M/S SAHASRA GASTROENTEROLOGY AND OBESITY CLINIC PRIVATE LIMITED vs DR JAYA BALASUNDARAM
- Court
- Karnataka High Court
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
TH
DATED THIS THE 30 DAY OF APRIL, 2026
R
PRESENT
HON'BLE MRS. JUSTICE ANU SIVARAMAN
AND
HON'BLE MS. JUSTICE TARA VITASTA GANJU
COMMERCIAL APPEALS NO. 147 OF 2021
BETWEEN:
M/S. SAHASRA GASTROENTEROLOGY
AND OBESITY CLINIC PRIVATE LIMITED.,
A PRIVATE LIMITED COMPANY REGISTERED UNDER
THE COMPANIES ACT, 1956,
PRESENTLY HAVING ITS OFFICE AT NO.219,
TH
7 CROSS, TEACHERS COLONY,
ND
BANASHANKARI 2 STAGE,
REPRESENTED BY ITS
MANAGING DIRECTOR,
DR.SRIKANTH GADIYARAM.
…APPELLANT
(BY SRI. P.S.RAJAGOPAL., SENIOR COUNSEL FOR
SRI. MADHUKAR.M.DESHPANDE., ADVOCATE)
AND:
1. DR. JAYA BALASUNDARAM
W/O LATE DR.A.N.BALASUNDARAM,
AGED ABOUT 87 YEARS,
REPRESENTED BY HER SON AND
CONSTITUTED ATTORNEY,
DR.SREEKAR,
RESIDING AT NO.1633,
TH ND
18 MAIN,BANASHANKARI 2 STAGE,
BENGALURU-560070.
2. DR. B.SREEKAR
S/O LATE DR.A.N.BALASUNDARAM,
AGED ABOUT 48 YEARS,
TH
RESIDING AT NO.1633, 18 MAIN,
1
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
ND
BANASHANKARI 2 STAGE,
BENGALURU-560070.
3.
DR. ASHWINI SREEKAR
W/O DR. B.SREEKAR,
AGED ABOUT 47 YEARS,
TH
RESIDING AT NO.1633, 18 MAIN,
ND
BANASHANKARI 2 STAGE,
BENGALURU-560070.
…RESPONDENTS
(BY SRI. DHANNJAY JOSHI., SENIOR COUNSEL FOR
SMT. KAVITHA DAMODARAN., ADVOCATE FOR C/R1 TO R3)
THIS COMMERCIAL APPEAL IS FILED UNDER SECTION 13(1A)
OF THE COMMERCIAL COURTS ACT, 2015 R/W SECTION
37(1)(C) OF THE ARBITRATION AND CONCILIATION ACT, 1996,
PRAYING TO CALL FOR RECORDS IN COM.A.S.NO. 172/2019 ON
THE FILE OF LXXXIII ADDITIONAL CITY CIVIL AND SESSIONS
JUDGE, BENGALURU (CCH-84) AND RECORDS IN A.C.NO.
146/2018 ON THE FILE OF ARBITRATION CENTRE, BENGALURU.
SET ASIDE THE JUDGMENT DATED 17/07/2021 PASSED BY THE
LXXXIII ADDITIONAL CITY CIVIL AND SESSIONS JUDGE,
BENGALURU (CCH-84) IN A.S.NO. 172/2019 AND ARBITRAL
AWARD DATED 28/08/2019 PASSED BY THE SOLE ARBITRATOR
IN A.C.NO. 146/2018 AND CONSEQUENTLY, DISMISS THE
CLAIM STATEMENT FILED BY THE RESPONDENTS AND ALLOW
THE COUNTER CLAIM OF THE APPELLANT, ANDPASS SUCH
OTHER ORDER AS THIS HON'BLE COURT DEEMS FIT TO GRANT
IN THE INTEREST OF JUSTICE AND EQUITY.
THIS APPEAL HAVING BEEN RESERVED FOR JUDGMENT ON
25.03.2026, COMING ON FOR PRONOUNCEMENT OF JUDGMENT
THIS DAY, THE COURT DELIVERED THE FOLLOWING:
2
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
CORAM: HON'BLE MRS. JUSTICE ANU SIVARAMAN
&
HON'BLE MS. JUSTICE TARA VITASTA GANJU
CAV JUDGMENT
(PER: HON'BLE MS. JUSTICE TARA VITASTA GANJU)
TABLE OF CONTENTS
I. PREFACE: 3
II. BRIEF FACTS: 4
III. IMPUGNED JUDGMENT: 7
IV. CONTENTIONS OF THE APPELLANTS : 12
V. CONTENTIONS OF THE RESPONDENTS: 15
VI. ISSUE FOR CONSIDERATION : 17
VII. ANALYSIS AND FINDINGS: 17
VIII. CONCLUSION : 55
I. PREFACE:
1. This Commercial Appeal under Section 13(1A) of the
Commercial Courts Act, 2015 read with Section 37 (1) (c)
of the Arbitration and Conciliation Act, 1996 (hereinafter
referred to as the “A&C Act”), impugns a Judgment dated
17.07.2021 passed in COM.AS.No.172/2019 (hereinafter
referred to as “Impugned Judgment”) by the LXXXIII
Additional City Civil And Sessions Judge at Bengaluru City
(CCH-84) (hereinafter referred to as “the Commercial
3
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
Court”), which has dismissed the Petition under Section 34
and 37 of the A&C Act filed by the appellant, and upheld the
Arbitral Award dated 28.08.2019 (hereinafter referred to as
“Arbitral Award”) with costs, passed by the Sole Arbitrator
in favour of the claimants/respondents. The Counter Claim
filed by the appellant has also been dismissed. This Appeal
seeks to challenge both dismissals.
II. BRIEF FACTS:
2. This Court has, by the order dated 01.09.2021,
admitted the appeal and granted a stay of operation and
execution of the Impugned Judgment and the Arbitral
Award subject to the appellant depositing a sum of
Rs.32,61,705/- within two weeks from the date of the order.
3. The brief relevant facts are that a claim petition was
filed by claimants/respondent Nos.1 to 3 on 28.09.2018
against the appellant seeking a direction to the appellant,
to pay the claimants/respondent Nos.1 to 3 a sum of
Rs.1,20,55,753/- along with interest at the rate of 18% per
annum from the date of claim petition till the date of
payment. Directions were also sought to declare that for the
4
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
period of the subsistence of the Deed of Reconstitution
dated 13.05.2015 (hereinafter referred to as “the
Reconstitution Deed”), the appellant is bound and liable to
pay monthly remuneration to the claimants/respondent
Nos.1 to 3 along with interest. The prayers as set out in the
Statement of Claim are extracted below:
“a) directing the Respondent to pay the Claimants a sum
of Rs.1,20,55,753/- (Rupees One Crore Twenty Lakhs Fifty
Five Thousand Seven Hundred and Fifty Three) together
with interest thereon at the rate of 18% from the date of
the Claim Petition until payment;
(b) declaring that, for the period during the subsistence of
the Deed of Reconstitution, dated 13.05.2015, the
Respondent is bound and liable to pay monthly
remuneration to the Claimants in the manner provided
therein, failing which the Respondent is liable to pay the
same together with interest at the rate of 18% per annum;
(c) directing the Respondent to furnish to the Claimants,
promptly on demand, all information and records
pertaining to the partnership firm, M/s. JBS Nursing
Home;
(d) directing the Respondent to indemnify and keep the
Claimants wholly indemnified from all losses, claims,
costs, etc. that may be raised on and / or claimed from
them in relation to the partnership firm, M/s. JBS Nursing
Home;
(e) directing the Respondent to bear and pay the entire
costs of these proceedings, including all actual costs borne
by the Claimant; and
(f) pass such further and other orders and / or directions
as this Hon’ble Tribunal may deem fit and proper in the
facts and circumstances of the case.”
5
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
3.1. It is the case of the claimants/respondent Nos.1 to 3
that they entered into a Memorandum of Understanding
dated 13.02.2015 (hereinafter referred to as ‘the MOU’)
with the appellant, to induct the appellant into the
claimants/respondent Nos.1 to 3’s partnership firm.
Subsequently, the parties entered into a Reconstitution
Deed of the Partnership Firm- M/s. JBS Nursing Home on
13.05.2015. The terms of the Reconstitution Deed were that
the claimants/respondent Nos.1 to 3 would surrender the
complete control and management of the Hospital-M/s. JBS
Nursing Home to the appellant and 99% of the profits were
also surrendered. It was further agreed that the
claimants/respondent Nos.1 to 3 would be paid a monthly
remuneration of Rs.5,04,000/- by the appellant.
3.2. The claimants/respondent Nos.1 to 3 averred that the
remuneration was not paid regularly and that even a non-
refundable deposit of Rs.50,40,000/- as was set out in the
MOU was not paid and only Rs.17,64,500/- was paid,
leaving a balance of Rs.32,75,500/- as outstanding.
6
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
3.3. Since the Reconstitution Deed contained an Arbitration
clause, the claimants/respondent Nos.1 to 3 took steps for
appointment of an Arbitrator. A retired Judge of this Court
was appointed as the Sole Arbitrator for adjudication of the
disputes inter-se the parties.
III. IMPUGNED JUDGMENT :
4. The claim petition was contested by the appellant by
filing Statement of Objections and a Counter Claim. It was
contended that the Statement of Claim filed by the
claimants/respondent Nos.1 to 3 is not maintainable either
on law or on facts. In addition, a Counter Claim was filed
seeking audited books of accounts; and a report from with
regard to the profit and loss statement qua about the
reconstituted partnership in the following manner:
“PRAYER
Wherefore the claim statement filed by the claimants may
be dismissed and this Hon'ble Tribunal may be pleased to
grant counter claim as under:
(i) Direct the Claimant No.1 & 2 to provide audited balance
sheet and profit & loss accounts for the financial year
2014-15 as at 31.03.2015 (financial year 2014-15) upto
the date of reconstitution deed (13.05.2015) of the
erstwhile partnership firm is made available of the
erstwhile partnership firm, namely, JBS Nursing Home
(PAN AAAFJ8715D) along with books of accounts;
7
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
(ii) Appoint a Commissioner, preferably a Chartered
Accountant, to examine receipts and expenditure of the
reconstituted partnership firm for the period 2015-16,
2016-17 and 2017-18, submit a report showing the total
profit and loss of the reconstituted partnership firm and
detailed report regarding the amounts paid to the partners
beyond their entitlement of profits and
(iii) Grant such other reliefs as this Hon'ble Tribunal deems
fit to grant in the interest of justice;”
5. During the pendency of the Arbitral proceedings, the
appellant filed an application under Section 16 of the A&C
Act seeking rejection of the claim stating that the dispute is
beyond the scope of Clause 20 of the Reconstitution Deed
and thus not arbitrable. The Arbitral Tribunal, by its order
dated 17.12.2018, dismissed the application under Section
16 of the A&C Act. It was held that the question raised by
the appellant would be examined along with the main
matter since it revolves around the consideration of various
clauses of the Reconstitution Deed and the effect of the
MOU.
6. After examining the pleadings between the parties,
the Arbitral Tribunal framed the following issues:
“ISSUES
1. Whether the Claimants are entitled for payment of a
sum of Rs.1,20,55,753/- together with interest thereon at
8
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
the rate of 18% from the Respondent from the date of the
claim petition until payment?
2. Whether the Claimant proves that the Respondent is
bound and liable to pay monthly remuneration to the
Claimants in the manner provided in the Deed of
Reconstitution dated 13.05.2015, failing which the
Respondent is liable to pay the same together with interest
at the rate of 18% per annum for the period during the
subsistence of the Deed of Reconstitution?
3. Whether the Claimant proves that the Respondent is to
be directed to furnish to the Claimants, promptly on
demand, all information and records pertaining to the
partnership firm, M/s JBS Nursing Home?
4. Whether the Claimant proves that Claimants are
entitled to be indemnified by the Respondent and keep the
Claimants wholly indemnified from claims raised by the
statutory authorities in terms of Clause 17 of the Deed of
Reconstitution?
5. Whether the Respondent proves that the claim by the
Claimant has to be rejected for non-joinder of the
partnership firm M/s JBS Nursing Home in as much as the
Tribunal will have no jurisdiction to try the dispute in the
absence of the said firm being a party to the proceeding?
(recast on 06.03.2019)
6. Whether the Respondent proves that payment of
remuneration is the obligation of the firm only and not that
of the Respondent Company?
7. Whether the Respondent proves that obligation to pay
remuneration to the Claimant is dependent upon the firm
making profit?
8. Whether the Respondent proves that the reconstituted
firm was unable to carry out business and make any profit
between June 2015 to December 2016?
9. Whether the Respondent proves that the claimants
failed to perform their duties as working partners and are
therefore not entitled to claim the remuneration?
10. Whether the Respondent proves that it is entitled for
direction against the Claimants 1 and 2 to provide audited
balance sheet and profit and loss accounts for the financial
9
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
year 2014-15 upto the date of Reconstitution Deed
(13.05.2015) of the erstwhile Partnership firm, namely,
M/s JBS Nursing Home as claimed in the counter-claim?
11. What order/Award?”
7. By the Arbitral Award, the Arbitral Tribunal found that
the claimants/respondent Nos.1 to 3 are entitled to a
payment of Rs.60,40,195/- along with interest at the rate
of 18% from 13.05.2015 along with pendente lite and future
interest. The Arbitral Award further directed the appellant
to furnish copies of the records pertaining to M/s JBS
Nursing Home and related documents in terms of Clause 15
of the Reconstitution Deed. It was also directed that the
claimants/respondent Nos.1 to 3 were entitled for being
indemnified against losses arising out of failure of the
appellant in discharging its duties. Costs were also awarded
by the Arbitral Tribunal.
7.1. So far as concerns the Counter Claim, the Arbitral
Tribunal found that since the Profit and Loss Statement of
the reconstituted partnership Firm for the periods 2015-16,
2016-17 and 2017-18 had already been placed on record,
there was no requirement for allowing the Counter Claim,
which was thus dismissed.
10
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
8. This led to the appellant filing a Petition under Section
34 of the A&C Act seeking to set aside the Arbitral Award
and to allow the Counter Claim of the appellant. The learned
Commercial Court after examining the contentions of the
parties, held that the jurisdiction to set aside an Arbitral
Award is limited to the grounds and under Section 34 of the
A&C Act if a contrary view based on facts is taken by an
Arbitral Tribunal, unless there are compelling reasons, the
Court cannot interfere. The learned Commercial Court
further held that the Reconstitution Deed (Ex.P2) is the
result of the MOU (Ex. P1) and since the Arbitral Tribunal
found that they are the result of the understanding reached
between the parties, it cannot be stated that the MOU is
only an agreement to agree, while the Reconstitution Deed
is the contract entered into between the parties. Relying on
Clause 5 to 10 specifically 6.3 of the Reconstitution Deed,
the Commercial Court gave a finding of the partnership
between the claimants/respondent Nos.1 to 3 and appellant
being a ‘pseudo-partnership’ and in the nature of
Proprietorship, giving 99% of profit to the appellant. It was
held that there was an obligation to pay for all expenses
11
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
including remuneration to the claimants/respondent Nos.1
to 3, regardless of the status of the Partnership Firm and
since the fixed remuneration was not paid in terms of Clause
7, the obligation to pay interest at 18% was also there. The
Commercial Court examined the Award and found that the
Arbitral Award is not against public policy of India and thus
cannot be set aside. The dismissal of the Counter Claim was
also upheld stating that since the appellant only became a
partnership on 13.02.2015, the accounts for the previous
periods cannot be directed to be given. Thus, the petition
under Section 34 of the A&C Act was dismissed.
IV. CONTENTIONS OF THE APPELLANTS :
9. The learned Senior Counsel for the appellant has
raised the following grounds in challenge to the Arbitral
Award and the Impugned Judgment.
9.1 Firstly, it is contended that the non-payment of
remuneration was not an arbitral dispute since the
Reconstitution Deed was not executed between the
Partnership Firm and the appellant but between the existing
partners and the incoming partners inter-se . It was thus
12
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
contended that the Arbitral Tribunal had no jurisdiction to
pass the Award. It was further contended that the
Reconstitution Deed was between the partners including the
appellant and claimants/respondent Nos.1 to 3 and that
Clause 20 of the Reconstitution Deed which is an Arbitral
Clause, refers disputes amongst Partnership Firm and the
partners and not the partners inter-se. Thus, there is no
arbitral clause in existence.
9.2 Secondly, it was contended that in the Impugned
Judgment, the Commercial Court erred in referring to the
Partnership Firm as ‘pseudo-partnership’. Reliance in this
behalf was placed on Paragraph Nos.20 and 23 of the
Impugned Judgment to submit characterization of
partnership as a ‘pseudo-partnership’ is contrary to the
express contractual terms and ignoring that the parties had
consciously agreed to a valid partnership structure.
9.3 The learned Senior Counsel for the appellant has
further averred that the MOU ceased to exist when the
Reconstitution Deed was signed and that no payments were
13
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
due to be made by the appellant to the
claimants/respondent Nos.1 to 3.
9.4 Lastly, it was contended that the Arbitral Tribunal has
gone beyond the terms of the contract, rewritten the terms
of the contract and thus, the Impugned Award is required
to be set aside. Reliance in this behalf is placed on the
judgments of the Court of Appeal of the United Kingdom in
1
Green Vs. Hertzog and Others , a judgment of the
Madras High Court in Lakshmanan Chetty Vs. Nagappa
2
Chetty judgments of the Supreme Court in Speech and
Software Technologies (India) Private Ltd., Vs.
3
NEOS Interactive Limited , in the case of M.
4
Gnanasambandam Vs. M. Raja Appar and the case of
Patel Engineering Limited Vs. North Eastern Electric
5
Power Corporation Limited.
1
(1954)1 WLR 1309
2
AIR 1918 MAD 167
3
(2009) 1 SCC 475
4
(2009) (2) CTC 819
5
(2020) 7 SCC 167
14
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
V. CONTENTIONS OF THE RESPONDENTS:
10. Learned Senior Counsel appearing for the
claimants/respondent Nos.1 to 3 on the other hand has
contended that the appellant through its Director,
approached the claimants/respondent Nos.1 to 3 who were
running SBS clinic in the City, to purchase their business
including its liabilities. The agreement was that the
claimants/respondent Nos.1 to 3 would get a fixed
remuneration and for this reason they surrendered 99% of
the profits of the firm.
10.1 It was further contended that the Reconstitution Deed
was an extension of the MOU, being only three months
apart, and that there was no question of it coming to an end
or being superseded by the Reconstitution Deed. Relying on
the Clauses of the Reconstitution Deed, It is contended that
Clause 20.1 of the Reconstitution Deed provides for all
disputes and differences or claims amongst partners to be
resolved through arbitration and that since this was a claim
inter-se the partners, it could not be stated to be a dispute
15
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
which was not arbitrable or outside the purview of the
contract.
10.2 The learned Senior Counsel further contended that the
scope of interference in Arbitral Awards under Sections 34
and 37 of the A&C Act is limited and once the Tribunal has
examined the Award, unless the Award is patently illegal or
against public policy or that the Award shocks the
conscience of the Court, it could not be interfered with by
this Court. Reliance in this behalf was placed on the
judgment of the Supreme Court in Associate Builders Vs.
6
Delhi Development Authority , MMTC Limited Vs.
7
Vedanta Limited , Dyna Technologies Private Limited
8
Vs. Crompton Greaves Limited and UHL Power
9
Company Limited Vs. State of Himachal . Reliance was
also placed on the judgment of a Co-ordinate Bench of this
Court in M/s. Parthiba Industries Limited Vs. Ms.
10
Amrutha Constructions to submit that if the view taken
6
(2015) 3 SCC 49
7
(2019) 4 SCC 163
8
(2019) 20 SCC 1
9
(2022) 4 SCC 116
10
COMAP 302/2025 : NC:2025:KHC:29774-DB
16
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
by the Arbitral Tribunal is a possible and reasonable view,
the Court, in exercise of jurisdiction under Sections 34 and
37 of the A&C Act, cannot substitute its own interpretation
or re-appreciate the evidence to arrive at a different
conclusion.
VI. ISSUE FOR CONSIDERATION :
11. The issue that arises for consideration before this
Court is, whether the Arbitral Award is liable to be set aside
under the provisions Sections 34 and 37 of the A&C Act?
VII. ANALYSIS AND FINDINGS:
12. At this stage, it is apposite to extract Sections 34 and
37 of the A&C Act which read as under:
“34. Application for setting aside arbitral award - (1)
Recourse to a Court against an arbitral award may be made only
by an application for setting aside such award in accordance with
sub-section (2) and sub-section (3).
(2) An arbitral award may be set aside by the Court only
if-
(a) the party making the application establishes on the basis of
the record of the arbitral tribunal that-
(i) a party was under some incapacity, or
(ii) the arbitration agreement is not valid under the law to which
the parties have subjected it or, failing any indication thereon,
under the law for the time being in force, or
(iii) the party making the application was not given proper notice
of the appointment of an arbitrator or of the arbitral proceedings
or was otherwise unable to present his case; or
17
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
(iv) the arbitral award deals with a dispute not contemplated by
or not falling within the terms of the submission to arbitration,
or it contains decisions on matters beyond the scope of the
submission to arbitration:
Provided that, if the decisions on matters submitted to
arbitration can be separated from those not so submitted, only
that part of the arbitral award which contains decisions on
matters not submitted to arbitration may be set aside; or
(v) the composition of the arbitral tribunal or the arbitral
procedure was not in accordance with the agreement of the
parties, unless such agreement was in conflict with a provision
of this Part from which the parties cannot derogate, or, failing
such agreement, was not in accordance with this Part; or
(b) the Court finds that-
(i) the subject-matter of the dispute is not capable of settlement
by arbitration under the law for the time being in force, or
(ii) the arbitral award is in conflict with the public policy
of India.
Explanation 1. For the avoidance of any doubt, it is
clarified that an award is in conflict with the public policy
of India, only if,-
(i) the making of the award was induced or affected by
fraud or corruption or was in violation of section 75 or
section 81; or
(ii) it is in contravention with the fundamental
policy of Indian law; or
(iii) it is in conflict with the most basic notions of
morality or justice.
Explanation 2. For the avoidance of doubt, the test as to
whether there is a contravention with the fundamental
policy of Indian law shall not entail a review on the merits
of the dispute.
(2A) An arbitral award arising out of arbitrations other
than international commercial arbitrations, may also be
set aside by the Court, if the Court finds that the award is
vitiated by patent illegality appearing on the face of the
award:
Provided that an award shall not be set aside merely on
the ground of an erroneous application of the law or by
reappreciation of evidence.
(3)….
xxx xxx xxx
18
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
37. Appealable orders. (1) Notwithstanding anything
contained in any other law for the time being in force, an appeal
shall lie from the following orders (and from no others) to the
Court authorised by law to hear appeals from original decrees
of the Court passing the order, namely:-
(a) refusing to refer the parties to arbitration under section 8;
(b) granting or refusing to grant any measure under section 9;
(c) setting aside or refusing to set aside an arbitral award
under section 34.
(2) Appeal shall also lie to a court from an order of the arbitral
tribunal-
(a) accepting the plea referred to in sub-section (2) or
sub-section (3) of section 16; or
(b) granting or refusing to grant an interim measure under
section 17.
(3) No second appeal shall lie from an order passed in appeal
under this section, but nothing in this section shall affect or
takeaway any right to appeal to the Supreme Court.”
[Emphasis Supplied]
12.1 The scope of interference under Section 34(2)(b)(ii) of
the A&C Act, is limited and circumscribed by the statutory
grounds set out herein. This power can thus be exercised
on several grounds including if the Award is in contravention
with the fundamental policy of Indian law or the most basic
notions of morality and justice. This will however not entail
a review on merits of the dispute by the Court. In addition,
an Award may be challenged on the grounds of patent
illegality on the face of the Award, provided that such
challenge is not on the ground of erroneous application of
law or of the re-appreciation of the evidence. The Supreme
19
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
Court in the DMRC Ltd. v. Delhi Airport Metro Express
11
P. (Ltd.) has while discussing the powers of a Court under
Section 34 of the Arbitration Act held the following:
“34. The contours of the power of the competent court to set
aside an award under Section 34 has been explored in several
decisions of this Court. In addition to the grounds on which
an arbitral award can be assailed laid down in Section
34(2), there is another ground for challenge against
domestic awards, such as the award in the present case.
Under Section 34(2-A) of the Arbitration Act, a domestic
award may be set aside if the Court finds that it is
vitiated by “patent illegality” appearing on the face of
the award .
35. In Associate Builders v. DDA [Associate Builders v. DDA,
(2015) 3 SCC 49 : (2015) 2 SCC (Civ) 204], a two-Judge Bench
of this Court held that although the interpretation of a
contract is exclusively within the domain of the
arbitrator, construction of a contract in a manner that no
fair-minded or reasonable person would take, is
impermissible. A patent illegality arises where the
arbitrator adopts a view which is not a possible view. A
view can be regarded as not even a possible view where
no reasonable body of persons could possibly have taken
it . This Court held with reference to Sections 28(1)(a) and
28(3), that the arbitrator must take into account the terms of
the contract and the usages of trade applicable to the
transaction. The decision or award should not be perverse
or irrational. An award is rendered perverse or irrational
where the findings are:
(i) based on no evidence;
(ii) based on irrelevant material; or
(iii) ignores vital evidence.
36. Patent illegality may also arise where the award is in
breach of the provisions of the arbitration statute, as
when for instance the award contains no reasons at all, so as
to be described as unreasoned.”
[Emphasis Supplied]
11
(2024) 6 SCC 357
20
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
12.2. A Coordinate Bench of the Delhi High Court in
12
Pragya Electronics v. Cosmo Ferrites Ltd has held
that the scope of interference under Section 34(2)(b)(ii) of
the A&C Act is extremely limited. In addition, an arbitral
award may be set aside on the ground of “public policy of
India” only when it is in conflict with the fundamental
policy of Indian law, the interests of India, or the most
basic notions of justice or morality, including where it
suffers from patent illegality going to the root of the
matter. Such interference however does not entail a review
on merits and is confined to cases where the findings of
the arbitral tribunal are arbitrary, capricious, perverse, or
shocks the conscience of the Court. If the view taken by
the Arbitral Tribunal is a possible and reasonable view
based on the material on record, no interference is
warranted. The relevant extract of the Pragya
Electronics case is set out below:
“11. The scope and ambit of a challenge under Sections
34 and 37 of the Arbitration Act is no longer res integra.
In a recent decision rendered by the Supreme Court in the
matter of PSA SICAL Terminals Pvt. Ltd. v. Board of
5
Trustees of V.O. Chidambranar Port Trust Tuticorin , the
12
2023 SCC Online Del 1680
21
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
Supreme Court has reiterated its view, in MMTC Limited
case (supra), and held as follows:
“41. It will be relevant to refer to the following
observations of this court in the case of MMTC Limited
(supra):
“11. As far as Section 34 is concerned, the position
is well-settled by now that the Court does not sit
in appeal over the arbitral award and may
interfere on merits on the limited ground
provided under Section 34(2)(b)(ii) i.e., if the
award is against the public policy of India. As per
the legal position clarified through decisions of this
Court prior to the amendments to the 1996 Act in
2015 , a violation of Indian public policy, in
turn, includes a violation of the fundamental
policy of Indian law, a violation of the interest
of India, conflict with justice or morality, and
the existence of patent illegality in the arbitral
award. Additionally, the concept of the
fundamental policy of Indian Law would cover
compliance with statutes and judicial precedents,
adopting a judicial approach, compliance with
the principles of natural justice, and
Wednesbury [Associated Provincial Picture
Houses v. Wednesbury Corpn., [1948] 1 K.B.
223 (CA)] reasonableness. Furthermore,
patent illegality itself has been held to mean
contravention of the substantive law of India,
contravention of the 1996 Act, and
contravention of the terms of the contract.
12. It is only if one of these conditions is met that
the Court may interfere with an arbitral award in
terms of Section 34(2)(b)(ii), but such
interference does not entail a review of the
merits of the dispute, and is limited to
situations where the findings of the arbitrator
are arbitrary, capricious or perverse, or when
the conscience of the Court is shocked, or
when the illegality is not trivial but goes to the
root of the matter. An arbitral award may not
be interfered with if the view taken by the
22
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
arbitrator is a possible view based on facts.
….“
[Emphasis Supplied]
13. It is necessary to examine the contention of the
parties in light of the settled law. The principal contention
that has been raised by the appellant is that the non-
payment of remuneration as claimed by the
claimants/respondents was not an arbitrable dispute since
the claim was that the Reconstitution Deed was entered into
between the partners inter-se and the payment of
remuneration was to be made by the partnership firm M/s
JBS Nursing Home and not the appellant. It is also the case
of the appellant that the Arbitral Tribunal and the learned
Commercial Court have gone beyond the terms of the
contract between the parties and thus, the Arbitral Award
and the Impugned Judgment are liable to be set aside.
14. The contentions raised before this Court were also
raised by the appellant both before the Arbitral Tribunal and
the learned Commercial Court. In fact, the appellant had
also filed an application under Section 16 of the A&C Act in
23
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
this behalf. The learned Arbitral Tribunal, however, after
examining these contentions, by its order dated
17.12.2018, dismissed the application setting out that it is
not a jurisdictional issue that has been raised by the
appellant but the question has been raised regarding the
effect of absence of the partnership firm which is not a party
to these proceedings and that the effect would only be
examined after examining the evidence. The relevant
extract of the order dated 17.12.2018 in this behalf is set
out below:
“4. It is also urged that the Memorandum of
Understanding (MOU) dated 13-02-2015 was superceded
by executing a Deed of Reconstitution dated 13-5-2015
hence the MOU became redundant. In addition, it is
urged that as the MOU was entered into between
JBS Nursing Home and the respondent, claimants
not being parties to the same, any dispute regarding
the MOU could be only between JBS Nursing Home
and the respondent.
xxx xxx xxx
10. No issue is raised regarding the jurisdiction of
this Tribunal to entertain the dispute. The question
raised by the applicant regarding the effect of
absence of the partnership firm which is not made
party to this proceeding will have to be examined along
with the main matter as the same necessarily revolves
around consideration of various clauses of the
Reconstitution Deed, the effect of the MOU; how the
parties conducted themselves in terms of their rights and
obligations under the agreement. All these things can
be examined only after recording evidence.
xxx xxx xxx
24
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
12. Accordingly, the Application filed under Section
16 of the Arbitration and Conciliation Act is
dismissed, reserving liberty to the respondent to
raise necessary grounds in this regard in the
defence statement to be filed.”
[Emphasis Supplied]
15. The contention raised by the appellant is that as per
the Clauses 6 and 7 of the Reconstitution Deed, the
remuneration of the partners is to be made by the
partnership firm and not the appellant. It has been averred
that since the claimants/respondents are parties to the
MOU, the dispute for compensation can only be between the
partnership firm M/s JBS Nursing Home and its partners,
the claimants/respondents herein and not the appellant.
16. An examination of the MOU shows that it is entered
into between M/s. JBS Nursing Home represented by its
partners Dr. M.V. Jayamma @ Dr. Jaya Balasundaram and
Dr. Srikhar Balasundaram and the appellant. It further
states that the understanding in the MOU shall be
incorporated into a partnership deed. The payments to the
existing partners has been set out in Clauses 1.1 and 1.3
while Clause 4.4 provides for the fact that existing partners
25
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
shall enter into a new deed. The relevant extract is set out
below:
“ JBS NURSING HOME: a partnership firm, having its
th
principal place of business at.27/B 39 Cross, VIII Block,
Jayanagar, Bangalore 560 082, represented by its
partners, Dr. M V Jayamma @Jaya Balasundaram
and Dr. Sreekar Balasundaram:
AND:
SAHASRA GASTROENTEROLOGY AND OBESITY
CLINIC PRIVATE LIMITED , a company incorporated
under the Companies Act, 1956, having its registered
office at 302 Team Emerald Apartments, Rustumba Main
Road, Kodihalli, Bangalore 560008, and represented by
its Director, Dr. Srikanth Gadiyaram.
JBS Nursing Home is referred to herein as ‘the
Partnership Firm’ or ‘the Firm’ , Dr. Jaya Balasundaram
and Dr. Sreekar Balasundaram are referred to herein as
‘the Existing Partners’, and Sahasra Gastroenterology
and Obesity Clinic Private Limited is referred to,
herein as the ‘Incoming Partner] .
WHEREAS:
xxx xxx xxx
C. The Incoming Partner has approached the
Existing Partners with a proposal to set up and
operate a gastroenterology and obesity hospital in
the Premises.
D. The Existing Partners and the Incoming Partner have
negotiated the terms for the induction of the Incoming
Partner into the Partnership Firm and all the Parties are
agreed that the Incoming Partner will take over the
management and business of the Partnership Firm
in entirety and operate it as a gastroenterology and
obesity hospital under the brand name, Sahasra.
E. The Parties have agreed that, upon the induction
of the Incoming Partner, it shall have a substantial
entitlement to the profits/losses of the Partnership
Firm (say, 99%) and the collective rights of the
Existing Partners will be reduced accordingly .
26
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
F. The parties have expressed their understanding
in this MOU, which shall, in appropriate detail, form
and manner, be incorporated in the Partnership
Deed recording the induction of Incoming Partner
into the Partnership Firm.
NOW THIS MEMORANDUM OF UNDERSTANDING
WITNESSETH :
1. Payments to Existing Partners:
1.1. Regardless of the status of the business of the
Partnership Firm, the Existing Partners will be paid
a fixed remuneration of Rs.5,04,000/- (Rupees Five
Lakhs Four Thousand) per month (Remuneration),
to be shared equally between the Existing Partners.
1.2 The Remuneration will be subject to escalation at the
th
rate of 10% per annum effective from the 25 month from
the date of the signing of the Deed of Reconstitution of
Partnership (Deed). (defined below)
1.3. Towards enabling the Incoming Partner to mitigate
and manage its costs, the Parties have agreed that the
payment of Remuneration shall be in accordance
with the following timeline determined from the
date of signing the Deed.
Period Remuner- Waived Deferre Catc- Payable
ation d hup
st rd
1 - 3 5,04,000 5,04,000 0
month
th th
4 – 6 5,04,000 2,01,600 3,02,400
month
th th
7 -18 5,04,000 2,01,600 3,02,400
month
th
19 –
th
24
month
5,04,000 2,01,6 7,05,600
00
th
25 -
th
30
month
5,54,500 2,01,6 7,05,600
00
st
31
month
onwards
5,54,500 5,54,500
1.4. The incoming partner agrees that the
remuneration shall be paid to the Existing Partners
27
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
th
within the 5 of every month following the month
for which the Remuneration relates.
xxx xxx xxx
4.1. Disputes, differences, claims, etc. if any, arising out
of and/or connected with this MOU, shall be subject
to arbitration in Bangalore under the Arbitration &
Conciliation Act, 1996.
xxx xxx xxx
4.4. The parties will enter into the Deed within a
period of 30 days from the date the Existing
Partners obtain the renewal of the lease referred to
hereinabove. ”
[Emphasis Supplied]
16.1 Thus, both the recital ‘F’ as well as ‘Clause 4.4’ set out
that the parties will enter into a fresh deed with additional
terms.
17. This was carried out in the form of the Reconstitution
Deed which was executed between the four partners -
respondent Nos.1 and 2 on the one part as the ‘existing
partners’, as well as respondent No.3 as ‘incoming partner
No.1’ and the appellant as ‘incoming partner No.2’, clearly,
thus specifying that the partnership firm M/s J.B. Nursing
Home had been reconstituted. The terms of the
Reconstitution Deed also set out that the partnership shall
be at ‘will’ and the nature of the business of the partnership
28
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
firm would be the operating of a hospital in the premises
available. The incoming partner No.2 (appellant) would
introduce capital into the firm as well as take 99% share of
profit in the firm and meet all future requirements in the
capital (clauses 5.1 and 5.2 of the Reconstitution Deed).
18. Under the Reconstitution Deed, all the partners would
be entitled to a remuneration, the existing partners as well
as incoming partner No.1 (respondent Nos.1 to 3) would be
entitled to a fixed remuneration which would be subject to
escalation every 25 months. The clause of remuneration is
exactly the same as set out in the MOU clause 1.3. The
Reconstitution Deed also provided sharing of profits and
losses in this behalf. The Reconstitution Deed also sets out
that there is no goodwill being developed in the name of the
partnership firm and that the appellant may use his brand
name ‘Sahasra’ for the business and no goodwill shall be
transferred. The relevant clauses of the Reconstitution Deed
are set out below:
“ B. The Existing Partners have agreed to admit the
incoming Partners to the partnership on the terms
and conditions mutually agreed between them
which they are now setting out in writing.
29
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
xxx xxx xxx
3.2. All the partners agree, admit and acknowledge
that, while the partnership may commence with
some other business at some other location, no
activity other than that of a hospital shall be carried
on in the premises .
xxx xxx xxx
5. CAPITAL
5.1. The Incoming Partner II shall introduce a
capital of Rs.50,000 and shall be entitled from the
date of this reconstitution deed to 99% share of the
profits of the firm. The Incoming Partner I shall
introduce such capital as will be mutually decided
by all the partners.
5.2. All future requirements of capital shall be met
only by the Incoming Partner II and the other partner
viz., the Existing Partners and the Incoming Partner I
shall not be obliged to make any further
contributions towards capital of the partnership
firm.
6. MANAGEMENT OF THE PARTNERSHIP :
6.1 All the Partners shall be Working Partners and shall be
entitled to remuneration.
6.2 The Incoming Partner II shall be solely and
absolutely responsible for the day-to-day
operations of the partnership firm in relation to its
activities in the Premises.
6.3 The Incoming Partner II acknowledges that the
Existing Partners have built the partnership
business to its current levels in the Premises and
that all further costs, expenses, Investments,
including all taxes, cess and all other outgoings in
relation to the partnership business in the Premises
shall be borne only by the incoming Partner II and
the partnership firm and the Existing Partners and the
incoming Partner I shall not be obliged to make any
contributions in that regard. All Partners agree and
acknowledge that the Incoming Partner I and Incoming
30
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
Partner II will not be liable for any dues or obligation, of
any nature whatsoever that may be owed by the
partnership to anyone prior to the date of the signing of
this Deed.
6.4 Subject to Clause 3.2 above, the Incoming Partner II
shall be free and entitled to take all decisions in relation
to the operation of the hospital activity in the Premises.
The Partners reiterate that any decision to commence with
any other activity either in the Premises or at any other
location, in the name of the partnership firm, shall be
taken only by a unanimous decision of all the Partners.
xxx xxx xxx
7. REMUNERATION OF PARTNERS:
7.1 Regardless of the status of the business of the of he
partnership firm, the Existing Partners as well as the
Incoming Partner I will be paid an aggregate fixed
remuneration of Rs,5,04,000/- (Rupees five Lakhs
four thousand) per month (Remuneration), to be
shared amongst the Existing Partners and Incoming
Partner I in such proportion as they may agree amongst
themselves.
xxx xxx xxx
7.3. The partners have agreed that the payment of
Remuneration shall be in accordance with the
following timeline determined from the date of this
Deed.”
Period Remuner Waived Deferred Catch Payable
ation up
st rd
1 - 3 5,04,000 5,04,000 0
month
th th
4 – 6 5,04,000 2,01,600 3,02,400
month
th th
7 -18 5,04,000 2,01,600 3,02,400
month
th
19 –
th
24
month
5,04,000 2,01,6 7,05,600
00
th
25 -
th
30
month
5,54,500 2,01,6 7,05,600
00
31
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
st
31
month
onwards
5,54,500 5,54,500
[Emphasis Supplied]
18.1. Clause 20.1 of the Reconstitution Deed provided that
disputes and differences amongst the partners are to be
resolved through arbitration in the following manner:
“ 20.1. All disputes, differences and/or claims
amongst the Partners, whether during the
subsistence of the partnership or thereafter, shall
be resolved through arbitration to be conducted
under the provisions of the Arbitration and
Conciliation Act, 1996. The Arbitral Tribunal shall
comprise of a Sole Arbitrator to be nominated by
mutual consent of all the parties to the dispute.”
[Emphasis Supplied]
19. The contention of the appellant that the liability to pay
remuneration was not on the appellant, but on the
partnership firm - M/s. JBS Nursing Home, cannot be
sustained. It is settled law that a partnership firm is not a
separate legal entity unlike a company and is merely an
association of persons for carrying out the business. In law,
the firm’s name is just a compendious method of describing
a partner. The Supreme Court in Dhansingh Prabhu Vs.
32
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
13
Chandrasekar has while discussing this issue, held that
reference to partners in their capacity as partners of a firm
would be sufficient to impute the liability on the partner.
Unlike a company, a partnership firm has no independent
legal existence separate from its partners. It is apposite to
set out the relevant extract of Dhansingh Prabhu case
below:
“ 41. A partnership firm, unlike a company registered
under the Companies Act, does not possess a
separate legal personality and the firm's name is
only a compendious reference for describing its
partners . This fundamental distinction between a firm
and a company rests on the premise that the company is
separate from its shareholders. In that context, the words
of Lord Macnaghten in Aron Salomon (Pauper) v. Salomon
& Co. Ltd. [Aron Salomon (Pauper) v. Salomon & Co. Ltd.,
1897 AC 22 (HL)] (“Salomon”) are instructive: (AC p. 51)
“… The company is at law a different person
altogether from the subscribers … and though it
may be that after incorporation the business is
precisely the same as it was before and the same
persons are managers and the same hands
receive the proceeds, the company is not in law ,
the agent of the subscribers or trustee for them. Nor
are the subscribers as members liable, in any shape or
form, except to the extent and in the manner provided
by the Act.”
42. This distinction does not, however, continue to hold
true for a partnership firm. In the seminal case of Bacha
F. Guzdar v. CIT [Bacha F. Guzdar v. CIT, (1954) 2 SCC
563 : (1955) 27 ITR 1 : (1955) 25 Comp Cas 1] , this
Court had an opportunity to briefly address this distinction
between a partnership firm and a company, wherein it was
observed thus: (SCC p. 570, para 13)
13
(2025) 10 SCC 96
33
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
“13. It was argued that the position of shareholders in
a company is analogous to that of partners inter se. This
analogy is wholly inaccurate. Partnership is merely
an association of persons for carrying on the
business of partnership and in law the firm name
is a compendious method of describing the
partners . Such is, however, not the case of a company
which stands as a separate juristic entity distinct from
the shareholders.”
43. The partnership name being only a compendious
method of describing the partners, it stands to
reason that a reference to the partners in their
capacity as partners of the firm will be sufficient to
impute liability on the partners themselves, whereas
Directors of a company are made liable vicariously through
the company, upon whom falls the primary liability. Thus,
the partners and the partnership firm are one and the
same. Unlike a company, a partnership firm has no
independent corporate existence and has no distinct
legal persona independent of its partners. Similarly,
the partners of a firm are co-owners of the property of the
firm unlike shareholders in a company who are not co-
owners of the property of the company. This principle was
also explained by the Calcutta High Court in Kondoli Tea
Co. Ltd., In re [Kondoli Tea Co. Ltd., In re, ILR (1886) 13
Cal 43] where the transferors of a tea estate claimed that
they were eligible to claim exemption from payment of ad
valorem duty because the transferee was a company in
which they themselves were shareholders. Negativing this
contention, it was held that the company was a separate
person and the transfer of the tea estate was a
conveyance and in substance, a transfer to another
person.”
[Emphasis Supplied]
20. The Arbitral Tribunal has succinctly dealt with the
contentions of the appellant and has held that a MOU and
the Reconstitution Deed are the result of a single
understanding reached between the parties and thus are
not two separate contracts. In addition, it was held that the
34
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
argument raised by the learned counsel for the appellant
that the partnership firm is required to pay the claim is
without basis since the partnership firm has no independent
existence. It was further held that since both the partners
of partnership firm M/s. JBS Nursing Home were parties to
the MOU, there was no need for the partnership firm to be
impleaded as a party. The relevant extract of the Arbitral
Award in this behalf of is set out below:
“32. The contention of the Respondent that Ex.P1 and P2
are two separate contracts and therefore, the MOU and
the conditions stated therein cannot be made subject
matter of this arbitration proceedings cannot be
accepted. A plain reading of the two agreements
make it clear that Ex.P1 sets out the broad terms of
understanding which is fructified into Ex.P2. It is not
the case of the Respondent that Ex.P2 substituted Ex.P1.
The main contention urged by the Respondent is that
Ex.P1 MOU is entered into by M/s.JBS Nursing Home
with the Respondent with Claimants 1 and 2 as its
partners, whereas, Ex.P2 deed of reconstitution has
been entered into by Claimants 1 and 2 with the
Respondent and also Claimant No.3, Dr. Ashwini Sreekar,
therefore, parties to both the agreements being
different and the partnership firm M/s. JBS Nursing
Home not being party to the present proceedings
this Tribunal has no jurisdiction to deal with the
dispute and the dispute itself is liable to be rejected
for non-joinder of necessary party. In my considered
view, this argument is not legally tenable in as much as
M/s. JBS Nursing Home consisted of two partners namely
Claimants 1 and 2. It is Claimants 1 and 2 for their firm
for and on behalf of their firm executed the MOU. The firm
M/s. JBS Nursing Home has no existence
independent of its partners. Since both the partners
of erstwhile M/s. JBS Nursing Home were parties to
the MOU, there was no need for M/s. JBS Nursing
Home to be impleaded as a party Respondent.
35
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
Question of firm becoming a necessary or proper party to
this proceeding would have arisen, if there was any claim
against the firm. No part of the claim by the parties is
directed against the firm. Particularly, the entire claim
made by the Claimants based on the MOU and the deed
of reconstitution is wholly against the Respondent
who has specifically undertaken to pay the amount
to the Claimants as stipulated in Exs.P1 and P2.
[Emphasis Supplied]
20.1 In addition, it was held by the Arbitral Tribunal that
there was no agreement between the parties that the
Claimants’ remuneration would be dependent on the profits
of the firm. The MOU and the Reconstitution Deed expressly
mandate payment of a fixed, escalating remuneration to the
Claimants in terms of the stipulated timeline, irrespective of
the firm’s business results. Since the Respondent retained
the right to exclusively manage the affairs of the firm and
to appropriate nearly the entire profits to the extent of 99%,
it cannot be contended that the remuneration payable to
the Claimants was to be discharged by the reconstituted
firm or exclusively out of the profits generated by it in the
following terms:
33. It has to be noticed that when parties have bound
themselves to the terms of the contract entered into by
them, the determination of their respective rights and
obligations in the arbitration proceedings would be clearly
circumscribed by the terms of the agreements. None of
36
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
the parties can request this Tribunal to travel beyond the
terms and conditions specifically agreed to by them in
determining their liability. As already extensively
referred to above respondent have specifically
undertaken to run the entire business on its own
taking over the hospital which was hitherto run by
Claimants 1 and 2 through the firm M/s. JBS Nursing
Home. The Respondent has also specifically
undertaken to pay fixed remuneration to the
Claimants as per the schedule of payment
enumerated in the MOU and reiterated in the deed
of reconstitution. It is not agreed between the
parties that the remuneration payable to the
Claimants shall be out of the profits of the firm. In
the wake of specific clause contained in Exs.P1 and
P2 specifying that irrespective of the business of the
firm fixed remuneration along with provision for
escalation shall be paid to the Claimants as per the
timeline fixed in the agreements; it is not open for
the Respondent to contend or for that matter for this
Tribunal to hold that such remuneration would be payable
only out of profit and subject to the firm making profit.
Such an interpretation would be against the agreed terms
of the contract by the parties. When a running hospital is
taken over by the Respondent to manage it exclusively by
making such investment, availing such loan as the
Respondent deemed fit with no liability for the costs and
consequences on the Claimants and with a specific
stipulation that 99% of the profit shall go to the
Respondent and that only fixed remuneration apart from
1% of the profit shall be payable to the Claimants who are
the other partners of the firm, merely, because all the
partners are termed as working partners it cannot be
inferred, that the remuneration payable will be only
subject to the firm making profit and only out of profit
derived. As per Section 11 of the Indian Partnership
Act, 1932, the mutual rights and duties of the
partners of a firm may be determined by the
contract between the parties. As per Section 12
right of a partner to take part in the conduct of the
business is subject to the contract . Similar is the
position under Section 13 which deals with mutual rights
and liabilities of the partners. The partners' rights to share
profits, his obligation to indemnify the firm, his right to
receive remuneration which a partner normally is not
entitled for taking part in the conduct to the business, are
subject to the contract between the partners. Therefore,
when the parties have expressly agreed that
37
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
Claimants 1 to 3 shall be entitled for fixed
remuneration and the Respondent shall enjoy
almost entire profit of 99% derived by the firm with
the right to exclusively manage the affairs of the
firm, it is not open to hold that the remuneration is
payable by the reconstituted firm and from out of
the profits derived by the firm. The argument of the
learned senior counsel for the respondent
emphasising the word working partners used in
Ex.P2 to describe the role of the claimants is also of
no avail in the light of the express stipulation contained in
Ex.P2.
xxx xxx xxx
35. It is also relevant to notice here that merely
because while reconstituting the firm Dr.Ashwini
Sreekar is inducted as one of the partners of the firm
along with the Respondent herein, it cannot be said
that the present arbitration proceedings cannot deal
with the rights and obligations flowing from the
MOU to which Dr. Ashwini Sreekar is not a party.
Admittedly, the two agreements are interconnected.
The underlying purpose and venture of both the
agreements are one and the same. Ex.P2 is the result
of Ex.P1. Dr. Ashwini Sreekar who is inducted as a partner
under the deed of reconstitution is provided with a right to
have her clinic in an area of 500 sq.ft. of the hospital
building in the ground floor with parking facilities for two
cars. There is no dispute with regard to this area and the
right to use the same by Claimant No.3. So far as
remuneration payable what is stipulated in Exs.P1 and P2
are one and the same. Hence, it is not open for the
Respondent to contend that Claimant No.3 not being
a party to MOU, the entire claim is liable to be
rejected and that this Tribunal will not have
jurisdiction to entertain the dispute. In the case
of Amit Lalchand Sha and Vs. Rishab and Another
Civil Appeal No.4602/2018, the Supreme Court has held
that where the agreements were interconnected with a
similar under lined purposes would bind all the parties to
the agreements, even though one of them might be
lacking an arbitration clause or any entity is not party to
all such agreements. Useful reference can be made to
paragraphs 12 to 18 and 24 to 26 of the said judgment of
the Apex Court in this connection. In the instant
case, Arbitration clause is found in Exs.P1 and P2. It is
only that Claimant No.3 was not a party to Ex.P1. Having
regard to the facts and circumstances stated above and
38
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
the nature of two documents, I am of the view that both
the contracts deal with the same purpose and venture and
they are interconnected; both contain arbitration clause.
Claimant No.3 is not enforcing any of her individual or
independent right. Hence, it cannot be stated that these
proceedings are not maintainable or that this tribunal has
no jurisdiction to decide the matter because of non-joinder
of the firm. ”
[Emphasis Supplied]
21. The Arbitral Tribunal further held that the terms of
agreement reached between the parties make it clear that
the appellant was responsible for carrying out the
renovation and furnishing of the hospital and the
claimants/respondents would not be responsible for this
purpose and that the delay in commencing of the hospital
business was already taken into consideration by the
claimants/respondents by deferring the payment of
remuneration for the first three months. The relevant
extract of the Arbitral Award in this behalf is set out below:
“36. As regards the liability of the Respondent to
pay remuneration in terms of the stipulation made in
Exs.P1 and P2, it is clear from the details of
remuneration made payable with escalation along
with provisions for wavier for few months and
deferment for certain other months that the
Respondent who has undertaken to make such payment
is bound by the terms of the agreement. He cannot wriggle
out of these terms by contending that he was required to
make huge investment for renovating, furnishing, and
securing new equipment for the hospital. The terms of
the agreement reached between the parties make it
specifically clear that it would be the entire
39
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
responsibility of the Respondent to make such
investment for developing the hospital and that
claimants shall not be responsible for any such
investments. It is further expressly agreed that the
Respondent could avail loan for any such development and
the claimants shall not be responsible for any such claim.
In the wake of such specific terms and conditions
contained in Ex.P2, it is not open for the Respondent to
contend that he had undertaken large-scale renovation of
the hospital building including installation of new lifts
requiring certain structural alteration in the building and
therefore operation of the hospital was delayed till the end
of December, 2016. No material is produced by the
Respondent to establish that there was a separate
contract or understanding between the Claimant
and Respondent where under they agreed to relax
the terms and conditions of Exs.P1 and P2 regarding
the timeline for payment of remuneration or for that
matter regarding renovation and structural alternation for
installation of lifts thereby Claimants' agreeing to forego
any part of the remuneration payable to them or to
postpone payment of remuneration for certain specified
months. On the contrary, the timelines stipulated in
Exs.P1 and P2 takes note of the probable delay in
commencing the hospital business and accounts for
it by waving payment of remuneration for the first
three months and by deferring the payment of part
of the remuneration by few months with a provision
to make up the same in future. In the light of such
terms and conditions contained in Exs.P1 and P2
and in the absence of any other contract or
understanding reached between the parties it is not
open for this tribunal to hold that because the
Respondent invested money for renovation and for
installation of lifts which delayed commencement of
business in the hospital. The Respondent shall not
be held liable to pay remuneration to the
Claimants.”
[Emphasis Supplied]
22. The interpretation of the clauses of the Reconstitution
Deed by the Arbitral Tribunal is cogent, reasonable and
based on the evidence placed before it.
40
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
23. Besides, an examination of the Legal Notice (Ex.P6)
sent on 22.03.2017 by the respondents to the appellant
shows that it sets out the appellant was in breach of the
terms of the Reconstitution Deed especially in the context
of making payment of the agreement remuneration. In
response to the Legal notice, an email was issued on
23.03.2017 (Exhibit- P7) by the appellant, wherein the
appellant has stated that it has incurred expenses in
renovating the hospital and had suggested a payment
schedule for payment of its pending dues. This was also
reflected in the Notice dated 23.03.2017 (Exhibit-P7).
Clearly thus, the contention that no amounts were due as
remuneration by the appellant was an afterthought. The
relevant extract of the notice (Exhibit-P7) in this behalf, is
set out below:
“ 2. The costs incurred by you on renovating the
hospital building are of no relevance to our Clients.
Our Clients’ entitlement to the payments, as set out
in the MOU, dated 13.02.2015 and the Deed of
Reconstitution, dated 13.05.2015, is not dependent
or in any manner linked to either any costs incurred
by you or the performance of the hospital.
3. Without prejudice to the above, our Clients state that,
prior to approaching our Clients with your proposal, it is
not as if you were not aware of the status of the hospital
building and / or the extent of costs that you would have
had to or wanted to incur to operate the hospital as per
41
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
your requirements. In fact, while finalising the MOU,
on your request, our Clients had, graciously, agreed
to a lower monthly remuneration in the beginning
as you claimed that you would require utilise your
funds for carrying out certain improvements to the
hospital building.
4. Further, you have, incorrectly, mentioned that you
have taken the hospital building on rent. Please note that
the hospital building has not been let out to you on rent.
The remuneration payable to our Clients under the said
Deed is not by way of rent, but is in consideration for
having inducted you in their partnership. As you are
aware, the hospital building is not partnership property.
This is explicitly stated in the said Deed. The hospital
building is our Clients’ personal property and you
have been merely granted permission / licence to
enter upon and operate the hospital that was
already being run by our Clients quite successfully
in the past. Such permission / licence is revocable
at any time by notice. Our Clients state that any attempt
on your part to suggest any claim on their hospital
property will force our Clients to forthwith revoke the
permission and demand your immediate eviction from the
property.”
[Emphasis Supplied]
24. The dispute thus was inter-se the appellant who was
the incoming partner into the partnership firm and who was
obligated to conduct his business in terms of the
Reconstitution Deed. In fact, the Reconstitution Deed also
contained a Clause for indemnification of the respondents
by the appellant being Clause 17 that the appellant will
indemnify the claimants/respondents from losses, claims,
costs and expenses on account of negligence in the
management or otherwise which is why 99% of the share
42
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
of the profits were the entitlement of the appellant and not
the claimants/respondents.
25. Given the examination of the clauses of the MOU and
Reconstitution Deed as are reproduced in paragraphs
above, this Court does not find any infirmity with the
interpretation of the MOU and Reconstitution Deed given by
the Arbitral Tribunal.
26. It cannot also be said that the Arbitral Tribunal went
beyond the terms of the contract or has re-written the
contract. The Arbitral Tribunal has given its interpretation
of the terms of the contract and its interpretation is based
on the intention of the parties as is set out in the contract
entered between the parties. Thus, the judgments in the
Green Vs. Hertzog and Lakshmana Chetty cases would
not be applicable in the facts of the present case.
27. The contention that the learned Commercial Court has
termed the partnership firm as a ‘pseudo-partnership’ in the
Impugned Judgment and hence, the Impugned Judgment
suffers from an infirmity, also is without merit. Regardless
43
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
of the nomenclature used, the findings in the Impugned
Judgment were based on an examination of the MOU
including Clauses 7 to 10 of the Reconstitution Deed.
28. As set out above, it is no longer res integra , that the
scope of interference in an Arbitral Award under Sections
34 and 37 of the A&C Act is limited. Amongst the grounds
provided in the A&C Act for interference with Arbitral Award
is patent illegality, which is limited to situations where the
findings of the arbitrator are arbitrary, capricious or
perverse, or when the conscience of the Court is shocked,
or when the illegality is not trivial but goes to the root of
the matter. [See: PSA SICAL Terminals Pvt. Ltd. v
Board of Trustees of V.O. Chidambranar Port Trust
14 15
Tuticorin and MMTC Limited v. Vedanta Limited ].
29. The Arbitrator examines the quality and quantity of
evidence placed before him when he delivers his Arbitral
Award and a view, which is possible on the facts as set forth
by the Arbitrator must be relied upon. In Delhi Airport
14
(2023) 15 SCC 781
15
(2019) 4 SCC 163
44
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
16
Metro Express Limited vs. DMRC case , the Supreme
Court has held that the very object of the Act is that there
should be minimal judicial interference with an Award. It is
further held that the Arbitral Tribunal holds the final
authority in both facts and law and contravention of law not
linked to public policy is beyond the scope of judicial
interference under “patent illegality”:
“28. This Court has in several other judgments interpreted
Section 34 of the 1996 Act to stress on the restraint to be
shown by Courts while examining the validity of the
Arbitral Awards. The limited grounds available to Courts
for annulment of Arbitral Awards are well known to legally
trained minds. However, the difficulty arises in applying
the well-established principles for interference to the facts
of each case that come up before the Courts. There is a
disturbing tendency of Courts setting aside Arbitral
Awards, after dissecting and reassessing factual
aspects of the cases to come to a conclusion that the
award needs intervention and thereafter, dubbing
the award to be vitiated by either perversity or
patent illegality, apart from the other grounds
available for annulment of the award. This approach
would lead to corrosion of the object of the 1996 Act
and the endeavours made to preserve this object,
which is minimal judicial interference with Arbitral
Awards . That apart, several judicial pronouncements of
this Court would become a dead letter if Arbitral Awards
are set aside by categorising them as perverse or patently
illegal without appreciating the contours of the said
expressions.
29. Patent illegality should be illegality which goes
to the root of the matter. In other words, every error
of law committed by the Arbitral Tribunal would not
fall within the expression “ patent illegality”.
Likewise, erroneous application of law cannot be
categorised as patent illegality. In addition,
16
(2022) 1 SCC 131
45
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
contravention of law not linked to public policy or
public interest is beyond the scope of the expression
“ patent illegality”. What is prohibited is for Courts
to reappreciate evidence to conclude that the award
suffers from patent illegality appearing on the face
of the award, as Courts do not sit in appeal against
the Arbitral Award. The permissible grounds for
interference with a domestic award under Section
34(2-A) on the ground of patent illegality is when
the arbitrator takes a view which is not even a
possible one, or interprets a clause in the contract
in such a manner which no fair-minded or
reasonable person would, or if the arbitrator
commits an error of jurisdiction by wandering
outside the contract and dealing with matters not
allotted to them. An Arbitral Award stating no reasons
for its findings would make itself susceptible to challenge
on this account. The conclusions of the arbitrator which
are based on no evidence or have been arrived at by
ignoring vital evidence are perverse and can be set aside
on the ground of patent illegality. Also, consideration of
documents which are not supplied to the other party is a
facet of perversity falling within the expression “patent
illegality”.”
[Emphasis Supplied]
29.1 In the case of State of Jharkhand & Ors. v. HSS
17
Integrated Sdn & Anr. , the Supreme Court held that the
Arbitral Tribunal is the master of evidence and a finding of
fact arrived at by an arbitrator is on an appreciation of the
evidence on record, and is not to be scrutinized as if the
Court was sitting in appeal.
17
2019 (9) SCC 798
46
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
30. A similar view was taken by the Supreme Court in
Maharashtra State Electricity Distribution Co. Ltd. v.
18
Datar Switchgear Ltd . & Ors . It was held that the
findings arrived at by the Arbitral Tribunal on the basis of
the evidence on record are not to be scrutinized as if the
Court was sitting in appeal. It was observed and held as
under:
“51. Categorical findings are arrived at by the Arbitral
Tribunal to the effect that insofar as Respondent 2 is
concerned, it was always ready and willing to perform its
contractual obligations, but was prevented by the
appellant from such performance. Another specific finding
which is returned by the Arbitral Tribunal is that the
appellant had not given the list of locations and, therefore,
its submissions that Respondent 2 had adequate lists of
locations. In fact, on this count, the Arbitral Tribunal has
commented upon the working of the appellant itself and
expressed its dismay about lack of control by the Head
Office of the appellant over the field offices which led to
the failure of the contract. These findings of facts
which are arrived at by the Arbitral Tribunal after
appreciating the evidence and documents on record.
From these findings it stands established that there
is a fundamental breach on the part of the appellant
in carrying out its obligations, with no fault of
Respondent 2 which had invested whopping amount of
Rs.163 crores in the project. A perusal of the award
reveals that the Tribunal investigated the conduct of the
entire transaction between the parties pertaining to the
work order, including withholding of DTC locations,
allegations and counter-allegations by the parties
concerning installed objects. The arbitrators did not focus
on a particular breach qua particular number of
objects/class of objects. Respondent 2 is right in its
submission that the fundamental breach, by its very
nature, pervades the entire contract and once committed,
the contract as a whole stands abrogated. It is on the
18
2018 (3) SCC 133
47
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
aforesaid basis that the Arbitral Tribunal has come to the
conclusion that the termination of contract by Respondent
2 was in order and valid. The proposition of law that
the Arbitral Tribunal is the master of evidence and
the findings of fact which are arrived at by the
arbitrators on the basis of evidence on record are
not to be scrutinized as if the Court was sitting in
appeal now stands settled by a catena of judgments
pronounced by this Court without any exception
thereto.”
[Emphasis Supplied]
31. Interpretation of a contract is a matter for an
Arbitrator to determine. Even if such interpretation gives
rise to an erroneous application of law, the Courts will
generally not interfere, unless the error is palpably perverse
or illegal and goes to the root of the matter. It is therefore
to be seen whether the interpretation given by the Arbitral
Tribunal is such that a fair minded or reasonable person
could conclude as well, or if the interpretation by the Arbitral
Tribunal is patently illegal.
32. In a recent judgment, the Supreme Court in
19
Hindustan Construction Co. Ltd. v. NHAI recapitulated
the prevailing view that Courts should not customarily
interfere with Arbitral Awards that are well reasoned, and
contain a plausible view. The Supreme Court observed, that
19
(2024) 2 SCC 613
48
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
judges, by nature, may incline towards using a corrective
lens, however, under Section 34 of the Arbitration Act, this
corrective lens is inappropriate especially under Section 37
of the Arbitration Act. It was held that the error in
interpreting a Contract is considered an error within its
jurisdiction. Therefore, judicial interference should be
avoided unless absolutely necessary, ensuring the
arbitrator's decision remains final and binding. The relevant
extract of the Hindustan Construction case reads as
follows:
“26. The prevailing view about the standard of scrutiny —
not judicial review, of an award, by persons of the
disputants' choice being that of their decisions to stand —
and not interfered with, (save a small area where it is
established that such a view is premised on patent
illegality or their interpretation of the facts or terms,
perverse, as to qualify for interference, courts have to
necessarily choose the path of least interference, except
when absolutely necessary). By training, inclination
and experience, Judges tend to adopt a corrective
lens; usually, commended for appellate review.
However, that lens is unavailable when exercising
jurisdiction under Section 34 of the Act. Courts
cannot, through process of primary contract
interpretation, thus, create pathways to the kind of
review which is forbidden under Section 34. So
viewed, the Division Bench's approach, of appellate
review, twice removed, so to say (under Section 37), and
conclusions drawn by it, resulted in displacing the majority
view of the tribunal, and in many cases, the unanimous
view, of other tribunals, and substitution of another view.
As long as the view adopted by the majority was plausible
— and this Court finds no reason to hold otherwise
(because concededly the work was completed and the
finished embankment was made of composite, compacted
49
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
matter, comprising both soil and fly ash), such a
substitution was impermissible.
27. For a long time, it is the settled jurisprudence of
the courts in the country that awards which contain
reasons, especially when they interpret contractual
terms, ought not to be interfered with, lightly…
[Emphasis Supplied]
33. The Supreme Court in Indian Oil Corporation Ltd.
20
v. Shree Ganesh Petroleum , had held that where the
terms of a contract are capable of more than one
interpretation, the Court cannot interfere with the Award
only if the Court is of the opinion that another interpretation
would have been a better one. Reliance is placed on the
following extract of the Indian Oil case:
“45. The Court does not sit in appeal over the award made
by an Arbitral Tribunal. The Court does not ordinarily
interfere with interpretation made by the Arbitral Tribunal
of a contractual provision, unless such interpretation is
patently unreasonable or perverse. Whereas
contractual provision is ambiguous or is capable of
being interpreted in more ways than one, the Court
cannot interfere with the Arbitral Award, only
because the Court is of the opinion that another
possible interpretation would have been a better
one.”
[Emphasis Supplied]
34. A similar view was also taken by the Co-ordinate
Bench of this Court in the case of M/s. Pratibha
20
(2022) 4 SCC 463
50
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
21
Industries Limited vs. M/s. Amrutha Constructions
has held that the Arbitral Tribunal is the final arbiter of
disputes and unless the Court finds that no reasonable
person could have interpreted the contract in the same
manner, the interpretation of the Arbitral Tribunal of the
contractual terms cannot be interfered with. The relevant
extract of the Pratibha Industries case is set out below:
“19. It is also a well-settled principle of law that
challenge cannot be laid to the award only on the
ground that the arbitrator has drawn his own
conclusion or failed to appreciate the relevant facts.
Nor can the Court substitute its own view on the
conclusion of law or facts as against those drawn by
the arbitrator, as if it is sitting in appeal. This aspect
has been highlighted in State of Rajasthan v. Puri
Construction Co. Ltd. [State of Rajasthan v. Puri
Construction Co. Ltd., (1994) 6 SCC 485], where it has
been observed thus: (SCC pp. 500-501, para 26)
"26. The arbitrator is the final arbiter for the dispute
between the parties and it is not open to challenge the
award on the ground that the arbitrator has drawn his
own conclusion or has failed to appreciate the facts. In
Sudarsan Trading Co. v. State of Kerala [Sudarsan
Trading Co. v. State of Kerala, (1989) 2 SCC 38] it has
been held by this Court that there is a distinction
between disputes as to the jurisdiction of the arbitrator
and the disputes as to in what way that jurisdiction
should be exercised. There may be a conflict as to the
power of the arbitrator to grant a particular remedy.
One has to determine the distinction between an error
within the jurisdiction and an error in excess of the
jurisdiction. Court cannot substitute its own evaluation
of the conclusion of law or fact to come to the conclusion
that the arbitrator had acted contrary to the bargain
21
COMAP NO.302 OF 2025 - order dated 01.08.2025
51
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
between the parties. Whether a particular amount was
liable to be paid is a decision within the competency of
the arbitrator. By purporting to construe the contract
the court cannot take upon itself the burden of saying
that this was contrary to the contract and as such
beyond jurisdiction. If on a view taken of a contract, the
decision of the arbitrator on certain amounts awarded is
a possible view though perhaps not the only correct
view, the award cannot be examined by the court.
Where the reasons have been given by the arbitrator in
making the award the court cannot examine the
reasonableness of the reasons. If the parties have
selected their own forum, the deciding forum must be
conceded the power of appraisement of evidence.
The arbitrator is the sole judge of the quality as well as
the quantity of evidence and it will not be for the court
to take upon itself the task of being a Judge on the
evidence before the arbitrator."
(emphasis in original and supplied)
20. As long as the arbitrator has taken a possible
view, which may be a plausible view, simply because
a different view from that taken in the award, is
possible based on the same evidence, would also not
be a ground to interfere in the award. In Arosan
Enterprises Ltd. v. Union of India [Arosan Enterprises Ltd.
v. Union of India, (1999) 9 SCC 449], this Court has held
as follows: (SCC p. 475, para 36)
"36. Be it noted that by reason of a long catena of
cases, it is now a well-settled principle of law that
reappraisal of evidence by the court is not permissible
and as a matter of fact exercise of power by the court
to reappraise the evidence is unknown to proceedings
under Section 30 of the Arbitration Act. In the event of
there being no reasons in the award, question of
interference of the court would not arise at all. In the
event, however, there are reasons, the interference
would still be not available within the jurisdiction of the
court unless of course, there exist a total perversity in
the award or the judgment is based on a wrong
proposition of law. In the event however two views are
possible on a question of law as well, the court would
not be justified in interfering with the award."
23. We are unable to accept that the view expressed
by the Arbitral Tribunal is perverse or that it fails the
Wednesbury test; that is, no reasonable person could
52
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
possibly hold the said view. It is also material to note
that the claim of the appellant was for subcontractor
charges. The Arbitral Tribunal's view that the charges were
for performing the contractual obligations of executing the
project cannot be held to be perverse or an implausible
one.”
[Emphasis Supplied]
35. The Arbitral Tribunal examined and interpreted the
provisions of the contract and the learned Single Judge
upheld all the findings of the Arbitral Tribunal after
examining the same. The findings of the Arbitral Tribunal
are not patently illegal or against public policy. The view
taken by the Arbitral Tribunal in its interpretation also does
not ignore any vital evidence.
36. So far as concerns the contention of the appellant that
the MOU ceases to exist when the Reconstitution Deed was
signed, thus, no payments were due to be made, cannot
also be sustained either. As stated above, the MOU was
executed by the partnership firm represented by its
partners respondent Nos.1 and 2 and the appellant. The
MOU clearly stated that the partners were going to enter
into a separate agreement within 30 days from the date
they obtained the renewal of lease of the premises and such
a separate agreement was executed as Reconstitution Deed
53
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
about three months thereafter. The Reconstitution Deed as
its name suggests, was a Deed of Reconstitution of the
partnership firm and the Reconstitution Deed was executed
by the claimants/respondents as well as the appellant.
Thus, this Court is unable to interfere with the findings given
by the Arbitral Tribunal.
37. So far as concerns the counter claim of the appellant
which was for a direction to produce audited balance sheets
and profit and loss accounts of the reconstituted partnership
as of 31.03.2015 and to appoint a Commissioner examining
the reconstituted partnership firm’s receipt and expenditure
for the period 2015-16 to 2017-18, both Arbitral Tribunal
as well as the learned Commercial Court have found that
the direction to claimants/respondent Nos.1 and 2 to
produce audited balance sheets and profit and loss accounts
of the partnership firm in the financial year 2015 was not
requisite since the firm was reconstituted in May 2015 and
reconstituted firm would have to maintain its accounts with
effect of its date of reconstitution. There is no claim made
by the appellant towards payment since none was
54
NC: 2026:KHC:24495-DB
COMAP No. 147 of 2021
HC-KAR
envisaged in the contract between the parties. Thus, there
would be no purpose to obtain these records as was claimed
by the appellant. In any event, this issue was not pressed
before this Court.
VIII. CONCLUSION :
38. In view of the aforesaid discussions, this Court finds
no infirmity with the findings of the Arbitral Tribunal which
were affirmed by the learned Commercial Court, that would
merit interference by this Court. The Appeal is accordingly
dismissed. All pending applications stand closed.
39. However, in the circumstances of the case, there shall
be no order as to costs.
Digitally signed by ANU
SIVARAMAN
Location: High Court of
Karnataka
Sd/-
(ANU SIVARAMAN)
JUDGE
Sd/-
(TARA VITASTA GANJU)
JUDGE
KS/JJ
Digitally signed by TARA
VITASTA GANJU
Location: HIGH COURT
OF KARNTAKA
55