Yadu Sugar Limited vs State Of Up And Another

Court
Allahabad High Court

HIGH COURT OF JUDICATURE AT ALLAHABAD
WRIT - C No. - 26307 of 2026
Yadu Sugar Limited
…..Petitioner(s)
Versus
State of UP and another
…..Respondent(s)
Counsel for Petitioner(s) : Anshuman Singh, Diptiman Singh
Counsel for Respondent(s) : C.S.C., Jahnavi Singh, Ravindra
Singh
Reserved
AFR
Court No. - 2
HON'BLE J.J. MUNIR, J.
HON'BLE SIDDHARTH NANDAN, J.
(Per: Siddharth Nandan,J.)
1. Heard Mr. Diptiman Singh, learned counsel for the petitioner, Mr.
Manish Goyal, learned Additional Advocate General, assisted by Mr.
A.K. Goyal, learned Additional Chief Standing Counsel on behalf of
respondent nos. 1 and 2 and Mr. Ravindra Singh, learned counsel for the
respondent no.3.
2. The present writ petition has been instituted for the issue of a writ
of mandamus directing respondent no.2, the Cane Commissioner, to allot
sugarcane for the crushing season 2026-27, as per the installed crushing
capacity of the petitioner; and in ratio of the increased proportion from
the estimate which has been mentioned in the Office
Memorandum/Order dated 14.10.2025.

2
WRIC No. - 26307 of 2026
Facts of the case
3. The petitioner, is registered under the Companies Act, 1956; (now
Companies Act, 2013) and engaged in the manufacture of crystal sugar
through the vacuum pan process. Its unit is located at Sujanpur-Bisauli,
District Badaun. The installed crushing capacity of the Sugar Mill is
7000 tons crushing per day (TCD) and the essential raw material for
manufacturing sugar is sugarcane.
4. The supply and purchase of sugarcane to Mills, are governed by
U.P. Sugarcane (Regulation of Supply and Purchase) Act, 1953 and U.P.
Sugarcane (Regulation of Supply and Purchase) Rules, 1954 (hereinafter
referred as Act, 1953 and Rules, 1954 respectively).
5. The petitioner has submitted his reservation proposal before the
Cane Commissioner and requested that sufficient sugarcane, as per the
Office Memorandum / Order dated 14.10.2025, may be allotted to the
petitioner’s unit. But, in the past he was never allotted sufficient
sugarcane.
6. The Office Memorandum dated 15.10.2020, which has been
issued under Section 12(2) of the Act, 1953 indicates the name of the
petitioner at Serial No. 71 and for the 5 years commencing 2020-2025,
the estimated cane requirement for crushing seasons has been
determined as 100.80 lakh quintals (LQ). Similarly, vide the
Memorandum dated 14.10.2025 issued under Section 12(2) of the Act,
1953, the estimated requirement has been indicated at Serial No. 75,
again to be 100.80 LQ, for the 5 years commencing 2025-2030.
7. It is an admitted fact that the petitioner has not been provided the
estimated cane requirement as determined under Section 12(2) of the
Act, 1953. For ready reference, the admitted chart demonstrating the
status relating to the petitioner's sugar Mill qua sugarcane allotment,
purchase, cane price payable, actual payments made by it and other
relevant particulars for the last ten crushing seasons, are being
reproduced below:-

S.N. Crushing
Estimat
Cane
Allotm
Cane
Purchas
Purch
Cane
Price
Payable
(Rs. Lakh)
Paymen
Mill Start
Mill
Closure
Date of Full
Delayed
payment
Season
ed
Cane
require
ase
(%)
t Made
Date
Payment
ent
(Lakh
ed
(Lakh
(Rs.
Lakh)
Date
period
After Mill
ment
(Lakh
Q.)
Q.)
Closure
date
Q.)
1 2 3 4 5 6 7 8 9 10 11 12
1 2016-17 100.80 73.37 36.95 50.37 9262.86 9262.86 21.11.16 25.03.17 28.12.17 9 months
2 2017-18 100.80 93.61 70.41 75.22 21900.29 21900.2
9
17.11.17 21.04.18 15.07.19 1 Year 3
Months
3 2018-19 100.80 129.04 37.49 29.06 11874.64 11874.6
4
30.11.18 31.03.19 31.07.20 1 Year 4
Months
4 2019-20 100.80 57.82 22.68 39.23 7297.32 7297.32 21.11.19 03.04.20 23.04.21 1 Year 20
Days
5 2020-21 100.80 22.01 18.46 85.78 5975.46 5975.46 08.11.20 20.03.21 25.10.21 7 Months
6 2021-22 100.80 63.86 37.59 58.86 12968.57 12968.5
7
10.11.21 30.03.22 17.12.22 8 Months
7 2022-23 100.80 63.60 38.81 61.02 13381.55 13381.5
5
04.11.22 26.03.23 05.01.24 9 Months
8 2023-24 100.80 91.21 27.91 30.60 10177.68 10177.6
8
10.11.23 11.03.24 02.12.25 1 Year 8
Months
9 2024-25 100.80 73.26 26.15 35.68 9518.89 9518.89 11.11.24 23.02.25 17.03.26 1 Year 1
Month
10 2025-26 100.80 50.31 9.17 17.88 3607.44 2330.64 21.11.25 26.01.26 pending -
8. The following figures pertaining to 8 sugar Mills in the area, as
admitted to the parties, is also reproduced below:-
S. No. Sugar Mill
Estimated
Alloted
Cane Area
(Hectares)
Cane Alloted
Alloted
cane (%)
Cane
Crushed
(Lakh Q.)
Drawl (%) Payment
Status as on
Name
Cane
Requiremen
vis-a-vis
Requirement
Reservation
Order dated
t for
Crushing
(Lakh Q.)
18.10.2025
Season
2025-26
(Lakh Q.)
(Crushing
Season
2024-25)
(%)
1 2 3 4 5 6 7 8 9
1 Majhawali 41.40 9430 79.04 190.92 28.71 36.32 95.52
2 Rajpura 147.73 31831 276.06 186.87 96.55 34.97 100
3 Sabitgarh 150.54 32580 243.26 161.59 120.66 49.60 100
4 Roopapur 109.47 21351 170.54 155.79 55.01 32.26 100
5 Badaun 20.77 3370 26.66 128.36 10.47 39.27 100
6 Kayamganj 21.69 3708 27.27 125.73 7.96 29.19 100
7 Karimganj 104.40 14053 113.35 108.57 41.31 36.44 91.73
8 Bisauli 100.80 6483 51.30 50.89 9.17 17.88 71.95
Petitioner's case
9. Sri Diptiman Singh, Advocate appearing for the petitioner, while
placing reliance on the Office Memorandums dated 15.10.2020 and
14.10.2025, vehemently argued that the reservation order / sugar
allotment memoranda, which were issued purportedly in accordance
with the provisions contained in Section 15 of the Act, 1953 read with
Rule 22 of the Rules, 1954, clearly envisage the crushing capacity of the
petitioner’s Mill, to be calculated taking into account the number of

4
WRIC No. - 26307 of 2026
days, which is 180 days, (when the Mills are functioning in the season)
and the said determination clearly indicates that there was no decline in
the crushing capacity of the petitioner's Mill. The estimated cane
requirement for crushing, for the seasons commencing 2021-2031,
remained a figure of 100.80 LQ. But, on account of non-allocation of
sufficient quantity of sugarcane, the drawl percentage of the petitioner's
Mill remained low, resulting in a situation wherein the petitioner was
pushed to a limit that it had to shut down operations with compounding
of losses, in the last four to five years.
10. It is also the petitioner's case that there is pilferage during transit
and other reputed reasons and on account of the said conditions, the
Sugarcane Commissioner had himself issued a policy dated 02.09.2025,
wherein he has expressed that a minimum 60% drawl should be
maintained by the sugar Mills. As such, he acknowledges the fact that
there is 40% pilferage. For ready reference, the relevant extract of the
policy dated 02.09.2025 is reproduced below:-
“1- :-
चीनीमिलोंकेलिएगन्नेकीआवश्यकता
( ) ,
गन्नेकीआवश्यकताकानिर्धारणउत्तरप्रदेशगन्ना पूर्ति तथाखरीदविनियमन अधिनियम
1953 -12
कीधारा केअन्तर्गतअलगसेकियाजायेगा।प्रदेशकीसभीचीनीमिलोंसेअपेक्षाकी
,
जातीहैकि वेआवंटितक्षेत्रकीभौगोलिकस्थि ति गन्नाउपलब्धताएवंचीनीमिलकीपेराई
,
क्षमताआदिकोध्यानमेंरखतेहुए अपनेआवंटितक्षेत्रसेनिर्धारितआवश्यकताकीपूर्तिहेतुगत
60
सत्रकेसापेक्षगन्नेकेड्रालकोअधिकसेअधिकबढ़ायेंएवंन्यूनतम प्रतिशतड्रालप्राप्त
"
करें।
11. The Learned Counsel for the petitioner has also placed reliance on the
letter of the Commissioner dated 02.09.2017 to indicate that 85% alone of the
proceeds is tagged, whereas 15% is left for the defraying of wages, repairs
necessitated by operations during the previous season etc.; and in this context,
has tried to explain the deficiency, which is reflected in the payment status,
against the Petitioner Sugar Mill.
12. In view of the aforesaid, the petitioner has contended that, since there
was no reduction in the estimated cane requirement for the last 10 years, the
crushing capacity of the petitioner Sugar Mill was not a consideration or a
factor, which could justify low cane allocation; and even the payment status is
not indicative of the fact that the petitioner’s sugar Mill is not capable of
functioning to its fullest capacity of 7000 T.C.D.

5
WRIC No. - 26307 of 2026
13. The petitioner’s case is based on discrimination, resulting in the
thwarting of the functioning of the petitioner Sugar Mill and Sri Diptiman
Singh Advocate, vehemently urges before the Court to examine the admitted
position and the allocations, which is being made to other Sugar Mills, which
demonstrates discrimination vis-a-vis the petitioner Sugar Mill. He submits
that out of the 8 sugar Mills, 7 sugar Mills are being allotted more than 100%
of their estimated cane requirement for during each crushing season and some
of the Mills are even being allotted close to 200% of the estimated cane
requirement.
14. In order to buttress his argument, he places reliance on the chart, which
has been appended to the counter affidavit filed on behalf of the State,
regarding the various sugar Mills. He says, for example, Majhawali has been
allocated 190.92% cane, the Rajpura 186.87%, Sabitgarh 161.59%, Roopapur,
155.79%, Badaun 128.36%, Kayamganj, 125.73% and Karimganj 108.57%
whereas the petitioner Sugar Mill at Bisauli, has been allocated only 50.89%
of the estimated sugarcane.
15. In view of the aforesaid, he submits that on account of the low
allocation, the calendar which is prepared for making available sugarcane
from the gate area is prepared in such a manner, that there is no continuous
supply of sugarcane. As such, while placing reliance on the final
manufacturing report for the season 2025-2026 in Form R.T.-8(c) under the
Rule 83 of the Central Excise Rules, learned counsel for the petitioner submits
that the hours lost due to cane shortage was 786.19 hours whereas the total
hours of actual crushing was 784.44 hours, i.e. the hours lost due to cane
shortage was more than the total hours of actual crushing. As such, he has
impressed upon us that due to the aforesaid reason, it is not economically
viable to run the Mills, with shortage of sugarcane, as huge losses are incurred
in running the sugar factory, which is attributable to the shortage of supply of
sugarcane.
16. He has further submitted that for continuous running or the actual
crushing, continuous supply of sugarcane is required every day and,
considering that in Eastern U.P., the season lasts for 180 days, 90 LQ of
sugarcane is required. In case only 51.30 LQ of sugarcane is allotted, then a
simple mathematical calculation would show that the Mill can function only
for 102.6 days.

6
WRIC No. - 26307 of 2026
17. In view of the aforesaid, the petitioner seeks strict application of the
Office Memorandum / Order dated 14.10.2025 and the grant of equitable
relief, for cane allocation of the estimated cane requirement i.e. 100.80 LQ
plus 40% extra, considering the pilferage cost during the transport, as
acknowledged by the Cane Commissioner himself, in his policy dated
02.09.2025.
Case of the State-Respondents:-
18. It is submitted on behalf of the respondents that the reservation order
was issued and the sugar allotment made in accordance with the provisions
contained in Section 15 of the Act, 1953 read with Rule 22 of the Rules, 1954.
Refuting the allegations of discrimination, Mr. Goyal places reliance on Para
36 of the counter affidavit filed on behalf of the Cane Commissioner i.e.
respondent no.2. He submits that the figures are self-explanatory and the fact
that the petitioner had failed to make payment of the cane price, within the
prescribed time and the procurement of only 9.17 LQ of sugarcane, as against
the quantity of sugarcane allotted to it i.e. for the crushing season 2025-2026
being 51.30 LQ of sugarcane is indicative of the fact that the petitioner’s Mill
is not performing according to its crushing capacity. It has also been pressed
that since the Mill could procure only the 9.17 LQ of sugarcane and on
account of the reluctance of the cane growers to supply sugarcane, the Mill
management was constrained to close the Mill on 26.01.2026. It is also not
disputed that the remaining sugarcane was allotted on 03.02.2026, to other
nearby sugar Mills.
19. Sri Manish Goyal, learned A.A.G. appearing on behalf of the State, has
submitted that the drawl, (which means the amount of sugar cane actually
received and crushed) by the petitioner is only 17.88%; which in comparison
to the other sugar Mills is very less, a fact evident from the comparative chart
which has been mentioned herein above.
20. As far as the reserved areas for the sugar factories are concerned, it is
for the sugar Mills to make an endeavour to increase the yield, in the Mill gate
area which is situated in a radius of 7.5 K.M. of a particular Mill.
21. Sri Goyal further submits that the allocation, is to be made in
accordance with the statute, which is a beneficial and welfare legislation,
enacted primarily to regulate the supply and purchase of sugarcane in the

7
WRIC No. - 26307 of 2026
larger public interest, and to protect the economic interest of sugarcane
growers. Accordingly, while exercising such statutory powers of reservation
and assignment, the Cane Commissioner is required to balance competing
public interest, while protecting the farmers, by way of an assurance of timely
payment of cane price, failing which the very objective would stand defeated.
22. Sri Goyal, while indicating the performance of the petitioner’s sugar
Mill since 2016-2026, not only impressed the admitted position that the
payments were made with a delay of almost one year for the last ten years but
also indicated that the cane purchased by the petitioner was much less than the
cane allocated, leave alone the estimated cane requirement as determined
under Section 12(2) of the Act, 1953.
23. In order to substantiate his argument, Sri Manish Goyal, learned
Additional Advocate General submits that for the crushing season 2025-2026,
although 51.30 LQ of sugar cane was reserved and allotted to the petitioner,
the petitioner actually purchased only about 9.17 LQ of sugarcane, which is
indicative of the fact that the petitioner Mill, did not even utilize, the quantity
already reserved. He submits that this clearly demonstrates that the grievance
of the petitioner before the Court is only artificial and otherwise there is no
prejudice being caused to it. The same is also the stand about the allegation of
discrimination, which per se has been denied.
24. He further submits that the comparative payment and the actual
purchase of sugarcane against the allotment, are the relevant factors which are
considered by the Cane Commissioner, while determining cane allotment, and,
as such, while balancing the competing public interest, only that much cane is
allocated, which may suffice for the crushing capability of the sugar Mill. The
remainder is required to be allocated to other sugar Mills, which are also
functioning to their crushing capacity, so that the yield may be maximized,
and at the same time, the interest of the farmers, that is, timely payment of
cane price, is also secured.
Case of -Cooperative Cane Development Union Ltd. Badaun
25. Sri Ravindra Singh, Advocate has also filed a counter affidavit on
behalf of respondent No. 3, i.e. Cooperative Cane Development Union Ltd.
Badaun and while placing before this Court, Rule 22 of the Rules, 1954 has
submitted, that the determination of the quantity of cane to be purchased from

8
WRIC No. - 26307 of 2026
an area by a factory, is based on the following factors, as enumerated under
Rule 22 of the Rules, 1954. For ready reference Rule 22 of the Rules, 1954 is
reproduced below:-
“22. In reserving an area for or assigning an area to a factory or
determining the quantity of cane to be purchased from an area by a
factory, under Section 15, the Cane Commissioner may take into
consideration-
(a) the distance of the area from the factory,
(b) facilities for transport of cane from the area,
(c) the quantity of cane supplied from the area to the factory in
previous year,
(d) previous reservation and assignment orders,
(e) the quantity of cane to be crushed in factory,
(f) the arrangements made by the factory in previous years for
payment of cess, cane price and commission,
(g) the views of the Cane-growers' Co-operative Society of the
area,
(h) efforts made by the factory in developing the reserved or
assigned area,
(i) efforts made by the factory to provide information to the
farmers pertaining to survey, supply tickets, weighment, payment
etc. through the use of website. Short Messaging Service (SMS),
Interactive
(j) Voice Response System (IVRS), Hand Held Computer (HHC),
Global Positioning System (GPS), electronic weigh-bridge etc."
26. On the basis of the aforesaid, he has submitted that the petitioner sugar
Mill had failed to develop the area, which was previously reserved under the
assignment order and the arrangement made by the factory in the previous
year for the payment of cane price etc., are relevant consideration in the
determination of cane allocation to the petitioner Mill. As such, he says there
is no discrimination or high handedness, as suggested by the petitioner.
27. He has further submitted that it is the exclusive authority of the Cane
Commissioner under Section 15 of the Act, 1953 to reserve and assign
sugarcane area. However, the Bonding Policy framed under Rule 57 of the
Rules, does not give, either to the Sugar Mill or the cane growers, an

9
WRIC No. - 26307 of 2026
unrestricted right to the demand or supply of sugarcane, except in accordance
with the statutory scheme.
28. The Cane Commissioner is required to consider all relevant statutory
factors, such as the actual availability of sugarcane etc. But, the welfare of the
sugar cane growers is also a requirement and since the petitioner’s track
record of payment to the sugarcane growers was dismal, the sugar cane
growers had also shown reluctance to supply sugarcane to the petitioner,
which is also evident, from the fact that the petitioner Sugar Mill at his own
instance had issued the closure notice dated 26.01.2026.
29. He has further submitted that the confidence of the cane growers in the
petitioner Mill had decreased, resulting in a continuous decline in the
sugarcane area and poor drawl of the reserved cane. As such, the allocation
limited to 51.30 LQ of sugarcane, cannot be faulted, and thereafter, the
petitioner procurement of only 9.17 LQ of sugarcane, also does not give a
right to the petitioner to claim higher allocation. Consequently, the case set up
by the petitioner, cannot be sustained or entitle it to relief.
Issue
30. In the facts and circumstances, the paramount issue which arises for
consideration by this Court, primarily is whether the petitioner was subjected
to discrimination in comparison to the other Sugar Mills, while making the
allocation of sugarcane; and as to whether the said discrimination led to
isolation of the petitioner's sugar Mill, to the extent that it was pushed to the
verge of closure?
31. The second issue which requires examination is, as to what is the
impact of delayed payment and the percentage of the drawl; and if it would
justify a lower cane allocation, than the estimated cane requirement, over the
various crushing seasons?
Issue No. 1:
Whether the petitioner was subjected to discrimination in comparison to the
other sugar Mills, while making the allocation of sugarcane; and whether the
said discrimination led to isolation of the petitioner Sugar Mill, to the extent
that it was pushed to the verge of closure?

10
WRIC No. - 26307 of 2026
32. It is not disputed between the parties that in comparison, amongst the
eight sugar Mills, the remaining seven Mills were all given allotments which
were more than 100%, whereas the petitioner was allotted only 50% of the
estimated cane requirement; i.e., the availability of sugarcane for purchase by
the petitioner Sugar Mill. It was quite limited as compared to the estimated
requirement. However, it is also contended that even out of the allocated
requirement, i.e., 51.30 LQ, the petitioner only purchased 9.17 LQ.
33. Sri Diptiman Singh, learned counsel for the petitioner, had given an
explanation for the lower procurement by the petitioner Sugar Mill, in the
back ground that the calendar which is prepared at the behest of the Sugar
Cane Commissioner, did not allocate sufficient days vis-a-vis the villages
from which the sugarcane was to be purchased by the petitioner, which
resulted in the hours lost due to cane shortage.
34. A perusal of the Final Manufacturing Report for the season 2025–2026,
in Form R.T.-8(c) under Rule 83 of the Central Excise Rules, reveals that the
hours lost due to cane shortage were 786.19 hours, as compared to the total
hours of actual crushing, i.e., 784.44 hours.
35. In view of the aforesaid, Sri Diptiman Singh, learned Advocate,
submits that clearly, during the period when there was no supply of sugarcane,
the functioning of the sugar Mill was brought to a standstill. However, the
recurring expenses in terms of wages, maintenance, etc. continued to mount
for the petitioner, and as such, the decline in the drawl percentage is largely
attributable to the non-allocation or availability of sugarcane.
36. Though he has repeatedly submitted that he does not have any
grievance against the other Sugar Mills, but the Court cannot shut its eyes to
the fact that figures which are admitted also, with respect to the other sugar
Mills there is not even a single Sugar Mill, which has not been allotted more
sugarcane, than what was estimated as per the notification issued under
Section 12 of the Act, 1953, (Perhaps keeping in mind the pilferage of
estimated 40%).
37. On a pointed query by us Sri Manish Goyal, learned Additional
Advocate General, submits that it is no doubt that certain sugar Mills were
allotted upto 190.92 percentage of the original estimated cane requirement, but
it was on account of their previous track record. However, he did not dispute

11
WRIC No. - 26307 of 2026
that columns 6 and 8 of the chart, which has been reproduced hereinabove,
indicating the data pertaining to the eight Sugar Mills, i.e. allotted cane
percentage and the drawl percentage, demonstrates that a comparison of the
allotment and the drawl of other sugar Mills was not more than what the
petitioner’s drawl yielded. For example, the sugar Mill Majhawali, was given
an estimate requirement of 41.40 LQ but allotted 79.04 LQ i.e. about 190.92%
allotment, yielded 36.32% of drawl. In case of the petitioner, the estimated
cane requirement was 100.80 LQ but was allotted only 51.30 LQ i.e. 50.89%
of allotment but yielded 17.88% drawl. If we make the data, commensurate to
the allotment of cane percentage between the two sugar Mills and their
corresponding drawl, we find that the drawl of the petitioner’s sugar Mill was
more in terms of the percentage.
38. The second consideration which may be relevant in determining the
discrimination, is the fact that if 90 LQ was the requirement of the petitioner’s
sugar Mill and 51.30 LQ was made available while determining the working
of the petitioner for the season being 180 days, we find that with 51.30 LQ,
the Mill could have only functioned for 102.6 days. It is, therefore, for good
reason acceptable that due to the low allocation done in a discriminatory
manner, the sugar Mill of the petitioner, could not function, for approximately
80 days out of 180 days in the season. As such, the comparative chart which is
sought to be relied upon by the respondents cannot be accounted for, in the
manner they have placed before this Court.
39. It is evident that if only approximately 50 LQ is allocated, then the
calendar for making available sugarcane allotment, would have a shorter
period, which is demonstrated by the fact that the cane shortage was for
786.19 hours i.e. more than the crushing hours.
40. In view of the aforesaid, we have no hesitation in holding that, by lesser
allocation in comparison with the estimated cane requirement for the crushing
seasons, the petitioner has been forced to a lower drawl percentage, which has
resulted in the closure of the sugar Mill, and, as such, the State machinery was
not justified in reallocating cane to other sugar Mills. Thus shortage of sugar
supplied to petitioner far below the allocation was the root cause for the
closure of the sugar Mill. As such, discrimination faced by the petitioner in
comparison to other seven sugar mills is writ large.
Second issue:-

12
WRIC No. - 26307 of 2026
Which requires examination is as to what is the impact of delayed payment
and the percentage of drawl; and it would justify a lower cane allocation, than
the estimated cane requirement, over the various crushing seasons?
41. In order to understand the issue regarding the delayed payment, it will
be appropriate to examine the policy dated 02.09.2025 and the Office
Memorandum dated 02.11.2017.
42. A perusal of the policy dated 02.09.2025 indicates that the expectation
of the Cane Commissioner, is to ensure that a minimum of 60% of the drawl is
achieved and the memorandum dated 02.11.2017 also contemplates that 85%
of the proceeds may be tagged while 15% is left for the purposes of
adjustment of wages, maintenance etc. A dual picture emerges from the
aforesaid assessment, which can be said to have been made, by the Cane
Commissioner.
43. The Cane Commissioner himself acknowledges that out of the 100%
procurement made by the sugar Mills, 40% constitutes pilferage and loss
which cannot be avoided and utilized for crushing, and, as such, he
contemplates 60% drawl.
44. We will examine the facts of the case, in the backdrop of the aforesaid
enumeration of the policy dated 02.09.2025. We find that the estimated
requirement for the petitioner was 100.80 LQ and, if 40% pilferage is taken
into account, the cane allocation should have been around 140 LQ, to ensure
that 60% drawl is achieved. Whereas only 50.31 LQ were allocated, which led
to a cascading effect where having a lesser number of days in the calendar for
making sugarcane available, the purchase could only be effected up to 9.17
LQ. The aforesaid had a direct impact on the payment to be made and, as
such, the second proposition of providing 15% of the cost outside the regular
payment cycle is also an acknowledgment of the payment cycle, that a sugar
Mill has to undergo, in order to meet various contingencies.
45. In view of the aforesaid, we do not find that there was any substantial
delay in making the payments and nonetheless, all the payments have been
made by the sugar Mill. Therefore the delayed payments cannot be attributed
to the crushing performance of the petitioner Sugar Mill and the answer lies
elsewhere, as noted hereinabove.

13
WRIC No. - 26307 of 2026
46. In view of the aforesaid facts we find that the discrimination directed
against the Petitioner Sugar Mill has resulted in its isolation and brought it to
the verge of closure. It is the duty of the State to ensure that the allocations are
made commensurate with the estimated requirement, so as to enable a sugar
Mill to sustain itself and also yield results commensurate to the Cane
Commissioner’s expectation of achieving 60% drawl.
47. In view of the aforesaid facts we are of opinion that writ petition must
succeed. Accordingly, we issue a mandamus to Respondent No. 2, the Cane
Commissioner, to allocate sugarcane for the crushing season 2026–2027 in
accordance with the crushing capacity of the petitioner, which has been
estimated at 100.80 LQ, by making available the requisite quantity of
sugarcane, after taking into account the 40% pilferage, acknowledged in the
policy dated 02.09.2025. At the same time, the calendar prepared for the
crushing season 2026–2027 shall be arranged in such a manner, as to ensure
that an uninterrupted supply of sugarcane to the Petitioner Sugar Mill for 180
days in the season is maintained.
48. Needless to say that the petitioner shall ensure that it purchases, the
sugarcane allotted to it and utilizes the same, so that the cane growers are paid
their price within a reasonable time and the payment schedule is maintained.
49. Before parting with the Judgement, this Court wishes to put a note of
reminder for the Government who represent a welfare State that an approach
with sustainable development, is the need of the hour, and as such, the Polices
of the Government, should be such that it sustains existing Mills and at the
same time, provide avenues for setting up new Mills.
50. The writ petition stands allowed. There shall be no order as to costs.
51. Let this order be communicated to the Cane Commissioner, U.P.
Lucknow by the Registrar (Compliance).