SRI MANJEGOWDA vs THE COMMISSIONER
- Court
- Karnataka High Court
- 1 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
®
CNR: KAHC010126962017
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
TH
DATED THIS THE 8 DAY OF OCTOBER, 2026
BEFORE
THE HON'BLE MR. JUSTICE SURAJ GOVINDARAJ
WRIT PETITION NO. 51965 OF 2017 (GM-TEN)
BETWEEN
1 . SRI MANJEGOWDA
S/O LATE SIDDEGOWDA,
AGED ABOUT 58 YEARS
PUTTAJJI MANE,
AANJANEYA TEMPLE ROAD,
NARIGUDDENAHALLI,
JYOTHI NAGARA POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
2 . SMT PARVATHAMMA
W/O LATE PARVATHEGOWDA,
SINCE DEAD BY LR’s
2(a) SRI. LOKESH
S/O LATE PARVATHEGOWDA
AGED ABOUT 56 YEARS
2(b) SMT. PUTTAMMA @ PUTTALAKSHMI
W/O LATE MANJUNATH K.P.
AGED ABOUT 54 YEARS
2(c) SRI. MANJUNATH
S/O LATE PARVATHEGOWDA,
AGED ABOUT 51 YEARS
2(a) TO 2(c) ARE R/O
NARIGUDDENAHALLI,
JYOTHINAGARA POST,
CHIKKAMAGALURU-577102.
3 . SMT LAKSHMAMMA
W/O LATE SHESHAIAH,
AGED ABOUT 55 YEARS
AMBALE VILLAGE,
CHIKKAMAGALURU TALUK & DISTRICT-57102.
4 . SMT CHANDRAMMA
W/O LATE LOKESH,
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 2 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
AGED ABOUT 39 YEARS
AANJANEYA TEMPLE ROAD,
NARIGUDDENAHALLI,
JYOTHI NAGARA POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
5 . SRI PARAMESH N P
S/O LATE CHANDRAMMA,
W/O LATE PUTTASWAMYGOWDA,
AGED ABOUT 38 YEARS
AANJANEYA TEMPLE ROAD,
NARIGUDDENAHALLI,
JYOTHI NAGARA POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
6 . SRI KRISHNAMURTHY N P
S/O LATE CHANDRAMMA,
W/ LAT PUTTAWMYGOWDA,
AGED ABOUT 37 YEARS
AANJANEYA TEMPLE ROAD,
NARIGUDDENAHALLI,
JYOTHI NAGARA POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
7 . SRI VISHWANATH N P
S/O LATE CHANDRAMMA,
W/O LATE PUTTASWAMYGOWDA,
AGED ABOUT 35 YEARS
AANJANEYA TEMPLE ROAD,
NARIGUDDENAHALLI,
JYOTHI NAGARA POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
8 . SMT D R JAYAMMA
W/O K.M.RUDRAPPA,
AGED ABOUT 70 YEARS
KYATHANABEEDU VILLAGE,
LAKYA POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102
9 . SMT KAMALAMMA
W/O LATE D.R.KUMARASWAMY,
AGED ABOUT 65 YEARS
DODDAKURUBARAHALLI VILLAGE,
JYOTHI NAGAR POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
10 . SMT D R SHANKARAMMA
D/O LATE RUDREGOWDA,
AGED ABOUT 65 YEARS
DODDAKURUBARAHALLI VILLAGE,
JYOTHI NAGAR POST,
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 3 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
CHIKKAMAGALURU TALUK & DISTRICT-577102.
11 . SRI D R PARAMESHWARAPPA
S/O LATE RUDREGOWDA,
AGED ABOUT 62 YEARS
DODDAKURUBARAHALLI VILLAGE,
JYOTHI NAGAR POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
12 . SRI D R RENUKAPPA
S/O LATE RUDREGOWDA,
AGED ABOUT 58 YEARS
DODDAKURUBARAHALLI VILLAGE,
JYOTHI NAGAR POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
13 . SRI KANTHARAJU D K
S/O LATE KUMARASWAMY,
AGED ABOUT 35 YEARS
DODDAKURUBARAHALLI VILLAGE,
JYOTHI NAGAR POST,
CHIKKAMAGALURU TALUK & DISTRICT-577102.
...PETITIONERS
(BY SRI: K.R. LINGARAJU., ADVOCATE)
AND
1. THE COMMISSIONER
CITY MUNICIPALITY,
CHIKKAMAGALURU-577101.
2. THE STATE OF KARNATAKA
REPRESENTED BY ITS PRINCIPAL SECRETARY,
REVENUE DEPARTMENT (LAND ACQUISITION)
VIKASA SOUDHA,
DR.B.R.AMBEDKAR VEEDHI,
BENGALURU-560001.
3. THE STATE OF KARNATAKA
REPRESENTED BY ITS
PRINCIPAL SECRETARY,
URBAN DEVELOPMENT DEPARTMENT,
VIKASA SOUDHA,
DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 4 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4. THE COMMISSIONER
CHIKKAMAGALURU URBAN DEVELOPMENT
AUTHORITY,
REPRESENTED BY ITS COMMISSIONER,
KALYANA NAGAR,
BYPASS ROAD,
JYOTHI NAGAR POST,
CHIKKAMAGALURU-577101.
5. THE DEPUTY COMMISSIONER
CHIKKAMAGALURU DISTRICT,
CHIKKAMAGALURU-577101.
6. THE ASSISTANT COMMISSIONER
CHIKKAMAGALURU SUB-DIVISION,
CHIKKMAGALURU-577101.
7. THE TAHASILDAR
CHIKKAMAGALURU TALUK & DISTRICT-577101.
8. K S RAJU
S/O SANNEGOWDA,
AGED ABOUT 52 YEARS
CHURCH STREET,
NAIDU BEEDI,
CHIKKAMAGALURU TALUK & DISTRICT-577101.
…RESPONDENTS
(BY SMT. SARITHA KULKARNI., AGA FOR R2, R3 AND R5 TO R7;
SRI. A. NAGARAJAPPA., FOR R1;
SRI. A. RAVISHANKAR., ADVOCATE FOR R4)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227 OF THE
CONSTITUTION OF INDIA PRAYING TO ISSUE A WRIT OR ORDER IN THE
NATURE OF CERTIORARI QUASHING THE E-PROCUREMENT RE-TENDER
NOTIFICATION DTD.24.5.2017 AND NOTICE PROCEED THE WORK ORDER
DTD.4.11.2017 ISSUED BY R-1 VIDE ANNEX-A AND B IN RESPECT OF
PETITIONERS LAND BEARING SY.NO.450 MEASURING 4 ACRES 13 GUNTAS
SITUATED AT HIREMAGALURU VILLAGE, KASABA HOBLI, CHIKKAMAGALURU
TALUK AND DISTRICT AND ETC.
THIS WRIT PETITION COMING ON FOR ORDERS AND HAVING BEEN
RESERVED FOR ORDERS ON 18.08.2026, THIS DAY, THE COURT
PRONOUNCED THE FOLLOWING:
CORAM: HON'BLE MR. JUSTICE SURAJ GOVINDARAJ
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 5 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
CAV ORDER
1. The petitioners are before this Court seeking for the
following reliefs:
a. Issue a writ or order in the nature of Certiorari
quashing the e-procurement re-tender notification
bearing No. CMC/CKM/CR/106/2016-2017 dated
24/05/2017 and Notice to proceed the work order dated
04/11/2017 issued by respondent No.1 vide Annexures-
'A' & 'B in respect of petitioners land bearing survey No.
450 measuring 4 acres 13 guntas Hiremagaluru Village,
Kasaba Hobli, situated at Chikkamagaluru Taluk &
District.
b. Declare the Preliminary Notification bearing No.
LAQ:2/89-90 dated 12/01/1990 issued under section
4(1) of L.A Act., and Final Notification bearing No.
R.D.9.Bhu.Swa.Chi.90 dated 23/03/1991 issued under
section 6(1) of the L.A Act both are issued by respondent
No.5 vide Annexure-C & D were stands lapsed by virtue
of Section 24(2) of "the right to fair compensation and
Transparency in Land Acquisition, Rehabilitation and
Resettlement Act, 2013" in respect of petitioners land
bearing survey No. 450 measuring 4 acres 13 guntas
situated at Hiremagaluru Village, Kasaba Hobli,
Chikkamagaluru Taluk & District.
C. Pass such other order or orders as this Hon’ble Court
deems fit under the facts and circumstances of the case
including cost of the proceedings, so as to meet the ends
of Justice and equity.
2. The petitioners are before this Court contending that
on acquisition of land by the respondents, the award
amount has neither been deposited nor paid and it is
for that reason that this Court ought to hold that the
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 6 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
acquisition has lapsed under Section 24(2) of the
Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act,
2013 [hereinafter referred to as the “LA Act 2013”].
3. Sri.K.R.Lingaraju, learned counsel for the petitioners,
submits that,
3.1. Learned counsel for the petitioners submits that
the e-procurement tender and the
consequential Work Order issued for carrying
out certain development works on the acquired
land have been challenged in the present
proceedings. Petitioners Nos.1 to 7 claim to be
the owners of land bearing Survey No.450,
measuring 3 acres, situated at Hiremagaluru
Village, Kasaba Hobli, Chikkamagaluru Taluk
and District. The original owner of the said land
was Smt. Puttamma, wife of Sidde Gowda,
whose name was shown in the preliminary
notification issued under Section 4(1) of the
Land Acquisition Act, 1894 (hereinafter, “the LA
Act, 1894”). Smt. Puttamma died on
02.11.2007 and her daughter Chandramma
died on 29.06.2013 . Petitioners Nos.1 to 7
claim to be legal heirs of Puttamma and
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 7 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Chandramma and assert that they have
remained in peaceful possession and cultivation
of the land without interference by any third
party.
3.2. Petitioners Nos.8 to 13 claim to be the owners
of land bearing Survey No.450, measuring 1
acre 13 guntas, situated at Hiremagaluru
Village, Kasaba Hobli, Chikkamagaluru District.
The original owner was one Rudre Gowda, son
of late Veerabhadre Gowda, whose name was
shown in the preliminary notification issued
under Section 4(1) of the LA Act, 1894. Rudre
Gowda died on 08.12.2003, and one of his sons
had predeceased him on 09.04.1997.
Petitioners Nos.8 to 13 claim to be the
surviving legal heirs of late Rudre Gowda and
assert that they have continued to remain in
peaceful possession and cultivation of the said
land.
3.3. Respondent No.4–Urban Development
Department issued a preliminary notification
under Section 4(1) of the LA Act, 1894, on
12.01.1990, which was published in the Official
Gazette on 15.03.1990, notifying various lands
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 8 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
for the development of the Hiremagaluru
Project of the Chikkamagaluru Urban
Development Department (hereinafter,
“ CUDA ”). The lands belonging to Puttamma
and Rudre Gowda were included in the
notification, their names being shown as the
kathedars of the respective properties,
measuring 3 acres and 1 acre 13 guntas,
respectively. Thus, the total extent of land in
Survey No.450 notified for acquisition was 4
acres 13 guntas.
3.4. It is contended that, without affording the
kathedars an opportunity of hearing as
contemplated under Section 5A of the LA Act,
1894, a declaration under Section 6(1) of the
said Act came to be issued on 23.03.1991.
According to the petitioners, the kathedars
came to know of the said declaration only in
October 1992. Consequently, they submitted a
representation dated 01.10.1992 to the State
Government seeking deletion of their lands
from the acquisition proceedings, contending
that they were solely dependent upon the lands
for their livelihood. Pursuant thereto, the State
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 9 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Government called upon CUDA to furnish its
comments.
3.5. On 29.05.1993, CUDA furnished a layout plan
stating that the lands were required for the
proposed layout. Thereafter, several rounds of
correspondence ensued between the concerned
authorities regarding the necessity of the lands
for the project. Ultimately, by order dated
04.01.1995, the State Government rejected the
request of the landowners for dropping the
lands from acquisition.
3.6. It is contended that the said order dated
04.01.1995 was passed without complying with
the principles of natural justice and without
considering the relevant documents and
materials placed by the landowners. On that
basis, the petitioners contend that the order
dated 04.01.1995 is unsustainable in law.
3.7. Thereafter, the kathedars once again sought
deletion of the lands from the acquisition
proceedings, resulting in a further exchange of
correspondence between the parties. According
to the petitioners, the said request remained
under consideration and, consequently,
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 10 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
possession of the acquired lands was never
taken in terms of Section 16(1) and (2) of the
LA Act, 1894. It is further submitted that the
award amount was not deposited in the Civil
Court, as neither CUDA nor the State
Government required the lands for the
proposed project.
3.8. Learned counsel, therefore, submits that, in the
aforesaid factual background, upon the coming
into force of the LA Act 2013, the acquisition
proceedings stood affected by the provisions of
the said enactment.
3.9. He submits that Section 24(2) of LA Act 2013
would be applicable, which is reproduced
hereunder for easy reference:
24 .(2) Notwithstanding anything contained in sub-
section (1), in case of land acquisition proceedings
initiated under the Land Acquisition Act, 1894, where an
award under the said section 11 has been made five
years or more prior to the commencement of this Act but
the physical possession of the land has not been taken
or the compensation has not been paid the said
proceedings shall be deemed to have lapsed and the
appropriate Government, if it so chooses, shall initiate
the proceedings of such land acquisition afresh in
accordance with the provisions of this Act:
Provided that where an award has been made and
compensation in respect of a majority of land holdings
has not been deposited in the account of the
beneficiaries, then, all beneficiaries specified in the
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 11 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
notification for acquisition under section 4 of the said
Land Acquisition Act, shall be entitled to compensation in
accordance with the provisions of this Act.
3.10. Placing reliance upon Section 24(2) of the LA
Act, 2013, learned counsel submits that, since
compensation has admittedly not been paid,
the acquisition proceedings are deemed to have
lapsed.
3.11. It is submitted that, in the aforesaid
circumstances, the petitioners were constrained
to approach this Court when the
Chikkamagaluru City Municipality proceeded to
develop the petitioners’ land as a park by
issuing an e-tender dated 24.05.2017.
3.12. Learned counsel further submits that, when the
representation submitted by the petitioners
seeking deletion of the land from the
acquisition proceedings was still pending
consideration, the respondents could not have
proceeded to issue the e-tender. It is submitted
that the landowners had proposed to provide a
60-feet road through their property, which is
situated at the fag end of the layout, and that
the said proposal ought to have been accepted,
with the balance extent of land being deleted
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 12 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
from the acquisition proceedings. According to
learned counsel, so long as the said proposal
remained pending before the State
Government, CUDA could not have proceeded
to issue an e-tender for development of the
land as a park.
3.13. Learned counsel submits that this Court had
called upon the respondents to furnish a report
regarding payment of compensation. According
to the report, no compensation had either been
paid to the petitioners or deposited in
accordance with law. It is submitted that the
contention of the respondents that, insofar as
the land measuring 3 acres belonging to
petitioners Nos.1 to 7 is concerned, the
compensation amount had been deposited in
Execution Petition No.247 of 2003 before the
Court of the Civil Judge, Chikkamagaluru, is
misconceived. According to learned counsel, the
alleged deposit was not made with the consent
or concurrence of the landowners and,
therefore, cannot be treated as payment of
compensation to them.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 13 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
3.14. Learned counsel further submits that the
preliminary notification had already been set
aside by this Court in W.P. No.27115 of 1991 by
order dated 19.06.1998. It is contended that,
the said order being applicable to the lands in
question, there was no acquisition notification
in force.
3.15. He further submits that, since the Karnataka
Urban Development Authorities Act, 1987
(hereinafter, “the KUDA Act”) came into force
on 01.05.1988, proceedings for acquisition
could not thereafter have been initiated under
the LA Act, 1894. On this premise, it is
contended that the entire acquisition
proceedings are vitiated in law.
3.16. Learned counsel also submits that possession of
the land was never taken in accordance with
the applicable statutory provisions. It is in that
background, according to him, that the
petitioners have filed the amendment
application challenging the acquisition
notification bearing No.R.D.9.Bhu.Swa.Chi.90
dated 23.03.1991 by way of I.A. No.1/24.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 14 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
3.17. Learned counsel reiterates that the alleged
payment of Rs.1,49,100/- made on 15.06.2006
in Execution Petition No.247 of 2003 cannot, in
law, be regarded as payment of compensation
to the petitioners.
3.18. He submits that, insofar as the land belonging
to petitioners Nos.8 to 13 is concerned, the
compensation amount continues to remain in
the treasury and has not been deposited before
any court of law. According to learned counsel,
the statutory requirement is that the
compensation amount be deposited before the
competent Reference Court and that a deposit
made before any other court, including an
Execution Court, would not satisfy the
requirement of law.
3.19. Learned counsel for the petitioners submits that
this Court, in W.P. No.27115 of 1991, by order
dated 19.06.1998, followed the judgment of the
Division Bench dated 15.06.1998 in W.P.
Nos.3539 to 3542 of 1996 and connected
matters, wherein it was held that a notification
issued under Section 4(1) of the Land
Acquisition Act, 1894, subsequent to the
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 15 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Central Amendment Act 68 of 1984, was
without authority of law. Applying the said
principle, this Court quashed the notifications
issued under Sections 4(1) and 6(1) insofar as
the lands therein were concerned, while
reserving liberty to the State Government to
initiate fresh proceedings.
3.20. Learned counsel submits that the preliminary
notification in the present case is also dated
12.01.1990, subsequent to the aforesaid
amendment. Hence, relying upon the decision
in W.P. No.27115 of 1991 and the Division
Bench judgment referred to therein, he submits
that the acquisition proceedings concerning the
petitioners' lands are without authority of law
and cannot constitute the basis for the
subsequent development of the land.
3.21. It is further submitted that, in the absence of
any fresh acquisition proceedings pursuant to
the liberty reserved by this Court, the
respondents could not have continued to rely
upon the original acquisition proceedings or
taken consequential steps, including
development of the petitioners' lands as a park.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 16 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
3.22. On the aforesaid grounds, learned counsel
submits that the writ petition deserves to be
allowed and the acquisition proceedings, as well
as the consequential action taken pursuant
thereto, are liable to be interfered with.
3.23. On the above grounds, he submits that the writ
petition is required to be allowed.
4. Sri A. Ravishankar, learned counsel appearing for
respondent No.4–Chikkamagaluru Urban
Development Authority (hereinafter, “CUDA”),
opposing the writ petition, submits that
4.1. The challenge raised by the petitioners is wholly
misconceived, particularly in view of the fact
that the acquisition proceedings were initiated
several decades ago, the awards were passed,
compensation amounts were deposited with the
Land Acquisition Officer, possession of the
acquired lands was taken, and the lands were
thereafter utilised for formation and
development of the residential layout at
Hiremagaluru.
4.2. Learned counsel submits that the acquisition
proceedings commenced as early as on
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 17 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
12.01.1990 with the issuance of the preliminary
notification under Section 4(1) of the LA Act,
1894, for the purpose of formation of a
residential layout at Hiremagaluru by CUDA.
The acquisition was not a mere proposal which
remained at an initial or intermediate stage.
According to learned counsel, the statutory
proceedings were thereafter carried forward to
their logical conclusion; declarations were
issued, awards were passed, compensation
amounts were made available to the Land
Acquisition Officer, and the acquired lands were
ultimately utilised for the purpose for which
they had been acquired.
4.3. It is submitted that pursuant to the acquisition
proceedings, the requisite awards came to be
passed in respect of the acquired lands. CUDA
deposited the award amounts with the State
Government/Land Acquisition Officer and the
amounts were thereafter disbursed by the
competent authority. According to learned
counsel, the acquisition therefore cannot now
be characterised as an incomplete or
abandoned acquisition merely on the basis that
the petitioners have subsequently raised a
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 18 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
dispute regarding the manner or place in which
a particular component of the compensation
was deposited.
4.4. Learned counsel further submits that the
subsequent conduct of the acquiring authority
and the manner in which the acquired lands
were utilised furnish clear evidence of
completion of the acquisition. A residential
layout was formed pursuant to the acquisition.
Sites were carved out from the acquired lands
and allotted to several persons. The allottees
have, over a period of time, constructed their
residential houses and have been occupying the
same. Thus, according to learned counsel, the
acquisition has resulted in the creation of a fully
developed residential layout and the acquired
lands have been substantially put to the very
purpose for which they were acquired.
4.5. It is submitted that, once the acquired lands
have been incorporated into an approved
residential layout, sites have been formed and
allotted, and third-party allottees have
constructed residential houses thereon, the
petitioners cannot seek to reopen the
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 19 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
acquisition proceedings after such a long lapse
of time, particularly when the rights and
interests of several third parties have
intervened.
4.6. Learned counsel submits that the contention of
the petitioners that the acquisition proceedings
are liable to lapse under Section 24(2) of the
2013 Act proceeds on an incorrect factual
premise. According to him, the statutory
requirements concerning possession and
payment/deposit of compensation have been
substantially complied with. The acquisition had
culminated in the formation of the layout and
utilisation of the land, and therefore the
petitioners cannot rely upon Section 24(2)
merely by asserting that the compensation
amount was not personally received by them.
4.7. Insofar as the representations submitted by the
petitioners and other landowners seeking de-
notification of their respective lands are
concerned, learned counsel submits that the
same had been duly considered by the
competent authorities. He submits that CUDA
had considered the requests and had
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 20 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
exchanged correspondence with the State
Government. The State Government, after
consideration of the matter, rejected the
request for de-notification.
4.8. According to learned counsel, the said rejection
was not an interim communication or a
communication merely seeking further
information. It constituted a decision on the
request made by the landowners. Once the
State Government rejected the request for de-
notification, the acquisition continued to remain
operative. The petitioners did not challenge the
said order of rejection at the relevant point of
time.
4.9. Learned counsel submits that the subsequent
submission of yet another representation by the
petitioners cannot have the effect of reviving a
request which had already been considered and
rejected by the competent authority. The mere
fact that the petitioners may have continued to
correspond with the authorities or may have
submitted a further representation seeking
reconsideration does not mean that the earlier
order of rejection ceased to operate.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 21 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4.10. He therefore submits that the contention that
the request for de-notification remained
pending before the Government, and that CUDA
was consequently precluded from acting upon
the acquired land, is untenable. According to
learned counsel, no subsisting order restraining
CUDA from utilising the acquired land was
brought to the notice of the Court.
4.11. Learned counsel further submits that the
petitioners' contention regarding non-taking of
possession is contrary to the subsequent
physical developments on the acquired lands.
The fact that a residential layout was formed,
that sites were carved out and allotted, and
that houses were constructed by third-party
allottees demonstrates that the acquired lands
were taken over and utilised.
4.12. It is submitted that a notification under Section
16 of the LA Act, 1894, had also been issued
indicating taking over of possession. Though
the original notification under Section 16 is
presently not available in the records, the
absence of the physical document by itself
cannot negate the subsequent and undisputed
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 22 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
events demonstrating utilisation of the acquired
lands. According to learned counsel, the actual
development of the layout and occupation by
third-party allottees constitute material
circumstances supporting the respondents' case
that possession had been taken.
4.13. Learned counsel submits that the acquisition
was not confined to a paper exercise. The
entire process resulted in actual development
of the area. In this regard, reliance is placed
upon the photographs produced before the
Court, which, according to learned counsel,
demonstrate the existence of residential houses
and other infrastructure in the layout.
4.14. The photographs, according to learned counsel,
have to be appreciated along with the approved
layout plan, the formation of roads, the
allotment of sites and the development
undertaken by CUDA. These circumstances,
taken cumulatively, establish that the acquired
land had been put to the intended public
purpose.
4.15. Learned counsel specifically addresses the
extent of 4 acres 13 guntas forming part of
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 23 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Survey No.450 and submits that the petitioners
have proceeded on an incorrect assumption
that the entire extent of the land ought to have
been covered by residential sites if it were to be
treated as having been utilised.
4.16. According to him, the acquired land has, in fact,
been put to different uses forming part of the
overall residential layout. Out of the total
extent of 4 acres 13 guntas, approximately 1
acre 15 guntas has been utilised for formation
of residential sites, approximately 10 guntas
has been utilised for formation of a road, and
approximately 2 acres 28 guntas has been
earmarked and utilised as a park.
4.17. Learned counsel submits that the petitioners
appear to be relying principally upon the fact
that the extent of approximately 2 acres 28
guntas presently appears to be vacant.
According to him, however, the said area
cannot be treated as unused land merely
because it has not been converted into
residential sites.
4.18. The area has been earmarked as a park in the
layout itself. A park constitutes an integral
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 24 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
component of a residential layout and is
intended for the common benefit of the
residents and site owners. Therefore, according
to learned counsel, the land does not cease to
be utilised merely because no individual
residential construction has been undertaken
upon it.
4.19. Learned counsel further submits that the
provision for the park was not an afterthought
or a subsequent proposal intended merely to
defeat the petitioners' claim. The park area was
contemplated while the layout plan was
prepared and sanctioned. Consequently, the
fact that the area remains substantially open is
consistent with the sanctioned purpose of the
land.
4.20. He submits that an open area earmarked as a
park cannot be equated with an abandoned or
unutilised parcel of land. The utility of a park is
precisely that it remains open and is available
for common use. Thus, according to learned
counsel, the petitioners cannot contend that the
land has not been utilised merely because
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 25 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
residential sites or structures are not found
upon every portion of the acquired extent.
4.21. Learned counsel submits that, in respect of the
entire acquisition covering approximately 140
acres 36.5 guntas, CUDA deposited a total sum
of Rs.50,27,000/- with the Land Acquisition
Officer on 06.04.1993. The fact that the
amount was deposited with the Land
Acquisition Officer and was thereafter dealt with
by the competent authority demonstrates,
according to learned counsel, that the acquiring
authority had made available the compensation
amount in accordance with the acquisition
proceedings.
4.22. He submits that the acquisition proceedings,
therefore, cannot be reopened by isolating the
case of the petitioners from the larger
acquisition and development project. The
acquisition was undertaken as one integrated
project for formation of the Hiremagaluru
residential layout, and the subsequent
development demonstrates implementation of
the public purpose.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 26 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4.23. Learned counsel further submits that this
Court, while considering the rival contentions
regarding payment or deposit of compensation,
called upon the State Government to furnish
the relevant material. This direction was issued
particularly because the stand of CUDA was
that the compensation had been duly paid or
deposited.
4.24. Pursuant to the said direction, CUDA and the
State Government placed their respective
materials before the Court. CUDA, in particular,
filed a memo dated 06.02.2026 enclosing
various documents relating to the payment and
deposit of compensation.
4.25. One of the documents relied upon by learned
counsel is the Form No.4 register maintained by
the concerned Court. According to learned
counsel, the entries therein establish the
connection between the compensation amount
pertaining to the land of Puttamma and the
subsequent execution proceedings.
4.26. He submits that Execution Petition No.247 of
2003 was instituted by Sri K.P. Manjunath. In
the said proceedings, Puttamma was arrayed as
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 27 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Judgment Debtor No.3. Her son Manjegowda,
who is petitioner No.1 herein, was arrayed as
Judgment Debtor No.4. Her daughter
Chandramma, who is petitioner No.4 herein,
was arrayed as Judgment Debtor No.5. Another
daughter, Lakshmamma, who is petitioner No.3
herein, was arrayed as Judgment Debtor No.8.
Petitioners Nos.5 to 7, being the children of
another daughter Chandramma, were also
connected with the said execution proceedings,
their mother having been arrayed as Judgment
Debtor No.7.
4.27. Learned counsel submits that the relevance of
the said execution proceedings lies in the fact
that amounts payable by the Land Acquisition
Officer were the subject matter of a garnishee
proceeding. The decree-holder in Execution
Petition No.247 of 2003 had a claim for a sum
of Rs.1,72,872/-. Since amounts were lying
with the Land Acquisition Officer, a requisition
was made pursuant to a garnishee order for
payment out of the amounts available with the
Land Acquisition Officer.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 28 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4.28. It is submitted that, pursuant to the said order,
the Land Acquisition Officer deposited a sum of
Rs.1,49,100/- in Execution Petition No.247 of
2003. The amount was thereafter released by
the Execution Court by Cheque No.144411
dated 13.02.2007 in favour of the decree-
holder.
4.29. According to learned counsel, the significance
of this transaction is that the amount did not
remain merely as an internal entry in the
records of the Land Acquisition Officer. It was
actually transferred pursuant to a judicial order
and was utilised towards satisfaction of the
liability of Puttamma and her family in the
execution proceedings.
4.30. Learned counsel submits that the petitioners
cannot now contend that the amount of
Rs.1,49,100/- was wholly unrelated to the
compensation payable in respect of the
acquired land. According to him, the amount
was lying with the Land Acquisition Officer and
was attached pursuant to a garnishee order
issued in the execution proceedings. The
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 29 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
subsequent release of the amount was
therefore a consequence of the judicial process.
4.31. He further submits that the petitioners and
their predecessors derived the benefit of the
said payment in the sense that the amount was
appropriated towards satisfaction of the decree
against Puttamma and her family. The
execution proceedings were thereafter
settled/closed to that extent. Consequently,
according to learned counsel, it is not open to
the petitioners to contend that no amount
whatsoever had been paid or that the
acquisition authority had wholly failed to make
available compensation.
4.32. Learned counsel submits that the question
whether the payment was made directly to the
petitioners is not determinative of the
respondents' case. According to him, what is
relevant is that the compensation amount was
subjected to a judicial process and was utilised
for discharging an enforceable liability of the
landowners. The payment was thus made for
and on behalf of the persons claiming through
Puttamma.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 30 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4.33. On this basis, learned counsel submits that the
petitioners cannot derive an advantage from
the circumstance that the amount was released
to a decree-holder rather than being directly
handed over to each individual landowner.
4.34. Insofar as the extent of 1 acre 13 guntas
originally belonging to Rudre Gowda is
concerned, learned counsel submits that CUDA
had deposited a sum of Rs.65,852/- with the
Land Acquisition Officer towards the
compensation payable in respect of the said
land.
4.35. According to learned counsel, this deposit,
coupled with the other material placed before
the Court, demonstrates that CUDA had taken
the necessary steps towards payment of the
awarded compensation. Therefore, it cannot be
contended that CUDA had deliberately withheld
the compensation or had failed to take any
steps towards discharging its obligation arising
from the acquisition.
4.36. Learned counsel further submits that the
petitioners' case regarding the alleged non-
utilisation of the 1 acre 13 guntas also cannot
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 31 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
be accepted on the basis of the physical
appearance of the property alone. Reliance is
placed upon the Google Map produced before
the Court, which, according to learned counsel,
demonstrates that the subject property is
surrounded by residential sites that have
already been formed pursuant to the layout.
4.37. The surrounding development, according to
learned counsel, establishes that the land forms
part and parcel of the larger residential layout
and cannot be viewed as an isolated parcel
independent of the development undertaken by
CUDA.
4.38. Learned counsel submits that, apart from the
residential sites, a road measuring
approximately 10 guntas has also been formed
in the area. The remaining extent has been
earmarked for development as a park. The
formation of the road and the provision for the
park are, according to learned counsel, integral
components of the approved layout.
4.39. He therefore submits that the fact that a
particular portion of the land has not been built
upon does not establish that possession has not
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 32 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
been taken or that the land has not been
utilised. The purpose of the acquisition was
formation of a residential layout and not merely
construction of buildings upon every square
foot of the acquired land.
4.40. Learned counsel reiterates that a residential
layout necessarily comprises several categories
of land, including residential sites, roads, parks,
civic amenity areas and other common-use
areas. Each such component serves the public
purpose for which the layout is developed.
Consequently, the Court, according to learned
counsel, ought not to determine utilisation
solely by examining whether a particular parcel
contains a residential structure.
4.41. Learned counsel submits that the area reserved
for the park was specifically taken into
consideration at the stage of sanctioning the
layout plan. The park therefore forms part of
the sanctioned development and is not a
subsequent device adopted by CUDA after the
petitioners initiated the present proceedings.
4.42. According to him, if the petitioners' contention
were accepted merely because the park area
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 33 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
presently remains vacant or open, it would
result in an anomalous situation where every
open space in a residential layout could be
treated as unutilised land, notwithstanding its
earmarking and intended use as a common
amenity.
4.43. Learned counsel further submits that the rights
of third-party allottees have intervened during
the long period following the acquisition.
Several persons were allotted sites, acted upon
such allotments and constructed residential
houses. The layout has therefore acquired a
substantial degree of finality and third-party
rights have accrued.
4.44. In such circumstances, according to learned
counsel, the petitioners cannot seek to reopen
the acquisition on the basis of a subsequent
challenge, particularly when the acquisition
proceedings themselves were initiated in 1990
and the layout has since been substantially
developed.
4.45. Learned counsel submits that the petitioners'
attempt to invoke Section 24(2) of the 2013
Act cannot be considered in isolation from the
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 34 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
factual developments that have taken place
over the intervening years. The Court,
according to him, must take into consideration
the award, deposit of compensation, formation
of the layout, taking over and utilisation of the
acquired lands, allotment of sites and
construction of houses by third parties.
4.46. According to learned counsel, these
circumstances collectively establish that the
acquisition proceedings have culminated in
implementation of the public purpose and that
the petitioners cannot contend that the
acquisition has remained incomplete merely
because they dispute the manner in which
certain compensation amounts were dealt with
or because a portion of the land is being
maintained as an open park.
4.47. Learned counsel accordingly submits that there
is no merit in the contention that the
acquisition proceedings have lapsed under
Section 24(2) of the 2013 Act. According to
him, possession had been taken and the
acquired lands had been utilised for the
purpose for which they were acquired. The
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 35 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
compensation amounts had also been deposited
with the competent authority and, in the case
of the land belonging to Puttamma, a portion
thereof had subsequently been appropriated
pursuant to a judicial order in the execution
proceedings.
4.48. Learned counsel further submits that the
petitioners cannot derive any advantage from
the subsequent request for de-notification. The
competent authority had already considered
and rejected the request, and that decision was
not challenged. The subsequent
representations, according to him, could not
keep the acquisition proceedings in a state of
perpetual uncertainty or prevent CUDA from
implementing the sanctioned layout.
4.49. On the question of the e-tender issued for
development of the park, learned counsel
submits that the tender was merely a
consequential step for implementing the
sanctioned layout and providing the common
amenity contemplated therein. Since the land
had already been acquired and earmarked as a
park in the layout, the issuance of the e-tender
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 36 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
cannot be characterised as an independent or
unauthorised act affecting the petitioners'
alleged continuing rights over the land.
4.50. Learned counsel submits that the petitioners,
having allowed the acquisition proceedings and
subsequent development to remain
unchallenged for several years, cannot now
seek to unsettle the completed acquisition and
the rights that have accrued in favour of third-
party allottees. The challenge, according to
him, has to be considered in the context of the
enormous lapse of time and the substantial
development that has taken place pursuant to
the acquisition.
4.51. It is therefore submitted that the material
placed on record establishes three essential
aspects: first, that the acquisition proceedings
had culminated in awards and deposit of
compensation; second, that possession was
taken and the acquired lands were incorporated
into and utilised for the residential layout; and
third, that the lands forming part of Survey
No.450 have been utilised for residential sites,
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 37 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
roads and the park contemplated under the
sanctioned layout.
4.52. Learned counsel accordingly submits that the
petitioners have failed to establish either of the
factual circumstances necessary to sustain their
claim under Section 24(2) of the 2013 Act.
According to him, the record demonstrates that
the acquisition had been substantially
completed and implemented much prior to the
present proceedings, and therefore the
subsequent challenge to the acquisition, the e-
tender and the development of the park is
liable to be rejected.
4.53. The reliance placed by the petitioners on the
order dated 19.06.1998 in W.P. No.27115 of
1991 is wholly misconceived. The said order did
not quash the acquisition notification in its
entirety. The notifications issued under Sections
4(1) and 6(1) of the Land Acquisition Act, 1894
were quashed only insofar as the lands of the
petitioners in the said writ petition were
concerned.
4.54. Learned counsel submits that the present
petitioners were not parties to W.P. No.27115 of
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 38 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
1991 and did not challenge the acquisition of
their lands at the relevant point of time.
Therefore, they cannot seek to derive the
benefit of the relief granted in a proceeding
instituted by different landowners in respect of
their respective lands. The decision relied upon
by the petitioners cannot be construed as
having the effect of automatically nullifying the
acquisition proceedings in respect of lands
which were not the subject matter of that writ
petition.
4.55. It is further submitted that the Division Bench
judgment dated 15.06.1998, which was relied
upon by this Court while deciding W.P.
No.27115 of 1991, also resulted in relief being
granted in respect of the lands of the
petitioners in those proceedings. The
petitioners herein, having consciously not
challenged the acquisition proceedings at the
relevant time, cannot now seek to reopen the
acquisition after several decades by relying
upon a judgment rendered in proceedings to
which they were not parties.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 39 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4.56. Learned counsel submits that, in the present
case, the acquisition proceedings in respect of
the petitioners' lands have proceeded to
completion. Awards have been passed,
compensation has been dealt with in
accordance with the acquisition proceedings,
possession has been taken and the acquired
lands have been utilised as part of the
residential layout. Residential sites have been
formed and allotted, roads have been laid and
the remaining portion has been earmarked and
utilised as a park. Third-party rights have also
intervened by way of allotment and
construction of residential houses.
4.57. In these circumstances, learned counsel
submits that the petitioners cannot, after
having failed to challenge the acquisition at the
appropriate stage, seek to unsettle the
completed acquisition by relying upon the order
in W.P. No.27115 of 1991. The said order, being
confined to the lands of the petitioners therein,
does not have the effect of reviving a challenge
which the present petitioners never raised in
respect of their own lands.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 40 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
4.58. Learned counsel therefore submits that the
reliance placed upon W.P. No.27115 of 1991 is
misplaced and cannot invalidate the acquisition
proceedings concerning the petitioners' lands,
which had attained finality and had been acted
upon long prior to the institution of the present
proceedings. Consequently, the petitioners
cannot challenge the subsequent development
of the acquired land on the strength of the said
decision.
4.59. On the aforesaid grounds, learned counsel
appearing for respondent No.4–CUDA submits
that the writ petition, including the challenge to
the e-tender and the consequential
development of the park, is devoid of merit and
is liable to be dismissed.
4.60. On all the above grounds, he submits that the
writ petition is required to be dismissed.
5. Sri Bopanna Beliappa, learned Additional
Government Advocate, on instructions, submits that
5.1. The total compensation awarded in respect of
the land bearing Survey No.450, measuring 4
acres 13 guntas, was Rs.2,14,952/-.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 41 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
5.2. Out of the said amount, a sum of Rs.1,49,100/-
was deposited in Execution Petition No.247 of
2003 on 30.06.2006 in so far as Puttamma’s
family.
5.3. Learned Additional Government Advocate
submits that the compensation amount was
deposited by CUDA with the Land Acquisition
Officer and, in turn, the Land Acquisition Officer
dealt with and disbursed the award amount in
the concerned proceedings.
5.4. It is further submitted that, insofar as the
extent belonging to Rudre Gowda is concerned,
the amount of Rs.65,852/- was paid to Rudre
Gowda on 06.04.1993, as reflected in Form
KFC-57 produced along with the memo dated
10.02.2026. According to learned Additional
Government Advocate, once the said amount
had been received by Rudre Gowda, the
question of any further deposit of the said
amount would not arise.
5.5. Learned Additional Government Advocate
therefore submits that the contention of
petitioners Nos.8 to 13 that compensation in
respect of their land was neither paid nor
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 42 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
deposited is contrary to the records. On that
premise, he submits that the writ petition is
devoid of merit and is liable to be dismissed.
6. Heard Sri. K. R. Lingaraju, learned counsel for the
petitioners, Sri. A. Ravishankar, learned counsel for
Respondent No. 4 and Sri. Bopanna Beliappa, learned
Additional Government Advocate. Perused papers.
7. The points that would arise for consideration are:
(i) Whether the acquisition proceedings in
respect of Survey No.450 measuring 4
acres 13 guntas have lapsed under Section
24(2) of the 2013 Act for want of taking of
physical possession and/or payment of
compensation?
(ii) Whether the petitioners can, at this stage,
rely upon the order dated 19.06.1998 in
W.P. No.27115 of 1991 and the Division
Bench judgment referred to therein to
challenge the acquisition of their lands,
notwithstanding that they were not parties
to those proceedings and had not
challenged the acquisition at the relevant
time?
(iii) Whether the subsequent formation and
implementation of the residential layout,
including formation of sites, roads and the
park and accrual of third-party rights, has
any bearing on the relief sought by the
petitioners?
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 43 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
(iv) Whether the petitioners are entitled to
quashing of the e-procurement re-tender
notification dated 24.05.2017 and the
Work Order dated 04.11.2017?
(v) What Order?
8. The above points are answered as follows:
9. Answer to Point No.(i): Whether the acquisition
proceedings in respect of Survey No.450
measuring 4 acres 13 guntas have lapsed under
Section 24(2) of the 2013 Act for want of
taking of physical possession and/or payment
of compensation?
9.1. Sri K.R. Lingaraju, learned counsel for the
petitioners, rests the case of the petitioners on
Section 24(2) of the LA Act 2013. His
submission is that an award was made under
the LA Act, 1894, long before the 2013 Act
came into force, but the compensation was
never paid to the landowners and physical
possession of the land was never taken.
According to him, each of these failures attracts
the deemed lapse provided in Section 24(2),
and since compensation has admittedly not
been paid, the acquisition must be declared to
have lapsed.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 44 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.2. On the question of compensation, learned
counsel makes three separate points.
9.3. The first is that this Court had called for a
report from the respondents on payment of
compensation, and that the report shows that
no compensation was paid to the petitioners or
deposited in accordance with law.
9.4. The second concerns the extent of 3 acres
which stood in the name of Smt. Puttamma and
is now claimed by petitioners Nos.1 to 7. He
accepts that a sum of Rs.1,49,100/- was
deposited in Execution Petition No.247 of 2003
before the Court of the Civil Judge,
Chikkamagaluru, on 15.06.2006. His grievance
is that the deposit was made without the
consent or concurrence of the landowners, and
so it cannot in law be treated as payment of
compensation to them.
9.5. The third concerns the extent of 1 acre 13
guntas which stood in the name of Sri Rudre
Gowda and is now claimed by petitioners Nos.8
to 13. To this extent, he submits that the
compensation is still lying in the treasury and
has not been deposited before any court.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 45 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.6. His submission is that the amount has to be
deposited before the competent Reference
Court, and a deposit made before any other
court, including an Execution Court, does not
meet that requirement.
9.7. On possession, learned counsel submits that
possession was never taken in terms of Section
16(1) and (2) of the LA Act, 1894. He links this
to the requests made by the landowners for
deletion of their lands. According to him, those
requests kept the matter under consideration
with the Government, and it is for this reason
that neither was possession taken nor was the
award amount deposited in the Civil Court. The
petitioners, he says, have continued in peaceful
possession and cultivation of the land
throughout.
9.8. Sri A. Ravishankar, learned counsel for
Respondent No.4–CUDA submits that Section
24(2) has been invoked on wrong facts. The
acquisition, according to him, did not stop
midway. Awards were passed, CUDA made the
compensation available with the Land
Acquisition Officer, possession was taken, and
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 46 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
the lands were used to form the residential
layout at Hiremagaluru. The petitioners, he
says, cannot rely on Section 24(2) merely by
asserting that the compensation was not
personally received by them.
9.9. On compensation, learned counsel points out
that CUDA deposited a total sum of
Rs.50,27,000/- with the Land Acquisition Officer
on 06.04.1993, covering the entire acquisition
of about 140 acres 36.5 guntas. For the land of
Smt. Puttamma, he relies on the memo dated
06.02.2026 and the Form No.4 register
maintained by the concerned Court. He explains
that Execution Petition No.247 of 2003 was filed
by Sri K.P. Manjunath. Smt. Puttamma was
Judgment Debtor No.3. Petitioner No.1 was
Judgment Debtor No.4, petitioner No.4 was
Judgment Debtor No.5 and petitioner No.3 was
Judgment Debtor No.8. The mother of
petitioners Nos.5 to 7 was Judgment Debtor
No.7. The decree-holder had a claim of
Rs.1,72,872/-. Since money was lying with the
Land Acquisition Officer, a garnishee order was
made, the Land Acquisition Officer deposited
Rs.1,49,100/- in the execution petition, and the
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 47 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Execution Court released it to the decree-holder
by Cheque No.144411 dated 13.02.2007. His
submission is that this money was applied,
through a judicial process, to discharge an
enforceable liability of Smt. Puttamma and her
family. It was, therefore, paid for and on their
behalf, and they took the benefit of it. For the
land of Sri Rudre Gowda, he submits that CUDA
deposited Rs.65,852/- with the Land Acquisition
Officer towards the compensation payable.
9.10. On possession, learned counsel submits that a
notification under Section 16 of the LA Act,
1894, was issued, though the original is not
presently available in the records. The absence
of the paper, he argues, cannot wipe out what
has happened on the ground. Out of 4 acres 13
guntas in Survey No.450, about 1 acre 15
guntas has been used for residential sites,
about 10 guntas for a road, and about 2 acres
28 guntas has been earmarked and kept as a
park. He relies on the photographs and the
Google map produced before this Court to show
that the land is surrounded by the formed
layout. An open space kept as a park, according
to him, is not abandoned or unused land.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 48 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.11. Sri Bopanna Beliappa, learned Additional
Government Advocate on instructions, places
three facts before this Court. The total
compensation awarded for Survey No.450,
measuring 4 acres 13 guntas, was
Rs.2,14,952/-. Out of this, Rs.1,49,100/- was
deposited in Execution Petition No.247 of 2003
on 30.06.2006 as far as the family of Smt.
Puttamma is concerned. For the extent of Sri
Rudre Gowda, the sum of Rs.65,852/- was paid
to Sri Rudre Gowda himself on 06.04.1993, as
shown in Form KFC-57 produced with the
memo dated 10.02.2026. He adds that CUDA
deposited the compensation with the Land
Acquisition Officer, who in turn dealt with and
disbursed it. Once Sri Rudre Gowda had
received the amount, he submits, there was
nothing left to deposit anywhere, and the claim
of petitioners Nos.8 to 13 that the amount was
neither paid nor deposited is contrary to the
records.
9.12. This point concerns the petitioners' contention
that the acquisition has lapsed under Section
24(2) of the 2013 Act on the ground that
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 49 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
possession of the land was not taken and
compensation was not paid.
9.13. The validity of the acquisition notifications is a
separate question and is considered under Point
No.(ii). For the present point, the relevant
provisions are Section 24(2) of the 2013 Act
and Sections 16 and 31 of the LA Act, 1894.
9.14. Section 24(2) applies where an award under
Section 11 of the LA Act, 1894 was made five
years or more before the commencement of the
2013 Act and, due to inaction on the part of the
acquiring authority, possession had not been
taken and compensation had not been paid.
9.15. The Constitution Bench of the Hon'ble Supreme
Court in Indore Development Authority v.
Manoharlal , [(2020) 8 SCC 129], has settled
the meaning of Section 24(2). In paragraph
366.3, it has held that the word “or” occurring
between possession and compensation is to be
read as “nor” or “and”. Thus, lapse occurs only
where, for five years or more before the
commencement of the 2013 Act, the authorities
had neither taken possession nor paid
compensation. If either possession had been
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 50 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
taken or compensation had been paid, there is
no lapse.
9.16. The Constitution Bench has further held that
Section 24(2) applies where, because of
inaction of the authorities, possession was not
taken and compensation was not paid for five
years or more before 01.01.2014. The provision
is therefore intended to deal with continuing
inaction in pending acquisition proceedings.
9.17. In the present case, the making of the award is
not in dispute. The total compensation awarded
in respect of Survey No.450 was Rs.2,14,952/.
The learned Additional Government Advocate
has stated that the compensation amount was
deposited with the Land Acquisition Officer on
06.04.1993 and that payment of Rs.65,852/- to
Sri Rudre Gowda is recorded on the same date.
Since compensation could have been deposited
or paid only after the award was made, the
award was necessarily made before
06.04.1993. Thus, the award was made more
than five years before 01.01.2014.
9.18. Since the acquisition can lapse under Section
24(2) only if both possession was not taken and
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 51 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
compensation was not paid, it is appropriate
first to examine whether compensation in
respect of the entire extent was paid. If that is
established, the question of possession would
not be decisive on the issue of lapse.
9.19. Compensation relating to 3 acres of Smt.
Puttamma: In respect of the extent of 3 acres
originally standing in the name of Smt.
Puttamma, the material placed before the Court
shows that Execution Petition No.247 of 2003
was filed before the Civil Judge,
Chikkamagaluru. Smt. Puttamma and some of
her legal heirs were judgment debtors in the
said proceedings. The decree-holder had a
claim of Rs.1,72,872/-. Pursuant to a garnishee
order, the Land Acquisition Officer deposited
Rs.1,49,100/- in the execution proceedings.
The amount was thereafter released by the
Execution Court to the decree-holder by Cheque
No.144411 dated 13.02.2007. These facts are
borne out by the Form No.4 register produced
along with the memo dated 06.02.2026.
9.20. The petitioners contend that the amount cannot
be treated as compensation paid to them
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 52 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
because it was deposited in the execution
proceedings without their consent and was not
deposited before the Reference Court.
9.21. This contention requires consideration in the
light of Section 31 of the LA Act, 1894. Under
Section 31(1), the Collector is required to
tender the compensation awarded to the
persons entitled to it and to pay the same to
them. Sub-section (2) provides for deposit in
the Reference Court where the persons entitled
do not consent to receive the compensation,
where there is no person competent to alienate
the land, or where there is a dispute as to the
person entitled or the apportionment.
9.22. The present case, however, is not one where
the compensation remained unpaid. The
amount of Rs.1,49,100/- was attached
pursuant to a judicial order in execution of a
decree against Smt. Puttamma and her family
and was thereafter paid to the decree-holder
towards satisfaction of that decree. The
payment was thus made out of the amount
standing to the credit of the landowners and
was applied towards their subsisting liability.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 53 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.23. The fact that the payment was made to the
decree-holder, rather than directly to the
landowners, does not by itself establish that the
compensation remained unpaid. The relevant
circumstance is that the amount was subjected
to a judicial attachment and was thereafter
applied towards the liability of the persons
entitled to the compensation.
9.24. This conclusion is strengthened by the fact that
petitioners Nos.1, 3 and 4 were themselves
judgment debtors in the execution proceedings
and the mother of petitioners Nos.5 to 7 was
also a judgment debtor. There is no material to
show that the garnishee order or the
subsequent release of the amount to the
decree-holder was challenged by them before
the Execution Court or in any other proceeding.
Smt. Puttamma, in whose name the land stood,
continued to live until 02.11.2007, but no
material has been placed to show that she
questioned the appropriation of the amount
during her lifetime.
9.25. The petitioners' further submission that the
amount was not deposited in the Reference
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 54 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Court also does not advance their case. The
Constitution Bench in Indore Development
Authority has made it clear that non-deposit of
compensation in Court does not result in lapse
under Section 24(2). The consequence of non-
deposit is dealt with separately in the proviso to
Section 24(2), and the failure to deposit
compensation in Court may have consequences
under the 1894 Act, including payment of
interest, but does not by itself result in lapse.
9.26. In the circumstances, the Court is satisfied that
the amount of Rs.1,49,100/- was paid out of
the compensation payable in respect of the 3
acres of Smt. Puttamma and was applied,
pursuant to the order of the Execution Court,
towards the liability of Smt. Puttamma and her
family.
9.27. Compensation relating to 1 acre 13 guntas
of Sri Rudre Gowda: The position regarding
the remaining extent of 1 acre 13 guntas is
somewhat different. The petitioners contend
that the compensation was not paid and
remained in the treasury. CUDA states that
Rs.65,852/- was deposited with the Land
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 55 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Acquisition Officer. The learned Additional
Government Advocate relies upon Form KFC-
57, produced along with the memo dated
10.02.2026, to submit that the Land Acquisition
Officer paid Rs.65,852/- to Sri Rudre Gowda on
06.04.1993.
9.28. These statements of CUDA and the State are
not inconsistent. CUDA's case relates to the
deposit made with the Land Acquisition Officer,
whereas the State relies upon the record of the
subsequent payment to the landowner. They
represent two stages of the same transaction.
9.29. Form KFC-57 is an official record which records
payment of Rs.65,852/- to Sri Rudre Gowda on
06.04.1993. Against this record, the petitioners
have not produced any document from the
treasury, the Land Acquisition Office or any
other authority showing that the amount
remained unpaid. Sri Rudre Gowda continued to
live until 08.12.2003. No material has been
placed before the Court to show that he had,
during his lifetime, raised any claim that the
compensation had not been paid. The present
petitioners claim through him.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 56 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.30. This Court is conscious that disputed questions
of fact ordinarily ought not to be decided in a
writ proceeding where their determination
requires oral evidence. The present case,
however, does not rest merely on competing
oral assertions. There is an official record of
payment made in 1993, whereas the petitioners
have placed no contemporaneous material to
contradict it. On the material available, the
Court has no sufficient basis to disregard the
official record.
9.31. Accordingly, this Court finds that the
compensation of Rs.65,852/- in respect of the
extent of 1 acre 13 guntas was paid to Sri
Rudre Gowda on 06.04.1993.
9.32. In any event, even if the petitioners' version
that the amount was not paid and remained in
the treasury were to be accepted, their case
would not necessarily result in lapse. The
Constitution Bench in Indore Development
Authority has held that Section 24(2) does not
permit a concluded acquisition to be reopened
merely on the ground that compensation was
deposited in the treasury rather than in Court,
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 57 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
or on the ground of the manner in which
possession was taken.
9.33. Compensation for the entire extent: The
two amounts account for the entire
compensation awarded for Survey No.450. The
amount of Rs.1,49,100/- applied in the
execution proceedings and the amount of
Rs.65,852/- paid to Sri Rudre Gowda together
total Rs.2,14,952/-, which is the compensation
awarded for the entire extent of 4 acres 13
guntas. The petitioners have not disputed the
total award amount.
9.34. Thus, the record does not disclose any part of
the compensation for Survey No.450 which
remained unpaid. This finding, by itself, is
sufficient to answer the question of lapse under
Section 24(2).
9.35. The proviso to Section 24(2) does not require
separate consideration in the facts of the
present case. No claim has been made in the
writ petition for compensation under the 2013
Act on the basis of the proviso, and no material
has been placed before the Court to establish
the factual conditions necessary for its
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 58 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
application. In any event, as explained in
Indore Development Authority, the proviso
deals with the consequence of non-deposit of
compensation and does not create a separate
ground for lapse of the acquisition.
9.36. Physical possession: Although the finding on
compensation is sufficient to reject the claim of
lapse, the question of possession has been
argued at length and is also relevant to the
other points arising for consideration. It is
therefore appropriate to examine it.
9.37. Section 16 of the LA Act, 1894 provides that
after an award is made, the Deputy
Commissioner may take possession of the land,
whereupon it vests absolutely in the
Government. Section 16(2), as applicable in
Karnataka, permits the fact of taking
possession to be notified in the Official Gazette
and provides that such notification shall be
evidence of possession.
9.38. The Constitution Bench in Indore
Development Authority has held that
possession under the 1894 Act is taken by
drawing up an inquest report or memorandum
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 59 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
and that, once possession is taken under
Section 16, the land vests in the State and
there is no divesting under Section 24(2).
9.39. The petitioners contend that possession was
never taken in accordance with Section 16.
CUDA states that a notification under Section
16 was issued, but the original document is not
presently available. The absence of the original
notification is a circumstance which cannot
simply be ignored. At the same time, Section
16(2) treats such notification as evidence of
possession; it does not make publication of the
notification the act by which possession is
taken.
9.40. This Court must therefore consider the other
evidence bearing upon possession. On this
aspect, the following facts are not seriously
disputed: approximately 1 acre 15 guntas of
Survey No.450 has been formed into residential
sites; approximately 10 guntas has been used
for a road; the sites have been allotted and
houses have been constructed thereon; and the
remaining extent of approximately 2 acres 28
guntas is shown as a park in the sanctioned
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 60 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
layout. The three components together account
for the entire extent of 4 acres 13 guntas.
9.41. These facts are significant. The land was not
merely notified for acquisition. It was
subsequently incorporated into the layout,
divided into sites, allotted to third parties, used
for a road and earmarked as a park. Third-party
allottees have constructed houses and are in
occupation. These are not merely
administrative steps; they constitute substantial
evidence that the acquiring authority took
control of the land and dealt with it as part of
the layout.
9.42. Section 36(3) of the KUDA Act also provides
that land acquired for the Urban Development
Authority is to be handed over to the Authority
after it has vested in the Government under
Section 16 of the LA Act, 1894. The fact that
CUDA thereafter formed and allotted sites in
Survey No.450 is therefore consistent with the
land having vested in the Government and
having been handed over to the Authority for
development.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 61 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.43. The same conclusion follows in respect of the
portion shown as a park. The sanctioned layout
treats the entire extent as part of one
development. The fact that the park area
remains open does not, by itself, show that it
remained in the possession of the former
owners. An open area reserved as a park is an
intended use of the acquired land and not
evidence of abandonment.
9.44. The petitioners' own case also has relevance.
Their grievance is that the portion presently
lying vacant is being developed as a public
park. They have not produced any material
showing that they continued to cultivate or
otherwise exercise physical possession over
that portion after the acquisition. The fact that
the land is vacant cannot, by itself, establish
continued possession by the petitioners.
9.45. The subsequent conduct of the authorities is
also consistent with the acquisition having been
acted upon. The request for deletion of the
lands was considered and rejected by the State
Government on 04.01.1995. Thereafter, the
land formed part of the layout in which sites
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 62 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
and roads were developed and a portion was
shown as a park. The later representations
made by the petitioners do not, by themselves,
undo the earlier decision or establish that
possession was never taken.
9.46. This Court does not consider it necessary to
draw any adverse inference merely from the
fact that the petitioners did not approach the
Court earlier. Delay and subsequent conduct
may have relevance while considering other
reliefs, but the finding on possession here rests
principally on the documentary and physical
evidence of development of the land.
9.47. The absence of the original Section 16
notification does not alter the conclusion. The
respondents have explained that the
proceedings are several decades old and that
the original document is not presently available.
More importantly, the question of possession is
not determined by that notification alone. The
formation and allotment of sites, construction of
houses, formation of the road and the
sanctioned layout showing the remaining extent
as a park are circumstances which, taken
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 63 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
together, establish that the land was treated
and dealt with by the acquiring authority as
acquired land.
9.48. The petitioners have also relied upon the
pendency of their requests for deletion of the
land. The record, however, shows that the State
Government had already rejected the request
on 04.01.1995. The mere submission of a
subsequent representation could not, without
an order staying or withdrawing the acquisition,
prevent the authorities from proceeding with
the development of land which had already
been acquired. The fact that CUDA had, as
early as 29.05.1993, informed the Government
that the land was required for the layout, and
that the land was subsequently utilised for
sites, a road and a park, is consistent with this
position.
9.49. The Court therefore finds, on the material
available, that possession of the entire extent
of 4 acres 13 guntas was taken and that the
land vested in the Government under Section
16 of the LA Act, 1894.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 64 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.50. Conclusion: The case before the Court is
therefore not one in which the acquiring
authority took no steps after issuing the
acquisition notification. The compensation was
dealt with in 1993 and, in respect of the 3 acres
of Smt. Puttamma, the amount of
Rs.1,49,100/- was subsequently applied
pursuant to the order of the Execution Court
towards the decree against her and her family.
The remaining Rs.65,852/- was recorded as
having been paid to Sri Rudre Gowda on
06.04.1993. The acquired land was thereafter
incorporated into the layout, sites were formed
and allotted, a road was laid and the remaining
extent was earmarked as a park.
9.51. More importantly, compensation for the entire
extent has been accounted for. Even assuming,
for the sake of argument, that there was some
defect in the manner in which the compensation
was deposited or in the manner in which
possession was taken, such defect would not, in
view of the law declared in Indore
Development Authority, result in lapse of the
acquisition under Section 24(2).
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 65 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
9.52. The essential requirement for lapse under
Section 24(2), failure to take possession and
failure to pay compensation, is therefore not
established. On the contrary, the material
shows payment of compensation for the entire
extent and also supports the conclusion that
possession was taken.
9.53. Accordingly, this Court answers Point No. (i) by
holding that the acquisition proceedings in
respect of Survey No.450, measuring 4 acres
13 guntas, have not lapsed under Section 24(2)
of the 2013 Act.
10. Answer to Point No.(ii): Whether the
petitioners can, at this stage, rely upon the
order dated 19.06.1998 in W.P. No.27115 of
1991 and the Division Bench judgment referred
to therein to challenge the acquisition of their
lands, notwithstanding that they were not
parties to those proceedings and had not
challenged the acquisition at the relevant time?
10.1. Sri K.R. Lingaraju, learned counsel for the
petitioners, submits that this Court, by order
dated 19.06.1998 in W.P. No.27115 of 1991,
followed the judgment of the Division Bench
dated 15.06.1998 in W.P. Nos.3539 to 3542 of
1996 and connected matters. According to him,
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 66 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
the Division Bench had held that issuance of a
notification under Section 4(1) of the LA Act,
1894, after the Central Amendment Act 68 of
1984 was without authority of law.
10.2. It is submitted that the preliminary notification
in the present case was issued on 12.01.1990,
after the said amendment. Therefore, according
to learned counsel, the acquisition of the
petitioners' lands was also without authority of
law. He submits that, once this Court had
quashed the acquisition notifications in W.P.
No.27115 of 1991 and liberty was reserved to
the State Government to initiate fresh
proceedings, the State could not continue with
the acquisition without issuing a fresh
notification.
10.3. Learned counsel further submits that the
Karnataka Urban Development Authorities Act,
1987 had come into force on 01.05.1988 and,
therefore, acquisition thereafter could not have
been initiated under the LA Act, 1894. He also
contends that the declaration under Section
6(1) dated 23.03.1991 was issued without
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 67 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
giving the kathedars an opportunity of hearing
under Section 5A.
10.4. It is also submitted that the State
Government's order dated 04.01.1995 rejecting
the request for deletion of the lands was passed
without considering the relevant material and
without complying with the principles of natural
justice. On these grounds, the petitioners seek
to challenge the declaration dated 23.03.1991
by way of I.A. No.1/24.
10.5. Sri A. Ravishankar, learned counsel for CUDA,
submits that the reliance placed on the order
dated 19.06.1998 in W.P. No.27115 of 1991 is
misplaced. The order did not quash the
acquisition notification in its entirety. The
acquisition was quashed only insofar as it
related to the lands of the petitioners in that
writ petition.
10.6. He submits that the present petitioners were
not parties to those proceedings and their lands
were not the subject matter of the relief
granted therein. Therefore, the order could not
have the effect of setting aside the acquisition
of the present petitioners' lands.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 68 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
10.7. Learned counsel submits that the same
principle applies to the Division Bench
judgment dated 15.06.1998. The relief granted
in that case was in respect of the lands of the
landowners who had approached the Court. The
present petitioners, who had not challenged the
acquisition of their lands, cannot now seek to
extend that relief to themselves after several
decades.
10.8. He further submits that, by the time the
present proceedings were initiated, the
acquisition had been acted upon. The layout
had been formed, sites had been allotted and
third-party rights had come into existence. The
petitioners cannot, after such a long lapse of
time, seek to unsettle the acquisition on the
basis of a judgment rendered in proceedings to
which they were not parties.
10.9. As regards the request for deletion, learned
counsel submits that the State Government had
considered the request and rejected it by order
dated 04.01.1995. The said order was never
challenged by the petitioners at the relevant
time.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 69 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
10.10. The principal submission of the petitioners is
that the order dated 19.06.1998 in W.P.
No.27115 of 1991, read with the Division Bench
judgment dated 15.06.1998 in W.P. Nos.3539
to 3542 of 1996 and connected matters,
rendered the acquisition notification in the
present case ineffective. The question,
therefore, is not merely what principle was laid
down in those proceedings, but what was
actually quashed by the orders passed therein
and whether the present petitioners can rely
upon those orders to reopen the acquisition of
their own lands after more than two decades.
10.11. It is not disputed before this Court that the
order dated 19.06.1998 in W.P. No.27115 of
1991 quashed the acquisition notifications only
insofar as they related to the lands of the
petitioners in that proceeding and reserved
liberty to the State to initiate fresh proceedings
in respect of those lands.
10.12. This distinction is important. A writ petition is
decided with reference to the relief sought and
the subject matter before the Court. If an
acquisition notification covers several parcels of
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 70 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
land belonging to different landowners, and the
Court quashes the notification only insofar as it
relates to the lands of the petitioners before it,
the order does not, by that fact alone, annul
the acquisition in respect of every other parcel
covered by the notification.
10.13. The liberty reserved to the State Government
to initiate fresh proceedings must also be
understood in the same context. Since the
acquisition in respect of the lands before that
Court had been set aside, liberty was reserved
to initiate fresh proceedings in respect of those
lands. It does not follow that the State was
required to initiate fresh proceedings in respect
of lands which were not the subject matter of
that writ petition and in respect of which the
acquisition had not been quashed.
10.14. The present petitioners were not parties to W.P.
No.27115 of 1991. More importantly, their
lands were not the lands in respect of which the
acquisition was quashed. The operative effect
of that order, therefore, cannot be extended to
the petitioners' lands merely because the same
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 71 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
acquisition notification may have covered both
sets of lands.
10.15. The fact that the Division Bench judgment was
referred to and followed in W.P. No.27115 of
1991 does not alter this position. The
petitioners may rely upon the legal principle
declared by a Division Bench as a precedent,
subject to its applicability to the facts of their
case. What they cannot do is treat the relief
granted in another writ petition as though their
own lands had also been covered by that relief.
10.16. It is, therefore, unnecessary for this Court, in
the present proceedings, to assume that the
entire notification stood quashed merely
because relief was granted in respect of certain
lands under the same notification. The record
before this Court does not support such a
conclusion.
10.17. Delay and subsequent conduct: There is
another circumstance which assumes
considerable importance. The petitioners
themselves state that the kathedars came to
know of the declaration under Section 6(1) in
October 1992. They thereafter submitted a
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 72 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
representation dated 01.10.1992 seeking
deletion of their lands from the acquisition.
10.18. Thus, the petitioners were aware, at least from
1992, that their lands had been included in the
acquisition and that a declaration under Section
6(1) had been issued. Their response at that
stage was not to challenge the validity of the
acquisition proceedings before this Court.
Instead, they requested the Government to
delete their lands from the acquisition.
10.19. That request was considered and rejected by
the State Government on 04.01.1995. The
petitioners did not challenge that order at that
stage. They also did not institute proceedings
challenging the Section 4(1) notification, the
Section 6(1) declaration or the alleged violation
of Section 5A.
10.20. This is significant because the grounds now
sought to be raised were available to the
petitioners at that time. The alleged absence of
a hearing under Section 5A, the alleged lack of
authority to issue the notification under the LA
Act, 1894 after the KUDA Act came into force,
and the alleged invalidity of the acquisition
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 73 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
were all matters which could have been raised
when the petitioners became aware of the
acquisition.
10.21. The petitioners also did not approach the Court
when the judgments dated 15.06.1998 and
19.06.1998 were rendered. If, according to the
petitioners, those judgments had the effect of
invalidating the acquisition of their lands also,
there was no apparent impediment to their
approaching the Court at that stage and
seeking similar relief. Instead, the acquisition
was allowed to proceed. As noticed while
considering Point No.(i), an award was made,
compensation was dealt with, possession was
taken and the land was incorporated into the
layout. Residential sites were formed and
allotted, a road was formed and the remaining
portion was earmarked for a park.
10.22. The present challenge was brought only after
the e-tender dated 24.05.2017 and the
subsequent Work Order dated 04.11.2017. The
challenge to the acquisition itself was sought to
be introduced later by I.A. No.1/24. Thus, the
challenge to the acquisition is being raised after
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 74 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
a very long period and after the acquisition has
been acted upon.
10.23. This Court is not proceeding on the basis that
mere delay can validate an acquisition which is
void in law. The question here is narrower. The
petitioners seek to reopen an acquisition of
their lands which they admittedly knew about
from 1992, by relying upon a judgment
rendered in proceedings concerning other
lands, after the acquisition has been completed
and the land has been put to the use for which
it was acquired. In such circumstances, the
discretionary jurisdiction under Article 226
cannot ordinarily be invoked to unsettle the
completed acquisition.
10.24. Effect of Section 24(2) of the 2013 Act:
There is also a statutory reason why the
petitioners cannot use the present proceedings
under Section 24(2) of the 2013 Act to revive
the old challenge to the acquisition.
10.25. The Constitution Bench of the Hon'ble Supreme
Court in Indore Development Authority , has
held in paragraph 366.9 that Section 24(2)
does not create a fresh cause of action to
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 75 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
challenge the legality of concluded land
acquisition proceedings. It does not reopen
concluded proceedings or revive stale and time-
barred claims.
10.26. The significance of this principle in the present
case is clear. The petitioners originally
approached this Court complaining of the
proposed development of the acquired land and
seeking to invoke Section 24(2). The
acquisition proceedings themselves were
initiated in 1990 and 1991. The petitioners, by
their own showing, were aware of the Section
6(1) declaration in 1992. The validity of that
declaration was not challenged then.
10.27. Section 24(2) cannot be converted into a
means of reopening that old challenge. The
question under Section 24(2) is whether the
statutory conditions for lapse were satisfied as
on the commencement of the 2013 Act. It is
not a mechanism for reviving a challenge to the
validity of the original acquisition which had
become stale.
10.28. The distinction between the two questions must
therefore be maintained. The Division Bench
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 76 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
judgment and the order dated 19.06.1998 may
have decided the validity of the acquisition
insofar as the lands before those Courts were
concerned. That does not mean that the
present petitioners' acquisition stood
automatically quashed. Nor does Section 24(2)
provide a fresh opportunity to challenge that
acquisition on grounds which were available to
the petitioners decades earlier.
10.29. Challenge based on the KUDA Act: The
petitioners next contend that, since the KUDA
Act came into force on 01.05.1988, the
acquisition could not thereafter be initiated
under the LA Act, 1894.
10.30. This submission overlooks Section 36(1) of the
KUDA Act. That provision expressly provides
that acquisition of land under the KUDA Act
otherwise than by agreement is to be
regulated, so far as applicable, by the
provisions of the LA Act, 1894.
10.31. Section 36, therefore, does not exclude the LA
Act, 1894. It incorporates that Act for the
purpose of compulsory acquisition under the
KUDA Act. Section 36(3) further contemplates
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 77 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
that, after the land vests in the Government
under Section 16 of the LA Act, 1894, it may be
transferred to the Urban Development
Authority.
10.32. The very structure of Section 36 thus shows
that the KUDA Act and the LA Act, 1894 were
intended to operate together in the matter of
compulsory acquisition. The mere fact that the
KUDA Act had come into force before the
preliminary notification dated 12.01.1990 does
not, by itself, invalidate the acquisition.
10.33. No specific provision of the KUDA Act has been
identified by the petitioners which prohibited
the use of the LA Act, 1894 for the acquisition
in question. Nor has any specific procedural
requirement under the KUDA Act, which was
allegedly violated before issuance of the
Section 4(1) notification, been established on
the material placed before this Court.
10.34. Challenge based on Section 5A: The
petitioners also contend that no hearing was
afforded under Section 5A before issuance of
the declaration under Section 6(1).
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 78 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
10.35. The importance of Section 5A cannot be
disputed. It provides a statutory opportunity to
a person interested in the land to object to the
proposed acquisition and requires consideration
of the objections before the Government
proceeds to make the declaration under Section
6(1). The difficulty for the petitioners is that
this objection is being raised more than three
decades after the declaration. The petitioners'
own case is that they became aware of the
declaration in October 1992. They did not
challenge the declaration then. They instead
sought deletion of the lands, and that request
was rejected on 04.01.1995. The petitioners
cannot, after allowing the acquisition to
proceed for decades, seek to have the entire
acquisition reopened merely on the basis of a
bare assertion that no hearing was afforded.
10.36. More importantly, even assuming that the
petitioners have a grievance regarding
compliance with Section 5A, that grievance had
to be raised when the declaration was known to
them. The subsequent enactment of the 2013
Act and the filing of a petition under Section
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 79 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
24(2) cannot revive such a stale challenge to
the original acquisition.
10.37. Order dated 04.01.1995: The petitioners also
challenge the order dated 04.01.1995 rejecting
their request for deletion of the lands. The
nature of that order must first be kept in view.
The petitioners had sought deletion of their
lands from an acquisition which had already
proceeded to the stage of a Section 6(1)
declaration. The State Government considered
that request and rejected it. The order was not
an adjudication of a challenge to the validity of
the Section 4(1) or Section 6(1) notifications.
10.38. If the petitioners considered the rejection to be
contrary to law or in breach of natural justice,
they could have challenged it at that stage.
They did not do so. The fact that further
representations may have been submitted
subsequently does not, by itself, keep the
original acquisition proceedings open
indefinitely or prevent the respondents from
acting upon an acquisition which had already
been completed.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 80 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
10.39. This Court therefore finds no basis to treat the
order dated 04.01.1995, or the subsequent
representations, as preserving an otherwise
concluded challenge to the acquisition.
10.40. I.A. No.1/24: By I.A. No.1/24, the petitioners
seek to introduce a direct challenge to the
declaration dated 23.03.1991.
10.41. The amendment sought is not merely a
clarification of the existing challenge. It seeks
to introduce, at this stage, a direct challenge to
an acquisition declaration which was made
more than three decades ago and of which the
petitioners admittedly became aware in 1992.
10.42. Even if the amendment were allowed, the
challenge would face the same difficulty of
extraordinary delay and the fact that the
acquisition has already been acted upon and
completed. The amendment cannot be
permitted merely to introduce a claim which
cannot itself be entertained at this stage. The
application for amendment is therefore liable to
be rejected.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 81 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
10.43. The order dated 19.06.1998 in W.P. No.27115
of 1991 did not quash the acquisition
notification in its entirety. The relief was
confined to the lands which were the subject
matter of that petition. The present petitioners'
lands were not before that Court. The same is
true of the relief granted by the Division Bench
in W.P. Nos.3539 to 3542 of 1996 and
connected matters.
10.44. The present petitioners were aware of the
acquisition by October 1992. They did not
challenge the Section 4(1) notification or the
Section 6(1) declaration. They sought deletion
of their lands, but the request was rejected on
04.01.1995, which order was not challenged at
the relevant time. The acquisition thereafter
proceeded and was acted upon.
10.45. The petitioners cannot now treat the orders
passed in proceedings relating to other lands as
though those orders had also quashed the
acquisition of their lands. Nor can Section 24(2)
of the 2013 Act be used to revive a challenge to
the validity of an acquisition which was
available to them decades earlier.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 82 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
10.46. The challenge based on the KUDA Act also fails,
since Section 36 of that Act expressly makes
the LA Act, 1894 applicable to compulsory
acquisition. The challenge based on Section 5A
is raised after an extraordinary delay,
notwithstanding the petitioners' admitted
knowledge of the declaration from 1992. The
challenge to the order dated 04.01.1995 is
likewise belated.
10.47. For all the above reasons, this Court answers
Point No. (ii) by holding that the petitioners
cannot, at this stage, rely upon the order dated
19.06.1998 in W.P. No.27115 of 1991 or the
Division Bench judgment referred to therein to
reopen the acquisition of their lands.
11. Answer to Point No.(iii): Whether the
subsequent formation and implementation of
the residential layout, including formation of
sites, roads and the park and accrual of third-
party rights, has any bearing on the relief
sought by the petitioners?
11.1. The submission of Sri K.R. Lingaraju, learned
counsel for the petitioners, is that the
petitioners continue to be in possession and
cultivation of the land and that the
Chikkamagaluru City Municipality has now
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 83 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
sought to develop the remaining portion as a
park.
11.2. Learned counsel also submits that the
petitioners had offered to provide a 60-feet
road through the property, which is situated at
the fag end of the layout, and that the
remaining extent ought to have been deleted
from the acquisition.
11.3. Sri A. Ravishankar submits that the acquisition
was followed by formation of the Hiremagaluru
residential layout. Sites were formed and
allotted, and houses have been constructed by
the allottees. A road has also been formed. The
remaining extent of the subject land is shown
as a park in the layout plan.
11.4. Learned counsel submits that the fact that a
portion of the land remains open does not
mean that it has not been put to use. A
residential layout necessarily contains not only
residential sites but also roads, parks and other
common areas. According to the break-up
placed before the Court, out of 4 acres 13
guntas, about 1 acre 15 guntas has been
utilised for sites, about 10 guntas for a road
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 84 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
and about 2 acres 28 guntas has been
earmarked as a park. These three extents
together account for the entire land in Survey
No.450.
11.5. Learned counsel further submits that third-
party rights have arisen in the meantime. Sites
have been allotted and houses have been
constructed. After such a long period, the
petitioners cannot seek relief which would
unsettle the existing layout and affect persons
who are not parties to the present proceedings.
11.6. The question under this Point is whether the
subsequent formation of the layout, the
formation of sites and roads, the portion
earmarked as a park, and the creation of rights
in favour of third parties have any bearing on
the relief sought by the petitioners.
11.7. At the outset, it is necessary to keep apart two
different questions. The formation of a layout or
the creation of third-party rights does not, by
itself, prevent an acquisition from lapsing if the
statutory requirements for lapse are otherwise
satisfied. Therefore, the subsequent
development of the land cannot be treated as
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 85 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
an independent answer to a claim under
Section 24(2) of the LA Act, 2013.
11.8. In the present case, however, this Court has
already held under Point No.(i) that the
acquisition has not lapsed. The subsequent
development of the land is relevant for another
reason. It bears upon the question of
possession and also upon whether discretionary
relief should be granted after the acquisition
has been acted upon for several decades.
11.9. The land has formed part of the layout: The
material placed before the Court shows that the
entire extent of 4 acres 13 guntas in Survey
No.450 has been dealt with as part of the
Hiremagaluru layout. According to the
respondents, about 1 acre 15 guntas has been
used for residential sites, about 10 guntas for a
road and about 2 acres 28 guntas has been
shown as a park. These three extents together
account for the entire land in question.
11.10. The petitioners have not produced any material
to show that any portion of the land falls
outside the layout. Their own case is that the
property is situated at the fag end of the layout
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 86 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
and that they had offered to provide a 60-feet
road through it. This itself shows that the
property has been dealt with as part of the
layout.
11.11. The formation and allotment of sites is also
significant. The material before the Court shows
that sites have been formed and allotted and
that houses have been constructed. A road has
also been formed. These facts are not
consistent with the petitioners' claim that the
entire land continued to remain in their
possession and cultivation. The photographs
and Google Maps placed on record clearly
establish this.
11.12. This Court has already considered these
circumstances while dealing with possession
under Point No.(i) and has held that possession
of the entire extent was taken over. The
subsequent development of the land lends
further support to that finding. The layout,
therefore, is not being referred to as a
substitute for the statutory requirement
relating to possession; it is being considered as
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 87 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
evidence of what happened to the land after
the acquisition.
11.13. The portion shown as a park: The
petitioners' case appears to proceed on the
basis that the extent of about 2 acres 28
guntas cannot be treated as having been put to
use because no residential sites have been
formed on it. This submission cannot be
accepted.
11.14. A residential layout is not confined to
residential sites. Roads and open spaces may
form part of the layout. Therefore, the fact that
a portion has not been covered by buildings
does not, by itself, mean that the land was not
acquired or that it continued to remain with the
former owners.
11.15. In the present case, the relevant fact is that the
disputed extent is shown as a park in the
layout. It is therefore not an unidentified or
unused piece of land lying outside the layout. It
has been earmarked for a particular purpose
within the layout.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 88 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
11.16. The record also shows that CUDA had furnished
the layout plan to the State Government on
29.05.1993 stating that the lands were
required for the layout. The request for deletion
of the lands was thereafter rejected on
04.01.1995. There is nothing on record to show
that the portion now shown as a park was
subsequently brought into the layout only after
the petitioners approached this Court.
11.17. The later issuance of the e-tender for
development of the park does not alter this
position. It indicates that the authorities
proposed to develop the portion which had
already been shown as a park in the layout.
The e-tender cannot therefore be treated as an
admission that the land had remained with the
petitioners.
11.18. The fact that the park was yet to be fully
developed when the petition was filed is also
not decisive. The question is whether the land
formed part of the layout and had been taken
over for the acquired purpose. An open area
earmarked as a park cannot be treated as land
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 89 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
outside the layout merely because further
development was proposed.
11.19. The petitioners' proposal for a 60-feet
road: The petitioners rely upon their proposal
to provide a 60-feet road through the property
and contend that the remaining land ought to
have been deleted from the acquisition.
11.20. This proposal does not assist the petitioners. It
was a proposal for an alternative arrangement
and not an order deleting the land from the
acquisition. The request for deletion had
already been considered and rejected by the
State Government on 04.01.1995. No material
has been placed before the Court to show that
the said decision was subsequently withdrawn
or that the petitioners' proposal was accepted.
11.21. The fact that the petitioners were willing to give
land for a road also does not establish that
possession of the remaining land continued
with them. At the highest, it shows that the
petitioners sought a different use of the land
and deletion of the balance extent from the
acquisition. That proposal did not result in any
change in the acquisition proceedings. What it
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:14, Bengaluru
Verified
- 90 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
could, however, show is that the layout has
been formed and this road was offered by the
petitioners to be provided as access to the
layout, which does not help the petitioners.
11.22. Effect of third-party rights: The next
question is the effect of the rights created in
favour of third parties. The record shows that
sites have been allotted and houses have been
constructed in the layout. These persons have
acquired their interests during the period in
which the petitioners did not challenge the
acquisition.
11.23. The relief sought by the petitioners is in respect
of the acquisition of the entire extent of 4 acres
13 guntas. That extent includes the portion on
which residential sites have been formed and
houses constructed, the road, and the portion
shown as a park.
11.24. A declaration in respect of the entire extent
would therefore have consequences beyond the
dispute between the petitioners and the
acquiring authorities. It would affect persons
who have been allotted sites and constructed
houses on the basis of the layout, although
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 91 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
those persons are not parties to these
proceedings.
11.25. This aspect is particularly relevant because of
the delay on the part of the petitioners. As
noticed under Point No.(ii), the petitioners
came to know of the Section 6 declaration in
1992. They sought deletion of the land, but the
request was rejected on 04.01.1995. They did
not challenge the acquisition at that stage. The
layout was thereafter formed, sites were
allotted and houses were constructed.
11.26. This Court must therefore consider not only the
claim made by the petitioners but also the
consequences of granting the relief sought.
Where the acquisition has been acted upon, the
land has been incorporated into a residential
layout, sites have been allotted and houses
have been constructed, this Court cannot
ignore the position that has arisen over the
years, particularly when the petitioners
themselves did not challenge the acquisition for
a long period.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 92 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
11.27. The subsequent formation and implementation
of the layout has a bearing on the present
proceedings in three respects.
11.28. Firstly, it supports the finding already recorded
under Point No.(i) that possession of the entire
extent was taken over. The residential sites,
road and the portion shown as a park together
account for the entire extent of 4 acres 13
guntas.
11.29. Secondly, the fact that about 2 acres 28 guntas
remains open does not establish that the land
was left with the petitioners. The material
shows that this portion forms part of the layout
and is earmarked as a park. The subsequent
proposal to develop the park is consistent with
that position.
11.30. Thirdly, the formation of sites, construction of
houses and creation of third-party rights are
relevant to the exercise of discretionary writ
jurisdiction. The petitioners seek to disturb an
acquisition and layout which have been acted
upon for several decades, without challenging
the acquisition at the stage when such
challenge was available to them.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 93 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
11.31. These circumstances do not, by themselves,
determine the question of lapse under Section
24(2). That question has already been
answered under Point No.(i). They are relevant
to the present Point because they show the
extent to which the acquisition has been
implemented and the consequences that would
follow if the relief sought by the petitioners
were granted at this stage.
11.32. For these reasons, this Court answers Point No.
(iii) by holding that the subsequent formation
and implementation of the residential layout,
including the formation of sites and roads, the
earmarking of the remaining portion as a park,
and the creation of third-party rights, have a
material bearing on the relief sought by the
petitioners.
12. Answer to Point No.(iv): Whether the
petitioners are entitled to quashing of the e-
procurement re-tender notification dated
24.05.2017 and the Work Order dated
04.11.2017?
12.1. Sri K.R. Lingaraju submits that the
Chikkamagaluru City Municipality issued the e-
procurement re-tender notification dated
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 94 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
24.05.2017 for development of the disputed
land as a park and thereafter issued the Work
Order dated 04.11.2017. According to learned
counsel, these proceedings were impermissible
because the acquisition had already lapsed and
the land continued to belong to the petitioners.
12.2. Learned counsel further submits that the
request of the landowners for deletion of the
land from the acquisition proceedings was still
under consideration. The landowners had
offered to provide a 60-feet road through their
property and had sought deletion of the
remaining extent. According to him, until that
request was finally decided, the respondents
ought not to have proceeded with development
of the land as a park.
12.3. Sri A. Ravishankar submits that the e-tender
was issued only to implement the layout which
had already been formed on the acquired land.
The portion in question had been earmarked as
a park in the layout. Therefore, the e-tender
and the subsequent Work Order were steps
towards implementation of the existing layout
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 95 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
and did not amount to any fresh action against
the petitioners' land.
12.4. With regard to the request for deletion, learned
counsel submits that the State Government had
already considered and rejected the request by
order dated 04.01.1995. The petitioners did not
challenge that order. The subsequent
representations made by them could not, by
themselves, revive a request which had already
been decided.
12.5. Learned counsel submits that no subsequent
order recalling or modifying the order dated
04.01.1995 has been produced. Nor has any
order of the Court or the Government
restraining the respondents from implementing
the layout been brought to the notice of this
Court.
12.6. The challenge to the e-tender and the Work
Order has to be considered in the background
of what had happened to the land before those
proceedings were initiated.
12.7. The acquisition commenced with the
preliminary notification dated 12.01.1990. The
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 96 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
declaration under Section 6(1) was thereafter
issued on 23.03.1991. The landowners became
aware of the declaration in October 1992 and
submitted a representation dated 01.10.1992
seeking deletion of their lands from the
acquisition.
12.8. The request for deletion was considered by the
State Government. CUDA furnished its layout
plan on 29.05.1993 and stated that the land
was required for the layout. After the
correspondence between the authorities, the
State Government rejected the request for
deletion on 04.01.1995.
12.9. The petitioners did not challenge the order
dated 04.01.1995 at that stage. Nor did they
obtain any order staying the acquisition
proceedings or restraining CUDA from
proceeding with the layout.
12.10. The acquisition was thereafter acted upon. An
award was made, compensation was dealt with
in the manner considered under Point No.(i),
possession was taken over and the residential
layout was formed. Sites and roads were
formed and sites were allotted to third parties.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 97 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
The portion now in question was shown as a
park in the layout.
12.11. It was much later, in 2017, that the e-
procurement re-tender was issued for
development of the park. The Work Order
followed on 04.11.2017. Thus, the e-tender
was not the event by which the land was first
sought to be brought into the layout. It was a
subsequent step for implementing the layout
which had already been formed.
12.12. The petitioners' challenge to the e-tender is
based on their assertion that the land continued
to belong to them because the acquisition had
lapsed or was otherwise invalid. That
contention has already been considered under
the earlier Points.
12.13. Under Point No.(i), this Court has held that the
acquisition had not lapsed. Under Point No.(ii),
this Court has held that the petitioners cannot,
at this stage, reopen the validity of the
acquisition on the grounds now urged by them.
Under Point No.(iii), this Court has found that
the disputed extent forms part of the layout
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 98 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
and that the portion in question has been
earmarked as a park.
12.14. Those findings are material to the present
issue. If the acquisition had lapsed and the
petitioners had established a subsisting right in
the land, the authority of the respondents to
undertake development thereon would require
examination. But once the acquisition is held to
have remained effective and possession is
found to have been taken, the petitioners
cannot challenge the subsequent
implementation of the layout merely on the
ground that the land was once owned and
cultivated by them.
12.15. The principal argument of the petitioners is that
their request for deletion was pending when the
e-tender was issued. The record does not
support that contention. The request for
deletion was made in 1992 and was considered
by the State Government. It was rejected on
04.01.1995. The petitioners did not challenge
that decision.
12.16. It is stated that further representations and
correspondence followed. However, no
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 99 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
subsequent order has been placed before this
Court showing that the order dated 04.01.1995
was recalled, set aside or modified. There is
also no material showing that the State
Government subsequently directed CUDA to
keep the land out of the layout.
12.17. Mere correspondence cannot, by itself, undo a
decision already taken by the competent
authority. Nor can a subsequent representation,
without an order accepting it, suspend the
operation of the earlier decision.
12.18. The proposal to provide a 60-feet road stands
on the same footing. It was only a proposal
made by the landowners. There is no material
to show that the State Government accepted
the proposal or formally released the remaining
land from acquisition.
12.19. In the absence of such an order, the petitioners
cannot contend that the respondents were
required to wait indefinitely before
implementing the layout. The acquisition and
the layout could not be kept in a state of
uncertainty merely because the landowners
continued to make representations.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 100 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
12.20. The e-tender dated 24.05.2017 was for
development of the park shown in the layout.
The Work Order dated 04.11.2017 followed the
tender process.
12.21. The petitioners have not pointed out any
independent illegality in the tender process or
in the Work Order. There is no challenge that
the tender conditions were illegal, that the
process was conducted arbitrarily, or that the
Work Order was issued contrary to the
applicable rules.
12.22. The challenge is therefore not really to the
tender process. It is to the respondents'
authority to use the land for the purpose for
which it had been acquired. Since the
acquisition has been held to be subsisting and
possession has been held to have been taken,
that challenge cannot succeed. The
development of the park also cannot be treated
as a new acquisition. The land had already
been included in the layout, and the park was
part of that layout. The e-tender was only a
step towards giving effect to that planned use.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 101 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
12.23. There is another circumstance which cannot be
ignored. By the time the e-tender was issued,
the acquisition had been acted upon for more
than two decades. Residential sites had been
formed and allotted, houses had been
constructed and roads had been laid. The
petitioners now seek to quash the e-tender and
Work Order as part of their larger challenge to
the acquisition. Such relief cannot be
considered without taking into account the
position which has arisen during the long period
in which the petitioners did not challenge the
acquisition.
12.24. In the present case, the petitioners had notice
of the acquisition at least by October 1992.
They sought deletion of the land, their request
was rejected in 1995, and they did not
challenge that decision. The layout was
thereafter implemented. The e-tender was
issued only in 2017 for development of the
park. In these circumstances, there is no
justification to grant a discretionary writ which
would have the effect of reopening the
completed acquisition and disturbing the
existing layout.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 102 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
12.25. As discussed under Point No.(i), possession has
been considered on the basis of the entire
material available before the Court, including
the subsequent formation and implementation
of the layout. The fact that the land has been
dealt with as part of the layout, residential sites
and roads have been formed, and the
remaining portion has been earmarked as a
park, supports the conclusion already reached
regarding possession.
12.26. The concerned authorities should, nevertheless,
make appropriate efforts to trace and preserve
the original acquisition and possession records.
Proper maintenance of such records is
particularly important where the acquisition is
of considerable vintage.
12.27. The e-tender dated 24.05.2017 and the Work
Order dated 04.11.2017 were issued after the
acquisition had been acted upon and the layout
had been formed. The park for which the
tender was issued forms part of that layout.
12.28. The petitioners have not established any
subsisting right in the land which would prevent
the respondents from implementing the layout.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 103 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
Their request for deletion had already been
rejected in 1995, and no subsequent order
releasing the land from acquisition has been
produced. The subsequent representations
made by the petitioners did not, by themselves,
keep the request for deletion pending or
prevent the respondents from proceeding with
the layout. The e-tender and the Work Order
therefore cannot be quashed on that ground.
12.29. In view of the findings recorded under Points
Nos.(i) to (iii), and particularly the findings that
the acquisition has not lapsed, that the
petitioners cannot now reopen its validity, and
that the disputed land forms part of the
existing layout, this Court answers Point No.
(iv) by holding that the petitioners are not
entitled to the relief of quashing the e-
procurement re-tender notification dated
24.05.2017 or the Work Order dated
04.11.2017.
13. Answer to Point No.(v): What Order?
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 104 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
13.1. In view of the above, this Court passes the
following:
ORDER
(i) The writ petition is dismissed .
(ii) The prayer for a writ of certiorari to quash the
e-procurement re-tender notification bearing
No.CMC/CKM/CR/106/2016-2017 dated
24.05.2017 and the Work Order dated
04.11.2017, at Annexures-A and B, is
rejected .
(iii) The prayer for a declaration that the
preliminary notification bearing No.LAQ:2/89-
90 dated 12.01.1990 and the final notification
bearing No.R.D.9.Bhu.Swa.Chi.90 dated
23.03.1991, at Annexures-C and D, have
lapsed under Section 24(2) of the Right to Fair
Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement
Act, 2013, in respect of land bearing Survey
No.450, measuring 4 acres 13 guntas, situated
at Hiremagaluru Village, Kasaba Hobli,
Chikkamagaluru Taluk and District, is rejected .
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
- 105 -
HC-KAR
NC: 2026:KHC:56421
WP No. 51965 of 2017
CNR: KAHC010126962017
(iv) I.A. No.1/24 is Dismissed .
(v) Interim order, if any, stands vacated. All
pending interlocutory applications, if any, stand
disposed of.
This Court has been assisted by Mr. Sourav,
Law Clerk, in the formulation of this Judgment.
Digitally Signed By:
SURAJ GOVINDA RAJ
09/10/2026, 12:15, Bengaluru
Verified
(SURAJ GOVINDARAJ)
JUDGE
LN
List No.: 3 Sl No.: 1