems to be <br /> unestablished. It is under these circumstances that the Court has to consider <br /> whether the widening of Road No. 320 can be held back or not. <br /> 45. In the opinion of this Court, the expansion of infrastructural projects, <br /> especially those concerning access to essential services, such as medical care, <br /> education, and fire safety, ought not to be delayed any further, as such delay <br /> would be detrimental to the larger interests of the residents of Shalimar Bagh. <br /> In these circumstances, the interest of private occupants who are encroaching <br /> upon public land must yield to the broader public interest, including the needs <br /> of the residents and the smooth flow of vehicular traffic in the said area. <br /> 46. Under such circumstances, this Court is of the view that the widening <br /> of Road No. 320 cannot be delayed any further. The residents have to ensure <br /> that the same is also not hampered or obstructed in any manner. The Court <br /> has repeatedly queried the Respondents to justify as to why the road had to be <br /> 30 metres wide. <br /> 47. A perusal of the status report of the DDA would show that, pursuant to <br /> the initial meeting dated 19th April, 2010, which was held between a <br /> delegation from Shalimar Bagh area and the Hon’ble Lieutenant Governor, <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 29 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> and which is relied upon by the occupants of the area, a meeting dated 19th <br /> November, 2012 was held by the Vice Chairman, DDA to deal with the issue <br /> of re-examination of alignment of the road. However, no fresh proposals were <br /> submitted for re-alignment. Thus, the re-alignment in the said manner was not <br /> approved. <br /> 48. Subsequent to the said meeting, the construction of the complete 30 <br /> meters wide road was considered necessary in the larger public interest and <br /> for the overall development of Delhi, particularly as it connects GT Karnal <br /> Road with the Outer Ring Road, through this area. The further reasons for the <br /> expansion of Road No.320 is set out in the Status report filed on behalf of the <br /> Delhi Development Authority. It is stated that Road No. 320 is essential for <br /> the accessibility to various infrastructural projects and proposed utility <br /> centres, which include the following: <br /></div><table><thead><tr><th>Infrastructural Project/Utility</th><th>Distance</th></tr></thead><tbody><tr><td>Existing Govt Girls Sr. Sec. School</td><td>117 meters</td></tr><tr><td>Existing MCD Community Centre towards RUB</td><td>160 meters</td></tr><tr><td>Existing Max Super Speciality Hospital</td><td>300 meters</td></tr><tr><td>Existing Delhi Police Integrated Complex<br>Operations and Communication</td><td>384 meters</td></tr><tr><td>Existing Fortis Hospital</td><td>1.5 Km</td></tr><tr><td>Existing MCD Maternity Child Welfare Centre<br>and Ayurvedic Hospital</td><td>730 meters</td></tr><tr><td>Existing RUB towards Azadpur Mandi</td><td>168 meters</td></tr><tr><td>Existing Passport Sewa Kendra</td><td>1.3 Km</td></tr><tr><td>Govt. Hospital under construction/renovation<br>(Outer Ring Road side)</td><td>181 meters</td></tr><tr><td>Underpass connecting Road No.320 to Outer<br>Ring Road</td><td>726 meters</td></tr></tbody></table><div><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 30 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /></div><table><thead><tr><th>Proposed Educational Institution adjacent to<br>Govt. Hospital (Outer Ring Road side)</th><th>30 meters</th></tr></thead><tbody><tr><td>Proposed Disaster Management Office/Institute<br>adjacent to Govt. Hospital (Outer Ring Road<br>side)</td><td>200 meters</td></tr></tbody></table><div><br /> <i> </i><br /> 49. Further, as per the records which have been produced before the Court, <br /> the conceptual plan of PWD project titled <i>‘Corridor from RUB Shalimar Bagh </i><br /> nd<br /> <i>to Outer Ring Road’</i> was approved in 2016 <i> vide </i> ‘52 Governing Body <br /> Meeting of UTTIPEC’ dated 13th January, 2016. <br /> 50. Additionally, it also needs to be considered that the subject land is near <br /> a railway line, which is crossing the subject land. There is no scope for <br /> expansion of the road on the side abutting the railway track. The mandatory <br /> safety conditions applicable for the railway line are to be maintained. Under <br /> such circumstances, the Court has no option but to allow the widening of Road <br /> No. 320 and make it a 30 meter road. <br /> 51. In the overall facts and circumstances, the following directions are <br /> issued: <br /> i) The concerned authorities shall proceed with the expansion of Road <br /> No. 320, in accordance with the approval of the UTTIPEC dated <br /> 13th January, 2016. <br /> ii) A reasonable time period shall be granted to the occupants to <br /> remove their belongings and vacate the unauthorised <br /> encroachments near the Road No. 320, so that they are not <br /> unnecessarily inconvenienced. For the said purpose, the concerned <br /> ADM shall interact with the occupants and fix an outer limit by <br /> which the occupants shall vacate the properties on the subject land <br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 31 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13<br /><br /> <br /> under their occupation and possession. In any event, this period <br /> th<br /> shall not be beyond 30 May, 2026. <br /> iii) The GNCTD shall take an appropriate decision regarding the grant <br /> of <i>ex gratia</i> compensation to be awarded to the occupants, in <br /> accordance with law, as prayed for by the Petitioner and other <br /> occupants, and the same shall be considered in a sympathetic <br /> manner. <br /> th<br /> iv) Upon the expiry of the aforesaid period <i>i.e.,</i> 30 May 2026, the <br /> Respondents are at liberty to proceed with the expansion of Road <br /> No. 320 and to remove all the encroachments/unauthorized <br /> constructions. <br /> v) Until the reasonable time to vacate expires in terms of (ii) above, <br /> the Petitioners shall not be displaced, subject to their cooperation <br /> with the authorities in terms of the present directions. <br /> 52. The present petition is disposed of in these terms. All pending <br /> applications, if any, are also disposed of. <br /> <br /> <b> PRATHIBA M. SINGH </b><br /> <b>JUDGE</b> <br /> <b> </b><br /> <b>MADHU JAIN </b><br /> <b> </b> <b> </b> <b> </b> <b> JUDGE</b> <br /> <b>APRIL 6, 2026/</b> <i>mr/sm </i><br /> Signature Not Verified<br /> <i>W.P.(C) 1784/2026 </i> <i> </i> <i>Page 32 of 32</i> <br /> <br /> Signed By:DHIRENDER<br /> KUMAR<br /> Signing Date:09.04.2026<br /> 20:57:13</div>