Harvinder Singh Sikka vs Nobal Buildtech Private Limited & Ors.
- Court
- National Company Law Appellate Tribunal
- Case type
- Company Appeal(AT)(Ins)
- Decided on
- 25-02-2026
<div> <b>NATIONAL COMPANY LAW APPELLATE TRIBUNAL </b><br /> <b>PRINCIPAL BENCH, NEW DELHI </b><br /> <b>Company Appeal (AT) (Insolvency) No. 256 of 2026 </b><br /> [Arising out of order dated 21.01.2026 passed by the Adjudicating Authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – II) in C.P. (IB) <br /> No. 143/ND/2022 in New I.A.312/ND/2026] <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Harvinder Singh Sikka </b> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Nobal Buildtech Pvt. Ltd. </b><br /> <b>Through the Interim Resolution Professional & Ors. </b><br /> <b> </b><br /> <b>…Respondents </b><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Abhijeet Sinha, Sr. Advocate & Mr. Sumant </b><br /> <b>Batra, Sr. Advocates with Mr. Piyush Singh, Mr. </b><br /> <b>Vivek Kumar, Ms. Raveena Paniker, Mr. Vijay </b><br /> <b>Nair, Mr. Raghav Dembla, Ms. Neeha Nagpal and </b><br /> <b>Mr. Rohan Tewari, Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Mr. Abhishek Anand, Mr. Amar Vivek, Mr. Aditya </b><br /> <b>Gauri, Ms. Damini Srestha, Mr. Anant Jain and </b><br /> <b>Mr. Aryan Chhabra and Mr. Hemant Sethi (RP in </b><br /> <b>person) Advocates for R-1/RP. </b><br /> <b> </b><br /> <b>Mr. Gopal Jain, Sr. Advocate with Mr. Kevin </b><br /> <b>Chadha, Advocates for R-2 & R-5. </b><br /> <b> </b><br /> <b>Mr. Sumesh Dhawan, Ms. Meghna Mishra and Ms. </b><br /> <b>Mallika Kamal, Advocates for R-3. </b><br /> <b> </b><br /> <b>Mr. Krishnendu Dutta, Sr. Advocate with Ms. </b><br /> <b>Palak Sharma, Advocates for R-4. </b><br /> <b>WITH </b><br /> <b>Company Appeal (AT) (Insolvency) No. 287 of 2026 </b><br /> [Arising out of order dated 13.01.2026 passed by the Adjudicating Authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – II) in C.P. (IB) <br /> No. 143/ND/2022 in New I.A.112/ND/2026] <br /><br /> <br /> <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Harvinder Singh Sikka </b> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Nobal Buildtech Pvt. Ltd. & Ors. </b> <b>…Respondents </b><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Abhijeet Sinha, Sr. Advocate & Mr. Sumant </b><br /> <b>Batra, Sr. Advocates with Mr. Piyush Singh, Mr. </b><br /> <b>Vivek Kumar, Ms. Raveena Paniker, Mr. Vijay </b><br /> <b>Nair, Mr. Raghav Dembla, Ms. Neeha Nagpal and </b><br /> <b>Mr. Rohan Tewari, Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Mr. Abhishek Anand, Mr. Amar Vivek, Mr. Aditya </b><br /> <b>Gauri, Ms. Damini Srestha, Mr. Anant Jain and </b><br /> <b>Mr. Aryan Chhabra and Mr. Hemant Sethi (RP in </b><br /> <b>person) Advocates for R-1/RP. </b><br /> <b> </b><br /> <b>Mr. Gopal Jain, Sr. Advocate with Mr. Kevin </b><br /> <b>Chadha, Advocates for R-2 & R-5. </b><br /> <b> </b><br /> <b>Mr. Sumesh Dhawan, Ms. Meghna Mishra, Ms. </b><br /> <b>Mallika Kamal and Mr. Shivam Sharan, Advocates </b><br /> <b>for R-3. </b><br /> <b> </b><br /> <b>Mr. Krishnendu Dutta, Sr. Advocate with Ms. </b><br /> <b>Palak Sharma, Advocates for R-4. </b><br /> <b>WITH </b><br /> <b>Company Appeal (AT) (Insolvency) No. 288 of 2026 </b><br /> [Arising out of order dated 07.01.2026 passed by the Adjudicating Authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – II) in C.P. (IB) <br /> No. 143/ND/2022 in RA 83/ND/2025] <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Harvinder Singh Sikka </b> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Nobal Buildtech Pvt. Ltd. & Ors. </b> <b>…Respondents </b><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Abhijeet Sinha, Sr. Advocate & Mr. Sumant </b><br /> <b>Batra, Sr. Advocates with Mr. Piyush Singh, Mr. </b><br /> <b>Vivek Kumar, Ms. Raveena Paniker, Mr. Vijay </b><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>2 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <b>Nair, Mr. Raghav Dembla, Ms. Neeha Nagpal and </b><br /> <b>Mr. Rohan Tewari, Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Mr. Abhishek Anand, Mr. Amar Vivek, Mr. Aditya </b><br /> <b>Gauri, Ms. Damini Srestha, Mr. Anant Jain and </b><br /> <b>Mr. Aryan Chhabra and Mr. Hemant Sethi (RP in </b><br /> <b>person) Advocates for R-1/RP. </b><br /> <b> </b><br /> <b>Mr. Gopal Jain, Sr. Advocate with Mr. Kevin </b><br /> <b>Chadha, Advocates for R-2 & R-5. </b><br /> <b> </b><br /> <b>Mr. Sumesh Dhawan, Ms. Meghna Mishra, Ms. </b><br /> <b>Mallika Kamal and Mr. Shivam Sharan, Advocates </b><br /> <b>for R-3. </b><br /> <b> </b><br /> <b>Mr. Krishnendu Dutta, Sr. Advocate with Ms. </b><br /> <b>Palak Sharma, Advocates for R-4. </b><br /> <b>J U D G M E N T </b><br /> <b>ASHOK BHUSHAN, J.</b> <br /> These three appeals have been filed by the suspended director of the <br /> corporate debtor challenging the order passed by the adjudicating authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – II) in C.P. (IB) <br /> 143/ND/2022. <br /> <b>2.</b> <b> </b> Comp. App. (AT) (Ins.) No. 256/2026 has been filed challenging the <br /> order dated 21.01.2026 passed in new I.A. No. 312/ND/2026, several other <br /> reliefs have been claimed in the appeal. Comp. App. (AT) (Ins.) No. 287/2026 <br /> has been filed against the order dated 13.01.2026 passed in new I.A. No. <br /> 112/ND/2026. Comp. App. (AT) (Ins.) No. 288/2026 has been filed <br /> challenging the order dated 07.01.2026 in RA No. 83/ND/2025 filed by Orbis <br /> Trusteeship Services Private Limited, the financial creditor. <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>3 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <b>3.</b> <b> </b> These three appeals arise out of the same CIRP initiated against the <br /> corporate debtor, Nobel Buildtech Private Limited. Brief background facts <br /> giving rise to these appeals are: <br /> i. Kindle Infraheights Pvt. Ltd. (the principal borrower) raised funds <br /> though issuance of secured Non-Convertible Debentures (NCDs) to Asia <br /> Pragati Strategic Investment Fund, respondent No. 3. The debenture <br /> issuance was carried out in two tranches namely, ₹ 130 crore though <br /> issuance of 13,000 debentures and ₹ 6 crore though issuance of 600 <br /> debentures. <br /> ii. The respondent No. 2 – Orbis Trusteeship Services Pvt. Ltd. was <br /> appointed as Debenture Trustee for the NCDs. Debenture Trust Deeds <br /> (DTD) was executed. Nobal Buildtech Pvt. Ltd. the corporate debtor <br /> stood as corporate guarantor. NCDs were secured by corporate <br /> guarantee, personal guarantees of members of Sikka family and by <br /> mortgage of land admeasuring 22,240 sq. metres situated at Plot No. <br /> GH-4C, Sector-10, Greater Noida, Uttar Pradesh. <br /> iii. The respondent No. 2, financial creditor initiated proceedings under <br /> Section 7 against the principal borrower, corporate guarantors and <br /> personal guarantors. Applications against principal borrower, <br /> corporate guarantor as well as proceedings under Section 95 of the <br /> Insolvency and Bankruptcy Code, 2016 (for short the IBC or the Code) <br /> against the personal guarantor were admitted. <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>4 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> iv. Against the orders admitting CIRP against the principal borrower and <br /> the corporate guarantor as well as against the personal guarantors, <br /> appeals were filed in this Tribunal. Comp. App. (AT) (Ins.) <br /> No.1836/2024 filed against the order initiating CIRP against the <br /> principal borrower vide order dated 20.09.2024. This Tribunal <br /> permitted the Sikka Group to deposit Part IV amount i.e., <br /> ₹<br /> 76,25,21,262/-. <br /> v. In pursuance of the order passed in Comp. App. (AT) (Ins.) <br /> No.1836/2024, appellant to show his <i>bona fide</i> deposited ₹ 55 crore <br /> before this Tribunal. The financial creditor and Sikka Group entered <br /> into settlement. Both the parties having made statement before this <br /> Tribunal that settlement has been entered. This Tribunal permitted <br /> withdrawal of company appeal by order dated 15.04.2025, with respect <br /> to principal borrower and Comp. App. (AT) (Ins.) No. 2187/2024 with <br /> respect to corporate debtor by order dated 24.04.2025 and permitted <br /> the financial creditor to file the application under Section 12A read with <br /> Regulation 30A for withdrawal of the CIRP. <br /> <br /> vi. A Settlement Agreement was entered between the parties on <br /> 09.05.2025, where parties agreed for withdrawal of CIRP proceedings <br /> against all proceedings initiated for CIRP against the principal <br /> borrower, corporate debtor as well as personal guarantors. Total <br /> settlement amount was fixed as ₹ 210 crore. ₹ 55 crore was already paid. <br /> ₹ 40 crore was paid at the time of execution of the Agreement and ₹ 25 <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>5 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> crore was to be paid within 30 days of commencement date and ₹ 90 <br /> crore was paid within 90 days of commencement date. <br /> vii. Settlement Agreement also contemplated that on consequent of default, <br /> financial creditor has right to revive the insolvency proceedings and <br /> right to sell the mortgage land until full and final payment of all dues. <br /> After settlement dated 09.05.2025, an application under Section 12A <br /> was filed before the NCLT for withdrawal of IB 143(ND)/2022. <br /> viii. Adjudicating authority held that the Orbis Trusteeship Services Private <br /> Limited is a sole financial creditor <i>qua</i> the corporate debtor who has <br /> preferred the application under Section 12A, the application was <br /> allowed and C.P. (IB) No.143(ND)/2022 is dismissed as withdrawn, <br /> which order was passed on 31.07.2025. <br /> ix. Order dated 31.07.2025 was uploaded on the website on 26.08.2025. <br /> On 28.08.2025, financial creditor issued notice to the principal <br /> borrower, corporate debtor and the personal guarantors, <br /> communicating that amount of ₹ 25 core is due on 30.08.2025. It was <br /> communicated that notice is given that failure to make the said <br /> payment by deadline shall amount to breach of Settlement Agreement <br /> and Debenture Trustee may proceed to invoke, enforce all rights and <br /> remedies available under the Settlement Agreement. The said notice <br /> was replied on 29.08.2025 by corporate debtor communicating that <br /> order dated 31.07.2025 although was orally pronounced but it was <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>6 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> signed and uploaded on 26.08.2025, hence the 30 days period for <br /> payment is due on or before 25.09.2025. <br /> x. Financial creditor, however, proceeded to file an application <br /> I.A.83/2025 on 09.09.2025 praying for revival of the C.P. (IB) <br /> No.143/2022 on the ground that amount of ₹ 25 crore as per Settlement <br /> Agreement has not been paid by 30.08.2025 and corporate debtor’s <br /> unilateral view that clock start from 26.08.2025 finds no support in the <br /> Settlement Agreement or applicable law and was plainly an attempt to <br /> evade the consequence of delay. <br /> xi. During the pendency of the said I.A.83/2025, the payment was made <br /> of ₹ 25 crore to the financial creditor which was accepted. Application <br /> came to be heard on 07.01.2026 by the adjudicating authority. <br /> Adjudicating authority noticed that amount of ₹ 120 crore, out of <br /> Settlement amount of ₹ 210 crore has been paid and corporate debtor is <br /> in progress of arranging the balance amount of ₹ 90 crore. <br /> xii. Application was earlier deferred on 24.11.2025 and again on <br /> 10.12.2025. It was submitted by the corporate debtor that willing <br /> investor was not inclined to make investments, as the original title <br /> deeds/documents regarding mortgage properties of corporate debtor <br /> were not available. It was stated that original titles are with financial <br /> creditor. <br /> xiii. Adjudicating authority by the order 07.01.2026 allowed the Restoration <br /> Application and restored the CIRP which had commenced in terms of <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>7 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> the order dated 05.11.2024. Adjudicating authority, however, noticing <br /> the fact that order dated 31.07.2025 was passed permitting withdrawal <br /> of the CIRP and the corporate debtor has already paid amount of ₹ 120 <br /> crore and is making efforts to pay the balance, adjudicating authority <br /> decided to give 10 days further time to the corporate debtor to pay, <br /> during which, RP will not proceed in the matter except for purpose of <br /> procurement of documents referred to in the order. Subject to above, <br /> the application was disposed of. <br /> xiv. By subsequent order 13.01.2026, corporate debtor’s application <br /> 112/ND/2026 praying for rectification of the order dated 07.01.2026 <br /> was disposed of by replacing the word “conceded” with word “agreed to”. <br /> It was after the aforesaid the corporate debtor filed an application <br /> I.A.312/ND/2026 dated 17.01.2026 praying for extension of 90 days to <br /> the corporate debtor to make payment to the debenture holder in terms <br /> of the order dated 09.05.2025 with other prayers. The prayers made in <br /> I.A. 312/2026 is as follows: <br /> <i>“a. Grant an extension of 90 (ninety) days to the </i><br /> <i>Applicant/ Corporate Debtor to make payment to the </i><br /> <i>Debenture Holders in terms of the settlement dated </i><br /> <i>09.05.2025; </i><br /> <i>b. Direct that during the said extended period, the CIRP </i><br /> <i>shall continue only in a facilitative and non-coercive </i><br /> <i>manner, in line with the orders dated 07.01.2026 and </i><br /> <i>13.01.2026; </i><br /> <i>c. Permit the Corporate Debtor to complete investor due </i><br /> <i>diligence, </i> <i>obtain </i> <i>requisite </i> <i>debenture </i> <i>holder </i><br /> <i>authorisations, and effect payment in a legally </i><br /> <i>compliant manner; and </i><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>8 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <i>d. Pass such other or further orders as this Hon’ble </i><br /> <i>Tribunal may deem fit in the interest of justice.” </i><br /> xv. In the application 312/2026, corporate debtor pleaded that after the <br /> order 07.01.2026, IRP had taken the steps for procuring the certified <br /> copy of the lease deed in respect of project land. Corporate debtor has <br /> also cooperated with the IRP. It was pleaded that process for <br /> regularisation and verification of title documents and completion of <br /> investor lead due diligence is presently underway and reasonable <br /> limited period is required to enable the investor to complete its internal <br /> approvals and facilitate in favour of funds. Prayer of 90 days was <br /> consequently made. <br /> xvi. The application was heard by adjudicating authority on 21.01.2026 and <br /> by order dated 21.01.2026, the said application has been disposed of. <br /> Adjudicating authority after noticing the prayers made in the <br /> application and further that the amount of ₹ 120 crore have already <br /> been paid, it was directed that reverse CIRP made in terms of the order <br /> dated 07.01.2026 would continue till 04.02.2026. The application was <br /> accordingly disposed of. <br /> <br /> xvii. As noted above the Comp. App. (AT) (Ins.) No.256/2026 has been filed <br /> against the order dated 21.01.2026, and other two appeals have been <br /> filed against the order dated 07.01.2026 and 13.01.2026. <br /> <b>4.</b> <b> </b> We have heard learned Sr. counsels Mr. Abhijeet Sinha & Mr. Sumant <br /> Batra appearing for the appellants. Learned counsel Mr. Abhishek Anand has <br /> appeared for the Resolution Professional (RP). Learned Sr. counsel Mr. Gopal <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>9 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> Jain has appeared for respondent No. 2, the financial creditor and respondent <br /> No. 5. Learned counsel Mr. Sumesh Dhawan has appeared for respondent <br /> No. 3 and learned Sr. counsel Mr. Krishnendu Datta has appeared for <br /> respondent No. 4. <br /> <b>5.</b> <b> </b> Learned counsel for the appellant in support of the appeal contends <br /> that corporate debtor and other principal borrower and personal guarantor <br /> from very beginning has been making efforts to settle the debts of the financial <br /> creditor. The corporate debtor, the entire group using all its resources has <br /> made various offers for liquidating the debt of the financial creditor. Amounts <br /> were also deposited in the appeals filed in this Tribunal, challenging the <br /> initiation of CIRP against the principal borrower. It is submitted that <br /> ultimately both the parties decided to settle their issues on settlement amount <br /> of ₹ 210 crore, which settlement led to withdrawal of CIRP against the <br /> corporate debtor by order dated 31.07.2025 on an application filed under <br /> Section 12A by the financial creditor itself. It is submitted that amount of ₹ 55 <br /> crore was already paid and further amount of ₹ 40 crore was paid on the <br /> execution of the Settlement. Further amount of ₹ 25 crore was also paid, <br /> although with little delay. Amount outstanding was only ₹ 90 crore for which <br /> corporate debtor has made all its efforts, the Noida Authority were approached <br /> for accepting a co-developer, which Noida Authority accepted the proposals <br /> made. It is submitted that due to original titles not being available, the <br /> investor backed out. The monetisation plan could not be fructified. The <br /> appellant has bona fide making all efforts to pay the balance amount of ₹ 90 <br /> crore but due to facts beyond the control of the corporate debtor amount could <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>10 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> not be paid. It is submitted that Restoration Application 83/2025 was filed <br /> alleging non-payment of ₹ 25 crore, which was the basis of the application, <br /> which amount having been paid and accepted very basis of Restoration <br /> Application was unfounded. The financial creditor proceeded to press the <br /> said application which was ultimately allowed on 07.01.2026. It is submitted <br /> that financial creditor with whom corporate debtor has entered into <br /> settlement was duty bound to extend all corporation to complete the <br /> monetisation of the assets from which investment was to be received. <br /> Financial creditor having been informed that order on 31.07.2025 has been <br /> uploaded only on 26.08.2025, hence amount could not be immediately <br /> procured from investor, rushed and filed the application on 09.09.2006 for <br /> reviving the CIRP. The steps taken by the financial creditor only indicate that <br /> the CIRP is being used by the financial creditor as a recovery mechanism. The <br /> Settlement having been entered and CIRP having been withdrawn, <br /> adjudicating authority ought not to have revived the CIRP when the corporate <br /> debtor was willing and making efforts to pay the balance amount. Admittedly, <br /> out of ₹ 210 crore, ₹ 120 crore was already paid and received by the financial <br /> creditor. After receiving a substantial amount, it is not open for the financial <br /> creditor to pray for revival. It is further submitted that by I.A.112/2026 was <br /> filed by the corporate debtor, since the corporate debtor never conceded to <br /> revive the CIRP. Corporate debtor only conceded that given sometime, the <br /> corporate debtor shall make the balance payment and RP be directed to <br /> procure the all relevant documents. Application for rectification was allowed <br /> on 13.01.2026. It is submitted that in I.A.312/ND/2026 prayer was made to <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>11 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> grant extension of 90 days, which 90 days has not been allowed by the <br /> adjudicating authority rather time till 04.02.2026 was only allowed up to <br /> which the RP was directed not to proceed with the CIRP. The time which was <br /> prayed by the appellant was a reasonable time for completion of the <br /> monetisation of the assets from which the fund was to be generated for <br /> payment of settlement amount. The objectives of the IBC proceedings are to <br /> revive the corporate debtor. CIRP proceedings cannot be used as methodology <br /> to hostile takeover of the assets of the corporate debtor. The corporate debtor <br /> having undertaken to pay the balance amount, CIRP ought not to have been <br /> revived. Appellant is still ready and willing to liquidate the balance amount <br /> of ₹ 90 crore. Action of financial creditor in rushing to the adjudicating <br /> authority for revival is not in accordance with the objective of the IBC. <br /> <b>6.</b> <b> </b> Learned counsel appearing for the financial creditor, Respondents No. <br /> 2 & 5 submits that the ample opportunity was given to the corporate debtor <br /> to make the payment of settlement amount as per settlement terms. Amount <br /> of ₹ 25 crore was to be paid within 30 days of the commencement date. <br /> Commencement date being the date on which the order was passed by the <br /> adjudicating authority for making withdrawal of the CIRP. Corporate debtor <br /> committed breach in not making payment on 30.08.2025. As per settlement <br /> agreement, consequence of default is provided in clause 2, which provides <br /> that any default in payment of any tranche of settlement amount will result <br /> in immediate termination of the Agreement. On non-payment of the tranche <br /> which was payable by 30.08.2025, Settlement Agreement has been <br /> terminated. It is submitted that formerly the Settlement Agreement has now <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>12 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> been terminated by email dated 22.01.2026. It is submitted that on default <br /> having been committed by the corporate debtor in making the payment as per <br /> the Settlement Agreement, adjudicating authority has rightly revived the CIRP <br /> proceedings vide order dated 07.01.2026. Order dated 07.01.2026 is a <br /> consent order, where the counsel for the corporate debtor conceded/agreed <br /> for revival of the CIRP, hence no appeal can be filed against the consent order. <br /> It is submitted that ample opportunity was granted by the adjudicating <br /> authority to the corporate data to make the balance payment of ₹ 90 crore in <br /> which he failed, hence the order dated 07.01.2026 was passed. There is no <br /> error in the order 21.01.2026, by which order opportunity was again granted <br /> to the corporate debtor to make payment by 04.02.2026. It is submitted that <br /> present is a case where debt and default is neither disputed nor it is the case <br /> of the appellant that appellant has not failed to honour the settlements. <br /> <b>7.</b> <b> </b> Learned counsel appearing for the RP submitted that in pursuance of <br /> the order dated 07.01.2025, IRP immediately wrote to both the suspended <br /> directors and the financial creditors to provide original title deeds/property <br /> documents for implementation of settlement. Email dated 08.01.2026 has <br /> been sent to the appellant and affidavit was also filed by the appellant that <br /> property document in respect of land bearing plot Plot No. GH-4C, Sector-10, <br /> Greater Noida, Uttar Pradesh are not in possession of custody of the corporate <br /> debtor, which title deeds were deposited with Orbis Trusteeship Services Pvt. <br /> Ltd. Orbis Trusteeship Services Pvt. Ltd. also wrote to the IRP on 08.01.2026, <br /> informing that first charge on the land of Greater Noida, UP, and the lease <br /> deed was executed on 10.12.2015 between Greater Noida and principal <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>13 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> borrower. Financial creditor informed that no original title documents were <br /> submitted with the financial creditor. RP also wrote to the Chief Executive <br /> Officer of the Greater Noida for issuance of duplicate certified copy of the <br /> documents pertaining to Plot No. GH-4C, Sector-10, Greater Noida, Uttar <br /> Pradesh. Learned counsel for the RP submitted that RP has obtained copy of <br /> the lease deed from Noida Authority and necessary documents have been <br /> given to the suspended directors. <br /> <b>8.</b> <b> </b> Learned counsel appearing for the respondent No. 3 has also submitted <br /> that there is no illegality in the order dated 07.01.2026 reviving the CIRP. <br /> Corporate debtor having failed to comply the terms of settlement, adjudicating <br /> authority has rightly revived the CIRP ample opportunities have been given to <br /> the corporate debtor to pay the balance amount. Now title deeds have also <br /> been found out and given to suspended directors. It is submitted that on <br /> breach of any terms in the Settlement Deed, there is a termination of <br /> Settlement Deed, and now the amount due is not ₹ 90 crore rather full amount <br /> is due and payable to the financial creditor. <br /> <b>9.</b> <b> </b> Learned Sr. counsel appearing for the respondent No. 4 also reiterated <br /> the above submissions. <br /> <b>10.</b> <b> </b> We have considered the submissions of the counsel for the parties and <br /> perused the records. <br /> <b>11.</b> <b> </b> It is an admitted fact that financial creditor and the corporate debtor <br /> and other group companies and personal guarantors have settled their <br /> disputes and Settlement Agreement was entered between the principal <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>14 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> borrower, corporate debtor, personal guarantors, Orbis Trusteeship Services <br /> Pvt. Ltd. and Standard Capital Markets Limited, the prospective debenture <br /> holders and the buyers who were to acquire the shareholding of the Nobal <br /> Buildtech Private Limited. Settlement amount was fixed as ₹ 210 crore as full <br /> and final settlement. The tranches for payment have been noticed in clause <br /> 1(C) of the Settlement Agreement, which is as follows: <br /> <b><i>“1. Settlement Payment Terms </i></b><br /> <i>C. The Sikka Group Shall make payments in the </i><br /> <i>following trenches towards the Settlement Amount: </i><br /></div><table><thead><tr><th>S. No.</th><th>Date</th><th>Amount (in INR<br>Crore)</th></tr></thead><tbody><tr><td>1.</td><td>Amount already Paid</td><td>55</td></tr><tr><td>2.</td><td>At the time of execution<br>of this Agreement</td><td>40</td></tr><tr><td>3.</td><td>Within 30 days of the<br>Commencement Date</td><td>25</td></tr><tr><td>4.</td><td>Within 90 days of the<br>Commencement Date</td><td>90</td></tr><tr><td></td><td>Total</td><td>210”</td></tr></tbody></table><div><br /> <b>12.</b> <b> </b> It was after Settlement Agreement dated 03.05.2025, an application <br /> under Section 12A was filed by the financial creditor being I.A. No.2874/2025, <br /> under Section 12A for withdrawal of the CIRP being C.P. IB 143/ND/2022. <br /> Adjudicating authority in detail noticed all relevant facts. Adjudicating <br /> authority also found that the Orbis Trusteeship Services Pvt. Ltd. is the sole <br /> financial creditor <i>qua</i> corporate debtor. Operative portion of the order of the <br /> adjudicating authority allowing 12A application is as follows: <b> </b><br /> <i>“In the wake of the aforementioned, particularly the </i><br /> <i>Applicant i.e. Orbis Trusteeship Services Private </i><br /> <i>Limited, is sole Financial Creditor qua the Corporate </i><br /> <i>Debtor and had preferred the present application for </i><br /> <i>withdrawal of IB-143/ND/2022, the </i> <b><i>IA is allowed</i></b> <i> </i><br /> <i>and IB-143/ND/2022 </i> <b><i>is dismissed as withdrawn.”</i></b> <i> </i><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>15 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <b>13.</b> <b> </b> It is the case of the appellant that although order dated 31.07.2025 was <br /> passed for making withdrawal, but the order dated 31.07.2025 could be <br /> uploaded only on 26.08.25, the financial creditor on 28.08.2025 immediately <br /> issued notice to the corporate debtor, principal borrower and personal <br /> guarantor putting the corporate debtor to notice that, in event the payment is <br /> not made by 30.08.2025, the financial creditor shall proceed to invoke and <br /> enforce its right. It is useful to notice letter dated 28.08.2025, which is stated <br /> as follows: <b> </b><br /> <i>“Accordingly, the third tranche of INR 25 Crores stands </i><br /> <i>due and payable on or before 30 </i><br /> <i>August 2025. </i><br /> <i>You are hereby formally called upon and directed to </i><br /> <i>remit the aforesaid sum of INR 25 Crores on or before </i><br /> <i>30 August 2025 strictly in accordance with the terms </i><br /> <i>of the Settlement Agreement. </i><br /> <i>Take notice that failure to make the said payment by </i><br /> <i>the stipulated deadline shall amount to a breach of the </i><br /> <i>Settlement Agreement. in such event, the Debenture </i><br /> <i>Trustee shall, without any further correspondence, </i><br /> <i>proceed to invoke and enforce all rights and remedies </i><br /> <i>available under the Settlement Agreement, the </i><br /> <i>transaction documents including TD-1 and DTD-2, and </i><br /> <i>applicable law, including but not limited to initiating </i><br /> <i>legal and enforcement proceedings. All costs and </i><br /> <i>consequences thereof shall be to your account. </i><br /> <i>This notice is issued on behalf of and for the benefit of </i><br /> <i>the Debenture Holders and is without prejudice to all </i><br /> <i>their rights, remedies and entitlements in law and in </i><br /> <i>equity </i><br /> <i>Yours faithfully,” </i><br /> <b>14.</b> <b> </b> The above letter was immediately replied by corporate debtor, pleading <br /> that 30 days’ timeline would commence from date from 26.08.2025, on which <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>16 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> date the order was uploaded. Reply to legal notice was given in following <br /> manner: <b> </b><br /> <i>“To </i><br /> <i>Date: 29.08.2025 </i><br /> <i>Orbis Trusteeship Services Pvt. Ltd. </i><br /> <i>4A, Ocus Technopolis </i><br /> <i>Sector-54. </i><br /> <i>Golf Club, Gurgaon-122002 </i><br /> <i>Subject: Reply to Legal Notice dated 28.08.2025 </i><br /> <i>regarding Second Tranche under Settlement Deed </i><br /> <i>Dear Sir(s), </i><br /> <i>We write in response to your Notice dated 28.08.2023 </i><br /> <i>demanding payment of the second tranche under the </i><br /> <i>Settlement Deed executed between the Companies. </i><br /> <i>At the outset, we wish to reaffirm our commitment to </i><br /> <i>the settlement and to its timely implementation. The </i><br /> <i>first tranche has already been paid in time, which </i><br /> <i>demonstrates our bona fides and intent to fully comply </i><br /> <i>with the agreed terms. </i><br /> <i>With respect to the second tranche, the Settlement </i><br /> <i>Deed clearly provides that the 30-day timeline would </i><br /> <i>commence from the date of passing of the withdrawal </i><br /> <i>order by the Hon'ble NCLT. Although the matter was </i><br /> <i>orally pronounced on 31.07.2025, the order was </i><br /> <i>neither signed nor uploaded at that stage. As is well </i><br /> <i>established, an order is deemed to have been passed </i><br /> <i>only when it is signed and dated by the Hon'ble Bench. </i><br /> <i>In this case, despite repeatedly mentioning before the </i><br /> <i>Beach, the order was signed find uploaded only on </i><br /> <i>26.08.2025. Accordingly, the 30-day period for </i><br /> <i>payment of the second tranche runs from 26.08.2025 </i><br /> <i>and is due on or before 25.09.2025. </i><br /> <i>We are fully prepared to make the payment within this </i><br /> <i>period in terms of the Settlement Deed. We trust this </i><br /> <i>clarifies our position and assures you of our continued </i><br /> <i>commitment to closing this matter amicably. </i><br /> <i>Yours sincerely </i><br /> <i>For Nobal Buildtech Pvt. Ltd. </i><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>17 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <i>(Authorized Signatory)” </i><br /> <b>15.</b> <b> </b> It is relevant to notice that the financial creditor proceeded to file an <br /> application I.A. 83/2025 praying for revival of the CIRP on account of default <br /> of non-payment of ₹ 25 crore within 30 days. In the application, after <br /> narrating earlier facts in paragraphs 2(x) and (xi) following was pleaded: <b> </b><br /> <i>“2. The facts which have resulted in filing of the instant </i><br /> <i>application are as under: </i><br /> <i>(x) Clause 1(B) of the Settlement Agreement clearly ties </i><br /> <i>the commencement of the payment timelines to the </i><br /> <i>passing of the NCLT's withdrawal order, which </i><br /> <i>occurred on 31.07.2025. Thus, the 30-day period for </i><br /> <i>the INR 25 Crore tranche ran from 31.07.2025 and </i><br /> <i>expired on 30.08.2025. The Corporate Debtor's </i><br /> <i>unilateral view that the clock starts from 26.08.2025 </i><br /> <i>finds no support in the Settlement Agreement or </i><br /> <i>applicable law, and was plainly an attempt to evade </i><br /> <i>the consequences of its delay. </i><br /> <i>(xi) In view of the foregoing, it is evident that the </i><br /> <i>Corporate Debtor defaulted under the Settlement </i><br /> <i>Agreement by failing to pay the tranche of INR 25 </i><br /> <i>Crores by 30.08.2025. Clause 2 of the Settlement </i><br /> <i>Agreement, titled "Consequences of Default", squarely </i><br /> <i>addresses this situation. It provides, inter alia, that </i><br /> <i>any default in payment of any tranche of the </i><br /> <i>Settlement </i> <i>Amount </i> <i>"will </i> <i>result </i> <i>in </i> <i>immediate </i><br /> <i>termination of this Agreement", and that the Debenture </i><br /> <i>Trustee (on behalf of the NCD holders) "continues to </i><br /> <i>have, hold and retain all rights and remedies" under </i><br /> <i>the original financing documents and law, "including </i><br /> <i>the right to revive the insolvency proceedings", until full </i><br /> <i>and final payment of all dues is received. In other </i><br /> <i>words, upon a default, the entire settlement stands </i><br /> <i>vitiated and the Financial Creditor's enforcement rights </i><br /> <i>are fully restored, as if no compromise had been </i><br /> <i>reached (save that any part payments already made </i><br /> <i>are to be adjusted against the total liability).” </i><br /> <b>16.</b> <b> </b> Appellant’s case is that amount of ₹ 25 crore on breach of which RA <br /> 83/2025 was filed, was subsequently paid and received by the financial <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>18 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> creditor, which fact is not disputed. It is an admitted case of the parties that <br /> now only an amount of ₹ 90 crore is due, which has not been paid. <b> </b><br /> <b>17.</b> <b> </b> By order dated 07.01.2026 adjudicating authority has allowed the <br /> application RA 83/2025, however, while allowing the RA 83/2025, <br /> adjudicating authority exercised its jurisdiction under Rule 11 of the NCLT <br /> Rules, 2016 extended for a period of limited 10 days during which period RP <br /> was to hold back and will not proceed with CIRP except to the extent of <br /> procuring the documents leading by its ex-management in its endeavour to <br /> implement the Settlement. It is useful to notice following observations of the <br /> adjudicating authority: <b> </b><br /> <i>“…Nevertheless, since a lot water could flow after the </i><br /> <i>aforementioned order and in the wake of the order </i><br /> <i>passed by Hon'ble NCLAT, we could pass the order </i><br /> <i>dated 31.07.2025 and thereafter in Civil Suit (Comm) </i><br /> <i>6/2026, the Hon'ble High of Court of Delhi passed </i><br /> <i>order dated 06.01.2026, we are inclined to exercise our </i><br /> <i>discretion in terms of the provisions of Rule 11 of the </i><br /> <i>NCLT Rules, 2016 to the extent that for a limited period </i><br /> <i>of 10 days the RP will hold back and will not proceed </i><br /> <i>with the CIRP except to the extent of procuring the </i><br /> <i>documents needed by the ex-management in its </i><br /> <i>endeavor to implement the settlement and pay the </i><br /> <i>balance amount in terms thereof to the FC. In a way, </i><br /> <i>for a period of 10 days, the RP will conduct the process </i><br /> <i>only in the nature of reverse CIRP to facilitate the </i><br /> <i>suspended management to pay the balance amount in </i><br /> <i>terms of the settlement…” </i><br /> <b>18.</b> <b> </b> Adjudicating authority thus was well aware that ex-management is <br /> making all endeavours to implement the settlement and pay balance amount <br /> of ₹ 90 crore for which purpose the adjudicating authority has asked the RP <br /> to hold back. Adjudicating Authority, however, observed that in the event, <br /> the payment is made within 10 days, the order dated 31.07.2025 will become <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>19 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> operative and CIRP shall stand terminated. Following observations are made <br /> by the adjudicating authority by disposing of the application: <b> </b><br /> <i>“…Nevertheless, for 10 days the RP will hold back and </i><br /> <i>will not proceed in the matter except for the purpose of </i><br /> <i>procurement of the documents referred to hereinabove </i><br /> <i>/ duplicates thereof. In the event of making the </i><br /> <i>payment by the Corporate Debtor to the Financial </i><br /> <i>Creditor within 10 days, the order dated 31.07.2025 </i><br /> <i>will become operative and the CIRP will stand </i><br /> <i>culminated /terminated without there being any </i><br /> <i>requirement of filing any further application by either </i><br /> <i>of the parties and the CD will be relieved of all the </i><br /> <i>rigorous of CIRP. As has been directed hereinabove, if </i><br /> <i>payment in terms of the settlement is not made within </i><br /> <i>10 days, the CIRP will be regulated in terms of the IBBI </i><br /> <i>(CIRP) Regulations, 2016 and the RP will discharge all </i><br /> <i>such functions, he is required to perform as the </i><br /> <i>relevant provisions of IBC and aforementioned </i><br /> <i>regulations for the purpose of resolution of insolvency </i><br /> <i>of CD. It is also amplified that the procurement of the </i><br /> <i>documents referred to hereinabove or duplicate thereof </i><br /> <i>would not be sine qua non for payment of balance </i><br /> <i>amount within 10 days from today. We expect the RP </i><br /> <i>to act promptly in the direction of procurement of </i><br /> <i>documents/ duplicates thereof (ibid). </i> <b><i>Subject to </i></b><br /> <b><i>aforementioned, the application stand disposed </i></b><br /> <b><i>of...” </i></b><br /> <b>19.</b> <b> </b> It was after 07.01.2026, IRP issued notice to the suspended director <br /> and the financial creditor. Financial creditor has informed RP that first <br /> charge holder is the Greater Noida and it had not received the original <br /> documents. RP has made endeavour and obtained copy of the lease deed from <br /> the Noida Authorities. The application 312/2025 was filed by the corporate <br /> debtor, giving events and facts subsequent to the order dated 07.01.2026. It <br /> was pleaded by the corporate debtor that corporate debtor all times have <br /> cooperated with the IRP. IRP, after the order dated 07.01.2026 has <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>20 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> approached procured the certified copy of the lease did in respect of the <br /> project. In paragraphs 5 & 6 of the application, following has been pleaded: <b> </b><br /> <i>“5. That in the continuum of steps undertaken </i><br /> <i>pursuant to the orders of this Hon’ble Tribunal, the </i><br /> <i>process of regularisation and verification of title </i><br /> <i>documentation and completion of investor-led due </i><br /> <i>diligence is presently underway. In this backdrop, the </i><br /> <i>Applicant respectfully submits that a reasonable and </i><br /> <i>limited period is required to enable the proposed </i><br /> <i>investor to complete its internal approvals and to </i><br /> <i>facilitate infusion of funds, so as to discharge the </i><br /> <i>balance amount payable under the settlement in an </i><br /> <i>orderly and compliant manner. </i><br /> <i>6. That the present Application is confined to seeking a </i><br /> <i>reasonable extension of time of 90 (ninety) days to </i><br /> <i>enable the Caproate Debtor to make payment to the </i><br /> <i>Debenture Holders under the settlement, without </i><br /> <i>triggering coercive insolvency consequences, and to </i><br /> <i>ensure that the very purpose of the orders dated </i><br /> <i>07.01.2026 and 13.01.2026 is fulfilled in substance </i><br /> <i>and not defeated by procedural or commercial </i><br /> <i>impracticability.” </i><br /> <b>20.</b> <b> </b> In paragraph under the heading grounds for seeking extension, several <br /> facts have been pleaded. It was also pleaded that factum or transfer of <br /> debentures to Standard Capital Market Limited was not placed before the <br /> Tribunal at the time of passing of the order, whereas earlier debenture holders <br /> had transferred debenture exposure to third-party namely Standard Capital <br /> Market Limited for which debenture sale and purchase agreement dated <br /> 09.05.2025 was executed. It was further pleaded that granting 90 days has <br /> cause no prejudice whatsoever to the creditor or the debenture trustee. In <br /> paragraphs 16 & 17, following was pleaded: <b> </b><br /> <i>“16. It is respectfully submitted that granting a limited </i><br /> <i>extension of ninety (90) days would cause no prejudice </i><br /> <i>whatsoever to the creditor or the Debenture Trustee, </i><br /> <i>inasmuch as the Corporate Insolvency Resolution </i><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>21 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <i>Process already stands restricted by judicial order, no </i><br /> <i>Committee of Creditors has been constituted, no third-</i><br /> <i>party rights have crystallised, and the underlying debt </i><br /> <i>continues to remain fully secured at all material times. </i><br /> <i>17. That on the other hand, refusal of reasonable time </i><br /> <i>would frustrate an otherwise viable settlement, </i><br /> <i>contrary to the settled principle that insolvency </i><br /> <i>proceedings should not be continued where settlement </i><br /> <i>is bona fide and achievable.” </i><br /> <b>21.</b> <b> </b> As noted above the adjudicating authority, noted the prayers made in <br /> I.A.312/2026, however, accepted the prayer for extending the time only till <br /> 04.02.2026 that is for a period of two weeks only. Appellant aggrieved by the <br /> order 21.01.2026 has filed Comp. App. (AT) (Ins.) No. 256/2026, as noted <br /> above. <b> </b><br /> <b>22.</b> <b> </b> In the present appeals, one of the important facts relevant to notice is <br /> that financial creditor i.e., Orbis Trusteeship Services Pvt. Ltd. is only <br /> financial creditor in the CIRP of the corporate debtor, which facts have been <br /> noted while allowing the 12A application filed by the Orbis Trusteeship <br /> Services Pvt. Ltd. in its order dated 31.07.2025. Orbis Trusteeship Services <br /> Pvt. Ltd. is the financial creditor of the corporate debtor. Hon’ble Supreme <br /> Court had occasion to consider the pivotal role to be played by the financial <br /> creditor in the CIRP resolution of the corporate debtor. In this context, we <br /> need to notice the judgement of the Hon’ble Supreme Court in the matter of <br /> <b><i>‘Swiss Ribbons Private Limited & Anr.’ Vs. ‘Union of India & Ors.’</i></b> <br /> reported in <b>[(2019) 4 SCC 17].</b> Hon’ble Supreme Court in the above case had <br /> considered the legislative scheme under Sections 7, 8 & 9 of the IBC and other <br /> related issues. Hon’ble Supreme Court held that the primary focus of the <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>22 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> legislation is to ensure revival and continuation of the corporate debtor. In <br /> paragraph 28 of the judgement, following has been laid down: <b> </b><br /> <b><i>“28.</i></b> <i> It can thus be seen that the primary focus of the </i><br /> <i>legislation is to ensure revival and continuation of the </i><br /> <i>corporate debtor by protecting the corporate debtor </i><br /> <i>from its own management and from a corporate death </i><br /> <i>by liquidation. The Code is thus a beneficial legislation </i><br /> <i>which puts the corporate debtor back on its feet, not </i><br /> <i>being a mere recovery legislation for creditors…” </i><br /> <b> </b><br /> <b>23.</b> Further in paragraph 51, Hon’ble Supreme Court has noticed the <br /> functions of financial creditors in respect to the corporate debtor. Role of <br /> financial creditor was held to be quite different from the operational creditors, <br /> who were also to preserve the corporate debtor as a going concern. In <br /> paragraph 51 of the judgement, following was laid down: <b> </b><br /> <b><i>“51.</i></b> <i> Most importantly, financial creditors are, from the </i><br /> <i>very beginning, involved with assessing the viability of </i><br /> <i>the corporate debtor. They can, and therefore do, </i><br /> <i>engage in restructuring of the loan as well as </i><br /> <i>reorganisation of the corporate debtor's business when </i><br /> <i>there is financial stress, which are things operational </i><br /> <i>creditors do not and cannot do. Thus, preserving the </i><br /> <i>corporate debtor as a going concern, while ensuring </i><br /> <i>maximum recovery for all creditors being the objective </i><br /> <i>of the Code, financial creditors are clearly different </i><br /> <i>from operational creditors and therefore, there is </i><br /> <i>obviously an intelligible differentia between the two </i><br /> <i>which has a direct relation to the objects sought to be </i><br /> <i>achieved by the Code.” </i><br /> <b> </b><br /> <b>24.</b> Hon’ble Supreme Court in <b>[(2020) 8 SCC 401]</b> in the matter of <b><i>‘Anuj </i></b><br /> <b><i>Jain, Interim Resolution Professional for Jaypee Infratech Limited’ Vs. </i></b><br /> <b><i>‘Axis Bank Ltd. & Ors.’</i></b> had again reiterated that financial creditors under <br /> the IBC has been concerned with the majority rather pivotal role in the <br /> process contemplated by Part – II, who is involved from very beginning with <br /> the corporate debtor and is indeed engaged in restructuring of the loan as well <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>23 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> as reorganisation of the corporate debtor business, when there is a financial <br /> stress. In paragraph 42.3 following was observed: <b> </b><br /> <b><i>“42.3.</i></b> <i> The enunciation aforementioned illuminates the </i><br /> <i>reasons as to why at all a financial creditor is </i><br /> <i>conferred with a major, rather pivotal, role in the </i><br /> <i>processes contemplated by Part II of the Code. It is the </i><br /> <i>financial creditor who lends finance on a term loan or </i><br /> <i>for working capital that enables the corporate debtor to </i><br /> <i>set up and/or operate its business; and who has </i><br /> <i>specified </i> <i>repayment </i> <i>schedules </i> <i>with </i> <i>default </i><br /> <i>consequences. The most important feature, as this </i><br /> <i>Court has said, is that a financial creditor is, from the </i><br /> <i>very beginning, involved in assessing the viability of </i><br /> <i>the corporate debtor who can, and indeed, engage in </i><br /> <i>restructuring of the loan as well as reorganisation of </i><br /> <i>the corporate debtor's business when there is financial </i><br /> <i>stress. Hence, a financial creditor is not only about in </i><br /> <i>terrorem clauses for repayment of dues; it has the </i><br /> <i>unique parental and nursing roles too. In short, the </i><br /> <i>financial creditor is the one whose stakes are </i><br /> <i>intrinsically interwoven with the well-being of the </i><br /> <i>corporate debtor.” </i><br /> <b>25.</b> <b> </b> It is also relevant to notice that in Supreme Court in <b>[(2022) 3 SCC </b><br /> <b>161]</b> in the matter of <b><i>‘E.S. Krishnamurthy & Ors.’ Vs. ‘Bharat Hi-Tecch </i></b><br /> <b><i>Builders Private Ltd.’</i></b> has held that settlement have to be encouraged <br /> because the ultimate purpose of the IBC is to facilitate the continuation and <br /> rehabilitation of the corporate debtor. In the above case, Section 7 application <br /> which was filed for initiating CIRP by the financial creditor was not admitted <br /> and adjudicating authority directed the respondent to settle the claims within <br /> three months, which order came to be challenged by the Hon’ble Supreme <br /> Court. In the above context following observations was made in paragraph <br /> 35 of the judgement: <b> </b><br /> <b><i>“35.</i></b> <i> Undoubtedly, settlements have to be encouraged </i><br /> <i>because the ultimate purpose of IBC is to facilitate the </i><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>24 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <i>continuance and rehabilitation of a corporate debtor, </i><br /> <i>as distinct from allowing it to go into liquidation. As the </i><br /> <i>Statement of Objects and Reasons accompanying the </i><br /> <i>introduction of the Bill indicates, the objective of IBC is </i><br /> <i>to facilitate insolvency resolution “in a time-bound </i><br /> <i>manner” for maximisation of the value of assets, </i><br /> <i>promotion </i> <i>of </i> <i>entrepreneurship, </i> <i>ensuring </i> <i>the </i><br /> <i>availability of credit and balancing the interest of all </i><br /> <i>stakeholders. What the adjudicating authority and </i><br /> <i>appellate authority, however, have proceeded to do in </i><br /> <i>the present case is to abdicate their jurisdiction to </i><br /> <i>decide a petition under Section 7 by directing the </i><br /> <i>respondent to settle the remaining claims within three </i><br /> <i>months and leaving it open to the original petitioners, </i><br /> <i>who are aggrieved by the settlement process, to move </i><br /> <i>fresh proceedings in accordance with law. Such a </i><br /> <i>course of action is not contemplated by IBC.” </i><br /> <b>26.</b> <b> </b> Hon’ble Supreme Court thus has categorically laid down that ultimate <br /> purpose of IBC is to facilitate continuation and rehabilitation of the corporate <br /> debtor. Reverting to the facts of the present case after entering Settlement <br /> between the financial creditor and the corporate debtor, CIRP was withdrawn <br /> under Section 12A by order dated 31.07.2025, out of settlement amount of <br /> ₹ 210 crore, ₹ 120 crore had already been paid. Appellant’s case is that due to <br /> unavailability of the title deeds of the mortgage land, there was difficulty in <br /> monetisation of the assets and it was only after order dated 07.01.2026, RP <br /> took steps by publishing notice for obtaining the title deeds of the mortgage <br /> land. It is further to be noticed that corporate debtor throughout has been <br /> pleading that it is willing to honour the settlement and pay the balance <br /> amount of ₹ 90 crore and by the application 312/ND/2026, time of 90 days <br /> was prayed for. We have noticed above that adjudicating authority vide order <br /> dated 21.01.2026 only allowed two weeks’ time till 04.02.2026. <b> </b><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>25 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <b>27.</b> <b> </b> In the present appeal, the protection which was granted by the <br /> adjudicating authority vide order dated 21.01.2026 till 04.02.2026 was <br /> continued. We have already noted the pleadings in I.A.312/2026, where it <br /> was pleaded that process of regularisation and verification of title documents <br /> and completion of investor led due diligence is presently underway. <br /> Reasonable and limited period was required to enable the proposed investor <br /> to complete its internal approvals and to facilitate infusion of funds. <br /> Adjudicating authority in the order dated 21.01.2026 although has not <br /> adverted to the pleadings in the application and facts pleaded, however <br /> granted limited protection for a period of two weeks. We are of the view that <br /> appellant has made out a case for grant of period of 90 days as prayed in <br /> I.A.312/ND/2026 to implement the settlement by paying the balance of ₹ 90 <br /> crore. <b> </b><br /> <b>28.</b> <b> </b> Adjudicating authority itself has permitted withdrawal of CIRP vide <br /> order dated 31.07.2025 settlement was entered, which appellant is claiming <br /> to implement. The reason regarding non-availability of the title deeds was <br /> also noted and pleaded before the adjudicating authority, which title deeds <br /> have now been procured as submitted by the learned counsel for the RP. We, <br /> thus are satisfied that sufficient cause was made out in the I.A.312/ND/2026 <br /> to grant 90 days’ time to appellant to make payment to the debenture holders <br /> in terms of settlement dated 09.05.2025. Application 312/ND/2026 deserves <br /> to be allowed in the facts of the present case. <b> </b><br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>26 of 27</i><br /> <b><i> </i></b><br /><br /> <br /> <br /> <b>29.</b> <b> </b> We thus are of the view that order dated 21.01.2026, deserves to be <br /> modified by allowing I.A.312/ND/2026. Period of 90 days as prayed in the <br /> application shall commence from date of passing of this order. <b> </b><br /> <b>30.</b> <b> </b> In result, all the appeals are disposed of in following manner: <b> </b><br /> i. I.A.312/2026 filed by the appellant is allowed. Order dated 21.01.2026 <br /> passed by the adjudicating authority is modified to the above extent. <br /> ii. In event, appellant is able to make payment of ₹ 90 crore as per <br /> Settlement Deed dated 09.05.2025 within the period of 90 days, the <br /> order dated 31.07.2025, withdrawing the CIRP shall become operative <br /> and CIRP shall stand terminated as already contemplated in the order <br /> dated 07.01.2026. <br /> iii. The financial creditor, RP shall render all necessary assistance to the <br /> corporate debtor towards implementation of Settlement Deed dated <br /> 09.05.2025. <br /> Parties shall bear their own costs. <br /> <br /> <b>[Justice Ashok Bhushan] </b><br /> <b>Chairperson </b><br /> <b> </b><br /> <b> </b><br /> <b>[Barun Mitra] </b><br /> <b>Member (Technical) </b><br /> <b> </b><br /> <b>NEW DELHI </b><br /> <b><i>th</i></b><br /> <b><i>25</i></b> <b><i> February, 2026 </i></b><br /> <i>himanshu</i> <br /> <i>Comp. App. (AT) (Ins.) No. 256, 287 & 288 of 2026 </i><br /> <i> </i> <i> </i> <i>27 of 27</i><br /> <b><i> </i></b></div>