Ashish Kumar & Ors. vs Capt Avinash Chander Malhotra

Court
Delhi High Court
Case type
Civil Revision Petition
Decided on
16-03-2026
<div> <br /> <br /> <br /> $~45 <br /> * <b>IN THE HIGH COURT OF DELHI AT NEW DELHI </b><br /> <b> </b><br /> <b><i>th</i></b><br /> <b>% </b> <b> </b> <b> </b> <b><i>Date of decision: 16</i></b> <b><i> March 2026 </i></b><br /> <br /> + <b>C.R.P. 56/2026, CM APPL. 15133/2026, CM APPL. </b><br /> <b>15134/2026 </b><br /> ASHISH KUMAR &amp; ORS. .....Petitioners <br /> Through: Mr. Sujeet Kumar Mishra, Mr. <br /> Harsh Kumar Pandey, Advocates. <br /> <br /> versus <br /> <br /> CAPT AVINASH CHANDER MALHOTRA ...Respondent <br /> Through: Mr. Ashim Vachher, Sr. <br /> Advocate, Mr. Vinayak Uniyal, <br /> Ms. Saiba M Rajpal, Advocates. <br /> <b>CORAM:</b> <br /> <b>HON&#x27;BLE MR. JUSTICE ANISH DAYAL</b> <br /> <b>JUDGMENT</b> <br /> <b> </b> <b> </b> <b> </b> <br /> <b> </b><br /> <b>ANISH DAYAL, J (ORAL) </b><br /> 1. This Revision Petition is filed by the petitioner/defendant assailing <br /> th<br /> the impugned order dated 24 January 2026, passed by the Trial Court, <br /> South East District, Saket Courts, New Delhi in CS (SCJ) 1077/2025, <br /> whereby the Trial Court dismissed petitioner&#x27;s application under Order <br /> <br /> VII Rule 11 of the Code of Civil Procedure, 1908 (‘ <b><i>CPC</i></b> ’). <br /> <br /> <b><i>Background facts as averred in the plaint are as under</i></b> <b>: </b><br /> 2. The dispute relates to the plot situated at <i>35 Anand Lok, New </i><br /> <i>Delhi</i> which was purchased by late <i>Sh.Ved Mitra</i> . After his death, the <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 1 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> property was inherited by late <i>Sh. Arun Kumar</i> and late <i>Sh. Sushil Kumar</i> <br /> and subsequently partitioned through a deed of partition. The <br /> respondent/plaintiff entered into two separate agreements to sell with late <br /> <i>Sh. Arun Kumar</i> and late <i>Sh. Sushil Kumar </i> for sale of the entire second-<br /> floor along with front terrace, as stated by the plaintiff. <br /> 3. Two separate sale deeds were executed between late <i>Sh. Sushil </i><br /> <i>Kumar</i> and plaintiff/respondent; it was decided that there shall be no <br /> construction over the rear portion of the terrace of the second-floor <br /> without the written consent of the respondent/plaintiff. Construction of <br /> the house at <i>35 Anand Lok</i> was completed with the funds provided by the <br /> respondent/plaintiff. <br /> 4. As per the arrangement, the rear part of the second-floor terrace <br /> was used as a common property of the entire building, housing AC <br /> compressor units, dish antennas, geysers, water motors along with five <br /> servant quarters for all the residents of the building since construction <br /> was completed in 2001. <br /> 5. As per the plaint, in September 2025, the petitioner started <br /> constructing an illegal structure through fabrication at the rear portion of <br /> the second-floor terrace, despite repeated protests by the respondent. A <br /> complaint was also made with the police regarding this construction, but <br /> after the police officials were gone, construction started again. <br /> Accordingly, respondent/plaintiff filed a suit being CS SCJ 1077/2025 in <br /> which notice was issued to the petitioner/defendants. <br /> th<br /> 6. A restraint order was passed by the Trial Court on 15 September <br /> 2025 from creating any further construction on the rear part of the <br /> th<br /> second-floor terrace. On 25 September 2025, respondent/plaintiff filed <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 2 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> an application under Order XXXIX Rule 2A of CPC, alleging that the <br /> th<br /> petitioner had violated the order dated 15 September 2025; proceedings <br /> in this application are <i>sub judice</i> . <br /> 7. On a query by the court, the counsel for the parties admitted that <br /> the front portion of the ground floor is with one <i>Mr. Jayant Dang</i> , the <br /> rear portion of the ground floor is with the petitioner/ defendant along <br /> with the front and rear portion of the first floor. The second-floor is with <br /> the respondent/plaintiff along with the front portion of the second-floor <br /> terrace, while the rear portion of the second-floor terrace was common <br /> for usage and facilities as noted above. <br /> 8. There is some dispute regarding the petitioner/defendant’s <br /> statement about the front portion of the second-floor terrace. It is <br /> contended that the front portion of the terrace was not provided <br /> exclusively to the respondent/plaintiff. However, this claim is disputed <br /> by <i>Mr. Ashim Vachher</i> , Senior Counsel for the respondent/plaintiff, on <br /> the basis of the sale deeds; therefore, at best, it is a disputed question of <br /> fact. <br /> 9. <i>Mr. Sujeet Kumar Mishra</i> , counsel for petitioner, has agitated the <br /> issue that the respondent/plaintiff had the rear portion of the property and <br /> also that plea for removal of any structure been constructed was barred <br /> under <i>Section 41(h) and (i) of the Specific Relief Act, 1963</i> read with <br /> <i>Section 343, 347E, 477, 478</i> of the Delhi Municipal Corporation Act, <br /> 1957 (‘ <b><i>DMC Act</i></b> ’). It was stated that whether the construction was legal <br /> or illegal could only be determined by the Municipal Corporation of <br /> Delhi (‘ <b><i>MCD</i></b> ’) and demolition of any unauthorized construction was <br /> squarely within the domain of such authority. Therefore, it was <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 3 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> contended that jurisdiction was barred <i>under 343 (4)</i> of the DMC Act as <br /> well as Section 9 of the CPC. <br /> <b><i>Analysis </i></b> <b> </b><br /> 10. As per the Supreme Court&#x27;s decision in <b><i>Dahiben v. Arvindbhai </i></b><br /> <b><i>Kalyanji Bhanusali, </i></b> (2020) 7 SCC 366, the Court while assessing an <br /> application under Order VII Rule 11 of CPC is bound to advert only to <br /> bare averments made in the plaint in order to assess that whether any <br /> cause of action is made out or not and whether the suit is not barred by <br /> any law. The relevant extracts of the aforesaid judgment is as under: <br /> “ <i>23.2. The remedy under Order 7 Rule 11 is an </i><br /> <i>independent and special remedy, wherein the court is </i><br /> <i>empowered to summarily dismiss a suit at the threshold, </i><br /> <i>without proceeding to record evidence, and conducting </i><br /> <i>a trial, on the basis of the evidence adduced, if it is </i><br /> <i>satisfied that the action should be terminated on any of </i><br /> <i>the grounds contained in this provision. </i><br /> <i>23.3. The underlying object of Order 7 Rule 11(a) is that </i><br /> <i>if in a suit, no cause of action is disclosed, or the suit is </i><br /> <i>barred by limitation under Rule 11(d), the court would </i><br /> <i>not permit the plaintiff to unnecessarily protract the </i><br /> <i>proceedings in the suit. In such a case, it would be </i><br /> <i>necessary to put an end to the sham litigation, so that </i><br /> <i>further judicial time is not wasted. </i><br /> <i>23.4. In Azhar </i> <i>Hussain v. Rajiv </i> <i>Gandhi [Azhar </i><br /> <i>Hussain v. Rajiv Gandhi, 1986 Supp SCC 315. Followed </i><br /> <i>in Manvendrasinhji </i> <i>Ranjitsinhji </i><br /> <i>Jadeja v. Vijaykunverba, 1998 SCC OnLine Guj 281 : </i><br /> <i>(1998) 2 GLH 823] this Court held that the whole </i><br /> <i>purpose of conferment of powers under this provision is </i><br /> <i>to ensure that a litigation which is meaningless, and </i><br /> <i>bound to prove abortive, should not be permitted to </i><br /> <i>waste judicial time of the court, in the following words : </i><br /> <i>(SCC p. 324, para 12) </i><br /> <i>“12. … The whole purpose of conferment of such </i><br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 4 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> <i>powers is to ensure that a litigation which is </i><br /> <i>meaningless, and bound to prove abortive should </i><br /> <i>not be permitted to occupy the time of the court, </i><br /> <i>and exercise the mind of the respondent. The sword </i><br /> <i>of Damocles need not be kept hanging over his </i><br /> <i>head unnecessarily without point or purpose. Even </i><br /> <i>in an ordinary civil litigation, the court readily </i><br /> <i>exercises the power to reject a plaint, if it does not </i><br /> <i>disclose any cause of action.” </i><br /> <i>23.5. The power conferred on the court to terminate a </i><br /> <i>civil action is, however, a drastic one, and the </i><br /> <i>conditions enumerated in Order 7 Rule 11 are required </i><br /> <i>to be strictly adhered to. </i><br /> <i>23.6. Under Order 7 Rule 11, a duty is cast on the court </i><br /> <i>to determine whether the plaint discloses a cause of </i><br /> <i>action by scrutinising the averments in the plaint </i><br /> <i>[Liverpool &amp; London S.P. &amp; I Assn. Ltd. v. M.V. Sea </i><br /> <i>Success I, (2004) 9 SCC 512] , read in conjunction with </i><br /> <i>the documents relied upon, or whether the suit is barred </i><br /> <i>by any law.</i> ” <i> </i><br /> (emphasis supplied) <br /> 11. A perusal of the plaint would show that the plaintiff has averred <br /> that in the sale deed with late <i>Shri Arun Kumar</i> , the front portion of the <br /> second-floor along with the front terrace over the second-floor had been <br /> sold, while the rear portion of the second-floor had been sold. The <br /> plaintiff admits that the rear portion of the terrace is a common utility <br /> area and they have not claimed any exclusive rights to that portion. <br /> 12. It is further admitted by the parties that that the rear portion of the <br /> terrace over the second-floor has five servant quarters, toilets, bathrooms <br /> and water tanks, and the quarters are occupied by the domestic help of <br /> each occupant of the floors. One quarter, therefore, is allocated to the <br /> respondent/plaintiff. It is also stated in the plaint that the water tanks of <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 5 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> the entire building are installed on the rear portion of the second-floor <br /> terrace, besides the inverter, the batteries, geysers, water pressure pump <br /> of the plaintiff as well. The site plan has been attached as <i>Annexure A </i><br /> along with the plaint. It was averred that the rear portion of the second-<br /> floor terrace is used by all the residents of the building and is common to <br /> all the residents. <br /> 13. Various disputes arose between the parties, particularly with <br /> respect to the landing of the spiral staircase on the second floor. The rear <br /> portion of the second-floor terrace is accessed by a spiral staircase <br /> originating from the driveway outside the building and is used by all <br /> domestic help. The rear portion of the terrace is also accessible through <br /> the main staircase. Respondent/plaintiff alleged that the <br /> petitioner/defendants were consistently attempting to occupy the rear <br /> portion of the terrace, claiming ownership thereof. Defendant no. 1 filed <br /> a suit, being CS (SCJ) 1507/2023, seeking a mandatory injunction to <br /> restrain the plaintiff from creating any hindrance in the use of the main <br /> staircase and the lift operating from the ground floor to the third floor. <br /> 14. The Trial Court declined the grant of <i>ad interim</i> injunction. <br /> th<br /> Subsequent proceedings culminated in an order dated 14 November <br /> 2024, wherein the Trial Court held that the lift area/staircase/lift lobby is <br /> under the lock and key of plaintiff, that a duplicate key could be <br /> provided to defendant no. 1 for his own use and that of his family <br /> members. <br /> 15. However, it is alleged that when the plaintiffs were away in <br /> November 2024, defendant no. 1, along with his son (defendant no. 2), <br /> came to the second-floor landing with an ironsmith and an electric cutter <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 6 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> and attempted to cut and damage the iron grill. <br /> 16. Since September 2025, defendant nos.1 &amp; 2 were constantly going <br /> to the rear portion of the property with the construction equipment and <br /> despite heavy rains and the objections raised by the plaintiff, and were <br /> constructing the illegal structure in order to usurp the rear portion of the <br /> terrace. The plaintiff, therefore, alleged that the issue of ownership of the <br /> rear portion at best being <i>sub judice</i> due to the pending suit (CS (SCJ) <br /> 1507/2023), and that the construction being carried out by the defendants <br /> is illegal and ought not to be permitted. Accordingly, the present suit was <br /> filed. <br /> 17. In these facts and circumstances, the cause of action as espoused <br /> by the respondent/ plaintiff clearly relates to asserting the right of <br /> common usage of the rear portion of the second-floor terrace and <br /> restraining the defendants from usurping the space of the second-floor <br /> terrace for their own exclusive use without any consent from the other <br /> members of the building. This is a legitimate cause of action and does <br /> not, in the opinion of the Court, relate simply and solely to a civic or <br /> building regulation matter which would require an exclusive intervention <br /> of the MCD. Even though an application has apparently been filed <br /> before the MCD by the respondent; however, it does not preclude them <br /> from asserting the right to common usage of the rear portion of the <br /> second-floor terrace along with the other occupants of the building. <br /> 18. The plea which has been taken by the counsel for the petitioner <br /> that the respondents have no right over the rear portion of the building, <br /> or that the suit is barred under Section 343(4) of the DMC Act, was <br /> considered in the impugned order. It has been rightly held by the <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 7 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> impugned order/judgment that Section 343(4) of the DMC Act simply <br /> provides that no court shall entertain any suit or application or <br /> proceeding for injunction of the relief against the Commissioner to <br /> restrain him from taking any action. The provision does not serve as any <br /> impediment to the filing of this Suit. <br /> 19. Reliance has been placed by petitioner’s counsel on <b><i>Shiv Kumar </i></b><br /> <b><i>Chadha v. Municipal Corporation of Delhi &amp; Ors.</i></b> (1993) 3 SCC 161, <br /> where appeals were filed against an order of the Delhi High Court <br /> directing the MCD to issue appropriate notices to owners/occupiers of <br /> buildings where illegal constructions were made. Liberty was given to <br /> the owners/occupiers to file a fresh building plan, the same to be <br /> examined by the Corporation, and if beyond compoundable limits, then <br /> to seal the same and demolish thereafter. The appellants came before the <br /> Supreme Court challenging another part of the order where the High <br /> Court had stated that no civil suit would be entertained by the Court in <br /> respect of any action taken or proposed to be taken. It was in this context <br /> that Section 343 of DMC Act along with Section 9 of the CPC was cited. <br /> 20. It was noted by the Supreme Court that the enforcement remedy <br /> had been provided under the Act itself. The Supreme Court, therefore, <br /> noted that it is up to the court to examine whether the dispute falls within <br /> the ambit of the Act, and if the court is satisfied that the provisions of the <br /> Act are not applicable, the basic procedural requirements have not been <br /> followed, it shall have the jurisdiction to enquire and investigate <br /> protecting the common law rights of the citizen. <br /> 21. This decision by the Supreme Court does not, by any stretch of <br /> interpretation, come to the support of what is being argued by <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 8 of 9 </i><br /> <br /><br /> <br /> <br /> <br /> petitioner’s counsel. The context is totally distinct and different. <br /> 22. On the other hand, <i>Mr. Ashim Vachher</i> , Senior Counsel for <br /> respondent/plaintiff has adverted to decision by the Division Bench of <br /> this Court in <b><i>Asha Johri v. Neerja Rajput &amp; Anr</i></b> , 2014:DHC:2442-DB <br /> where the Division Bench held that the ownership of a property would <br /> automatically entail that the roof above it would form part of the flat <br /> which is allotted. However, this should not engage the attention of this <br /> Court since these are all questions of trial and, therefore, do not need to <br /> be adverted to. <br /> 23. It is settled law that the mandate of a revision Court is limited to <br /> issues of jurisdictional exercise by the Trial Court and not act as an <br /> appellate Court for re-appreciation of issues of fact. <br /> 24. In light of the above, no interference with the impugned order is <br /> warranted. Accordingly, the petition stands dismissed. <br /> 25. Pending applications, if any, are rendered infructuous. <br /> 26. Judgment be uploaded on the website of this Court. <br /> <b> </b><br /> <b> </b><br /> <b>(ANISH DAYAL) </b><br /> <b> JUDGE </b><br /> <b>MARCH 16, 2026/</b> ak/zb <br /> <br /> <br /> <br /> <br /> <br /> Signature Not Verified<br /> Digitally Signed<br /> By:MANISH KUMAR<br /> Signing Date:25.03.2026<br /> 16:29:47<br /> <i>C.R.P. 56/2026 </i> <i> </i> <i> Page 9 of 9 </i><br /> </div>