M/S SREE RAJESHWARI DAIRY vs THE STATE OF KARNATAKA
- Court
- Karnataka High Court
- 1 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
®
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
ST
DATED THIS THE 1 DAY OF JUNE, 2026
BEFORE
THE HON'BLE MR. JUSTICE SURAJ GOVINDARAJ
WRIT PETITION NO. 23487 OF 2024 (CS-RES)
C/W
WRIT PETITION NO. 22850 OF 2024 (GM-TEN)
IN WRIT PETITION NO.23487/2024
BETWEEN
M/S SHREE SSR ENTERPRISES
HOUSE NO. 1-1-5/1/2
BESIDE SATSANG VIHAR
NEAR PILLAR NO.216
RAJENDAR NAGAR X ROAD
HYDERABAD-500048
REPRESENTED BY ITS MANAGING PARTNER
YASHWANTH KUMAR POTU
... PETITIONER
(BY SRI. JAYAKUMAR S. PATIL., SR. ADVOCATE FOR
SRI. PRUTHVI WODEYAR., ADVOCATE)
AND
Digitally signed
by SHWETHA
RAGHAVENDRA
Location: HIGH
COURT OF
KARNATAKA
1. THE STATE OF KARNATAKA
DEPARTMENT OF CO-OPERATION
VIDHANA SOUDHA
BANGALORE-560001
REPRESENTED BY ITS SECRETARY
2. THE KARNATAKA CO-OPERATIVE MILK
PRODUCERS FEDERATION LIMITED
KMF COMPLEX DR. M.H MARIGOWDA ROAD
BANGALORE-560029
REPRESENTED BY ITS MANAGING DIRECTOR
- 2 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
3. THE RAICHUR BELLARY KOPPAL DISTRICT CO-OPERATIVE
MILK PRODUCERS SOCIETIES UNION
FIRE STATION, SANJAY GANDHI NAGAR
BELLARY-583101
REPRESENTED BY ITS MANAGING DIRECTOR
4. THE HASSAN CO-OPERATIVE
MILK PRODUCERS SOCIETIES UNION
NO.120 INDUSTRIAL AREA B.M ROAD
HASSAN-573201
REPRESENTED BY ITS MANAGING DIRECTOR
5. SR MARKETING AND SERVICES
REPRESENTED BY ITS SOLE PROPRIETOR,
MR. DAYAM RAKESH,
S/O LATE SRI. DAYAM SATYANARAYANA
TH
RESIDING AT FLAT NO.402, 4 FLOOR,
HAYAS MARVEL RESIDENCY, NARSINGI,
HYDERABAD-520075 TELANGANA
…. RESPONDENTS
(BY SRI. YOGESH D. NAIK., AGA FOR R1;
SRI. SUMANTH L. BHARADWAJ., ADVOCATE FOR R2;
SRI. M. SHYAM PRASAD., ADVOCATE FOR R3;
SRI. PRADEEP S. SAWKAR., ADVOCATE FOR R4;
SRI. PRAMOD NAIR SR. ADVOCATE FOR
SRI. SANTOSH MUTTALLI., ADVOCATE FOR R5)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 & 227
OF THE CONSTITUTION OF INDIA PRAYING TO ISSUE A WRIT OF
CERTIORARI QUASHING THE COMMUNICATION DTD 7.08.2024
BEARING NO.RBKMUL/02319/2024-25 ISSUED BY THE R-2 TO R-3
VIDE ANNX-H AND ETC.
IN WRIT PETITION NO.22850/2024
BETWEEN
M/S SREE RAJESHWARI DAIRY
PRODUCTS IND (PVT) LTD
SY NO. 224/EE2, MOJERIA SHIVAR
NH-7, KANIMET TA VILLAGE
MAHABUBNAGAR DISTRICT
- 3 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
TELANGANA 509381
REPRESENTED BY ITS DIRECTOR
G SUDHAKAR REDDY
REGISTERED UNDER COMPANIES ACT, 1956
... PETITIONER
(BY SRI. JAYAKUMAR S. PATIL., SR. ADVOCATE FOR
SRI. MOHAMAD TAHIR.A., ADVOCATE)
AND
1. THE STATE OF KARNATAKA
DEPARTMENT OF CO-OPERATION
VIDHANA SOUDHA
BANGALORE-560001
REPRESENTED BY ITS SECRETARY
2. THE KARNATAKA CO-OPERATIVE MILK
PRODUCERS FEDERATION LIMITED
KMF COMPLEX, DR. M.H MARIGOWDA ROAD
BANGALORE-560029
REPRESENTED BY ITS MANAGING DIRECTOR
REGISTERED UNDER THE COMPANIES ACT, 1959.
3. THE HASSAN CO-OPERATIVE
MILK PRODUCERS SOCIETIES UNION
NO.120 INDUSTRIAL AREA B.M ROAD
HASSAN-573201
REPRESENTED BY ITS MANAGING DIRECTOR
REGISTERED UNDER THE COMPANIES ACT, 1959.
4. M/S SHAKTI MILK AND MILK PRODUCTS
A PARTNERSHIP FIRM
NO. 24-7 208/A
POOJA COMPLEX
ST
1 FLOOR
BESIDE NIT COLLEGE
DHARGA-KAZIPET
HANUMAKONDA, TELAGANA-506001.
REP BY ITS MANAGING DIRECTOR
…. RESPONDENTS
(BY SRI. YOGESH D. NAIK., AGA FOR R1;
SRI. SUMANTH L. BHARADWAJ., ADVOCATE FOR R2;
SRI. PRADEEP S. SAWKAR., ADVOCATE FOR R3;
- 4 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
SRI. ANAND MUTTALLI., ADVOCATE FOR R4)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 & 227
OF THE CONSTITUTION OF INDIA PRAYING TO ISSUE A WRIT OF
CERTIORARI QUASHING THE TENDER DTD 20.05.2024 BEARING NO.
KMF/PUR/TENDER-650/2024-25 VIDE ANNEXURE-K ISSUED BY R-2
AND ETC.
THESE WRIT PETITIONS COMING ON FOR ORDERS AND
HAVING BEEN RESERVED FOR ORDERS ON 17.02.2026, THIS DAY,
THE COURT PRONOUNCED THE FOLLOWING:
CORAM: HON'BLE MR. JUSTICE SURAJ GOVINDARAJ
CAV ORDER
1. The petitioner in Writ Petition No.23487/2024 is
before the Court seeking for the following reliefs:
a. Issue a writ of certiorari quashing the
communication dated 07.08.2024 bearing
RBKMUL/02319/2024-25 issued by KMF to
Respondent No.3 vide Annexure-H.
(a)(i)To issue a writ of certiorari quashing the
work order dated 07.11.2024 bearing No.
RBKVMU/WC & FA/1249/2024-25 issued by
Respondent No.3 vide Annexure-J in the interest
of justice and equity.
b. Issue any writ or order or direction as this Hon’ble
Court deems fit under the circumstances of the
case.
2. The petitioner in Writ Petition No.22850/2024 is
before the Court seeking for the following reliefs:
- 5 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
a. Issue a writ of certiorari quashing the tender
dated 20.5.2024 bearing No.KMF/PUR/Tender-
650/2024-25 vide Annexure-K issued by KMF.
b. Issue any writ of certiorari quashing the LOA
dated 07.08.2024 issued by KMF in favour of
Hassan vide Annexure-K1.
c. Issue any writ or order or direction as this Hon’ble
Court deems fit under the circumstances of the
case.
3. Facts in WP No. 23487 of 2024;
3.1. The petitioner claims to be a partnership firm
engaged in marketing, warehousing, and
clearing and forwarding operations in the State
of Telangana.
3.2. Respondent No.2 - The Karnataka Co-Operative
Milk Producers Federation Limited (Hereinafter
for brevity referred to as “ KMF ”) appointed the
petitioner as a marketing, warehousing,
clearing and forwarding agent on 18.05.2015 in
respect of products of Sri Rajeshwari Dairy
Products for the entire State of Telangana, for a
period of two years.
3.3. By order dated 28.09.2016, KMF permitted
transactions between the co-packing agent and
the marketing and warehousing agent to be
carried out through Respondnet No.4 – Hassan
- 6 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Co-operative Milk Producers Society Union
(Hereinafter for brevity referred to as
“ Hassan ”).
3.4. On 29.09.2016, KMF addressed a
communication to the petitioner stating that all
milk marketing operations would thereafter be
handled by Hassan. Pursuant thereto, Hassan,
acting under the directions of KMF, issued an
Expression of Interest for selection of an
agency to undertake marketing, warehousing,
clearing and forwarding operations in the State
of Telangana. The petitioner, having been
selected pursuant to the said process, was
issued a work order dated 30.03.2019, and a
Warehousing, Clearing and Forwarding Agency
Agreement was executed on the same date.
3.5. Subsequently, by communication dated
07.08.2024, KMF permitted respondent No.3 -
The Raichur Bellary Koppal District Co-
Operative Milk Producers Societies Union
(Hereinafter for brevity referred to as
“ Raichur ”) to market Nandini milk and allied
products in the districts of Warangal, Adilabad,
Nizamabad, Karimnagar, and Khammam. The
- 7 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
petitioner contends that, in view of its
appointment as the Warehousing, Clearing and
Forwarding Agent for the entire State of
Telangana, the said districts could not have
been excluded from its area of operation.
Aggrieved thereby, the petitioner has
challenged the said communication before this
Court.
3.6. During the pendency of the proceedings, KMF
issued a further work order dated 07.11.2024
in favour of Raichur, which has also been
challenged by way of amendment. The
petitioner reiterates that, in light of its alleged
exclusive contract as Warehousing, Clearing
and Forwarding Agent, no parallel or
overlapping appointment in favour of Raichur
could have been made.
4. Facts in WP No.22850 of 2024;
4.1. The petitioner claims to be engaged in the dairy
industry, including production and packaging of
dairy products for sale in the State of
Telangana. It is stated that KMF, with the
objective of entering the Hyderabad market for
sale of Nandini milk, curd and allied products,
- 8 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
issued a work order to the petitioner pursuant
to an Expression of Interest, for undertaking
co-packing, processing, pasteurisation,
standardisation, reprocessing, packaging and
refrigeration of milk, for a period of eleven
months.
4.2. It is further stated that KMF, by arrangement
dated 04.02.2016, entrusted the entire
business of sale of “Nandini” branded milk and
milk products in Hyderabad to Hassan. Under
the said arrangement, Hassan was vested with
responsibility to invite tenders and enter into
agreements for co-packing and related
activities. Though KMF had initially issued a
tender notification dated 30.04.2016, upon
respondent No.3 assuming control, an
agreement came to be executed between
Hassan and the petitioner on 01.10.2016 for
similar activities, for a period of 36 months.
4.3. In 2019, Hassan issued a fresh tender
notification. The petitioner, having been
selected, entered into an agreement dated
01.01.2020 for a further period of three years.
The petitioner contends that notwithstanding
- 9 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
the entrustment of the Hyderabad market
(including the State of Telangana) to Raichur,
KMF, by communication dated 07.01.2020,
unilaterally divided Hyderabad into five zones.
4.4. In respect of the central, north and west zones,
KMF entrusted operations to the Shimoga Milk
Union, which in turn appointed M/s Sambasiva
Dairy Products (India) Private Limited as its
agent. The said action was objected to by
Hassan on the ground that parallel operations
by different milk unions would lead to market
disruption and operational confusion in
Hyderabad.
4.5. Thereafter, by communication dated
12.08.2020, KMF withdrew the earlier
permission granted to Shimoga Milk Union to
operate in three zones of Hyderabad and
directed Hassan to continue operations therein.
Subsequently, a tender notification dated
25.01.2023 was issued, which was challenged
in W.P. No.4989/2023; the said writ petition
came to be dismissed on 16.03.2023. Pursuant
thereto, the tender was awarded to the
- 10 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
petitioner for a further period of 36 months
commencing from 19.05.2023.
4.6. In the meantime, KMF issued a tender
notification dated 20.05.2024 for co-packing of
milk and curd in the State of Telangana for a
period of two years. The said tender was
awarded to M/s Shakti Milk and Milk Products,
by issuance of a Letter of Acceptance dated
07.08.2024.
4.7. The petitioner has approached this Court
contending that Hassan, having been granted
exclusive rights in Telangana, and having in
turn appointed the petitioner for execution of
such activities, the subsequent action of KMF in
awarding parallel contracts is impermissible. It
is stated that a meeting of Hassan was
convened on 09.08.2024, pursuant to which a
communication dated 12.08.2024 was
addressed to KMF asserting that the petitioner
was already operating in the concerned areas.
In the aforesaid circumstances, the petitioner
challenges the actions of KMF and seeks the
reliefs set out in the writ petition.
- 11 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
5. Sri.Jayakumar S Patil., learned Senior Counsel,
appearing for the petitioners in both the matters
submits that:
5.1. Sri.Jayakumar S Patil., learned Senior Counsel,
for the petitioners submits that the petitioners
have been appointed by Hassan for the entire
State of Telangana. It is contended that the
petitioner in W.P.No.22850/2024 has been
conferred exclusive rights to undertake co-
packing, processing, pasteurisation,
standardisation, reprocessing, packaging and
refrigeration of milk, and that such exclusivity
cannot be interfered with during the
subsistence of the contract.
5.2. That the petitioner in W.P. No.23487/2024 has
been appointed as the exclusive Warehousing,
Clearing and Forwarding Agent for the State of
Telangana, and that KMF could not have
appointed any third party to undertake identical
activities within the same territorial jurisdiction.
5.3. KMF has erroneously interpreted the expression
“Hyderabad”. According to him, the term does
not denote merely Hyderabad City, but refers
to the broader Hyderabad region, historically
- 12 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
understood as encompassing the undivided
State of Andhra Pradesh, and, post-bifurcation,
the State of Telangana.
5.4. It is contended that the work orders issued in
favour of the petitioners remain valid and
subsisting till May 2026, and, during their
currency, no parallel appointment could have
been made. It is further submitted that an
earlier attempt by KMF to divide Hyderabad
into zones and entrust certain zones to
Shimoga Milk Union was withdrawn upon
objection, thereby affirming the petitioners’
exclusive operational domain. In such
circumstances, KMF is precluded from
reintroducing parallel arrangements.
5.5. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that the consistent course of conduct
between the parties demonstrates that
exclusivity in favour of the petitioners was
recognised and maintained for a substantial
period. It is therefore contended that the
impugned communication dated 07.08.2024
and the work order dated 07.11.2024, whereby
respondent No.5 in W.P. No. 23487/2024 has
- 13 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
been appointed as Warehousing, Clearing and
Forwarding Agent, and Hassan in W.P. No.
22850/2024 has been appointed for co-packing
activities, are arbitrary and impermissible.
5.6. It is further submitted that the petitioners have
been continuously performing the contractual
obligations since 2015 across the State of
Telangana, and that the subsisting contractual
arrangements could not have been altered
unilaterally. Learned Senior Counsel,
emphasises that respondents No.2 and 3, being
instrumentalities of the State, are amenable to
writ jurisdiction under Article 12 of the
Constitution of India, and their actions are
liable to be tested on the touchstone of Article
14.
5.7. In this regard, he relies upon the decision in
K.V. Panduranga Rao v. Karnataka Dairy
1
Development Corporation, Bangalore ,
more particularly paras 22 and 23 thereof,
which is reproduced hereunder for easy
reference;
1
(1994) 1 Karnataka Law Journal 149
- 14 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
22. Applying these aforesaid principles, let us consider
the position of the Federation. It is true that the entire
share capital is not met by the State Government;
that the membership is open not only to the State and
Central Governments, but also to the Co-operative
Milk Producers' Unions; that provision is made for
obtaining finances from sources other than the
Government; that the power of management lies in a
Board which consists not only the Government
nominees and officers, but Chairman of affiliated Milk
Producers' Unions; and that provision is made for
distribution of profits among the members, by way of
dividend on the paid up share capital. But these
answers in the negative, to some of the tests do not
mean that the federation is not ‘State’. It is not
necessary that all the tests laid down by the Supreme
Court should be satisfied to reach the conclusion as to
whether a given entity is a State.
23. It is evident from the facts narrated in paras (3)
to (6) above that the Federation is created by the
State Government to implement and to carry out
Dairy Development Programme in the State. Dairy
Development is a part of State's endeavour to
organise agriculture and animal Husbandry on modern
and scientific lines and to take steps for preserving
and improving breeds of cows and other milch cattle,
under the Directive Principles of State Policy, as
contained in Article 48 of the Constitution of India.
The Dairy units that were being originally run as
Departments of the State Government, were
transferred to the Federation on its incorporation,
either directly or through Karnataka Dairy
Development Corporation Ltd. to cut down the losses
incurred by the State Government. The functions of
the Federation as detailed in the Government order
dated 6-11-1982 and the Bye-laws of the Federation,
show that they are of public importance and closely
related to the Government's functions relating to
- 15 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
organising animal husbandry. In the field in which it
operates, the Federation enjoys monopoly status
conferred by the State. Most of the finances, loans
and Bank guarantees required for running the affairs
of the Federation have been provided by the State
Government. The deep and pervasive control of the
State over the Federation over the functions and
working of the Federation are evident from the
Government Orders and Bye-laws 3.1, 5.1, 20 (1.1 to
1.3), 26.3, 26.8(a) referred to above. It is thus
evident that Federation has undertaken and is
executing functions which were earlier discharged by
the Government and which are public obligations of
the State. Therefore, there is no doubt that the
Federation as it presently stands, is an agent and
instrumentality of the State and is therefore ‘State’
within the meaning of that expression in Article 12.
We may point out here that several other High Courts
have, while dealing with similar Federations in other
States, consistently taken the view that such
Federations are instrumentalities of the State, See the
cases of A.P. Dairy Development Co-operative
Federation-Dr. Yarlagadda Purnachandra Rao v. State
of Andhra Pradesh [1984 LIC (NOC) 21.] , Punjab
State Co-operative Milk Producers Federation Ltd.-R.S.
Goyal v. State of Punjab [1989 (3) SLR 258.] and
National Dairy Development Board-S.A. Rahim v.
NDDB [1984 (1) LLJ 496.] . We are afraid that learned
Single Judge took a narrow view in holding that the
Federation is not ‘State’. Assuming that the Co-
operative Milk Producers' Unions, which are the
members of the Federation, are not instrumentalities
of the State as held by the learned Single Judge, it
does not follow that the Federation of such Milk
Producers' Union is not an instrumentality of State.
The totality of circumstances and the answers to
important tests laid by the Supreme Court as to
whether the functions of the entity are of public
importance and closely related to government
- 16 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
functions and whether any Department or wing of the
Government has been transferred to the new entity,
and whether there is deep and pervasive State Control
over the affairs and functioning of the entity, ought to
have been considered by the learned Single Judge, in
determining whether the Federation is ‘State’ under
Article 12. He has failed to do and his reasoning and
decision cannot be sustained.
5.8. By relying on K.V.Panduranga Rao ,
Sri.Jayakumar S Patil., learned Senior Counsel,
submits that in K.V.Panduranga Rao , it has
been held that a co-operative federation
engaged in dairy development, though not
wholly owned by the State, would nonetheless
constitute “State” within the meaning of Article
12 of the Constitution of India, having regard to
the nature of its functions, the degree of State
control, and the public importance of the
activities undertaken.
5.9. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that KMF and Hassan discharge
functions of public importance in the field of
dairy development, which is integrally
connected with the Directive Principles of State
Policy under Article 48 of the Constitution. It is
contended that the said entities operate under
deep and pervasive control of the State, are
- 17 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
substantially financed by the State, and
perform functions which are closely related to
governmental objectives. On that basis, it is
submitted that KMF and Hassan are
instrumentalities of the State within the
meaning of Article 12, and consequently, their
actions are subject to judicial review on the
touchstone of Article 14 of the Constitution of
India.
5.10. Sri.Jayakumar S Patil., learned Senior Counsel,
relies upon the decision of the Hon'ble Supreme
Court in ABL International Ltd. v. Export
2
Credit Guarantee Corpn. of India Ltd . ,
more particularly para 8, 10, 14, 19, 21, 23,
27, 50 and 53 thereof, which are reproduced
hereunder for easy reference:
8. As could be seen from the arguments addressed in
this appeal and as also from the divergent views of
the two courts below, one of the questions that falls
for our consideration is whether a writ petition under
Article 226 of the Constitution of India is maintainable
to enforce a contractual obligation of the State or its
instrumentality, by an aggrieved party.
10. It is clear from the above observations of this
Court in the said case, though a writ was not issued
on the facts of that case, this Court has held that on a
given set of facts if a State acts in an arbitrary
2
(2004) 3 SCC 553
- 18 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
manner even in a matter of contract, an aggrieved
party can approach the court by way of writ under
Article 226 of the Constitution and the court
depending on facts of the said case is empowered to
grant the relief. This judgment in K.N. Guruswamy v.
State of Mysore [AIR 1954 SC 592 : (1955) 1 SCR
305] was followed subsequently by this Court in the
case of D.F.O. v. Ram Sanehi Singh [(1971) 3 SCC
864] wherein this Court held: (SCC p. 865, para 4)
“By that order he has deprived the respondent of a
valuable right. We are unable to hold that merely
because the source of the right which the respondent
claims was initially in a contract, for obtaining relief
against any arbitrary and unlawful action on the part
of a public authority he must resort to a suit and not
to a petition by way of a writ. In view of the judgment
of this Court in K.N. Guruswamy case [AIR 1954 SC
592 : (1955) 1 SCR 305] there can be no doubt that
the petition was maintainable, even if the right to
relief arose out of an alleged breach of contract,
where the action challenged was of a public authority
invested with statutory power.”
(emphasis supplied)
14. This judgment again, in our opinion, does not help
the first respondent in the argument advanced on its
behalf that in contractual matters remedy under
Article 226 of the Constitution does not lie. It is seen
from the above extract that in that case because of an
arbitration clause in the contract, the Court refused to
invoke the remedy under Article 226 of the
Constitution. We have specifically inquired from the
parties to the present appeal before us and we have
been told that there is no such arbitration clause in
the contract in question. It is well known that if the
parties to a dispute had agreed to settle their dispute
by arbitration and if there is an agreement in that
regard, the courts will not permit recourse to any
- 19 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
other remedy without invoking the remedy by way of
arbitration, unless of course both the parties to the
dispute agree on another mode of dispute resolution.
Since that is not the case in the instant appeal, the
observations of this Court in the said case of Bridge &
Roof Co. [(1996) 6 SCC 22] are of no assistance to
the first respondent in its contention that in
contractual matters, writ petition is not maintainable.
19. Therefore, it is clear from the above enunciation
of law that merely because one of the parties to the
litigation raises a dispute in regard to the facts of the
case, the court entertaining such petition under Article
226 of the Constitution is not always bound to
relegate the parties to a suit. In the above case of
Gunwant Kaur [(1969) 3 SCC 769] this Court even
went to the extent of holding that in a writ petition, if
the facts require, even oral evidence can be taken.
This clearly shows that in an appropriate case, the writ
court has the jurisdiction to entertain a writ petition
involving disputed questions of fact and there is no
absolute bar for entertaining a writ petition even if the
same arises out of a contractual obligation and/or
involves some disputed questions of fact.
21. Placing reliance on the observations of this Court
in the said case, the learned Counsel, contended,
unless the action challenged in the writ petition
pertains to the discharge of a public function or public
duty by an authority, the courts will not entertain a
writ petition which does not involve the performance
of the said public function or public duty. Learned
Counsel, argued in the instant case while repudiating
the contract, the first respondent was not discharging
any public function or public duty.
23. It is clear from the above observations of this
Court, once the State or an instrumentality of the
State is a party of the contract, it has an obligation in
law to act fairly, justly and reasonably which is the
- 20 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
requirement of Article 14 of the Constitution of India.
Therefore, if by the impugned repudiation of the claim
of the appellants the first respondent as an
instrumentality of the State has acted in contravention
of the abovesaid requirement of Article 14, then we
have no hesitation in holding that a writ court can
issue suitable directions to set right the arbitrary
actions of the first respondent. In this context, we
may note that though the first respondent is a
company registered under the Companies Act, it is
wholly owned by the Government of India. The total
subscribed share capital of this Company is 2,50,000
shares out of which 2,49,998 shares are held by the
President of India while one share each is held by the
Joint Secretary, Ministry of Commerce and Industry
and Officer on Special Duty, Ministry of Commerce
and Industry respectively. The objects enumerated in
the memorandum of association of the first
respondent at para 10 read:
“To undertake such functions as may be entrusted to
it by the Government from time to time, including
grant of credits and guarantees in foreign currency for
the purpose of facilitating the import of raw materials
and semi-finished goods for manufacture or
processing goods for export.”
Para 11 of the said object reads thus:
“To act as agent of the Government, or with the
sanction of the Government on its own account, to
give the guarantees, undertake such responsibilities
and discharge such functions as are considered by the
Government as necessary in national interest.”
27. From the above discussion of ours, the following
legal principles emerge as to the maintainability of a
writ petition:
- 21 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
(a) In an appropriate case, a writ petition as against a
State or an instrumentality of a State arising out of a
contractual obligation is maintainable.
(b) Merely because some disputed questions of fact
arise for consideration, same cannot be a ground to
refuse to entertain a writ petition in all cases as a
matter of rule.
(c) A writ petition involving a consequential relief of
monetary claim is also maintainable.
50. The learned Counsel, appearing for the appellants
in this appeal contended that the one and the only
stand taken by the first respondent in its two letters of
repudiation is that the appellants have changed the
mode of receipt of consideration without consulting
the first respondent which ground according to the
learned Counsel, is not one of the conditions of the
insurance contract. He further submitted that an
imposition of a condition of that nature requiring a
prior consultation would be beyond the terms of the
insurance contract, and therefore, impermissible.
While the learned Counsel, appearing for the first
respondent Corporation contended that the ground of
repudiation is not so much the lack of prior
consultation but, according to the learned Counsel, is
that the first respondent was not liable to pay for the
loss suffered by the exporter by agreeing to accept
the consideration in cash because that mode of
consideration was not covered by the risk insured by
the respondent. According to the learned Counsel, the
one and the only mode of payment of consideration
covered by the said respondent is by barter of goods.
Therefore, even though in the letters of repudiation
prior consultation before change in the mode of
consideration is pointed out as one of the grounds, the
same is not the primary ground.
- 22 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
53. From the above, it is clear that when an
instrumentality of the State acts contrary to public
good and public interest, unfairly, unjustly and
unreasonably, in its contractual, constitutional or
statutory obligations, it really acts contrary to the
constitutional guarantee found in Article 14 of the
Constitution. Thus if we apply the above principle of
applicability of Article 14 to the facts of this case, then
we notice that the first respondent being an
instrumentality of the State and a monopoly body had
to be approached by the appellants by compulsion to
cover its export risk. The policy of insurance covering
the risk of the appellants was issued by the first
respondent after seeking all required information and
after receiving huge sums of money as premium
exceeding Rs 16 lakhs. On facts we have found that
the terms of the policy do not give room to any
ambiguity as to the risk covered by the first
respondent. We are also of the considered opinion
that the liability of the first respondent under the
policy arose when the default of the exporter occurred
and thereafter when the Kazakhstan Government
failed to fulfil its guarantee. There is no allegation that
the contracts in question were obtained either by
fraud or by misrepresentation. In such factual
situation, we are of the opinion, the facts of this case
do not and should not inhibit the High Court or this
Court from granting the relief sought for by the
petitioner.
5.11. By relying on ABL International ,
Sri.Jayakumar S Patil., learned Senior Counsel,
submits that the present writ petitions are
clearly maintainable notwithstanding that the
dispute arises in a contractual context. It is
contended that once KMF and Hassan are held
- 23 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
to be instrumentalities of the State, their
actions, even in contractual matters, are
required to satisfy the test of fairness,
reasonableness and non-arbitrariness under
Article 14 of the Constitution of India.
5.12. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that the impugned actions of KMF in
issuing the communication dated 07.08.2024
and the work order dated 07.11.2024, resulting
in parallel appointments in respect of the very
same field of operation, are ex facie arbitrary
and in derogation of the subsisting contractual
rights of the petitioners. It is further contended
that the mere existence of disputed questions
of fact or the contractual origin of the dispute
does not bar the exercise of jurisdiction under
Article 226, particularly where the impugned
action is vitiated by arbitrariness.
5.13. It is therefore submitted that the petitioners
are entitled to invoke the writ jurisdiction of
this Court to challenge the impugned actions,
and to seek appropriate reliefs, including
enforcement of their subsisting contractual
rights, inasmuch as the actions of the
- 24 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
respondents fail to meet the constitutional
mandate of fairness and non-arbitrariness.
5.14. He relies on Mahabir Auto Stores and Others
3
vs. Indian Oil Corporation and Others .,
more particularly para 5, 15, 17, 18, 19, 20, 21
and 23 thereof, which are reproduced
hereunder for easy reference;
5. It was the case of the appellants before the High
Court and they had tried to demonstrate with
reference to the various documents, annexures etc.
filed by them that the firm had been always carrying
business as Lube Distributor of the Company, and
has been selling all kinds of lubricants. The appellants
further contended that the Company had recognised
the firm during all this period as authorised dealer,
distributor and agent. Certain letters were written by
the company directing various customers to contact
the firm as an authorised Lube Distributor. This
contention was stated before the High Court as well
as before us. It is stated that annexures A-2 to A- 14
were copies of letters written by the company
directing various customers to con- tact the firm as
an authorised Lube Distributor. Annexure A-15 is an
advertisement issued in a specially published
souvenir on the occasion of All India Highway Motor
Rally held in 1972 sponsored by the Company in
which the firm was referred to as the Company's
authorised Lube Distributor. Annexures A- 16 to A-35
are copies of the letters written by the Company to
the appellants in relation to the dealing of the
appellants as Lube Distributor. There are several
other documents on which reliance was placed on
3
(1990) 3 SCC 752
- 25 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
behalf of the appellants. The firm was treated as
authorised dealer and agent of the respondent
company. It was contended that there was a change
of policy by the respondent company, and certain
documents of the year 1972 were relied upon to
indicate that the supply of lubricants was stopped to
those Associations and Dealers to whom ad hoc
supplies were given, who were merely re-sellers,
traders and who did not have written contracts with
the Company. That was the case of the appellant's
firm. However, the appellants asserted, that the
supply was continued to the appellant firm being a
dealer and distributor of the Company. Reliance was
placed on Annexures P-28 to P-34 which are the
Product Indent-cum- Delivery Orders for various
periods issued by the Company to the firm. It is
stated that in the said Product Indent-cum Delivery
Order there was a note indicating "For Conditions of
Supply Please Turnover ..... ". However, in the copies
filed with the rejoinder affidavit, there are no terms
on the reverse side of the Product Indent-cum-
Delivery Order. Although the firm has been receiving
continuous supply of lubricants from the Company, it
was suddenly stopped on 27th May, 1983 by the
Company, and it was con- tended that such an action
of the Company will have the effect of black-listing
the firm and is arbitrary and against the principles of
natural justice besides being hit by the doctrine of
promissory estoppel. The appellant firm, it was
contended, had made representations against the
aforesaid action of the respondent company but to no
use. In that background the reliefs mentioned here-
in-before were sought from the High Court in the
application filed under Article 226 of the Constitution.
15. Mr. Salve on behalf of the respondents sought to
urge that the appellant-firm had never been
appointed as a Lube Distributor. There is no letter of
intent, letter of appointment, much less letter at all.
- 26 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Ad-hoc supplies of Lube products alone had been
made to the appellant from 1965 onwards. The
procedure adopted for the supply of lube products
was that the appellant would write a letter to the
company whereupon the Divisional Office, Lube
Section would process the same. The policy decision
in December, 1982 indicated that no new Distributor
for Lube products would be appointed and no new
products would be distributed either through the
existing network, of existing Lube Distributors or to
authorised dealers of other products such as, petrol,
SKO, LDO and HSD. It was submitted that as a result
of the policy it was not the appellant alone to whom
the supplies were discontinued. There was similar
discontinuance of supplies to 24 other parties whose
names were given in the counter-affidavit.
17. We are of the opinion that in all such cases
whether public law or private law rights are involved,
depends upon the facts and circumstances of the
case. The dichotomy between rights and remedies
cannot be obliterated by any strait-jacket formula. It
has to be examined in each particular case. Mr Salve
sought to urge that there are certain cases under
Article 14 of arbitrary exercise of such “power” and
not cases of exercise of a “right” arising either under
a contract or under a statute. We are of the opinion
that that would depend upon the factual matrix.
18. Having considered the facts and circumstances of
the case and the nature of the contentions and the
dealing between the parties and in view of the
present state of law, we are of the opinion that
decision of the State/public authority under Article
298 of the Constitution, is an administrative decision
and can be impeached on the ground that the
decision is arbitrary or violative of Article 14 of the
Constitution of India on any of the grounds available
in public law field. It appears to us that in respect of
corporation like IOC when without informing the
- 27 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
parties concerned, as in the case of the appellant-
firm herein on alleged change of policy and on that
basis action to seek to bring to an end to course of
transaction over 18 years involving large amounts of
money is not fair action, especially in view of the
monopolistic nature of the power of the respondent in
this field. Therefore, it is necessary to reiterate that
even in the field of public law, the relevant persons
concerned or to be affected, should be taken into
confidence. Whether and in what circumstances that
confidence should be taken into consideration cannot
be laid down on any strait-jacket basis. It depends on
the nature of the right involved and nature of the
power sought to be exercised in a particular situation.
It is true that there is discrimination between power
and right but whether the State or the
instrumentality of a State has the right to function in
public field or private field is a matter which, in our
opinion, depends upon the facts and circumstances of
the situation, but such exercise of power cannot be
dealt with by the State or the instrumentality of the
State without informing and taking into confidence,
the party whose rights and powers are affected or
sought to be affected, into confidence. In such
situations most often people feel aggrieved by
exclusion of knowledge if not taken into confidence.
19. Such transaction should continue as an
administrative decision with the organ of the State. It
may be contractual or statutory but in a situation of
transaction between the parties for nearly two
decades, such procedure should be followed which
will be reasonable, fair and just, that is, the process
which normally be accepted (sic is expected) to be
followed by an organ of the State and that process
must be conscious and all those affected should be
taken into confidence.
20. Having regard to the nature of the transaction,
we are of the opinion that it would be appropriate to
- 28 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
state that in cases where the instrumentality of the
state enters the contractual field, it should be
governed by the incidence of the contract. It is true
that it may not be necessary to give reasons but, in
our opinion, in the field of this nature fairness must
be there to the parties concerned, and having regard
to the large number or the long period and the nature
of the dealings between the parties, the appellant
should have been taken into confidence. Equality and
fairness at least demands this much from an
instrumentality of the State dealing with a right of
the State not to treat the contract as subsisting. We
must, however, evolve such process which will work.
21. Therefore, we direct that the case of the
appellants be put to the respondents and let the
respondent authorities consider afresh the
submissions made by the appellant-firm, namely,
that the existing arrangement amounts to a contract
by which the distributorship was continued in case of
the appellant-firm without any formal contract and
further that the new policy of the government
introduced in December 1982 would not cover the
appellant firm and as such the appellant should
continue. It will be sufficient, having regard to the
nature of the claims, for the respondent authority to
consider this aspect after taking the appellant-firm
into confidence on this aspect. Nothing further need
be stated or required to be done and we give no
directions as to whether reasons should be recorded
or hereinafter should be given. In the facts and
circumstances, it is not necessary to give oral hearing
or record the reasons as such for the decision. The
decision should be based on fair play, equity and
consideration by an institution like IOC. It must act
fairly.
23. It is not our decision which is important but a
decision on the above basis should be arrived at
which should be fair, just and reasonable, and
- 29 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
consistent with good government, which will be
arrived at fairly and should be taken after taking the
persons concerned whose rights/obligations are
affected, into confidence. Fairness in such action
should be perceptible, if not transparent.
5.15. By relying on Mahabir Auto , Sri.Jayakumar S
Patil., learned Senior Counsel, submits that
even in the realm of contractual or commercial
dealings, an instrumentality of the State is
under a constitutional obligation to act fairly,
reasonably and in a non-arbitrary manner. It is
contended that where there exists a long-
standing course of dealings and an established
working arrangement, the State or its
instrumentality cannot abruptly alter or
terminate such arrangement, particularly
without notice, consultation, or affording an
opportunity to the affected party.
5.16. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that in the present case, the petitioners
have been engaged in the relevant operations
since 2015, and their continued engagement
over a substantial period establishes a
consistent course of conduct recognising their
role and operational domain. It is contended
that the impugned actions of KMF in introducing
- 30 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
parallel arrangements by appointing third
parties, without prior notice or consultation with
the petitioners, is arbitrary and violative of the
principles of fairness mandated under Article 14
of the Constitution.
5.17. It is further submitted that, as held in Mahabir
3
Auto Stores , even in the absence of a formal
statutory obligation, the State and its
instrumentalities are required to act in a
manner that is fair, just and reasonable,
particularly where their actions have the effect
of disrupting an existing commercial
relationship of considerable duration. On this
basis, it is contended that the impugned actions
are liable to be set aside.
5.18. He relies upon the decision of the Hon’ble
Supreme Court in Shrilekha Vidyarthi v.
4
State of U.P ., more particularly para 13, 15,
18, 20, 21, 23, 24, 29, 30, 35, 36 and 39
thereof, which are reproduced hereunder for
easy reference;
13. The learned Additional Advocate General
contended that clause (3) of para 7.06 says that the
appointment of a District Government Counsel, is only
4
(1991) 1 SCC 212
- 31 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
professional engagement terminable at will on either
side and not appointment to a post under the
government; and the government has the power to
terminate the appointment at any time ‘without
assigning any cause’. He contended that this power to
terminate the appointment at any time without
assigning any cause and the clear statement that the
appointment is only professional engagement
terminable at will on either side is sufficient to indicate
that the relationship is the same as that of a private
client and his Counsel,. In our opinion, this provision
has to be read not in isolation, but in the context in
which it appears and along with the connected
provisions, already referred to. The expression
‘professional engagement’ is used therein to
distinguish it from ‘appointment to a post under the
government’ in the strict sense. This, however, does
not necessarily mean that a person who is not a
government servant holding a post under the
government does not hold any public office and the
engagement is purely private with no public element
attaching to it. This part of clause (3) of para 7.06
means only this and no more. The other part of clause
(3) which enables the government to terminate the
appointment ‘at any time without assigning any cause’
can also not be considered in the manner suggested
by the learned Additional Advocate General. The
expression ‘at any time’ merely means that the
termination may be made even during the subsistence
of the term of appointment and ‘without assigning any
cause’ means without communicating any cause to the
appointee whose appointment is terminated. However,
‘without assigning any cause’ is not to be equated with
‘without existence of any cause’. It merely means that
the reason for which the termination is made need not
to be assigned or communicated to the appointee. It
was held in Liberty Oil Mills v. Union of India [(1984)
3 SCC 465] that the expression ‘without assigning any
reason’ implies that the decision has to be
- 32 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
communicated, but reasons for the decision have not
to be stated; but the reasons must exist, otherwise,
the decision would be arbitrary. The non-assigning of
reasons or the non-communication thereof may be
based on public policy, but termination of an
appointment without the existence of any cogent
reason in furtherance of the object for which the
power is given would be arbitrary and, therefore,
against public policy. Clause (3) of para 7.06 must,
therefore, be understood to mean that the
appointment of a District Government Counsel, is not
to be equated with appointment to a post under the
government in the strict sense, which does not
necessarily mean that it results in denuding the office
of its public character; and that the appointment may
be terminated even during currency of the term by
only communicating the decision of termination
without communicating the reasons which led to the
termination. It does not mean that the appointment is
at the sweet will of the government which can be
terminated at any time, even without the existence of
any cogent reason during the subsistence of the term.
The construction, suggested on behalf of the State of
U.P. of this provision, if accepted, would amount to
conceding arbitrary power of termination to the
government, which by itself is sufficient to reject the
contention and thereby save it from any attack to its
validity.
15. A brief reference to some decisions of this Court,
in which the character of engagement of a
Government Counsel, was considered, may be made.
In Mahadeo v. Shantibhai [(1969) 2 SCR 422 : 40 ELR
81] it was held that a lawyer engaged by the Railway
Administration during the continuance of the
engagement was holding an ‘office of profit’. The
engagement of the Railway Counsel, was similar to
that of the Government Counsel, in the present case.
It was pointed out that by ‘office’ is meant the right
- 33 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and duty to exercise an employment or a position of
authority and trust to which certain duties are
attached; and such an engagement satisfied that test.
Even though the decision was rendered in the context
of disqualification under the Election Law by holding
an ‘office of profit’, yet it is useful for appreciating the
nature of such an engagement or appointment of a
Counsel, by the government. In Mundrika Prasad
Singh v. State of Bihar [(1979) 4 SCC 701 : (1980) 1
SCR 759] the nature of appointment of Government
Pleaders came up for consideration and it was said
that the office of a Government Pleader, as defined in
Section 2(7) of the Code of Civil Procedure, 1908, is a
public office. Krishna Iyer, J., in that decision, also
pointed out that the (SCC p. 707, para 16)
“governments under our Constitution shall not play
with Law Offices on political or other impertinent
considerations as it may affect the legality of the
action and subvert the rule of law itself”. In that
decision, an earlier Madras decision was quoted with
approval, wherein, it was clearly held that the duties
of the Government Pleader are of a public nature and
that the office of a Government Pleader is a public
office. The relevant extract is as under : (SCC pp.
706-07, para 15)
“… A Government Pleader is more than an advocate
for a litigant. He holds a public office. We recall with
approval the observations a Division Bench of the
Madras High Court made in Ramachandran v.
Alagiriswami [AIR 1961 Mad 450 : ILR 1961 Mad 553]
and regard the view there, expressed about a
Government Pleader's office, as broadly correct even
in the Bihar set up.
… the duties of the Government Pleader, Madras are
duties of a public nature. Besides, as already
explained the public are genuinely concerned with the
manner in which Government Pleader discharges his
- 34 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
duties because, if he handles his cases badly, they
have ultimately to foot the bill. …
*
I consider that the most useful test to be applied to
determine the question is that laid down by Erle, J. in
(1851) 17 QB 149. The three criteria are, source of
the office, the tenure and the duties. I have applied
that test and I am of opinion that the conclusion that
the office is a public office is irresistible.”
Similarly, in Mukul Dalal v. Union of India [(1988) 3
SCC 144 : 1988 SCC (Cri) 566] , it was held that (SCC
pp. 149 & 152, para 6 & 9) “the office of the Public
Prosecutor is a public one” and “the primacy given to
the Public Prosecutor under the Scheme of the Code
(CrPC) has a social purpose”.
18. The scope of judicial review permissible in the
present case, does not require any elaborate
consideration since even the minimum permitted
scope of judicial review on the ground of arbitrariness
or unreasonableness or irrationality, once Article 14 is
attracted, is sufficient to invalidate the impugned
circular as indicated later. We need not, therefore,
deal at length with the scope of judicial review
permissible in such cases since several nuances of
that ticklish question do not arise for consideration in
the present case.
20. Even apart from the premise that the ‘office’ or
‘post’ of DGCs has a public element which alone is
sufficient to attract the power of judicial review for
testing validity of the impugned circular on the anvil of
Article 14, we are also clearly of the view that this
power is available even without that element on the
premise that after the initial appointment, the matter
is purely contractual. Applicability of Article 14 to all
executive actions of the State being settled and for
- 35 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
the same reason its applicability at the threshold to
the making of a contract in exercise of the executive
power being beyond dispute, can it be said that the
State can thereafter cast off its personality and
exercise unbridled power unfettered by the
requirements of Article 14 in the sphere of contractual
matters and claim to be governed therein only by
private law principles applicable to private individuals
whose rights flow only from the terms of the contract
without anything more? We have no hesitation in
saying that the personality of the State, requiring
regulation of its conduct in all spheres by
requirements of Article 14, does not undergo such a
radical change after the making of a contract merely
because some contractual rights accrue to the other
party in addition. It is not as if the requirements of
Article 14 and contractual obligations are alien
concepts, which cannot co-exist.
21. The Preamble of the Constitution of India resolves
to secure to all its citizens Justice, social, economic
and political; and Equality of status and opportunity.
Every State action must be aimed at achieving this
goal. Part IV of the Constitution contains ‘Directives
Principles of State Policy’ which are fundamental in the
governance of the country and are aimed at securing
social and economic freedoms by appropriate State
action which is complementary to individual
fundamental rights guaranteed in Part III for
protection against excesses of State action, to realise
the vision in the Preamble. This being the philosophy
of the Constitution, can it be said that it contemplates
exclusion of Article 14, non-arbitrariness which is
basic to rule of law, from State actions in contractual
field when all actions of the State are meant for public
good and expected to be fair and just? We have no
doubt that the Constitution does not envisage or
permit unfairness or unreasonableness in State
actions in any sphere of its activity contrary to the
- 36 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
professed ideals in the Preamble. In our opinion, it
would be alien to the constitutional scheme to accept
the argument of exclusion of Article 14 in contractual
matters. The scope and permissible grounds of judicial
review in such matters and the relief which may be
available are different matters but that does not
justify the view of its total exclusion. This is more so
when the modern trend is also to examine the
unreasonableness of a term in such contracts where
the bargaining power is unequal so that these are not
negotiated contracts but standard form contracts
between unequals.
23. Thus, in a case like the present, if it is shown that
the impugned State action is arbitrary and, therefore,
violative of Article 14 of the Constitution, there can be
no impediment in striking down the impugned act
irrespective of the question whether an additional
right, contractual or statutory, if any, is also available
to the aggrieved persons.
24. The State cannot be attributed the split
personality of Dr Jekyll and Mr Hyde in the contractual
field so as to impress on it all the characteristics of the
State at the threshold while making a contract
requiring it to fulfil the obligation of Article 14 of the
Constitution and thereafter permitting it to cast off its
garb of State to adorn the new robe of a private body
during the subsistence of the contract enabling it to
act arbitrarily subject only to the contractual
obligations and remedies flowing from it. It is really
the nature of its personality as State which is
significant and must characterize all its actions, in
whatever field, and not the nature of function,
contractual or otherwise, which is decisive of the
nature of scrutiny permitted for examining the validity
of its act. The requirement of Article 14 being the duty
to act fairly, justly and reasonably, there is nothing
which militates against the concept of requiring the
State always to so act, even in contractual matters.
- 37 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
There is a basic difference between the acts of the
State which must invariably be in pubic interest and
those of a private individual, engaged in similar
activities, being primarily for personal gain, which may
or may not promote public interest. Viewed in this
manner, in which we find no conceptual difficulty or
anachronism, we find no reason why the requirement
of Article 14 should not extend even in the sphere of
contractual matters for regulating the conduct of the
State activity.
29. It can no longer be doubted at this point of time
that Article 14 of the Constitution of India applies also
to matters of governmental policy and if the policy or
any action of the government, even in contractual
matters, fails to satisfy the test of reasonableness, it
would be unconstitutional. (See Ramana Dayaram
Shetty v. International Airport Authority of India
[(1979) 3 SCC 489 : (1979) 3 SCR 1014] and Kasturi
Lal Lakshmi Reddy v. State of Jammu and Kashmir
[(1980) 4 SCC 1 : (1980) 3 SCR 1338] ). In Col. A.S.
Sangwan v. Union of India [1980 Supp SCC 559 :
1981 SCC (L&S) 378] while the discretion to change
the policy in exercise of the executive power, when
not trammelled by the statute or rule, was held to be
wide, it was emphasised as imperative and implicit in
Article 14 of the Constitution that a change in policy
must be made fairly and should not give the
impression that it was so done arbitrarily or by any
ulterior criteria. The wide sweep of Article 14 and the
requirement of every State action qualifying for its
validity on this touchstone, irrespective of the field of
activity of the State, has long been settled. Later
decisions of this Court have reinforced the foundation
of this tenet and it would be sufficient to refer only to
two recent decisions of this Court for this purpose.
30. In Dwarkadas Marfatia and Sons v. Board of
Trustees of the Port of Bombay [(1989) 3 SCC 293]
the matter was re-examined in relation to an
- 38 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
instrumentality of the State for applicability of Article
14 to all its actions. Referring to the earlier decisions
of this Court and examining the argument for
applicability of Article 14, even in contractual matters,
Sabyasachi Mukharji, J. (as the learned Chief Justice
then was), speaking for himself and Kania, J.,
reiterated that: (SCC p. 304, para 22) “every action of
the State or an instrumentality of the State, must be
informed by reason. ….actions uninformed by reasons
may be questioned as arbitrary in proceedings under
Article 226 or Article 32 of the Constitution.”
Ranganathan, J. did not express any opinion on this
point but agreed with the conclusion of the other
learned Judges on the facts of the case. It is obvious
that the conclusion on the facts of the case could not
be reached by Ranganathan, J. without examining
them and this could be done only on the basis that it
was permissible to make the judicial review. Thus,
Ranganathan, J. also applied that principle without
saying so. In view of the wide ranging and, in
essence, all-pervading sphere of State activity in
discharge of its welfare functions, the question
assumes considerable importance and cannot be
shelved. The basic requirement of Article 14 is fairness
in action by the State and we find it difficult to accept
that the State can be permitted to act otherwise in
any field of its activity, irrespective of the nature of its
functions when it has the uppermost duty to be
governed by the rule of law. Non-arbitrariness, in
substance, is only fair play in action. We have no
doubt that this obvious requirement must be satisfied
by every action of the State or its instrumentality in
order to satisfy the test of validity.
35. It is now too well settled that every State action,
in order to survive, must not be susceptible to the vice
of arbitrariness which is the crux of Article 14 of the
Constitution and basic to the rule of law, the system
which governs us. Arbitrariness is the very negation of
- 39 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
the rule of law. Satisfaction of this basic test in every
State action is sine qua non to its validity and in this
respect, the State cannot claim comparison with a
private individual even in the field of contract. This
distinction between the State and a private individual
in the field of contract has to be borne in the mind.
36. The meaning and true import of arbitrariness is
more easily visualized than precisely stated or
defined. The question, whether an impugned act is
arbitrary or not, is ultimately to be answered on the
facts and in the circumstances of a given case. An
obvious test to apply is to see whether there is any
discernible principle emerging from the impugned act
and if so, does it satisfy the test of reasonableness.
Where a mode is prescribed for doing an act and there
is no impediment in following that procedure,
performance of the act otherwise and in a manner
which does not disclose any discernible principle which
is reasonable, may itself attract the vice of
arbitrariness. Every State action must be informed by
reason and it follows that an act uninformed by
reason, is arbitrary. Rule of law contemplates
governance by laws and not by humour, whims or
caprices of the men to whom the governance is
entrusted for the time being. It is trite that ‘be you
ever so high, the laws are above you’. This is what
men in power must remember, always.
39. No doubt, it is for the person alleging arbitrariness
who has to prove it. This can be done by showing in
the first instance that the impugned State action is
uninformed by reason inasmuch as there is no
discernible principle on which it is based or it is
contrary to the prescribed mode of exercise of the
power or is unreasonable. If this is shown, then the
burden is shifted to the State to repel the attack by
disclosing the material and reasons which led to the
action being taken in order to show that it was an
informed decision which was reasonable. If after a
- 40 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
prima facie case of arbitrariness is made out, the
State is unable to show that the decision is an
informed action which is reasonable, the State action
must perish as arbitrary.
5.19. By relying on Shrilekha Vidyarthi ,
Sri.Jayakumar S Patil., learned Senior Counsel,
submits that the State and its instrumentalities
cannot claim a dual character in contractual
matters so as to act fairly at the stage of
entering into a contract, and thereafter act
arbitrarily during its subsistence. It is
contended that the requirement of Article 14,
namely fairness, reasonableness and non-
arbitrariness, permeates all actions of the
State, irrespective of whether such actions arise
in the realm of public law or contractual
dealings.
5.20. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that even where a contract permits
termination or variation without assigning
reasons, such power cannot be exercised
arbitrarily or without the existence of a rational
and discernible basis. It is contended that in the
present case, the impugned actions of KMF in
introducing parallel arrangements and
appointing third parties in respect of the very
- 41 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
same field of operation, during the subsistence
of valid contractual arrangements in favour of
the petitioners, are not informed by any
discernible principle or rational basis and are
therefore vitiated by arbitrariness.
5.21. It is further submitted that once a prima facie
case of arbitrariness is established, the burden
shifts to the respondents to justify their action
by placing on record the reasons and material
forming the basis of the impugned decisions. In
the absence of any such justification, the
impugned actions are liable to be set aside as
violative of Article 14 of the Constitution of
India.
5.22. He relies upon the decision of the Hon’ble Apex
Court in GAIL v. Indian Petrochemicals
5
Corpn. Ltd. , more particularly para 21, 22,
23, 24 and 25 thereof, which are reproduced
hereunder for easy reference;
21. Although the dispute arises from a commercial
contract, we find that the writ petition challenging the
clauses was maintainable. It is not disputed that GAIL
is a public sector undertaking and thus qualifies
under the definition of “State” as per Article 12 of the
Constitution. At the time of entering into contract,
5
(2023) 3 SCC 629
- 42 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
GAIL was enjoying a monopolistic position with
respect to the supply of natural gas in the country.
IPCL, having incurred a significant expense in setting
up the appropriate infrastructure, had no choice but
to enter into agreement with GAIL. Thus, there was a
clear public element involved in the dealings between
the parties. Further, writ jurisdiction can be exercised
when the State, even in its contractual dealings, fails
to exercise a degree of fairness or practises any
discrimination. We are fortified in our view by this
Court's decision in ABL International [ABL
International Ltd. v. Export Credit Guarantee Corpn.
of India Ltd., (2004) 3 SCC 553] and Joshi
Technologies [Joshi Technologies International Inc. v.
Union of India, (2015) 7 SCC 728] .
22. In the present case, GAIL's action in levying “loss
of transportation charges” was ex facie
discriminatory, insofar as IPCL was mandated to build
its own pipeline in terms of the allocation letter and
was not using GAIL's HBJ pipeline at all. Thus, it
cannot be said that merely because an alternative
remedy was available, the Court should opt out of
exercising jurisdiction under Article 226 of the
Constitution and relegate the parties to a civil
remedy.
23. Now, we come to the validity of the clauses
under which “loss of transportation charges” were
levied. In our view, it would be extremely unfair and
unjust, apart from being an arbitrary action in
violation of Article 14 of the Constitution of India that
IPCL is charged for loss of transportation charges
when it is mandated to lay down its own pipelines
and not to transport the gas through the HBJ
pipeline. This action also violates the principle of non-
discrimination enshrined in Article 14. IPCL, which is
using its own pipelines, is being treated on a par with
other commercial entities who are carrying gas
through the HBJ pipeline laid down by GAIL. This is
- 43 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
more so when the pricing orders by the authority
concerned i.e. MoPNG stipulate a fixed price for
natural gas.
24. On a basic principle, it cannot be doubted that
once GAIL has laid down the pipeline, it is entitled to
structure in its cost in the contract. However, the
issue is not simply that. We are faced with a scenario
where two public sector enterprises entered into a
contract in pursuance of the allocation made by the
MoPNG. There was also a time constraint for IPCL.
After incurring a heavy expenditure in the
construction of the Gandhar Plant, IPCL had very little
choice but to enter into the contract. What is of most
significance is that IPCL was bound to follow the
allocation terms provided by the principal authority
i.e. MoPNG. Thus, as pleaded by IPCL, they were
faced with a “Hobson's choice”, where they had to
either give up the contract or accept the clauses
levying transportation charges. On a conspectus of
the above factors, it can be said that GAIL exercised
an unequal bargaining power at the time of signing
the contract.
25. In fact, the contractual exercise of providing such
a clause runs contrary to every commercial and
common sense and is manifestly arbitrary, as IPCL is
not being charged under any general terms but for a
specific purpose. This purpose cannot exist in the
contract in view of the master authority i.e. the Union
of India, providing to the contrary.
5.23. By relying on Gas Authority of India ,
Sri.Jayakumar S Patil., learned Senior Counsel,
submits that even in contractual matters
involving commercial arrangements, the writ
- 44 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
jurisdiction of this Court is maintainable where
the State or its instrumentality acts in a
manner that is arbitrary, discriminatory, or
unfair. It is contended that where one party
enjoys a dominant or monopolistic position,
resulting in unequal bargaining power, the
contractual terms and subsequent actions
flowing therefrom are subject to scrutiny on the
touchstone of Article 14 of the Constitution of
India.
5.24. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that in the present case, KMF, being
the controlling entity in respect of the “Nandini”
brand and dairy distribution network, occupies
a position of dominance vis-à-vis the
petitioners. It is contended that the petitioners,
having made substantial investments and
having structured their operations in
furtherance of the arrangements entered into
with KMF and Hassan, were effectively left with
no real alternative but to continue within the
framework determined by the respondents.
5.25. Sri.Jayakumar S Patil., learned Senior Counsel,
further submitted that the impugned actions of
- 45 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
KMF in introducing parallel appointments and
overlapping contractual arrangements during
the subsistence of the petitioners’ contracts are
manifestly arbitrary and commercially
irrational, inasmuch as they disrupt an existing
operational framework without any discernible
justification. Such action, it is contended, is
akin to imposing conditions or creating
obligations that are inconsistent with the very
structure of the contractual relationship, and
therefore falls foul of Article 14.
5.26. Sri.Jayakumar S Patil., learned Senior Counsel,
therefore submits that, as held in GAIL , where
a State instrumentality exercises its contractual
powers in a manner that is unjust,
discriminatory or reflective of unequal
bargaining power, the same is amenable to
judicial review and liable to be set aside.
5.27. He relies upon the decision of the Hon’ble Apex
Court in Subodh Kumar Singh Rathour v.
Kolkata Metropolitan Development
6
Authority , more particularly para 34, 53, 64
and 65 thereof, which are reproduced
hereunder for easy reference;
6
2024 SCC OnLine SC 1682
- 46 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
34. Having heard the learned Counsel, appearing
for the parties and having gone through the
materials on record, the two pivotal questions
that fall for our consideration are as under:
34.1. (I) What is the scope of judicial review of
the actions of the State in the matters relating to
contract/tender disputes under writ jurisdiction?
34.2. (II) Whether the action on the part of the
respondent herein in cancelling the tender vide
its Notice dated 7-2-2023 was amenable to the
writ jurisdiction of the High Court? If so, whether
the said action could be termed as arbitrary or
unfair and in consequence of violation of Article
14 of the Constitution of India?
53. The decision of this Court in ABL
International Ltd. v. Export Credit Guarantee
Corpn. of India Ltd. [ABL International Ltd. v.
Export Credit Guarantee Corpn. of India Ltd.,
(2004) 3 SCC 553 : (2004) 118 Comp Cas 213]
is significant and was the turning point in the
scope of judicial review in contractual matters. In
this landmark ruling, this Court decisively laid
down and approved that a relief against a State
or its instrumentalities in matters related to
contractual obligations can be sought under the
writ jurisdiction. The relevant observations read
as under: (SCC pp. 570 & 572, paras 23 & 27)
“23. It is clear from the above observations of
this Court, once the State or an instrumentality
of the State is a party of the contract, it has an
obligation in law to act fairly, justly and
reasonably which is the requirement of Article 14
of the Constitution of India. Therefore, if by the
impugned repudiation of the claim of the
appellants the first respondent as an
instrumentality of the State has acted in
- 47 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
contravention of the abovesaid requirement of
Article 14, then we have no hesitation in holding
that a writ court can issue suitable directions to
set right the arbitrary actions of the first
respondent. …
*
27. From the above discussion of ours, the
following legal principles emerge as to the
maintainability of a writ petition:
(a) In an appropriate case, a writ petition as
against a State or an instrumentality of a State
arising out of a contractual obligation is
maintainable.
(b) Merely because some disputed questions of
fact arise for consideration, same cannot be a
ground to refuse to entertain a writ petition in all
cases as a matter of rule.
(c) A writ petition involving a consequential relief
of monetary claim is also maintainable.”
(emphasis supplied)
64. Thus, the present dispute even if related to a
tender, cannot be termed as a pure contractual
dispute, as the dispute involves a public law
element. Although there is no discharge of a
public function by the respondent towards the
appellant yet there is a right to public law action
vested in him against the respondent in terms of
Article 14 of the Constitution. This is because the
exercise of the executive power by it in the
contractual domain i.e. the cancelling of the
tender carries a corresponding public duty to act
in a reasonable and rationale manner. Thus, we
find that the writ petition filed by the respondent
was maintainable and the relief prayed for could
- 48 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
have been considered by the High Court in
exercise of its writ jurisdiction.
65. In Ramana Dayaram Shetty v. International
Airport Authority of India [Ramana Dayaram
Shetty v. International Airport Authority of India,
(1979) 3 SCC 489 : AIR 1979 SC 1628] this
Court held that the actions of the State in
contractual matters must conform to some
standard or norms which is rational, non-
discriminatory and not guided by extraneous
considerations, otherwise the same would be in
violation of Article 14 of the Constitution. The
relevant observations read as under: (SCC pp.
511-12, para 21)
“21. This rule also flows directly from the doctrine
of equality embodied in Article 14. It is now well
settled as a result of the decisions of this Court in
E.P. Royappa v. State of T.N. [E.P. Royappa v.
State of T.N., (1974) 4 SCC 3 : 1974 SCC (L&S)
165] and Maneka Gandhi v. Union of India
[Maneka Gandhi v. Union of India, (1978) 1 SCC
248] that Article 14 strikes at arbitrariness in
State action and ensures fairness and equality of
treatment. It requires that State action must not
be arbitrary but must be based on some rational
and relevant principle which is non-
discriminatory: it must not be guided by any
extraneous or irrelevant considerations, because
that would be denial of equality. The principle of
reasonableness and rationality which is legally as
well as philosophically an essential element of
equality or non-arbitrariness is projected by
Article 14 and it must characterise every State
action, whether it be under authority of law or in
exercise of executive power without making of
law. The State cannot, therefore, act arbitrarily in
entering into relationship, contractual or
otherwise with a third party, but its action must
- 49 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
conform to some standard or norm which is
rational and non-discriminatory.”
(emphasis
supplied)
5.28. By relying on Subodh Kumar Singh Rathour ,
Sri.Jayakumar S Patil., learned Senior Counsel,
reiterated that even in matters arising out of
contracts or tenders, the writ jurisdiction of this
Court is maintainable where the impugned
action of the State or its instrumentality
involves a public law element and is alleged to
be arbitrary or unreasonable.
5.29. It is contended that the present dispute cannot
be characterised as a mere contractual dispute,
inasmuch as the impugned actions of KMF in
restructuring operational arrangements and
introducing parallel appointments in the State
of Telangana involve the exercise of executive
power having civil and commercial
consequences, thereby attracting the discipline
of Article 14 of the Constitution.
5.30. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that, as held in Subodh Kumar Singh
6
Rathour , every action of the State in
contractual matters must conform to rational,
- 50 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
non-discriminatory standards and must not be
guided by extraneous or irrelevant
considerations. It is contended that the
impugned communications and work orders,
having the effect of diluting or overriding the
petitioners’ subsisting contractual rights without
any disclosed rationale, are vitiated by
arbitrariness.
5.31. Sri.Jayakumar S Patil., learned Senior Counsel,
further submitted that the existence of a
contractual relationship or the availability of
alternative remedies does not bar the exercise
of writ jurisdiction, particularly where the action
impugned is not a mere breach but constitutes
an arbitrary exercise of power by a State
instrumentality. On this basis, it is contended
that the present writ petitions are maintainable
and the impugned actions are liable to be
interfered with.
5.32. On the basis of the aforesaid factual matrix and
the legal propositions laid down in the decisions
relied upon, Sri.Jayakumar S Patil., learned
Senior Counsel, for the petitioners submits that
the petitioners are operating under valid and
- 51 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
subsisting contractual arrangements, which,
according to them, confer exclusive rights in
respect of the activities entrusted, namely co-
packing, processing, and Warehousing, Clearing
and Forwarding operations, within the State of
Telangana. It is contended that these
arrangements have been acted upon over a
substantial period of time, during which the
petitioners have established infrastructure,
invested capital, and structured their
commercial operations on the legitimate
premise that the field of operation entrusted to
them would not be subjected to parallel or
overlapping appointments.
5.33. Sri.Jayakumar S Patil., learned Senior Counsel,
submits that KMF and Hassan, being
instrumentalities of the State within the
meaning of Article 12 of the Constitution of
India, are bound by the constitutional mandate
of fairness, reasonableness and non-
arbitrariness in all their actions, including those
arising in the contractual sphere. It is
contended that the State cannot assume a dual
character so as to adhere to constitutional
discipline at the stage of entering into a
- 52 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
contract, and thereafter act in a purely private
capacity during its subsistence. The
requirement of Article 14 permeates the
entirety of State action and obligates the
respondents to act in a manner that is informed
by reason, consistent, and non-discriminatory.
5.34. It is further submitted that during the currency
of the subsisting work orders and agreements,
the impugned actions of KMF in issuing the
communication dated 07.08.2024 and the work
order dated 07.11.2024, thereby appointing
additional entities to undertake identical
activities in the very same territorial
jurisdiction, amount to a direct and arbitrary
interference with the petitioners’ operational
domain. Such actions, it is contended, are not
supported by any disclosed policy decision,
objective criteria, or rational basis, and are
therefore liable to be characterised as arbitrary
and violative of Article 14.
5.35. Sri.Jayakumar S Patil., learned Senior Counsel,
emphasises that the course of conduct between
the parties over the years demonstrates a
consistent understanding that the petitioners
- 53 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
were to operate within the entirety of the State
of Telangana without competing or parallel
appointments. The earlier attempt by KMF to
introduce zonal bifurcation and involve another
milk union having been withdrawn upon
objection, reinforces the petitioners’ contention
that exclusivity in operational terms was both
recognised and acted upon. The impugned
actions, therefore, represent a departure from
established practice without any justification,
thereby attracting the vice of arbitrariness.
5.36. It is further contended that the petitioners have
altered their position and incurred substantial
financial and operational commitments in
reliance upon the subsisting arrangements. The
sudden introduction of parallel agencies not
only disrupts the existing supply chain and
distribution framework but also results in
commercial prejudice, erosion of business
viability, and uncertainty in operations. Such
action, it is submitted, is manifestly
unreasonable and disproportionate.
5.37. Sri.Jayakumar S Patil., learned Senior Counsel,
also submits that the petitioners were neither
- 54 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
put on notice nor taken into confidence prior to
the issuance of the impugned communications
and work orders. The absence of any
consultative process or opportunity to represent
their position renders the decision-making
process arbitrary and contrary to the principles
of fairness which are required to be observed
by State instrumentalities, particularly in the
context of long-standing commercial
arrangements.
5.38. It is further submitted that the impugned
actions have the effect of imposing an
unreasonable restriction on the petitioners’
right to carry on trade and business under
Article 19(1)(g) of the Constitution of India.
While the State may regulate commercial
activity, such regulation must be reasonable
and in public interest. In the present case, the
impugned actions, being unsupported by any
discernible public interest or rational basis, fail
to satisfy the test of reasonableness.
5.39. Sri.Jayakumar S Patil., learned Senior Counsel,
therefore submits that the present case is not
one of a mere breach of contract, but one
- 55 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
involving arbitrary exercise of power by State
instrumentalities in the contractual domain,
thereby attracting the jurisdiction of this Court
under Article 226. It is contended that the
impugned communications and work orders are
vitiated by arbitrariness, lack of transparency,
and absence of rational justification, and are
therefore liable to be quashed.
6. Sri.Sumanth L.Bharadwaj., learned Counsel,
appearing for Respondent No.2 - KMF would submit
that;
6.1. At the outset, it is contended that the writ
petitions are not maintainable. The dispute,
according to learned Counsel, arises purely out
of contractual arrangements and pertains to
commercial rights and obligations inter se the
parties. It is submitted that no public law
element is involved so as to warrant
interference under Article 226 of the
Constitution of India. The lis, being in the realm
of private law, ought to be adjudicated before a
competent civil forum.
6.2. Sri.Sumanth L.Bharadwaj., learned Counsel,
submits that the petitioners have
- 56 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
fundamentally misconstrued the expression
“Hyderabad Market”. It is contended that the
said expression refers specifically to the
geographical and commercial market within the
city of Hyderabad, and cannot be expanded to
include the entire State of Telangana. The
interpretation sought to be placed by the
petitioners, equating “Hyderabad Market” with
the whole State, is stated to be untenable and
contrary to the contractual and administrative
understanding of KMF.
6.3. It is further submitted that, in terms of Clause
3 of the agreement entered into with the
petitioner in W.P. No. 23487/2024, KMF has
expressly reserved the right to add, delete or
modify the area of operation depending upon
market requirements and performance
parameters. In view of such contractual
stipulation, it is contended that no claim of
exclusivity can be asserted by the petitioners,
and KMF retains the authority to appoint
additional agencies as necessitated by business
exigencies.
- 57 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
6.4. Sri.Sumanth L.Bharadwaj., learned Counsel,
submits that, historically, the marketing of
Nandini milk and allied products in Hyderabad
was carried out through Mother Dairy, which
procured products from various milk unions in
Karnataka. In order to streamline operations
and ensure efficient supply, KMF took a
conscious decision to entrust operations in the
“Hyderabad Market” to Hassan, which led to the
issuance of the order dated 28.09.2016.
6.5. Referring to the said order dated 28.09.2016, it
is submitted that the entrustment in favour of
Hassan was confined strictly to the “Hyderabad
Market”. It is contended that such entrustment
was a policy decision taken in the business
interest of KMF, and the scope thereof cannot
be enlarged by the petitioners. Being a policy
decision relating to commercial operations, the
same is not amenable to judicial review in writ
proceedings.
6.6. Sri.Sumanth L.Bharadwaj., learned Counsel,
further submits that all subsequent
communications, including the letter dated
29.09.2016 issued by KMF and the
- 58 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
communication dated 12.07.2018 issued by
Hassan, consistently refer only to the
“Hyderabad Market” and not to the State of
Telangana. It is therefore contended that the
petitioners cannot derive any right beyond the
territorial scope expressly contemplated in
these communications.
6.7. It is submitted that the permission granted by
KMF to respondent No.3 on 17.07.2018 to issue
an Expression of Interest was also confined to
the “Hyderabad Market”. Consequently, any
action taken by Hassan beyond this limited
mandate would be ultra vires its authority.
6.8. Sri.Sumanth L.Bharadwaj., learned Counsel,
contends that Hassan exceeded its authority by
entering into agreements with the petitioners
purporting to cover the entire State of
Telangana. It is submitted that Hassan, being
subordinate to KMF in the operational
hierarchy, could not have expanded the
territorial scope beyond what was delegated.
Therefore, any claim of exclusivity based on
such agreements is legally untenable.
- 59 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
6.9. In this background, it is submitted that the
petitioners cannot claim any exclusive right
over the entire State of Telangana. At best,
their rights, if any, are confined to the
“Hyderabad Market”. It is further submitted
that, in order to expand the market and
improve distribution of Nandini products in
other districts of Telangana, KMF took a policy
decision to permit other milk unions to operate
in specified districts, as reflected in the
communication dated 07.08.2024. Pursuant
thereto, appropriate appointments have been
made, including appointment of agencies by the
concerned unions.
6.10. Sri.Sumanth L.Bharadwaj., learned Counsel,
submits, without prejudice, that even assuming
the petitioners have enforceable rights within
the “Hyderabad Market”, the impugned
appointments pertain to districts outside
Hyderabad, and therefore do not infringe any
rights of the petitioners. It is contended that no
legal injury or prejudice is caused to the
petitioners by such appointments.
- 60 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
6.11. Lastly, Sri.Sumanth L.Bharadwaj., learned
Counsel, reiterates that the decisions taken by
KMF are in the nature of policy and commercial
decisions, taken in furtherance of business
expansion and market efficiency. Such
decisions, it is submitted, are not amenable to
judicial review unless shown to be patently
arbitrary or mala fide, which is not the case
here. If the petitioners have any grievance
arising out of contractual terms, their remedy
lies before a civil court and not under Article
226 of the Constitution.
7. Sri Syed Kashif Ali Leaned Counsel, for Sri.Pradeep
S.Sawkar appearing for Respondent No.4 - Hassan
would submit that;
7.1. Sri Syed Kashif Ali, Learned Counsel, relies
upon the decision of Hon’ble Apex Court in
Noida Toll Bridge Co. Ltd. v. Federation of
7
Noida Residents Welfare Assn ., more
particularly para Nos.67, 68, 83, 87 and 88
thereof, which are reproduced hereunder for
easy reference;
7
(2025) 6 SCC 717
- 61 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
67. The High Court while analysing the
reasonableness of the formula adopted, held
that Article 14 of the concession agreement was
perpetual in nature and it entitled Ntbcl to
recover user fees/toll indefinitely. Such a
clause, therefore, being opposed to public policy
was unjust and arbitrary and liable to be
severed from the concession agreement.
68. We find no error in the analysis undertaken
by the High Court. It is pertinent to understand
that the formula in Annexure F of the
concession agreement calculates the total
project cost and returns. As per the formula,
the total project cost is the aggregate of (a) the
project cost; (b) major maintenance expenses;
and (c) shortfall in the recovery of returns in a
specific financial year.
83. As previously mentioned, a letter dated 29-
8-2007 from the CEO of the appellant to Noida
indicated that the total project cost after 30
years would be approximately Rs 5353 crores,
suggesting that the term of the Project should
be extended to 100 years. The CAG Report
pertinently states that, if Ntbcl continues to
operate under the current terms of the
concession agreement, with extensions as per
its provisions, the unrecovered total project
cost could rise to around Rs 7200 crores by 31-
3-2020 and Rs 15,200 crores by 31-3-2029.
This unending escalation in the total project
cost leaves no room to doubt that the
concession agreement was cleverly designed to
remain perpetually operational.
87. Contracts loaded with terms which are so
unfair and unreasonable, that they truly baffle
this Court, are undoubtedly opposed to public
policy and must be adjudged void. [Central
- 62 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Inland Water Transport Corpn. v. Brojo Nath
Ganguly, (1986) 3 SCC 156 : (2009) 2 SCC
(Civ) 803 : 1986 SCC (L&S) 429] The Court is
always cautious when determining if a
particular contract or action is opposed to public
policy, but in doing so, it cannot shirk from its
duty and approve helplessly the interpretation
of a statute or a document or of an action which
is certain to subvert the societal goals and
endanger the public good. [Rattan Chand Hira
Chand v. Askar Nawaz Jung, (1991) 3 SCC 67]
88. To do so, the Court may invoke the
doctrine of severability and sever the incurable
parts of the contract from the whole. The Court
can do so only when the rest of the contract can
breathe and survive without the aid of its void
covenants. The Court must ask itself whether
the parties would have agreed to the valid
terms of the agreement if they knew that the
invalid terms would be removed. [Beed District
Central Coop. Bank Ltd. v. State of
Maharashtra, (2006) 8 SCC 514 : 2006 SCC
(L&S) 2042] Given the extent of manipulation in
the instant case, we must intervene and hold
that Article 14 of the concession agreement,
read with the formula in Annexure F, is opposed
to public policy and must be cut apart from the
concession agreement.
7.2. By relying on Noida Toll Bridge, Sri Syed
Kashif Ali, Learned Counsel, submits that
contractual terms or arrangements entered into
by the State or its instrumentalities, if found to
be manifestly unfair, unreasonable or opposed
to public policy, are amenable to judicial
- 63 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
scrutiny and can be either invalidated or
appropriately moulded by the Court.
7.3. It is contended that the Hon’ble Supreme Court
has recognised that contracts which are
structured in a manner that perpetuates
imbalance, confers disproportionate advantage,
or results in unjust consequences are liable to
be struck down as being opposed to public
policy. The Court, in such circumstances, is
empowered to examine the substance of the
arrangement and intervene to prevent
arbitrariness and injustice.
7.4. Sri Syed Kashif Ali, Learned Counsel, submits
that in the present case, the conduct of KMF in
altering the operational framework by
introducing parallel agencies during the
subsistence of the petitioners’ contractual
arrangements results in a situation of inherent
unfairness and commercial imbalance. It is
contended that such action effectively dilutes
the contractual rights of the petitioners as also
Hassan while permitting overlapping
operations, thereby rendering the contractual
- 64 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
framework uncertain and commercially
untenable.
7.5. It is further submitted that, even assuming that
the respondents seek to rely upon contractual
clauses reserving certain rights, such clauses
cannot be exercised in a manner that produces
manifestly arbitrary or unjust consequences. If
the contractual framework, as implemented,
results in unfairness or is contrary to public
policy, this Court would be justified in
intervening, including by reading down or
severing such offending aspects to ensure
conformity with constitutional principles.
7.6. On this basis, Sri Syed Kashif Ali, Learned
Counsel, submits that the impugned actions,
being inconsistent with the principles of fairness
and public policy, and resulting in manifest
arbitrariness, are liable to be interfered with by
this Court.
7.7. Sri Syed Kashif Ali, Learned Counsel, relies
upon the decision of Hon’ble Apex Court in M.I.
8
Builders (P) Ltd. v. Radhey Shyam Sahu ,
more particularly para Nos.57, 58 and 88
8
(1999) 6 SCC 464
- 65 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
thereof, which are reproduced hereunder for
easy reference;
57. We may now examine some of the terms of
the agreement dated 4-11-1993. There are six
recitals to the agreements which cannot be
correlated to any discussion in any of the
meetings of the Mahapalika, the Executive
Committee or the High Power Committee.
Under clause (2) of the agreement it is for the
builder to make a construction at its own cost
and then to realise the cost with profit not
exceeding more than 10% of the investment in
respect of each shop. Nobody knows how much
cost the builder is likely to incur and how long it
will continue to be in possession of the shopping
complex. Full freedom has been given to the
builder to lease out the shops as per its own
terms and conditions to persons of its choice on
behalf of the Mahapalika and the Mahapalika
shall be bound by these terms and conditions.
The builder has also been given the right to sign
the agreement on behalf of the Mahapalika on
the terms and conditions which the builder may
deem fit and proper. The builder is only
required to give a copy of the agreement to the
Mahapalika after its execution and both the
Mahapalika and the builder shall remain bound
by the terms of that agreement. Since there is
no project report nobody knows how many
shops the builder would construct and of what
sizes. The Mahapalika is allowed to charge Rs
5000 per shop for every second and subsequent
transfer of shops by the builder but what
amount is to be charged for the first transfer or
subsequent transfers is left to the sole
discretion of the builder. A bare glance at the
terms of the agreement shows that not only the
- 66 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
clauses of the agreement are unreasonable for
the Mahapalika but they are atrocious. No
person of ordinary prudence shall ever enter
into such an agreement. A trustee, which the
Mahapalika is, has to be more cautious in
dealing with its properties. Valuable land in the
heart of a commercial area has been handed on
a platter to the builder for it to exploit and to
make runaway profits. As a matter of fact on
examining the terms of the agreement we find
that the Mahapalika has been completely ousted
from the underground shopping complex for an
indefinite period. It has completely abdicated its
functions.
58. To repeat, the agreement is completely
one-sided favouring the builder. A land of
immense value has been handed over to it to
construct an underground shopping complex in
violation of the public trust doctrine and the
Master Plan for the city of Lucknow. The
Mahapalika has no right to step in even if there
is any violation by the builder of the terms of
the agreement or otherwise. The Mahapalika,
though considered to be the owner of the land,
is completely ousted and divested of the land
for a period which is not definite and which
depends wholly on the discretion of the builder.
On the question of reasonableness reference
may be made to Wade on Administrative Law,
7th Edn., p. 399. The learned author observed
that:
“The court must strive to apply an objective
standard which leaves to the deciding authority
the full range of choices which the legislature is
presumed to have intended. Decisions which
are extravagant or capricious cannot be
legitimate.”
- 67 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Quoting Lord Hailsham, L.C. in W. (an infant),
Re [1971 AC 682 : (1971) 2 All ER 49] where
he said:
“Two reasonable persons can perfectly
reasonably come to opposite conclusions on the
same set of facts without forfeiting their title to
be regarded as reasonable.”
The following passage from the treatise would
be relevant:
“This is not therefore the standard of ‘the man
on the Clapham omnibus’. It is the standard
indicated by a true construction of the Act
which distinguishes between what the statutory
authority may or may not be authorised to do.
It distinguishes between proper use and
improper abuse of power. It is often expressed
by saying that the decision is unlawful if it is
one to which no reasonable authority could
have come. This is the essence of what is now
commonly called ‘Wednesbury
unreasonableness’, after the now famous case
in which Lord Greene, M.R. expounded it as
follows:
‘It is true that discretion must be exercised
reasonably. Now what does that mean? Lawyers
familiar with the phraseology used in relation to
exercise of statutory discretions often use the
word ‘unreasonable’ in a rather comprehensive
sense. It has frequently been used and is
frequently used as a general description of the
things that must not be done. For instance, a
person entrusted with a discretion must, so to
speak, direct himself properly in law. He must
call his own attention to the matters which he is
bound to consider. He must exclude from his
consideration matters which are irrelevant to
- 68 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
what he has to consider. If he does not obey
those rules, he may truly be said, and often is
said, to be acting ‘unreasonably’. Similarly,
there may be something so absurd that no
sensible person could ever dream that it lay
within the powers of the authority. Warrington,
L.J. in Short v. Poole Corpn. [1926 Ch 66 :
1925 All ER Rep 74] gave the example of the
red-haired teacher, dismissed because she had
red hair. This is unreasonable in one sense. In
another it is taking into consideration
extraneous matters. It is so unreasonable that
it might almost be described as being done in
bad faith; and, in fact, all these things run into
one another.'
This has become the most frequently cited
passage (though most commonly cited only by
its nickname) in administrative law. It explains
how ‘unreasonableness’, in its classic
formulation, covers a multitude of sins. These
various errors commonly result from paying too
much attention to the mere words of the Act
and too little to its general scheme and
purpose, and from the fallacy that unrestricted
language naturally confers unfettered
discretion.
Unreasonableness has thus become a
generalised rubric covering not only sheer
absurdity or caprice, but merging into
illegitimate motives and purposes, a wide
category or errors commonly described as
‘irrelevant considerations’, and mistakes and
misunderstandings which can be classed as
self-misdirection, or addressing oneself to the
wrong question. But the language used in the
cases shows that, while the abuse of discretion
has this variety of differing legal facets, in
practice the courts often treat them as distinct.
- 69 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
When several of them will fit the case, the court
is often inclined to invoke them all. The one
principle that unites them is that powers must
be confined within the true scope and policy of
the Act.
Taken by itself, the standard of
unreasonableness is nominally pitched very
high: ‘so absurd that no sensible person could
ever dream that it lay within the powers of the
authority’ (Lord Greene, M.R.); ‘so wrong that
no reasonable person could sensibly take that
view’ (Lord Denning, M.R.); ‘so outrageous in
its defiance of logic or of accepted moral
standards that no sensible person who had
applied his mind to the question to be decided
could have arrived at it’ (Lord Diplock). It might
seem from such language that the deliberate
decisions of ministers and other responsible
public authorities could almost never be found
wanting. But, as may be seen in the following
pages, there are abundant instances of legally
unreasonable decisions and actions at all levels.
This is not because ministers and public
authorities take leave of their senses, but
because the courts in deciding cases tend to
lower the threshold of unreasonableness to fit
their more exacting ideas of administrative
good behaviour.”
59. When we keep in view the principles laid by
this Court in its various judgments and which
we have noticed above, it has to be held that
the agreement dated 4-11-1993 is not a valid
one. The agreement defies logic. It is
outrageous. It crosses all limits of rationality.
The Mahapalika has certainly acted in a fatuous
manner in entering into such an agreement. It
is a case where the High Court rightly interfered
in exercise of its powers of judicial review
- 70 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
keeping in view the principles laid down by this
Court in Tata Cellular v. Union of India [(1994)
6 SCC 651] . Every decision of the authority
except the judicial decision is amenable to
judicial review and reviewability of such a
decision cannot now be questioned. However, a
judicial review is permissible if the impugned
action is against law or in violation of the
prescribed procedure or is unreasonable,
irrational or mala fide. On the principle of good
governance reference was made to a decision of
the Division Bench of the Bombay High Court in
State of Bombay v. Laxmidas Ranchhoddas
[AIR 1952 Bom 468, 475 (para 12) : 54 Bom
LR 681] (AIR Bom at p. 475) (para 12). It was
submitted that bad governance sets a bad
example. That is what exactly happened in the
present case.
7.8. By relying on M.I.Builders, Sri Syed Kashif Ali,
Learned Counsel, submits that where an
authority vested with public power exercises
such power in a manner that is unreasonable,
irrational, or amounts to an abdication of its
statutory or public duties, such action is liable
to be interfered with in exercise of judicial
review.
7.9. It is contended that the Hon’ble Supreme Court
has unequivocally held that decisions of public
authorities which are one-sided, arbitrary, or
confer disproportionate advantage without any
rational basis are liable to be struck down as
- 71 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
being violative of the principles of good
governance and the rule of law. It is further
emphasised that even in contractual or
commercial matters, the State or its
instrumentalities cannot act in a manner that is
capricious, extravagant, or devoid of any
discernible principle.
7.10. Sri Syed Kashif Ali, Learned Counsel, submits
that in the present case, the impugned actions
of KMF in permitting overlapping and parallel
appointments during the subsistence of the
petitioners’ contractual arrangements with
Hassan disclose a clear absence of rationality
and structured decision-making. It is contended
that such actions are not guided by any
objective criteria, policy framework, or
discernible standard, and therefore fall within
the ambit of Wednesbury unreasonableness,
inasmuch as no reasonable authority acting
within the bounds of law would have adopted
such a course.
7.11. It is further submitted that the respondents,
while being custodians of a structured
distribution framework under the “Nandini”
- 72 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
brand, are required to act in a manner that
promotes coherence, consistency and fairness.
The introduction of parallel arrangements,
without any transparent basis, is stated to
disrupt the existing framework and reflects an
improper exercise of discretion.
7.12. On this basis, Sri Syed Kashif Ali, Learned
Counsel, submits that the impugned actions are
vitiated by arbitrariness, irrationality and
improper exercise of power, and are therefore
liable to be set aside in exercise of the writ
jurisdiction of this Court.
7.13. Sri Syed Kashif Ali, Learned Counsel, relies
upon the decision of Hon’ble Maharashtra High
Court in Vijay Kumar Gupta vs State of
9
Maharashtra ., more particularly para No.9
thereof, which is reproduced hereunder for easy
reference;
9. Now, we may proceed to discuss the second
limb of point (iii). It is neither in dispute before
us nor it can be disputed that in the present
case, the State has exclusive control over
drawing of water and it has been allotting the
contract to respondent No. 2 without inviting
9
2008 (4)Mh.L.j
- 73 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
any tenders and in its sole discretion that too
without framing any guidelines for that purpose.
It is a distribution of State largesse as except
the State, nobody could permit the drawing of
water from the wells which is the property of the
State. Water is essential for life and admittedly,
drawing of water and its distribution in the public
and private sector by respondent No. 2 was a
pure and simple trade activity. While operating
in the matter of trade coupled with distribution
of State largesse, the State was expected to
adhere to the cannons of equality and fairness.
Its action was to be beyond the limitations and
patent discrimination. Respondent No. 2, for the
first time, was awarded contract for a period of
10 years in the year 1987. Nothing is on record
to show why the decision of awarding contract to
the respondent No. 2 for such a long time was
taken without following any fair procedure. No
guidelines have been brought to our notice
which show on what basis the concerned
authorities in the administration of the State
hierarchy had applied their mind and in what of
administration such guidelines were framed for
the State to have taken such an action. This
contract was extended time and again without
permitting any other person to participate in any
manner whatsoever before awarding or
extending the contract in favour of respondent
No. 2. This perpetual grant/extension right from
the year 1987 till date is a strange phenomena
adopted by the State which exfacie is not only
arbitrary, unjust, unreasonable but even directly
impinges upon the spirit of Article 14 of the
Constitution of India. It appears from the record
that in the year 2005 on noticing the illegal and
unauthorized activities of respondent No. 2, the
concerned authorities issued a show-cause
notice intending to cancel the contract in favour
- 74 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
of the respondent No. 2 as well as for imposing a
penalty of Rs. 9,95,578/for drawing water
unauthorisedly from one extra point for the
period between 12th May, 1998 to 3rd
December, 2005. This notice was challenged by
respondent No. 2 by filing a suit in the court of
competent jurisdiction. The court vide its order
dated 3.2.2005, declined to grant any interim
order in favour of the respondent No. 2.
Correctness of this order was challenged by
respondent No. 2 by filing an appeal before the
High Court which was also dismissed by order
dated 8th December, 2005. However, liberty
was granted to the respondent No. 2 to move
the trial court for expeditious disposal of the
suit. As it is evident that the courts in exercise of
their judicial discretion, consistently declined to
grant any relief to the respondent No. 2, he had
pursued the suit filed by him before the trial
court after the order of the appellate court dated
8.12.2005. With some sense of dissatisfaction,
we may notice that in the reply affidavit filed on
behalf of the Government in the present petition,
the reasons for extending the period of contract
is recorded in para 10 of the affidavit, which is in
reply to para 3(j) of the petition, which reads
thus
10. With reference to para 3(j) of the
petition, I say that as already stated
hereinabove, the Respondent No. 2 had agitated
his rights for the said contract by filing a Civil
Suit in the City Civil Court after receipt of the
Deputy Director of Sports and Youth Services,
Mumbai notice dated 19th September, 2005.
The Respondent No. 2 did not secure any
Interim relief against this Respondent and
thereafter he filed an Appeal challenging the
orders of the Hon'ble City Civil Court in Hon'ble
- 75 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
High Court. Taking into consideration the
revenue loss due to closure of the site, these
respondents have awarded the contract to
Respondent No. 2.
7.14. By relying on Vijay Kumar Gupta , Sri Syed
Kashif Ali, Learned Counsel, submits that where
the State or its instrumentalities deal with
distribution of commercial rights, privileges, or
opportunities amounting to State largesse, such
distribution must conform to the constitutional
mandate of fairness, transparency and non-
arbitrariness under Article 14 of the
Constitution of India.
7.15. It is contended that the Hon’ble High Court has
held that the grant or extension of contractual
rights by the State, without following any fair
procedure, without inviting competition, or
without framing any objective guidelines, would
be ex facie arbitrary and violative of Article 14.
It is emphasised that even in trade or
commercial activities, the State cannot act in
an unfettered or discretionary manner so as to
favour particular entities or exclude others
without a rational basis.
- 76 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
7.16. Learned counsel submits that in the present
case, the impugned actions of KMF in
permitting or facilitating parallel appointments,
without any transparent process, competitive
bidding, or disclosed criteria, amount to an
arbitrary distribution of commercial
opportunities. It is contended that the absence
of any discernible policy framework or
guidelines governing such appointments
renders the decision-making process opaque
and susceptible to arbitrariness.
7.17. It is further submitted that the respondents,
while exercising control over the distribution
network of “Nandini” products, are effectively
dealing with a form of State-controlled
commercial opportunity, and therefore are
required to adhere to the principles governing
distribution of State largesse. The impugned
actions, having been undertaken without
affording an equal opportunity to similarly
situated entities or without following any fair
procedure, are stated to be violative of Article
14.
- 77 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
7.18. On this basis, learned counsel submits that the
impugned communications and appointments
are arbitrary, non-transparent and
constitutionally impermissible, and are
therefore liable to be set aside.
7.19. Sri Syed Kashif Ali, Learned Counsel, relies
upon the decision of Hon’ble Maharashtra High
Court in SecLink Technologies Corpn. v.
10
State of Maharashtra , more particularly
para No.79 thereof, which is reproduced
hereunder for easy reference;
79. As already observed above, in a tender for
certain work floated by a public authority, the
terms and conditions and, requirement and
scope of work should be certain and definite and
not uncertain and indefinite. In absence of
definite and certain scope of work, it would be
highly improper to proceed with the tender
process for the reason that such a situation may
pose uncertainty and difficulty in the mind of the
tenderers while submitting their bid. The CoS, in
th
its meeting held on 27 August 2020 considered
all these aspects of the matter and decided to
cancel the earlier tender process. The reasons,
thus, given by the respondents for cancelling the
earlier tender process, in our opinion, cannot be
said to be non-existent or unjustified or based
on any perversity.
10
2024 SCC OnLine Bom 3843
- 78 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
7.20. By relying on SecLink Technologies
Corporation , Sri Syed Kashif Ali, Learned
Counsel, submits that in matters involving
public contracts and tenders, the scope of work,
territorial jurisdiction, and operational
parameters must be clearly defined, certain,
and free from ambiguity. It is contended that
any contractual or administrative arrangement
which suffers from vagueness or lack of clarity
is liable to result in uncertainty, arbitrariness,
and unequal treatment.
7.21. Learned counsel submits that the Hon’ble High
Court has emphasised that absence of definite
and certain terms governing the scope of work
creates confusion not only for the contracting
parties but also undermines the integrity and
fairness of the process itself. In such
circumstances, the decision-making process of
the authority becomes susceptible to
arbitrariness.
7.22. It is contended that in the present case, the
respondents have failed to maintain clarity and
consistency in defining the operational area and
scope of work. While on one hand the
- 79 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
petitioners were permitted to operate under
arrangements which, according to them,
extended across the State of Telangana, the
respondents have subsequently adopted a
restrictive interpretation of “Hyderabad Market”
and simultaneously introduced parallel
appointments in overlapping territories. This
shifting and inconsistent delineation of
operational areas, it is submitted, results in
uncertainty and renders the contractual
framework inherently arbitrary.
7.23. Learned counsel further submits that the
introduction of multiple agencies without clearly
demarcating territorial boundaries or
operational responsibilities creates ambiguity in
execution, potential conflict in operations, and
an uneven playing field. Such lack of
definitional clarity, it is contended, is contrary
to the principles laid down in SecLink
Technologies, and is indicative of an
unstructured and arbitrary exercise of power.
7.24. On this basis, learned counsel submits that the
impugned actions, being founded on uncertain
and inconsistently applied parameters, are
- 80 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
liable to be interfered with as violative of Article
14 of the Constitution of India.
7.25. Sri Syed Kashif Ali, Learned Counsel, relies
upon the decision of Hon’ble Maharashtra High
Court in New Horizons Ltd. v. Union of
11
India , more particularly para No.79 thereof,
which is reproduced hereunder for easy
reference;
17. At the outset, we may indicate that in the
matter of entering into a contract, the State
does not stand on the same footing as a private
person who is free to enter into a contract with
any person he likes. The State, in exercise of its
various functions, is governed by the mandate of
Article 14 of the Constitution which excludes
arbitrariness in State action and requires the
State to act fairly and reasonably. The action of
the State in the matter of award of a contract
has to satisfy this criterion. Moreover a contract
would either involve expenditure from the State
exchequer or augmentation of public revenue
and consequently the discretion in the matter of
selection of the person for award of the contract
has to be exercised keeping in view the public
interest involved in such selection. The decisions
of this Court, therefore, insist that while dealing
with the public, whether by way of giving jobs or
entering into contracts or issuing quotas or
licences or granting other forms of largesse, the
Government cannot act arbitrarily at its sweet
11
(1995) 1 SCC 478
- 81 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
will and like a private individual, deal with any
person it pleases, but its action must be in
conformity with the standards or norms which
are not arbitrary, irrational or irrelevant. It is,
however, recognised that certain measure of
“free play in the joints” is necessary for an
administrative body functioning in an
administrative sphere [See : Ramana Dayaram
Shetty v. International Airport Authority of India
[(1979) 3 SCC 489 : (1979) 3 SCR 1014] (SCR
p. 1034 : SCC pp. 505-06, para 12); Kasturi Lal
Lakshmi Reddy v. State of J & K [(1980) 4 SCC
1 : (1980) 3 SCR 1338] (SCR p. 1355 : SCC pp.
11-12, para 11); Fasih Chaudhary v. Director
General, Doordarshan [(1989) 1 SCC 89 : 1988
Supp (3) SCR 282] (SCR p. 286 : SCC p. 92,);
Sterling Computers Ltd. v. M & N Publications
Ltd. [(1993) 1 SCC 445] ; Union of India v.
Hindustan Development Corpn. [(1993) 3 SCC
499] (at p. 513)].
7.26. By relying on New Horizons Limited, Sri Syed
Kashif Ali, Learned Counsel, submits that while
the State has discretion in matters relating to
award of contracts and structuring of
commercial arrangements, such discretion is
not absolute and must be exercised in
conformity with the mandate of Article 14 of
the Constitution of India. It is contended that
the State does not stand on the same footing
as a private individual and cannot act at its
whim or pleasure while dealing with public
contracts or commercial opportunities.
- 82 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
7.27. Learned counsel submits that every action of
the State in the contractual domain must be
guided by rational, non-discriminatory
standards and must be informed by public
interest. While a limited degree of flexibility or
“free play in the joints” is recognised, such
flexibility cannot extend to actions that are
arbitrary, irrational, or lacking in any
discernible principle.
7.28. It is contended that in the present case, the
impugned actions of KMF in introducing parallel
and overlapping arrangements during the
subsistence of the petitioners’ contracts do not
disclose any objective criteria, policy
framework, or public interest justification. The
absence of any transparent basis for such
decisions takes the matter beyond the
permissible zone of administrative discretion
and renders the action arbitrary.
7.29. Learned counsel further submits that KMF,
while dealing with distribution and marketing of
“Nandini” products, are effectively allocating
commercial opportunities under a State-
controlled framework, and are therefore
- 83 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
required to adhere to established norms of
fairness, transparency and equality. The
impugned actions, being inconsistent with these
principles, are stated to be violative of Article
14.
7.30. On this basis, Learned Counsel submits that
KMF cannot justify the impugned actions on the
ground of policy discretion or administrative
flexibility, as the same are neither structured
nor supported by any rational basis, and are
therefore liable to be set aside.
7.31. Sri Syed Kashif Ali, Learned Counsel appearing
for the Respondent No.3 – Hassan essentially
supports the case of the Petitioners and
submits that the present writ petitions are
maintainable notwithstanding that the dispute
arises in a contractual context, inasmuch as the
impugned actions are those of KMF, Hassan
having acted properly, KMF has also impinged
on the rights of Hassan, who are
instrumentalities of the State within the
meaning of Article 12 of the Constitution of
India. He contends that the lis is not a mere
private commercial dispute, but involves the
- 84 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
exercise of public power in the contractual
domain, thereby attracting the discipline of
Article 14. Placing reliance on decisions such as
ABL International Ltd. v. Export Credit
2
Guarantee Corporation of India Ltd . and
Subodh Kumar Singh Rathour v. Kolkata
6
Metropolitan Development Authority , he
submits that writ jurisdiction can be invoked
where State action, even in contractual
matters, is arbitrary, unreasonable or lacking in
fairness, and that the existence of disputed
facts or alternative remedies does not operate
as a bar.
7.32. It is his submission that the impugned actions
of KMF in issuing communications and work
orders introducing parallel and overlapping
arrangements during the currency of the
petitioners’ contracts are ex facie arbitrary. He
contends that such actions lack any disclosed
policy basis, objective criteria or rational
justification, and represent a departure from
the established practice.
7.33. Learned counsel also submits that the manner
in which additional agencies have been
- 85 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
introduced reflects a lack of transparency and
absence of any fair procedure. The allocation of
such commercial opportunities, being in the
nature of State largesse, is required to be
undertaken in a transparent and non-
discriminatory manner.
7.34. It is further contended that KMF has adopted
inconsistent and shifting positions with regard
to the scope of operation, particularly in their
interpretation of “Hyderabad Market”, while
simultaneously permitting overlapping
operations. Such lack of clarity and definitional
certainty, according to learned counsel, renders
the entire framework arbitrary and unworkable.
7.35. On the aforesaid grounds, learned counsel
submits that the impugned communications
and work orders are arbitrary, unreasonable
and violative of Articles 14 and 19(1)(g) of the
Constitution of India, and are therefore liable to
be quashed.
8. Sri.Pramod Nair., Learned Senior Counsel, appearing
for the newly appointed Re-packaging agent and
Warehousing Clearing and Forwarding Agency
submits that;
- 86 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
8.1. Sri.Pramod Nair., Learned Senior Counsel,
submits that the authorization granted in favour
of his clients is confined strictly to the districts
of Warangal, Adilabad, Nizamabad, Karimnagar
and Khammam, and expressly excludes the
“Hyderabad Market”. It is therefore contended
that the operations of the answering
respondents do not overlap with the area in
which the petitioners claim to operate, and
consequently, no prejudice is caused to the
petitioners.
8.2. Sri.Pramod Nair., learned Senior Counsel,
further relies upon the order dated 01.10.2024
passed in W.P. No. 22850/2024, wherein this
Court clarified that Hassan Milk Union was at
liberty to supply milk and milk products to
Warangal District pursuant to the Letter of
Acceptance dated 07.08.2024. It is submitted
that the said order recognises and affirms the
permissibility of operations outside the
Hyderabad Market, thereby negating the
petitioners’ claim of exclusivity over the entire
State of Telangana.
- 87 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
8.3. Sri.Pramod Nair., Learned Senior Counsel,
submits that the rights, if any, conferred upon
Hassan Milk Union were limited to the
“Hyderabad Market”, and consequently, any
rights derived by the petitioners through
Hassan Milk Union cannot extend beyond the
said territorial scope. It is further contended
that the present challenge is directed against a
tender process and consequential work orders,
in which the petitioners did not participate. On
that ground alone, it is submitted that the
petitioners lack locus standi to question the
validity of such tender or the appointments
made pursuant thereto.
8.4. Sri.Pramod Nair., Learned Senior Counsel,
further submitted that the petitioners are guilty
of suppression of material facts and
misrepresentation, amounting to suggestio falsi
and suppressio veri. Learned Senior Counsel
contends that the petitioners have sought to
project a right over the entire State of
Telangana, despite being aware that the
underlying authorization in favour of Hassan
Milk Union was confined only to the Hyderabad
Market. It is further alleged that the work order
- 88 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
issued by Hassan Milk Union in favour of the
petitioners, purporting to cover the entire
State, is beyond the authority of Hassan Milk
Union and is the result of a collusive
arrangement between the petitioners and
Hassan Milk Union.
8.5. Sri.Pramod Nair., Learned Senior Counsel,
draws attention to the tender notifications
issued by Hassan Milk Union, which, according
to him, clearly indicate that bids were invited
only for the Hyderabad region and not for the
entire State of Telangana. It is therefore
contended that any agreement or work order
extending beyond the scope of the tender
documents is impermissible and unenforceable.
8.6. Sri.Pramod Nair., Learned Senior Counsel,
submits that the answering respondents have
made substantial investments, exceeding Rs.
35 crores, in establishing a state-of-the-art
dairy plant in compliance with the norms of the
National Dairy Development Board. Despite the
issuance of the work order in their favour, the
interim orders passed by this Court have
- 89 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
prevented them from commencing operations,
thereby causing significant financial prejudice.
8.7. Sri.Pramod Nair., learned Senior Counsel, relies
upon the decision of Co-ordinate Bench of this
Court in Mahalakshmi Engineering Works
vs. Bangalore Electricity Supply Company
12
Limited ., more particularly para 9, 10 and 11
thereof, which are reproduced hereunder for
easy reference;
9. I have given my anxious consideration to the
submissions made by the respective learned
senior Counsel, and have perused the material on
record. In furtherance whereof the issues that
would fall for my consideration are –
(i) Whether BESCOM was right in seeking to re-
tender only those 10 tenders that were quashed
by this Court? and
(ii) Whether petitioners have any locus to question
any act of BESCOM qua the tender notified,
notwithstanding their non-participation in the
tender process?
In the light of the second issue cutting at the root
of the matter, I deem it appropriate to consider
the same at the outset.
Issue No.2:
(ii) Whether petitioners have any locus to question
any act of BESCOM qua the tender notified,
12
WP No.17266 of 2022 dated 09.11.2022
- 90 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
notwithstanding their non-participation in the
tender process?
10. The afore-narrated facts with regard to
issuance of notice inviting tender for the works
notified therein are not in dispute. The petitioners
though belong to Scheduled Castes/Scheduled
Tribes and reservation of 10 tenders being
accorded thereto out of 50 tenders, did not
participate in the tender process, are all a matter
of record. The notice inviting tender did no where
restrict any tenderer to participate in any tender
on the NIT dated 28.03.2022. Though reservation
was stipulated qua 10 tenders, the tenderers
belonging to Scheduled Castes/Scheduled Tribes
were not precluded from participating in the
tenders of general category. As a matter of fact,
there were several tenderers who did participate
in both the tenders reserved for Scheduled
Castes/Scheduled Tribes and in the general
category. The petitioners chose to sit on the
fence, did not participate in the tender process at
all, neither in the 10 reserved tenders nor in the
40 unreserved tenders. Therefore, the petitioners
now seek to point out lacunae in the tenders,
sitting outside throughout. Whether that would be
permissible is the question?
11. A tenderer who remains outside and then
seeks to question the tender process or conditions
stipulated in the tender notification would not get
locus to challenge and condition of tender. This
issue need not detain this Court for long or delve
deep into the matter. The Apex Court in the case
of NATIONAL HIGHWAYS AUTHORITY OF INDIA
(supra) considering this issue, has held as follows:
- 91 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
“20. While considering the relief claimed by the
respondent (claimant), the same should have
been tested on the touchstone of the principle
governing the tender process, especially when the
validity of the tender document has not been put
in issue or challenged before any competent
forum. Going by the terms and conditions in the
tender documents, as already alluded to in para
10 above, there is no title of doubt that the right
of the claimant (respondent) to match the bid of
L-1 or to exercise ROFR would come into play only
if the respondent was to participate in the tender
process pursuant to the notice inviting tenders
from the interested parties. The objective of
tender process is not only to adhere to a
transparent mechanism but to encourage
competition and give equal opportunity to all
tenderers with the end result of getting a fair offer
or value for money. The plain wording of the
eligibility clause in the tender documents and the
incidental stipulations make it explicit that the
respondent was required to participate in the
tender process by submitting its sealed bid
(technical and financial). The fact that a deeming
clause has been provided in the tender document
that if the respondent was to participate in the
bidding process, it shall be deemed to fulfill all the
requirements of the tender Clauses 3 to 6 of RFP,
being the existing concessionaire of the project,
does not exempt the respondent from
participating in the tender process; rather the
tenor of the terms of the documents made it
obligatory for the respondent to participate in the
tender process to be considered as a responsive
bidder, along with others. Having failed to
participate in the tender process and, more so,
despite the express terms in the tender
documents, validity whereof has not been
challenged, the respondent cannot be heard to
- 92 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
contend that it had acquired any right
whatsoever. Only the entities who participate in
the tender process pursuant to a tender notice
can be allowed to make grievances about the non-
fulfillment or breach of any of the terms and
conditions of the tender documents concerned.
The respondent who chose to stay away from the
tender process, cannot be heard to whittle down,
in any manner, the rights of the eligible bidders
who had participated in the tender process on the
basis of the written and express terms and
conditions. At the culmination of the tender
process, if the respondent had not participated, in
law, the offer submitted by the eligible bidders is
required to be considered on the basis of the
stated terms and conditions. Thus, if the claim of
the respondent was to be strictly adjudged on the
basis of the terms and conditions specified in the
subject tender document, the respondent has no
case whatsoever.”
(Emphasis supplied)
The Apex Court clearly holds that the tenderer
who would chose to stay away from the tender
process cannot be heard to whittle down the
rights of eligible bidders who had participated in
the tender process on the basis of written and
express terms and conditions. At the culmination
of the tender process, if the tenderer had not
participated in law, he cannot be seen to question
the terms and conditions. The petitioners, in the
case at hand, have admitted their non
participation in the tender. Staying away from the
tender, they cannot now seek to challenge the
tender. It is further germane to notice a similar
view taken by the Calcutta High Court. A Division
Bench of the High Court of Calcutta in the case of
- 93 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
SUBIR GHOSH v. STATE OF WEST BENGAL AND
OTHERS2 has held as follows:
“4. The more important factor is that the tender
process in this case opened sometime in March,
2019 and the closing date for submitting online
bids was April 1, 2019. The writ petition was filed
in January, 2020. Though it is submitted on behalf
of the writ petitioner that the time to submit the
bids was extended, no specific date in such regard
is indicated. What is apparent is that the writ
petitioner did not participate in the bidding
process and yet chose to challenge the same.
5. It is possible that a prospective bidder finds the
terms of the tender documents to be unfair or
illegal and challenges the same; but such
challenge has to be before the time to put in the
bids is closed. At any rate, if a bid is made and
the bid is thrown out on an illegal or unfair ground
contained in the tender documents, even then, a
challenge can be fashioned. But a person who has
not participated in the bidding process at all
cannot challenge the tender conditions on any
ground whatsoever. This admitted aspect of the
matter escaped the attention of the Single Bench
while passing the impugned order of January 15,
2020.
6. For the reasons aforesaid, the order dated
January 15, 2020 cannot be sustained and the
same is set aside. Since the best arguable case of
the writ petitioner will not result in any of the
tender terms being altered as the writ petitioner
did not participate in the process at all, the writ
petition itself is dismissed. Nothing in this order
will be construed to be an approval of the terms
and conditions of the tender document and in an
appropriate challenge, the same may be
considered in accordance with law.”
- 94 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
In the light of the judgments of the Apex Court in
the case of NATIONAL HIGHWAYS AUTHORITY OF
INDIA and the Division Bench of the Calcutta High
Court in the case of SUBIR GHOSH holding that
only a participant can question the tender, the
challenge raised by the petitioners who are not
the participants in the subject tender, would thus
tumble down. Therefore, the second issue that fell
for consideration which concerns locus of the
petitioners to challenge the tender process being
held against the petitioners, the first issue with
regard to tender process would not arise for
consideration, as it is trite law, that if a writ
petitioner has no locus to raise a challenge to the
subject matter, no other ground on merit of the
challenge need be considered.
8.8. By relying on the above, Sri.Pramod Nair.,
Learned Senior Counsel, submits that a party
who has not participated in the tender process
has no locus standi to challenge either the
tender conditions or the consequential award of
contract. It is contended that the law is well-
settled that a person who chooses to remain
outside the bidding process cannot
subsequently seek to assail the terms of the
tender or the rights accrued to successful
bidders.
8.9. Sri.Pramod Nair., Learned Senior Counsel,
submits that in the present case, the petitioners
did not participate in the tender process
- 95 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
pursuant to which the answering respondents
were awarded the work. Having consciously
abstained from participating, the petitioners
cannot now be permitted to question the
validity of the tender process or the work
orders issued pursuant thereto. Such a
challenge, it is contended, is barred on the
ground of lack of locus and is liable to be
rejected at the threshold.
8.10. It is further submitted that the Hon’ble
Supreme Court has consistently held that
participation in the tender process is a
precondition for maintaining a challenge to its
outcome, and that non-participants cannot be
permitted to “sit on the fence” and
subsequently challenge the process after the
bids have been finalised. Learned Senior
Counsel emphasises that permitting such
challenges would undermine the sanctity of the
tender process, discourage fair competition,
and prejudice the rights of those bidders who
have participated in accordance with the terms
and conditions of the tender.
- 96 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
8.11. On this basis, it is contended that the
petitioners, having admittedly not participated
in the relevant tender process, lack the
necessary locus to maintain the present writ
petitions insofar as they seek to challenge the
tender and the work orders issued in favour of
the answering respondents, and consequently,
the petitions are liable to be dismissed on this
ground alone.
8.12. Sri.Pramod Nair., learned Senior Counsel, relies
upon the decision of the Hon'ble Apex Court in
13
NHAI v. Gwalior-Jhansi Expressway Ltd . ,
more particularly para 20 thereof, which is
reproduced hereunder for easy reference;
20. While considering the relief claimed by the
respondent (claimant), the same should have been
tested on the touchstone of the principle governing
the tender process, especially when the validity of the
tender document has not been put in issue or
challenged before any competent forum. Going by the
terms and conditions in the tender documents, as
already alluded to in para 10 above, there is no tittle
of doubt that the right of the claimant (respondent) to
match the bid of L-1 or to exercise ROFR would come
into play only if the respondent was to participate in
the tender process pursuant to the notice inviting
tenders from the interested parties. The objective of
tender process is not only to adhere to a transparent
mechanism but to encourage competition and give
13
(2018) 8 SCC 243
- 97 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
equal opportunity to all tenderers with the end result
of getting a fair offer or value for money. The plain
wording of the eligibility clause in the tender
documents and the incidental stipulations make it
explicit that the respondent was required to
participate in the tender process by submitting its
sealed bid (technical and financial). The fact that a
deeming clause has been provided in the tender
document that if the respondent was to participate in
the bidding process, it shall be deemed to fulfil all the
requirements of the tender Clauses 3 to 6 of RFP,
being the existing concessionaire of the project, does
not exempt the respondent from participating in the
tender process; rather the tenor of the terms of the
documents made it obligatory for the respondent to
participate in the tender process to be considered as a
responsive bidder, along with others. Having failed to
participate in the tender process and, more so,
despite the express terms in the tender documents,
validity whereof has not been challenged, the
respondent cannot be heard to contend that it had
acquired any right whatsoever. Only the entities who
participate in the tender process pursuant to a tender
notice can be allowed to make grievances about the
non-fulfilment or breach of any of the terms and
conditions of the tender documents concerned. The
respondent who chose to stay away from the tender
process, cannot be heard to whittle down, in any
manner, the rights of the eligible bidders who had
participated in the tender process on the basis of the
written and express terms and conditions. At the
culmination of the tender process, if the respondent
had not participated, in law, the offer submitted by
the eligible bidders is required to be considered on the
basis of the stated terms and conditions. Thus, if the
claim of the respondent was to be strictly adjudged on
the basis of the terms and conditions specified in the
subject tender document, the respondent has no case
whatsoever.
- 98 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
8.13. By relying on Gwalior Jhansi Expressway ,
Sri.Pramod Nair., learned Senior Counsel,
submits that participation in the tender process
is a sine qua non for asserting any right or
grievance in relation to the tender or the
contract awarded pursuant thereto. It is
contended that the Hon’ble Supreme Court has
categorically held that a party which chooses to
remain outside the bidding process cannot
subsequently claim any entitlement, nor can it
be permitted to challenge the outcome of the
tender or the rights accrued in favour of
successful bidders.
8.14. Learned Senior Counsel submits that the tender
process is designed to ensure transparency,
competition, and equal opportunity, and that all
claims relating to rights such as matching bids,
preferential rights, or continuance of
engagement are necessarily contingent upon
participation in such process. Even an existing
concessionaire or incumbent entity, it is
submitted, is not exempt from the requirement
of participating in the tender, and failure to do
- 99 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
so disentitles such party from raising any
grievance.
8.15. It is therefore contended that, in the present
case, the petitioners, having admittedly not
participated in the tender process pursuant to
which the answering respondents were
appointed, cannot assert any enforceable right
in respect of the subject matter of the tender.
Learned Senior Counsel emphasises that the
petitioners cannot be permitted to bypass the
tender mechanism and yet seek to interfere
with or invalidate the outcome of a competitive
process conducted in accordance with
prescribed terms.
8.16. He further submits that permitting such a
challenge would not only be contrary to settled
law but would also prejudice the rights of bona
fide participants who have acted in accordance
with the tender conditions. On this ground, it is
contended that the petitioners lack locus standi,
and the writ petitions, insofar as they seek to
assail the tender process and the consequential
work orders, are liable to be dismissed.
- 100 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
8.17. Sri.Pramod Nair., learned Senior Counsel, relies
upon the decision of the Hon’ble Calcutta High
Court in Subir Ghosh vs. State of West
14
Bengal and others more particularly para 5
and 6 thereof, which are reproduced hereunder
for easy reference;
5. It is possible that a prospective bidder finds the
terms of the tender documents to be unfair or illegal
and challenges the same; but such challenge has to
be before the time to put in the bids is closed. At any
rate, if a bid is made and the bid is thrown out on an
illegal or unfair ground contained in the tender
documents, even then, a challenge can be fashioned.
But a person who has not participated in the bidding
process at all cannot challenge the tender conditions
on any ground whatsoever. This admitted aspect of
the matter escaped the attention of the Single Bench
while passing the impugned order of January 15,
2020.
6. For the reasons aforesaid, the order dated January
15, 2020 cannot be sustained and the same is set
aside. Since the best arguable case of the writ
petitioner will not result in any of the tender terms
being altered as the writ petitioner did not participate
in the process at all, the writ petition itself is
dismissed. Nothing in this order will be construed to
be an approval of the terms and conditions of the
tender document and in an appropriate challenge, the
same may be considered in accordance with law.
8.18. By relying on Subir Ghosh , Sri.Pramod Nair.,
learned Senior Counsel, reiterates that a person
14
(2020) SCC Online Calcutta 2213
- 101 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
who has not participated in a tender process is
precluded from challenging either the tender
conditions or the outcome of the tender. It is
contended that even if a prospective bidder
considers the tender conditions to be unfair or
illegal, such challenge must be mounted prior
to the closure of the bidding process; failing
which, the right to question the process stands
forfeited.
8.19. Learned Senior Counsel submits that the
Hon’ble High Court has categorically held that a
non-participant cannot be permitted to assail
the tender conditions on any ground
whatsoever, and that such a challenge is liable
to be rejected at the threshold. It is
emphasised that participation in the tender
process is a necessary precondition to acquire
standing to challenge any aspect of the tender.
8.20. Applying the aforesaid principle, learned Senior
Counsel submits that the petitioners, having
admittedly not participated in the tender
process pursuant to which the answering
respondents have been appointed, cannot now
seek to question either the validity of the
- 102 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
tender or the consequential work orders. It is
contended that the petitioners, having chosen
to remain outside the competitive process,
cannot be permitted to indirectly invalidate the
rights of successful bidders who have
participated in accordance with the prescribed
procedure.
8.21. He further submits that the present writ
petitions, insofar as they seek to challenge the
tender process and the appointments made
pursuant thereto, are therefore not
maintainable and are liable to be dismissed on
the ground of lack of locus standi alone, without
entering into the merits of the controversy.
8.22. On the basis of the aforesaid submissions and
the authorities relied upon, Sri Pramod Nair,
learned Senior Counsel, submits that both the
writ petitions are devoid of merit and are liable
to be dismissed in limine. It is contended that
the petitioners lack locus standi to maintain the
present proceedings, inasmuch as they did not
participate in the tender process pursuant to
which the answering respondents have been
appointed, and therefore cannot be permitted
- 103 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
to challenge either the tender or the
consequential work orders.
8.23. Learned Senior Counsel further submits that
the rights claimed by the petitioners are, in any
event, confined to the “Hyderabad Market”, and
the appointments in favour of the answering
respondents pertain to districts outside
Hyderabad. It is therefore contended that no
legal injury or prejudice is caused to the
petitioners, and the writ petitions are liable to
be rejected on this ground as well.
8.24. It is also submitted that the petitioners have
sought to expand their contractual entitlement
beyond its legitimate scope, and have
approached this Court with suppression and
misrepresentation of material facts. On this
ground also, it is contended that the petitioners
are disentitled to any discretionary relief under
Article 226 of the Constitution of India.
8.25. Learned Senior Counsel emphasises that the
answering respondents have made substantial
investments and have been lawfully awarded
contracts pursuant to a valid tender process,
and that any interference at this stage would
- 104 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
result in serious prejudice to them and
adversely affect the larger business operations.
8.26. On these grounds, it is submitted that the writ
petitions deserve to be dismissed, and the
answering respondents be permitted to carry
on their operations in the districts allotted to
them, subject to the undertaking that they shall
not operate within the “Hyderabad Market”.
9. Heard Sri.Jayakumar S Patil, learned senior Counsel,
appearing for the petitioners in both the above
petitions, Sri.Sumanth L. Bharadwaj., learned
Counsel, appearing for KMF in both the petition,
Sri.Pramod Nair., learned Senior Counsel, appearing
for respondent No.5 in WP No.23487 of 2024 and
Respondent No.4 in WP No.22850 of 2024 and Sri
Syed Kashif Ali, learned counsel appearing for the
Respondent No.3., learned Counsel, appearing for
Respondent No.4 - Hassan Milk Union in WP
No.23487 of 2024 and respondent No.3 – Hassan
Milk Union in WP No.22850 of 2024. Perused papers.
10. The points that would arise for determination are;
i. Whether the present writ petitions are
maintainable under Articles 226 and 227
of the Constitution of India, having regard
- 105 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
to the contractual nature of the dispute,
and whether the impugned actions involve
a sufficient public law element attracting
judicial review under Article 14?
ii. Whether the petitioners have established
subsisting and enforceable contractual
rights of exclusivity, and in particular,
whether such rights extend to the entire
State of Telangana or are confined to the
“Hyderabad Market”, and the true meaning
of that expression?
iii. Whether the impugned communications,
tenders and work orders result in
impermissible parallel or overlapping
arrangements, and if so, whether such
actions are arbitrary, unreasonable or
violative of Article 14 of the Constitution of
India?
iv. Whether the respondents, particularly
KMF, were entitled under the terms of the
agreement and in exercise of
policy/commercial discretion to modify or
expand the area of operations and appoint
additional agencies, and the extent to
which such decisions are amenable to
judicial review?
v. Whether the petitioners, having not
participated in the tender process, have
locus standi to challenge the impugned
actions, and whether any alleged
suppression or misrepresentation affects
their entitlement to relief; and
consequently, whether the petitioners are
entitled to the reliefs sought?
- 106 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
vi. What order?
11. This Court answers the above points as under:
12. Answer to Point No.i: Whether the present writ
petitions are maintainable under Articles 226
and 227 of the Constitution of India, having
regard to the contractual nature of the dispute,
and whether the impugned actions involve a
sufficient public law element attracting judicial
review under Article 14?
12.1. The present writ petitions have been filed under
Articles 226 and 227 of the Constitution of
India. Article 226 confers upon every High
Court the power to issue writs, orders, and
directions for the enforcement of fundamental
rights and for any other purpose. Article 227
confers upon the High Court the power of
superintendence over all courts and tribunals
throughout its territorial jurisdiction. The
primary basis for the exercise of jurisdiction in
these petitions is Article 226, which is the
source of the power to issue a writ of certiorari
quashing the impugned administrative
decisions of KMF and Hassan as being contrary
to Article 14. Article 227 supplements Article
226 by providing broader supervisory
jurisdiction where necessary, but no separate
reliance need be placed upon it in the present
- 107 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
case, the jurisdiction under Article 226 being
fully adequate to the reliefs sought.
12.2. The question of maintainability of writ petitions
arising from contractual disputes involving
State instrumentalities is one of the most
debated threshold questions in Indian
administrative law. Its resolution requires the
Court to consider a set of competing
considerations: on one side, the foundational
principle that the State and its instrumentalities
are bound by the constitutional guarantee of
equality and non-arbitrariness in all their
actions; and on the other, the principle that
courts should exercise restraint in converting
commercial disputes into constitutional
controversies. Both petitioners hold subsisting
commercial agreements with Hassan, a
constituent of the KMF dairy federation, and yet
the reliefs they seek are not the enforcement of
contractual terms per se, but the quashing of
administrative decisions taken by KMF in the
exercise of its institutional authority.
12.3. This Court is called upon to determine, at the
threshold, whether the subject-matter of these
- 108 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
petitions crosses the line from private contract
law into public constitutional law, the domain
where Article 226 operates. The resolution of
this question requires this Court to trace the
historical evolution of the law, to examine the
constitutional status of KMF and Hassan under
Article 12, and to identify the specific public law
elements present on the facts.
12.4. The jurisprudence on the maintainability of writ
petitions in contractual matters commenced
with the decision of a Constitution Bench of the
Hon'ble Supreme Court in Ramana Dayaram
Shetty v. The Inter
15
National Airport Authority of India . In
this landmark decision, the Court laid the
foundation for the 'public law in private law'
doctrine, the principle that State
instrumentalities, even when acting in the guise
of private parties in the commercial domain,
remain bound by the constitutional guarantees
of Articles 14 and 16. The Hon'ble Supreme
Court held that the rules and norms governing
the grant of contracts and licences by State
instrumentalities must conform to Article 14,
15
(1979) 3 SCC 489
- 109 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and that a departure from these rules without
good reason gives rise to a constitutional
remedy under Article 226.
12.5. The Hon'ble Supreme Court in Ramana
15
Dayaram Shetty was careful, however, to
circumscribe the scope of the doctrine. It was
not the Hon'ble Supreme Court's intention to
hold that every contractual action of a State
instrumentality is automatically reviewable in
writ jurisdiction. The doctrine was intended to
apply to actions that involve the exercise of a
'public element', actions that partake of the
character of State action rather than of the
commercial conduct of a private person. The
challenge for subsequent courts has been to
identify, in a principled manner, where this line
is to be drawn.
12.6. Subsequent to Ramana Dayaram Shetty , the
law underwent a process of gradual
elaboration. In Mahabir Auto Stores v.
3
Indian Oil Corporation , the Hon'ble Supreme
Court affirmed that the public law doctrine
applies to long-standing commercial
relationships between State instrumentalities
- 110 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and private parties, and that the State cannot
arbitrarily modify or terminate such
relationships without observing the basic norms
of fair dealing that Article 14 mandates. In
4
Shrilekha Vidyarthi v. State of U.P ., the
Hon'ble Supreme Court took the doctrine a step
further, holding that Article 14 pervades every
action of the State in the contractual domain,
and that the State cannot claim the shield of
contractual autonomy to escape its
constitutional obligations.
12.7. In ABL International Ltd. v. Export Credit
2
Guarantee Corporation of India Ltd ., a
three-Judge Bench of the Hon'ble Supreme
Court undertook a comprehensive consolidation
of the case law and laid down the following
propositions as definitively settled: (i) a writ
petition against a State or its instrumentality
arising from a contractual obligation is
maintainable in an appropriate case; (ii) the
mere fact that the dispute arises out of a
contract does not deprive the Court of
jurisdiction; (iii) the relevant question is
whether the action of the State instrumentality
is arbitrary, unreasonable, or contrary to Article
- 111 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
14; (iv) once a State instrumentality is a party
to a contract, it is bound to act fairly, justly,
and reasonably as required by Article 14; and
(v) the mere availability of an alternative
remedy by way of a civil suit is not a ground for
refusing to exercise writ jurisdiction where the
challenge is to arbitrary State action.
2
12.8. The decision in ABL International was
particularly significant in clarifying the
relationship between contractual remedies and
constitutional remedies. The Hon'ble Supreme
Court rejected the argument that a party who
has a contractual remedy is disentitled to seek
writ jurisdiction, holding that constitutional
remedies under Article 226 are not alternative
remedies in the ordinary sense, they are
remedies of a distinct kind, going to the
constitutional validity of State action, which
civil courts are not equipped to provide. A civil
court applying contract law cannot quash
arbitrary State action; only a constitutional
court exercising writ jurisdiction can do so.
12.9. In GAIL (India) Ltd. v. Indian
5
Petrochemicals Corporation Ltd ., the
- 112 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Hon'ble Supreme Court added a further and
important dimension: the “Hobson's choice”
principle. A “Hobson's choice” arises when the
affected party has no real alternative but to
deal with the State monopolist on the terms
dictated by it. In such a situation, the affected
party cannot be said to have 'freely' contracted
with the State; it was, in practical terms,
compelled to accept the State's terms as a
condition of participation in the relevant
market. The Hon'ble Supreme Court held that
where the State or its instrumentality occupies
a monopoly position and the affected party has
no realistic alternative, the public law element
is particularly strong and the writ jurisdiction of
the constitutional court is clearly available.
12.10. The most recent authoritative restatement of
the law is contained in Subodh Kumar Singh
Rathour v. Kolkata Metropolitan
6
Development Authority ., decided on
16.08.2024. The Hon'ble Supreme Court
affirmed all the foregoing principles and held
that the existence of a public law element, not
the mere existence of a contract, is the decisive
criterion for the availability of writ jurisdiction.
- 113 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
The determination must be made on the facts
of each case, and the mere labelling of a
dispute as 'contractual' or 'commercial' does
not automatically place it beyond the reach of
Article 226.
12.11. The foundational prerequisite for the
applicability of Article 14, and therefore for the
maintainability of these petitions, is that the
respondents against whom the petitions are
directed are 'State' within the meaning of
Article 12 of the Constitution. Article 12 defines
'State' to include 'any other authority within the
territory of India or under the control of the
Government of India'. The scope of this
residuary category has been extensively
elaborated by the Hon'ble Supreme Court over
several decades.
12.12. The seminal decision on what constitutes 'other
authority' under Article 12 is Rajasthan State
16
Electricity Board v. Mohan Lal ., in which
the Hon'ble Supreme Court held that the
expression includes all constitutional and
statutory authorities on whom powers are
16
AIR 1967 SC 1857
- 114 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
conferred by law. The Hon'ble Supreme Court
in Sukhdev Singh v. Bhagatram Sardar
17
Singh Raghuvanshi ., extended this to
statutory corporations. The landmark
Constitution Bench decision of the Hon'ble
Supreme Court in Pradeep Kumar Biswas v.
18
Indian Institute of Chemical Biology
synthesised the evolution of Article 12
jurisprudence and articulated a comprehensive
multi-factor test. The factors identified are: (i)
financial support from the Government; (ii)
Government ownership of share capital; (iii)
monopoly status conferred or protected by the
State; (iv) deep and pervasive Government
control; (v) functions of a governmental nature
or closely connected therewith; and (vi)
transfer of a Government-run department or
undertaking to the entity. No single factor is
decisive; the totality of circumstances must be
examined.
12.13. So far as KMF is concerned, the question of its
status under Article 12 was directly addressed
and conclusively determined by a Division
17
(1975) 1 SCC 421
18
(2002) 5 SCC 111
- 115 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Bench of this Court in K.V. Panduranga Rao
v. Karnataka Dairy Development
1
Corporation, Bangalore . In that decision, the
Hon'ble Division Bench examined KMF with
reference to each of the relevant criteria and
made the following findings: (a) KMF was
established by the State Government of
Karnataka as part of the 'Operation Flood'
programme, centrally sponsored and funded
through the National Dairy Development Board;
(b) KMF's creation and functioning are
governed by the Karnataka Co-operative
Societies Act, and its bye-laws, policies, and
major decisions require State Government
approval; (c) the State Government and the
National Dairy Development Board provide
substantial financial support to KMF by way of
share capital, loans, and guarantees; (d) KMF
has been granted a de facto monopoly over the
procurement, processing, and distribution of
milk and milk products in the cooperative
sector in Karnataka; (e) KMF's Managing
Director and senior officials are appointed by or
with the approval of the State Government; (f)
KMF discharges a function, the organisation of
- 116 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
dairy development, that is a Directive Principle
obligation of the State under Article 48 of the
Constitution; and (g) KMF took over dairy units
originally run as State Government
departments. The sister dairy federations of
other States, A.P. Dairy Development Co-
operative Federation, Punjab State Co-
operative Milk Producers Federation, and the
National Dairy Development Board, have been
similarly held to be State instrumentalities by
their respective High Courts, a consideration
1
the Division Bench in K.V. Panduranga Rao
found instructive. On the totality of these
circumstances, the Hon'ble Division Bench held
unequivocally that KMF is an instrumentality of
the State within the meaning of Article 12.
12.14. This Court is bound by the decision in K.V.
1
Panduranga Rao , being a decision of a
Division Bench of this Court. No subsequent
decision of this Court or of the Hon'ble
Supreme Court has overruled, distinguished, or
departed from this holding. This Court
accordingly holds that KMF is 'State' within the
meaning of Article 12.
- 117 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
12.15. As regards Hassan, the Hassan Co-operative
Milk Producers Societies Union, its status under
Article 12 must be assessed on first principles,
since there is no specific binding precedent on
the point placed on record.
12.16. Hassan is one of the constituent milk unions
that form part of the KMF federation. It
operates within the same legal, financial, and
administrative framework as KMF. Its
operations in the Hyderabad market, the
subject-matter of these petitions, were initiated
by KMF as a delegation of KMF's dairy
development function for that territory. Hassan
receives its operational mandate, financial
resources, and institutional support through
KMF, which is itself a State instrumentality. The
management of Hassan is conducted in
accordance with KMF's policies and is subject to
KMF's oversight. The functions performed by
Hassan, procurement of milk from dairy
farmers, processing, and distribution of dairy
products, are precisely the functions that Article
48 identifies as a State obligation. In all these
circumstances, and particularly given that
Hassan forms an integral part of the State's
- 118 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
dairy development infrastructure through its
membership in the KMF federation, this Court
has no difficulty in concluding that Hassan is
also an instrumentality of the State within the
meaning of Article 12.
12.17. The significance of this holding cannot be
understated. Once both KMF and Hassan are
characterised as State under Article 12, every
action they take, including their actions in the
domain of commercial contracts, is subject to
the constitutional guarantee of non-
arbitrariness under Article 14. There is no
'private' sphere into which KMF or Hassan can
retreat to escape constitutional scrutiny.
12.18. KMF and Hassan are, therefore, precisely the
kind of State instrumentalities that the framers
of the Constitution had in mind when they
crafted Article 226. They are entities created,
controlled, and financed by the State to carry
out a public function, dairy development, in the
commercial sphere. The petitioners who deal
with these entities are precisely the kind of
persons/entities who need the protection of
Article 226: they have invested their livelihoods
- 119 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
in the Nandini distribution chain, they have no
alternative to dealing with the State
monopolist, and they are at the mercy of
institutional decisions over which they have no
contractual veto. The writ jurisdiction of this
Court is designed for exactly this situation.
12.19. Given the constitutional status of KMF and
Hassan, the question narrows to whether the
specific actions challenged in these petitions
carry a sufficient 'public law element' to attract
writ jurisdiction. This Court identifies the
following elements in the present case that
cumulatively and individually establish the
public law character of the dispute.
12.20. MONOPOLISTIC CONTROL: KMF exercises
effective monopoly control over the distribution
of Nandini-branded dairy products in the
Telangana market. The Nandini brand is a
brand created, owned, and promoted by KMF,
which is itself a State instrumentality. No party
other than those authorised by KMF can
legitimately engage in the distribution and co-
packing of Nandini products in Telangana. The
petitioners had no realistic alternative but to
- 120 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
deal with KMF and in the present case Hassan,
as KMF’s delegate, if they wished to participate
in the Nandini dairy supply chain in Telangana.
This is an instance of the “Hobson's choice”
elaborated in GAIL: the contracting party had
no real choice, because there was no competing
supplier and no competing market for the rights
in question. Where the State operates as a
monopolist in a commercial domain, the 'public
law element' in that domain is pervasive, and
the State cannot insulate its monopolistic
actions from constitutional scrutiny by claiming
the mantle of private contract.
12.21. STATE LARGESSE: The rights obtained by the
petitioners, the right to act as WCF agent and
co-packing agent for Nandini products in the
Hyderabad market, were obtained by grant
from KMF/Hassan, acting in their capacity as
State instrumentalities. These rights are, in the
constitutional sense, State largesse: benefits
distributed by the State from its resources and
domain. The concept of State largesse was
introduced into Indian constitutional
15
jurisprudence in Ramana Dayaram Shetty .
The essential principle is that when the State
- 121 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
distributes benefits, whether in the form of
contracts, licences, appointments, or
commercial opportunities, the distribution
process must comply with Article 14. The initial
grant as also renewal of such benefits must be
fair and transparent; and the modification,
restriction, or revocation of such benefits must
also comply with the basic fairness
requirements of Article 14. The petitioners hold
their positions in the Nandini distribution chain
as grantees of State largesse, and any State
action that affects their position in that chain is
subject to constitutional scrutiny.
12.22. ARTICLE 48 MANDATE: The operations of KMF
and Hassan in the dairy distribution sector are
directly connected to the implementation of the
Directive Principle in Article 48 of the
Constitution of India. Article 48 directs the
State to organise agriculture and animal
husbandry on modern and scientific lines, and
in particular to take steps for preserving and
improving breeds and prohibiting the slaughter
of cows and calves and other milch and draught
cattle. The Hon'ble Supreme Court has
consistently held that Directive Principles, while
- 122 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
not enforceable as fundamental rights, are
nonetheless 'fundamental in the governance of
the country' (Article 37) and provide the
backdrop against which the actions of State
instrumentalities in related domains are to be
understood. KMF's entire commercial operation,
including the appointment of distribution agents
for Nandini products, is an instrumentality for
the realisation of the Article 48 mandate. The
public purpose is not incidental or remote; it is
the very raison d'etre of KMF's existence.
12.23. EMPLOYMENT AND LIVELIHOOD: The
petitioners' operations in the Hyderabad market
generate employment for a significant number
of persons, drivers, warehouse staff, delivery
personnel, and administrative employees. The
disruption of these operations, through the
unilateral introduction of competing distribution
channels, is not a purely commercial matter; it
has direct consequences for the livelihoods of
these employees and their families. The Hon'ble
Supreme Court has repeatedly recognised the
livelihood dimension of commercial contracts
between State instrumentalities and private
- 123 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
parties as a factor supporting the availability of
writ jurisdiction.
12.24. CONSUMER INTEREST: KMF's distribution of
Nandini dairy products serves a significant
public interest in ensuring the supply of
affordable, quality dairy products to consumers
across Telangana. The efficiency and reliability
of the distribution chain directly affect the
availability and price of these products to
consumers. Actions by KMF that disrupt or
compromise the existing distribution chain are,
therefore, matters of public concern, not
merely private commercial interest.
12.25. NO ARBITRATION CLAUSE: There is no
arbitration clause in any of the agreements that
form the subject-matter of these petitions. The
absence of an arbitration clause confirms that
the parties did not agree to refer disputes to a
private alternative forum. Since the petitioners'
challenge goes to the constitutional validity of
State action, a matter for which the civil court
has no mandate, the writ jurisdiction of this
Court is not merely an alternative remedy; it is
the only appropriate remedy.
- 124 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
12.26. PUBLIC TRUST DOCTRINE: The public trust
doctrine holds that certain resources and
powers held by the State are held in trust for
the public at large. While the doctrine has its
clearest application in the environmental and
natural resources domain as held by the
Hon'ble Supreme Court in M.C. Mehta v.
19
Kamalnath and Akhil Bharatiya Upbhokta
20
Congress v. State of Madhya Pradesh , its
underlying principle, that the State cannot deal
with public resources and public powers as if
they were purely private property, is of broad
relevance in the present context. The Nandini
brand, the KMF distribution network, and the
public money invested in building the KMF
cooperative dairy structure are, in a meaningful
sense, public resources. KMF's allocation of
Nandini distribution rights must therefore
satisfy Article 14's requirements of fairness and
non-arbitrariness.
12.27. Sri. Jayakumar S. Patil, learned Senior Counsel
for the petitioners, and Sri. Syed Kashif Ali,
learned Counsel for Hassan, have both invoked
19
(1997) 1 SCC 388
20
(2011) 5 SCC 29
- 125 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Article 19(1)(g) of the Constitution of India,
contending that the impugned actions impose
unreasonable restrictions on the petitioners'
right to carry on trade and business.
12.28. Article 19(1)(g) guarantees to every citizen the
right to practise any profession, or to carry on
any occupation, trade, or business. This
guarantee is not absolute: Article 19(6) permits
the State to make any law imposing reasonable
restrictions on the exercise of this right in the
interests of the general public, or providing for
the carrying on by the State, or by a
corporation owned or controlled by the State, of
any trade, business, industry, or service,
whether to the exclusion, complete or partial,
of citizens or otherwise.
12.29. The Article 19(1)(g) argument, as advanced by
the petitioners, is essentially an amplification of
the Article 14 argument rather than an
independent ground of challenge. The
petitioners do not contend that any law, in the
sense of legislation, restricts their trade. They
contend that an executive action of a State
instrumentality has disrupted their commercial
- 126 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
operations. The correct constitutional
framework for examining executive actions
alleged to be arbitrary or unfair is Article 14,
not Article 19(6) (which applies to legislative
restrictions). The Hon'ble Supreme Court in
Rustom Cavasjee Cooper v. Union of
21
India held that the Court must examine the
direct and immediate impact of State action on
the petitioner's rights, and where the impact
primarily engages Article 14, the Article 19
argument is typically subsumed.
12.30. Nevertheless, since the Article 19(1)(g)
challenge has been extensively argued, this
Court examines it on its own terms. The
petitioners contend that by introducing
competing agencies in their operational
territory, KMF has effectively deprived them of
the ability to carry on their trade, since their
entire business model depends upon exclusive
access to the Nandini supply chain. This
argument has two parts: (a) whether a right
under Article 19(1)(g) to carry on trade in the
Nandini supply chain exists in the first place;
21
(1970) 1 SCC 248
- 127 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and (b) whether the impugned actions
unreasonably restrict that right.
12.31. As to the first part: the petitioners' trade is not
the manufacture or sale of Nandini products, it
is the distribution and co-packing of a branded
product under a franchise-type arrangement
with a State monopolist. The right to carry on
this specific trade is, at its core, a contractual
right granted by KMF/Hassan, not a general
constitutional right to enter the dairy market.
Article 19(1)(g) does not confer a right to carry
on trade in a particular manner or through a
particular medium, it confers a right to choose
one's occupation. The petitioners remain free to
carry on trade in the dairy distribution sector;
what they contest is their entitlement to a
particular contractual appointment, and that is
a matter of contract law and public law, not
Article 19.
12.32. As to the second part: assuming, without
conceding, that the impugned actions
constitute a restriction on the petitioners' trade,
such a restriction is plainly a 'reasonable
restriction' within Article 19(6). KMF's decision
- 128 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
to expand the Nandini distribution network to
serve additional Telangana districts serves the
general public interest in wider dairy product
availability, a clear public interest justification
within Article 19(6). The impugned actions are
not a prohibition on the petitioners' trade; they
are the introduction of additional distributors in
non-overlapping territories. The petitioners
retain full freedom to carry on their Hyderabad
Metropolitan Area operations. No violation of
Article 19(1)(g) is established.
12.33. The invocation of Articles 14 and 19(1)(g)
together by Hassan (Respondent No. 4 in WP
23487/2024 and Respondent No. 3 in WP
22850/2024), in support of the petitioners,
requires a particular observation. Hassan,
having entered into agreements with the
petitioners for operations within the Hyderabad
Market, finds itself in an anomalous position: it
supports the petitioners' challenge to KMF's
direction to expand operations in Telangana,
because the expansion arguably diminishes
Hassan's own commercial footprint within the
KMF federation. Hassan's support of the
petitioners' submissions is not legally
- 129 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
determinative. The rights of the petitioners are
determined by the agreements and orders
between the parties, not by the institutional
preferences of Hassan. Hassan's support for the
petitioners' broader construction of 'Hyderabad
Market' is understandable from a commercial
perspective but does not carry legal weight in
the determination of the true meaning of that
expression.
12.34. For the reasons stated above, the challenge
under Article 19(1)(g) fails on all counts. The
challenge under Article 14 is the primary and
appropriate constitutional ground. The Article
19(1)(g) argument does not add any
independent ground of relief.
12.35. Sri. Sumanth L. Bharadwaj, for KMF, contends
that the present disputes are 'purely
contractual' and that this Court should not
convert them into constitutional controversies.
This contention fails on the facts of the present
case. The disputes are not purely contractual in
the relevant sense: the petitioners do not seek
mere enforcement of contractual terms or
damages for breach of contract. They seek the
- 130 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
quashing of administrative decisions of State
instrumentalities, decisions taken in the
exercise of institutional authority, not in the
exercise of ordinary contractual rights. The
distinction between 'contractual' and 'public
law' action is not one of form but of substance:
the relevant question is whether the action
being challenged partakes of the character of
State action subject to constitutional control.
12.36. If the argument that the impugned actions are
'commercial' decisions not amenable to
constitutional scrutiny were accepted, it would
follow that no action of KMF in the commercial
domain, no tender, no appointment, no
modification of a distribution arrangement,
could ever be challenged in writ jurisdiction.
This is plainly contrary to the settled law, which
has consistently held since Ramana Dayaram
15
Shetty that State instrumentalities are bound
by Article 14 even in the commercial domain.
The fact that a decision is commercial does not
insulate it from constitutional review; it merely
determines the standard of review that the
constitutional court will apply, that is, the
- 131 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Wednesbury standard of reasonableness rather
than a full merits review.
12.37. Sri. Kashif Ali's reliance on Noida Toll Bridge
Co. Ltd. v. Federation of Noida Residents
7
Welfare Association is misplaced in the
context of maintainability. That decision dealt
with the maintainability of a PIL challenging
terms of a concession agreement for a toll
bridge, a very different context from the
present case, where the petitioners are directly
affected parties with a concrete legal interest.
The principle of judicial restraint in PIL matters
relating to commercial contracts is not the
same principle that governs the maintainability
of a writ petition by a directly affected party
challenging specific administrative actions.
12.38. The reliance on New Horizons Ltd. v. Union
11
of India is also misplaced on the
11
maintainability question. In New Horizons ,
the Hon'ble Supreme Court did not hold that
writ petitions relating to tender and contract
matters are not maintainable; on the contrary,
it examined the challenge on merits and
dismissed it because the tendering authority
- 132 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
had not acted in an arbitrary or unreasonable
manner. That decision thus presupposes the
maintainability of such writ petitions. The use
11
of New Horizons to argue non-maintainability
is a misreading of the ratio.
12.39. The principle that there is no constitutional
impediment to challenging State action in
contractual matters is now so firmly established
that this Court need not labour the point
further. The objection to maintainability on this
groud is rejected.
12.40. A final aspect of the maintainability question is
whether the petitioners ought to be denied writ
relief on the ground that they have an
adequate alternative remedy by way of a civil
suit. The availability of a civil suit does not
constitute an adequate alternative remedy in
the present case.
12.41. First, the reliefs sought by the petitioners are
constitutional reliefs, specifically, the quashing
of administrative decisions of State
instrumentalities as being violative of Article
14. A civil court does not have the jurisdiction
or the constitutional mandate to grant such
- 133 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
reliefs. Civil courts operate on the basis of
contract law and apply the contractual
remedies of damages, specific performance,
and injunction. They do not operate on the
touchstone of Article 14 and cannot grant the
remedy of quashing an unconstitutional State
action. The remedy available in writ jurisdiction
is therefore not a 'duplicate' of the civil
remedy; it is a distinct remedy for a distinct
wrong.
12.42. Second, the Hon'ble Supreme Court in ABL
2
International held that 'the mere availability
of an alternative remedy will not always take
away the jurisdiction of the constitutional
courts to examine the challenge on the ground
of violation of Article 14'. The availability of an
alternative remedy is a factor to be taken into
account in the exercise of discretion, but it is
not an absolute bar to writ jurisdiction. This
principle was affirmed in Whirlpool
22
Corporation v. Registrar of Trade Marks ,
where the Hon'ble Supreme Court held that the
existence of an alternative remedy does not
oust writ jurisdiction particularly when
22
(1998) 8 SCC 1
- 134 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
fundamental rights or a public element is
involved. In the present case, given the
strength and clarity of the public law element,
this Court does not consider the availability of a
civil suit to be a sufficient reason to decline
jurisdiction.
12.43. The question of maintainability is not resolved
by any single test or factor. It requires a
holistic appreciation of the nature of the
respondent, the nature of the action
challenged, and the nature of the right
asserted. The 'public law element' test looks to
all three dimensions: (a) is the respondent the
State or a State instrumentality? (b) is the
action administrative/institutional in character,
or is it purely the exercise of a private
contractual right? (c) does the petitioner assert
a constitutional right, such as the right to non-
arbitrary State action under Article 14, or
merely a private law right? Where all three
questions are answered in the affirmative, as
they are in the present case, the writ
jurisdiction of the High Court is clearly
available.
- 135 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
12.44. The Hon'ble Supreme Court's progressive
expansion of the maintainability of writs in
commercial matters reflects a judicial
understanding that the distinction between
'public' and 'private' in the modern State is
increasingly artificial. The State participates in
the market as buyer, seller, employer, licensor,
and distributor. If its actions as market
participant were categorically exempt from
constitutional discipline, a vast and growing
domain of State power would escape the
accountability that Article 14 demands. It is
precisely to prevent this outcome that the
Hon'ble Supreme Court in Shrilekha
4
Vidyarthi held that the State cannot have a
split personality, and that the Hon'ble Supreme
2
Court in ABL International held that the
availability of an alternative remedy does not
bar the writ court from examining constitutional
validity.
12.45. In the present case, this principle applies with
full force. KMF's power over the Nandini
distribution chain in Telangana is, in practical
terms, plenary: it decides who gets to
distribute Nandini products, in what territory,
- 136 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and on what terms. The exercise of this plenary
commercial power by a State monopolist must
be subject to the constitutional guarantee of
Article 14. The writ jurisdiction of this Court is
the constitutional mechanism through which
that guarantee is enforced.
12.46. For all the foregoing reasons, this Court holds
that the present writ petitions are fully and
clearly maintainable under Articles 226 and 227
of the Constitution. The objection to
maintainability is overruled.
12.47. This Court answers Point No.1 in the affirmative
by holding that the present writ petitions are
maintainable under Articles 226 and 227 of the
Constitution of India. KMF and Hassan Co-
operative Milk Producers Societies Union are
State instrumentalities within the meaning of
Article 12. The actions of KMF and Hassan
challenged in these petitions carry a sufficient
public law element, arising from KMF's
monopolistic control over Nandini distribution,
the Hobson's choice principle, the nature of the
rights as State largesse, the Article 48
mandate, and the absence of an adequate
- 137 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
alternative remedy, to attract the constitutional
jurisdiction of this Court under Article 14. The
objection to maintainability raised by the
respondents is rejected.
13. Answer to Point No.ii: Whether the petitioners
have established subsisting and enforceable
contractual rights of exclusivity, and in
particular, whether such rights extend to the
entire State of Telangana or are confined to the
“Hyderabad Market”, and the true meaning of
that expression?
13.1. The legal consequence of the answer to this
question is direct and far-reaching: if the
petitioners' rights extend to the entire State of
Telangana, then the impugned actions,
appointing a competing entity in five Telangana
districts and issuing a fresh tender for the
State, would necessarily constitute an
encroachment upon the petitioners' territory
and would call for serious constitutional
scrutiny; if, on the other hand, the petitioners'
rights are confined to the city and metropolitan
area of Hyderabad, then the impugned actions,
which relate to districts and territories well
outside the Hyderabad Metropolitan Area,
would not encroach upon the petitioners' rights
- 138 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
at all, and the challenge to them would fail on
the merits.
13.2. This binary structure makes it essential that
this Court approach the question of
interpretation with great care and rigour. This
Court must examine not only the literal
language of the agreements but also the
surrounding circumstances, the conduct of the
parties, the broader commercial context, and
the applicable canons of contractual and legal
interpretation.
13.3. Sri. Jayakumar S. Patil submits that the
expression 'Hyderabad Market', read in context
and with reference to the circumstances
prevailing at the time the agreements were
entered into, should be understood to mean the
entire Telangana market, i.e., all of the State of
Telangana. He advances four principal
arguments in support of this construction. First,
he argues from history: at the time of the
bifurcation of undivided Andhra Pradesh in June
2014, the newly formed State of Telangana
inherited all the territory west of the Krishna
and Godavari river basins, including Hyderabad
- 139 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
city as its capital. 'Hyderabad' was, in this
sense, the name of the new State's commercial
heartland and the term used to denote the
entire new State's commercial territory.
Second, he argues from conduct: over nine
years of the commercial relationship, KMF and
Hassan consistently referred to the whole of the
petitioners' operational scope as 'Hyderabad',
and the petitioners in fact serviced customers
across multiple districts, not just within the
city. Third, he argues from the 2020 episode:
the internal KMF proposal in 2020 to divide the
'Hyderabad market' into a 'North/Warangal
Zone', a 'Central Zone', and a 'West Zone',
which was described using names that refer to
districts outside Hyderabad city, demonstrates
that KMF itself understood 'Hyderabad Market'
as extending to Warangal and other districts.
Fourth, he argues from commercial logic: it
would make no sense for KMF to appoint a WCF
agent based in Hyderabad only for the city of
Hyderabad; the whole purpose of such an
appointment is to service the broader regional
market of which Hyderabad is the hub.
- 140 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.4. The respondents advance the narrower
construction. They submit: (i) the plain and
ordinary meaning of 'Hyderabad Market' is the
market located in and centred on the city of
Hyderabad; (ii) the consistent and unvarying
use of the expression 'Hyderabad Market', as
opposed to 'Telangana Market' or 'State of
Telangana', in all KMF documents from 2015 to
2023 is deliberate and reflects KMF's settled
understanding of the petitioners' operational
territory; (iii) the deliberate shift to the
expression 'State of Telangana' in the 2024
tender demonstrates that KMF drew a clear
distinction between the two expressions, and
that the change of language was intended to
expand the scope of operations; (iv) the 2020
episode, properly understood, was about
dividing the Hyderabad city distribution network
into sub-zones for administrative efficiency, not
about acknowledging that 'Hyderabad Market'
encompasses all of Telangana; and (v) the
distances of the five newly assigned districts
from Hyderabad city (145 to 290 km) make it
commercially implausible that they were ever
- 141 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
intended to form part of the 'Hyderabad
Market'.
13.5. The starting point for the interpretation of any
contractual expression is the text of the
instrument itself, read as a whole and in its
grammatical and ordinary sense. This is the
first rule of interpretation where the language is
clear and unambiguous, effect must be given to
the plain meaning, without reference to
extrinsic evidence or surrounding
circumstances.
13.6. The expression 'Hyderabad Market' is not, in
this Court's opinion, ambiguous in its ordinary
meaning. 'Hyderabad' is the name of a specific
city, the capital of Telangana. 'Market' in this
context means the commercial territory served
from or centred on that city. 'Hyderabad
Market' therefore means, in its ordinary and
natural sense, the market in and around the
city of Hyderabad, not the market of the entire
State of Telangana, which is a State formed
initially of 10 districts and reorganised to 33
districts covering an area of approximately
1,12,077 sq. km. It is impossible to service this
- 142 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
entire area with only one facility in the city of
Hyderabad, the Petitioners have not placed
anything on record to indicate that they had
established facilities in places other than
Hyderabad and/or were servicing all districts of
the state of Telangana.
13.7. The petitioners' argument that 'Hyderabad
Market' should be read as a reference to the
State of Telangana stretches the language
beyond its ordinary meaning. At the time the
initial agreement was entered into in 2015, just
one year after the bifurcation of Andhra
Pradesh, the State of Telangana had a well-
established governmental and administrative
structure with its own government, its own
capital, and its own official name. If KMF had
intended to appoint the petitioners as agents
for the entire State of Telangana, it would have
been a simple matter to say so. The fact that
KMF chose to use the expression 'Hyderabad
Market' rather than 'State of Telangana' or
'Telangana Market' is itself probative of KMF's
intention: it was appointing agents for the
Hyderabad city and metropolitan market, not
for the whole of Telangana.
- 143 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.8. Where the ordinary meaning of a contractual
expression, while not strictly ambiguous, is said
to be inapt or incongruous in the light of the
parties' actual conduct, the courts are
permitted to have regard to the surrounding
circumstances and the factual matrix of the
contract for the purpose of ascertaining the
true objective meaning of the expression. This
principle, often described as the 'factual matrix'
approach, the meaning of the document is what
the parties using those words against the
relevant background would reasonably have
been understood to mean. The use of the
factual matrix approach is circumscribed by an
important limitation: it cannot be used to
override a clear and unambiguous contractual
expression.
13.9. Nonetheless, and out of abundant caution, this
Court has examined the surrounding
circumstances and the factual matrix of the
agreements between the parties, to determine
whether there is any cogent basis for preferring
the petitioners' broader construction over the
respondents' narrower one. Before undertaking
that examination, this Court notes two further
- 144 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
interpretive principles that independently
confirm the narrower construction.
13.10. The first is the parol evidence rule. The
petitioners rely extensively upon extrinsic
evidence, primarily the 2020 internal KMF
proposal and asserted oral understandings, to
support the broader construction of 'Hyderabad
Market'. Section 92 of the Indian Evidence Act,
1872 which is now Section 94 of the Bharatiya
Sakhya Adhiniyam, codifies the parol evidence
rule in Indian law. It provides that when the
terms of a contract have been reduced to
writing, no evidence of any oral agreement or
statement shall be admitted 'for the purpose of
contradicting, varying, adding to, or subtracting
from its terms'. Extrinsic evidence is admissible
only to resolve a genuine ambiguity in the
written text, not to substitute a different
meaning for a clear contractual expression.
13.11. In the present case, the expression 'Hyderabad
Market' is, as this Court has held, not genuinely
ambiguous in its ordinary meaning. The parol
evidence rule therefore operates to exclude the
petitioners' reliance upon the 2020 internal KMF
- 145 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
proposal as a basis for giving the expression a
meaning different from its ordinary meaning.
Even if the 2020 proposal had said, in
unambiguous terms, that 'Hyderabad Market
means all of Telangana', which it does not, such
an extrinsic statement would not be admissible
under Section 92 and now Section 94 to alter
the clear meaning of the written agreements
between the parties.
13.12. Furthermore, the 2020 proposal is an internal
KMF document, it is not a statement made to or
communicated to the petitioners, and it cannot
constitute a representation to the petitioners of
KMF's understanding of the scope of their
rights. For a representation to give rise to
estoppel, it must be communicated to the
person who is to rely upon it. An internal KMF
document that was never communicated to the
petitioners as a statement of their rights cannot
estop KMF from asserting the narrower
construction. The reliance upon the 2020
episode as a basis for a broader construction is
therefore inadmissible, irrelevant, and
unavailing.
- 146 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.13. The second additional principle is contra
proferentem. Where the meaning of a
contractual expression is genuinely ambiguous,
the contra proferentem rule applies: the
expression is construed against the party who
drafted and imposed the contract. In the
context of agreements between a State
instrumentality and a private party, the State
instrumentality is invariably the drafter of the
standard form agreement; the private party
accepts the terms as presented, often without
meaningful negotiation. The same principle
applies here: if there is any residual ambiguity
in the expression 'Hyderabad Market', it should
be resolved against KMF/Hassan (the drafters)
and in favour of the petitioners.
13.14. However, this Court emphasises that it does
not find the expression 'Hyderabad Market' to
be genuinely ambiguous. The plain meaning
clearly points to the city of Hyderabad and its
metropolitan area. The contra proferentem
principle is therefore not the basis of this
Court's conclusion; it is an additional
consideration that would support the narrower
- 147 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
construction even were the expression treated
as ambiguous.
13.15. A further alternative holding on the interpretive
question is this: even if this Court were to
accept, which it does not, that the expression
'Hyderabad Market' extended to all of
Telangana, it would still need to determine
whether the petitioners' rights were truly
exclusive, i.e., whether their appointments
gave them the sole and exclusive right to
distribute or co-pack Nandini products
throughout Telangana, to the exclusion of all
other agencies. The petitioners assert such
exclusivity, but this claim is not clearly
supported by the documents on record.
13.16. The WCF Agent Agreement appointing the
petitioner in WP 23487/2024 does not contain
any express exclusivity clause, a clause that
would prohibit KMF or Hassan from appointing
any other WCF agent in the operational
territory. The absence of an express exclusivity
clause is significant: in commercial agreements
between sophisticated commercial parties,
exclusivity, if intended, is almost invariably
- 148 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
expressed in explicit terms. Agreements that do
not contain an explicit exclusivity clause are
generally treated as non-exclusive, unless
exclusivity is necessarily implied from the
context.
13.17. Similarly, the co-packing arrangement of the
petitioner in WP 22850/2024 does not contain
an express exclusivity clause prohibiting the
appointment of any other co-packer in the
'Hyderabad Market'. In the absence of an
explicit exclusivity clause, this Court would be
reluctant to imply such a sweeping restriction
upon KMF's commercial freedom, particularly
since the implication of exclusivity in a State
instrumentality's commercial dealings raises
significant constitutional concerns about the
foreclosure of market access to other potential
participants.
13.18. For the avoidance of doubt: this Court's finding
on Point No. 2 that the petitioners' rights are
confined to the Hyderabad Metropolitan Area
makes the exclusivity question academic. Even
if the agreements were exclusive within the
Hyderabad Metropolitan Area, the impugned
- 149 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
actions, which relate to territories outside that
area, would not violate that exclusivity.
13.19. Sri. Sumanth L. Bharadwaj, learned Counsel for
KMF, has placed before this Court the historical
background of how Nandini products came to
be marketed in Hyderabad. Before the
establishment of a dedicated distribution
channel, the marketing of Nandini milk and
allied products in Hyderabad city was carried
out through Mother Dairy, a public sector
undertaking under the National Dairy
Development Board, which procured dairy
products from various Karnataka milk unions,
including Hassan, Mysore, and Shimoga unions,
and distributed them in Hyderabad through its
own retail and wholesale network.
13.20. With a view to streamlining operations and
improving the efficiency of Nandini product
distribution in Hyderabad, KMF decided to
establish its own distribution channel
independent of Mother Dairy. By the
arrangement dated 04.02.2016, KMF entrusted
the business of sale of Nandini branded milk
and milk products 'in Hyderabad' to Hassan.
- 150 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
The entrustment was explicitly and exclusively
for 'Hyderabad', the city of Hyderabad, which
was the territory in which Mother Dairy's
distribution network operated. The entire
rationale for the Hassan appointment was to
replace and supplement Mother Dairy's
Hyderabad city distribution with a dedicated
KMF-controlled channel. The intended scope of
the Hassan appointment, and consequently of
any sub-appointment by Hassan to the
petitioners, was therefore the city of Hyderabad
and its immediate environs, not the entire
State of Telangana.
13.21. The Mother Dairy history is thus strong
contextual evidence supporting the narrower
construction. The 'Hyderabad Market' that KMF
entrusted to Hassan was the Hyderabad city
market that Mother Dairy had been serving, a
city-level distribution market, not a State-wide
one. This context was known to both KMF and
Hassan at the time of the arrangement, and the
petitioners, who were appointed by Hassan
under this arrangement, are taken to have
been aware of this background when they
accepted their appointments. The principles of
- 151 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
contextual interpretation require that a
contractual expression be read against its
historical and commercial background.
13.22. From 2015 to 2023, a period of nine years,
every official document issued by KMF and
Hassan in relation to the petitioners'
appointments uses the expression 'Hyderabad'
or 'Hyderabad Market'. This includes: the initial
appointment order of 18.05.2015 (WP 23487);
the KMF order dated 04.02.2016 transferring
the 'Hyderabad business' to Hassan; the KMF
order dated 28.09.2016 confirming the
transfer; the KMF permission dated 17.07.2018
for Hassan to issue an Expression of Interest;
the KMF communication dated 12.07.2018; the
EOI issued by Hassan for selecting the
petitioner in WP 22850; the appointment order
dated 01.10.2016; the agreement dated
01.01.2020; and the tender notification and
award in 2023. Not one of these documents
uses the expression 'State of Telangana',
'Telangana Market', or any formulation that
would suggest a territory extending beyond the
Hyderabad Metropolitan Area.
- 152 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.23. This nine-year pattern of consistent and
unvarying terminology is highly probative.
When parties to a commercial relationship
consistently use a particular expression over an
extended period, courts generally treat that
consistent usage as evidence of the parties'
mutual understanding of the meaning of the
expression. If the parties had understood
'Hyderabad Market' to mean 'entire State of
Telangana', one would expect to see some
documents that use 'Telangana' or 'State of
Telangana' as an alternative description for the
petitioners' territory, particularly in the later
years, when the new State of Telangana was
fully established. The complete absence of any
such alternative formulation strongly supports
the conclusion that the parties consistently
understood 'Hyderabad Market' to mean the
city of Hyderabad and its metropolitan area.
13.24. When KMF decided, in 2024, to expand its co-
packing operations to cover the entire State of
Telangana, it issued the tender notification with
the explicit description 'for carrying out co-
packing activities for the State of Telangana for
a period of 2 years'. The change from
- 153 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
'Hyderabad Market' (used in all previous
documents) to 'State of Telangana' (used in the
2024 tender) is not a casual or inadvertent one.
It is a deliberate and purposeful change of
language, effected by a professionally managed
State instrumentality in an official document.
The change of expression carries legal
significance: it demonstrates that KMF
understood, and intended, these to be different
and distinct territorial descriptions. If they were
the same, there would have been no reason to
change the language in 2024.
13.25. This reasoning is consistent with the well-
established principle that contracting parties
are presumed to have used different words to
mean different things. Where a contract uses
two different expressions, the presumption is
that the parties intended the expressions to
have different meanings. The use of 'Hyderabad
Market' in pre-2024 documents and 'State of
Telangana' in the 2024 documents must
therefore be read as a conscious and deliberate
choice to describe different territorial scopes.
- 154 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.26. This Court turns to the practical commercial
geography of the Telangana dairy market as a
further basis for the narrower construction.
Dairy distribution is a logistics-intensive
business requiring the maintenance of a 'cold
chain', a continuous refrigeration infrastructure
from the processing plant to the end consumer.
Cold chain logistics imposes severe constraints
on the geographic range over which a single
distribution hub can efficiently operate. A WCF
agent or co-packing agent based in Hyderabad
city would typically operate within a delivery
radius of 50–100 km, the practical distance for
efficient cold chain delivery within a single
working day.
13.27. The five Telangana districts that are the subject
of the impugned authorisation, Warangal (145
km), Karimnagar (165 km), Nizamabad (170
km), Khammam (213 km), and Adilabad (290
km), are all well beyond this practical delivery
radius. A Hyderabad-based WCF agent
attempting to serve these districts would face:
(a) transit times of 3–6 hours by road,
significantly compromising cold chain integrity;
(b) substantially higher logistics costs making
- 155 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
the operations commercially unviable; and (c)
regulatory compliance challenges under FSSAI
regulations governing temperature-controlled
transportation across large distances. The
commercial reality, therefore, is that the
'Hyderabad Market' for dairy distribution
purposes has always been and can only
practically be the city of Hyderabad and its
metropolitan area.
13.28. This Court takes judicial notice of the fact that
the State of Telangana has a well-developed
district-level dairy infrastructure of its own.
Each major Telangana district has its own
APDDCF (Andhra Pradesh Dairy Development
Cooperative Federation) or local dairy
cooperative infrastructure, through which
locally sourced milk products are distributed.
The idea that Nandini products from Karnataka
would be distributed across all of Telangana by
a single Hyderabad-based agent, thereby
competing with and bypassing the existing
district-level dairy infrastructure of Telangana,
is commercially and operationally implausible.
The 'Hyderabad Market' for Nandini products
has always been the city of Hyderabad and its
- 156 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
suburban environs, where the demand for
Karnataka Nandini products is concentrated
among Karnataka-origin migrant communities
and discerning urban consumers.
13.29. The petitioners cite the Shimogga Milk Union
episode as evidence of their broader territorial
claim.
13.30. Hassan opposed this reorganisation vigorously,
contending that the permission granted by KMF
to Shimoga. Following Hassan's objections,
KMF, by communication dated 12.08.2020,
formally withdrew the permission granted to
Shimoga Milk Union and directed Hassan to
continue operating the entire Hyderabad city
market. M/s Sambasiva Dairy Products, which
had been identified as Shimoga's agent, was
accordingly not allowed to commence
operations.
13.31. The petitioner in WP 22850/2024 relies upon
the 2020 episode as establishing that KMF's
own proposal to divide the 'Hyderabad Market'
into sub-zones, one of which was called
'North/Warangal Zone', proves that the
Hyderabad Market extends to Warangal. This
- 157 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
argument fails for the reasons this Court has
already given. There is a further reason specific
to the 2020 episode: the episode actually
proves the opposite of what the petitioner
contends. The withdrawal of the Shimoga
permission and the reaffirmation of Hassan's
mandate for the entire Hyderabad city market
establishes that KMF's settled institutional
position, after the episode, was that the
'Hyderabad Market' belongs exclusively to
Hassan. It does NOT establish that the
'Hyderabad Market' means all of Telangana; it
establishes that within the city of Hyderabad,
Hassan is the authorised and exclusive
distributor.
13.32. When WP 23487/2024 first came up for hearing
before this Court, an interim order was passed
on 01.10.2024. The order, as recorded,
'allowed Hassan to supply Nandini products to
Warangal' for a specified interim period, subject
to conditions. This Court has carefully
considered the significance of this interim order
in the context of the present Point.
- 158 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.33. The interim order of 01.10.2024 carries a clear
and telling implication. If Warangal had been
within the operational territory of the petitioner
in WP 23487/2024, there would have been no
need for the Court to 'allow' Hassan to supply
to Warangal, the petitioner's pre-existing rights
would have covered Warangal, and the Court's
order on the interim application would have
been directed at maintaining the status quo,
i.e., preventing any new entrant from entering
the petitioner's territory. The fact that the
Court, on the very first hearing, granted
permission for Hassan to supply to Warangal,
thereby implicitly recognising that Warangal
was not within the petitioner's exclusive
territory, is a strong indication of this Court's
prima facie view, at the interlocutory stage,
that the petitioner's rights did not extend to
Warangal.
13.34. The interim order is not, in itself, determinative
of the rights of the parties, interim orders are
inherently provisional and are made on the
basis of a prima facie assessment. But the
reasoning underlying the interim order is
indicative of this Court's assessment of the
- 159 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
probable position in law, and that assessment
is confirmed upon a full examination of the
evidence and arguments at the final hearing
stage.
13.35. There is an additional and independent ground
on which the petitioners' claim to rights over
the entire State of Telangana must fail: the
principle of delegatus non potest delegare, the
delegate cannot sub-delegate beyond the scope
of the delegated authority.
13.36. The chain of authority relevant to the present
case is as follows: KMF, as the apex dairy
federation of Karnataka, had the authority to
distribute Nandini products in any territory it
chose, including Telangana. KMF exercised this
authority by delegating the 'Hyderabad
business', i.e., the business of distributing
Nandini products in the Hyderabad market, to
Hassan by the order dated 04.02.2016.
Hassan's authority in Telangana was therefore
confined to the 'Hyderabad Market' as
delegated by KMF. Hassan could not, without
further authorisation from KMF, extend its sub-
delegated authority to cover territories beyond
- 160 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
those delegated to it. When Hassan appointed
the petitioners as its sub-agents, it could
therefore grant them only such rights as it itself
had, i.e., rights within the 'Hyderabad Market'.
Any purported grant of rights over the entire
State of Telangana by Hassan would have been
in excess of Hassan's own authority and would
have been void to that extent.
13.37. The principle of delegatus non potest delegare
is well established in both public law and
private law. In the context of agency, the
principle is expressed as the rule that an agent
cannot sub-delegate authority that has not
been conferred upon him, a sub-agent's
authority cannot exceed the agent's authority.
In the public law context, a delegate of
statutory power cannot further delegate that
power unless expressly authorised to do so.
The same principle applies, by analogy, to the
sub-delegation of commercial authority by a
State instrumentality.
13.38. It follows that even if the agreements between
Hassan and the petitioners were, on their face,
worded as granting rights over 'Telangana' or
- 161 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
some larger territory, such a grant would be
ultra vires the scope of Hassan's authority from
KMF and would be legally ineffective to that
extent. The agreements between Hassan and
the petitioners must be read subject to the
limitation on Hassan's authority, i.e., they
confer rights only within the 'Hyderabad
Market', which is the territory that Hassan was
itself authorised to operate in by KMF.
13.39. The petitioners argue that the word 'Hyderabad'
in the expressions 'Hyderabad Market' and
'Hyderabad business' must be understood in its
post-bifurcation political and administrative
context, where 'Hyderabad' was the capital of a
newly formed State and colloquially denoted
the entire State. This Court is unable to accept
this argument for the following reasons.
13.40. First, there is no linguistic or legal basis for
reading 'Hyderabad' as a synonym for
'Telangana'. The State of Telangana, even
immediately after bifurcation in June 2014, had
an official name, Telangana, and a well-
established geography that was distinct from
and far larger than the city of Hyderabad. The
- 162 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Andhra Pradesh Reorganisation Act, 2014,
precisely defined the territory of Telangana as
comprising 10 districts (subsequently
reorganised into more). These districts included
not only Hyderabad but also Warangal,
Karimnagar, Nizamabad, Medak, Nalgonda,
Mahabubnagar, Khammam, Adilabad, and
Ranga Reddy. In this context, when KMF used
the expression 'Hyderabad Market' in 2015, it
was writing against a clear background in which
'Hyderabad' referred to the city and 'Telangana'
referred to the State. The substitution of one
for the other is not legally supportable.
13.41. Second, KMF is a sophisticated institutional
actor, it is an apex dairy federation with
experience in commercial operations across
multiple States. It is not plausible that KMF,
when preparing official orders and agreements
in 2015, 2016, and subsequent years, would
use the word 'Hyderabad' when it meant 'State
of Telangana'. A professionally managed State
instrumentality of KMF's stature would use
precise language in official documents. If KMF
had intended the entire State of Telangana, it
would have said so.
- 163 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.42. Third, the argument from the 'joint capital'
status of Hyderabad proves as much. Under the
Andhra Pradesh Reorganisation Act, 2014,
Hyderabad was the joint capital of both
Telangana and Andhra Pradesh for ten years.
On the petitioners' logic, 'Hyderabad Market'
could be read as denoting not only the whole of
Telangana but also the whole of Andhra
Pradesh, an absurdity that demonstrates the
fallacy of reading 'Hyderabad' as coextensive
with any State. The joint capital arrangement
was a political expedient for an interim period;
it had no bearing on the commercial meaning of
the word 'Hyderabad' in business documents.
13.43. Since this Court has held that the petitioners'
contractual rights are confined to the
Hyderabad Metropolitan Area, and since the
operative order specifically protects those rights
within this area, it is necessary to precisely
define what this area encompasses.
13.44. The Hyderabad Metropolitan Development
Authority (HMDA) was constituted under the
Hyderabad Metropolitan Development Authority
Act, 2008. The HMDA exercises planning and
- 164 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
development authority over the Hyderabad
Metropolitan Region (HMR), which covers an
area of approximately 10,473 sq. km. The HMR
includes: (a) the area of Greater Hyderabad
Municipal Corporation (GHMC); (b) the areas of
surrounding municipalities; (c) mandal
development authorities; and (d) gram
panchayats within the metropolitan area. It
encompasses portions of the districts of
Hyderabad, Medchal-Malkajgiri, Rangareddy,
Sangareddy, Yadadri-Bhongiri, and Vikarabad.
13.45. For the purposes of this matter, the expression
'Hyderabad Metropolitan Area' refers to the
entire area under the jurisdiction of the HMDA,
i.e., the Hyderabad Metropolitan Region as
constituted under the HMDA Act, 2008. The
petitioners' contractual rights under their
respective agreements with Hassan CMPSU
encompass this entire area, and no other party
is entitled to conduct Nandini distribution or co-
packing operations within this area in
competition with the petitioners during the
subsistence of their agreements, subject to the
terms of those agreements.
- 165 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
13.46. Sri. Syed Kashif Ali, appearing for Hassan
(Respondent No. 4 in WP 23487/2024 and
Respondent No. 3 in WP 22850/2024), has
taken the unusual step, for a respondent, of
supporting the petitioners' submissions.
Hassan's counsel has submitted: (a) that the
impugned actions of KMF in introducing parallel
and overlapping agencies are ex facie arbitrary;
(b) that KMF has adopted inconsistent positions
regarding the meaning of 'Hyderabad Market';
(c) that the allocation of commercial
opportunities without fair procedure violates
Article 14; and (d) that the impugned actions
violate Articles 14 and 19(1)(g). These
submissions, made by the party that entered
into the relevant agreements with the
petitioners, deserve careful consideration.
13.47. This Court acknowledges that Hassan's support
of the petitioners is understandable from an
institutional perspective. Hassan, as the entity
that entered into the WCF Agent Agreement
and the Co-packing Agreement with the
petitioners, has a direct interest in the integrity
of those agreements: if the agreements are
found to have been exceeded by Hassan, i.e., if
- 166 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Hassan is found to have granted rights over a
broader territory than it was authorised to
grant, Hassan itself may be exposed to liability.
Hassan therefore has an institutional incentive
to support the broader construction of
'Hyderabad Market' that would legitimate its
own appointments of the petitioners. This Court
takes note of this institutional interest and
weighs Hassan's submissions accordingly.
13.48. More importantly, Hassan's submissions on
behalf of the petitioners cannot override the
legal analysis of the documents and
agreements. The meaning of the expression
'Hyderabad Market' is determined by the Court
on the basis of the text, context, and
surrounding circumstances of the relevant
documents, not on the basis of the current
institutional preferences of the parties. The fact
that Hassan now supports a broader reading of
'Hyderabad Market' does not establish that this
broader reading was intended at the time the
agreements were made. If anything, Hassan's
previous conduct, consistently referring to the
petitioners' territory as 'Hyderabad Market' in
- 167 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
all official communications, supports the
narrower construction, not the broader one.
13.49. The fact that a respondent supports the
petitioners does not, in itself, assist the
petitioners, the Court must independently
determine the legal position. As the Hon’ble
Supreme Court observed in Shrilekha
23
Vidyarthi v. State of U.P . the Court must
examine arbitrariness on the basis of whether
the impugned action is 'uninformed by reason',
not on the basis of which parties support or
oppose it. Having examined the impugned
actions on the merits, this Court finds, that no
arbitrariness cognisable under Article 14 is
established.
13.50. This Court's finding that 'Hyderabad Market'
means the city of Hyderabad and its
metropolitan area has the following specific
legal effects: (a) KMF is entitled to appoint any
entity/ies that it chooses, whether through
tender or administrative direction, to carry out
Nandini distribution, co-packing, or other dairy
activities in any part of the State of Telangana
23
(1991) 1 SCC 212
- 168 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
outside the Hyderabad Metropolitan Area,
without any reference to or consent from the
petitioners; (b) KMF's letter dated 07.08.2024
and the work order dated 07.11.2024,
appointing Raichur CMPSU for five districts
outside the Hyderabad Metropolitan Area, are
lawful; (c) KMF's tender and the Letter of
Award to M/s Shakti Milk for the State of
Telangana are lawful, subject to the specific
direction that these appointments shall not
encroach upon the Hyderabad Metropolitan
Area during the subsistence of the petitioners'
agreements; and (d) the petitioners' existing
agreements with Hassan for their Hyderabad
Metropolitan Area operations remain in full
force and effect, and neither Hassan nor any of
the newly appointed entities is entitled to
interfere with those operations during the
subsistence of the contractual arrangment.
13.51. This Court concludes, on the basis of: (a) the
plain and ordinary meaning of the expression
'Hyderabad Market'; (b) the Mother Dairy
history and the terms of the 04.02.2016
entrustment; (c) the consistent nine-year
usage of this expression in all official
- 169 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
documents; (d) the deliberate change to 'State
of Telangana' in the 2024 tender; (e) the
commercial geography and cold chain logistics;
(f) the principle of delegatus non potest
delegare; (g) the implication of this Court's
interim order of 01.10.2024; (h) the Shimoga
episode, which confirms rather than contradicts
the narrower construction; and (i) the failure of
the post-bifurcation 'Hyderabad = Telangana'
argument, that the expression 'Hyderabad
Market' as used in the agreements and orders
between the parties refers to the city of
Hyderabad and its metropolitan area as defined
by the HMDA Act, 2008. The petitioners' rights
do NOT extend to the entire State of
Telangana.
13.52. It is equally important to state what this Court's
conclusion does not mean. It does not mean
that the petitioners have no rights at all. The
petitioners have subsisting contractual rights
within the Hyderabad Metropolitan Area, and
these rights are both acknowledged and
protected by this Court's order. The
respondents are not permitted to encroach
upon the Hyderabad Metropolitan Area
- 170 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
operations of the petitioners during the
subsistence of their respective agreements with
Hassan.
13.53. This Court answers Point No.2 by holding that
the expression 'Hyderabad Market' in the
agreements, orders, and communications
between the parties refers to the city of
Hyderabad and its metropolitan area, and does
NOT encompass the entire State of Telangana.
The petitioners have subsisting contractual
rights within the Hyderabad Metropolitan Area,
but these rights do not extend to the districts of
Warangal, Adilabad, Nizamabad, Karimnagar,
Khammam, or any other part of Telangana
lying outside the Hyderabad Metropolitan Area.
14. Answer to Point No.iii: Whether the impugned
communications, tenders and work orders
result in impermissible parallel or overlapping
arrangements, and if so, whether such actions
are arbitrary, unreasonable or violative of
Article 14 of the Constitution of India?
14.1. Answer to Point No.iii is substantially, though
not entirely, dependent upon this Court's
conclusion on Point No. 2. The petitioners' case
under Point No. 3 is that the impugned
appointments, Raichur CMPSU for five
- 171 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Telangana districts and M/s Shakti Milk for the
State of Telangana, create impermissible
parallel or overlapping arrangements within
their operational territory, thereby violating
Article 14. Given this Court's finding under
Point No.ii that the petitioners' rights are
confined to the Hyderabad Metropolitan Area,
the question under Point No.iii is whether the
impugned appointments encroach upon that
territory.
14.2. The broader question of whether the manner in
which KMF proceeded, without prior notice to
the petitioners, without consultation, and
without any fair process, constitutes arbitrary
State action in violation of Article 14,
independent of the question of geographic
overlap.
14.3. The five districts specified in the impugned
letter dated 07.08.2024, Warangal, Adilabad,
Nizamabad, Karimnagar, and Khammam, are
located at the following approximate distances
from Hyderabad city centre: Warangal (145
km), Karimnagar (165 km), Nizamabad (170
km), Khammam (194 km), Adilabad (290 km).
- 172 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
The Hyderabad Metropolitan Development
Authority (HMDA) area of jurisdiction, the
legally defined metropolitan area of Hyderabad,
does not extend to any of these districts. The
HMDA includes Hyderabad, Medchal-Malkajgiri,
Rangareddy, and parts of Sangareddy and
Vikarabad. None of the five Telangana districts
specified in the impugned authorisation falls
within this HMDA area.
14.4. Accordingly, the authorisation of Raichur
CMPSU to operate in these five districts does
not, on its face, create any geographical
overlap with the petitioners' operational
territory in the Hyderabad Metropolitan Area.
The operations are spatially separate. There is
no 'parallel' arrangement in the sense of two
competing entities operating in the same
geographic market.
14.5. As regards WP 22850/2024, the appointment of
M/s Shakti Milk and Milk Products as co-packing
agent for the 'State of Telangana' requires
more careful treatment. The Letter of Award is
framed in terms of the entire State, which
would ostensibly include the Hyderabad
- 173 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Metropolitan Area. However, the appointment
of M/s Shakti Milk for the State of Telangana
cannot, as a matter of law, extinguish or
override the petitioner's subsisting contractual
rights within the Hyderabad Metropolitan Area.
The petitioner holds a valid agreement with
Hassan CMPSU for co-packing operations within
the Hyderabad Market. That agreement
remains operative. M/s Shakti Milk's
appointment cannot be given effect within the
Hyderabad Market to the extent that it would
conflict with the petitioner's pre-existing
contractual rights during the subsistence of the
existing agreement.
14.6. The petitioners challenge the impugned actions
on the ground that they were taken without
prior notice or consultation with the petitioners,
and that this absence of notice constitutes
arbitrary State action in violation of Article 14.
This ground of challenge raises the important
question of what procedural obligations Article
14 imposes upon a State instrumentality
making commercial decisions that affect its
long-standing contractual partners.
- 174 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
14.7. The starting point for this analysis is the
decision in Mahabir Auto Stores v. Indian
24
Oil Corporation . In that case, the Indian Oil
Corporation terminated a dealership of 18
years' standing without any prior notice or fair
process. The Hon’ble Supreme Court held that
this was impermissible under Article 14,
observing that a State instrumentality that has
maintained a long-standing commercial
arrangement owes its commercial partner at
least a basic duty of notice and fair dealing
before introducing any significant change. The
Hon’ble Supreme Court referred to this as the
'obligation to act fairly', which is an incident of
the constitutional guarantee of non-
arbitrariness.
14.8. The principle in Mahabir Auto Stores has
been affirmed and applied in a series of
subsequent decisions. In Ramana Dayaram
Shetty v. The International Airport
25
Authority of India , the Hon’ble Supreme
Court similarly held that the State cannot act
capriciously or irrationally in its contractual
24
(1990) 3 SCC 752
25
(1979) 3 SCC 489
- 175 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
dealings, even where it has a formal right to do
so under the contract. These decisions
collectively establish that Article 14 imposes a
duty of basic procedural fairness upon State
instrumentalities in their commercial dealings.
14.9. Applying these principles to the present case:
the undisputed evidence on record establishes
that KMF did not provide any prior notice to
either petitioner before: (a) issuing the letter
dated 07.08.2024 to Raichur CMPSU permitting
it to operate in five Telangana districts; or (b)
issuing the tender notification dated
20.05.2024 for a co-packing agent for the State
of Telangana. The petitioners first learnt of
these actions through informal channels, not
through any official communication from KMF
or Hassan. This falls short of the basic fairness
standard that Article 14 requires of State
instrumentalities.
14.10. However, the more critical question is whether
this failure to give notice has caused the
petitioners any legally cognisable prejudice, in
circumstances where the impugned actions do
not actually encroach upon the petitioners'
- 176 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Hyderabad Market rights. This Court holds that
the answer is in the negative. The procedural
deficiency has not prejudiced the petitioners'
substantive rights, because the impugned
actions do not touch the Hyderabad
Metropolitan Area in which the petitioners
operate.
14.11. It is a settled principle of administrative law
that not every procedural irregularity vitiates
the substantive validity of an administrative
action. The courts have consistently
distinguished between procedural defects that
go to the root of the action and cause
substantial prejudice (which vitiate the action)
and those that are technical or incidental and
cause no substantial prejudice (which do not).
In the present case, the failure to give prior
notice is a procedural deficiency, but it has not
caused any substantial prejudice to the
petitioners since the impugned actions do not
encroach upon the Hyderabad Market.
14.12. The doctrine of proportionality, which the
Hon’ble Supreme Court has increasingly applied
as a standard of constitutional review, similarly
- 177 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
supports this conclusion. Even if KMF's failure
to give prior notice constitutes a departure
from the standard of procedural fairness
required by Article 14, the appropriate remedy
for such a departure must be proportionate to
the wrong. The disproportionate remedy of
quashing the impugned appointments entirely,
thereby depriving five Telangana districts of a
distribution channel for Nandini products,
cannot be justified on the basis of a procedural
deficiency that has caused no substantive harm
to the petitioners.
14.13. Having said that, this Court considers it
appropriate to note on record that KMF and
Hassan are expected to observe higher
standards of procedural fairness in their future
dealings with long-standing commercial
partners. KMF and Hassan are accordingly
directed to ensure that, in future, any material
change to the distribution arrangements in
Telangana that affects the petitioners'
contractual entitlements during the subsistence
of the contract within the Hyderabad Market
shall be preceded by adequate notice to the
- 178 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
petitioners and a reasonable opportunity for
them to be heard.
14.14. This Court examines the substantive rationality
of KMF's decision to expand its Telangana
distribution network to the five districts under
the Wednesbury unreasonableness standard, as
articulated by the Hon’ble Supreme Court in
26
Tata Cellular v. Union of India . Under this
standard, the court examines whether the
decision is so unreasonable that no reasonable
person in the position of the decision-maker
could have made it, or whether the decision
was made without applying the mind, or was
actuated by mala fides, extraneous
considerations, or irrelevant factors.
14.15. This court can take judicial note that the five
Telangana districts to which the authorisation
was extended, Warangal, Karimnagar,
Nizamabad, Khammam, and Adilabad, have a
substantial. The availability of quality dairy
products, including the well-established Nandini
brand, in these districts serves a demonstrable
public interest. The decision by KMF to extend
26
(1994) 6 SCC 651
- 179 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
its distribution network to these districts, which
had been underserved in terms of Nandini
product availability, is a manifestly rational
decision in furtherance of KMF's public dairy
development mandate. This Court cannot
characterise this decision as Wednesbury
unreasonable.
14.16. The decision of KMF to assign this expanded
Telangana distribution territory to Raichur
CMPSU, rather than to some other entity, is an
internal federal arrangement within the KMF
family of constituent milk unions. It does not
involve the disbursement of State largesse to a
private party; it is an administrative direction
by the apex federation to one of its own
constituent units. This Court holds that such
internal administrative arrangements are
entitled to a still higher degree of judicial
deference than public tenders or contracts with
private parties. In the absence of any evidence
of mala fides, discrimination, or non-application
of mind, this Court will not interfere with KMF's
internal federal arrangements.
- 180 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
14.17. The doctrine of proportionality has been
increasingly recognised as an additional tool of
constitutional review by the Hon’ble Supreme
Court, most significantly in Modern Dental
College and Research Centre v. State of
27
Madhya Pradesh and K.S. Puttaswamy v.
28
Union of India . In these decisions, the
Hon’ble Supreme Court recognised
proportionality, the principle that State action
should not exceed what is necessary to achieve
its legitimate aim, as an implied constitutional
standard under Article 14. The doctrine requires
that any restriction on the rights of a private
party dealing with the State should be no
greater than necessary to achieve the State's
legitimate commercial or public interest
objective.
14.18. The legitimate aim of KMF's actions is to
expand the reach of the Nandini distribution
network to districts of Telangana that had not
previously been adequately served, a legitimate
commercial and public interest objective. The
means adopted, authorising Raichur CMPSU to
27
(2016) 7 SCC 353
28
(2017) 10 SCC 1
- 181 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
operate in five specific districts (WP 23487) and
issuing a public tender for Telangana-wide co-
packing (WP 22850), are appropriate and
necessary to achieve this aim. Neither action
goes further than what is required to serve the
districts in question. Neither action encroaches
upon the petitioners' Hyderabad Metropolitan
Area rights. The impugned actions satisfy the
proportionality test.
14.19. Even applying the more searching
proportionality analysis, which requires
examining whether a less restrictive means was
available to achieve the same end, this Court
finds that KMF's actions pass scrutiny. The
appointment of Raichur CMPSU for the five
districts is a rational choice for those specific
districts; there is no 'less restrictive' alternative
that would have achieved the same result of
serving those districts. Raichur also being
geographically abutting State of Telangana. The
issuance of a public tender for co-packing
services is itself the least restrictive means of
making a new appointment, it is an open,
competitive, and transparent process that gave
- 182 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
all eligible parties, including the petitioner, the
opportunity to bid.
14.20. The dections relied and its application to the
facts of the present case are as under.
14.21.
Noida Toll Bridge Co. Ltd. V. Federation Of
29
Noida Residents Welfare Association , was
relied upon by Sri. Syed Kashif Ali. The Hon’ble
Supreme Court examined the terms of a
concession agreement for a toll bridge and held
that contractual terms which are 'so unfair and
unreasonable that they truly baffle this Court'
are opposed to public policy and must be
adjudged void, and that courts may invoke the
doctrine of severability to sever incurable void
terms from the rest of the contract. Sri. Kashif
Ali relied on this decision for the proposition
that even if contractual clauses purport to
reserve modification rights, such clauses cannot
be exercised in an arbitrary or unreasonable
manner, and if so exercised, are liable to be
struck down.
29
14.22. Noida Toll Bridge , on its specific facts, is
distinguishable. That decision deals with a
29
(2025) 6 SCC 717
- 183 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
concession agreement containing terms
structurally so one-sided as to amount to
unconscionable bargain, the tolling formula was
found to permit the toll collector to recover
revenues indefinitely, far beyond any
reasonable recovery of project cost. The
present case is not one where any term of the
agreements between the parties is being
challenged as unconscionable or void. The
petitioners are not seeking to strike down
Clause 3 of the WCF Agent Agreement; they
are seeking to prevent KMF from acting in
territories they claim as their own. The Noida
Toll Bridge doctrine of striking down void
contract terms has no application to this claim.
14.23. M.I. Builders (P) Ltd. V. Radhey Shyam
8
Sahu , struck down a commercial agreement
between the Lucknow Mahapalika and a private
builder for construction of an underground
shopping complex as being 'completely one-
sided favouring the builder', violative of the
public trust doctrine, and inconsistent with the
Master Plan. Sri. Kashif Ali relied on this for the
proposition that where a public authority
exercises power in a manner that is 'one-sided,
- 184 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
arbitrary or confers disproportionate advantage
without any rational basis', the resultant
arrangement must be struck down. M.I.
8
Builders is distinguishable on its facts. That
decision involved an agreement that was itself
found by the Hon’ble Supreme Court to be
unconscionable and in violation of a specific
statutory provision (the Master Plan). In the
present case, there is no allegation that the
agreement between KMF and the Respondents
is unconscionable or illegal on its face. The
challenge is to the exercise of specific rights
under the agreement, not to the agreement
itself. The Wednesbury standard of review
applied to the exercise of contractual rights by
a State instrumentality is the correct standard,
not the more intensive standard applied in M.I.
8
Builders to strike down a manifestly
unconstitutional agreement.
11
14.24. New Horizons Ltd. V. Union Of India . The
11
Hon’ble Supreme Court in New Horizons
stated that 'the State, in exercise of its various
functions, enters into contracts. Such contracts
cannot be regarded as being on the same
footing as contracts between private persons.
- 185 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
The actions of the State or its instrumentalities,
even while entering into contracts, are required
to conform to the standard of fairness and non-
arbitrariness which is the hallmark of State
action.' Sri. Kashif Ali relies on this to argue
that KMF's actions in the contractual domain
must conform to non-arbitrary standards. This
Court entirely accepts this proposition, it is the
foundation of the public law analysis in this
judgment. However, the question of whether a
standard has been met is a different question
from whether the standard applies. This Court
holds that the standard applies but, for the
reasons set out in Points 2 and 4, the standard
is met by KMF's actions in the present case.
The 'free play in the joints' doctrine, articulated
in the context of government contracts in Tata
26 11
Cellular and endorsed in New Horizons ,
recognises that the State must have a degree
of commercial flexibility necessary for efficient
and rational commercial management of State
resources. KMF's decisions fall well within this
zone of legitimate discretion.
14.25. Seclink Technologies Corporation V. State
10
Of Maharashtra . The Hon’ble Bombay High
- 186 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
10
Court held in SecLink that in matters
involving public contracts, 'the terms and
conditions and requirement and scope of work
should be certain and definite, and not
uncertain and indefinite; the absence of definite
and certain terms creates confusion not only for
the contracting parties but also undermines the
integrity and fairness of the process'. Sri.
Kashif Ali relies on this to contend that the
impugned actions, by introducing multiple
agencies with inconsistently defined territorial
boundaries, create ambiguity and undermine
10
fairness. SecLink is distinguishable for two
10
reasons. First, the proposition from SecLink is
directed at the clarity and definiteness of
tender terms, it holds that tenders must have
clear and certain specifications. The 2024
tender issued by KMF was for co-packing
activities 'for the State of Telangana for a
period of 2 years', a description that is clear,
definite, and certain. There is no ambiguity in
the scope of the 2024 tender. Second, the
letter dated 07.08.2024 to Raichur specifies
five distinct named districts, again clear and
10
definite. The SecLink principle of definiteness
- 187 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and clarity is therefore satisfied. The complaint
is not about the definiteness of the impugned
documents but about whether those documents
encroach upon the petitioners' territory, a
question of interpretation addressed under
Point 2.
14.26. Vijay Kumar Gupta V. State Of
9
Maharashtra . The Hon’ble Supreme Court
held that where the State exercises exclusive
control over resources and allocates
commercial opportunities on the basis of such
control, the allocation must follow fair
procedure and objective criteria. Sri. Kashif Ali
relied on this for the proposition that KMF's
allocation of additional distribution territory to
Raichur CMPSU, without transparent criteria or
competitive process, is an arbitrary distribution
9
of State largesse.The Vijay Kumar Gupta
principle, while correct in the abstract, does not
assist the petitioners on the facts of the present
case. The key distinction is that Vijay Kumar
9
Gupta involved the allocation of commercial
opportunities to private third parties without
any transparent procedure, a pure case of
arbitrary grant of State largesse. In the present
- 188 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
case, the 'allocation' to Raichur CMPSU is not a
grant of State largesse to an outside private
party; it is an internal administrative direction
by an apex federation to one of its own
constituent units. The internal allocation of
functions between constituent members of the
same cooperative federation does not attract
the same transparency requirements as the
grant of commercial rights to private parties.
14.27. Sri. Pramod Nair, learned Senior Counsel for
Respondent No. 5, has relied upon
Mahalakshmi Engineering Works v.
12
BESCOM , NHAI v. Gwalior-Jhansi
13
Expressway Ltd ., and Subir Ghosh v. State
14
of West Bengal .
14.28. The specific propositions are: (a)
12
Mahalakshmi : a tenderer who remains
outside the tender process and then seeks to
question the tender conditions does not have
locus to challenge; (b) NHAI v. Gwalior-
13
Jhansi : a person who has not participated in
the tender process cannot assert rights against
a person who has validly participated; (c)
14
Subir Ghosh : a prospective bidder who finds
- 189 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
tender terms unfair must challenge before bid
closure, not after the award.
14.29. All three decisions apply directly and squarely
to the position of the petitioner in WP
22850/2024. The tender notification
KMF/PUR/Tender-650/2024-25 was issued on
20.05.2024. The petitioner in WP 22850/2024
was aware of the tender. The petitioner chose
not to participate, and critically, chose not even
to challenge the tender before bid closure. WP
22850/2024 was filed only after the Letter of
Award had been issued to M/s Shakti Milk on
07.08.2024. By this time, M/s Shakti Milk had
already been selected after a competitive
process, and had made substantial investments
exceeding Rs. 35 crores in establishing a state-
of-the-art dairy plant compliant with National
Dairy Development Board norms, in reliance
upon the award.
14
14.30. The principle from Subir Ghosh is particularly
apposite: 'It is possible that a prospective
bidder finds the terms of the tender documents
to be unfair or illegal and challenges the same;
but such challenge has to be before the time to
- 190 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
put in bids is closed.' This Court specifically
endorses and adopts this principle. The
petitioner in WP 22850/2024 had the option of:
(a) participating in the tender; (b) challenging
the tender before bid closure; or (c) seeking an
interim injunction against the tender process
before its conclusion. The petitioner chose none
of these options. Having sat on the fence until
the tender process concluded and the award
was made, the petitioner cannot now be heard
to challenge the process, this would be unfair
to M/s Shakti Milk, which participated
legitimately, was selected on merit, and has
made substantial investments in reliance on the
award.
14.31. The submission of Sri. Pramod Nair that the
petitioners are guilty of suggestio falsi (active
misrepresentation) and suppressio veri
(suppression of true facts) is also well-founded
in relation to WP 22850/2024. The petitioner in
WP 22850/2024 did not disclose: (a) its
deliberate choice not to participate in the
tender; (b) the fact that it was aware of the
tender process; and (c) the nine-year
documentary record consistently describing the
- 191 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
territory as 'Hyderabad Market' rather than
'State of Telangana'. These are material facts
whose disclosure would have significantly
affected this Court's consideration of interim
relief. The doctrines of suggestio falsi and
suppressio veri are recognised grounds in
equity for declining to grant relief to a
petitioner who has approached the Court with
incomplete or misleading disclosure: see S.P.
30
Chengalvaraya Naidu v. Jagannath , where
the Hon’ble Supreme Court held that a litigant
cannot be permitted to 'play a fraud on the
Court' by suppressing material facts, and that
such conduct may justify dismissal of the
petition.
14.32. The petitioners' case, reduced to its essentials,
is this: KMF created competing distribution
arrangements in territories that the petitioners
had been led to believe were within their
exclusive domain; KMF did so without any
notice to the petitioners and without any fair
process; and the result is arbitrary State action
contrary to Article 14.
30
(1994) 1 SCC 1
- 192 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
14.33. This Court accepts the factual premise of this
case, that KMF acted without prior notice to the
petitioners. It does not accept the legal
premise, that the territories affected were
within the petitioners' exclusive domain. As this
Court has held under Point No. 2, the
petitioners' rights are confined to the
Hyderabad Metropolitan Area, and the
impugned actions relate entirely to territories
outside that area. The factual premise of the
petitioners' case therefore does not engage the
legal consequences they seek to draw from it.
14.34. Even if one were to assume, that the
petitioners had rights over a wider area that
included some of the affected districts, the
remedy of quashing the impugned
appointments, thereby depriving those districts
of Nandini product supply, would be
disproportionate. Courts exercising writ
jurisdiction are mindful of the principle that the
remedy must be proportionate to the wrong,
and must take into account the interests of all
affected parties, including the consumers in
those districts and the newly appointed entities
- 193 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
that have committed resources in reliance upon
the appointments.
14.35. The petitioners' case accordingly fails. The
procedural deficiency (absence of prior notice)
is noted but does not vitiate the impugned
actions in the circumstances, given the absence
of cognisable prejudice to the petitioners'
substantive rights. The prospective direction to
KMF and Hassan to give prior notice in future is
a sufficient and proportionate remedy for the
procedural deficiency.
14.36. The letter dated 07.08.2024, the work order
dated 07.11.2024, and the tender
KMF/PUR/Tender-650/2024-25 and the Letter
of Award dated 07.08.2024 in WP 22850/2024,
do not create impermissible parallel or
overlapping arrangements within the
petitioners' Hyderabad Metropolitan Area, and
are not arbitrary or unreasonable in violation of
Article 14 of the Constitution of India.
14.37. This Court accordingly answers Point No.3 by
holding that the impugned communications,
tenders, and work orders do not create
impermissible parallel or overlapping
- 194 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
distribution arrangements within the
petitioners' operational territory (the
Hyderabad Metropolitan Area). The five districts
assigned to Raichur CMPSU and the broader
Telangana scope of the 2024 tender do not
encroach upon the Hyderabad Metropolitan
Area. KMF's failure to give prior notice to the
petitioners was a procedural deficiency that did
not cause any cognisable prejudice in the
circumstances. The Wednesbury standard of
reasonableness is not infringed. No violation of
Article 14 is established.
15. Answer to Point No.iv: Whether the
respondents, particularly KMF, were entitled
under the terms of the agreement and in
exercise of policy/commercial discretion to
modify or expand the area of operations and
appoint additional agencies, and the extent to
which such decisions are amenable to judicial
review?
15.1. What is required to be examined is first,
whether KMF had the contractual and
institutional authority to take the impugned
actions, specifically, to modify the area of
operation of its WCF agents and to issue a fresh
tender for Telangana co-packing operations;
and second, assuming such authority exists,
- 195 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
what is the appropriate standard of judicial
review for such commercial and policy decisions
of a State instrumentality.
15.2. These are questions of general importance in
administrative law, and this Court is acutely
aware that an overly expansive or an overly
restrictive approach to judicial review in this
domain can have significant systemic
consequences: in the former case, by
converting every government commercial
decision into a constitutional controversy; in
the latter case, by insulating arbitrary State
action from the accountability it deserves. Both
errors are to be avoided.
15.3. Sri. Yogesh D. Naik, learned Additional
Government Advocate for Respondent No. 1,
the State of Karnataka, has supported the
respondents' position on maintainability,
pointing out that the writ petitions arise out of
purely commercial contractual arrangements
and that the appropriate forum for such
disputes is the civil court. He has also
supported KMF's position that the expression
'Hyderabad Market' does not encompass the
- 196 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
entire State of Telangana, and that KMF's
decisions were taken in furtherance of a
legitimate commercial policy. This Court has
held the petitions maintainable but has noted
the State's position on the merits.
15.4. Sri. M. Shyam Prasad, learned Counsel
appearing for Respondent No. 3, the Raichur
District Co-operative Milk Producers Societies
Union, has adopted the submissions of KMF and
Respondent No. 5 on all points. Raichur CMPSU
submits, in particular, that its operations under
the work order dated 07.11.2024 are strictly
confined to the five specified districts,
Warangal, Adilabad, Nizamabad, Karimnagar,
and Khammam, which are all outside the
Hyderabad Metropolitan Area, and that it has
no intention of or authority to operate within
the Hyderabad Metropolitan Area.
15.5. It is also relevant to note, in the context of the
respondents' equitable argument, that Raichur
CMPSU is itself a constituent member of the
KMF federation, it is not an outside private
party. The extension of operations to Raichur
CMPSU is a movement of business from one
- 197 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
part of the KMF family (Hassan) to another
(Raichur), not a privatisation or external grant
of commercial rights. This internal
redistribution, while it may affect the
petitioners' volume of business indirectly, is not
of the same constitutional significance as an
arbitrary grant of a private party's commercial
rights to another private party.
15.6. In WP 23487/2024, the relevant agreement
between the petitioner and KMF (through
Hassan) contains an express clause, Clause 3,
that reserves to KMF the right to 'add, delete,
modify, expand or alter the area of operation'
of the WCF Agent. This is an unequivocal
contractual reservation of authority. The
petitioner, by executing the agreement
containing Clause 3, accepted that KMF
retained the right to modify, expand, or alter
the area of operation. The petitioner cannot
now challenge the exercise of this reserved
right on the ground that it was not entitled to
be exercised.
15.7. The petitioners argue that Clause 3 should be
read as authorising KMF to modify the area of
- 198 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
operation only in the petitioner's favour, e.g.,
to expand the petitioner's territory, and not to
reduce or introduce competing areas. This is a
strained and artificial construction that the
Court declines to accept. Clause 3 is framed in
broad and unconditional terms. There is no
textual basis for limiting this authority to
modifications that favour the agent. The power
to 'modify' or 'alter' includes the power to
reduce or change the configuration of the
territory, not merely to expand it. The clause,
read in its plain and natural sense, is a broad
reservation of authority that fully covers the
actions taken by KMF in the present case.
15.8. In WP 22850/2024, the relevant question is
whether KMF had the institutional authority to
issue a fresh tender for co-packing operations
in Telangana, even though the petitioner had a
subsisting agreement with Hassan for co-
packing in the Hyderabad Market. This Court
holds that KMF clearly had such authority. KMF,
as the apex dairy federation and the principal
authority in the KMF distribution chain, has an
inherent and inalienable authority to manage
and reorganise its distribution network as it
- 199 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
considers appropriate, subject only to the
constraints imposed by its own policies, its
constituent agreements, and the constitutional
guarantee of non-arbitrariness. The issuance of
a tender for the 'State of Telangana', a territory
wider than the 'Hyderabad Market' covered by
the petitioner's existing agreement, is a lawful
exercise of this authority. The tender covers
new territory (all of Telangana outside
Hyderabad); it does not purport to extinguish
the petitioner's existing rights within the
Hyderabad Market.
15.9. The petitioners' argument that the 2024 tender
implicitly cancelled or superseded the
petitioner's existing agreement is not supported
by the terms of the tender or any other
document on record. The Letter of Award in
favour of M/s Shakti Milk is for co-packing
operations for the 'State of Telangana', it does
not purport to cancel any pre-existing
agreement, and it does not direct Hassan to
discontinue its operations with the petitioner
within the Hyderabad Market. The co-existence
of the petitioner's Hyderabad Market
arrangement with Hassan and M/s Shakti Milk's
- 200 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Telangana-wide arrangement is therefore
legally possible, subject to the territorial
protection provided in the operative order.
15.10. Sri. Jayakumar S. Patil learned Senior Counsel
has relied upon specific paragraphs of Mahabir
3
Auto Stores v. Indian Oil Corporation in
support of the petitioners' case on this Point.
Para 17 holds: 'In all such cases whether public
law or private law rights are involved, depends
upon the facts and circumstances of the case.
The dichotomy between rights and remedies is
not sacrosanct.' Para 18 holds that in a
situation of 'a transaction between the parties
for nearly two decades', it is 'appropriate' to
treat the transaction as having a public law
dimension. Para 20 holds that 'in cases where
the instrumentality of the state enters the
contractual field, it should act in a manner
which is fair, just and reasonable'. Para 21
directed that the Corporation should 'consider
afresh the submissions' of the affected party
before deciding. Para 23 holds that 'a decision
on the above basis should be arrived at which
should be fair, just and reasonable, and
consistent with good government'.
- 201 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
15.11. This Court is bound by the principles in
3
Mahabir Auto Stores . These principles are
fully reflected in this judgment's holding that
(a) the writ petitions are maintainable ; (b)
KMF's actions are subject to the constitutional
test of non-arbitrariness; and (c) the
petitioners are entitled to notice and fair
consideration before their existing Hyderabad
Market arrangements are modified. However,
3
Mahabir Auto Stores does not require this
Court to grant the specific reliefs sought by the
petitioners, it requires that the affected party
receive fair consideration and a fair decision.
The decision that this Court has rendered,
holding that the impugned actions do not
encroach upon the petitioners' Hyderabad
Market rights, are within KMF's authority, and
are supported by legitimate reasons, is itself
the fair, just, and reasonable decision that
3
Mahabir Auto Stores contemplates. The
petitioners cannot invoke that decision to insist
on a different substantive outcome.
15.12. Sri. Jayakumar S. Patil has specifically relied
upon paragraph 24 of Shrilekha Vidyarthi v.
4
State of U.P . , which contains the celebrated
- 202 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
'split personality of Dr. Jekyll and Mr. Hyde'
formulation. Paragraph 24 reads: 'The State
cannot be attributed the split personality of Dr.
Jekyll and Mr. Hyde in the contractual field so
as to impress on it all the characteristics of the
State at the threshold while making a contract
and thereafter to shed off that character, and
thereafter to act as Dr. Hyde like a private
individual while performing, violating or
terminating the contract.' This formulation was
relied upon to argue that KMF cannot exercise
its contractual modification powers under
Clause 3 as if it were a private commercial
entity, free of constitutional constraints.
4
15.13. This Court is bound by Shrilekha Vidyarthi . It
is precisely because KMF cannot shed its
constitutional character that this Court has
held, under Point No. 1, that the writ petitions
are maintainable and that the Wednesbury
standard of review applies to KMF's exercise of
its commercial discretion. However, accepting
the principle that KMF cannot act as a private
individual does not mean that every exercise of
KMF's contractual discretion must be held to
violate Article 14. The principle requires that
- 203 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
KMF's actions be examined on the
constitutional touchstone of non-arbitrariness,
it does not require that those actions be struck
down unless they are found to fail that test.
15.14. Other specific paragraphs of Shrilekha
4
Vidyarthi relied upon by the petitioners also
deserve engagement. Para 35 holds that 'every
State action, in order to survive, must not be
susceptible to the vice of arbitrariness which is
the crux of Article 14'. Para 36 holds that 'the
meaning and true import of arbitrariness is
more easily visualized than precisely stated'
and that 'an act uninformed by reason is
arbitrary'. Para 39 holds that the 'person
alleging arbitrariness must prove it by showing
that the impugned State action is uninformed
by reason'. Applying paras 35, 36, and 39 to
the present case, this Court holds: (a) KMF's
actions in expanding its Telangana distribution
network are with informed by reason, the
reason being the commercial and
developmental objective of extending Nandini
product availability to underserved districts; (b)
the petitioners have not demonstrated that
KMF's decisions are 'uninformed by reason';
- 204 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
and (c) accordingly, no arbitrariness under
Article 14 is established. The Shrilekha
4
Vidyarthi principle, though fully applicable,
does not assist the petitioners on the facts of
this case.
15.15. The appropriate standard of judicial review for
commercial and policy decisions of State
instrumentalities is the Wednesbury
unreasonableness standard, as authorised by
the House of Lords in Associated Provincial
Picture Houses Ltd. v. Wednesbury
31
Corporation and adopted by the Hon’ble
Supreme Court of India most systematically in
26
Tata Cellular v. Union of India
15.16. The Wednesbury standard, as applied in the
context of government contracts and tenders,
was explained by the Supreme Court in Tata
26
Cellular in the following terms: (a) the court
does not act as an appellate authority over the
decision of the Government or the tendering
authority; (b) it confines its review to
determining whether the decision-making
process was lawful, fair, and rational; (c) the
31
(1947) 2 All ER 680
- 205 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
court will not interfere merely because it would
have reached a different commercial conclusion
on the same facts; and (d) the court will only
intervene if the decision is vitiated by mala
fides, bias, extraneous considerations, non-
application of mind, or such irrationality that no
reasonable authority could have made the
decision.
15.17. Applying the Wednesbury standard to the
present case, this Court finds no basis for
interfering with KMF's commercial decisions.
The decision to expand the Telangana
distribution network to five underserved
districts is rational and serves a demonstrable
public interest. The assignment of the
expanded territory to Raichur CMPSU, a
constituent member of the KMF federation, is a
rational internal federal arrangement. The
decision to issue a fresh public tender for co-
packing operations in Telangana is the adoption
of the most transparent and competitive
procurement method available. None of these
decisions can be characterised as irrational,
arbitrary, or so unreasonable that no
reasonable authority could have made them.
- 206 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
15.18. The Court has also carefully considered whether
there is any evidence of mala fides in KMF's
conduct. The petitioners have made general
allegations of arbitrariness but have not
pleaded or adduced any specific evidence of
mala fides, bias, extraneous considerations, or
discriminatory purpose. In the absence of such
evidence, the Court cannot presume bad faith.
The presumption of good faith in favour of
State action, which is the starting point for any
review of executive or administrative action,
has not been displaced in the present case.
15.19. For completeness, this Court addresses the
argument that the absence of prior notice to
the petitioners, acknowledged as a procedural
deficiency under Point No. 3, itself
demonstrates non-application of mind or
arbitrariness under the Wednesbury test. This
argument fails because the impugned actions
do not terminate or cancel the petitioners'
existing rights within the Hyderabad Market;
they expand KMF's operations into new
territories outside that market. The absence of
notice to the petitioners before expanding
operations outside their territory does not
- 207 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
constitute non-application of mind within the
Wednesbury framework.
15.20. The petitioners invoke the doctrine of
promissory estoppel, arguing that KMF's nine-
year course of conduct, in consistently
appointing and renewing the petitioners as sole
agents in the Hyderabad Market, created a
legitimate expectation amounting to a
promissory estoppel that prevented KMF from
appointing competing agents without the
petitioners' consent.
15.21. The doctrine of promissory estoppel in the
context of public law was authoritatively
examined by the Hon’ble Supreme Court in
32
M.P. Sugar Mills v. State of U.P . The
essential elements of the doctrine, as applicable
to public law, are: (i) a clear, unequivocal, and
unconditional representation or promise by the
Government/State authority; (ii) the
representation was intended to be relied upon;
(iii) the promisee relied upon the
representation to its detriment; and (iv) it
would be inequitable to allow the promisor to
32
(1979) 2 SCC 409
- 208 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
resile from its representation. An additional and
crucial limitation on the public law application
of promissory estoppel is that the doctrine
cannot be invoked to compel the Government
to perform an act that is contrary to public
interest or contrary to its statutory duties.
15.22. The petitioners' case for promissory estoppel
fails at the first stage: there is no clear,
unequivocal, and unconditional representation
or promise by KMF or Hassan that the
petitioners would be the sole agents for the
entire State of Telangana, or even for the
Hyderabad Market, in perpetuity. The
appointments were for fixed terms of 36
months at a time, and were subject to renewal,
which is itself antithetical to the concept of a
permanent and exclusive grant. The mere
renewal of a fixed-term appointment does not
give rise to a representation that the
appointment will be renewed indefinitely, or
that no competing appointment will ever be
made in adjacent territories.
15.23. Furthermore, as this Court has held under Point
No. 2, the petitioners' rights are confined to the
- 209 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Hyderabad Metropolitan Area, not to the entire
State of Telangana. Even if a promissory
estoppel argument were available in principle,
it could at best protect the petitioners from
being displaced from the Hyderabad Market
during the subsistence of their existing
agreements, it could not give them a vested
and inalienable right over the entire State of
Telangana, which was never within the scope of
their appointments.
15.24. The related doctrine of legitimate expectation,
which the petitioners invoke as an alternative
to, or in conjunction with, promissory estoppel.
The doctrine of legitimate expectationholds that
a person who has a legitimate expectation of a
benefit or a particular course of conduct by a
public authority is entitled to have that
expectation given fair consideration before the
authority acts inconsistently with it.
15.25. The limits of the legitimate expectation doctrine
are, however, well established. In the context
of commercial contracts and business licences,
the Hon’ble Supreme Court has consistently
held that a legitimate expectation does not
- 210 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
create a legally enforceable right to a particular
substantive outcome; it creates only a right to
procedural fairness, i.e., a right to be heard
before the expectation is defeated.
Furthermore, the doctrine of legitimate
expectation cannot be invoked to prevent the
State from making policy changes in the public
interest.
15.26. At most, the petitioners could have invoked the
legitimate expectation doctrine to require KMF
to give them prior notice before introducing
competing distribution arrangements, a
procedural entitlement, not a substantive one.
This Court has already acknowledged this
procedural entitlement under Point No. 3. The
doctrine of legitimate expectation cannot give
the petitioners a substantive right to prevent
KMF from expanding its distribution network
into territories that were never within the
petitioners' operational mandate.
15.27. The petitioners suggest, though do not
expressly plead, that there is an element of
discrimination or favouritism in KMF's choice to
assign the expanded Telangana territory to
- 211 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
Raichur CMPSU rather than to some other
entity, including the petitioners themselves.
This Court examines and rejects this
suggestion.
15.28. The assignment of expanded Telangana
territory to Raichur CMPSU is not an external
commercial appointment; it is an internal
federal direction by KMF to one of its
constituent milk unions. Raichur CMPSU, like
Hassan CMPSU, is a member of the KMF
federation, more importantly Raichur is situate
abutting the State of Telangana. The
assignment of a new territory to Raichur
CMPSU is analogous to a corporate parent
directing one of its subsidiary companies to
expand its operations to new markets, it is an
internal governance decision, not a public
procurement that must comply with
competitive tendering norms.
15.29. There is no evidence on record of any mala
fides, discrimination, or favouritism in KMF's
choice of Raichur CMPSU for the expanded
Telangana territory. The choice of a constituent
union that has geographical proximity to the
- 212 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
assigned districts, Raichur district borders
Telangana, and existing operational experience
in dairy distribution is entirely rational. The
suggestion of discrimination, unsupported by
any evidence, cannot be accepted.
15.30. This Court addresses a dimension of the
impugned actions that reinforces the conclusion
reached under the Wednesbury standard: the
public interest in the expansion of the Nandini
distribution network to unserved Telangana
districts. The mandate of KMF, as established
by the State Government of Karnataka and the
National Dairy Development Board, includes not
merely the maximisation of KMF's commercial
revenue but also the broader developmental
objective of ensuring that quality dairy products
are accessible to consumers across the widest
possible geographic area. This objective is
directly connected to the Directive Principle in
Article 48 and to India's 'Operation Flood'
programme, which aimed to ensure the
availability of milk and milk products to the
population at fair prices.
- 213 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
15.31. The five Telangana districts specified in the
impugned authorisation, Warangal, Adilabad,
Nizamabad, Karimnagar, and Khammam, are
districts where, on the evidence before this
Court, the availability of Nandini dairy products
was limited or non-existent prior to KMF's
decision to extend operations to those districts,
there is nothing placed on record to indicate as
to if the Petitioners were servicing those
districts. Consumers in these districts were
therefore did not have access to the Nandini
range of dairy products. KMF's decision to
rectify this situation by authorising Raichur
CMPSU to operate in those districts directly
serves the public interest in wider dairy product
availability and is entirely in keeping with KMF's
institutional mandate.
15.32. The importance of protecting commercially
negotiated arrangements that serve the public
interest from unwarranted judicial interference
was emphasised by the Supreme Court in
Noida Toll Bridge Co. Ltd. v. Federation of
7
Noida Residents Welfare Association ,
where the Hon’ble Supreme Court held that
judicial interference in commercially negotiated
- 214 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
arrangements between the State and private
parties should be carefully circumscribed,
particularly where the commercial terms were
arrived at through a transparent and
competitive process and where interference
would disrupt the delivery of public services.
Although the facts of that case are
distinguishable from the present case in several
respects, the underlying principle of judicial
restraint in matters serving a clear public
purpose applies with equal force here.
15.33. This public interest dimension is a further and
independent reason why this Court will not
interfere with KMF's expansion decisions. Even
if there were some marginal procedural
deficiency in the manner in which the
expansion was effected, the Court should be
slow to grant relief that would deprive
consumers in five Telangana districts of access
to Nandini dairy products. What this court is
concerned with is grant of access, it is ofcourse
for the persons in those territories to make a
choice of their brand of diary products. Courts
exercising writ jurisdiction are courts of equity,
and equity requires the Court to balance the
- 215 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
interests of all affected parties, not merely the
interests of the petitioners, in fashioning relief.
15.34. The expansion of the Nandini distribution
network to underserved Telangana districts is
part of KMF's broader social mandate, to make
quality dairy products accessible to consumers
across the widest possible geographic area, at
affordable prices. This is a mandate that KMF
carries not merely as a commercial enterprise
but as an instrumentality of the developmental
State. The Court should be particularly cautious
about intervening in decisions that further this
public purpose, in the absence of any evidence
of mala fides or arbitrariness.
15.35. This Court articulates the outer limits of KMF's
policy-making authority in the Telangana dairy
market, so as to provide clear guidance for
future conduct and to prevent any ambiguity
about the scope of this Court's decision. KMF,
as a State instrumentality, has broad authority
to make commercial and policy decisions in the
dairy distribution domain. This authority
includes: the right to expand its distribution
network to new territories; the right to appoint
- 216 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
new agents or entities for new territories; the
right to conduct competitive tenders for
distribution and co-packing services; and the
right to issue internal federal directions to its
constituent milk unions.
15.36. However, this authority operates within three
constitutional constraints: (a) KMF cannot
arbitrarily modify or terminate the existing
contractual rights of its long-standing agents
and co-packers within their established
operational territories without adequate prior
notice and a fair opportunity to be heard; (b)
KMF cannot discriminate between similarly
situated agents or co-packers without a rational
and objective basis; and (c) KMF cannot act in
mala fides or for extraneous purposes. None of
these constraints has been violated in the
present case, the impugned actions relate to
new territories outside the petitioners'
established operational area, and this Court has
found no evidence of discrimination, mala fides,
or arbitrariness. The impugned actions are
therefore lawful. But the constraints remain
operative for future conduct, and KMF is
subject to their terms.
- 217 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
15.37. KMF had both the contractual authority (under
Clause 3 of the WCF Agent Agreement in WP
23487/2024) and the institutional authority (as
the apex dairy federation in WP 22850/2024) to
take the impugned actions. The applicable
standard of review is the Wednesbury
unreasonableness standard. The impugned
decisions are rational, are made in furtherance
of a legitimate public interest, and are not
vitiated by mala fides, bias, or non-application
of mind. The promissory estoppel argument
fails for want of a clear and unequivocal
representation of permanent and exclusive
rights over the entire State of Telangana. The
legitimate expectation argument yields only a
procedural entitlement, to prior notice, which
this Court has addressed by way of prospective
directions under Point No. 3. The discrimination
argument fails for want of any evidence of
favouritism. Point No. 4 is accordingly
answered in favour of the respondents.
15.38. This Court answers Point No.4 by holding that
KMF was entitled, under Clause 3 of the WCF
Agent Agreement (WP 23487/2024) and under
its inherent institutional authority as the apex
- 218 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
dairy federation, to modify the area of
operation and to expand its distribution
network in Telangana. The appointment of
Raichur CMPSU for five Telangana districts is a
lawful internal federal arrangement within KMF.
The issuance of the 2024 tender for co-packing
activities in the State of Telangana was a lawful
exercise of KMF's commercial discretion
through a transparent competitive process. The
applicable standard of judicial review is the
Wednesbury unreasonableness standard. This
standard is not satisfied in the present case. No
mala fides, bias, extraneous considerations, or
non-application of mind have been established.
The promissory estoppel argument fails for
want of a clear and unequivocal representation
of permanent and exclusive rights. KMF's
decisions are upheld.
16. Answer to Point No.v: Whether the petitioners,
having not participated in the tender process,
have locus standi to challenge the impugned
actions, and whether any alleged suppression
or misrepresentation affects their entitlement
to relief; and consequently, whether the
petitioners are entitled to the reliefs sought?
16.1. The question of locus standi , goes to the very
foundations of writ jurisdiction. Article 226 of
- 219 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
the Constitution confers a broad and expansive
writ jurisdiction upon the High Courts, including
the power to issue writs to any 'person or
authority'. However, the power of the Court to
act under Article 226 does not mean that any
person may invoke that jurisdiction regardless
of any connection to the subject-matter of the
dispute. The requirement of locus standi, that
the petitioner must have a legally cognisable
interest in the outcome of the proceeding, is an
essential condition for the exercise of writ
jurisdiction.
16.2. In the context of writ jurisdiction under Article
226, the Supreme Court has recognised a
broad category of locus standi that extends to
all persons who are 'adversely affected' by the
impugned action. However, these liberal
standing rules apply primarily in cases of public
interest and constitutional law challenges; in
the specific context of challenges to commercial
tenders and contracts, the courts have applied
a more specific and stringent locus standi
requirement.
- 220 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
16.3. The specific locus standi requirement for
challenges to tender decisions has been
addressed by the Supreme Court in a series of
decisions. The leading authority is NHAI v.
13
Gwalior-Jhansi Expressway Ltd . , where a
three-Judge Bench held that a person who has
not participated in the tender proceedings can
have no locus to challenge the selection of one
bidder in preference to another. The rationale
for this rule is: (a) non-participants cannot
demonstrate that the process prejudicially
affected them, since they did not submit a bid;
(b) non-participants cannot show that they
would have been selected if the process had
been properly conducted; (c) allowing non-
participants to challenge tender outcomes
would create commercial uncertainty; and (d)
the right to challenge a tender process is a
right that must be earned by participation, just
as the right to win the tender must be earned
by submitting the best offer.
16.4. This principle has been consistently applied by
this Court and by other High Courts. In
Mahalakshmi Engineering Works v.
12
BESCOM , this Court applied the principle and
- 221 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
held that a non-participant in a tender had no
locus standi to challenge the award. In Subir
14
Ghosh v. State of West Bengal , the Hon’ble
Calcutta High Court reached the same
conclusion in a materially identical factual
matrix. This body of case law establishes a
clear and settled principle of procedural law in
the context of tender challenges.
16.5. In WP 23487/2024, the petitioner challenges:
(a) the letter dated 07.08.2024 from KMF to
Raichur CMPSU; and (b) the work order dated
07.11.2024. These documents are not the
outcome of a competitive tender process. They
are administrative/executive directions issued
by KMF, in its capacity as the apex dairy
federation, to one of its constituent milk
unions. There was no public tender for the
appointment; there was no competitive process
in which the petitioner could have participated.
The non-participant rule, which applies
specifically to competitive procurement
processes, is therefore inapplicable to the
challenge in WP 23487/2024.
- 222 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
16.6. The petitioner in WP 23487/2024 holds a pre-
existing agreement with Hassan for WCF agent
operations in the Hyderabad Market. It is a
directly and immediately affected party: the
letter of 07.08.2024, by authorising Raichur
CMPSU to operate in five Telangana districts, is
alleged by the petitioner to encroach upon its
exclusive operational territory. Whether or not
this allegation is correct on the merits, this
Court has held it is not, under Points 2 and 3, it
is sufficient to confer locus standi upon the
petitioner to bring the challenge. The petitioner
has a legally cognisable interest in the integrity
of its commercial territory, and any executive
action that is alleged to threaten that territory
may be challenged by it.
16.7. This Court accordingly holds that the petitioner
in WP 23487/2024 has locus standi to challenge
the letter dated 07.08.2024 and the work order
dated 07.11.2024. However, as this Court has
held under Points 2, 3, and 4, the challenge
fails on merits, the impugned actions do not
encroach upon the petitioner's Hyderabad
Market rights, are within KMF's authority, and
do not violate Article 14.
- 223 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
16.8. In WP 22850/2024, the petitioner challenges:
(a) the tender notification KMF/PUR/Tender-
650/2024-25 dated 20.05.2024; and (b) the
Letter of Award dated 07.08.2024 to M/s Shakti
Milk and Milk Products. Both of these are direct
outcomes of a competitive public tender
process. The petitioner in WP 22850/2024 did
NOT participate in the tender process. This is
not disputed.
16.9. The non-participant locus rule established in
13
NHAI v. Gwalior-Jhansi Expressway Ltd .
applies directly and squarely to the facts of WP
22850/2024. The petitioner, having not
participated in the tender, has no locus standi
to challenge the tender notification or the
Letter of Award.
16.10. The petitioner's attempt to justify its non-
participation on the ground that participation
would have been inconsistent with its legal
position, i.e., that it already had exclusive
rights that precluded the tender, does not
assist it. This argument is circular: it assumes
the very thing that is in dispute (exclusive
rights over all of Telangana). Courts have
- 224 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
consistently refused to accept this 'paradox of
participation' argument as a justification for
non-participation, on the ground that it would
effectively allow any person who claims pre-
existing rights to bypass the competitive tender
process without consequences. The law
requires that if a person contests the validity of
a tender, it must challenge the tender at the
time it is issued, not await the outcome and
challenge the result after it proves adverse.
16.11. It is also relevant to note that the petitioner
had the option of pursuing an alternative
course: it could have participated in the tender
'without prejudice' to its legal position, i.e.,
submitting a bid while simultaneously
challenging the validity of the tender by writ
petition. This is a recognised procedure that
allows a party to preserve its legal rights while
still participating in a competitive process. The
petitioner chose not to adopt this course, and
must now live with the consequences of that
choice.
16.12. The non-participant locus rule is not a
technicality; it reflects a substantive principle of
- 225 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
commercial law and public procurement. The
integrity of the public procurement process
depends upon the willingness of eligible parties
to participate and compete on the merits. If
non-participants could successfully challenge
tender outcomes, the incentive to participate
would be diminished, and the efficiency-
enhancing purpose of competitive procurement
would be undermined.
16.13. This Court accordingly holds that the petitioner
in WP 22850/2024 lacks locus standi to
challenge the tender notification or the Letter of
Award. WP 22850/2024 is accordingly
dismissed on this threshold ground alone,
without prejudice to the further holding that the
challenge also fails on merits for the reasons
given under Points 2, 3, and 4.
16.14. The respondents allege that the petitioners
have suppressed material facts from this Court,
and that this suppression should disentitle them
to any relief in equity. The instances of alleged
suppression identified by the respondents are:
(i) the petitioners' failure to disclose that all
KMF and Hassan documents consistently
- 226 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
described the operational territory as
'Hyderabad Market' or 'Hyderabad', and not as
'State of Telangana' or 'Telangana'; (ii) the
petitioners' failure to disclose that their claims
of exclusive rights over all of Telangana were
not supported by any express agreement or
order; (iii) the petitioners' misleading
presentation of the 2020 episode as evidence
that 'Hyderabad Market' includes Warangal,
without disclosing that the 2020 proposal was
objected to by Hassan and was formally
withdrawn by KMF; and (iv) the petitioners'
failure to disclose that they chose not to
participate in the 2024 tender despite being
aware of it.
16.15. The duty of full and frank disclosure in writ
jurisdiction is a well-established principle. It
arises from the ex parte character of the initial
hearing in most writ petitions, the Court acts on
the petitioner's version of events, often
granting interim relief, without having the
benefit of the respondent's side of the story. If
the petitioner at this stage suppresses material
facts or presents a one-sided picture, it
subverts the Court's ability to make an
- 227 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
informed decision on interim relief. The courts
have accordingly held that a petitioner who
approaches a court of equity with unclean
hands, through suppression of material facts,
may be denied equitable relief, even if the
petitioner would otherwise have a valid case on
merits (a) suppression of material facts is a
serious matter in writ jurisdiction; (b) courts
have the discretion to dismiss petitions in which
material facts have been suppressed; (c) the
threshold for what constitutes 'material'
suppression depends upon whether the
suppressed fact would have materially
influenced the Court's decision on interim relief
or on the merits; and (d) where the
suppression is not so deliberate or so material
as to amount to a fraud upon the Court, the
courts may decline to dismiss the petition on
this ground alone, but may take the
suppression into account in the matter of costs
and relief.
16.16. In the present case, this Court finds that the
instances of alleged suppression are established
to the following degree: (i) the petitioners did
not fully and transparently disclose the nine-
- 228 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
year pattern of KMF and Hassan documents
using 'Hyderabad Market' rather than 'State of
Telangana'; (ii) the petitioners presented the
2020 episode in a misleading light, without
disclosing the fact of withdrawal; and (iii) in WP
22850/2024, the petitioner did not explain why
it did not participate in the 2024 tender despite
being aware of it. These constitute
suppressions of material facts that were
relevant to the grant of interim relief and to the
merits of the case.
16.17. However, this Court does not find that the
suppression was so deliberate and calculated as
to amount to a fraud upon the Court, or as to
require the outright dismissal of the petitions
on this ground alone. The petitions were
received, heard, and decided on their merits.
16.18. The doctrine of clean hands, that a party
seeking equitable relief must come to the Court
with clean hands, is a foundational principle of
equity that applies with full force in writ
jurisdiction. The writ jurisdiction of the High
Court under Article 226, though constitutional
in character, is nonetheless equitable in its
- 229 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
roots: it is a discretionary remedy, granted on
the basis of justice, equity, and good
conscience. A petitioner who has not acted with
full candour and transparency before the Court
may, in the discretion of the Court, be denied
equitable relief, regardless of the technical
merits of its case.
16.19. In the present case, this Court has identified
several respects in which the petitioners have
fallen short of the standard of full and frank
disclosure that writ jurisdiction requires. The
petitioners characterised their rights in terms
that went well beyond what the documentary
record supported; they presented the 2020
episode selectively and misleadingly; and the
petitioner in WP 22850/2024 did not disclose its
deliberate choice not to participate in the 2024
tender. These departures from the standard of
candour expected in writ proceedings, while not
amounting to a fraud upon the Court, are
relevant to the exercise of this Court's
discretion in granting relief. Since this Court is
in any event declining the relief sought on the
merits and on the ground of locus standi in WP
22850/2024, the clean hands doctrine is a
- 230 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
further and independent reason for declining
the relief.
16.20. This Court notes, however, that the doctrine of
clean hands does not operate as an automatic
bar to relief in every case of imperfect
disclosure. The Court's discretion is wide
enough to grant partial relief, or no relief, in
cases where the suppression, while real, is not
so deliberate or so material as to render the
petitioner wholly unworthy of any
consideration. In the present case, this Court
exercises this discretion by declining the
substantive reliefs sought (quashing of the
impugned actions) while expressly protecting
the petitioners' pre-existing Hyderabad
Metropolitan Area rights through the directions
in the operative order. This is, in the Court's
view, a just and equitable balance.
16.21. This Court now addresses the specific
paragraphs of the three principal Supreme
Court decisions relied upon by Sri. Jayakumar
2 5
S. Patil, ABL International , GAIL , and
6
Subodh Kumar Singh Rathour , as they bear
- 231 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
upon the question of locus standi and
entitlement to relief.
16.22. In ABL International Ltd. v. Export Credit
2
Guarantee Corporation of India Ltd . , the
specific paragraphs relied upon are: Para 8 (the
question whether a writ petition against a State
instrumentality arising from a contractual
obligation is maintainable); Para 10 (the Court
recognising that the State, even in contractual
matters, is bound to act fairly); Paras 19 and
21 (recognising that writ jurisdiction is available
when State acts 'in a manner which is arbitrary,
unjust or unfair'); Para 23 (the obligation to act
'fairly, justly and reasonably'); and Para 27
(the consolidated propositions on
maintainability). This Court has accepted all
these propositions in its analysis under Point
No. 1. The critical point is that acceptance of
these propositions on maintainability does not
predetermine the merits, it merely opens the
gate to judicial review. The gate being open,
this Court has examined the merits and
concluded that the impugned actions do not
violate Article 14.
- 232 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
16.23. In GAIL (India) Ltd. v. Indian
5
Petrochemicals Corporation Ltd . , the
paragraphs specifically cited are paras 21 to 25.
Para 21 holds that a challenge to contractual
clauses of a public sector undertaking is
maintainable as it involves a public law
element. Paras 22–23 hold that GAIL's action in
levying 'loss of transportation charges' was 'ex
facie discriminatory' and 'manifestly arbitrary'
because it discriminated between similarly
situated parties without rational basis. Paras
24–25 hold that the clause runs 'contrary to
every commercial and common sense' and is
'manifestly arbitrary'. The learned Senior
5
Counsel cited GAIL for the discrimination and
manifest arbitrariness limbs of the Wednesbury
test.
5
16.24. The GAIL facts are different from the present
5
case on the merits. In GAIL , the discrimination
was established by reference to a specific
contractual clause that imposed 'loss of
transportation charges' on one party (IPCL) but
not on similarly situated parties, a direct
discrimination without rational basis. In the
present case, there is no analogous
- 233 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
discrimination: KMF is not treating the
petitioners differently from similarly situated
parties. It is expanding its distribution network
into new territories (outside the petitioners'
Hyderabad Market) and doing so in a rational
and consistent manner. The Hobson's choice
5
element that makes GAIL particularly relevant
to the maintainability question does not, on the
merits, assist the petitioners in establishing
discrimination or manifest arbitrariness, for the
reasons given under Points 2, 3, and 4.
16.25. In Subodh Kumar Singh Rathour v. Kolkata
6
Metropolitan Development Authority , the
specific paragraphs cited are 34, 53, 64, and
65. Para 34 frames the two pivotal questions:
(i) the scope of judicial review in
contract/tender disputes; and (ii) whether the
action of cancelling a tender was amenable to
writ jurisdiction. Para 53 restates the ABL
2
International principles. Para 64 holds that
'the present dispute, even if related to a
tender, cannot be termed as a pure contractual
dispute, as the dispute involves a public law
element'. Para 65 cites the Ramana Dayaram
- 234 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
15
Shetty principle that the State cannot act
arbitrarily in the matter of grant of contracts.
6
16.26. Subodh Kumar (para 64) holds that what
makes a tender dispute a 'public law' dispute is
the existence of a 'public law element', and the
Hon’ble Supreme Court found such an element
in the facts of that case. This Court has
similarly found a public law element in the
present case (Point 1). But the finding of a
public law element leads only to the conclusion
of maintainability, it does not predetermine the
6
outcome on merits. In Subodh Kumar itself,
the Hon’ble supreme Court went on to examine
whether the cancellation of the tender was
justified on the facts, and held that it was not.
In the present case, this Court has found, on
the merits, that KMF's actions are justified. The
6
principles from Subodh Kumar therefore
support the petitioners on maintainability but
do not assist them on the merits.
16.27. The respondents also raise, obliquely, the
argument that the petitioners did not exhaust
all available remedies before approaching this
Court, specifically, that they did not make
- 235 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
representations to KMF or Hassan before
challenging the impugned actions. The doctrine
of exhaustion of remedies, as applied in writ
jurisdiction, holds that where a statutory or
administrative appeal or review is available, the
petitioner should ordinarily exhaust that
remedy before approaching the High Court. The
basis for this doctrine is the general principle
that courts of superior jurisdiction should not
be the forum of first resort for disputes that
statutory or administrative authorities are
equipped to resolve. In Whirlpool
22
Corporation v. Registrar of Trade Marks ,
the Hon’ble Supreme Court held that the
exhaustion of remedies rule is not an absolute
bar but a rule of prudence, which the court may
waive in cases of urgency, or where the
alternative remedy would be ineffective.
16.28. In the present case, there is no statutory
appeal or review mechanism specifically
available to the petitioners against the
impugned actions of KMF. The Karnataka Co-
operative Societies Act provides for certain
dispute resolution mechanisms within the
cooperative framework, but these mechanisms
- 236 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
are not designed to address constitutional
challenges to arbitrary State action. This Court
therefore does not apply the exhaustion of
remedies rule as a bar to the writ jurisdiction in
the present case.
16.29. The argument that the petitioners should have
made representations to KMF before filing these
writ petitions is, at most, a factor relevant to
the grant of equitable relief, not a jurisdictional
bar. Even if the petitioners had made
representations to KMF and KMF had rejected
them, the outcome of this litigation, on the
findings this Court has made, would have been
the same. The argument of exhaustion of
remedies is therefore academic in the present
case.
16.30. This Court answers Point No.5 by holding that:
(a) WP 23487/2024, The petitioner has locus
standi to challenge the letter dated 07.08.2024
and the work order dated 07.11.2024, but the
challenge fails on merits for reasons given
under Points 2, 3, and 4. (b) WP 22850/2024,
The petitioner lacks locus standi to challenge
the tender notification and the Letter of Award,
- 237 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
having not participated in the tender process;
the challenge also fails on merits. (c) Neither
petitioner is entitled to the substantive reliefs
sought. The petitioners' existing contractual
rights within the Hyderabad Metropolitan Area
are preserved by the directions in the operative
order.
17. Answer to Point No.vi: What Order?
17.1. Having held, under Points ii, iii and iv, that the
impugned actions do not encroach upon the
petitioners' Hyderabad Market rights, are within
KMF's authority, and do not violate Article 14;
and having held under Point No. 5 that the
petitioner in WP 22850/2024 lacks locus standi;
this Court concludes that neither petitioner is
entitled to the substantive reliefs sought.
17.2. In WP 23487/2024, the petitioner sought the
quashing of the letter dated 07.08.2024 and
the work order dated 07.11.2024. These reliefs
are declined. The petitioner has locus standi to
bring the challenge, but the challenge fails on
merits.
17.3. In WP 22850/2024, the petitioner sought the
quashing of the tender notification dated
- 238 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
20.05.2024 and the Letter of Award dated
07.08.2024. These reliefs are declined, both on
the threshold ground of want of locus standi
and on merits.
17.4. It is, however, important to state clearly what
is not decided by this Court's orders. The
dismissal of both writ petitions does not affect
the petitioners' pre-existing contractual rights
within the Hyderabad Metropolitan Area. Both
petitioners hold valid and subsisting
agreements with Hassan CMPSU for their
respective operations within the Hyderabad
Market. These agreements must be honoured
by Hassan and by all other parties during their
subsitence. The newly appointed entities,
Raichur CMPSU, SR Marketing and Services
(WP 23487), and M/s Shakti Milk and Milk
Products (WP 22850), shall not encroach upon
the Hyderabad Metropolitan Area operations of
the petitioners during the subsistence of the
petitioners' respective agreements.
17.5. Before recording the operative order, this Court
records two concluding observations that are
important for the guidance of the parties and
- 239 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
for the future conduct of their commercial
relationship.
17.6. First: this Court's dismissal of the writ petitions
should not be read as an endorsement of the
manner in which KMF and Hassan have
conducted themselves in relation to the
petitioners in the period leading up to the filing
of these petitions. The failure to give prior
notice before introducing significant changes to
the Telangana distribution landscape, changes
that reasonably caused concern among the
petitioners, was not consistent with the
standards of procedural fairness that Article 14
and the principles in Mahabir Auto Stores
require of State instrumentalities. Better
communication, greater transparency, and a
willingness to explain the rationale for
institutional decisions could have avoided the
filing of these petitions altogether. KMF and
Hassan are strongly encouraged to adopt these
practices in their future dealings with their
commercial partners.
17.7. Second: the petitioners should note that this
Court's judgment does not close the door on all
- 240 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
future challenges. If, in the future, during the
subsistence of the contractual arrangements
with the Petitioners, if any of the newly
appointed entities, Raichur CMPSU, SR
Marketing and Services, or M/s Shakti Milk,
encroach upon the petitioners' Hyderabad
Metropolitan Area operations in defiance of the
specific directions in the operative order, the
petitioners will be entitled to seek enforcement
of those directions by approaching this Court.
Similarly, during the subsistence of the
contractual arrangements with the Petitioners,
if Hassan CMPSU seeks to unilaterally modify or
terminate the petitioners' Hyderabad Market
arrangements without the prior notice and fair
process directed by this Court, the petitioners
would have a cause of action. The directions in
the operative order are binding, and this Court
expects all parties to honour them.
17.8. In the result, and for the reasons stated in this
judgment, this Court makes the following
- 241 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
ORDER:
i. WP No. 23487/2024 filed by M/s Shree
SSR Enterprises (Hyderabad) against the
State of Karnataka and others, and WP
No. 22850/2024 filed by M/s Sree
Rajeshwari Dairy Products Ind (Pvt) Ltd
against the State of Karnataka and others,
are hereby partly Allowed.
ii. The letter/communication dated
07.08.2024 issued by KMF to the Raichur
District Co-operative Milk Producers
Societies Union permitting it to carry out
WCF Agent operations in the districts of
Warangal, Adilabad, Nizamabad,
Karimnagar, and Khammam in the State
of Telangana, and the consequential work
order dated 07.11.2024, are hereby
UPHELD, subject to the directions below.
iii. The tender notification KMF/PUR/Tender-
650/2024-25 dated 20.05.2024 and the
Letter of Award dated 07.08.2024 issued
by KMF to M/s Shakti Milk and Milk
Products for co-packing activities for the
- 242 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
State of Telangana are hereby UPHELD,
subject to the directions below.
iv. Respondent No. 3 (Raichur CMPSU) and
Respondent No. 5 (SR Marketing and
Services) in WP 23487/2024 are
DIRECTED that their operations under the
letter dated 07.08.2024 and the work
order dated 07.11.2024 shall be confined
to the five specified districts (Warangal,
Adilabad, Nizamabad, Karimnagar, and
Khammam) and shall NOT extend to or
encroach upon the Hyderabad
Metropolitan Area (as notified by the
Hyderabad Metropolitan Development
Authority), which constitutes the
operational territory of the petitioner in
WP 23487/2024 under its subsisting
agreement with Hassan CMPSU.
v. Respondent No. 4 (M/s Shakti Milk and
Milk Products) in WP 22850/2024 is
DIRECTED that its operations under the
Letter of Award dated 07.08.2024 shall
NOT encroach upon or interfere with the
co-packing operations of the petitioner in
- 243 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
WP 22850/2024 within the Hyderabad
Metropolitan Area (as notified by HMDA)
during the subsistence of the petitioner's
agreement with Hassan CMPSU. To the
extent the Letter of Award purports to
operate within the Hyderabad
Metropolitan Area, it shall be read as
subject to the petitioner's pre-existing
contractual rights within that area, and
M/s Shakti Milk shall not be entitled to
carry out co-packing operations within the
Hyderabad Metropolitan Area so long as
the petitioner's agreements with Hassan
CMPSU remains in force.
vi. Hassan Co-operative Milk Producers
Societies Union (Respondent No. 4 in WP
23487/2024, Respondent No. 3 in WP
22850/2024) is DIRECTED to honour the
agreements with both petitioners in
respect of their respective operations
within the Hyderabad Metropolitan Area,
during their subsistence.
vii. All interim orders, if any, passed by this
Court during the pendency of these writ
- 244 -
NC: 2026:KHC:25586
WP No. 23487 of 2024
C/W WP No. 22850 of 2024
HC-KAR
petitions shall stand VACATED upon the
pronouncement of this judgment.
viii. There shall be NO ORDER AS TO COSTS.
Sd/-
(SURAJ GOVINDARAJ)
JUDGE
SR
List No.: 1 Sl No.: 99