NITHIN S vs THE PROJECT DIRECTOR,

Court
Karnataka High Court

- 1 -
WP No. 34985 of 2025


IN THE HIGH COURT OF KARNATAKA AT BENGALURU

TH
DATED THIS THE 11 DAY OF NOVEMBER, 2026

PRESENT

THE HON'BLE MRS. JUSTICE ANU SIVARAMAN

AND

THE HON'BLE MR. JUSTICE K.S.BHARATH KUMAR

WRIT PETITION NO. 34985 OF 2025 (GM-RES-PIL)



BETWEEN:



1. NITHIN S.
AGED ABOUT 21 YEARS,
S/O SHIVANNA S.V.,
RESIDENT OF MULBAGALU, SOORAKUNTE,
NANGALI POST OFFICE,
KOLAR DISTRICT, KARNATAKA - 563132.

…PETITIONER
(BY MS. THANUJA, ADVOCATE FOR






SRI. SHIVA KUMAR N., ADVOCATE)


AND:



Digitally
signed by
RAKSHA
Location:
high court
of
karnataka
1. THE PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI),

TH
PIU, SURVEY NO.13, 14 K.M.,
NAGASANDRA VILLAGE,
BENGALURU - 560073.

2. THE SPECIAL LAND ACQUISITION OFFICER &
COMPETENT AUTHORITY,
NATIONAL HIGHWAYS AUTHORITY OF INDIA,
NO.678/3, NEERUBHAVI KEMPANNA LAYOUT,
HEBBAL, BENGALURU - 560024.

- 2 -
WP No. 34985 of 2025


3. THE DEPUTY COMMISSIONER
DC OFFICE, MULBAGAL ROAD,
KOLAR - 563101.

4. THE TAHSILDAR
MULBAGAL TALUK,
KARNATAKA - 563131.

5. M/S. BHARAT PETROLEUM CORPORATION LIMITED
HEAD OFFICE AT 17, DUPARC TRINITY,
TH
7 FLOOR, M.G. ROAD,
BANGALORE- 560 001, KARNATAKA.
REPRESENTED BY ITS GENERAL MANAGER.

6. SRI. HARISH N.R.
S/O RAVI N.R.
RESIDING AT VALMIKI ROAD,
VTC NANGALI, PO NANGLI,
SUB- DISTRICT MULBAGAL,
DISTRICT KOLAR- 563 132.

…RESPONDENTS
(BY MS. SRUTI CHAGANTI, ADVOCATE FOR R1 & R2,
SMT. PRAMODHINI KISHAN, AGA FOR R3 AND R4,
MS. SUNAYANA BASU MALLIK, ADVOCATE FOR R5,
SRI. SHRINIVAS B.S., ADVOCATE FOR R6.)

THIS WRIT PETITION IS FILED UNDER ARTICLES 226
AND 227 OF THE CONSTITUTION OF INDIA, 1950, PRAYING TO
DIRECT THE RESPONDENTS TO PRODUCE AND PLACE BEFORE
THIS HON'BLE COURT THE ENTIRE RECORDS RELATING TO
THE CONSTRUCTION AND WIDENING OF NATIONAL HIGHWAY-
75 IN AND AROUND NANGALI VILLAGE, MULBAGAL TALUK,
KOLAR DISTRICT, INCLUDING ALL PLANS, APPROVALS,

- 3 -
WP No. 34985 of 2025


DRAWINGS, AND CORRESPONDENCE CONCERNING THE
CLOSURE OR DIVERSION OF THE NATURAL STORM WATER
DRAIN (RAJAKALUVE) ADJOINING SY.NOS.378, 382, AND 515-
528 AND ETC.,

THIS WRIT PETITION HAVING BEEN HEARD AND
RESERVED FOR JUDGMENT ON 29.10.2026 AND COMING ON
FOR PRONOUNCEMENT OF JUDGMENT THIS DAY,
K.S.BHARATH KUMAR, J., PRONOUNCED THE FOLLOWING :

CORAM: HON'BLE MRS. JUSTICE ANU SIVARAMAN
and
HON'BLE MR. JUSTICE K.S.BHARATH KUMAR

CAV JUDGMENT

(PER: HON'BLE MR. JUSTICE K.S.BHARATH KUMAR)

The petitioner has preferred the instant petition by
way of public interest litigation inter alia seeking the
following reliefs:
" a. Direct the Respondents to produce and
place before this Hon'ble Court the entire records
relating to the construction and widening of National
Highway-75 in and around Nangali Village, Mulbagal
Taluk, Kolar District, including all plans, approvals,
drawings, and correspondence concerning the
closure or diversion of the natural Storm Water Drain

- 4 -
WP No. 34985 of 2025


(Rajakaluve) adjoining Sy. Nos. 378, 382, and
515-528;
b. Issue a Writ of Mandamus directing the
Respondents to conduct a joint inspection of the
affected area in the presence of the local farmers,
villagers, and revenue officials, for the purpose of
identifying and demarcating the original alignment of
the natural Storm Water Drain (Rajakaluve) and
assessing the extent of obstruction caused during the
construction and widening of National Highway-75;

c. Issue a Writ of Mandamus directing the
Respondents to initiate and complete proceedings for
acquisition of such extent of land as may be required
for the restoration of the natural drainage path,
strictly in accordance with law, including the
provisions of the National Highways Act, 1956 and
the Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and Resettlement
Act, 2013;

d. Issue a Writ of Mandamus directing the
Respondents, particularly Respondent Nos. 1 and 2,
to reconstruct, reinstate, or provide an alternative
scientifically designed Storm Water Drain
(Rajakaluve) ensuring the natural and unobstructed
flow of rainwater from the upstream lakes to
Mallakuppa Lake, so as to permanently prevent
flooding of agricultural lands, residential areas, and
National Highway-75;

- 5 -
WP No. 34985 of 2025



e. Pass any other appropriate writ, order, or
direction in the interest of justice and equity."

2 . We have heard Ms. Thanuja, learned counsel
appearing for Sri. Shivakumar N., learned counsel for the
petitioner, Ms. Sruti Changati, learned counsel appearing
for respondents No.1 and 2, Smt. Pramodini Kishan,
learned Addl. Government Advocate appearing for
respondent Nos.3 and 4, Ms. Sunayana Basu Mallik,
learned counsel appearing for respondent No.5 and Sri
Shrinivasa B.L., learned counsel appearing for respondent
No.6.

3. The learned counsel appearing for the petitioner
submits that he is a resident of Nangali village, Mulbagal
Taluk, Kolar District and carrying out agricultural activities.
That a natural storm water drain existed adjoining Survey
Nos.378, 382 and 515 to 528 of Nangali village and
formed part of the natural drainage system receiving
overflow from several lakes in the surrounding Gram

- 6 -
WP No. 34985 of 2025


Panchayats and conveying the same downstream to other
lakes and rivers.

4. During the construction and widening of National
Highway-75, towards eastern side of Nangali village, the
Rajakaluve was subsumed into and obstructed by the
works carried out in respect of the said Highway over a
stretch of approximately 480 to 580 mtrs. and no
adequate drainage channel was constructed to carry the
natural flow of storm water. It is stated that the
obstruction of the Rajakaluve has resulted in recurring of
inundation of agricultural lands, residential properties,
approach roads and portion of National Highway-75 during
the monsoon seasons causing loss to the crops, damage to
the property and grave risks to public safety and
movement of vehicles. The said continued inundation has
adversely affected the livelihood of the agriculturists and
residents. In spite of several representations, the
respondents have failed to take effective remedy and
measures to reinstate the natural drainage and provide
alternative drainage solution.

- 7 -
WP No. 34985 of 2025



5. It is contended by learned counsel appearing for
the petitioner that, the storm water drainage was
subsumed during the construction and widening of
National Highway-75 and no adequate drainage channel
was constructed to carry the natural flow of storm water,
which has resulted in causing loss to the crops, damage to
the property and grave risks to public safety and
movement of vehicles during monsoon season and the
said continued inundation has adversely affected the
livelihood of the agriculturists and residents. It is further
contended that in spite of several representations, the
respondents have failed to take effective remedy and
measures to reinstate the natural drainage and provide
alternative drainage solution.

6. The respondent No.1-National Highway Authorities
of India in the statement of objections has stated that
respondent No.1 vide letter dated 09.09.2026, directed
the Independent Engineer to examine the site conditions,
survey maps and existing drainage alignment and to

- 8 -
WP No. 34985 of 2025


submit a report and thereafter, the Independent Engineer
conducted a joint site visit on 18.09.2026 and submitted a
report stating that the project highway possess sufficient
drainage facilities to effectively drain storm water.

7. The respondent No.5-M/s.Bharat Petroleum
Corporation Ltd., in its statement of objections, has stated
that the concerned Tahsildar after conducting spot
inspection and verifying the revenue records, survey
sketches and village maps, pertaining to Survey No.527,
submitted a report dated 14.01.2026 stating that there is
no encroachment of Rajakaluve.

8. The learned Addl. Government Advocate appearing
on behalf of the respondent-State contended that
respondent No.4 has written letters dated 12.01.2026,
17.07.2026 and 03.09.2026 to respondent No.1,
requesting to build an alternative new Rajakaluve by
acquiring the private lands next to the Rajakaluve. It is
submitted that by another letter dated 03.09.2026,
addressed to respondent No.1, it was requested to restore

- 9 -
WP No. 34985 of 2025


the Rajakaluve which is existing, thereby ensuring free
flow of storm water through the same. It is submitted
that since no reply was given by respondent No.1 nor
th
action was taken, the 4 respondent-Tahsildar, of
Mulbagal Taluk, instructed the concerned officials to
reopen the existing Rajakaluve next to National Highway
and to rearrange the drainage system for smooth flow of
storm water into the drainage. It is further submitted
that subsequent thereto, the existing Rajakaluve is
restored and it is ensured that there is free flow of storm
water into Rajakaluve without any obstruction and in this
regard. To substantiate the said submission, the learned
Addl. Government Advocate has produced photographs of
the Rajakaluve depicting the restoration of Rajakaluve for
free flow of storm water.

9. In view of the submission made by the learned
Addl. Government Advocate stating that the existing
Rajakaluve has been restored ensuring free flow of storm
water and further upon perusal of the photographs
produced in support of the said submission, we are of the

- 10 -
WP No. 34985 of 2025


considered opinion that no further consideration of the
grievances raised in the instant petition is called for.

Accordingly, the writ petition stands disposed of.

Pending interlocutory applications, if any, shall stand
disposed of.


Sd/-
(ANU SIVARAMAN)
JUDGE


Sd/-
(K.S.BHARATH KUMAR)
JUDGE









bk/