Unison Hotels Private Limited vs Iffco Tokio General Insurance Company Limited

Court
Delhi High Court

$~
* IN THE HIGH COURT OF DELHI AT NEW DELHI
Reserved on: 7 September 2026
Pronounced on: 16 September 2026

# CNR No. DLHC010059632026
+ FAO(OS) (COMM) 29/2026 & CM APPL. 11008/2026
UNISON HOTELS PRIVATE LIMITED .....Appellant
Through: Mr. Darpan Wadhwa and Mr.
Rajiv Nayar, Sr. Advs. with Mr. Ajay
Bhargava, Mr. Shivank Diddi, Mr. Arsh
Alok and Ms. Sanjana, Advs.

versus

IFFCO TOKIO GENERAL INSURANCE
COMPANY LIMITED .....Respondent
Through: Mr. A.S. Chandhiok, Sr. Adv.
with Ms. Bindu Saxena, Mr. Tanpreet
Gulati, Ms. Aparajita Swarup and Mr. Dhruv
Chandra Saxena, Advs.
CORAM:
HON'BLE MR. JUSTICE C. HARI SHANKAR
HON'BLE MR. JUSTICE VINOD KUMAR
JUDGMENT
% 16.09.2026

C. HARI SHANKAR, J.

S. No. Subject Para Nos
1. A The lis 1– 3
2. B Facts 4 – 9
3. C Submissions before the learned Single Judge 10-16
4. C.I Submissions of Insurance Company before the
learned Single Judge
11-13
5. C.II Submissions of UHPL before the learned Single
Judge.
14-16
6. D Findings of the learned Single Judge 17-20
7. E Rival Submissions before us 21-25
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 1 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

8. E.I Submissions of Mr. Darpan Wadhwa 22
9. E.II Submissions of Mr. Chandhiok 23
10. E.III Submissions of Mr. Wadhwa in rejoinder 24-25
11. F Statement of Defence 26-28
12. G The Arbitral Award 29-32

13. H The Legal Position 33-38.7
14. The decision in Lancor Holdings 37.1-37.13
15. Velusamy 38.1-38.7
16. I Applying the Law 39-84
17. I.1 Approach in the impugned judgment 39-40
18. I.2 Stand of Insurance Company before the Arbitral
Tribunal.
41
19. I.3 Approach of the learned Arbitral Tribunal –
Maintainability, as well as Clause 13, effectively
addressed.
42-54
20. I.4 Recourse of Section 14 not necessary. 55-56
21. I.5 Finding in impugned judgment on the aspect of
delay in rendition of the arbitral award, and its
effect.
57-58
22. I.6 Scope of Section 37 59-61
23. I.7 To remand or not? 62-63
24. I.8 “Merits need not be gone into” 64-66
25. I.9 Re. plea that delay by itself is sufficient to set
aside an arbitral award.
67
26. I.10 Re. plea that the learned Arbitral Tribunal failed
to address Clause 13 of the Policies.
68
27. I.11 Whether the delay was sufficiently explained 69-74
28. I.12 All issues discussed – Delay did not impact
findings in the arbitral award.
75-78
29. I.13 The Division Bench judgment in G.L. Litmus
Events.
79-84
30. J The Sequitur 85
31. K Conclusion 86-89


A. The lis

1. This appeal throws up, for consideration, the seminal issue of
whether the unanimous arbitral award forming subject matter of
challenge, rendered by a three member Arbitral Tribunal, would stand
vitiated solely on the ground that two years elapsed between the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 2 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

reserving and the rendition of the award.

2. A learned Single Judge of this Court has answered the issue on
the affirmative.

1
3. Unison Hotels Pvt Ltd , aggrieved by the decision, has appealed
2
under Section 37(2)(b) of the Arbitration and Conciliation Act, 1996 .

B. Facts

4. UHPL ensured its Hotel with IFFCO Tokio General Insurance
3
Company Ltd by taking two policies; a Standard Fire and Special
4 5
Perils Policy for ₹ 186,44,11,765/- and a Fire Loss of Profit Policy
for ₹ 100 Crores. The Policies were valid for the period 1 April 2007
to 31 March 2008.

5. During the period of validity of the Policies, a fire broke out in
the Hotel on 26 January 2008. UHPL sought redemption of the
Policies, claiming ₹ 68.64 crores under the MD Policy and ₹ 100
crores under the LOP Policy. Consequent to payment, by the
Insurance Company to UHPL, of ₹ 20 crores under the MD Policy and
₹ 30 crores under the LOP Policy, the Insurance Company submitted
that the claims between them stood settled on 30 January 2012.

6. To the extent its claims had been short paid by the Insurance

1
“UHPL”, hereinafter
2
“the 1996 Act”, hereinafter
3
“Insurance Company”, hereinafter
4
“MD Policy”, hereinafter
5
“LOP Policy”, hereinafter
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 3 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Company, UHPL invoked arbitration, as provided in Clause 13, which
was common to both the Policies, and which read thus:

“13. If any dispute or difference shall arise as to the quantum to
be paid under This Policy (liability being otherwise admitted) such
difference shall independently of all other questions be referred to
the decision of a sole arbitrator to be appointed in writing by the
parties to or if they cannot agree upon a single arbitrator within 30
days of any part of invoking arbitration, the same shall be referred
to a panel of three arbitrators, comprising of two arbitrators, one to
be appointed by each of the parties to the dispute/difference and the
third arbitrator to be appointed by such two arbitrators and
arbitration shall be conducted under and in accordance with the
provision of the Arbitration and Conciliation Act, 1996. It is
clearly agreed and understood that no difference or dispute shall be
referable to arbitration as here in before provided, if the Company
has disputed or not accepted liability under or in respect of this
policy.

It is hereby expressly stipulated and declared that it shall be a
condition precedent to any right of action or suit upon this Policy
that the award by such arbitrator/arbitrators of the amount of the
loss or damage shall be first obtained.”

7. A three member Arbitral Tribunal was appointed, on 27 April
2012, to adjudicate on the dispute. Statement Of Claim was filed on 7
September 2012. The award was reserved, by the learned Arbitral
Tribunal, on 6 March 2021, and was pronounced on 6 March 2023.

8. The learned Arbitral Tribunal framed, as a preliminary issue,
“the question of the effect of the full and final settlement of the claims
arrived at between the parties”. The learned Arbitral Tribunal found
the settlement not to be voluntary and thereafter proceeded to
adjudicate on the merits of the claims.

9. A total amount of ₹ 65,12,97,874/- was awarded against the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 4 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Insurance Company and in favour of the Hotel with 9% simple
interest per annum from the date of filing of statement of claim till the
date of award and interest for the future at the same rate till
realisation. Costs of ₹ 50 lakhs were also awarded.

C. Submissions before the learned Single Judge

10. The award was challenged by the Insurance Company before
this Court, under Section 34 of the 1996 Act, by way of OMP (Comm)
197/2023.

C.I Submissions of Insurance Company before the learned Single
Judge

11. The primary submission advanced by the Insurance Company
before the learned Single Judge was that the arbitral award was
vitiated by inordinate and unexplained delay. Reliance was placed, for
this proposition on the judgments of this Court in DDA v. GL Litmus
6 7
Events (P) Ltd , BWL Ltd. v. Union of India , HR Builders v. Delhi
8 9
Agricultural Marketing Board , and Gian Gupta v. MMTC Ltd .

12. Reliance was also placed, by the Insurance Company, on Clause
13 of the Policies, under which no dispute was referable to arbitration
if the insurance company had not accepted its liability in respect of the
Policy. In other words, it was only the quantum of the claim which

6
2025 SCC Online Del 9906
7
2012 SCC Online Del 5873
8
2024 SCC Online Del 7635
9
2020 SCC Online Del 107
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 5 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

was arbitrable and not its admissibility. If liability was not admitted by
Insurance Company, no arbitrable dispute would arise.

13. It was, therefore, submitted that after the claim of UHPL stood
fully and finally settled, no arbitrable dispute survives for
consideration and the Arbitral Tribunal had no jurisdiction. It was
submitted that the UHPL was estopped from raising any claim after
settlement of the claim and acceptance, by it, of the settled amount.

C.II Submissions of UHPL before the learned Single Judge


14. UHPL contended, per contra , that an arbitral award would be
vitiated by delay only where the delay was unexplained and adversely
reflected on the findings recorded in the award. For this purpose,
UHPL relied on the judgment of the Supreme Court in Lancor
10
Holdings Limited v. Prem Kumar Menon , and this Court in
11
Director General, CRPF v. Fibroplast Marine Pvt. Ltd . .

15. It was further submitted that the plea of the Insurance company
of the claim of the UHPL having been settled by accord and
satisfaction was rejected on the ground that the settlement was not
voluntary.

16. UHPL contended, on the other hand, that the settlement was
vitiated by coercion and undue influence and would not, therefore,
impact the arbitrability of the dispute.

10
2025 SCC OnLine SC 2319
11
2022 SCC OnLine Del 1335
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 6 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

D. Findings of the learned Single Judge

17. Having thus recorded the submissions of both sides, the learned
Single Judge, apropos the decision in Lancor Holdings , observes as
under:

“6. The judgements in Gian Gupta (supra) and BWL Ltd.
(supra) relied upon by the petitioner and the judgement in Director
General, Central Reserve Police Force (supra) relied upon by the
respondent were considered by the Supreme Court in case of M/s.
Lancor Holdings Limited (supra) . It is held that delay in
delivering the award cannot be the sole ground for setting it aside.
There cannot be a straight-jacket formula and the issue would
depend upon the facts of each case as to whether the delay had an
adverse effect on the findings recorded. An unexplained delay in
delivering the award brings it within the ambit of being in conflict
with the public policy of India and patent illegality. Further that the
aggrieved party need not avail the remedy under Section 14(2) of
the Act to challenge the delay. The paragraph from judgement is
quoted below:-

“63. To conclude, the questions framed for consideration
in these appeals are answered as under:

(i) What is the effect of undue and unexplained
delay in the pronouncement of an arbitral award
upon its validity?-

-Delay in the delivery of an arbitral award, by itself,
is not sufficient to set aside that award. However,
each such case would have to be examined on its
own individual facts to ascertain whether that delay
had an adverse impact on the final decision of the
arbitral tribunal, whereby that award would stand
vitiated due to the lapses committed by the arbitral
tribunal owing to such delay. It is only when the
effect of the undue delay in the delivery of an
arbitral award is explicit and adversely reflects on
the findings therein, such delay and, more so, if it
remains unexplained, can be construed to result in
the award being in conflict with the public policy of
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 7 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

India, thereby attracting Section34(2)(b)(ii) of the
Act of 1996 or Section 34(2A) thereof, as it may
also be vitiated by patent illegality. Further, it would
not be necessary for an aggrieved party to invoke
the remedy under Section 14(2) of the Act of1996 as
a condition precedent to lay a challenge to that
delayed and tainted award under Section 34
thereof.…..”

18. The learned Single Judge in the impugned judgment, holds as
under:

“12. The issue of jurisdiction of the Tribunal in absence of an
arbitral dispute in view of the couched language of the arbitration
clause needed consideration from various angles, (i) whether the
issue of quantum of claim dependent on outcome of challenge to
settlement was an arbitrable dispute; (ii) whether the Tribunal had
jurisdiction to decide the validity of the settlement between the
parties; and lastly (iii) whether the “admitted liability” foundation
for arbitrable dispute was eroded after the claim was settled. The
Arbitrator after only deciding that the settlement was not voluntary
proceeded to deal with the claims on merits.

13. No doubt, the objection of non-existence of the arbitral
dispute finds mention in the award but it cannot be lost sight of that
the contentions raised is fortified by raising various arguments.
With the passage of time due to limitation of human memory the
arguments no longer remain potent. Inordinate delay jolts the
confidence of the parties as to whether the submissions were
effectively weighed. The written submissions made in a matter can
only be supplement and not substitute oral arguments. It is trite law
that the justice should not only be done but should also appear to
have been done. It would be relevant to quote the following
paragraph of M/s. Lancor Holdings Limited (supra) :

“19. However, the undeniable fact remains that Section
34 of the Act of 1996 does not postulate delay in the
delivery of an arbitral award as a ground, in itself, to set it
aside. There is no gainsaying the fact that inordinate delay
in the pronouncement of an arbitral award has several
deleterious effects. Passage of time invariably debilitates
frail human memory and it would be wellnigh impossible
for an arbitrator to have total recall of the oral evidence, if
any, adduced by witnesses; and the submissions and
arguments advanced by the parties or their learned counsel.
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 8 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Even if detailed notes were made by the arbitrator during
the process, they would be a poor substitute to what is fresh
in the mind immediately after conclusion of the hearings in
the case. More importantly, such delay, if unexplained,
would give rise to unnecessary and wholly avoidable
speculation and suspicion in the minds of the parties.
Absolute faith and trust in the system is essential to make it
work the way it is intended to. Once that belief is shaken, it
would lead to a breakdown of that system itself. A situation
that is to be eschewed at all costs.”

14. The germane of arbitration was to provide speedy and
alternative forum for resolution of disputes. By the Amendment
Act (Act 3 of 2016), Section 29A was inserted in the Act
stipulating that the award to be pronounced within twelve months
from entering of the reference. The amendment was not applicable
to pending proceedings unless the parties specifically agreed to it.
In the case in hand the arbitrator was appointed in April, 2013 and
the proceedings concluded in March, 2023. The Act was amended
in 2016 crystallising the object of speedy resolution by fixing
period for conclusion of proceedings, albeit not applicable to the
present case but still the fact is that there was a gap of two years
between reserving and pronouncing the award.

15. Another angle to be considered is that arbitration
proceedings are designed with the object of minimum intervention
by the court. The remedy against an award under Section 34 is not
equivalent to the appellate jurisdiction and the award can be
challenged only on the ground mentioned in Section 34. In other
words there is a limited scope of interference by the court in the
award and in such a scenario the timely rendering of an award
dealing with each and every contention and argument in support
thereof gains more importance. The contention of the learned
senior counsel for the respondent that the arguments raised now
were not pressed before the Tribunal is a dispute fanned by delay
in pronouncement of the award as the contention may be noted but
the arguments in support thereof go begging.

16. The reasons given in the award for delay in pronouncement
are that hearing was interrupted by covid-19; the matter was
concluded on 06.03.2021, but written submissions were filed in
August, 2021; and lastly that the members of the Tribunal could
not meet to finalise the award due to Covid-19 which receded in
the last quarter of 2022. It would be apposite to note that the
hearing of the matter continued and the award was reserved during
the pandemic. After excluding the time taken by the parties to file
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 9 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

written submissions there is a delay of more than eighteen months
in pronouncing the award.

17. The period affected by Covid-19 was considered by the
Supreme Court in Suo Motu Writ Petition (C) No.3/2020 and by
order dated 10.01.2022, limitations expiring between 15.03.2020 to
28.02.2022 were ordered to start from 01.03.2022. Further, for
computing the period under Section 23(4) and 29A of the Act and
for Section 12A of the Commercial Court Act, 2015, the period
from 15.03.2020 to 28.02.2022 was excluded. The reason in the
award for attributing the delay to Covid-19 till the last quarter of
2022 is not in consonance with the order of the Supreme Court.
Moreover, after exclusion of time up to 28.02.2022 there is still a
delay of almost one year in pronouncing the award. The reason
mentioned that after reserving the judgment the members of the
Tribunal could not meet for a long time, fortifies that for a
considerable time there was no deliberation on matter after award
was reserved.

18. The findings on the jurisdictional issue raised were affected
by the delay caused in pronouncement of the award. The reasons
for the delay mentioned in the award are not sufficient. In the facts
and circumstances the award is vitiated by inordinate delay, is
patently illegal and is unsustainable .

19. The detailed reasons given for dealing with the merits of
the claim need not be gone into as the issue of existence of arbitral
dispute in view of the language of the arbitration clause goes to the
root of the jurisdiction of the matter and the decision on this was
adversely impacted by the delay.”

(Emphasis supplied)


19. Following the above discussion, the learned Single Judge has
proceeded to set aside the arbitral award and allow OMP (COM)
197/2023.

20. Aggrieved thereby, UHPL is in appeal before us under Section
37(2)(b) of the 1996 Act.

Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 10 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

E. Rival Submissions before us

21. We have heard Mr. Darpan Wadhwa, learned Senior Counsel
for the appellant and Mr. A. S. Chandhiok, learned Senior Counsel for
the respondent at length.

E.I Submissions of Mr. Darpan Wadhwa

22. Arguing on behalf of UHPL, Mr. Darpan Wadhwa advances the
following submissions:

(i) Delay in delivering an arbitral award is not, by itself,
sufficient to set it aside, as held by the Supreme Court in
Lancor Holdings (from which Mr. Wadhwa sites paras 1, 19 to
12
21 and 63) and C. Velusamy v. K. Indhera .

(ii) Delay in delivery would vitiate an arbitral award only if
(a) the delay is unexplained and (b) the delay has an adverse
impact on the findings in the award. A balance has to be struck
between the pace of arbitration and satisfactory meaningful
content thereof, as the Court and the parties have interest in a
“correct decision”. It is only, therefore, where the award is
“clearly riddled with the damaging effects of delay” that it can
be considered to be in conflict with public policy or vitiated by
patent illegality. In the present case, the delay is explained, and
has no adverse impact on the findings in the arbitral award. This
position, in fact, stands acknowledged by the learned Single

12
2026 SCC OnLine SC 142
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 11 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Judge in para 6 of the impugned judgment.

(iii) The delay in delivery of the award in the present case has
been explained as attributable to the following causes:

(a) The final hearing was interrupted by the onset of
the COVID pandemic, which concluded, resulting in the
hearings concluding on 6 March 2021.

(b) The parties did not file written submissions on or
before 15 April 2021 as directed, but sort multiple
extensions. The written submissions were ultimately filed
only in August 2021. This delay was directly attributable
to the parties.

(c) Again owing to the COVID pandemic meetings of
the Arbitral Tribunal, for deliberating on the issues, were
interrupted. Ultimately, the learned Arbitral Tribunal held
four meetings to analyse evidence, documents and
finalised the award.

(iv) The delay did not adversely impact the findings in the
arbitral award, as the award was detailed, reasoned, unanimous
and unambiguous. Findings were returned on all aspects,
including the effect of the full and final settlement, extension of
the reinstatement period, and various heads under the MD
Policy and LOP Policy. The impugned judgment does not at all
examined the findings in the arbitral award on merits. Rather, in
paragraph 19, it states that the detailed reasons given for dealing
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 12 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

with merits “need not be gone into”.

(v) The impugned judgment fails to identify any specific
finding which is erroneous, inadequate or unsupported by
evidence.

(vi) Equally, the impugned judgment fails to identify any
submission which was not considered by the learned Arbitral
Tribunal, or any inconsistency in reasoning, attributable to
delay. For that reason, the finding, of the learned Single Judge,
that the oral arguments not adequately considered due to lapse
of time, was not sustainable.

(vii) The impugned judgment sets aside the arbitral award
without examining or demonstrating how the delay adversely
impacted the findings therein.

(viii) The impugned judgment is incorrect in noting that the
learned Arbitral Tribunal did not consider the issue of
jurisdiction raised by the Insurance Company in the context of
Clause 13 of the agreement. For this purpose, the Insurance
Company contended that, in view of the final settlement of the
dispute with UHPL, no arbitrable dispute survived. As against
this, UHPL contended that the settlement was not voluntary.
The arbitral award has dealt with this aspect specifically and
extensively.

(ix) The learned Single Judge has merely recorded that “with
the passage of time due to limitation of human memory the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 13 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

arguments no longer remain potent” and that the findings on the
issue of jurisdiction were affected by the delay. These
observations are entirely speculative, unsupported by any
material on record.

(x) As held in Lancor Holdings , the issue is whether the
delay has an adverse impact on the decision, and not whether
there is a possibility of such impact. The learned Arbitral
Tribunal recorded detailed findings on each issue with reference
to arguments and evidence.

(xi) The learned Single Judge has erred in holding that the
reasons provided by the learned Arbitral Tribunal for delay
were inadequate, and not in consonance with the judgment of
the Supreme Court in In Re: Cognizance for Extension of
13
Limitation. The impugned judgment further errs in holding
that, even after excluding the period up to 28 February 2022,
there remains a delay of almost one year in rendition of the
award. It took considerable time for the learned Arbitral
Tribunal to convene physical meetings, deliberate on complex
issues involving voluminous evidence, documents and detailed
written submissions. In these circumstances, the delay could not
be said to be inordinate and sufficient to constitute the sole
basis to set aside the arbitral award.


(xii) Once an Arbitral Tribunal has provided reasons for delay,
the Court, under Section 34 of the 1996 Act, is not to sit in

13
Suo Motu Writ Petition (Civil) No. 3 of 2020
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 14 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

judgment over the correctness, adequacy or sufficiency of those
reasons. Reliance has been placed, for this proposition, on
14
Punjab State Civil Supplies Corpn. Ltd v. Sanman Rice Mills
15
and Dyna Technologies (P) Ltd v. Crompton Greaves Ltd .

(xiii) The Insurance Company was estopped from challenging
16
the arbitral award on the ground of delay, in view of Section 4
of the 1996 Act, which deems a party who, despite being aware
of non-compliance with any provision of the 1996 Act, and fails
to object there to. The Insurance Company neither (a) raised the
issue of delay before the learned Arbitral Tribunal at any stage,
17
nor (b) filed any application under Section 14(2) read with
18
Section 14(1)(a) of the 1996 Act, seeking termination of the
mandate of the learned Arbitral Tribunal on the ground of
unreasonable delay, nor (c) issued any communication
expressing concern regarding delay. Rather, the Insurance
Company actively participated in the proceedings.

(xiv) The Supreme Court held, in Velussamy , that, in the

14
2024 SCC OnLine SC 2632
15
(2019) 20 SCC 1
16
4. Waiver of right to object.
A party who knows that
(a) any provision of this Part from which the parties may derogate, or
(b) any requirement under the arbitration agreement, has not been complied with
and yet proceeds with the arbitration without stating his objection to such non-compliance without
undue delay or, if a time limit is provided for stating that objection, within that period of time, shall
be deemed to have waived his right to so object.
17
14. Failure or impossibility to act.—
*
(2) If a controversy remains concerning any of the grounds referred to in clause (a)
of sub-section (1), a party may, unless otherwise agreed by the parties, apply to the Court to decide
on the termination of the mandate.
18
14.
(1) The mandate of an arbitrator shall terminate and he shall be substituted by another
arbitrator, if—
(a) he becomes de jure or de facto unable to perform his functions or for other
reasons fails to act without undue delay;
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 15 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

event of failure of an arbitrator to act without undue delay, the
party had to approach the arbitrator first and, thereafter, the
Court, under Section 14 of the 1996 Act, seeking termination of
the mandate of the arbitrator for this reason.

(xv) The learned Single Judge travelled beyond the pleadings,
in examining the issue of non-arbitrability of the dispute. The
issue of non-arbitrability was not raised by the Insurance
Company before the learned Arbitral Tribunal, and was not
even pleaded in the Section 34 petition. The issue was raised for
the first time in additional written submissions filed in the
Section 34 proceedings. The learned Single Judge could not,
therefore, have adversely commented on the said issue and
based his findings on these averments.

19
(xvi) Section 29A of the 1996 Act had been inserted by the
20
Arbitration and Conciliation (Amendment) Act, 2015 , Section
26 of which expressly provided that it would not apply to
arbitral proceedings commenced before its introduction, unless
the parties agreed otherwise. In the present case, the arbitral
proceedings commenced with the invocation, by UHPL, of
arbitration, by its notice dated 15 February 2012, well before 23
October 2015. There was no agreement, between the parties, to

19
29-A. Time limit for arbitral award.—
(1) The award in matters other than international commercial arbitration shall be made by the
arbitral tribunal within a period of twelve months from the date of completion of pleadings under
sub-section (4) of section 23:
Provided that the award in the matter of international commercial arbitration may be
made as expeditiously as possible and endeavor may be made to dispose of the matter within a
period of twelve months from the date of completion of pleadings under sub-section (4) of section
23.
20
"the 2015 Amendment Act" hereinafter
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 16 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

apply Section 29A.

(xvii) The impugned judgment militates against the legislative
policy of minimal judicial intervention, envisaged in the 1996
21
Act. Section 5 of the 1996 Act provides that no judicial
authority would intervene except where so provided under Part
I thereof. The grounds for challenge to an arbitral award, as
22
contained in Section 34 , are exhaustive and narrow. The
principle of judicial restraint also stands embodied in the
judgments of the Supreme Court in Ssangyong Engineering
23
and Construction Co Ltd v. NHAI , Delhi Airport Metro
24
Express Pvt Ltd v. Delhi Metro Rail Corporation Ltd and

21
5. Extent of judicial intervention. - Notwithstanding anything contained in any other law for the
time being in force, in matters governed by this Part, no judicial authority shall intervene except where so
provided in this Part.
22
34. Application for setting aside arbitral award.
( 1) Recourse to a Court against an arbitral award may be made only by an application for
setting aside such award in accordance with sub-section (2) and sub-section (3).
(2) An arbitral award may be set aside by the Court only if—
1
(a) the party making the application [establishes on the basis of the record of the
arbitral tribunal that]—
(i) a party was under some incapacity, or
(ii) the arbitration agreement is not valid under the law to which the
parties have subjected it or, failing any indication thereon, under the law for the
time being in force; or
(iii) the party making the application was not given proper notice of the
appointment of an arbitrator or of the arbitral proceedings or was otherwise
unable to present his case; or
(iv) the arbitral award deals with a dispute not contemplated by or not
falling within the terms of the submission to arbitration, or it contains decisions
on matters beyond the scope of the submission to arbitration:
Provided that, if the decisions on matters submitted to arbitration can be
separated from those not so submitted, only that part of the arbitral award which
contains decisions on matters not submitted to arbitration may be set aside; or
(v) the composition of the arbitral tribunal or the arbitral procedure was
not in accordance with the agreement of the parties, unless such agreement was
in conflict with a provision of this Part from which the parties cannot derogate,
or, failing such agreement, was not in accordance with this Part; or
(b) the Court finds that—
(i) the subject-matter of the dispute is not capable of settlement by
arbitration under the law for the time being in force, or
(ii) the arbitral award is in conflict with the public policy of India.
23
(2019) 15 SCC 131
24
(2022) 1 SCC 131
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 17 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

25
Associate Builders v. D.D.A.

Apart from the decisions already noted, Mr. Wadhwa placed reliance
on the judgments of the Supreme Court in paras 36, 36.1, 50 to 57 and
26
138 of SBI General Insurance Co. Ltd v. Krish Spinning .

E.II Submissions of Mr. Chandhiok

23. Responding to Mr. Wadhwa’s submissions, Mr. Chandhiok
contends as under:

(i) The scope of interference, under Section 37, is even more
circumscribed than the scope of interference under Section 34
of the 1996 Act. Section 37 is akin to a second appeal under the
Code of Civil Procedure, 1908. The finding, by the learned
Single Judge, that the reasons cited in the arbitral award to
justify the delay in its rendition were insufficient, is a finding of
fact, which cannot be interfered with, in appeal, under Section
37.

(ii) Delay in pronouncement of an arbitral award is in itself
sufficient to set aside. Reliance is placed, for this purpose, on
the judgments of the Supreme Court in O.N.G.C. v. Saw Pipes
27
Ltd and Lancor Holdings , the judgments of Division Benches
28
of this Court in BWL Ltd v. Union of India and of the learned
Single Judges of this Court in Gian Gupta and Harji

25
(2015) 3 SCC 49
26
(2024) 12 SCC 1
27
(2003) 5 SCC 705
28
2012 SCC OnLine Del 5873
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 18 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

29
Engineering Works Pvt Ltd v. B.H.E.L. The delay rendered
the award opposed to public policy as well as patently illegal.
Reliance has also been placed, in this context, on the judgment
of the Division Bench of this Court in D.D.A. v. G.L. Litmus
30
Events Pvt Ltd , the Special Leave Petition against which was
also dismissed by the Supreme Court. Inordinate delay in
rendition of an arbitral award gave rise to a presumption that the
parties contentions, demeanour of witnesses and intricate details
of the record would inevitably have faded from the memory of
the arbitrator.


(iii) The impugned judgment clearly observes that the delay
in rendition of the arbitral award has impacted it, inasmuch as
there was no decision, by the learned Arbitral Tribunal, on its
own jurisdiction, in the face of Clause 13 of the Policies. The
learned Single Judge has held that “the issue of existence of
arbitration disputes in view of the language of the arbitration
clause goes to the root of the jurisdiction of the matter and
decision of this was definitely impacted by delay”.

(iv) The impugned judgment further notes that, even if the
period till 28 February 2022 were to be excluded, there was still
a delay of almost one year in rendering the award.


(v) The COVID-19 pandemic could not constitute a
legitimate basis to explain the delay in rendition of the arbitral

29
2008 SCC OnLine Del 1080
30
2025 SCC OnLine Del 9906
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 19 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

award, as the arbitral proceedings continued during the currency
of the pandemic.

(vi) It was admitted, in the arbitral award itself, that, after the
award was reserved, the members of the learned Arbitral
Tribunal did not meet for a long time, thereby demonstrating
that, for a considerable period of time, there was no deliberation
on the issues involved, which obviously meant that all that was
urged had been forgotten.

(vii) The issue before the Supreme Court in Velusamy was
whether an arbitral award delivered after termination of the
mandate of the Arbitral Tribunal could be regularised under
Section 29A(5) of the 1996 Act. It was not, therefore, of
relevance in the present case.

(viii) Lancor Holdings was rendered under Article 142 of the
Constitution of India and could not, therefore, be cited as a
precedent by UHPL. Even otherwise, the decision held that
delay in making or pronouncing an award was opposed to the
public policy of India.

(ix) The findings in the arbitral award were a verbatim copy
of the written submissions of UHPL, which also indicated
absence of independent application of mind. The learned
Arbitral Tribunal had not evaluated the evidence or addressed
the contentions of the Insurance Company.

(x) Inasmuch as there was no admission of liability by the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 20 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Insurance Company, the dispute in question was not arbitrable
under Clause 13 of the Policies. The learned Arbitral Tribunal
did not refer to, much less consider, the core terms of the
Policies or the arbitration clause. The execution of Discharge
Receipts, towards full and final settlement, resulted in discharge
of the liability by accord and satisfaction. The arbitration
agreement itself stood extinguished thereby. The learned Single
Judge was, therefore, justified in his view that, owing to the
inordinate delay in rendition of the arbitral award, this aspect,
and the submissions advanced in connection therewith, had
been forgotten by the learned Arbitral Tribunal. Mr. Chandhiok
drew attention to para 32 of the arbitral award to support his
submission that the learned Arbitral Tribunal had not addressed
the issue of arbitrability of the dispute in the light of Clause 13
of the Policies.

In support of his submissions, Mr. Chandhiok placed reliance on paras
39 to 47 and 53 to 55 of the judgment of the learned Single Judge of
31
this Court in G.L. Litmus Events Pvt Ltd v. D.D.A. as well paras 28
and 31 of the appellate judgment of the Division Bench, already cited
supra .

E.III Submissions of Mr. Wadhwa in rejoinder


24. Mr. Wadhwa, in rejoinder, disputes Mr. Chandhiok’s
submission that Lancor Holdings is not a valuable precedent, or that it

31
2025 SCC OnLine Del 5772
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 21 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

has been rendered under Article 142 of the Constitution of India.
Article 142, he submits, was relied upon, by the Supreme Court, only
in support of its decision not to send the dispute back for de novo
consideration by the arbitrator, though he had left many issues
undecided. Mr. Wadhwa points out, further, that Lancor Holdings
also took note of the judgment of the learned Single Judge of this
Court in G.L. Litmus Events .

25. Mr. Wadhwa further submits that the only issue raised by the
Insurance Company before the learned Arbitral Tribunal was the plea
of discharge of the liability by accord and satisfaction. Clause 13 of
the Policies, he submits, was never made subject matter of dispute. In
fact, by drawing attention to sub-paras (a) to (g) of the Statement of
Defence filed by the Insurance Company before the learned Arbitral
Tribunal, the Issues framed by the learned Arbitral Tribunal in para 5
of the arbitral award, and paras 12 to 14, 24 and 25 of the arbitral
award, Mr. Wadhwa submits that the learned Arbitral Tribunal was
only called upon to decide as to whether the claims of UHPL against
the Insurance Company stood discharged by accord and satisfaction.

F. The Statement of Defence

26. The resolution of the controversy in dispute turns, to some
extent, on the assertions contained in the Statement of Defence of the
Insurance Company before the learned Arbitral Tribunal. It was
sought to be contended that the learned Arbitral Tribunal has not
addressed the issues advanced before it, owing to the delay which had
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 22 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

been occasioned in its rendition. In fact, the impugned judgment
specifically faults the learned Arbitral Tribunal for not having
properly addressed the objection of the Insurance Company with
respect to arbitrability of the dispute in the light of Clause 13 of the
Policies.

27. Mr. Wadhwa has sought to contend, in this regard, that no
specific objection with respect to arbitrability of the dispute in the
light of Clause 13 of the Policies was advanced by the Insurance
Company in the arbitral proceedings. To the extent that the Insurance
Company had objected to the Statement of Claim filed by UHPL, Mr.
Wadhwa’s contention is that the learned Arbitral Tribunal has
adequately addressed the points urged.

28. The Statement of Defence of UHPL runs into over 90 pages.
We deem it appropriate to reproduce in extenso the following
paragraphs from the Statement of Defence:

“2. Preliminary Objections/Submissions:

The Respondent states and submits that the arbitration is not
maintainable, this Hon'ble Tribunal has no jurisdiction and the
claims of the Claimant are not maintainable, misconceived and
untenable and liable to be dismissed in limine for each of the
following preliminary objections which go to the root of the matter
and are set out hereinafter without prejudice to one another:

(a) The Parties having arrived at full and final settlement of all
of the Claims of the Respondent under the Fire and Special Perils
(Materials Damage) Policy No. 11181790 (the "Fire MD Policy")
and Business interruption/Fire Loss of Profit Policy No. 11181787
(the "LOP Policy" in respect of its property known as Grand Hotel
situate in Vasant Kunj, New Delhi (the "Hotel") the contract of
insurance contained in the said Policies between the Parties came
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 23 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

to an end and stood extinguished and the arbitration clause
contained therein also perished along with it.

(b) There is no arbitrable dispute between the parties, they
having entered into a full and final settlement of all claims of the
Claimant under the Fire MD Policy and the LOP Policy
(collectively the "Claims").

(c) The Claimant having arrived at full and final settlement
after discussions/negotiations and having agreed to the amount in
full and final settlement the Claims under the Fire MD Policy and
the LOP Policy (collectively the "two Policies") after due
consideration of the loss and damage assessed by the Surveyors
and the Claimant having issued at its free will and volition the
Discharge Receipts in respect of the same under the two Policies
without any reservation or condition and depositing the moneys so
received in full and final settlement of its clauses under said two
Policies, the Claimant is estopped from disputing or challenging in
any manner whatsoever.

(d) The Claimant by signing and delivering unconditional
discharge receipts with respect to the full and final settlement of its
claims under the two Policies Media representation to the
Respondent intended to induce the Respondent to make the
payments of the amounts referred to in the Discharge receipts in
full and final settlement of Claims of the Claimant under the two
Policies and on the basis thereof received the payorders and
collected the amounts thereunder without any reservation, the
Claimant is estopped from questioning the settlement or claiming
the differential.

(e) By depositing the payorders received in terms of the
Discharge Receipts and collecting the payments thereunder the
Claimant accepted the settlement unconditionally and cannot now
change the terms on which the payment was accepted unilaterally
nor can it go back on the settlement.

(f) The Claimant having discussed with the Respondent the
settlement of the Claims under the two Policies and upon the
Respondent making the proposal for full and final settlement after
the Claimant after discussions and various clarifications and
provision of information and negotiations and thereupon it having
thereafter accepted the offered amount and after having signed and
delivered to the Respondent the discharge receipts on 23.01.2012
with respect to its Claims under the two Policies, in full and final
satisfaction and discharge of its Claims, the Claimant
unconditionally and irrevocably waived and relinquished and fully
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 24 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

and forever released and discharged the Respondent in respect of
all of its liability or obligations towards the Claimant with respect
to the Claims under the two Policies.

(g) The questioning/challenging of full and final settlement by
the Claimant is an afterthought, the quantum of the settlement
amount having been arrived at and accepted by the Claimant after
negotiation and without any objection. The allegation of duress,
coercion and undue influence with respect to the full and final
settlement or about the Claimant's alleged "dire" financial situation
is an after thought and nothing but a device to avoid full and final
discharge and settlement of the Claims.

(h) The Claim is not maintainable on account of negligence of
the Claimant. The fire took place at 12.40 p.m. and Respondent
was informed about the same at 12.55 p.m. over telephone. The
Respondent immediately appointed the Surveyor and surveyor was
at the place of incident at 3 p.m. The Surveyor observed that the
fire spread in the premises in a very short time inspite of the flame
and smoke detectors as sprinkler lines were not functional or
poorly pressurized. He also observed that various fire hydrants
installed along with fire hoses in several sections of the hotel were
not or perhaps could not be used. So was also the case with the
handheld fire extinguishers (except for a few handheld fire
extinguishers, majority of these were not used), which instead of
being used were burnt in unused status which clearly evidenced the
carelessness and negligence on the part of the Claimant. These
facts were pointed out by the surveyor in their letters dated
30/01/2008 and 23/02/2008.

(i) The reinstatement of damage or destruction or loss can only
be to what it was prior to loss, damage or destruction thereof. The
Claimant having altered and changed the insured asset i.e. the
Hotel including change in layout, design etc. from what it was, the
claims are inadmissible and not maintainable and without prejudice
to the foregoing in any event the Claim on that account cannot
exceed the cost of restoration thereof.

(j) The terms of policy have to be strictly construed and the
words of the condition relating to reinstatement period under the
Fire MD Policy containing the express term of the contract
between the parties is clear and unambiguous. There is no
entitlement as a matter of right or otherwise of the insured for
extension of time for reinstatement work. The Claim on account of
art work was for a much higher amount, which may have been
based on the cost as declared by the Claimant, however the Claim
on that account has to be in accordance with the terms of the Fire
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 25 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

MD Policy as the Policy limits the Claim on this account to an
amount of Rs. 10,000/- the same was settled for the said amount as
per policy terms and conditions and the Claim over and above the
said limit was and is admissible under the Policy. Further claims on
account of borrowings by the Claimant or on account of use by the
Respondent of its own funds on the ground that had the Claim been
paid when made, the funds used by the Respondent would have
been the funds of the Claimant and that the Claimant would not
have used borrowed funds, are claims of consequential and indirect
loss and damage are inadmissible, misconceived and not
maintainable in law.

(k) The cause of action for the claims under the two Policies
arose on 26.01.2008 when the fire took place at the Hotel. The
claims are barred by limitation as the arbitration in respect of the
Claims was commenced only after the expiry of a period of three
years from the date of cause of action i.e. 26.01.2008 under the
Standard Fire and Special Perils Policy (Material Damage) No.
11181790 and under the Fire Loss of Profit Policy No. 11181787.
Merely because the Claimant tooks its time in formulating/
fleshing out and quantifying its Claim or because the parties
continued to discuss the Claims or the quantum thereof or a
settlement was arrived at a later date will not and can not in law
extend limitation.

(l) The Claimant is guilty of suppressing various material facts
and making incorrect statements as can be seen form the true and
correct facts setout in this Statement of Defense and the Statement
of Claim is liable to be dismissed on this ground alone.

3. FACTS:-

*

b) The Respondent issued following 2 insurance policies in
favour of the Claimants for their Hotel property - The Grand,
Vasant Kunj, Phase II, Nelson Madela Road, New Delhi 110070:

(1) The Fire MD Policy - Policy No. 11181790 -
Standard Fire & Special Perils Policy (Material Damage)
Policy period: 01.04.2007 to 31.03.2008. Sum insured:
Rs.1,864,411,765, Premium: Rs. 2,161,222.

Under the policy the Reinstatement Value Policies clause at
page 19 reads as follows:

Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 26 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

"It is hereby declared and agreed that in the event of
the property insured as mentioned in the policy
schedule within the policy being destroyed or
damaged, the basis upon which the amount payable
under (each of the said items of) the policy to be
calculated shall be cost of replacing or reinstalling
on the same site or any other site with property of
the same kind or type but not superior to or more
expensive than the insured property when new as on
date of the loss.... "

(2) LOP Policy- Policy No. 11181787 - Fire Loss of
Profit Policy (Business Interruption). Policy period:
01.04.2007 31.03.2008. Sum Insured: Rs. 1,000,000,000.
Premium: Rs. 14,73,150.

The calculation methodology for computation of the loss of
profit upon occurrence of loss as stipulated under the said
policy was business interruption on turnover basis as per
policy conditions.


c) On 26.01.2008, at around noon, a fire took place at the
Lower Ground floor level in Japanese display kitchen area of
Enoki Restaurant and spread rapidly through the air duct passage
causing serious damages to various restaurants, bars, coffee shop,
lobby, lounge and certain other areas. The fire brigade reached the
premises shortly and put out the fire in about three and a half
hours.

(d) The Respondent was telephonically informed by the
Claimant about the fire incident and immediately the Respondent
within a matter of an hour or so appointed M/s. K.D. Kohli & Co.
Pvt. Ltd. (the "Surveyor") as the surveyor who visited the premises
on the same day at around 3.15 pm and tried to take pictures but
were later instructed by the fire fighters to leave as the fire was still
raging and were apprehensive that injuries could be caused due to
th
falling debris. The Surveyor again visited the premises on 27
January, 2008 and requested the Claimant to provide various
documents and information and also requested them to do the
needful for rehabilitation........

*

(h) Despite several Letter/reminders/ requests to the Claimant
no document was handed over to the Surveyor or the
Respondent.......
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 27 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

*

(j) On 20.02.2008, the surveyor alongwith Mrs. Sadhna
Trehan of the Respondent visited the Hotel premises and after
examining the situation, the Respondent requested the Surveyor by
its letter / email dated 21.02.2008 to coordinate with the Claimant
as the debris removal was proceeding at an unusually slow pace
and despite it being started on 10.02.2008 only a small percentage
has been accomplished and greater part needs to be removed.
Email dated 21.02.08 is annexed herewith as Annexure R-8.

*

(l) On 28.02.2008, the Respondent wrote to Claimant and
asked it to submit Claim bill by 06.03.2008. On 28.02.2008 and
29.02.2008 Joint inspection meeting to verify the damage and
actions taken in regard thereto were carried out by the Surveyor
and the Claimant. A copy of the said letter / email dated 28.02.08 is
annexed hereto and marked as Annexure R-10.

*

(p) The Claimant also submitted their Claim alongwith
supporting compilation and Claim Form to the Surveyor under the
Standard Fire and Special Perils Policy No. 11181790 for Material
Damage inter alia, claiming a total estimated sum of Rs.
68,64,23,750 for material damage caused to the Claimant's Hotel
due to accidental fire. It may be mentioned that details of the Claim
were submitted by the Claimant to the Surveyor on 07.03.08 at
7.30 p.m.
*

(s) The Surveyor, on 31.03.2008 wrote a letter to the
Respondent and informed that inordinate delay is on the part of the
insured. It was further informed that loss under MD policy may not
exceed 18 crores and under LOP 26.88 Crores .

*

(w) The First Interim Report dated 14.05.2008 was submitted
by the Surveyor in which it was stated that estimated loss is of Rs.
38 Crores for Material Damage and Rs. 27 Crores for Loss of
Profit. According to the said report the reasons for spread of fire
are:



Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 28 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

The Surveyor provisionally assessed the loss at Rs. 38 crores and
recommended interim payment of Rs. 20 crores to the Claimant to
facilitate faster rehabilitation and reduction in the period of
interruption which may have a positive and beneficial effect on the
loss of gross profit Claim. Accordingly interim payment of Rs 20
Crore was made to the Claimant.

(x) The Respondent at the instance of the Reinsurers appointed
Cunningham Lindsey International Pvt. Ltd. (CLIP) as another
surveyor on 16.05.2008 and the MIs. KD Kohli shared the records
with CLIP ("for the sake of brevity M/s. KO Kohli & Co. and
CLIP are together referred to as the "Surveyors"). The Respondent
st
released 1 Interim Payment of Rs. 20 Crores under the Material
Damage Claim on 06/06/2008.

*

(dd) On 13.10.2008 Interim survey report was submitted by
Cunningham Lindsey International Pvt. Ltd. It recommended
interim payment of upto Rs. 30 Crores to the Claimant. The
relevant portion of the Report is reproduced below:

*

The said interim Report further stated that against the
Insured/Claimant's Claim of Rs.100,00,00,000, and its
recommendation to retain the loss reserve at Rs.75,00,00,000
towards the business interruption claim, it may be in order to
consider an interim payment of up to Rs.300,000,000 to the
Insured, for the present . It stated that it is not satisfied that, even if
it is able to compute a lower gross profit than that projected by the
Insured, the liability of the Insurers will be more than the
recommended interim payment. The Interim Survey Report dated
13.10.2008 is annexed as Annexure R-21.

*

th
(gg) On 25 February, 2009 on the repeated concerns and
disagreement expressed by the Claimant regarding the value at risk
and the period of restoration required for removal of interruption
and with a view to have another opinion, and not as any
dissatisfaction with the Surveyors work, the Respondent appointed
Mr. Samir Bajpai, an expert in the above matters to, inter alia,
express his opinion and recommendations in this regard. Mr. Samir
Bajpai has experience of, inter alia, design and development of
hotel projects including site selection, mixed land use
developments including 5 star hotels and high end service
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 29 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

apartments and design development of international standard
hospitals at Mohali and Naida for Fortis Healthcare Ltd. And is a
civil engineer and has Masters in Business Administration. The
said expert vide his report dated 17.03.2009 concluded that the
rehabilitation of the affected hotel could be carried out within 28
weeks i.e. 7 months to put the property back into pre event status.

(hh) The Claimant raised certain objections to the said Report
dated 17.03.2009 by its letter dated 13.08.2009 on the ground inter
alia that the appointment of the expert was 13 months after the
accident and that his opinion is based on the documents largely and
his interaction with the surveyors. On 16.11.2009 the Claimant sent
detailed final claim bill of Rs 57 .97 Crores for Material Damage.
On 05.12.2009 the Claimant submitted its detailed working in
support of LOP Claim for the interruption period 26.01.2008 to 25.
02.2009.

(ii) On 07.09.2011 Final Joint Survey Report was submitted by
KO Kohli & Co. and Cunningham Lindsey International Pvt. Ltd.
The said Report recommended the following amounts towards full
and final settlement:

Under Policy No. 11181790 - Standard Fire & Special Perils
Policy (Material Damage) - Rs. 20,19,19,599 (out of which Rs. 20
Crores was already paid and the balance amount payable was Rs.
19,19,599).

Under Policy No. 11181787 -- Fire Loss of Profit Policy Rs.
70,52,90,638 (out of which Rs. 30 Crores was already paid and the
balance amount payable was Rs.40,52,90,638.

(jj) OD On 15.09.2011 the Claimant wrote an email to the
Respondent that Surveyors have submitted their report hence claim
may be processed and also acknowledged receipt of on account
payment of Rs. 50 crores against claims of Rs. 160 crores and
requested for copy of survey reports.

As it was obvious that the Claim of the Claimant were inflated and
the Claimant had not only been negligent in discharge of its
obligations and delays have been solely because of the conduct of
the Claimant including its failures, the Respondent in the totality of
facts and circumstances made the final assessment of the
Claimant's claims. It on 14.12.2011 the Respondent informed the
Claimant about the approval of claims by competent authority for
full and final payment and requested them to return the Discharge
Vouchers duly signed and stamped alongwith NOC from financial
institutions to enable Respondent to process payment mentioning
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 30 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

that the balance payable under Material Damage is - Rs.
1,919,599 and under Fire Loss of Profit is - Rs. 405,290,638.

(kk) In reply to above referred letter dated 14.12.2011, Mr.
Rajesh Rustagi, Group CFO & Company Secretary, Unison Hotels
informed the Respondent by its letter dated 21.12.2011 that since
they had claimed Rs. 57,98,05,120 - Material Damage and Rs.
1,00,00,00,000 - Loss of Profit totaling to Rs. 1,57,98,05,120 while
ITGI has offered Rs. 20,19,19,599 - Material Damage and Rs.
70,52,90,638 - Loss of Profit, totaling to Rs. 90,72,10,237, there is
a Differential Amount of Rs. 67,25,94,883.

It was further stated:

"Thus we are accepting the Offered Amount as partial
payment out of the total claim reserving our right to claim
Differential Amount. We are accepting the Offered Amount
with and under protest and only towards partial payment of
Total Claim Amount without prejudice to our right to claim
the Differential Amount".

There was not even a whisper of any purported bad financial
situation or coercion on account thereof of the Claimant by the
Respondent or its financial hardship in the said letter.

(ll) Thereafter on 23.12.2011, a meeting was held in the
corporate offices of the Respondent in Gurgaon between Mr. Parag
Gupta, Ms. Sadhana Trehan and Mr. Dinesh Pargain of the
Respondent and Mr. Rajesh Rustogi, the CFO of the Claimant at
which the Claimant discussed the basis of full and final settlement
and after satisfying itself sent on the same day its letter dated
23.12.2011 whereby the Claimant agreed to accept the offered full
and final settlement amount without any reservation and enclosed
therewith its unconditional full and final settlement discharge
receipts with respect to its Claims under the two Policies. The
Claimant quite obviously as it is now apparent as an afterthought
and with deliberate intent on a device to renege on the
unconditional discharge receipts duly signed and enclosed
therewith, referred in this letter to its alleged "bad financial
condition". The fact that it was an afterthought would be evident
when this letter is read with Claimant's earlier letter of 21.12.2011
which was by its CFO and who must have known its purported
"bad financial condition" in which the Claimant did not even allude
much less made any reference to its "bad financial condition" and
by which it wanted only the reservation to claim the differential
amount (which is now claimed) at a later date after receipt of the
settlement amount. The Claimant by signing and delivering
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 31 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

unconditional discharge receipts made a representation to the
Respondent intended to induce · the Respondent to make the
payments of the amounts referred to therein in full and final
settlement of the Claim of the claimant under the two Policies. The
Respondent upon receipt of unconditional discharge receipts duly
signed issued payorder dated 30/01/2012 of Rs. 18,84,045 and Rs.
40,51,26,934 in favour of the Claimant. The Claimant thereafter
deposited and collected the payment obtained by making a
representation that full and final settlement of the Claims under the
two Policies has been arrived at and thereby induced the payments
and therefore the Claimant is estopped from questioning the full
and final settlement or claiming the differential.

(mm) Despite accepting the payment after duly signing the
unconditional discharge receipts and collection of payments under
the payorder issued by the Respondent, the Claimant wrote its
letter dated 01.02.2012 questioning the full and final settlement
towards the policies........

*

(nn) In reply to the above letter dated 01.02.2012, the
Respondent wrote its letter dated 16.02.2012 to the Claimant
denying its contention and stated that the amount was accepted
without any kind of duress and selective use of these words is
making an underhanded attempt to escape the finality of settlement
of claim.

(oo) On 17.02.2012, the Respondent received Notices dated
15.02.2012 from Khaitan & Co. Advocate invoking arbitration
clause in the two Policies and alleging that their client was coerced
into accepting the Admitted Amount by issuing the discharge
vouchers out of utter necessity to pay the bankers and creditors and
the said acceptance was a result of coercion, duress and undue
influence by the Respondent and thus invalid and nominated Mr.
Justice S.K. Mahajan (Retd.) as Sole Arbitrator to adjudicate upon
the dispute.”
(Emphasis supplied)

G. The Arbitral Award

29. Placing the horse after the cart as it were, and having
paraphrased the impugned judgment of the learned Single Judge and
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 32 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

the rival contentions of learned Senior Counsel before us, we turn,
now, to the arbitral award, to ascertain what exactly it holds. We
would be referring to the award only to the extent it is relevant, given
the nature of the impugned judgment and the rival submissions made
by learned Senior Counsel. More particularly, since the impugned
judgment does not deal with the merits of the dispute, but sets aside
the arbitral award on the ground of delay in its rendition, we would
also be adverting more to this aspect when dealing with the award.

30. The learned Arbitral Tribunal framed the following issues in
para 5 of its Award, for consideration:

“(i) Whether the claims under two insurance policies, namely,
fire (material damage) policy ("Fire MD Policy") and Loss of
Profit Policy ("LOP Policy") are barred by Limitation?

(ii) What is the effect of full and final settlement of claims
arrived at by
the parties?

(iii) Is the Claimant entitled to recover from the Respondent any
amount under the two insurance policies?

(iv) Whether any party is entitled to cost of these proceedings?

(v) the question of admissibility and maintainability of the
claims would be covered under Issue No. 3. The question whether
the Claimant is entitled to interest, if any, would also be covered by
Issue No.3 ..."”

31. Having set out, thereafter, the evidence adduced before it, the
learned Arbitral Tribunal, proceeds from para 11 of its award, to
provide its reasons and findings. Para 12 of the award records the
preliminary objection of the Insurance Company, as advanced before
the learned Arbitral Tribunal, thus:
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 33 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

“12. At the outset, Respondent raised "Preliminary Objection"
with regard to the maintainability of the claims on the ground of
full and final settlement and estoppel on the premise of the
"discharge receipts" and payments made by the Respondent to the
Claimant. The Respondent has setup a case of complete discharge
and consequently argued that no claims can be agitated by the
Claimant before this Tribunal.”

32. Paras 13 and 14 of the arbitral award set out the rival stands of
the Insurance Company and UHPL with respect to the objection to
maintainability of the claim of UHPL in the light of the discharge
voucher signed by it. Thereafter, the learned Arbitral Tribunal has
addressed this issue in paras 15 to 32 of the Arbitral Award thus:

“15. Whereas the Claim voucher was provided to the Claimant
on 15.12.2011, no Survey Report Copy was provided to the
Claimant till the start of the Arbitration proceedings and nearly
three months after statement of claim was filed by the Claimant on
07.09.2012 and despite several letters including letter dated
01.02.2012 by CW-1 asking the Respondent for settlement of the
balance payment.

16. While the claimant was not provided with a copy of the
survey Report for the purpose of understanding the deductions
made, the Respondent also brushed aside the objections made by
the Claimant vide letters dated 21.12.2011 and 18.04.2011.

17. The Respondent failed to show how the full Survey Report
has been attached to the email dated 03.10.2011 sent by Mr.
Anupam Shukla to CW-1, when the said fact stems out to be
incorrect.

18. The respondent had sent a letter dated 15.12.2011
informing without explanation, the amounts of the final claim
settlements along with discharge receipts required to be signed by
the Claimants accepting the amounts in full and final settlements.

19. It may be noted that even though the Claim was in excess
of Rs. 100 crores, the Claimant was provided relief by way of an
on-account payment by the Respondent who offered a settlement
voucher nearly 4 years after the date of loss requiring the Claimant
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 34 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

to not only keep the Company going but to also restore/ reinstate
the premises to 5-star standards at their own costs.

20. In such circumstances, the Claimant very clearly alleged the
financial duress being faced by it in their letter dated 23.01.2012
wherein it stated as follows:

"Owing to our bad financial conditions, we agree to accept
the above-mentioned amount of Rs. 90,72,10,237/-, as
directed by you, and request you to kindly release the
payment of the said amount forthwith. We are, therefore,
forwarding you the said discharge vouchers along with the
requisite revenue stamp and signature and addresses of the
witnesses and request you to release the admitted payment
immediately.”

21. In fact, it was very clearly brought out during the
examination of CW-1, that the Claimant had no option but to
borrow funds on short term basis to meet the dual requirement of
running the property and also reinstating the damaged portions of
the Hotel.

22. The relevant cross-examination is as under:

Q. 321 Please see para 62 of your Affidavit of Evidence.
Since when did the financial condition of the
Claimant start to deteriorate?

Ans. Financial condition of the Claimant started
deteriorating after commencement of operations
post fire."
Q. 329 Kindly look to paragraph 69 of your Affidavit of
Evidence. Can you explain what you meant by
"severe financial strain"?

Ans. By "severe financial strain" I mean requirement of
funds for meeting obligations towards banks each
other financial institutions."

Q. 330 Were the loans referred to in paragraph 70 of your
Affidavit of Evidence paid, and if so when and to
whom?

Ans. Yes, they were paid in financial year 2011-12 itself
immediately after the receipt of the payment from
Respondent. The banks I financial institutions were
Kotak Mahindra Bank and HDFC Limited."
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 35 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Q.332 When were the loans referred to in Question No.330
taken by the Claimant?

Ans. The loan from Kotak Mahindra Bank was taken in
Financial Year 2009-10 and from HDFC Ltd. in the
Financial Year 2011-12.

23. Two statements submitted on behalf of the Claimant
containing financial details that were culled out from the audited
Statements of Account and Balance Sheets on perusal reveals that
during the period, F.Y. 2007-2008 to F.Y. 2011-12 the expenses
towards interest as well as the repayments made by the Claimant to
the Bank/ FI's were increasing year on year and the cumulative
amount of interest paid by the Claimant at the end of F.Y. 2012
stood at Rs. 119.32 crore and on the same date, repayments of loan
cumulatively were to the tune of Rs. 284.41 crore.

24. Thus, the statements also reveals that the additional loans
that were taken by the Claimant during the same period stood at
Rs. 376 crores. The other statement shows that the Claimant
continued to remain under financial duress and financial crunch
and to meet its financial duress and suffered financial crunch and to
discharge its financial obligations, it had to avail additional loans
from time to time from Bank/FIs. The said statement also supports
the fact that Rs. 40.51 crore, that was received by the Claimant
from the Respondent on 30.12.2012 against the purported final
settlement receipts, was mainly utilized in immediately repaying
the outstanding loans, i.e., Rs. 15 Crore to Kotak Mahindra Bank,
Rs. 15.25 crore to HDFC Limited and Rs. 5.56 Crore to Punjab
National Bank.

25 In our view, the Claimant had made it clear that there was
substantial financial pressure and that it had no option but to accept
the payments made by the Respondent after 4 years of the date of
Loss under duress.

26. Discharge Receipts were submitted by the Claimant on
23.01.2012. Respondent took advantage of its superior bargaining
position and its refusal to pay even the amounts which had been
determined by the Respondent itself as being due to payable to the
Claimant in respect of its claims, without complying with the pre-
conditions of executing the two Discharge Receipts strictly as
prescribed and demanded by the Respondent establishes the
element of coercion. As the covering letter of the Claimant itself
states, the said Discharge Receipts were given owing to financial
difficulty and to comply with the 'directions' given by the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 36 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Respondent to that effect. For this reason alone, the submission
that the Discharge Receipts were given owing to financial
difficulties and to comply with the 'directions' given by the
Respondent to that effect is supported. Thus, the submission of the
Discharges Receipts by the Claimant to the Respondent cannot be
termed as an act that was done voluntarily or of its own free will.

27. The Claimant relied upon the ratio of the judgements of the
Hon'ble Supreme Court rendered in the following two cases:

(i) National Insurance Company Limited v. Mis
32
Boghara Polyfab Pvt. Ltd .

"26. When we refer to a discharge of contract by an
agreement signed by both the parties or by
execution of a full and final discharge voucher/
receipt by one of the parties, we refer to an
agreement or discharge voucher which is validly
and voluntarily executed. If the party which has
executed the discharge agreement or discharge
voucher, alleges that the execution of such
discharge agreement or voucher was on account of
fraud/coercion! undue influence practiced by the
other party and is able to establish the same, then
obviously the discharge of the contract by such
agreement/ voucher is rendered void and cannot be
acted upon.”

(ii) Oriental Insurance Company Limited v. Dicitex
33
Furnishing Limited .

28. The Claimant also relied upon a recent judgement of the
Hon'ble Delhi High Court delivered on 06.07.2021 in the case of
34
Gail (India) Limited v. Bansal Infratech Synergies Limited
wherein the above-mentioned judgments of the Hon'ble Supreme
Court have been relied upon. On the contrary, the Respondent has
35
relied upon (i) Bhishunndeo v. Seogeni Rai at 283 (para 25), (ii)
36
Ladli Prasad v. Kamal Distrillery Co . , Paras 7 (lack of financial
resources), 22(3) (financial constraint), 23, 31 (allegations never
pleaded and proved cannot travel beyond the pleadings), (iii) New
India Assurance Co. Ltd. v. Genus Power Infrastructure

32
2009 (1) SCC 267
33
(2020) 4 SCC 621
34
2021 SCC OnLine Del 3628
35
AIR 1951 SC 280
36
AIR 1963 SC 1279
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 37 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

37
Limited - Paras 4 (allegation) 7, 9 (what claimant contending was
the plea) &, 10 (no particulars), (iv) ONGC Mangalore
38
Petrochemicals Ltd. v. ANS Constructions Limited & Anr. , Paras
23, 24 (arguments), 25,26& 30 (what is financial duress), (v)
Haryana State Cooperative Supply & Marketing Federation Ltd.
v. IFFCO Tokio General Insurance Co. Ltd. & Anr., National
39
Consumer Disputes Redressal Commission, New Delhi.

29. The Claimant also relied upon the contents of the following
circulars issued by the IRDA:-

(i) Ref. No.: IRDA/NL/CIR/Misc./173/09/2015 dated
24.09.2015

(ii) Ref. No.: IRDA/NL/CIR/Misc./113/06/2016
dated 07.06.2016

30. After perusing the Judgements cited by the parties, we find
that the conclusion whether the Discharge Receipts were submitted
voluntarily or under coercion due to financial distress depends
upon the facts and circumstances of each case, as facts of no two
cases are akin and so are the ratio of these judgements. On the
premise of the facts stated above, we find no escape from
concluding that there has not been a full and final settlement
between the parties in the matter of its Material Damage and
Business Interruption Claims. Once the Respondent had, on its
own, decided that it would settle the claims of the Claimant for a
certain sum of money; the said sums of money assumed the
character of property that belonged to the Claimant. Act of
withholding payment of that amount to the prejudice of the
claimant with the intention of forcing the Claimant to enter into an
agreement of full and final settlement by way of signing the
Discharge Receipts, despite the fact that the said amounts were
considerably lower than the Claims made by the Claimant, clearly
falls within the definition of 'coercion' as defined in Section 15 in
the Indian Contract Act, 1872. Claimant has established a case that
it was in desperate need of funds and the Respondent misused its
superior bargaining power. Moreover, the Respondent did not
discharge the burden of proving that the said agreement was not
induced by undue influence within the meaning and content of
Section 16 of the Indian Contract Act, 1872.

31. The judgements relied upon by the Respondent are
distinguishable on facts in as much as we have come to a

37
(2015) 2 SCC 424
38
(2018) 3 SCC 373
39
Revision Petition No. 4713 of 2012 , decided on 5 April 2013
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 38 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

conclusion that there was financial duress and abuse of dominant
position by the Respondent in the face of facts of the present case.

32. The question of limitation does not arise as the payment
under protest was only accepted around January 2012 and the
claims are for the remaining unpaid amounts. Thus, the plea of
limitation and maintainability is not available to the Respondent.”

H. The Legal Position

33. Section 29A was introduced in the 1996 Act, by Section 15 of
40
the Arbitration and Conciliation (Amendment) Act, 2015 with effect
41
from 23 October 2015. Section 29-A(1), as inserted by Section 15 of
the 2015 Amendment Act, requires the arbitral award to be made
within 12 months from the date of entering upon the reference by the

40
“2015 Amendment Act”, hereinafter
41
15. After section 29 of the principal Act, the following new sections shall be inserted, namely:—
“29A. (1) The award shall be made within a period of twelve months from the date the
arbitral tribunal enters upon the reference.
Explanation.—For the purpose of this sub-section, an arbitral tribunal shall be deemed to
have entered upon the reference on the date on which the arbitrator or all the arbitrators, as the case
may be, have received notice, in writing, of their appointment.
(2) If the award is made within a period of six months from the date the arbitral tribunal
enters upon the reference, the arbitral tribunal shall be entitled to receive such amount of additional
fees as the parties may agree.
(3) The parties may, by consent, extend the period specified in sub-section (1) for making
award for a further period not exceeding six months.
(4) If the award is not made within the period specified in sub-section (1) or the extended
period specified under sub-section (3), the mandate of the arbitrator(s) shall terminate unless the
Court has, either prior to or after the expiry of the period so specified, extended the period:
Provided that while extending the period under this sub-section, if the Court finds that the
proceedings have been delayed for the reasons attributable to the arbitral tribunal, then, it may order
reduction of fees of arbitrator(s) by not exceeding five per cent. for each month of such delay.
(5) The extension of period referred to in sub-section (4) may be on the application of any of
the parties and may be granted only for sufficient cause and on such terms and conditions as may be
imposed by the Court.
(6) While extending the period referred to in sub-section (4), it shall be open to the Court to
substitute one or all of the arbitrators and if one or all of the arbitrators are substituted, the arbitral
proceedings shall continue from the stage already reached and on the basis of the evidence and
material already on record, and the arbitrator(s) appointed under this section shall be deemed to
have received the said evidence and material.
(7) In the event of arbitrator(s) being appointed under this section, the arbitral tribunal thus
reconstituted shall be deemed to be in continuation of the previously appointed arbitral tribunal.
(8) It shall be open to the Court to impose actual or exemplary costs upon any of the parties
under this section.
(9) An application filed under sub-section (5) shall be disposed of by the Court as
expeditiously as possible and endeavour shall be made to dispose of the matter within a period of
sixty days from the date of service of notice on the opposite party.
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 39 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Arbitral Tribunal.

42
34. Section 6(a) of the Arbitration and Conciliation (Amendment)
Act, 2019 replaced Section 29A(1) with a substituted provision
requiring the Arbitral Tribunal to make the arbitral award within 12
months from the date of completion of pleadings under Section 23(4)
of the 1996 Act. Significantly, Section 1(2) of the 2019 Arbitration
and Conciliation (Amendment) Act read with Notice No. SO 3154(E)
dated 30.08.2019 issued by the Ministry of Law & Justice brought
Section 6(a) of the 2019 Amendment Act into force from 30 August
2019.

35. In the present case, pleadings themselves were completed with
the filing of the Statement of Defence on 3 January 2013. As such,
Section 29A(1), whether in its originally inserted form, or in its
amended avatar , would not apply. The issue of whether the delay in
rendition of the arbitral award would vitiate it has therefore to be
examined agnostic of Section 29-A.

36. The leading decision on the aspect of delay in rendition of

42
6. In section 29A of the principal Act,—
(a) for sub-section (1), the following sub-section shall be substituted, namely:—
"(1) The award in matters other than international commercial arbitration
shall be made by the arbitral tribunal within a period of twelve months from the
date of completion of pleadings under sub-section (4) of section 23:
Provided that the award in the matter of international commercial arbitration may be
made as expeditiously as possible and endeavour may be made to dispose of the matter
within a period of twelve months from the date of completion of pleadings under sub-
section (4) of section 23.";
(b) in sub-section (4), after the proviso, the following provisos shall be inserted, namely:—
'Provided further that where an application under sub-section (5) is pending, the mandate
of the arbitrator shall continue till the disposal of the said application:
Provided also that the arbitrator shall be given an opportunity of being heard before the
fees is reduced.'.
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 40 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

arbitral awards prior to the introduction of Section 29-A, and the
extent to which such delay imperils the award, is the judgment of the
two Judge Bench of the Supreme Court in Lancor Holdings. Learned
counsel for both sides, before us, have relied on the said decision. It is
necessary, therefore, to advert to the decision in some detail.

37. The decision in Lancor Holdings

37.1 The Supreme Court has in para 1.1 of the decision in Lancor
Holdings, identified the very first issue as arising before it for
consideration as “the effect of undue and unexplained delay in the
pronouncement of an arbitral award upon its validity.”

37.2 The arbitrator, in Lancor Holdings , reserved the award on 28
July 2012 but pronounced it nearly three years and eight months later
on 16 March 2016. The Supreme Court observes, in para 2 of the
report that the arbitral award did not provide any definite resolution of
the dispute and did not, also contain “any explanation worth the
name” for the delay in rendition of the award.

37.3 The Supreme Court, thereafter, adverts to the views expressed
by various High Courts on the aspect of delay in rendering arbitral
awards, and the effect thereof, during which course the judgment also
takes note of the decisions of this Court in Harji Engineering Works,
BWL Gian Gupta and GL Litmus Events (of the learned Single
Judge). In as much as these decisions have been considered by the
Supreme Court in Lancor Holdings, before proceeding to export its
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 41 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

own views in the matter, the need for referring to the said decisions is
obviated.

37.4 One of the contentions advanced before us by Mr. Wadhwa is
that the appropriate remedy with the Insurance Company, if it was
aggrieved by the delay, which had taken place in rendition of the
award, was to seek remedies under Section 14 of the 1996 Act.
Lancor Holdings, particularly addresses and rejects this submission in
the following paragraphs:

“ 17. Prior to insertion of Section 29-A in the statute book, in the
event of failure of an arbitrator to act without undue delay,
recourse was provided under Section 14 of the 1996 Act to dual
remedies—by approaching the arbitrator first and, then, the Court.
Section 14(1)( a ) states that the mandate of an arbitrator would
stand terminated if he either becomes de jure or de facto unable to
perform his functions or, for other reasons, fails to act without
undue delay. Section 14(2) states that, if a controversy remains
concerning any of the grounds referred to in Section 14(1)( a ), a
party may, unless otherwise agreed by the parties, apply to the
Court to decide on the termination of the arbitrator's mandate.

18. Though it is argued before us that recourse must necessarily
be taken to this remedy under Section 14(2) if a party is aggrieved
by long delay on the part of an arbitrator in delivering the arbitral
award, we may observe that, in reality, a party to an arbitration
proceeding would not willingly choose to incur the risk of
provoking the wrath of the arbitrator by moving such an
application as, in the event of failing in that endeavour, the very
same arbitrator would continue with the arbitration proceedings
and deliver a verdict. Being human, an arbitrator, who is
unsuccessfully subjected to a proceeding seeking the termination of
his/her mandate under Section 14(2), on grounds of his/her
personal failure, may well be prone to bias against the party who
had subjected him to such process. Therefore, notwithstanding this
remedy provided by the statute, to what extent it has actually been
of use is open to question.

*
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 42 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

25.2. ... Further, it would not be necessary for an aggrieved party
to invoke the remedy under Section 14(2) of the 1996 Act as a
condition precedent to laying a challenge to a delayed and tainted
award under Section 34 thereof. Both provisions would operate
independently as the latter is not dependent on the former.”

37.5 The following paragraphs from Lancor Holdings, are also in
relevance:

“ 21. Notably, on the issue of a “dilatory arbitrator”, Russel on
Arbitration states that an Arbitral Tribunal is required to conduct
proceedings and adopt procedures that would avoid unnecessary
delay and refusal or failure to conduct the proceedings or make an
award with reasonable dispatch can lead to that Tribunal's removal,
although the delay would have to be truly exceptional so as to
cause substantial injustice to the applicant. As to what would be
reasonable dispatch was stated to depend on circumstances—for
instance, a decision in a “documents-only” case may be expected
more quickly than in an arbitration where the testimony of many
witnesses has to be considered. It was further stated that a delay of
12 months in publishing an award was inordinate and was capable
of founding an application to have that award set aside.

*

24. However, the undeniable fact remains that Section 34 of the
1996 Act does not postulate delay in the delivery of an arbitral
award as a ground, in itself, to set it aside. There is no gainsaying
the fact that inordinate delay in the pronouncement of an arbitral
award has several deleterious effects. Passage of time invariably
debilitates frail human memory and it would be well-nigh
impossible for an arbitrator to have total recall of the oral evidence,
if any, adduced by witnesses; and the submissions and arguments
advanced by the parties or their learned counsel. Even if detailed
notes were made by the arbitrator during the process, they would
be a poor substitute to what is fresh in the mind immediately after
conclusion of the hearings in the case. More importantly, such
delay, if unexplained, would give rise to unnecessary and wholly
avoidable speculation and suspicion in the minds of the parties.
Absolute faith and trust in the system is essential to make it work
the way it is intended to. Once that belief is shaken, it would lead
to a breakdown of that system itself. A situation that is to be
eschewed at all costs.
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 43 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

*

25.1 In this regard, in his seminal article, titled “Arbitrators and
Accuracy” [ Journal of International Dispute Settlement (February,
2010).] , Professor William W. Park says thus:

“Although good case management values speed and
economy, it does so with respect for the parties' interest in
correct decisions. The parties have no less interest in
correct decisions than in efficient proceedings. An
arbitrator who makes the effort to listen before deciding
will enhance both the prospect of accuracy and satisfaction
of the litigants' taste for fairness. In the long run, little
satisfaction will come from awards that are quick and cheap
at the price of being systematically wrong.”

25.2. Therefore, keeping in mind these competing interests, it is
only in cases where the negative effect of the delay in the delivery
of an arbitral award is explicit and adversely reflects on the
findings in the said award, that such delay, and more so, if it
remains unexplained, can be construed to be a factor to set aside
that award. Once all the requirements, referred to supra, are
fulfilled in a given case and the arbitral award therein is clearly
riddled with the damaging effects of the delay, it can be construed
to be in conflict with the public policy of India, thereby attracting
Section 34(2)( b )( ii ) of the 1996 Act, or Section 34(2-A) thereof as
it may also be vitiated by patent illegality. Further, it would not be
necessary for an aggrieved party to invoke the remedy under
Section 14(2) of the 1996 Act as a condition precedent to laying a
challenge to a delayed and tainted award under Section 34 thereof.
Both provisions would operate independently as the latter is not
dependent on the former.

25.3. This being the legal position, we would have to examine
whether the present arbitral award suffers from any such malady
owing to the delay, whereby its very validity would stand vitiated.
Further, we would also have to see whether the award is liable to
be set aside for falling short, as it did not resolve the disputes
between the parties but their positions stood altered irreversibly
owing to the interim orders passed during the arbitral proceedings.
Lastly, if the award is liable to be set aside, the relief to be
granted.”

37.6 In the afore-extracted paragraphs, Lancor Holdings lays down
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 44 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

the following principles:

(i) Delay in pronouncement or rendition, in order to vitiate
the arbitral award has to be truly exceptional, resulting in
substantial injustice to the applicant.

(ii) It could not be denied that, with the passage of time,
human memory debilitates, and it might be impossible for an
arbitrator to totally recall the evidence adduced and submissions
advanced before him. If such delay is unexplained, it would
give rise to speculation and suspicion in the minds of the
parties, which would erode the requirement of absolute faith
and trust in the system. This was a consequence which, at all
costs, had to be eschewed.

(iii) The extent to which delay vitiates an award would,
however, have to be examined on the individual facts of each
case. The Court would have to examine the import and impact
of the delay on the final decision of the Arbitral Tribunal and as
to whether the arbitral award would stand vitiated owing to the
lapses committed by the Tribunal because of the delay . In other
words, mere delay by itself would not ipso facto vitiate an
arbitral award unless it had resulted in “lapses” as understood
by the Supreme Court in Lancor Holdings.


(iv) A balance was required to be struck between the pace of
arbitration, culminating in an award, and the satisfactory
meaningful content of the award. The requirement of a correct
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 45 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

decision could not be sacrificed at the altar of speed and
economy.

(v) Following these observations, the Supreme Court, in para
25.2 of the report, lays down the definite tests which would
apply in such a case. It is clearly held that delay would be a
factor to satisfy an arbitral award only where (i) the negative
effect of the delay is explicit, (ii) the delay adversely reflects on
the findings in the award, (iii) the delay is unexplained and (iv)
the arbitral award is riddled with the damaging effects of the
delay. If these circumstances coalesced in any particular case,
the award would be liable to be set aside both under Section 34
(2)(v)(ii) as well as Section 34 (2)-A of the 1996 Act as being in
conflict with the public policy of India and as vitiated by patent
illegality.

(vi) In each such case where delay in rendition or
pronouncement of an arbitral award is cited as a ground to
challenge it, therefore, the Court has to examine (i) whether the
award suffers from any such malady owing to the delay, as
would vitiate its very validity, (ii) the award falls short, as it
does not resolve the disputes between the parties and (iii) the
positions of the parties stand altered irreversibly owing to
interim orders passed during the arbitral proceedings. These
are all considerations which, according to Lancor Holdings,
are of importance and significance while assessing whether an
arbitral award could be set aside solely on the ground that it
was rendered belatedly.
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 46 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

37.7 Lancor Holdings, thereafter, proceeds, from para 27 to 62 of
the report, to analyse, thread bare, the facts of the case, and to take
apart the dispute literally strand by strand. It is not necessary for us to
burden this judgment by any detailed allusion thereto. Suffice it,
however, to state that, following the said analysis, the Supreme Court
proceeds, in paras 63, 64 and 66 of the report to observe and hold as
under:

“63. Having given our earnest consideration to the award in
question, we are of the opinion that the repetitions ad nauseam in
the award and the vacillation by the arbitrator as to what he should
do clearly manifest that the delay on his part contributed to his
demonstrable indecisiveness. Having stated at one stage that the
situation created by the Company was very complex requiring to
be carefully dealt with resulting in some delay in devising a proper
relief/award which “would be equitable to both parties”, the
arbitrator ultimately did not devise any such relief which was
equitable to both parties but held entirely in favour of the
respondents. He set aside the sale deeds executed by the Company
in its own favour and divested it of its possession over its 50%
share in the building, apart from directing payment of all the
rentals received by it to the respondents. In effect, the arbitrator left
the Company empty-handed with no relief whatsoever being
granted to it except for advice to take recourse to fresh litigation.
The respondents, on the other hand, were put in possession of their
share of the building, free of cost and without discharging their
obligations in terms of the JDA. They were also enriched to the
extent of appropriating all the rentals collected by the Company till
2016. As noted by the arbitrator himself and affirmed by both the
Courts that heard the matter thereafter, the building was not built
gratuitously by the Company and it was to be given its 50% share
in the building, along with a corresponding share in the land, to be
enjoyed by it and/or its nominees with full rights. However,
without that coming to pass, the Company was left with nothing
while the respondents got to enjoy the possession of their share in
the building for the past 15 years, provided to them free of cost and
without discharge of their corresponding obligations. In this
scenario, the respondents obviously did not think it fit to terminate
the JDA!

Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 47 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

64. Arbitration, an alternative dispute resolution mechanism, is
envisioned as a substitute to time-consuming and costly litigation
in Courts. The aim and objective of this mechanism is to ensure
settlement of disputes between parties with minimum intervention
by the Court. That is the reason why Section 34 of the 1996 Act is
crafted in a manner so as to restrict the grounds on which the
arbitrator's award can be set aside. Unless the limited grounds
stipulated in the provision are made out, an arbitral award cannot
be invalidated. However, the very objective of the exercise would
be lost if, after the entire process, an arbitrator fails to resolve the
disputes between the parties and leaves them high and dry with
advice to initiate a fresh round of arbitration/litigation once again.

*

66. The arbitrator in this case took nearly 4 years to conclude
that he had no equitable relief to offer both parties but held in
favour of one side in all respects, leaving it to the parties to start
litigating again. He conveniently opined that proper pleadings and
evidence had not been placed before him and, therefore, he was
constrained to relegate the parties to another round of litigation,
ignoring the fact that he had already altered their positions and had
benefitted one party at the expense of the other. This approach on
the part of the arbitrator, after dithering for nearly 4 years, served
absolutely no purpose and reflected total non-application of mind.
The delay in the making of the award resulted in nearly four
valuable years passing away with no benefit to show for it. When
the public policy underlying resort to arbitration is to make it a
time-saving mechanism for resolving disputes, this unexplained
and pointless delay of the arbitrator in concluding the matter
clearly pitted his ineffective and futile award against the public
policy of India.”


37.8 Thus, the factors which persuaded the Supreme Court in Lancor
Holdings, to hold that the very findings in the arbitral award were
vitiated on the ground of delay were that (i) there were repetitions ad
nauseam in the award, (ii) the arbitrator was vacillating on the course
of action which he was required to follow, (iii) this indicated
demonstrable indecisiveness on the part of the learned arbitrator which
was clearly attributable to the delay of four years in rendering the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 48 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

award, (iv) at one stage, the award stated that the situation was very
complex and required devising of a proper relief which would be
equitable to both parties, but the award ultimately, does not devise any
such equitable relief, but entirely ruled in favour of one of the parties
to the lis , (v) the other party was left, by the arbitrator, empty handed
with no relief whatsoever except an advice to take recourse to fresh
litigation, (vi) the opposite party, without complying with the terms of
the contract or discharging its obligations thereunder, was put in
possession of the property forming subject matter of the dispute, (vii)
“the very objective of an arbitral exercise would be lost if, after the
entire process, an Arbitrator fails to resolve the disputes between the
parties and leaves them high and dry with advice to initiate a fresh
round of arbitration/litigation once again”.

37.9 Para 66 of the Report was particularly critical of the manner in
which the arbitrator dealt with the matter. The Supreme Court
observed that the arbitrator took nearly four years to conclude that he
had no equitable relief to offer both parties, but entirely ruled in
favour of one of the parties, leaving the other side to start litigating
afresh. It was further observed that the learned arbitrator
“conveniently” opined that proper pleadings and evidence had not
been placed before him and that, therefore, he was constrained to
relegate the parties to another round of litigation. In doing so, the
learned arbitrator completely ignored the fact that he had already
altered the positions of the parties vis-a-vis each other and had
benefitted one party at the expense of the other. The Supreme Court
referred to this approach as “dithering for nearly four years”, and as
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 49 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

having served absolutely no purpose, reflective of total non-
application of mind. As a result, observed the Supreme Court, the
delay had resulted in wastage of four valuable years with no benefit to
show for it. The concluding observation in para 66 is particularly
telling noting, as it does, that the unexplained and pointless delay on
the part of the arbitrator rendered his award contrary to the public
policy of India. To the same effect, we may note, is para 76 of the
Report, which read thus:

“76. The arbitrator, therefore, clearly fell into error in reading
more into Clauses 6( a ), ( b ) and ( c ) than was permissible. The
award was ultimately passed by him with a delay of nearly 4 years,
not even settling the matter finally but requiring the parties to
litigate or seek arbitration afresh. In Ssangyong Engg. and
Construction Co. (supra) , it was observed that an argument to set
aside an award on the ground of being in conflict with “most basic
notions of justice” can be raised only in very exceptional
circumstances, that is, when the conscience of the Court is shocked
by infraction of some fundamental principle of justice. The undue
delay and wavering attitude of the arbitrator, contributing to his
rudderless award, are utterly shocking, to say the least, as he totally
lost sight of the very purpose of the exercise. Further, owing to the
pointless award passed by him with a delay of nearly 4 years, the
parties were left with no option but to litigate once again in relation
to a contract dating back to the year 2004! The award is, therefore,
liable to be set aside as it is in clear conflict with the public policy
of India and is also patently illegal.”

37.10 Though, therefore, in Lancor Holdings, the Supreme Court
held the delay on the part of the arbitrator in rendering the award to be
fatal to its validity, it is clear that the finding is specific to the facts of
that case. The delay was of four years, with no explanation
whatsoever. The arbitrator first held that the situation was complex
and required an equitable solution to be devised and thereafter, did not
desire any such solution. Instead, he decided the lis entirely in favour
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 50 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

of one of the parties and nonetheless left the parties to litigate all over
again. The Supreme Court also notes that relevant clauses of the
contract between the parties were ignored by the learned Arbitrator.

37.11 It is on a cumulative assessment of these facts that the Supreme
Court has observed that the delay in rendering the arbitral award had
imperilled it fatally.

37.12 On principle, however, the law declared by the Supreme Court
in Lancor Holdings, as would bind this Court and all other Courts
under Article 141 of the Constitution of India, is to be found in para
25.2, which for ready reference, we may reproduce once again:

“25.2. Therefore, keeping in mind these competing interests, it is
only in cases where the negative effect of the delay in the delivery
of an arbitral award is explicit and adversely reflects on the
findings in the said award, that such delay, and more so, if it
remains unexplained, can be construed to be a factor to set aside
that award. Once all the requirements, referred to supra, are
fulfilled in a given case and the arbitral award therein is clearly
riddled with the damaging effects of the delay, it can be construed
to be in conflict with the public policy of India, thereby attracting
Section 34(2)( b )( ii ) of the 1996 Act, or Section 34(2-A) thereof as
it may also be vitiated by patent illegality...”


The ratio of the decision in Lancor Holdings is contained in the afore-
extracted para 25.2, which follows after reference to earlier decisions
and authoritative commentaries on the point. Delay can be said to
vitiate an arbitral award only if it is explicit, adversely reflects on the
findings in the award and is unexplained to the extent that the arbitral
award is riddled with the damaging effects of the delay . Short of this,
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 51 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

the mere fact that an arbitral award was rendered belatedly cannot
constitute sufficient basis to set it aside.

37.13 Mr. Chandhiok sought to contend that Lancor Holdings could
not constitute a valuable precedent as it was rendered under Article
142 of the Constitution of India. This contention is clearly incorrect. A
bare reading of the judgment reveals that Article 142 has been invoked
only in para 87.2.1, while dealing with the issue of whether the matter
ought to have been remanded to the Arbitral Tribunal for
consideration afresh or whether the arbitral award deserved to be set
aside. The Supreme Court chose the second option, invoking for the
said purpose, its jurisdiction under Article 142. It is to this limited
extent, and for this limited purpose that Article 142 has been invoked
in the decision in Lancor Holdings . The said limited invocation does
not, in any way, dilute the precedential value of the decision.

38. Velusamy

38.1 We may now advert to the decision in Velusamy.

38.2 Velusamy relies on Lancor Holdings. This very reliance is
sufficient to negate Mr. Chandhiok’s submission that Lancor
Holdings does not constitute a valuable precedent.


38.3 Velusamy, on facts, is not directly applicable to the case before
us, as it refers to proceedings which took place after the introduction
of Section 29-A(5) in the 1996 Act. In fact, as Mr. Chandhiok
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 52 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

correctly points out, the very question of law which arose for
consideration in Velusamy , as set out in para 1 of the report, is distinct
and different from that which arises before us. The question read thus:

“Whether a Court can entertain an application under Section 29-
A(5) of the Arbitration and Conciliation Act, 1996 to extend the
mandate of the arbitrator(s) for making the award even after an
‘award’ is rendered, though after the expiry of the statutory limit of
eighteen-month period?
”

38.4 There are only three paras in Velusamy which are instructive
for adjudicating the dispute on hand, viz:

“14. Party autonomy, coupled with minimal intervention of
judicial authorities, has been the guiding principle for the 1996
Act. This is perhaps the reason for not provisioning a statutory
timeline for delivering awards and prescribing consequences of not
delivering them on time.

15. In the event of failure of an arbitrator to act without undue
delay, recourse was provided under Section 14 of the 1996 Act to
dual remedies—by approaching the arbitrator first and then the
Court. Section 14(1)( a ) states that the mandate of an arbitrator
would stand terminated if he either becomes de jure or de facto
unable to perform his functions or, for other reasons, fails to act
without undue delay. Section 14(2) states that, if a controversy
remains concerning any of the grounds referred to in Section
14(1)( a ), a party may, unless otherwise agreed with by the parties,
apply to the Court to decide on the termination of the arbitrator's
mandate. On the other hand, Section 34 of the 1996 Act does not
postulate delay in the delivery of the arbitral award as a ground in
itself, to set it aside, except, as explained in Lancor Holdings ,
where the negative effect of the delay in the arbitral award is
explicit and adversely reflects on the findings of the award.

*

20. It is well recognized that a fixed time-limit for the
rendering of an arbitral award may foreclose the mandate of a
Tribunal if breached. However, such limits are not intended to
frustrate the arbitral process. In appropriate cases, Courts have
retroactively extended timelines and even upheld awards rendered
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 53 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

outside agreed deadlines where it was necessary to preserve justice
and prevent the arbitration from being defeated by technical non-
compliance.”

38.5 The concluding observation in para 15 of Velusamy, which
refers to the earlier decision in Lancor Holdings, once again reiterates
the position that mere delay in delivery of an award is not sufficient to
set it aside, except where the negative effect of the delay in the award
is explicit and adversely reflects on the findings in the award.

38.6 Similarly, in para 20 of Velusamy , the Supreme Court has
clearly held that awards, even rendered outside agreed deadlines, were
at times upheld “where it was necessary to preserve justice and
prevent the arbitration from being defeated by technical non-
compliance”.

38.7 The Supreme Court has concluded the decision in Velusamy by
setting out the principles which emerged from the preceding
discussion in the said decision in the various sub paras of para 21. Of
these, para 21.8 once again reiterates the principle enunciated in
Lancor Holdings thus :

“21.8. Delay in the delivery of an arbitral award, by itself, is not
sufficient to set aside that award. It is only when the effect of the
undue delay in the delivery of an arbitral award is explicit and
adversely reflects on the findings therein, such delay and, more so,
if it remains unexplained, can be construed to result in the award
being in conflict with the public policy of India.”

I. Applying the Law

I.1 Approach in the impugned judgment
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 54 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

39. A significant feature of the impugned judgment is that the
learned Single Judge, after arriving at a finding that Clause 13 of the
Policies and its effect on the arbitrability of the dispute had not been
addressed by the learned Arbitral Tribunal and, has not set aside the
arbitral award on that ground. There is no specific finding by the
learned Single Judge to the effect that the dispute was not arbitrable in
view of Clause 13 and that, therefore, in arbitrating on the dispute, the
arbitral award was rendered liable to be set aside. Instead, the learned
Single Judge has identified the points which, according to him, would
arise when examining the arbitrability of the dispute in the light of
Clause 13, and has proceeded to hold that owing to the delay in
rendition of the award after it was reserved, and possibly owing to the
dilution, in the memory of the members of the learned Arbitral
Tribunal of the contentions advanced by the parties with the passage
of time, these issues have not been addressed.

40. This is an important distinction. To reiterate, the learned Single
Judge has not set aside the arbitral award on the ground that the
disputes were not arbitrable in view of Clause 13. He has set aside the
arbitral award on the ground that, owing, possibly, to the fact that the
Arbitral Tribunal had, because of the delay in rendition of the award,
forgotten the submissions advanced before it, the issue of arbitrability
of the dispute in the light of Clause 13 has not been adequately
addressed. We have to examine whether this view of the learned
Single Judge passes muster. It is in that context, that the averments
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 55 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

contained in the Statement of Defence filed by UHPL assumes
importance.

I.2 Stand of Insurance Company before the Arbitral Tribunal

41. A reading of the paragraphs from the Statement of Defence
filed by the Insurance Company before the Arbitral Tribunal,
extracted in para 28 supra , makes it clear that there was no categorical
denial, by the Insurance Company, of the fact that it was liable to pay
UHPL against the insurance policies taken out by UHPL with the
Insurance Company. The fact that the fire had broken out, damage had
taken place and that UHPL was insured with the Insurance Company
under Fire MD Policy and the LOP Policy stand admitted. There can,
therefore, be no escape from the Insurance Companies’ liability to
recompense UHPL for the loss suffered by it in the fire. The dispute,
therefore, was only with respect to the amount which was payable by
the Insurance Company to UHPL. The Insurance Company contended
that all amounts payable and duly assessed stood paid to UHPL,
whereas UHPL asserted, per contra, that it was entitled to additional
amounts, in respect of which, claims stood referred to arbitration.
Clearly, therefore, the dispute was arbitrable within the meaning of
Clause 13 of the Policies, as the dispute was only with respect to the
amount, i.e. the quantum payable and not with respect to the liability
of the Insurance Company towards UHPL. From a reading of the
Statement of Defence, it is also clear that Mr. Wadhwa is correct in his
submission that no specific objection to the arbitrability of the dispute,
in the light of Clause 13 of the Policies was urged by the Insurance
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 56 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Company in the arbitral proceedings.

I.3 Approach of the learned Arbitral Tribunal – Maintainability, as
well as Clause 13, effectively addressed

42. The learned Arbitral Tribunal has examined, completely, the
aspect of whether the claim of UHPL against the Insurance Company
stood discharged by accord and satisfaction, in view of the discharge
voucher signed by UHPL and the receipt and acceptance by UHPL, of
the payments made by the Insurance Company, as recorded in the
discharge voucher. The learned Arbitral Tribunal has come to a
conclusion that the discharge voucher stood vitiated by financial
duress and abuse by the Insurance Company, of its dominant position,
in the facts of the case, and could not therefore, result in discharge of
the liability of the Insurance Company towards UHPL by accord and
satisfaction.

43. This being the sole ground of maintainability advanced by the
Insurance Company before the learned Arbitral Tribunal, and the
Arbitral Tribunal having examined the aspect in its entirety, we are
unable to accept the submission of the Insurance Company that the
aspect of arbitrability of the dispute has not been properly examined
by the learned Arbitral Tribunal.

44. We are not returning any finding on whether the decision of the
learned Arbitral Tribunal, with respect to the plea of accord and
satisfaction raised by the Insurance Company is, or is not, legally
sustainable. The Learned Single has not examined the arbitral award
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 57 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

from that angle and, therefore, exercising, as we are, Section 37
jurisdiction, it would not be proper for us to pronounce thereupon.

45. The learned Single Judge has, however, proceeded to hold that
the learned Arbitral Tribunal did not examine the aspect of
arbitrability of the dispute in the wake of Clause 13 of the Policies.
For this purpose, the impugned judgment has, in para 12, enumerated
the aspects which, according to the learned Single Judge, should have
been addressed by the learned Arbitral Tribunal while examining the
aspect of arbitrability of the dispute vis-a-vis Clause 13. The learned
Single Judge expresses its disagreement with the approach of the
learned Arbitral Tribunal in proceeding to deal with the claims on
merits “after only deciding that the settlement was not voluntary”.
This lapse, on the part of the learned Arbitral Tribunal - as the learned
Single Judge views it – is, according to the impugned judgment
attributable to the delay in rendition of the award after it was reserved.
This is clear from para 13 of the impugned judgment, already
reproduced supra.

46. As we have already noted, and as Mr. Wadhwa has correctly
submitted, no specific objection to the arbitrability of the dispute, in
the wake of Clause 13 of the Policies, was urged by the Insurance
Company in its Statement of Defence. Pleadings bind the parties as
much in arbitration as in other legal proceedings. A plea that the
dispute was not arbitrable, given the nature of Clause 13 of the
Policies, is, at the very least, a mixed question of fact and law. It has
to be pleaded. In the absence of any p1leadings, objecting to the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 58 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

arbitrability of the dispute on the basis of Clause 13 of the Policies, we
are unable to agree with the learned Single Judge or with Mr.
Chandhiok, that the learned Arbitral Tribunal was remiss in not
examining, holistically, the aspect of arbitrability of the dispute vis-a-
vis Clause 13 of the Policies.

47. Even if we were to presume that the learned Arbitral Tribunal
ought to have examined the arbitrability of the dispute vis-a-vis
Clause 13 of the Policies, despite no specific objection to that effect
having been raised by the Insurance Company before it, we are of the
opinion that the findings of the learned Arbitral Tribunal indirectly, if
not directly, address and decide the issue.

48. Clause 13 of the Policies specifically provides that a dispute
between the parties would be arbitrable if there is no contest to the
liability of the Insurance Company and the dispute pertains only to the
quantum. Clause 13 says just this much, and no more.

49. All that the Arbitral Tribunal would be required to consider, in
examining the arbitrability of the dispute vis-a-vis Clause 13 of the
Policies, would, therefore, be whether the parties were forming issue
only with respect to the quantum of liability, or also on the aspect of
liability of the Insurance Company itself.


50. We have already noted, while referring to the relevant
paragraphs from the Statement of Defence filed by the Insurance
Company, that there was no contest, by the Insurance Company, of the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 59 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

fact that it was liable to recompense UHPL for the loss suffered by it
owing to the fire. The dispute related only to quantum. The Insurance
Company was of the view that as the entire amount payable to UHPL,
as worked out by the surveyor, appointed by it, had been paid and
UHPL had acknowledged this fact by signing the discharge voucher,
no further amount was payable by it .

51. UHPL contended, per contra, that the Insurance Company
owed more to it than the amount specified in the discharge voucher
and that the discharge voucher could not be made binding on UHPL,
as it was executed under financial duress and coercion.

52. The learned Arbitral Tribunal has, after a detailed and
exhaustive analysis, arrived at the conclusion that the discharge
voucher was in fact executed under financial duress and coercion. The
sequitur would, therefore, be that the discharge voucher could not
liquidate the claim of UHPL against the Insurance Company on the
principle of accord and satisfaction. The further sequitur would be,
therefore, that the quantum of amount payable by the Insurance
Company to UHPL remained open to adjudication.

53. The corollary of these findings would, therefore, be that the
dispute remained arbitrable as it related only to the quantum of
compensation payable by the Insurance Company to UHPL, the
liability to pay being undisputed.

54. We cannot, therefore, agree with the learned Single Judge in his
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 60 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

finding that the aspect of arbitrability of the dispute had not been
addressed by the learned Arbitral Tribunal.

I.4 Recourse of Section 14 not necessary

55. It is not possible to accept Mr. Wadhwa’s contention that the
only remedy available with the Insurance Company, apropos the delay
in rendition of the arbitral award, was by way of proceedings under
Section 14. The Supreme Court has clarified, in no uncertain terms,
that the remedy under Section 14 does not eviscerate the right to
challenge the award under Section 34 on the ground of delay –
provided the appropriate indicia in that regard, are met.

56. We, therefore, reject Mr. Wadhwa’s submission that, not having
chosen to prefer any proceedings under Section 14, the Insurance
Company cannot maintain a challenge to the arbitral award on the
ground of delay in its pronouncement under Section 34.

I.5 Finding in impugned judgment on the aspect of delay in
rendition of the arbitral award, and its effect

57. In examining whether the arbitral award was vitiated by delay
in its pronouncement, the impugned judgment does not, however,
conform to the Lancor principles. The learned Single Judge has not
returned any specific finding of adverse impact, of the delay in
rendition of the arbitral award which form subject matter of the
controversy before us, on the findings in the award. All he says that
there is a mere possibility that, owing to the passage of time, the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 61 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

fallibility of human memory, the arbitrators may have forgotten the
arguments advance before them. Which argument was forgotten is
also not spelt out in the impugned judgment. A mere “possibility of
forgetting”, absent any specific finding of the delay in the arbitral
award having a negative effect on the findings contained therein is,
quite clearly, insufficient to set aside the award.

58. Though the aforesaid discussion is by itself sufficient to allow
the present appeal, we may nonetheless address the various
contentions advanced by Mr. Chandhiok, thus, even if at the cost of
some repetition.

I.6 Scope of Section 37

59. Mr. Chandhiok commenced his submissions by drawing our
attention to the limited scope of judicial intervention under Section 37
of the 1996 Act. He sought to submit that, an appeal under Section 37
is akin to a second appeal under the CPC. This submission is
jurisprudentially incorrect. In Bombay Slum Redevelopment Corpn.
43
(P) Ltd. v. Samir Narain Bhojwani , it has been specifically held by
the Supreme Court, in para 28, thus:

“28. The provisions of the CPC have not been made applicable to
the proceedings before the learned arbitrator and the Court under
Sections 34 and 37 of the Arbitration Act. The legislature's intention
is reflected in Section 19(1) of the Arbitration Act, which provides
that an Arbitral Tribunal is not bound by the provision of the CPC.
That is why the provisions of the CPC have not been made
applicable to the proceedings under Sections 34 and 37(1)( c ). We are

43
(2024) 7 SCC 218
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 62 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

not even suggesting that because the provisions of the CPC are not
applicable, the appellate court dealing with an appeal under Section
37(1)( c ) is powerless to pass an order of remand. The remedy of an
appeal will not be effective unless there is a power of remand vesting
in the appellate authority. In the Arbitration Act, there is no statutory
embargo on the power of the appellate court under Section 37(1)( c )
to pass an order of remand. However, looking at the scheme of the
Arbitration Act, the appellate court can exercise the power of remand
only when exceptional circumstances make an order of remand
unavoidable.”


60. In a similar vein para 14 of the Punjab State Civil Supplies
44
Corpn. Ltd. v. Sanman Rice Mills holds :

“14. It is equally well settled that the appellate power under
Section 37 of the Act is not akin to the normal appellate
jurisdiction vested in the civil courts for the reason that the scope
of interference of the courts with arbitral proceedings or award is
very limited, confined to the ambit of Section 34 of the Act only
and even that power cannot be exercised in a casual and a cavalier
manner.

61. The scope of Section 37 jurisdiction has been clarified by the
Supreme Court in several decisions, from some of which we may
extract the relevant paras thus:

45
(i) MMTC Ltd. v. Vedanta Ltd. :

“13. It is relevant to note that after the 2015 Amendment
to Section 34, the above position stands somewhat
modified. Pursuant to the insertion of Explanation 1 to
Section 34(2), the scope of contravention of Indian public
policy has been modified to the extent that it now means
fraud or corruption in the making of the award, violation of
Section 75 or Section 81 of the Act, contravention of the
fundamental policy of Indian law, and conflict with the
most basic notions of justice or morality. Additionally, sub-

44
2024 SCC OnLine SC 2632
45
(2019) 4 SCC 163
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 63 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

section (2-A) has been inserted in Section 34, which
provides that in case of domestic arbitrations, violation of
Indian public policy also includes patent illegality
appearing on the face of the award. The proviso to the same
states that an award shall not be set aside merely on the
ground of an erroneous application of the law or by
reappreciation of evidence.

14. As far as interference with an order made under
Section 34, as per Section 37, is concerned, it cannot be
disputed that such interference under Section 37 cannot
travel beyond the restrictions laid down under Section 34.
In other words, the court cannot undertake an independent
assessment of the merits of the award, and must only
ascertain that the exercise of power by the court under
Section 34 has not exceeded the scope of the provision.
Thus, it is evident that in case an arbitral award has been
confirmed by the court under Section 34 and by the court in
an appeal under Section 37, this Court must be extremely
cautious and slow to disturb such concurrent findings.”

46
(ii) Haryana Tourism Ltd. v. Kandhari Beverages Ltd. :

“2.3. Feeling aggrieved and dissatisfied with the order
passed by Additional District Judge, Chandigarh dismissing
the appeal/objection petition under Section 34 of the
Arbitration Act, the respondent herein preferred a further
appeal before the High Court under Section 37 of the
Arbitration Act. By the impugned judgment and order
47
[ Kandhari Beverages Ltd. v. Haryana Tourism Ltd . ], the
High Court has allowed the said appeal by entering into the
merits of the claim and has quashed and set aside the award
passed by the arbitrator as well as the order passed by
Additional District Judge, Chandigarh.

*

8. So far as the impugned judgment and order
[ Kandhari Beverages Ltd. v. Haryana Tourism Ltd . ]
passed by the High Court quashing and setting aside the
award and the order passed by the Additional District Judge
under Section 34 of the Arbitration Act are concerned, it is
required to be noted that in an appeal under Section 37 of

46
(2022) 3 SCC 237
47
2018 SCC OnLine P&H 3233
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 64 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

the Arbitration Act, the High Court has entered into the
merits of the claim, which is not permissible in exercise of
powers under Section 37 of the Arbitration Act.

9. As per settled position of law laid down by this
Court in a catena of decisions, an award can be set aside
only if the award is against the public policy of India. The
award can be set aside under Sections 34/37 of the
Arbitration Act, if the award is found to be contrary to: ( a )
fundamental policy of Indian law; or ( b ) the interest of
India; or ( c ) justice or morality; or ( d ) if it is patently
illegal. None of the aforesaid exceptions shall be applicable
to the facts of the case on hand. The High Court has entered
into the merits of the claim and has decided the appeal
under Section 37 of the Arbitration Act as if the High Court
was deciding the appeal against the judgment and decree
passed by the learned trial court. Thus, the High Court has
exercised the jurisdiction not vested in it under Section 37
of the Arbitration Act. The impugned judgment and order
[ Kandhari Beverages Ltd ] passed by the High Court is
hence not sustainable.”


(iii) Punjab State Civil Supplies Corpn. Ltd. v. Sanman Rice
Mills:

“14. It is equally well settled that the appellate power
under Section 37 of the Act is not akin to the normal
appellate jurisdiction vested in the civil courts for the
reason that the scope of interference of the courts with
arbitral proceedings or award is very limited, confined to
the ambit of Section 34 of the Act only and even that power
cannot be exercised in a casual and a cavalier manner.

15. In Dyna Technology Private Limited v. Crompton
Greaves Limited , the court observed as under:

“24. There is no dispute that Section 34 of the
Arbitration Act limits a challenge to an award only
on the grounds provided therein or as interpreted by
various courts. We need to be cognizant of the fact
that arbitral awards should not be interfered with in
a casual and cavalier manner, unless the court
comes to a conclusion that the perversity of the
award goes to the root of the matter without there
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 65 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

being a possibility of alternative interpretation
which may sustain the arbitral award. Section 34 is
different in its approach and cannot be equated with
a normal appellate jurisdiction. The mandate under
Section 34 is to respect the finality of the arbitral
award and the party autonomy to get their dispute
adjudicated by an alternative forum as provided
under the law. If the courts were to interfere with
the arbitral award in the usual course on factual
aspects, then the commercial wisdom behind opting
for alternate dispute resolution would stand
frustrated.

25. Moreover, umpteen number of judgments of this
Court have categorically held that the courts should
not interfere with an award merely because an
alternative view on facts and interpretation of
contract exists. The courts need to be cautious and
should defer to the view taken by the Arbitral
Tribunal even if the reasoning provided in the award
is implied unless such award portrays perversity
unpardonable under Section 34 of the Arbitration
Act.”

16. It is seen that the scope of interference in an appeal
under Section 37 of the Act is restricted and subject to the
same grounds on which an award can be challenged under
Section 34 of the Act. In other words, the powers under
Section 37 vested in the court of appeal are not beyond the
scope of interference provided under Section 34 of the Act.

17. In paragraph 14 of MMTC Limited v. Vedanta
Limited , it has been held as under:

“14. As far as interference with an order made under
Section 34, as per Section 37, is concerned, it
cannot be disputed that such interference under
Section 37 cannot travel beyond the restrictions laid
down under Section 34. In other words, the court
cannot undertake an independent assessment of the
merits of the award, and must only ascertain that the
exercise of power by the court under Section 34 has
not exceeded the scope of the provision. Thus, it is
evident that in case an arbitral award has been
confirmed by the court under Section 34 and by the
court in an appeal under Section 37, this Court must
be extremely cautious and slow to disturb such
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 66 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

concurrent findings.”

18. Recently a three-Judge Bench in Konkan Railway
Corporation Limited v. Chenab Bridge Project
48
Undertaking referring to MMTC Limited (supra) held
that the scope of jurisdiction under Section 34 and Section
37 of the Act is not like a normal appellate jurisdiction and
the courts should not interfere with the arbitral award
lightly in a casual and a cavalier manner. The mere
possibility of an alternative view on facts or interpretation
of the contract does not entitle the courts to reverse the
findings of the arbitral tribunal.

CONCLUSION:

20. In view of the above position in law on the subject,
the scope of the intervention of the court in arbitral matters
is virtually prohibited, if not absolutely barred and that the
interference is confined only to the extent envisaged under
Section 34 of the Act. The appellate power of Section 37 of
the Act is limited within the domain of Section 34 of the
Act. It is exercisable only to find out if the court, exercising
power under Section 34 of the Act, has acted within its
limits as prescribed thereunder or has exceeded or failed to
exercise the power so conferred. The Appellate Court has
no authority of law to consider the matter in dispute before
the arbitral tribunal on merits so as to find out as to whether
the decision of the arbitral tribunal is right or wrong upon
reappraisal of evidence as if it is sitting in an ordinary court
of appeal. It is only where the court exercising power under
Section 34 has failed to exercise its jurisdiction vested in it
by Section 34 or has travelled beyond its jurisdiction that
the appellate court can step in and set aside the order passed
under Section 34 of the Act. Its power is more akin to that
superintendence as is vested in civil courts while exercising
revisionary powers. The arbitral award is not liable to be
interfered unless a case for interference as set out in the
earlier part of the decision, is made out. It cannot be
disturbed only for the reason that instead of the view taken
by the arbitral tribunal, the other view which is also a
possible view is a better view according to the appellate
court.”

I.7 To remand or not?

48
(2023) 9 SCC 85
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 67 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

62. Having observed, in para 28 of Bombay Slum Redevelopment
Corpn, that remand has to be resorted to, while exercising jurisdiction
under Section 37 of the 1996 Act, only in exceptional cases, the
Supreme Court, in para 29, exemplifies some such exceptional cases
thus:

“29. There may be exceptional cases where remand in an appeal
under Section 37 of the Arbitration Act may be warranted. Some of
the exceptional cases can be stated by way of illustration:

(a) Summary disposal of a petition under Section 34 of the
Arbitration Act is made without consideration of merits;

(b) Without service of notice to the respondent in a petition
under Section 34, interference is made with the award; and

(c) Decision in proceedings under Section 34 is rendered when
one or more contesting parties are dead, and their legal
representatives have not been brought on record.”

63. The present case clearly falls within category (a) in para 29 of
Bombay Slum Redevelopment Corpn, as the learned Single Judge has
not adverted to merits at all.

I.8 “Merits need not be gone into”

64. In fact, the observation of the learned Single Judge, in para 19
of the impugned judgment, to the effect that the detailed reasons
provided in the arbitral award for dealing with the merits of the claim
were not required to be gone into, is even by itself sufficient to vitiate
the impugned judgment. One of the cardinal tests for deciding whether
delay in rendition of an arbitral award vitiates it, is the impact and
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 68 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

effect of the delay on the findings on merits contained in the arbitral
award. In holding that it was not necessary to refer to the findings in
the arbitral award on merits, therefore, the learned Single Judge has
ruled contrary to the declaration of law in Lancor Holdings and
Velusamy .

65. We are confident that, in passing the present judgment, we are
not transgressing the jurisdiction vested in us by Section 37 of the
1996 Act. The learned Single Judge has not adverted to the merits of
the arbitral award at all, but has set aside solely on the ground of
delay. While examining, in exercise of the appellate jurisdiction
vested in us by Section 37 of the 1996 Act, whether the view of the
learned Single Judge is legally sustainable, we, at the very least, have
to determine whether the learned Single Judge was correct in setting
aside the arbitral award solely on the ground of delay and whether, in
so deciding, the learned Single Judge has applied the correct legal
principles.

66. For the reasons set out earlier in this judgment as well as
hereinafter, we are of the opinion that the answers to both these
questions have necessarily to be in the negative. Section 37, therefore,
obligates us to interfere in the present case.

I.9 Re. plea that delay by itself is sufficient to set aside an arbitral
award

67. Mr. Chandhiok further submits that delay in pronouncement of
an arbitral award is sufficient in itself to set it aside. It is not necessary
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 69 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

to once again deal with this submission except to draw attention to the
observations already made by us earlier, as the issue stands concluded
by the decision in Lancor Holdings, particularly by paras 25.2 and
25.3 thereof. The decisions of this Court in BWL Limited, Harji
Engg. Works (P) Ltd., Gian Gupta and G.L. Litmus have all been
noticed in Lancor Holdings and need not, therefore, be dealt with
individually here.

I.10 Re. plea that the learned Arbitral Tribunal failed to address
Clause 13 of the Policies

68. Mr. Chandhiok’s next contention is that the learned Single
Judge was correct in holding that the arbitral award in the present case
was vitiated as there was no decision, by the learned Arbitral Tribunal,
on its own jurisdiction, in the face of Clause 13 of the Policies. We
have already rejected this submission for two reasons; firstly, because
Clause 13 was never specifically invoked by the Insurance Company
either in the Statement of Defence or the pleadings before the learned
Arbitral Tribunal and, secondly, even otherwise, the findings of the
learned Arbitral Tribunal effectively adjudicate on the aspect of
maintainability of the arbitration in the light of Clause 13 of the
Policies. We are in agreement with the findings in the arbitral award
that the arbitral proceedings were maintainable.

I.11 Whether the delay was sufficiently explained

69. It is further contended by Mr. Chandhiok that the reasons for
delay, as provided in the arbitral award were insufficient. The learned
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 70 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

Single Judge has also ruled, likewise.

70. With respect, we cannot agree.

71. The learned Arbitral Tribunal has clearly held that the
proceedings took place during the COVID-19 pandemic and, once the
period of the pandemic is excluded, the reaming delay is only of one
year. During that period, there was considerable delay on the part of
the parties in filing the written submissions, despite the time in that
regard having been fixed by the learned Arbitral Tribunal.

72. It cannot be forgotten that, unlike Lancor Holdings, this was a
case of an Arbitral Tribunal consisting of three learned Arbitrators of
undisputed eminence, one being a learned retired Judge of the
Supreme Court, the second a learned retired Chief Justice of the High
Court of Jammu and Kashmir and the third a learned retired Judge of
this Court. Where a three member Arbitral Tribunal is involved, it
goes without saying that they are required to concur among
themselves, and arrive at a consensus, or otherwise, before finally
pronouncing the award.

73. Viewed in that light and, the fact that the period included the
pandemic lockdown, it cannot be said that the delay in rendering the
arbitral award was unexplained.

74. Besides, at the cost of repetition, delay in its rendition does not
vitiate an arbitral award, unless it is positively demonstrated and held
that the delay fatally impacted the findings in the award. There is no
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 71 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

such finding by the learned Single Judge.

I.12 All issues discussed – Delay did not impact findings in the
arbitral award


75. Even otherwise, as we have already observed, the arbitral award
discusses all issues threadbare. The learned Single Judge does not
hold in the impugned judgment, that any aspect of this dispute was left
undecided- except the effect of Clause 13 of the policies, with which
finding we have already respectfully expressed our inability to concur.
We have also perused the said findings and, irrespective of whether
would, or would not, otherwise withstand Section 34 scrutiny, do not
find this to be in any way adversely effective by the time taken to
render the award after it was reserved.

76. The submission that, as the learned Arbitral Tribunal did not
meet for a long time after reserving of the award, it indicated that
“there was ( sic were) deliberations upon the issues involved, which
obviously meant that, all that was urged have been forgotten” is
presumptuous, to say the least, and is also, to an extent, dismissive of
the capability and capacity of the learned arbitrators, who constituted
the Tribunal.

77. Most significantly, Mr. Chandhiok has not pointed a single
argument which was urged before the learned Arbitral Tribunal and
was not considered by it, while rendering the arbitral award. This
single fact, to our mind, is sufficient to completely demolish the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 72 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

submission that the award was vitiated by delay in its rendition. If the
contentions advanced by the parties have been considered by the
learned Arbitral Tribunal, it is obvious that it cannot be contended that
the delay in rendering the award imperilled it, or indicated that the
Arbitrators had forgotten the arguments which were advanced.

78. Mr. Chandhiok has, therefore, merely presumed that “all that
was urged had been forgotten”, without pointing out a single point
which was urged and which, from the arbitral award, appeared to have
been forgotten.

I.13 The Division Bench judgment in G.L. Litmus Events

79. The judgment of the Division Bench of this Court in G.L.
Litmus Events was rendered after the decision of the Supreme Court
in Lancor Holdings , and considers the decision. As such, it assumes
some significance. Mr. Chandhiok places extensive reliance on the
decision in G.L. Litmus Events , asserting that it covers the case.

80. We find ourselves unable to agree.

81. Three stark features distinguish the present case from G.L.
Litmus Events . Firstly, and most significantly, the arbitral award
provided no explanation for the delay, and this aspect weighed heavily
both with the learned Single Judge as well as with the Division Bench
of this Court in the decision to set aside the award. Secondly, as
many as three communications were addressed by the parties to the
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 73 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

arbitrator in that case, requesting for an expeditious award, but to no
avail. Thirdly, and, again, significantly, the decision does not address
the requirement of the findings in the arbitral award having to be
prejudicially affected by the delay in its rendition as a pre-requisite
for setting aside the award on that ground; indeed, it does not appear
that this plea, so assiduously canvassed before us by Mr. Wadhwa,
was even advanced before the Division Bench in that case. The plea
that was advanced was of the absence of any finding of prejudice and
miscarriage of justice, which has been rejected by the Division Bench.

82. This position is clear from the following passages from the
judgment:

“28. Even if it is presumed that the final hearing was completed
on 04.05.2016, still there is a huge delay for about 18 months and
23 days i.e. approximately 19 months in passing the award.
Learned Counsel for the appellant argued that delay in passing the
award would become fatal only if some prejudice is caused to a
party or demonstrable miscarriage of justice has happened.
However, the law does not require that to hold such time barred
award null and void, any fact manifesting prejudice or miscarriage
of justice should be brought on record. Therefore, when an award
is unreasonably delayed, parties are not required to show any
prejudice or miscarriage of justice because these two factors are
automatically implied.

*
31. In the present case, the award has been passed after a delay of
approximately 19 months. The learned Single Judge has observed
that the parties had, on three occasions, written to the Arbitrator to
pronounce the award, which shows the anxiety of the parties and
also suggests they have lost faith in the arbitral process. We also
find that no explanation has been given by the Arbitrator in the
Award for the delay . We are of the view that such inordinate
unexplained delay would render the arbitral proceeding contrary to
the public policy of India, and the award was rightly set aside
under Section 34(2)(b)(ii) of the Act.”
(Emphasis supplied)
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 74 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

83. The position that delay in rendition of an arbitral award is fatal
only where (i) the delay is unexplained, and (ii) the delay affects the
findings in the award, stands reiterated in Velusamy , which was
rendered after the decision of the Division Bench in G.L. Litmus
Events . The Division Bench, therefore, had no occasion to see
Velusamy .

84. The decision of the Division Bench in G.L. Litmus Events
cannot, therefore, come to the aid of the Insurance Company.

J. The Sequitur

85. We find ourselves, therefore, unable to sustain the impugned
judgment, for the following reasons:

(i) Delay in rendition of an arbitral award is not, by itself,
sufficient to set it aside. Additionally,
(a) the delay must be unexplained, and
(b) the findings in the award must be affected by the
delay.

(ii) In the present case, the learned Arbitral Tribunal has
provided an explanation for the delay, which, to our mind,
adequately explains it. Moreover, unlike G.L. Litmus Events ,
neither side raised any objection regarding the delay in
rendering the award at the time, and the plea was advanced by
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 75 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

the Insurance Company only in its Section 34 petition, when it
found that the award went against it.

(iii) The arbitral award is detailed and comprehensive, and
deals with all aspects of the dispute. The learned Single Judge
has not held, in the impugned judgment, that any finding in the
arbitral award is affected by the delay in its rendition.

(iv) Rather, the learned Single Judge holds that it is not
necessary to enter into the merits of the arbitral award, which
militates against the test laid down in Lancor Holdings and
Velusamy , both of which require, as a necessary sine qua non ,
the findings in the arbitral award to be affected by the delay in
its rendition , for the award to be set aside on that ground.

(v) We, on facts, do not find any ground to hold that any of
the findings in the arbitral award were affected by the delay in
its rendition. Nor, for that matter, has Mr. Chandhiok so
contended before us.

(vi) The finding, in the impugned judgment, that the arbitral
award does not address the aspect of arbitrability of the dispute
in the light of Clause 13 of the Policies, cannot operate, in our
view, to vitiate the award, for a variety of reasons, viz.

(a) There is no accompanying finding, in the
impugned judgment, that, in fact or in law, the dispute
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 76 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

was not arbitrable in view of Clause 13. Having noted
this aspect of the matter, the learned Single Judge
proceeds to hold that the learned Arbitral Tribunal
omitted to deal with it, probably because, with the
passage of time, the submissions advanced in that regard
were effaced from the memory of the Members of the
learned Arbitral Tribunal.

(b) The impugned judgment does not, however,
identify any submission, advanced by either of the
parties, which has not been dealt with, by the learned
Arbitral Tribunal.

(c) In the absence of any such finding, the observation
that the submissions advanced before the learned Arbitral
Tribunal may have been forgotten is a mere presumption,
at best, and wholly insufficient to invalidate the arbitral
award.

(d) Clause 13 of the Policies was, moreover, never
invoked by the Insurance Company in its Statement of
Defence.

(e) The only plea raised by the Insurance Company, to
contest the validity of UHPL’s claims, was the plea that
they stood discharged by accord and satisfaction.

Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 77 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

(f) This aspect has been addressed, in detail, by the
learned Arbitral Tribunal, and the impugned judgment
does not question the correctness of the decision of the
learned Arbitral Tribunal in that regard.

(g) We, besides the findings in the arbitral award also
effectly address the aspect of arbitrability of the dispute
in the light of Clause 13 of the Policies, even if it does
not expressly advert to the Clause.

(vii) Mr. Chandhiok has not sought to urge, before us, that
there was any submission advanced before the learned Arbitral
Tribunal, which has escaped its attention or not been addressed
in the arbitral award.

(viii) Delay in rendition of an arbitral award is not, by itself,
envisaged as a ground to set it aside, in Section 34 of the 1996
Act. Delay becomes fatal only where it is unexplained, and
imperils the findings in the award. These requirements are not
met in the present case.

K. Conclusion

86. For the above reasons, we are unable to sustain the impugned
judgment dated 30 January 2026 of the learned Single Judge. It is
accordingly quashed and set aside.

Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 78 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26

87. OMP (Comm) 197/2023 is accordingly remanded for
consideration de novo by the learned Single Judge, uninfluenced by
any observations or findings contained in the impugned judgment.

88. We also clarify that all observations contained in this judgment
are to be treated as having been returned only for the purposes of
adjudicating on the present appeal, which is limited to the issue of
whether the arbitral award, in the present case, was liable to have been
set aside, as the learned Single Judge has done, solely on the ground
of delay in its rendition. We have held otherwise.


89. The appeal is accordingly allowed with no orders as to costs.


C. HARI SHANKAR, J.

VINOD KUMAR, J.
SEPTEMBER 16, 2026 /aky/yg
Signature Not Verified
FAO(OS) (COMM) 29/2026 Page 79 of 79

Digitally Signed By:AJIT
KUMAR
Signing Date:16.09.2026
18:51:26