Era Infra Engineering Limited vs Alok Kumar Agarwal (Asc Insolvency Services Llp) & Ors.

Court
National Company Law Appellate Tribunal
Case type
Company Appeal(AT)(Ins)
Decided on
12-03-2026
<div> <b>NATIONAL COMPANY LAW APPELLATE TRIBUNAL </b><br /> <b>PRINCIPAL BENCH, NEW DELHI </b><br /> <b>Company Appeal (AT) (Insolvency) No. 1693 of 2025 </b><br /> <b> </b> [Arising out of Order dated 04.11.2025 passed by the Adjudicating <br /> Authority (National Company Law Tribunal, New Delhi Bench, Court – IV) in <br /> C.P. No. (IB) 172/2025] <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Era Infra Engineering Ltd., </b><br /> <b>Through Its Authorised Representative </b><br /> <b>Mr. Niladri Chatterji </b><br /> <b> </b><br /> <b> </b><br /> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Alok Kumar Agarwal, IRP, </b><br /> <b>Era Infrastructure (India) Ltd. &amp; Ors. </b><br /> <b> </b><br /> <b>…Respondents </b><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Krishnendu Datta, Sr. Advocate with Ms. </b><br /> <b>Priya Singh and Ms. Alina Merin Mathew, </b><br /> <b>Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Ms. Smriti Churiwal, Mr. Jaiveer Kant, Ms. Meher </b><br /> <b>Thappar, Ms. Vidisha Jain and Mr. Abhishek </b><br /> <b>Periwal, Advocates for R1/RP. </b><br /> <b> </b><br /> <b>Mr. Arun Kathpalia, Sr. Advocate with Mr. </b><br /> <b>Abhishek Anand, Ms. Aditi Sinha, Ms. Diksha </b><br /> <b>Gupta and Ms. Palak Kalra, Advocates for R-2. </b><br /> <b>WITH </b><br /> <b>Company Appeal (AT) (Insolvency) No. 1694 of 2025 </b><br /> [Arising out of Order dated 04.11.2025 passed by the Adjudicating Authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – IV) in INV.P. <br /> No. 59/2025 in C.P. (IB) No. 172(ND)/2025] <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Era Infra Engineering Ltd., </b><br /> <b>Through Its Authorised Representative </b><br /> <b>Mr. Niladri Chatterji </b><br /> <b> </b><br /> <b> </b><br /> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Alok Kumar Agarwal, IRP, </b><br /> <b>Era Infrastructure (India) Ltd. &amp; Ors. </b><br /> <b> </b><br /> <b>…Respondents </b><br /><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Krishnendu Datta, Sr. Advocate with Ms. </b><br /> <b>Priya Singh and Ms. Alina Merin Mathew, </b><br /> <b>Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Ms. Smriti Churiwal, Mr. Jaiveer Kant, Ms. Meher </b><br /> <b>Thappar, Ms. Vidisha Jain and Mr. Abhishek </b><br /> <b>Periwal, Advocates for R1/RP. </b><br /> <b> </b><br /> <b>Mr. Arun Kathpalia, Sr. Advocate with Mr. </b><br /> <b>Abhishek Anand, Ms. Aditi Sinha, Ms. Diksha </b><br /> <b>Gupta and Ms. Palak Kalra, Advocates for R-2. </b><br /> <b>WITH </b><br /> <b>Company Appeal (AT) (Insolvency) No. 1695 of 2025 </b><br /> [Arising out of Order dated 04.11.2025 passed by the Adjudicating Authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – IV) in C.P. No. <br /> (IB) 777/2024] <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Era Infra Engineering Ltd., </b><br /> <b>Through Its Authorised Representative </b><br /> <b>Mr. Niladri Chatterji </b><br /> <b> </b><br /> <b> </b><br /> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Alok Kumar Agarwal, IRP, </b><br /> <b>Haridwar Highways Project Ltd. &amp; Ors. </b><br /> <b> </b><br /> <b>…Respondents </b><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Abhijeet Sinha, Sr. Advocate with Ms. Priya </b><br /> <b>Singh and Ms. Heena Kochar, Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Ms. Smriti Churiwal, Mr. Jaiveer Kant, Ms. Meher </b><br /> <b>Thappar, Ms. Vidisha Jain and Mr. Abhishek </b><br /> <b>Periwal, Advocates for R1/RP. </b><br /> <b> </b><br /> <b>Mr. Arun Kathpalia, Sr. Advocate with Mr. </b><br /> <b>Abhishek Anand, Ms. Aditi Sinha, Ms. Diksha </b><br /> <b>Gupta and Ms. Palak Kalra, Advocates for R-2. </b><br /> <b>WITH </b><br /> <b>Company Appeal (AT) (Insolvency) No. 1697 of 2025 </b><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>2 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> [Arising out of Order dated 04.11.2025 passed by the Adjudicating Authority <br /> (National Company Law Tribunal, New Delhi Bench, Court – IV) in INV.P. <br /> No. 60/2025 in C.P. (IB) No. 777(ND)/2024] <br /> <b>IN THE MATTER OF: </b> <b> </b><br /> <b>Era Infra Engineering Ltd., </b><br /> <b>Through Its Authorised Representative </b><br /> <b>Mr. Niladri Chatterji </b><br /> <b> </b><br /> <b> </b><br /> <b> …Appellant </b><br /> <b> </b><br /> <b>Versus </b><br /> <b>Alok Kumar Agarwal, IRP, </b><br /> <b>Haridwar Highways Project Ltd. &amp; Ors. </b><br /> <b> </b><br /> <b>…Respondents </b><br /> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant </b> <b>: Mr. Abhijeet Sinha, Sr. Advocate with Ms. Priya </b><br /> <b>Singh and Ms. Heena Kochar, Advocates. </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>For Respondents </b> <b>: Ms. Smriti Churiwal, Mr. Jaiveer Kant, Ms. Meher </b><br /> <b>Thappar, Ms. Vidisha Jain and Mr. Abhishek </b><br /> <b>Periwal, Advocates for R1/RP. </b><br /> <b> </b><br /> <b>Mr. Arun Kathpalia, Sr. Advocate with Mr. </b><br /> <b>Abhishek Anand, Ms. Aditi Sinha, Ms. Diksha </b><br /> <b>Gupta and Ms. Palak Kalra, Advocates for R-2. </b><br /> <b>J U D G M E N T </b><br /> <b>ASHOK BHUSHAN, J.</b> <br /> These appeals have been filed by Era Infrastructure Engineering Ltd. <br /> the holding company of the corporate debtor (principal borrower and <br /> corporate guarantor) challenging the order dated 04.11.2025 passed by the <br /> adjudicating authority (National Company Law Tribunal, New Delhi Bench, <br /> Court – IV) admitting Section 7 application filed by National Asset <br /> Reconstruction Company Ltd. (NARCL), the respondent No. 2 herein against <br /> the principal borrower and the corporate guarantor. By order of the same <br /> day, intervention petition filed by the appellant i.e., INV.P. No.59/2025 in C.P. <br /> (IB) No.172/2025 and in INV.P. No.60/2025 in C.P. (IB) No.774/2025 were <br /> rejected. Aggrieved by the aforesaid orders, these appeals have been filed. <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>3 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> <b>2.</b> <b> </b> Background facts and sequence of the events giving rise to these <br /> appeals need to be noticed first: <br /> i. The appellant, Era Infrastructure Engineering Ltd. (EIEL) is an <br /> Engineering Procurement and Construction Company engaged primary <br /> in Build-Operate-Transfer Infrastructure Projects. <br /> ii. Appellant was successful bidder for the Muzaffarnagar Haridwar <br /> section from 131 KM to 211 KM of NH-58 in state of Uttar Pradesh and <br /> Uttarakhand. <br /> iii. The Project was awarded by the National Highway Authority of India <br /> (NHAI). In compliance with NHAI, standard condition mandating <br /> incorporation of Special Purpose Vehicles (SPV), Haridwar Highways <br /> Project Ltd. (HHPL) was formed on 02.02.2010 as 100% subsidiary of <br /> the appellant to execute the Project. <br /> iv. The financing for the Project was obtained by HHPL through consortium <br /> of lenders Axis Bank and other banks. <br /> v. On 31.07.2010 at the request of HHPL, Axis Bank sanctioned a loan to <br /> the tune of Rs.690.60 crore for part financing of the Project – Term Loan <br /> I. Axis Bank invited Punjab National Bank (PNB) and other Banks <br /> including Bank of India to participate in part financing for the Project. <br /> vi. A Joint Lender Forum agreed to grant additional term loan of Rs.290.48 <br /> crore as Term Loan II. Due to delay in commencement of the Project <br /> Term Loan III was sanctioned for Rs.28.6 crore. <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>4 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> vii. The corporate debtor executed various security documents including <br /> registration of charge before the Registrar of Companies (RoC). <br /> viii. On 29.06.2016 a corporate guarantee was executed by Era <br /> Infrastructure (India) Ltd. (EIIL) to the Bank of India for Term Loan I, <br /> Term Loan II and Term Loan III totalling to Rs.149.48 crore. <br /> ix. Borrower’s account was declared Non-Performing Asset (NPA). Notice <br /> under Section 13(2) was issued by the Bank of India on 03.04.2019. <br /> x. Corporate Insolvency Resolution Process (CIRP) proceedings <br /> commenced against EIEL the appellant herein by the order of <br /> adjudicating authority 08.05.2018 on application filed by Union Bank <br /> of India. In the CIRP of the appellant a resolution plan was submitted <br /> by M/s. S.A. Infrastructure Consultants Pvt. Ltd., which plan came to <br /> be approved by the adjudicating authority on 11.06.2024. <br /> xi. The appellant, EIEL had given a sponsor undertaking with respect to <br /> financial facility extended to SPV including HHPL. <br /> xii. In the CIRP of the appellant, claims were filed by financial creditors <br /> including Bank of India, under which shortfall undertaking given by <br /> sponsorer i.e., appellant were also included. Claim pertaining to <br /> shortfall with respect to dues of HHPL was also filed by lenders in the <br /> CIRP of the appellant. <br /> xiii. The lenders assigned their debt in favour of NARCL on 28.03.2024. <br /> xiv. On 05.09.2024, an Agreement for the sharing of arbitral proceeds was <br /> executed between the appellant, assenting financial creditors including <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>5 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> the NARCL to give effect to Part B of the resolution plan detailing terms <br /> and conditions for the distribution of proceeds from arbitration awards <br /> of SPVs in terms of the resolution plan. <br /> xv. NARCL filed an application under Section 7 against EIIL the corporate <br /> guarantor being C.P. (IB) No.172/2025 alleging default and principal <br /> amount of Rs.143,75,79,510/- along with the interest. The corporate <br /> guarantor, EIIL had given corporate guarantee to the Bank of India for <br /> the amount of Rs.143,75,79,510/-. Date of default mentioned in Part <br /> IV was 03.04.2019. <br /> xvi. Prior to filing of Section 7 application against the corporate guarantor, <br /> the NARCL has filed a Section 7 application being C.P. (IB) No.777/2024 <br /> against HHPL claiming total default of amount i.e., <br /> Rs.2,386,51,75,911/- as on 08.08.2024 and date of default was <br /> mentioned on 24.02.2017. <br /> xvii. In the C.P. (IB) No.777/2024 notices were issued, corporate debtor <br /> HHPL filed its reply opposing the application. In C.P. (IB) No.777/2024, <br /> the appellant EIIL has filed an intervention application being INV.P. <br /> No.59/2025. Similarly, C.P. (IB) No.172/2025 filed against EIIL, <br /> intervention petition was filed by the appellant. <br /> xviii. Adjudicating authority heard the C.P. (IB) No.172/2025, C.P. (IB) <br /> No.777/2024 as well as INV.P. No.59/2025 &amp; INV.P. No.60/2025 by <br /> separate orders dated 04.11.2025. C.P. (IB) No.777/2024 against the <br /> HHPL has been admitted and by order of the same date, INV.P. <br /> No.60/2025 filed in C.P. (IB) No.774/2025 has been rejected. By order <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>6 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> of the same date 04.11.2025, C.P. (IB) No.172/2025 against EIIL has <br /> been admitted and by order of the same date, INV.P. No.59/2025 filed <br /> by the appellant in C.P. (IB) No.172/2025 has been rejected. <br /> xix. Aggrieved against the order passed in C.P. (IB) No.172/2025 admitting <br /> Section 7 application, Comp. App. (AT) (Ins.) No.1693/2025 has been <br /> filed, against the order dated 04.11.2025 rejecting INV.P. No.59/2025, <br /> Comp. App. (AT) (Ins.) No.1693/2025 has been filed, against an order <br /> dated 04.11.2025 admitting C.P. (IB) No.777/2024, Comp. App. (AT) <br /> (Ins.) No.1695/2025 has been filed and against an order dated <br /> 04.11.2025 rejecting INV.P. No.60/2025, Comp. App. (AT) (Ins.) <br /> No.1697/2025 has been filed. <br /> <b>3.</b> <b> </b> We have heard learned Sr. counsel Mr. Krishnendu Dutta appearing for <br /> the appellant in Comp. App. (AT) (Ins.) Nos. 1693 &amp; 1694/2025 and learned <br /> Sr. counsel Mr. Abhijeet Sinha appearing for the appellant in Comp. App. (AT) <br /> (Ins.) Nos. 1695 &amp; 1697/2025. Learned Sr. counsel Mr. Arun Kathpalia has <br /> appeared for NARCL, the financial creditor. Learned counsel Ms. Smriti <br /> Churiwal has appeared for Resolution Professional (RP). <br /> <b> </b><br /> <b>4.</b> The submission which has been advanced by learned counsel for the <br /> appellant being common in the above appeals, they are being referred to as <br /> submissions of the appellant. <br /> <b>5.</b> <b> </b> Learned counsel for the appellant submitted that Section 7 application <br /> filed by NARCL against the HHPL, principal borrower and EIIL, the corporate <br /> guarantor was not maintainable. It is submitted that in the resolution plan <br /> of the appellant the holding company, the lenders of HHPL had already filed <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>7 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> their claim, which claim was admitted and dealt with in the resolution plan. <br /> When the lenders have filed their claim and Form-C filed in the CIRP of the <br /> appellant clearly mentions dues against SPV also i.e., HHPL and the said debt <br /> has been dealt and resolved in the CIRP no legally enforceable debt subsists <br /> on the date of filing of the Section 7 application by NARCL, hence the order of <br /> admission passed by NCLT is wholly unsustainable. It is submitted that after <br /> approval of the resolution plan by the adjudicating authority in the CIRP of <br /> the appellant dated 11.06.2024 and after the Sharing of Arbitral Process <br /> Agreement (SAP Agreement) was entered on 05.09.2025 between the <br /> appellant, lenders and NARCL providing for distribution of the receipt of <br /> arbitral proceeding relating to SPV, there was no occasion to file any Section <br /> 7 application by the NARCL against the principal borrower and corporate <br /> guarantor. It is submitted that the resolution plan approved by the <br /> adjudicating authority under Section 31 is binding on lenders which include <br /> NARCL, the assignee of the debt by lenders. Initiation of proceedings under <br /> Section 7 against HHPL and corporate guarantor shall lead to non-<br /> implementation of the resolution plan approved on 11.06.2024 which is <br /> impermissible. The debts of lender including the debt due on SPV i.e., HHPL <br /> having been admitted, addressed, resolved and extinguished after the <br /> approval of the resolution plan on 11.06.2024, there is no legally enforceable <br /> debt to initiate any proceedings under Section 7. It is submitted that <br /> intervention application filed by the appellant in C.P. (IB) of principal borrower <br /> and corporate guarantor has been erroneously rejected, appellant being <br /> holding company and having claimed that debt claimed in Section 7 <br /> application has already been resolved was entitled to be permitted to <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>8 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> intervention in the CIRP process in the proceeding before the NCLT. The debt <br /> which is claimed in Section 7 application against the principal borrower and <br /> corporate guarantor stood eclipsed and extinguished in the CIRP of the <br /> appellant. There was treatment of HHPL debt under the approved resolution <br /> plan. Arbitral proceeds of HHPL form an integral part of the appellant’s <br /> resolution framework. CIRP of EIIL frustrates implementation of the <br /> resolution plan approved on 24.06.2024. Impugned order fails to consider <br /> and adjudicate submissions advanced by the appellant in intervention <br /> petition. <br /> <b>6.</b> <b> </b> Learned Sr. counsel Mr. Arun Kathaplia appearing for the financial <br /> creditor refuting the submissions of the counsel for the appellant submits <br /> that the debt of lenders qua the EIEL were resolved and extinguished. The <br /> claim which was filed by the lenders in the CIRP of the EIEL were with respect <br /> to sponsor’s shortfall undertaking which was an unsecured debt. The above <br /> unsecured debt was dealt with in the resolution plan of the appellant. The <br /> debt of HHPL arise from Term Loan Agreements I, II &amp; III which has security <br /> documents. The debt of lenders was secured debt with respect to HHPL, the <br /> secured debt of lenders due against HHPL cannot be extinguished in CIRP of <br /> the appellant. The resolution plan dated 20.09.2022 filed in CIRP of the <br /> appellant does not extinguish/deal with the liability of the debt owed by the <br /> corporate debtor under term loans. There was no release of security created <br /> by principal borrower in the resolution plan of appellant. Pay out proposed <br /> in the resolution plan of the appellant was toward assenting unsecured <br /> financial creditors which pay out has no relation with respect to secured debt <br /> of lenders against the term loan extended to HHPL. The submission of the <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>9 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> appellant that entire debt against the principal borrower and corporate <br /> guarantor was eclipsed by approval of the resolution plan of the appellant is <br /> misconceived. In the CIRP of the appellant, a clarification affidavit dated <br /> 28.11.2022 was filed by the Successful Resolution Applicant (SRA) clarifying <br /> that there shall be no effect on the obligation of the personal guarantor for the <br /> debt of the corporate debtor and shall not discharg the claims of unsecured <br /> financial creditor who will continue to retain their rights for realisation of the <br /> debt from the principal debtor/any other guarantor. Sharing of arbitral <br /> proceeds does not discharge the secured financial debt of financial creditor <br /> against principal borrower. In any event, the said is private inter se <br /> arrangement for sharing of arbitral proceeds cannot, in law, operate as a <br /> waiver, novation, or satisfaction of a secured financial debt. It is submitted <br /> that Bareilly Highways Project Limited was also a SPV of the appellant who <br /> was also included in sharing of Arbitral Proceeds Agreement. SBI filed an <br /> application under Section 7 against Bareilly Highways Project Limited. It is <br /> submitted that adjudicating authority has rightly admitted Section 7 <br /> application. It is further submitted that appellant being a shareholder of the <br /> corporate debtor does not have any locus to challenge the admission of the <br /> CIRP. It is submitted that shareholder has no locus to challenge that <br /> admission of CIRP of the corporate debtor. <br /> <b>7.</b> <b> </b> We have considered the submissions of the counsel for the parties and <br /> perused the records. <br /> <b>8.</b> <b> </b> The entire focus of the counsel for the appellant challenging the <br /> impugned order is based on resolution plan’s approval in the CIRP of the <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>10 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> appellant dated 11.06.2024. As noted above, it is contended that the lenders <br /> of HHPL also filed their claim in the CIRP of the appellant, which claim clearly <br /> tallies with the claim which has been made in Section 7 application filed <br /> against the principal borrower. It is submitted that when the lenders by filing <br /> their claim in Form-C which claim also included the dues against the SPV i.e., <br /> HHPL and said dues have been resolved and pay outs have been made to the <br /> lenders for same debt, no proceedings under Section 7 can be initiated <br /> subsequently by the financial creditor against the SPV, HHPL and the <br /> corporate guarantor. <br /> <b>9.</b> <b> </b> Appellant has filed a convenience compilation dated 19.11.2025 on <br /> which convenience compilation, both the parties have placed reliance. We <br /> thus refer to the convenience compilation and the documents included therein <br /> while considering the submissions of both the parties. CIRP against the <br /> appellant i.e., EIEL commenced by order dated 08.05.2018 in C.P. (IB) <br /> No.190/PB/2017 filed by Union Bank of India. As noted above, a consortium <br /> of lenders lead by Axis Bank has extended term loan was for Rs.690.60 crore <br /> to HHPL. Common Rupee Term Loan was executed on 31.07.2010. <br /> Additional term loan of Rs.290.48 crore referred to as Term Loan II was <br /> extended and further Term Loan III of Rs.51.26 crore was extended by Axis <br /> Bank and Union Bank of India and UCO Bank in the year 2017, with respect <br /> to aforesaid term loans, sponsor’s undertaking was given by the appellant. <br /> We may refer to Common Rupee Term Loan Agreement entered between the <br /> HHPL and the Axis Bank, in which clause 6.1.32 promotors/sponsors <br /> undertaking was contained. Clause 6.1.32(b) is as follows: <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>11 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> <i>“6.1.32 Promoters/Sponsors’ Undertaking </i><br /> <i>The Borrower shall procure that Sponsors shall furnish </i><br /> <i>the following undertakings </i><br /> <i>(b) in the event of Termination, Payments received </i><br /> <i>upon the termination of Concession Agreement is </i><br /> <i>not sufficient to meet the Outstanding Due </i><br /> <i>Amount EFEL, shall make good such shortfall” </i><br /> <b>10.</b> <b> </b> A sponsors undertaking was given by the appellant in the above <br /> reference dated 31.07.2010. Clause 5 was with regard to undertaking for <br /> termination shortfall. Clause 5 of sponsors undertaking is as follows: <br /> <b><i>“5. </i></b> <b><i>UNDERTAKING </i></b> <b><i>FOR </i></b> <b><i>TERMINATION </i></b><br /> <b><i>SHORTFALL </i></b><br /> <i>In the event that the Termination Payments (as defined </i><br /> <i>under the Concession Agreement) are not adequate to </i><br /> <i>repay the Dues in full, then EIEL undertakes to pay </i><br /> <i>to/deposit with the Senior Lender the Shortfall </i><br /> <i>Amounts within three (3) days of the date of notice of </i><br /> <i>demand from the Senior Lender/ Lender&#x27;s Agent. </i><br /> <i>For the purposes of this Agreement, the term &quot;Shortfall </i><br /> <i>Amounts&quot; shall mean the Dues minus the amounts </i><br /> <i>demanded from and payable by NHAI as Termination </i><br /> <i>Payments pursuant to the notice of demand in this </i><br /> <i>regard. </i><br /> <i>EIEL shall forthwith on demand as stated herein (and </i><br /> <i>in any event within three (3) Business Days of the </i><br /> <i>demand) and without any contest, dispute or demur, </i><br /> <i>pay to the Security Trustee the whole of the Shortfall </i><br /> <i>Amounts, and/or any other monies as may be then </i><br /> <i>due to the Senior Lender in respect of the Loan Facility. </i><br /> <i>This undertaking shall remain in full force and effect </i><br /> <i>until all the Dues of the Senior Lender has been </i><br /> <i>discharged in full to the satisfaction of the Senior </i><br /> <i>Lender and the Senior Lender certifies the same in </i><br /> <i>writing.” </i><br /> <b>11.</b> <b> </b> Now we come to Form-C claim submitted by the lenders in the CIRP of <br /> the appellant. For example, we ma refer to Form-C filed by the Union Bank <br /> of India dated 14.02.2014 in the CIRP of EIEL. The entire claim of Union <br /> Bank of India was Rs.2365,82,64,753/- as on 08.05.2018. The breakup of <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>12 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> the claim was mentioned in which HHPL was also mentioned. It is useful to <br /> notice the breakup of exposure in column 4, which is as follows: <br /></div><table><thead><tr><th>S.&lt;br&gt;No.</th><th>PARTICULARS</th><th></th></tr></thead><tbody><tr><td>4.</td><td>Total Amount&lt;br&gt;of Claim&lt;br&gt;(including any&lt;br&gt;interest as at&lt;br&gt;the insolvency&lt;br&gt;commencement&lt;br&gt;date)</td><td>Rs.2365,82,64,753.78&lt;br&gt;(Rupees Two thousand&lt;br&gt;three hundred sixty five&lt;br&gt;crore eighty two lakh&lt;br&gt;sixty four thousand&lt;br&gt;seven hundred fifty&lt;br&gt;three and paise seventy&lt;br&gt;eight only) as at the&lt;br&gt;insolvency&lt;br&gt;commencement date i.e.&lt;br&gt;on 08.05.2018. Details&lt;br&gt;are given in Annexure-1. It&lt;br&gt;includes, BGs of Rs.40.71&lt;br&gt;crore which are&lt;br&gt;outstanding in the account&lt;br&gt;as on date (including&lt;br&gt;expired BGs of Rs.20.32&lt;br&gt;crore.&lt;br&gt;[Exposure in India:&lt;br&gt;Rs.2157,91,99,209.38]*&lt;br&gt;(Rupees Two thousand&lt;br&gt;one hundred fifty seven&lt;br&gt;crore ninety one lakh&lt;br&gt;ninety nine thousand&lt;br&gt;two hundred nine and&lt;br&gt;paise thirty eight only)&lt;br&gt;as on 08.05.2018&lt;br&gt;Exposure in Hong Kong&lt;br&gt;(EIEL): USD&lt;br&gt;30,991,511.43 (United&lt;br&gt;States Dollar Thirty Million&lt;br&gt;Nine Hundred Ninety One&lt;br&gt;Thousand Five Hundred&lt;br&gt;Eleven And Forty Three&lt;br&gt;Cents) equivalent to&lt;br&gt;Rs.2,079,065,544.40&lt;br&gt;(Rupees Two hundred&lt;br&gt;Seven Crores Ninety Lakh</td></tr></tbody></table><div><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>13 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /></div><table><thead><tr><th></th><th></th><th>Sixty Five Thousand Five&lt;br&gt;Hundred Forty Four And&lt;br&gt;Paisa Forty only) at an&lt;br&gt;exchange rate of&lt;br&gt;Rs.67.085 per USD) as on&lt;br&gt;08.05.2018.</th></tr></thead><tbody></tbody></table><div><br /> <i></i> The break-up of exposure in India is as under:- *<br /></div><table><thead><tr><th>Name of the Company</th><th>Claim Amount</th></tr></thead><tbody><tr><td>Era Infra Engineering&lt;br&gt;Limited-Crystallised&lt;br&gt;liability&lt;br&gt;Outstanding BGs</td><td>1675,07,87,270.72&lt;br&gt;40,71,04,257.00</td></tr><tr><td>Dehradun Highways&lt;br&gt;Project Limited</td><td>53,56,749,26.98</td></tr><tr><td>Haridwar Highways Project&lt;br&gt;Limited</td><td>170,00,22,883.39</td></tr><tr><td>Bareilly Highways Project&lt;br&gt;Limited</td><td>218,56,09,871.29</td></tr><tr><td>Total</td><td>2157,91,99,209.38</td></tr></tbody></table><div><br /> <b>12.</b> <b> </b> In the claim form with respect to security mentioned, there was no <br /> reference of any security by HHPL. Similarly, we may also notice the claim <br /> Form-C filed by Bank of India dated 31.01.2019 the proof of claim was <br /> submitted by Bank of India in respect of the CIRP in the case of M/s. EIEL. <br /> The claim form mentioned that Bank of India has sanctioned the security <br /> facility to M/s. HHPL. Details of securities were also mentioned in the claim <br /> form. <br /> <b>13.</b> <b> </b> It is an admitted fact between the parties that the claim of lenders with <br /> respect to claim under shortfall undertaking against the EIEL was unsecured <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>14 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> claim and was admitted as unsecured claim and treatment of unsecured claim <br /> was given in the resolution plan. Pay out to assenting financial creditors in <br /> the financial proposal in the plan is as follows: <br /> <b><i>“PART – B: FINANCIAL PROPOSAL </i></b><br /> <b><i>1. BID AMOUNT </i></b><br /></div><table><thead><tr><th>For</th><th>In Amount (INR in&lt;br&gt;Crores)</th><th></th><th>Details</th></tr></thead><tbody><tr><td></td><td>Upfront&lt;br&gt;Payment&lt;br&gt;Amount</td><td>Committed&lt;br&gt;Payment</td><td>Residual&lt;br&gt;Payment</td></tr><tr><td>A. Mandatory Payments</td><td></td><td></td><td></td></tr><tr><td>Payouts to&lt;br&gt;Unsecured&lt;br&gt;Assenting&lt;br&gt;Financial&lt;br&gt;Creditors</td><td>1</td><td>NA</td><td>The Resolution&lt;br&gt;Applicant&lt;br&gt;proposes to share&lt;br&gt;the proceeds&lt;br&gt;received from&lt;br&gt;arbitral awards&lt;br&gt;in the manner as&lt;br&gt;set out below:&lt;br&gt;Procee %&lt;br&gt;ds&lt;br&gt;Propos&lt;br&gt;from&lt;br&gt;ed to&lt;br&gt;Arbitr&lt;br&gt;be&lt;br&gt;al&lt;br&gt;share&lt;br&gt;Award&lt;br&gt;d ****&lt;br&gt;s (Rs.&lt;br&gt;Crores&lt;br&gt;)&lt;br&gt;&gt;3000 10%&lt;br&gt;The Resolution&lt;br&gt;Applicant&lt;br&gt;proposes to issue&lt;br&gt;1% Equity Shares&lt;br&gt;of the Company to&lt;br&gt;the unsecured&lt;br&gt;Assenting&lt;br&gt;Financial</td></tr></tbody></table><table><thead><tr><th>Procee&lt;br&gt;ds&lt;br&gt;from&lt;br&gt;Arbitr&lt;br&gt;al&lt;br&gt;Award&lt;br&gt;s (Rs.&lt;br&gt;Crores&lt;br&gt;)</th><th>%&lt;br&gt;Propos&lt;br&gt;ed to&lt;br&gt;be&lt;br&gt;share&lt;br&gt;d ****</th></tr></thead><tbody><tr><td>&gt;3000</td><td>10%</td></tr></tbody></table><div><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>15 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /></div><table><thead><tr><th></th><th></th><th></th><th>Creditors on the&lt;br&gt;Closing Date.”</th></tr></thead><tbody></tbody></table><div><br /> <b>14.</b> <b> </b> Release and securities interest were also mentioned in resolution plan. <br /> In clause 6, item No. 2 with regard to release and securities, following has <br /> been stated: <br /> <i>“6. TERMS AND CONDITIONS OF THE COMMITTED </i><br /> <i>PAYMENTS </i><br /></div><table><thead><tr><th>S. No.</th><th>Particulars</th><th>Heads and References</th></tr></thead><tbody><tr><td>2.</td><td>Release of&lt;br&gt;Security Interest</td><td>The Information&lt;br&gt;Memorandum enlists&lt;br&gt;the following securities&lt;br&gt;which are charged to the&lt;br&gt;Secured Financial&lt;br&gt;Creditors. For the sake&lt;br&gt;of abundant caution, the&lt;br&gt;following is the list of&lt;br&gt;securities which are&lt;br&gt;charged to the Secured&lt;br&gt;Financial Creditors, as&lt;br&gt;stated in the Information&lt;br&gt;Memorandum is&lt;br&gt;outlined below.&lt;br&gt;The Resolution&lt;br&gt;Applicant states that on&lt;br&gt;and from the Closing&lt;br&gt;Date, the security&lt;br&gt;interest of the Secured&lt;br&gt;Financial Creditors over&lt;br&gt;the assets mentioned&lt;br&gt;below shall stand&lt;br&gt;released. No separate&lt;br&gt;consent shall be sought&lt;br&gt;from the Secured&lt;br&gt;Financial Creditors for&lt;br&gt;monetization of the&lt;br&gt;these secured assets.&lt;br&gt;1. Charge on Fixed&lt;br&gt;assets of the Corporate&lt;br&gt;Debtor;</td></tr></tbody></table><div><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>16 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /></div><table><thead><tr><th></th><th></th><th>2. Exclusive and pari-&lt;br&gt;passu charges by way&lt;br&gt;of hypothecation on&lt;br&gt;equipments and&lt;br&gt;machinery of the&lt;br&gt;Corporate Debtor;&lt;br&gt;3. Pari-passu first&lt;br&gt;charge on inventory cum&lt;br&gt;book debts/ current&lt;br&gt;assets of the Corporate&lt;br&gt;Debtor;&lt;br&gt;4. Non-disposal&lt;br&gt;Undertaking and Power&lt;br&gt;of Attorney (NDU-PoA)&lt;br&gt;executed by the&lt;br&gt;Corporate Debtor;&lt;br&gt;5. Charge over Debt&lt;br&gt;Servicing Reserve&lt;br&gt;Account of the Corporate&lt;br&gt;Debtor;&lt;br&gt;6. Charge on the&lt;br&gt;immovable property&lt;br&gt;admeasuring 1670.75&lt;br&gt;sq. mts. forming part of&lt;br&gt;Survey No.855 situated&lt;br&gt;at Mouje Indrad, Kadi&lt;br&gt;Taluka, District&lt;br&gt;Mehsaana, and Gujarat;&lt;br&gt;7. Charge on land&lt;br&gt;situated at in the limits&lt;br&gt;of Kothur Revenue&lt;br&gt;Village,&lt;br&gt;Grampanchayath a&lt;br&gt;Mandal, Mehboobnagar,&lt;br&gt;Andhara Pradesh in the&lt;br&gt;name of the Corporate&lt;br&gt;Debtor;&lt;br&gt;8. Charge on land &amp;&lt;br&gt;Building situated at&lt;br&gt;Khewat No, 387 Min,&lt;br&gt;Mustikit/Kila No.&lt;br&gt;90/3/3,3,5,6,7 and&lt;br&gt;8/1, Intikal No. 1590,&lt;br&gt;Sakna Khori, Tehsil&lt;br&gt;Dadri, District Bhiwani,</th></tr></thead><tbody></tbody></table><div><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>17 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /></div><table><thead><tr><th></th><th></th><th>Haryana measuring&lt;br&gt;3.98125 acre;&lt;br&gt;9. Charge on land&lt;br&gt;situated at Mehsana,&lt;br&gt;Gujarat area 1770.065&lt;br&gt;sq. yard in the name of&lt;br&gt;the Corporate Debtor;&lt;br&gt;10. Release of all pledge&lt;br&gt;on shares held by the&lt;br&gt;Coprorate Debtor in its&lt;br&gt;special purpose vehicles&lt;br&gt;and/or its subsidiaries;&lt;br&gt;11. Kelease of charge on&lt;br&gt;all intangible assets of&lt;br&gt;the Corporate Debtor;&lt;br&gt;12. rights, interest, and&lt;br&gt;obligations of the&lt;br&gt;Corporate Debtor&lt;br&gt;assigned in favour of all&lt;br&gt;lenders.</th></tr></thead><tbody></tbody></table><div><br /> <b>15.</b> <b> </b> From the above release of securities, it is clear that there was no <br /> security of principal borrower which was included therein. Learned counsel <br /> for the financial creditor has referred to and relied on the clarification affidavit <br /> which was filed by the SRA in the CIRP of the appellant. Clarification affidavit <br /> dated 28.11.2022 has been brought on record is part of the convenience <br /> compilation. The affidavit clearly mentioned that clarification shall be integral <br /> part of the resolution plan and in event of any contradiction between the <br /> proposal contained in the resolution plan and clarification, clarification shall <br /> prevail. Paragraph 8 of the affidavit is as follows: <br /> <i>“8. Since, the clarifications as submitted by the </i><br /> <i>Resolution Applicant are vital for proper understanding </i><br /> <i>of the intent and overall effect of various proposals </i><br /> <i>proposed by the Resolution Applicant vide its </i><br /> <i>Resolution Plan, it is essential that the Resolution </i><br /> <i>Applicant make a binding statement to affirm the true </i><br /> <i>intent and effect of the said Clarifications in the context </i><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>18 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> <i>of the Resolution Plan as submitted by the Resolution </i><br /> <i>Applicant in the CIRP of the Corporate Debtor, </i><br /> <i>accordingly, by way of this affidavit, it is hereby duly </i><br /> <i>affirmed and stated on behalf of the Resolution </i><br /> <i>Applicant that: </i><br /> <i>a. The Clarifications submitted by the Resolution </i><br /> <i>Applicant as per the Annexures II &amp; Annexure III </i><br /> <i>attached, have been given in pursuance to the </i><br /> <i>queries and clarifications sought by the CoC in the </i><br /> <i>CIRP of the Corporate Debtor under section 30 of </i><br /> <i>the Code with full knowledge and belief that the </i><br /> <i>said Clarifications shall convey the true intent </i><br /> <i>and effect of the relevant provisions of the </i><br /> <i>Resolution Plan of the Resolution Applicant. </i><br /> <i>b. Such Clarifications shall be binding on the </i><br /> <i>Resolution Applicant and shall form integral part </i><br /> <i>of the Resolution Plan and the Resolution Plan of </i><br /> <i>the Resolution Applicant will be considered by the </i><br /> <i>CoC in the light of such clarifications. </i><br /> <i>c. The Clarifications are irrevocable and binding </i><br /> <i>on the Resolution Applicant and the same can be </i><br /> <i>relied upon the CoC and the Hon&#x27;ble INCLT, in the </i><br /> <i>event the Resolution Plan of the Resolution </i><br /> <i>Applicant is considered for approval by the CoC in </i><br /> <i>its commercial wisdom. </i><br /> <i>d. In the event of any contradiction between the </i><br /> <i>proposals contained in the Resolution Plan of the </i><br /> <i>Resolution Applicant and the Clarifications, the </i><br /> <i>contents of the Clarifications shall prevail, and the </i><br /> <i>provisions of the Resolution Plan of the Resolution </i><br /> <i>Applicant will be construed in the light of the </i><br /> <i>Clarifications and explanations as provided and </i><br /> <i>submitted by the Resolution Applicant.” </i><br /> <b>16.</b> <b> </b><br /> Clarifications are contained in Annexure 2 which was part of the <br /> clarification affidavit. Clause relating to release of the security clarification <br /> was provided in Annexure 2, which is at page 263 to 267 of the convenience <br /> compilation. It was clarified that transaction is proposed to be discharged on <br /> the claim of the unsecured financial creditor against the corporate debtor and <br /> the unsecured financial creditor will continue to retain all their rights for <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>19 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> realisation of their debt from the principal debtor/any other guarantor as per <br /> terms of the Loan Agreement. It is useful to notice following part: <br /> <b><i>“Addendum to Additional Clarifications to be </i></b><br /> <b><i>provided by the Resolution Applicant </i></b><br /> <b><i>RESOLUTION </i></b> <b><i>PLAN </i></b> <b><i>SUBMITTED </i></b> <b><i>BY </i></b> <b><i>SA </i></b><br /> <b><i>INFRASTRUCTURE </i></b> <b><i>CONSULTANTS </i></b> <b><i>PRIVATE </i></b><br /> <b><i>LIMITED </i></b><br /> <b><i>IN </i></b> <b><i>CORPORATE </i></b> <b><i>INSOLVENCY </i></b> <b><i>RESOLUTION </i></b><br /> <b><i>PROCESS OF ERA INFRA ENGINEERING LIMITED </i></b><br /></div><table><thead><tr><th>1.</th><th>Clauses/Part&lt;br&gt;of the&lt;br&gt;Resolution&lt;br&gt;Plan</th><th>Contents of&lt;br&gt;Clause/Provisions</th><th>Clarifications&lt;br&gt;required/provided&lt;br&gt;by the Resolution&lt;br&gt;Applicant</th><th>Addendum to the&lt;br&gt;Additional&lt;br&gt;Clarification&lt;br&gt;sought</th></tr></thead><tbody><tr><td></td><td></td><td></td><td></td><td>It is clarified that the&lt;br&gt;steps as mentioned&lt;br&gt;above is not&lt;br&gt;intended to cause&lt;br&gt;any effect on the&lt;br&gt;obligations of the&lt;br&gt;guarantors/personal&lt;br&gt;guarantors for the&lt;br&gt;debt of the Corporate&lt;br&gt;Debtor, or cause any&lt;br&gt;restriction on the&lt;br&gt;rights of the secured&lt;br&gt;Financial Creditors&lt;br&gt;on any other&lt;br&gt;securities provided&lt;br&gt;by third parties as&lt;br&gt;additional collateral&lt;br&gt;for the debt of the&lt;br&gt;Corporate Debtor in&lt;br&gt;any manner&lt;br&gt;whatsoever.&lt;br&gt;Please note that&lt;br&gt;these figures are&lt;br&gt;approximate and&lt;br&gt;might change&lt;br&gt;slightly at the stage&lt;br&gt;of finalisation of the&lt;br&gt;Definitive&lt;br&gt;Documents.</td></tr></tbody></table><div><br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>20 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /></div><table><thead><tr><th></th><th></th><th></th><th></th><th>It is clarified that&lt;br&gt;100% of the balance&lt;br&gt;Admitted Unsecured&lt;br&gt;Financial Debt&lt;br&gt;(which are all in the&lt;br&gt;nature of liabilities&lt;br&gt;on account of&lt;br&gt;Corporate&lt;br&gt;Guarantees will be&lt;br&gt;converted into 1%&lt;br&gt;common equity of the&lt;br&gt;Company and&lt;br&gt;issued to the&lt;br&gt;unsecured Financial&lt;br&gt;Creditors in the ratio&lt;br&gt;of their Admitted&lt;br&gt;Unsecured Debt.&lt;br&gt;It is also clarified&lt;br&gt;that this transaction&lt;br&gt;is proposed to be a&lt;br&gt;discharge on the&lt;br&gt;Claims of the&lt;br&gt;unsecured Financial&lt;br&gt;Creditors against the&lt;br&gt;Corporate Debtor.&lt;br&gt;The unsecured&lt;br&gt;Financial Creditors&lt;br&gt;will continue to&lt;br&gt;retain all their rights&lt;br&gt;for realization of&lt;br&gt;their Debts from the&lt;br&gt;principal debtor/any&lt;br&gt;other guarantor as&lt;br&gt;per the terms of the&lt;br&gt;loan agreements.</th></tr></thead><tbody></tbody></table><div><br /> <b>17.</b> <b> </b> The claim which was filed by the lenders in the CIRP of the appellant <br /> <i>qua</i> the SPV, HHPL was towards the shortfall undertaking. The appellant <br /> EIEL who had given sponsors undertaking was liable to pay as per shortfall <br /> undertaking, hence the claim was filed against the EIEL by the lenders <br /> towards the shortfall undertaking. By approval of the resolution plan, the <br /> unsecured debt of the lenders has to be held to be satisfied but the said <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>21 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> satisfaction shall be with respect to the EIEL not any debt which was owed to <br /> lenders by SPV. The debt of lenders against the SPV, HHPL was based on <br /> separate Term Loan Agreement and was secured debt in view of the security <br /> documents mentioned in the Loan Agreement. The debt owed by HHPL to the <br /> lenders arising out of Term Loan Agreements cannot be treated to have been <br /> extinguished by approval of resolution plan of EIEL. <br /> <b> </b><br /> <b>18.</b> The submission which has been pressed by the appellant that in view <br /> of the approval of the resolution of EIEL, where claim of lenders which relates <br /> to HHPL has also been dealt with the entire debt shall be eclipsed and there <br /> was no enforceable debt against HHPL to initiate Section 7 application cannot <br /> be accepted. The debt owed by EIEL to the lenders arising out of shortfall <br /> undertaking given by sponsors to the lenders of HHPL and the debt owed by <br /> the HHPL to the lenders arising out of separate Term Loan Agreements are <br /> two different debt. The clauses of the resolution plan cannot be read to mean <br /> that it has extinguished the debt of the lenders <i>qua</i> the HHPL by virtue of the <br /> approval of the resolution plan of EIEL. One more submission advanced by <br /> the appellant needs to be noticed. Learned counsel for the appellant submits <br /> that an Agreement dated 05.09.2025 was entered between EIEL, assenting <br /> secured financial creditor, assenting unsecured financial creditor and SRA <br /> where arbitral proceeds mentioned in Schedule II were dealt with where it was <br /> agreed to pursue all arbitration proceedings by the resolution applicant and <br /> the company. In Schedule II HHPL is mentioned at item No. 48. Submission <br /> is that when arbitral proceeds from HHPL are to be distributed as per <br /> resolution plan, initiation of CIRP against the HHPL shall frustrate the <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>22 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> implementation of the plan. Paragraph 2.2 of the Arbitral Proceeds Agreement <br /> is as follows: <br /> <i>“2.2 The Company hereby agrees and undertakes that, </i><br /> <i>upon receipt of any Arbitral Proceeds, whether before </i><br /> <i>or after the Closing Date, it shall promptly transfer </i><br /> <i>such proceeds to the Assenting Financial Creditors in </i><br /> <i>the following percentages: </i><br /> <i>2.2.1 Secured Creditors </i><br /></div><table><tbody><tr><td>Gross Proceeds received from&lt;br&gt;Arbitral Awards (INR Crores)</td><td>% Proposed to be&lt;br&gt;shared</td></tr><tr><td>Upto 450</td><td>84%</td></tr><tr><td>&gt;450 – 1500</td><td>40%</td></tr><tr><td>&gt;1500-2500</td><td>50%</td></tr><tr><td>&gt;2500-3500</td><td>55%</td></tr><tr><td>&gt;3500</td><td>65%</td></tr></tbody></table><div><br /> <i>2.2.2 Unsecured Creditors </i><br /></div><table><tbody><tr><td>Gross Proceeds received from&lt;br&gt;Arbitral Awards (INR Crores)</td><td>% Proposed to be&lt;br&gt;shared</td></tr><tr><td>&gt;3000</td><td>10%</td></tr></tbody></table><div><br /> <b>19.</b> <b> </b> When we look into the above Agreement at best which mentions that <br /> 10% arbitral proceed shall be shared entitlement of unsecured creditors, the <br /> said Agreement in no manner prohibit the financial creditor to exercise their <br /> statutory rights under Section 7 when a default is committed by HHPL to <br /> whom the lenders have advanced Term Loan I, Term Loan II &amp; Term Loan III <br /> by separate Rupee Term Loan Agreement. We thus are not persuaded to <br /> accept the submission of the appellant that admission of Section 7 application <br /> against the HHPL shall make the resolution plan of EEIL unimplementable. <br /> The rights of the financial creditor under Section 7 to proceed against the <br /> principal borrower and the corporate guarantor are separate and independent <br /> rights, which rights can be exercised by the financial creditor without any <br /> kind of fetter from the approval of the resolution plan of the EIEL. Initiation <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>23 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> of Section 7 application against the corporate guarantor in respect to the <br /> corporate guarantee dated 29.06.2016 given by corporate guarantor i.e., EIIL <br /> to the Bank of India is an admitted fact after invocation of the guarantee the <br /> proceedings have been initiated, in which we do not find any fetter. It is also <br /> on the record that the principal borrower in its Balance Sheet 2019-2020, <br /> 2020-2021 &amp; 2021-2022 has acknowledged the debt of lenders. <br /> <b> </b><br /> <b>20.</b> We thus are of the view that the debt of lenders towards principal <br /> borrower and the corporate guarantor shall not be eclipsed by approval of the <br /> resolution plan of the appellant be order dated 11.06.2024 passed by the <br /> adjudicating authority. Relevant clauses of the resolution plan and <br /> clarification affidavit given by the SRA we have already noticed which clearly <br /> indicate that the debt of unsecured financial creditor with respect to HHPL <br /> was not to be extinguished with and financial creditors were fully entitled to <br /> proceed. In the clarification affidavit (Annexure – 2) we had extracted the <br /> following statement “that unsecured financial creditor will continue to retain <br /> all their rights for realisation of their debts from the principal debtor/any <br /> other guarantor as per the terms of Loan Agreement”. The above clarification <br /> clearly dispels all doubts regarding entitlement of the financial creditor to <br /> proceed against the principal borrower and guarantor despite of the approval <br /> of the resolution plan in the CIRP of EIEL. <br /> <b>21.</b> <b> </b> One more submission which has been advanced by the counsel for the <br /> respondent is that appellant has no locus to file the appeal, they being only <br /> the shareholder of the principal borrower. Learned counsel for the respondent <br /> in support of his submissions has relied on the judgments of this Tribunal in <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>24 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> <b><i>‘Peninsula Holdings &amp; Investments Pvt. Ltd.’ Vs. ‘JM Financial Credit </i></b><br /> <b><i>Solutions Ltd. &amp; Ors.’</i></b> in <b>[Comp. App. (AT) (Ins.) No.1393/2025],</b> in <b><i>‘Nirej </i></b><br /> <b><i>Vadakkedathu Paul and Ors.’ Vs. ‘Sunstar Hotels and Estates Private </i></b><br /> <b><i>Limited and Anr.’</i></b> reported in <b>[2023 SCC OnLine NCLAT 102],</b> in <b><i>‘Park </i></b><br /> <b><i>Energy Pvt. Ltd.’ Vs. ‘State Bank of India &amp; Ors.’</i></b> in <b>[Comp. App. (AT) </b><br /> <b>(CH) (Ins.) No.62/2023]</b> and also in <b><i>‘Anant Kajare’ Vs. ‘Eknath Aher &amp; </i></b><br /> <b><i>Anr.’</i></b> reported in <b>[2017 SCC OnLine NCLAT 434].</b> The present is the case <br /> where appeal filed by the appellant challenging the order initiating Section 7 <br /> application against the principal borrower which is subsidiary company of the <br /> appellant is not based only on the challenge that appellant is shareholder and <br /> holding company of the corporate debtor rather the challenge has been made <br /> on the ground that debt of lenders which were part of the CIRP of the EIEL <br /> had extinguished on account of the approval of the resolution plan and <br /> initiation of CIRP against the principal borrower and corporate debtor shall <br /> cause hinderance in the implementation of the resolution plan of EIEL, the <br /> above ground raised by the appellant were sufficient to hold that appellant <br /> are person aggrieved within meaning of Section 61 of the IBC to enable them <br /> to have locus to file an appeal under Section 61 against the order admitting <br /> Section 7 application. <br /> <b>22.</b> <b> </b> Learned counsel for the appellant has also contended that adjudicating <br /> authority committed error in rejecting INV.P. No.59/2025 &amp; INV.P. <br /> No.60/2025 due to which, the relevant facts could not be pleaded and placed <br /> before the adjudicating authority. In the proceeding under Section 7 initiated <br /> against the principal borrower and the corporate guarantor, the debt of the <br /> financial creditor against the principal borrower and corporate guarantor fully <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>25 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> proved and adjudicating authority having find that default has been <br /> committed in payment of the debt proceeded to admit Section 7 application. <br /> The corporate debtor has appeared and opposed the application and <br /> submission made by the corporate debtor has already been noticed by the <br /> adjudicating authority in the impugned order. Adjudicating authority has <br /> rightly placed reliance on the judgement of the Hon’ble Supreme Court in <b><i>‘M. </i></b><br /> <b><i>Suresh Kumar Reddy’ Vs. ‘Canara Bank &amp; Ors.’</i></b> reported in <b>[(2023) 8 SCC </b><br /> <b>387],</b> where Hon’ble Supreme Court in paragraph 11 of the judgment has laid <br /> down following: <br /> <b><i>“11.</i></b> <i> Thus, once NCLT is satisfied that the default has </i><br /> <i>occurred, there is hardly a discretion left with NCLT to </i><br /> <i>refuse admission of the application under Section 7. </i><br /> <i>“Default” is defined under sub-section (12) of Section 3 </i><br /> <i>IBC which reads thus: </i><br /> <i>“</i> <b><i>3. Definitions</i></b> <i>.—In this Code, unless the context </i><br /> <i>otherwise requires— </i><br /> <b></b> *<br /> <i>(12) “default” means non-payment of debt when </i><br /> <i>whole or any part or instalment of the amount of </i><br /> <i>debt has become due and payable and is not </i><br /> <i>[paid] by the debtor or the corporate debtor, as the </i><br /> <i>case may be;” </i><br /> <i>Thus, even the non-payment of a part of debt when it </i><br /> <i>becomes due and payable will amount to default on the </i><br /> <i>part of a corporate debtor. In such a case, an order of </i><br /> <i>admission under Section 7 IBC must follow. If NCLT </i><br /> <i>finds that there is a debt, but it has not become due </i><br /> <i>and payable, the application under Section 7 can be </i><br /> <i>rejected. Otherwise, there is no ground available to </i><br /> <i>reject the application.” </i><br /> <b>23.</b> <b> </b> We thus are of the view that the corporate debtor was before the <br /> adjudicating authority and was heard, no error has been committed by the <br /> adjudicating authority in rejecting the intervention petition filed by the <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>26 of 27</i><br /> <b><i> </i></b><br /> <i> </i><br /><br /> appellant. In any view of the matter, we have entertained the appeal filed by <br /> the appellant under Section 61 challenging the order initiating Section 7 <br /> application and has considered the submission raised by the appellant on <br /> merits. In the appeal no other points have been pressed on behalf of the <br /> appellant. <br /> <b>24.</b> <b> </b> We do not find any error in the order passed by the adjudicating <br /> authority admitting Section 7 application against the principal borrower and <br /> the corporate guarantor and in rejecting intervention petition filed by the <br /> appellant in CIRP of the principal borrower of the corporate debtor. <br /> In result all the appeals are dismissed. <br /> <br /> <b>[Justice Ashok Bhushan] </b><br /> <b>Chairperson </b><br /> <b> </b><br /> <b> </b><br /> <b>[Barun Mitra] </b><br /> <b>Member (Technical) </b><br /> <b> </b><br /> <b>NEW DELHI </b><br /> <b><i>th</i></b><br /> <b><i>12</i></b> <b><i> March, 2026 </i></b><br /> <i>himanshu</i> <br /> <br /> <i>Comp. App. (AT) (Ins.) Nos. 1693 – 1695 &amp; 1697 of 2025 </i><br /> <i>27 of 27</i><br /> <b><i> </i></b><br /> <i> </i></div>