Zawar Sales Corporation vs Reliance Petro Marketing Ltd
- Court
- Bombay High Court
sumedh carbpl-14180-2021.doc
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
COMMERCIAL ARBITRATION PETITION (L) NO. 14180 OF 2021
Zawar Sales Corporation ]
Proprietorship concern, ]
having address at Zawar Polyclinic, ]
Civil Lines, Mehkar, District Buldhana, ]
Maharashtra, through its authorised ]
Signatory Shri Bhagwandas Zawar ] … Petitioner
V/s.
Reliance Petro Marketing Limited ]
A company registered under the ]
provisions of Companies Act, 2013 ]
having its office at, Reliance Corporation ]
Park, Block 5, 'C'-Wing, 2nd floor, 5, TTC ]
Industrial Area, Thane Belapur Road, ]
Ghansoli, Navi-Mumbai 400701 ] … Respondent
______________________________________
Mr. Abhijeet Desai, a/w Mr. Arvind Wachunsdar, Mr. Mohin Rehpade,
Mr. Deepesh Ramrakhyani/by Desai Legal LLP for the Petitioner.
Ms. Snehalata Paranjpe a/w Mr. Rubin Vakil, Mr. Gaurav Thakur and
Ms. Aditi Kambli i/by A.S. Dayal and Associates for the Respondent.
_____________________________________________
CORAM : KAMAL KHATA, J.
th
RESERVED ON : 6 April, 2026.
th
PRONOUNCED ON : 30 June, 2026.
JUDGMENT :
1. The present Petition, filed under Section 34 of the
Arbitration and Conciliation Act, 1996, ("the Arb. Act"), challenges
th
the Arbitral Award dated 25 March 2021 ("Impugned Award"),
passed by the learned Sole Arbitrator, Shri R. M. Savant (Retd.
1/28
Digitally
signed by
SUMEDH
NAMDEO
SONAWANE
Date:
2026.06.30
19:40:28
+0530
SUMEDH
NAMDEO
SONAWANE
sumedh carbpl-14180-2021.doc
Judge, Bombay High Court) ("the Arbitrator"), rejecting the
Petitioners’ claim for damages for breach of contract by the
Respondent. The Impugned Award, however, allowed a sum of
st
₹ 5,62,500/- in respect of Claim No. 1 pertaining to the 1 August
2012 Distribution Agreement but rejected all other claims of
approximately 40 Crores. ₹
Background:
2. The dispute arises out of the Distribution Agreements
("DAs") executed between the Petitioner and the Respondent for the
supply and distribution of LPG cylinders. The parties executed three
st st
DAs, dated 1 August 2002 (2002 DA), 1 August 2007 (2007 DA)
st
and 1 August 2012 (2012 DA), under which the Petitioners are
described as ‘Distributors’ and the Respondents as ‘Suppliers’. The
Petitioners’ claim is founded on the loss allegedly caused by the
extravagant and arbitrary increase in the price of the LPG
cylinders/refills supplied, and by the sudden stoppage of supply by
the Respondents.
th
3. By their Advocate’s notice dated 28 July 2016 the
Petitioners raised claims and sought appointment of Arbitrator. The
Respondents replied to the same and called upon the Petitioners to
supply information required to migrate from Tally to SAP accounting
st
system. On 31 March 2017 the 2012 DA expired by efflux of time.
2/28
sumedh carbpl-14180-2021.doc
th
4. On 11 February 2019 the Petitioners filed an Application
for appointment of Arbitrator under section 11 of the Arb. Act. On
th
13 August 2019 the Arbitrator was appointed. After the Statement
th
of Claim was filed, on 19 October 2019 the Respondent filed a section
16 Application disputing the jurisdiction of the Arbitrator to
th
entertain claims under the 2002 DA or 2007 DA. An order dated 28
November 2019 came to be passed by the Arbitrator holding that the
subsequent two agreements were in continuation of the 2002
Agreement and dismissed the Respondents’ Application. This order
has attained finality.
th
5. On 6 July 2020 the Hon'ble Court substituted the
Arbitrator and directed the newly appointed Arbitrator to continue
the proceedings from the stage already reached.
Petitioner’s Submissions:
6. Dr. Tulzapurkar, learned Senior Counsel appearing for
th
the Petitioners submits that the impugned Award dated 25 March
2021 is challenged on the grounds of patent illegality and perversity,
particularly assailing the rejection of the Petitioner’s claims for
damages arising from the Respondent’s breach of its contractual
obligations.
7. He further submits that the Arbitrator erred by limiting
the scope of the proceedings to the 2012 Agreement only. The
3/28
sumedh carbpl-14180-2021.doc
Petitioners’ principal grievance is that the Arbitrator ought to have
granted damages arising from all three Distribution Agreements
st st st
(“DAs”), namely those dated 1 August 2002, 1 August 2007 and 1
August 2012, and ought not to have limited it to the 2012 Agreement
alone. He contended that once the erstwhile Arbitrator had held, in
the Application filed by the Respondent under Section 16 of the Arb.
Act, that the 2007 DA and 2012 DA were in continuation of the 2002
DA, the cause of action became a recurring one as contemplated
under Section 22 of the Limitation Act. Consequently, the final Award
rejecting the Petitioners’ claims on the ground of limitation is
rendered bad and liable to be set aside under Section 34(2)(b)(ii)
read with Section 34(2A) of the Arbitration Act. Moreover, the
Arbitrator’s decision that the Petitioners’ claims under the 2002 DA
and 2007 DA are barred by limitation is itself erroneous, since that
question had already been decided in the Application under Section
16 of the Arbitration Act. The Arbitrator was therefore estopped from
reopening it under the principle of “internal res judicata”.
8. In support of his contentions, he relied upon the decisions
in the following cases:
For Res Judicata
1
i. Satyadhyan Ghosal vs Smt. Deorajin Debi
2
ii. Y B Patil v Y L Patil
1
AIR 1960 SC 941 (paras 7 & 8)
2
(1976) 4 SCC 66 (para 4)
4/28
sumedh carbpl-14180-2021.doc
3
iii. Arjun Singh v Mohindra Kumar
For continuous cause of action
4
iv. V. Alagar Thevar v The Madurai Municipality
v. Gaya Prasad Singh v Jagadish Chandra Deo Dhalal
5
Deb
6
vi. Food Corporation of India v Ratanlal N Gwalani .
9. He submits that the reliance placed on the decision in
7
State of Gujarat v Kothari and Associates by the Arbitrator is
untenable as the facts of the present case are entirely different from
it.
10. He submits that the extravagant price hikes — from ₹ 25-
35 in 2002 to ₹ 400 in 2008 — were arbitrary and unsupported by
any pricing policy, as mandated under Clauses 6 and 7 of the DA. The
burden lay upon the Respondent to prove that the price hikes were in
accordance with the pricing policy, and not upon the Petitioner, as
held in the Award. The material on record shows that the pricing
policy was suppressed. Since the Arbitrator ignored the evidence of
Respondent No. 1, the finding rendered thereon is contrary to the
record and deserves to be set aside.
11. He further contends that the Arbitrator selectively relied
upon portions of the cross-examination while disregarding the
3
AIR 1964 SC 993 (paras 10, 11 and 13)
4
AIR 1975 Mad 77
5
AIR 1940 Pat 561
6
2004 (1) M.P.L.J. 552
7
(2016) 14 SCC 761
5/28
sumedh carbpl-14180-2021.doc
material admissions made by the Respondent’s witness (RW-1), and
failed to appreciate the inherent contradictions in the Respondent’s
case. It is submitted that such selective appreciation of evidence, and
the omission to consider relevant admissions, has resulted in findings
that are perverse, arbitrary, and unsustainable in law. The Petitioner
also assails the reliance placed by the Arbitrator upon Exhibit R-19,
contending that the said document was never proved in accordance
with law. He submits that the mere marking of a document does not
amount to proof of its contents. The Arbitrator nonetheless relied
upon the said document to sustain the Respondent’s defence, thereby
vitiating the Award.
th
12. He further submits that the impugned Award dated 25
March 2021, is contrary to the express terms of the contract, ignores
settled principles relating to burden of proof, relies upon unproved
documents, and overlooks binding findings already rendered.
According to the Petitioner, these errors constitute “patent illegality”
warranting interference under Section 34 of the Act.
13. Reliance is placed on following Judgements: Ssangyong
8
Engg. & Construction Co. Ltd. vs. NHAI , the Supreme Court while
9
relying on Associate Builders v DDA held that judicial interference
with an arbitral award on the ground of patent illegality is
8
2019 15 SCC 131
9
2015 3 SCC 49
6/28
sumedh carbpl-14180-2021.doc
permissible only where the error is so fundamental that it goes to the
root of the matter. The Court further clarified that "patent illegality"
must appear on the face of the award and does not include a mere
erroneous application of the law or a re-appreciation of evidence.
14. He submits that, although the Arbitrator found a breach
in respect of the non-supply of cylinders from January 2016, the
damages awarded were insufficient. He argues that, once a breach is
proven, the Court or the Arbitrator must resort to "honest
guesswork" to award reasonable compensation, even where the exact
loss is difficult to quantify.
15. Reliance is placed on Sineximco Pte Ltd. v M.M.T.C
10
Limited wherein the Hon'ble Supreme Court, relying on its decision
11
in Dwarka Das v. State of M.P. , held that some degree of estimation
is always involved in assessing damages, and once there is material
on record having a reasonable nexus with the claim, damages cannot
be denied merely because precise computation is not possible. The
Court further notes that even evidence relating to a nearby place or a
comparable transaction can be relied upon for determining damages,
12
as recognized earlier in M/s. A.T. Brij Paul Singh v. State of Gujarat
13
and Mohd. Salamatullah v. Govt. of A.P. Honest guesswork in
10
2009 SCC OnLine Del 1394
11
1999 3 SCC 500
12
1984 4 SCC 59
13
1977 3 SCC 590
7/28
sumedh carbpl-14180-2021.doc
quantification is therefore legally permissible. The Court held that
the Arbitrators erred in rejecting this principle on the ground that
those judgments were rendered under Section 73 and not Section 74
of the Contract Act, since once damages under Section 74 also require
proof of actual loss, their determination must necessarily follow the
principles under Section 73.
16. The Hon'ble Supreme Court in EMCO Ltd. v Malvika Steel
14
Ltd & Ors. held that a party guilty of breach of contract cannot
avoid liability merely on the ground that the exact quantum of
damages suffered by the aggrieved party is incapable of precise
mathematical computation. Difficulty in assessment or absence of
exact evidence regarding the extent of loss does not absolve the
defaulting party from its obligation to compensate for the breach
committed. In such cases, the Court is not confined to awarding
merely nominal damages. Rather, once breach and consequent loss
are established, the injured party is entitled to the benefit of every
reasonable presumption in relation to the damage suffered. Where
precise quantification is not possible due to insufficiency of material
on record, the Court is empowered to make a fair and reasonable
assessment based on surrounding circumstances, comparable
evidence, and honest estimation. The law permits reasonable
guesswork in the determination of damages, provided such
14
2012 SCC OnLine Del 5763
8/28
sumedh carbpl-14180-2021.doc
assessment bears a rational nexus to the evidence available. The
underlying object is restitutive in nature, namely, to place the
aggrieved party, so far as monetary compensation can achieve, in the
same position in which it would have been had the contract been duly
performed and the breach not occurred.
Respondent’s Submissions:
17. Per Contra, Ms. Paranjpe, learned counsel appearing on
behalf of the Respondent, vehemently opposes the Petition, supports
the Impugned Award and seeks dismissal of the Petition.
18. She submits that the scope of Section 34 of the Act is very
limited, and that the present Petition is wholly devoid of merit and
deserves to be dismissed, as the challenge mounted by the Petitioner
is nothing but an impermissible attempt to seek a re-appreciation of
the facts, evidence and findings conclusively determined by the
Arbitrator in a detailed and reasoned Award dated 25th March 2021.
She further submits that this Court cannot sit in appeal over the
findings of the Arbitrator or re-appreciate the evidence. If the view
taken by the Arbitrator is a plausible one, based on the interpretation
of the contract and the evidence on record, the Award must be
upheld.
19. Reliance is placed on UHL Power Co. Ltd. vs. State of
9/28
sumedh carbpl-14180-2021.doc
15
Himachal Pradesh wherein the Hon’ble Supreme Court held that
where the view adopted by the learned Arbitrator is a plausible one
founded upon the terms of the contract and the evidence on record,
the arbitral award merits affirmation. The Court, in exercise of
jurisdiction under Section 34 of the Arb. Act, cannot supplant such
interpretation merely because an alternative view is possible. In the
present case, the interpretation accorded by the learned Arbitrator
to the contract is a plausible one based on the material available on
record and, therefore, does not warrant interference.
20. The Supreme Court further placing reliance on Dyna
16
Technologies Pvt. Ltd. v. Crompton Greaves Ltd. has further
clarified that the jurisdiction under Section 34 is supervisory in
nature and not appellate. Consequently, this Court is precluded from
re-appreciating evidence or substituting its own interpretation of the
contractual terms merely on the ground that another view is
possible. Interference is justified only where the award is vitiated by
patent illegality, by perversity going to the root of the matter, or is in
conflict with the public policy of India. Where the Arbitrator’s view is
a plausible one arising from the record, judicial deference is
warranted. Similar principles have been reiterated in Konkan
17
Railway Corporation Ltd. v. Chenab Bridge Project Undertaking
15
2022 4 SCC 116
16
2019 20 SCC 1
17
2023 9 SCC 85
10/28
sumedh carbpl-14180-2021.doc
where it was held that the Court under Section 34 cannot act as a
court of appeal over arbitral findings. The said position has also been
reinforced by the Hon'ble Bombay High Court in National Insurance
18
Co. Ltd. v. Reliance Industries Ltd. holding that the learned
Arbitrator is the sole judge of the quality and quantity of evidence,
and an arbitral award cannot be set aside merely because another
view is possible or because the Court might have arrived at a
different conclusion on merits.
21. She further strongly objects to several new pleas
introduced by the Petitioner, including the contention that Clauses 6
and 7 are opposed to public policy. These pleas were neither raised
before the learned Arbitrator nor formed part of the Statement of
Claim or the written submissions before the Arbitral Tribunal, and
therefore cannot be permitted to be agitated for the first time in
proceedings under Section 34 of the Act. She further submits that it
is settled law that a party cannot be permitted to travel beyond its
pleadings. Reliance is placed on Ram Sarup Gupta (Dead) by LRs. v.
19
Bishun Narain Inter College & Ors. , wherein the Hon’ble Supreme
Court emphasised that a party cannot be allowed to travel beyond its
pleadings.
22. She submits that the Order dated 28th November 2019,
18
2023 SCC Online Bom 1088
19
(1987) 2 SCC 555
11/28
sumedh carbpl-14180-2021.doc
passed under Section 16 of the Act, does not operate as internal res
judicata. The said Order was a preliminary decision on jurisdiction
and did not constitute a final adjudication on the merits of the
limitation plea for each individual claim.
23. She further submits that the Petitioner’s contention that
the issue of limitation stood finally decided in its favour by the
Section 16 order dated 28th November 2019 is wholly misconceived.
The Respondent’s application under Section 16 of the Act challenged
the jurisdiction of the Tribunal on the ground that there were three
separate DA's dated 2002, 2007 and 2012, each of which had expired
by efflux of time, and that claims under the expired 2002 agreement
could not be entertained when the invocation notice pertained to the
2012 agreement. No issue of limitation was raised or argued under
Section 16 of the Act, nor was any evidence led on limitation at that
stage. Immediately after disposal of the Section 16 application, the
learned Arbitrator framed Issue No. 3, namely, “Whether the claim is
within limitation?”, to which no objection was raised by the
Petitioner, and both parties thereafter led evidence and made
detailed submissions on limitation. This itself demonstrates that
limitation was never concluded by the Section 16 Order dated 28th
November 2019.
24. She further submits that the Petitioner’s claims
12/28
sumedh carbpl-14180-2021.doc
pertaining to alleged price escalations for the period from 2004 to
April 2012 are ex facie barred by limitation. The cause of action
accrued with each individual invoice/supply, whereas the arbitration
was invoked only on 20th April 2015. The determination on
limitation constitutes an “interim award”, or in any event a final
adjudication on that issue, and is therefore amenable to challenge
only on the limited grounds available under Section 34 of the Act.
Reliance was placed on Indian Framers Fertilizer Cooperative
20
Limited v Bhadra Products in support of the above contention.
25. She further submits that the limitation is a mixed
question of law and fact and is distinct from jurisdiction under
Section 16. She placed reliance on Nusli Neville Wadia v. Ivory
21
Properties & Ors. in support of her contention . She further placed
reliance on Urban Infrastructure Real Estate Fund v. Neelkanth
22
Realty Pvt. Ltd. & Ors. , to submit that limitation ordinarily does not
fall within the scope of a Section 16 jurisdictional challenge and
requires adjudication on facts and evidence.
26. She further submits that the Arbitrator has correctly
held that claims prior to 28 July 2013 were barred by limitation. The
invocation notice was admittedly issued on 28th July 2016 and
therefore only claims within three years preceding the invocation
20
2018 2 SCC 534
21
2020 6 SCC 557
22
2025 SCC OnLine SC 2380
13/28
sumedh carbpl-14180-2021.doc
could survive. The Arbitrator correctly found that there was a long
th
hiatus between the Petitioner’s grievance raised by letter dated 15
May 2008 and the Advocate’s notice dated 28th July 2016; that
despite such grievance the Petitioner continued to accept supplies
without protest; that yet another distributorship agreement was
executed thereafter; and that the earlier agreements expired by
efflux of time without reservation of rights. The Arbitrator, therefore,
rightly rejected the theory of a continuing cause of action and held
that the claims under the 2002 and 2007 agreements were ex facie
barred.
27. She placed reliance on State of Gujarat v. Kothari &
23
Associates (supra) and B and T AG v. Ministry of Defence ,
particularly paragraphs 37, 40, 41, 43 and 71 to 76, to submit that
stale claims cannot be revived by alleging a continuing cause of
action in the absence of a continuing wrong, and that, in cases of
successive breaches, limitation runs separately from each individual
breach, a fresh or extended contract not serving to revive stale
claims. She relied upon Article 55 of the Limitation Act, 1963, and
upon the decision in Mahavir Spinning Mills Ltd. v. HB Leasing and
24
Finances Co. Ltd. , to submit that each breach gave rise to a separate
cause of action and that Section 22 of the Limitation Act has no
23
(2024) 5 SCC 358
24
2012 SCC OnLine Del 5658 (paragraphs 62 and 67)
14/28
sumedh carbpl-14180-2021.doc
application as limitation runs from the date of each breach.
28. Ms Paranjape further argues that the challenge on
pricing policy and alleged breach of Clauses 6 and 7 of the DA's are
equally unsustainable. There were three separate agreements dated
st st st
1 August 2002, 1 August 2007 and 1 August 2012, each of which
expressly conferred upon the Respondent the right to fix and revise
prices of LPG cylinders. Each agreement also stipulated that the
distributor could not sell above the MRP fixed by the Respondent.
The Petitioner was fully aware from inception that the Respondent
was a parallel marketer and not a PSU distributor and that private
parallel marketers operated outside the subsidy regime applicable to
PSU oil companies. The distinction between the two was specifically
admitted by the Petitioner both in pleadings and in cross-
examination.
29. She further submits that the Petitioner’s own witness
admitted in cross-examination that the agreements permitted the
Respondent to increase prices and further admitted that there was
no contractual condition requiring the Respondent to take the
distributor into confidence before effecting price increase. At page
390 of the evidence, the witness specifically admitted that no such
clause existed. The Arbitrator also recorded the demeanor of the
witness noting that he was avoiding direct answers, and the answer
15/28
sumedh carbpl-14180-2021.doc
eventually recorded completely demolished the Petitioner’s own case.
30. Ms. Paranjape submits that no grievance regarding
violation of Clause 6 was ever pleaded in the Statement of Claim and
the same was sought to be introduced only at the stage of written
arguments. Such an attempt is impermissible. She submits that the
finding of facts based on appreciation of oral and documentary
evidence cannot be reopened under section 34 of the Act.
31. Ms. Paranjpe contends that the Petitioner’s challenge is
untenable because the learned Arbitrator considered the claims on
the assumption that the entire claim was within limitation and that
there was breach of the agreements and still held that the Petitioner
had failed to prove any loss or damages. The learned Arbitrator
rightly rejected all monetary claims except a limited amount towards
loss of earnings arising from the non-supply of cylinders from 31
December 2015 until the expiry of the third DA, the Petitioner having
failed to produce basic evidence such as CA-certified books of
accounts, income tax returns, or customer lists to prove a loss of
business or customer base. According to her, the learned Arbitrator
was left with no alternative but to rely upon the data furnished by
the Respondent at Exhibit R-20. The said material constituted the
only reliable evidence available on record for assessing the claim of
alleged business loss. It was on that basis that the learned Arbitrator
16/28
sumedh carbpl-14180-2021.doc
quantified and awarded the amount towards “loss of earnings”.
Accordingly, the Arbitrator ensured that the Award was founded
strictly on proved material and not on conjecture or unsupported
assertions.
32. She submits that in the present case, the challenge
mounted by the Petitioner requires this Court to reassess factual
findings and contractual interpretation already considered by the
learned Arbitrator, which is impermissible within the limited
jurisdiction under Section 34. She places reliance on Ssangyong
Engg. & Construction Co. Ltd. vs. NHAI (supra) in support of her
contention. She finally submits that the Award is reasoned, evidence-
based and in conformity with settled principles of arbitral law and
that no ground under Section 34 of the Act, whether patent illegality,
perversity, conflict with public policy or violation of the fundamental
policy of Indian law, is made out. According to her, the present
Petition is merely an attempt to re-argue the merits and must fail.
Reasons and Conclusions:
33. I have carefully considered the submissions advanced by
Dr. Tulzapurkar learned Senior Counsel appearing for the Petitioner
and Ms. Paranjpe learned Counsel appearing for the Respondent and
have perused the record including the Impugned Award dated 25th
March 2021 passed by the learned Arbitrator.
17/28
sumedh carbpl-14180-2021.doc
Internal Res Judicata And Limitation
34. The Petitioner's primary contention — that the
Arbitrator's finding on limitation is barred by "internal res judicata"
— is wholly baseless. The Order on the Section 16 Application dated
28th November 2019 merely affirmed the Tribunal's jurisdiction over
disputes arising from all three DAs, opining that they were in
"continuation".
35. In Nusli Neville Wadia v. Ivory Properties (supra), the
Supreme Court held as under:
“20. Jurisdiction is the power to decide and not merely the
power to decide correctly. Jurisdiction is the a uthority of
law to act officially. It is an authority of law to act
officially in a particular matter in hand. It is the power
to take cognizance and decide the cases. It is the power
to decide rightly or wrongly. It is the power to hear and
determine. Same is the foundation of judicial
proceedings. It does not depend upon the correctness of
the decision made. It is the power to decide justiciable
controversy and includes questions of law as well as
facts on merits. Jurisdiction is the right to hear and
determine. It does not depend upon whether a decision
is right or wrong. Jurisdiction means power to entertain
a suit, consider merits, and render binding decisions,
and “merits” means the various elements which enter
into or qualify plaintiff's right to the relief sought. If the
law confers a power to render a judgment or decree,
then the court has jurisdiction. The court must have
control over the subject-matter, which comes within
classification limits of law under which the court is
established and functions.
21. The word “jurisdiction” is derived from Latin words
“juris” and “dico”, meaning “I speak by the law” and does
18/28
sumedh carbpl-14180-2021.doc
not relate to rights of parties as between each other but
to the power of the court. Jurisdiction relates to a class
of cases to which a particular case belongs. Jurisdiction
is the authority by which a judicial officer takes
cognizance and decides the cases. It only presupposes
the existence of a duly constituted court having control
over subject-matter which comes within classification
limits of the law under which court has been
established. It should have control over the parties'
litigant, control over the parties' territory, it may also
relate to pecuniary as well as the nature of the class of
cases. Jurisdiction is generally understood as the
authority to decide, render a judgment, inquire into the
facts, to apply the law, and to pronounce a judgment.
When there is the want of general power to act, the
court has no jurisdiction. When the court has the power
to inquire into the facts, apply the law, render binding
judgment, and enforce it, the court has jurisdiction.
Judgment within a jurisdiction has to be immune from
collateral attack on the ground of nullity. It has co-
relation with the constitutional and statutory power of
tribunal or court to hear and determine. It means the
power or capacity fundamentally to entertain, hear, and
determine.”
(Emphasis added)
36. Thus, the Arbitrator did entertain the Petitioners’ claim
on all three DAs, as contemplated by the order under Section 16. In
continuation of that finding, the learned Arbitrator framed a specific
issue, namely:
“1. Does the Claimant prove that the Respondent has
st
violated the terms and conditions of the Agreements dated 1
st st
August 2002, 1 August 2007 and 1 August 2012?”
37. In Urban Infrastructure Real Estate Fund v Neelkanth
Realty Pvt. Ltd. (supra) the Supreme Court, in paragraph 134, held
19/28
sumedh carbpl-14180-2021.doc
that the issue of limitation, being one of both fact and law, could not
have been finally decided on a demurrer, as that would risk stale
claims being entertained. That a ruling confined to the question of
jurisdiction does not, in any event, amount to an adjudication on the
25
merits is also borne out by SBP & Co. v. Patel Engineering Ltd. and
26
National Insurance Co. Ltd. v. Boghara Polyfab Pvt. Ltd. , which
distinguish a preliminary decision on jurisdiction from a final
determination on the merits.
38. As a matter of record, the Petitioners not only did not
object to this issue, but both parties even led extensive evidence on it.
Keeping in mind the settled law that ‘limitation’ is a mixed question
of law and fact, the learned Arbitrator, in his Award, in fact
considered all three DAs, considered all the contentions of both
parties together with the evidence, and arrived at the conclusion that
each arbitrary price hike gave rise to a separate cause of action, and
that claims for breaches occurring more than three years prior to the
th
invocation of arbitration on 28 July 2016 were time-barred. The
learned Arbitrator correctly observed that the claims under the
2002 DA and 2007 DA were ex facie barred, as there was a long
hiatus between the Petitioners’ grievance, first raised by letter dated
th th
15 May 2008 and the Advocate’s notice dated 28 July 2016; that,
25
(2005) 8 SCC 618
26
(2009) 1 SCC 267
20/28
sumedh carbpl-14180-2021.doc
despite such grievance, the Petitioner continued to accept supplies
without protest; and that the 2012 DA was executed after the earlier
DAs had expired by efflux of time, without any reservation of rights.
39. The Supreme Court in State of Gujarat v Kothari &
Associates (supra) has held that in cases of successive breaches,
limitation runs separately from each individual breach and a fresh or
extended contract does not revive stale claims. Similarly, in Mahavir
Spinning Mills Ltd. v HB Leasing and Finances Ltd. (supra) the
Supreme Court held that where each breach gives rise to a separate
cause of action, limitation runs from the date of each breach and
Section 22 of the Limitation Act has no application. The test for
determining what constitutes a ‘continuing wrong’ attracting Section
22 of the Limitation Act was authoritatively explained in Balkrishna
Savalram Pujari Waghmare & Ors. v. Shree Dnyaneshwar Maharaj
27
Sansthan & Ors. , while the principles governing the point from
which limitation runs for invoking arbitration have been set out in
Geo Miller & Co. (P) Ltd. v. Chairman Rajasthan Vidyut Utpadan
28
Nigam Ltd. Applying these tests, the Petitioner’s grievance
discloses not a single continuing wrong but a series of distinct and
completed breaches, each attracting its own period of limitation.
40. In Rushibhai Jagdishbhai Pathak v. Municipal Corpn.,
27
AIR 1959 SC 798
28
(2020) 14 SCC 643
21/28
sumedh carbpl-14180-2021.doc
29
Bhavnagar , referring to Tarsem Singh [ Union of India v. Tarsem
30
Singh , where reference was also made to Section 22 of the
Limitation Act, 1963, and the following passage from Balakrishna
Savalram Pujari Waghmare v. Shree Dhyaneshwar Maharaj Sansthan
(supra) , which had explained the concept of continuing wrong in the
context of Section 23 of the Limitation Act, 1908, corresponding to
Section 22 of the Limitation Act, 1963, observing that :
“31. … It is the very essence of a continuing wrong that it
is an act which creates a continuing source of injury and
renders the doer of the act responsible and liable for the
continuance of the said injury. If the wrongful act causes
an injury which is complete, there is no continuing wrong
even though the damage resulting from the act may
continue. If, however, a wrongful act is of such a character
that the injury caused by it itself continues, then the act
constitutes a continuing wrong. In this connection, it is
necessary to draw a distinction between the injury caused
by the wrongful act and what may be described as the
effect of the said injury.”
41. This principle was reiterated by recently this Court in
31
Pramod Vasantrao Deshmukh v. State of Maharashtra,
42. In view of the reasons set out above the decisions relied
upon in paragraph 6 hereinabove by the learned Senior Counsel for
the Petitioner with regard to the principles of res judicata and
limitation will be of no assistance.
29
( 2022) 18 SCC 144 : 2022 SCC OnLine SC 641 at page 152
30
(2008) 8 SCC 648 : (2008) 2 SCC (L&S) 765
31
2025 SCC OnLine Bom 3473
22/28
sumedh carbpl-14180-2021.doc
Patent Illegality
43. Mr. Tulzapurkar’s reliance upon the decision in
Ssangyong Engg. & Construction Co. Ltd (supra) to contend that the
Court must set aside the award since the Arbitrator had selectively
relied upon portions of cross-examination and disregarded material
admissions made by the Respondent’s witness; failed to appreciate
inherent contradictions; failed to consider document not proved in
accordance with law; or ignored principles of burden of proof as they
constitute “patent illegality” warranting interference under section
34 of the Arb. Act., is wholly misconceived. In my view, in the garb of
“patent illegality” what the Petitioners expect from the Court is to
reappreciate evidence – which is clearly impermissible as set out in
paragraph 38 of the very same judgment. This limited scope of
interference under Section 34 has since been reaffirmed by the
32
Supreme Court in Delhi Airport Metro Express (P) Ltd. v. DMRC ,
33
MMTC Ltd. v. Vedanta Ltd. , Haryana Tourism Ltd. v. Kandhari
34
Beverages Ltd. and PSA Sical Terminals Pvt. Ltd. v. Board of
35
Trustees of V.O. Chidambranar Port Trust Tuticorin & Ors. , each
reiterating that an arbitral award is not to be disturbed merely
because another view of the evidence or of the contract is possible.
32
(2022) 1 SCC 131
33
(2019) 4 SCC 163
34
(2022) 3 SCC 237
35
2023 15 SCC 781
23/28
sumedh carbpl-14180-2021.doc
Breach of Contract concerning Pricing Policy:
44. The dispute concerning the interpretation of Clauses 6
and 7 of the DAs is a matter of contractual interpretation, which falls
squarely within the domain of the Arbitrator. The finding in the
Award — that the Petitioner, by its conduct in accepting the prices for
over a decade and renewing the agreement twice without protest,
had waived its right to challenge the pricing mechanism — is not only
a finding of fact based on an appreciation of the evidence, but is also a
plausible interpretation of the contractual terms. This Court is
precluded from substituting its own view for that of the Arbitrator.
Perversity and Quantification of Damages:
45. In my view, the Petitioners have utterly failed to prove
the damages of ₹ 40 Crores. The learned Arbitrator has categorically
held that the Petitioner failed to produce cogent evidence to
substantiate its claims of loss of goodwill, business loss, or
infrastructure expenditure. The absence of financial records,
accounts, or other primary evidence has been specifically noted. The
Award did, however, grant an amount towards loss of earnings for
the period of non-supply, based on the material produced by the
Respondents.
46. The principle of "honest guesswork" relied upon by the
Petitioner is not a license to award damages in an evidentiary
24/28
sumedh carbpl-14180-2021.doc
vacuum. It can be invoked only when the fact of loss is established
and only its precise quantification is difficult. Here, the very
foundation of the loss claimed was unsubstantiated. While it is true
that exact quantification is not always necessary, the existence of
loss must first be established on some reliable material. In such
circumstances, the refusal to award speculative damages cannot be
characterized as illegal or perverse. This is consistent with the
settled position that compensation, even when assessed on a
reasonable estimate, must rest on proof of the fact of loss, as held in
36
Kanchan Udyog Ltd. v. United Spirits Ltd. , Maula Bux v. Union of
37 38
India and Kailash Nath Associates v. DDA & Anr. , all of which hold
that damages cannot be awarded in the absence of evidence
establishing that loss was in fact suffered.
47. The contours of this Court's jurisdiction under Section 34
of the Act are well-defined. The Court is not to act as a court of
appeal, nor to review the Award on its merits. The Court is not
permitted to reappreciate evidence on the ground of patent illegality.
Interference is warranted only if the award is vitiated by patent
illegality appearing on the face of the award, or is in conflict with the
public policy of India. An erroneous application of law, or a
misappreciation of evidence, does not by itself constitute patent
36
(2017) 8 SCC 237
37
(1969) 2 SCC 554
38
(2015) 4 SCC 136
25/28
sumedh carbpl-14180-2021.doc
illegality. The view taken by the Arbitrator must be a plausible one,
and if it is so, the Court shall not interfere. The decision in Ssangyong
Engg. & Construction Co. Ltd vs NHAI (supra) supports the above
conclusion.
48. The challenge in the present Petition is, in essence,
nothing more than a plea for the re-appreciation of evidence and the
substitution of the Arbitrator’s view by that of this Court, which is
impermissible under Section 34.
49. Applying these settled principles to the facts of the
present case, this Court finds no merit in the challenge raised by the
Petitioner.
50. The Award is a reasoned Award. The findings are based
on evidence, and the conclusions drawn are plausible. No ground of
patent illegality, perversity, or conflict with public policy has been
made out.
51. Accordingly, this Court is of the considered view that the
th
Impugned Award dated 25 March 2021 is a well-reasoned decision
based on a plausible interpretation of the contract and a thorough
appreciation of the evidence on record. The Petitioner has failed to
establish any ground that would warrant interference under Section
34 of the Arb. Act. The award is not vitiated by patent illegality, nor is
it in conflict with the fundamental policy of Indian law. The Petition is
26/28
sumedh carbpl-14180-2021.doc
an attempt to invite this Court to re-assess the merits of the dispute,
which is impermissible.
52. Consequently, the Petition lacks merit and deserves to be
dismissed.
53. In view of the aforesaid discussion, the following Order is
passed:
::ORDER::
1. The Petition is dismissed accordingly.
2. There shall be no order as to costs.
(KAMAL KHATA, J.)
Judgements Relied:
1. Satyadhan Ghosal v Smt. Deorajin Debi AIR 1960 SC 941.
2. Y.B. Patil v. Y.L. Patil (1976) 4 SCC 66.
3. Arjun Singh v. Mohindra Kumar AIR 1964 SC 993.
4. V. Alagar Thevar v The Madurai Municipality AIR 1975 Mad 77.
5. Gaya Prasad Singh v Jagadish Chandra Deo Dhalal Deb AIR 1940 Pat 561.
6. Food Corporation of India v Ratanlal N Gwalani 2004 (1) M.P.L.J. 552.
7. State of Gujarat v Kothari and Associates (2016) 14 SCC 761.
8. Ssangyong Engg. & Construction Co. Ltd. vs. NHAI 2019 15 SCC 131.
9. Associate Builders v DDA 2015 3 SCC 49.
10. Sineximco Pte Ltd. v M.M.T.C Limited 2009 SCC OnLine Del 1394.
11. Dwarka Das v State of M.P. 1999 3 SCC 500.
12. M/s A.T. Brij Paul Singh v State of Gujarat 1984 4 SCC 59.
13. Mohd. Salamatullah v. Govt. of A.P. 1977 3 SCC 590.
14. EMCO Ltd. v Malvika Steel Ltd. & Ors. 2012 SCC OnLine Del 5763.
15. UHL Power Co. Ltd. vs. State of Himachal Pradesh 2022 4 SCC 116.
16. Dyna Technologies Pvt. Ltd. v. Crompton Greaves Ltd., (2019) 20 SCC 1.
27/28
sumedh carbpl-14180-2021.doc
17. Konkan Railway Corporation Ltd. v Chenab Bridge Project 2023 9 SCC 85.
18. National Insurance Co. Ltd. V Reliance Industries Ltd. 2023 SCC OnLine
Bom 1088.
19. Ram Sarup Gupta (Dead) by LRs. v. Bishun Narain Inter College (1987) 2
SCC 555.
20. Indian Framers Fertilizer Cooperative Limited v Bhadra Products 2018 2
SCC 534.
21. Nusli Neville Wadia v. Ivory Properties, (2020) 6 SCC 557.
22. Urban Infrastructure Real Estate Fund v. Neelkanth Realty Pvt. Ltd. 2025
SCC OnLine 2380.
23. B and T AG v. Ministry of Defence (2024) 5 SCC 358.
24. Mahavir Spinning Mills Ltd. v. HB Leasing and Finances Co. Ltd. 2012 SCC
OnLine Del 5658 (paragraphs 62 and 67).
25. SBP & Co. v. Patel Engineering Ltd. (2005) 8 SCC 618.
26. National Insurance Co. Ltd. v. Boghara Polyfab Pvt. Ltd. (2009) 1 SCC 267.
27. Balkrishna Savalram Pujari Waghmare & Ors. v. Shree Dnyaneshwar
Maharaj Sansthan & Ors. AIR 1959 SC 798.
28. Geo Miller & Co. (P) Ltd. v. Chairman Rajasthan Vidyut Utpadan Nigam
Ltd. (2020) 14 SCC 643.
29. Rushibhai Jagdishbhai Pathak v. Municipal Corpn., Bhavnagar (2022) 18
SCC 144 : 2022 SCC OnLine SC 641 at page 152.
30. Tarsem Singh [Union of India v. Tarsem Singh (2008) 8 SCC 648 : (2008) 2
SCC (L&S) 765.
31. Pramod Vasantrao Deshmukh v. State of Maharashtra 2025 SCC OnLine
Bom 3473.
32. Delhi Airport Metro Express (P) Ltd. v. DMRC (2022) 1 SCC 131.
33. MMTC Ltd. v. Vedanta Ltd. (2019) 4 SCC 163.
34. Haryana Tourism Ltd. v. Kandhari Beverages Ltd. (2022) 3 SCC 237.
35. PSA Sical Terminals Pvt. Ltd. v. Board of Trustees of V.O. Chidambranar
Port Trust 2023 15 SCC 781.
36. Kanchan Udyog Ltd. v. United Spirits Ltd. (2017) 8 SCC 237.
37. Maula Bux v. Union of India (1969) 2 SCC 554.
38. Kailash Nath Associates v. DDA (2015) 4 SCC 136.
28/28