WPMS/707/2020
M/s Malik Industries
--Petitioner
Versus
Executive Engineer
--Respondent
Hon’ble Manoj Kumar Tiwari, J.
Mr. B.D. Pande, Advocate, for the
petitioner.
Mr. Dharmendra Barthwal,
Advocate, for the respondent.
(2) Petitioner obtained a HT Power
connection of 25 kw for running an
industrial unit. He applied for disconnection
of the electricity connection on 19.4.2018.
According to him, the electricity meter was
physically removed by officials of
Uttarakhand Power Corporation (UPCL) on
31.5.2019. Since a demand of ₹1,05,056
was raised towards electricity charges from
the petitioner for the period between
19.4.2018 to 20.4.2019, therefore,
petitioner approached Consumer Grievance
Redressal Forum under Section 42(5) of
Electricity Act, 2003. The Forum rejected
the complaint of the petitioner, vide order
dated 30.8.2019. Petitioner thereafter
approached Ombudsman under Section
42(6) of Electricity Act by filing a
representation. His representation was
rejected by Ombudsman, vide order dated
31.10.2019. Thus feeling aggrieved,
petitioner has approached this Court
challenging the order passed by the Forum,
as affirmed by the Ombudsman.
UKHC010041362020
2026:UHC:8543
(3) Learned Counsel for the petitioner
submits that the industrial unit of petitioner
was shut down vide order dated 22.9.2016,
passed by State Pollution Control Board,
therefore, there is no question of any power
consumption by the petitioner thereafter.
Learned Counsel for the petitioner further
submits that the Forum has observed in its
concluding paragraph that UPCL was
negligent in not removing the electricity
meter even after one year of making
application for disconnection by the
petitioner.
(4) Learned Counsel appearing for the
UPCL, however, submits that the first
ground regarding shutting down of the
industrial unit, which is now being raised,
was not raised either before the Forum or
before the Ombudsman and this fact is not
even pleaded in the writ petition also. Thus
it is submitted that new ground cannot be
raised in a writ petition under Article 227 of
the Constitution. As regards the second
contention that as to why the electricity
meter was not removed even after one year
of petitioner making application for
disconnection, learned Counsel appearing
for the UPCL submits that even though the
Forum expressed displeasure regarding the
lethargy shown by the officials of UPCL,
however the demand raised by the UPCL
regarding electricity charges was upheld.
He further submits that as per the MRI
report, the consumption history of
petitioner’s industrial unit was found to be
consistent even after petitioner making
application for disconnection, which belies
the contention raised by the petitioner that
the industrial unit was shut down in 2016.
UKHC010041362020
2026:UHC:8543
It is further contended that since both the
Forum and the Ombudsman have upheld
the metered consumption of petitioner’s
industrial unit, therefore, the concurrent
finding returned by both the Forums below
is not to be disturbed by this Court while
exercising supervisory jurisdiction under
Article 227 of the Constitution.
(5) This Court finds substance in the
contention raised by Mr. Barthwal,
appearing for the UPCL. Since the Forum as
well as the Ombudsman have considered
and discussed all relevant aspects and have
arrived at a finding that demand raised by
the UPCL is as per the actual metered
consumption, therefore, this Court do not
find any scope for interference while
exercising supervisory jurisdiction under
Article 227 of the Constitution. Writ petition
thus fails and is dismissed.
(Manoj Kumar Tiwari, J.)
22.9.2026
Pr
PRABODH
KUMAR
Digitally signed by PRABODH KUMAR DN: c=IN, o=HIGH COURT OF UTTARAKHAND, ou=HIGH COURT OF UTTARAKHAND,
2.5.4.20=3a082a00a95aff911a9559743af8f21c50602ff6eae4e61af3aeab198d462503, postalCode=263001, st=UTTARAKHAND, serialNumber=0DC111E8D8CA66E16B940EFDF806ACCC1AB588052DF6FCA58C67F3C91
957BE53, cn=PRABODH KUMAR Date: 2026.09.23 10:18:15 +05'30'
UKHC010041362020
2026:UHC:8543