M/S Hazoor Multi Projects Limited vs Union Of India & Anr.
- Court
- Delhi High Court
- Case type
- Writ Petition Civil
- Decided on
- 06-04-2026
<div> <br /> <i> </i><br /> $~47 <br /> * <b>IN THE HIGH COURT OF DELHI AT NEW DELHI</b> <br /> % <i>Date of Decision : 06.04.2026 </i><br /> + <b>W.P.(C) 3434/2026, CM APPL. 16499/2026</b> <br /> M/S HAZOOR MULTI PROJECTS LIMITED .....Petitioner <br /> Through: Mr. Puneet Taneja, Sr. Advocate with <br /> Mr. Amit Yadav and Mr. Manmohan <br /> Singh Narula, Advocates. <br /> <br /> Versus <br /> <br /> UNION OF INDIA & ANR. .....Respondents <br /> Through: Mr. Nishant Gautam CGSC with Mr. <br /> Vardhman Kaushik, Ms. Kavya <br /> Shukla, Mr. Vineet Negi, Mr. Vibhav <br /> V. Nath, Ms. Theresa, Advocates with <br /> Mr. Bipul Kumar, GP for R1/UOI <br /> Mr. Sandeep Sethi, Sr. Advocate and <br /> Mr. Kunal Tandon, Sr. Advocate with <br /> Mr. Kapil Arora, Ms. Aditi Tambi, <br /> Mr. Kartik Sharma, Ms. Natasha and <br /> Ms. Shreni Taran, Advocates for R2. <br /> <br /> <b>CORAM:</b> <br /> <b>HON'BLE MR. JUSTICE V. KAMESWAR RAO</b> <br /> <b>HON'BLE MS. JUSTICE MANMEET PRITAM SINGH ARORA </b><br /> <br /> <b>V. KAMESWAR RAO, J. (</b> <b><i>ORAL</i></b> <b>)</b> <br /> <br /> 1. This writ petition has been filed with the following prayers: <br /> <i>a)</i> <i> </i> <i>Issue a writ of certiorari or any other appropriate writ, </i><br /> <i>order or any direction of like nature thereby quashing/ </i><br /> <i>setting aside the Technical Evaluation Result dated </i><br /> <i>20.02.2026 whereby the Petitioner‟s bid has been declared </i><br /> <i>“Non-Responsive”; and/or </i><br /> <i>b)</i> <i> </i> <i>Issue a writ of certiorari or any other appropriate writ, </i><br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 1 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <i>order </i> <i>or </i> <i>any </i> <i>direction </i> <i>of </i> <i>like </i> <i>nature </i> <i>thereby </i><br /> <i>quashing/setting aside the Financial Bid Result dated </i><br /> <i>12.03.2026, including the consequential declaration of M/s </i><br /> <i>J Infratech Limited as L-1 bidder, in so far as it excludes the </i><br /> <i>Petitioner from consideration; </i><br /> <i>c)</i> <i> </i> <i>Issue a writ of mandamus or any other appropriate writ, </i><br /> <i>order or any direction of like nature directing the </i><br /> <i>Respondent to consider the clarifications of the Petitioner </i><br /> <i>and open the Financial Bid of the Petitioner; </i><br /> <i>d)</i> <i> </i> <i>Issue a writ of mandamus or any other appropriate writ, </i><br /> <i>order or any direction of like nature thereby restraining the </i><br /> <i>Respondent from taking any further steps pursuant to the </i><br /> <i>financial bid result dated 12.03.2026, including issuance of </i><br /> <i>Letter of Acceptance, till the Petitioner‟s bid is </i><br /> <i>reconsidered; </i><br /> <i> </i><br /> 2. The present dispute arises out of the tender invited by respondent <br /> no.1/ Ministry of Road Transport & Highways (MoRTH) for construction of <br /> road from 113.25 km to 160.75 km of the Huri-Taliha section of NH-913 <br /> (Frontier Highway) to Intermediate Lane on EPC mode in the State of <br /> Arunachal Pradesh. Corrigendum was issued by the respondent no.1 on <br /> 01.09.2025 whereby clause 2.2.2.2(ii) was modified. Subsequent to which, <br /> the petitioner submitted its bid. <br /> 3. It is the case of the petitioner as contented by Mr. Puneet Taneja, <br /> learned Senior Advocate along with Mr. Amit Yadav that the petitioner is <br /> aggrieved by the technical evaluation result dated 20.02.2026 whereby the <br /> bid submitted by the petitioner has been arbitrarily declared as “Non-<br /> Responsive” and also by the subsequent financial bid result dated <br /> 12.03.2026 wherein the petitioner has again been reflected as “Non-<br /> Responsive” without due consideration of the clarifications submitted by the <br /> petitioner vide emails dated 05.02.2026 and 25.02.2026. It is their case that <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 2 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> the respondent no.1 has alleged that the petitioner does not meet the <br /> eligibility requirement stipulated under Clause 2.2.2.2(i) & (ii) of the <br /> Request for Proposal (RFP). However, while issuing the aforesaid technical <br /> evaluation result, the respondent no.1 itself called upon the petitioner to <br /> furnish response/clarifications with respect to the declaration of “Non-<br /> Responsiveness”. In compliance to the aforesaid, the petitioner furnished <br /> detailed replies along with supporting documents demonstrating that the <br /> petitioner satisfies the eligibility criteria under the RFP. Even then the <br /> respondent no.1 did not consider the aforesaid clarifications and documents <br /> proceeded with the tender process and opened financial bids on 12.03.2026 <br /> wherein the bid of the respondent no.2 emerged as L-1. <br /> 4. As per Mr. Taneja, the petitioner satisfies the eligibility criteria under <br /> Clause 2.2.2.2(i), which is the threshold technical capacity of <br /> Rs.7,90,91,76,231/-. The petitioner has executed/received payment of <br /> Rs.806.88 crores in the project Construction of Access Controlled Nagpur-<br /> Mumbai Super Communication Expressway (Maharashtra Samrudhi <br /> Mahamarg) in the state of Maharashtra on EPC mode for Package-11 from <br /> 502.698 km to 532.094 km (Section-Village Kokamthan to Village Derde <br /> Korhale), District Ahmednagar (Pkg-11). He has drawn our attention to the <br /> documents in support of the executed/receiving payment of Rs.806.88 <br /> crores. <br /> 5. According to him, Clause 2.2.2.2(ii) which stipulates either two <br /> similar completed works costing not less than amount equal to 25% each of <br /> estimated cost i.e. Rs.1,97,72,94,058/- or one similar completed work <br /> costing not less than amount which equals to 35% each of estimated cost, <br /> i.e. Rs.2,76,82,11,681/-. Mr. Taneja further argues that Clause 2.2.2.2(ii) <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 3 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> which is the criteria of hill road wherein one similar work of atleast 5 km <br /> length involving formation building along with hill and valley side slope <br /> protection work. Mr. Taneja has referred to „List of eligible projects for hill <br /> road qualification‟ as annex IVA at Page 179 of the paper book wherein he <br /> has referred to three projects which satisfies the criteria for hill road <br /> qualification and length executed by the bidder in the hilly area. The details <br /> of the same are as under: <br /> <br /> 6. Upon a reading of the same it can be seen that the Petitioner had <br /> submitted the following details : <br /> i. Construction of Access Controlled Nagpur-Mumbai Super <br /> Communication Expressway (Maharashtra Samruddhi Mahamarg) in <br /> the state of Maharashtra on EPC Mode for Package-11, from km <br /> 502.698 to km 532.094 (Section-Village Kokamthan to Village Derde <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 4 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> Korhale), District Ahmednagar. <br /> ii. Construction of Access Controlled Nagpur-Mumbai Super <br /> Communication Expressway (Hindu Hruday Samrat Balasaheb <br /> Thakaray Maharashtra Samruddhi Mahamarg) in the state of <br /> Maharashtra on EPC Mode–CP-13, from km 577+739 to km <br /> 623+3798 (Village Sonari to Village Taranganpada) in District <br /> Nashik. <br /> iii. Rehabilitation & Up-gradation to 2 Lane with Paved Shoulder/5 <br /> Lanning configuration of Wakan Pali Khopoli Road SH93 (New NH), <br /> MPEW, AH47 (NH4) and NH66 (NH17) from km. 0/000 to 40/600in <br /> the state of Maharashtra on EPC Mode. <br /> 7. Mr. Taneja has drawn our attention to the summary form which <br /> comprises the petitioner‟s compliance submission as under: <br /> <br /> 8. The petitioner had also furnished the certificates issued by the <br /> authorities giving details of Bill of Quantities (BOQ) items in respect of the <br /> project i.e. Pkg-11 and Maharashtra Samrudhi Expressway (Pkg-13). The <br /> scope of works executed include slope protection works, RCC retaining <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 5 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> walls, etc. which constitute integral components of Hill Slope Protection <br /> (HSP) works. This further cements the claim of the petitioner that the <br /> requirements under Clause 2.2.2.2(i) & (ii) are met. <br /> 9. On the issue of the petitioner being declared as “Non-Responsive” <br /> vide Technical Evaluation Result dated 20.02.2026 project code „c‟ i.e. Pkg-<br /> 13 has been considered against similar work with 5 km hill slope protection <br /> work and project code „a‟ & „b‟ has not been considered. He contended that <br /> the petitioner satisfies the hill road qualification in all three project works <br /> and the requirements of the present RFP stands satisfied. <br /> 10. Concerning the issue of threshold capacity of Rs.303.14 crores, <br /> according to Mr. Taneja, the petitioner had informed the respondent no.1 <br /> with respect to the Nagpur-Mumbai Expressway wherein it was the official <br /> sub-contractor for the contract issued to M/s. Gayatri Projects Ltd. This <br /> coupled with the fact that the contract agreement allows the provision of <br /> sub-contracting. The petitioner has annexed the sub-contract agreement <br /> along with the BOQ items demonstrating the value of the work awarded to <br /> the tune of Rs.303.14 crores to the petitioner. This was as on 03.01.2022 <br /> relating to Chainage from 521.60 km to Chainage 532.094 km. Later on <br /> 20.06.2022 the scope was enhanced from 502.698 km to 532.094 km <br /> whereby further work of Rs.220.41 crores has also been given to the <br /> petitioner. Then again on 14.02.2023, the scope of work was changed <br /> whereby further work of Rs.346.56 crores was given to the petitioner, which <br /> brought the total value of the awarded work to the petitioner to Rs.870.11 <br /> crores. The petitioner was also given the price escalation which brought the <br /> value of the work allotted to the petitioner to Rs.922.01 crores out of which <br /> the petitioner had executed work of Rs.806.88 crores in the five financial <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 6 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> years as certified by the auditors. It is his contention that the respondent no.1 <br /> has failed to consider the subsequent work orders issued in continuation of <br /> the agreement as well as the auditor‟s certificate. All these documents were <br /> submitted and formed part of the bid documents. <br /> 11. It is the case of Mr. Taneja that the petitioner had submitted a <br /> representation seeking an opportunity to represent against the result of the <br /> technical evaluation, which was done after taking note of the reasons for <br /> declaration of Non-Responsiveness vide Technical Evaluation Result dated <br /> 20.02.2026. The said representation was accompanied with the certificate <br /> dated 23.02.2026. The same is not a new document but rather a clarifying <br /> certificate issued to provide more clarity and to re-affirm the fact and <br /> credentials already forming part of the bid document. The said certificate <br /> clearly stated that 12.398 km falls under hilly terrain and the work was <br /> completely executed by the petitioner. <br /> 12. Mr. Taneja has contested the decision on the representation dated <br /> 05.02.2026 as being an unreasoned order. The respondent no.1 did not <br /> consider the representation by terming the certificate dated 23.02.2026 as a <br /> new document, without appreciating that the same clarifies and re-confirms <br /> the information already submitted. On the issue of the Hill Road Criteria, <br /> respondent no.1 had only considered the project code „c‟ for similar work <br /> with 5 km HSP work under the Hill Criteria Qualification. The respondent <br /> had also failed to consider the justification in response to the grounds of <br /> „Non-Responsiveness‟, by stating the supporting certificate constitutes a <br /> new document. The purpose of granting opportunity to submit a <br /> representation is to clarify any issue that may have not been fully <br /> appreciated by the Technical Evaluation Committee (“TEC”). If such an <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 7 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> evaluation is disregarded then the process becomes a mere formality. <br /> 13. He stated that if the contentions of the petitioner are considered in <br /> perspective, it is likely to emerge as L-1 bidder as such the exclusion of the <br /> petitioner is arbitrary and unreasonable. He has relied upon a judgment of <br /> the Supreme Court in the case of <b><i>Tata Cellular v. Union of India, (1994) 6 </i></b><br /> <b><i>SCC 651</i></b> to state that even though the Courts must exercise judicial restraint <br /> in tender matters but it was also held that the decision making process <br /> remains fully amenable to judicial review and it would be open for the Court <br /> to review the decision maker‟s evaluation of facts. He has referred to the <br /> executed value of the petitioner‟s projects to be Rs.806.88 crores under <br /> project code „a‟ which alone satisfies the threshold technical capacity of <br /> Rs.790.91 crores. He has also relied on the said judgment to argue that the <br /> rejection of the petitioner‟s bid was on hyper-technical grounds without <br /> independent verification and constitutes unreasonableness as per the <br /> <i>Wednesbury</i> Principles. <br /> 14. Reliance is also being placed on the judgment in the case of <b><i>Smt. S.R. </i></b><br /> <b><i>Venkataraman v. Union of India, (1979) 2 SCC 491</i></b> wherein it was held <br /> that an administrative order which is based on reasons of fact which do not <br /> exist must be held to be an abuse of power. In the present case, he stated <br /> that not only had the petitioner demonstrated technical capacity but also <br /> completed hill road works with slope protection and the same is <br /> conclusively contradicted by the official certificate issued by the Project <br /> Authority. <br /> 15. Mr. Nishant Gautam, appearing on behalf of the respondent no.1, the <br /> MoRTH stated that MoRTH had floated a tender on 11.07.2025 for <br /> construction of NH-913 at an estimated cost of Rs.790.92 Crores excluding <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 8 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> Goods and Services Tax (GST). Corrigenda were issued on 01.09.2025 and <br /> 15.09.2025 modifying the clause 2.2.2.2(ii). The petitioner submitted its bid <br /> in September 2025 claiming three works with project codes „a‟ „b‟ and „c‟ <br /> against eligible clauses 2.2.2.2(i) and 2.2.2.2(ii). The bidder sought <br /> clarifications as to how the qualification criteria required as per clauses <br /> 2.2.2.2(i) and 2.2.2.2(ii) and the reply of the bidder dated 05.02.2026 was <br /> deliberated upon by the Committee in its meeting dated 12.02.2026. On <br /> 20.02.2026 the TEC declared the petitioner „non-responsive‟ on two <br /> independent grounds. After which the petitioner was granted seven days‟ to <br /> represent and the said opportunity was availed by email dated 25.02.2026. <br /> After giving due consideration to the representation MoRTH maintained its <br /> stand on its finding that the petitioner‟s bid is non-responsive. It was then <br /> the financial bids were opened on 12.03.2026 wherein the respondent no.2 <br /> emerged as L1. <br /> 16. Mr. Gautam stated that two grounds on which the petitioner bid was <br /> declared non-responsive are both related to clauses 2.2.2.2(i) and 2.2.2.2(ii). <br /> Ground 1 pertains to non-compliance of similar work criteria under clauses <br /> 2.2.2.2(ii), which when read with corrigendum dated 15.09.2025, the bidder <br /> was required to demonstrate:- <br /> a) Value threshold of one similar work equal or greater than <br /> Rs.272.82 Crores or two similar work equal or greater than <br /> Rs.197.73 Crores each; and <br /> b) HSP (retaining wall/breast wall/gabion wall/Hydro seeding/soil <br /> nailing /rock anchor) in a total length of 5 km in the said similar <br /> work, i.e. within the very same work satisfying the value threshold. <br /> Each similar work needed to comply with 5 km HSP works. <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 9 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> 17. It is his contention that both works were conjunctive. The phrase „the <br /> said similar work‟ for any cross-project aggregation of the 5 km HSP <br /> requirement. The following table sets out the three projects submitted by the <br /> petitioner and the reason why each of them failed to meet the prescribed <br /> criteria:- <br /></div><table><thead><tr><th>Project</th><th>Work</th><th>Completed value</th><th>Why it falls</th></tr></thead><tbody><tr><td>“a”</td><td>Maharashtra Samruddhi<br>Expressway Package-11<br>(MSRDC)</td><td>Rs.749.03 Cr</td><td>Original Certificate:<br>Retaining Wall only<br>0.87 km (< 5 km).<br>Earthwork in<br>banking ≠ HSP.<br>Altered certificate<br>submitted post bid-<br>date — inadmissible.</td></tr><tr><td>“b”</td><td>Wakan-Pali-Kholpoli<br>Road, NH-548A</td><td>Rs.98.62 Cr</td><td>Certificate silent on<br>HSP — fails 5 km<br>condition outright,<br>irrespective of value.</td></tr><tr><td>“c”</td><td>Maharashtra Samruddhi<br>Expressway Pkg-13<br>(MSRDC)</td><td>Rs.113.27 Cr</td><td>5 km HSP met — but<br>value far below<br>Rs.197.73 Cr / Rs.<br>272.82 Cr threshold.<br>Failed value<br>condition.</td></tr></tbody></table><div><br /> 18. As per Mr Gautam, project code „a‟ the original certificate of MSRDC <br /> dated 15.09.2025 as submitted in original bid, records that the slope <br /> protection by earth work in banking is 54.49 km and retaining wall is 0.87 <br /> km. The retaining wall was only the component that could qualify as HSP <br /> and at 0.87 km it fell short of 5 km. The earth work in banking is not HSP <br /> as it involved filling and compacting earth to form road embankment. It was <br /> structurally distinct from HSP works (retaining wall/breast wall/gabion <br /> wall/Hydro seeding/soil nailing /rock anchor) which protected the existing <br /> hill slope from erosion and failure. The committee‟s exclusion of this <br /> component was technically sound and is not perverse. <br /> 19. In the representation by email dated 25.02.2026, the petitioner had <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 10 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> submitted a second certificate also dated 15.09.2025 with two unexplained <br /> alternations being the deletion of “earthwork in banking” and alternation of <br /> the retaining wall component from 0.87 km to 8.70 km which is a ten fold <br /> increase by transposition of digits. This document was not part of the <br /> original bid and materially contradicted it. According to him, the law in this <br /> regard, is well settled, that post bid date documents could not cure eligibility <br /> deficiencies and documents contradicting original bid documents could not <br /> be considered. As such, no project submitted by the petitioner satisfied both <br /> the value and HSP requirement of clause 2.2.2.2(ii). Accordingly, the <br /> declaration of non-responsiveness was fully justified. <br /> 20. The next objection taken by MoRTH as contended by Mr. Gautam, is <br /> on the ground of non-compliance of threshold technical capacity clause <br /> 2.2.2.2(i). The said clause stipulates that the receipts from five eligible <br /> projects are required in the last five financial years which exceed the <br /> threshold technical capacity of Rs.790.92 Crores. In sub contracting cases, <br /> clause 2.2.2.5(iv) restricted the value of the claimable amount to the <br /> <i>„approved sub-contract valu</i> e‟ as approved by the authority which is the <br /> Government client. Project „a‟ which is a sub-contract under M/s.Gayatri <br /> Projects Limited, the petitioner executed project and claimed receipts of <br /> Rs.806.88 Crores from this project whereas the sub-contract agreement <br /> between client/MSRDC, M/s.Gayatri Projects Limited, and the petitioner <br /> recorded a sub-contract value of only Rs.303.14 Crores. <br /> 21. As per Mr.Gutam, clause 2.2.2.5(iv) mandated a proof of the <br /> authority‟s approval of the sub contract, i.e. approval from MSRDC and not <br /> merely an <i>inter se</i> agreement between the private parties. No such document <br /> from MSRDC was included in the original bid and the petitioner submitted a <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 11 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> purported MSRDC approval dated 23.02.2026 only at the representation <br /> stage, which is post dated the bid and could not be considered. The <br /> consequences, which followed under clause 2.2.2.5(iv) stated that since no <br /> authority approval was furnished as part of the original bid the receipts <br /> claimed by the petitioner from project code „a‟ were required to be restricted <br /> to the sub-contract value of Rs.303.14 Crores, for which legal document was <br /> present. On that basis, the petitioner‟s aggregate technical capacity fell short <br /> of the required Rs.790.91 Crores and even on this ground, the finding of the <br /> non-responsiveness was also justified. <br /> 22. On the aspect of whether the representation of the petitioner was not <br /> considered, Mr Gautam submits that both the representations dated <br /> 05.02.2026 and 25.02.2026 were fully considered by the committee before <br /> the financial bids were opened on 12.03.2026. Non-acceptance of the <br /> petitioner‟s submission in this case does not amount non-consideration. <br /> 23. Mr.Gautam stated that even if, one were to assume that the altered <br /> certificate is genuine the same was submitted beyond the bid date and <br /> materially contradicted the original bid document. Hence, only the document <br /> which form part of the original bid are governed under the evaluation and <br /> the petitioner cannot be permitted to improve or supplement its bid after the <br /> bid due date. <br /> 24. It is also the submission of Mr. Gautam that since the project is <br /> situated in a hilly terrain there was not a substitute for demonstration of <br /> specific HSP works evidenced by a certificate from the authority. The RFP <br /> mandated a specific, quantified and certified 5 km threshold and not a <br /> general characterisation of the terrain in which the project was located. <br /> Accordingly, all 15 bids, which were received for NH-913 works in the <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 12 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> State of Arunachal Pradesh were evaluated on identical principles on <br /> 20.02.2026 and the petitioner has not in any way, been subjected to any <br /> discriminatory treatment. <br /> 25. Mr. Sandeep Sethi and Mr. Kunal Tandon learned Senior Counsels <br /> along with Mr. Kapil Arora and Ms. Aditi Tambi appearing for the <br /> respondent no.2, which entity has emerged as L1 in the project tender has <br /> supported the decision of MoRTH in declaring the petitioner as non-<br /> responsive after having given them ample opportunity to be heard. Mr. Sethi <br /> stated that even though clause 3.1.9 of the RFP does not require respondent <br /> no.1 to provide any further opportunity to non-responsive bidders to submit <br /> clarifications, once the technical evaluation result is declared, MoRTH still <br /> provided another opportunity to the non-responsive bidders including the <br /> petitioner vide the technical bid result. Even prior to 11.03.2026 the <br /> petitioner had multiple opportunities to submit clarification/representation to <br /> the respondent no.1 MoRTH. <br /> 26. Mr.Sethi has drawn our attention to clause 2.2.2.2 wherein the <br /> technical requirement pertains to completion of 5 km of hill road and 5 km <br /> hill and valley slide protection work in at least one similar work. <br /> Additionally, he has also referred to the subsequent corrigenda dated <br /> 01.09.2025 and 15.09.2025 to state that the petitioner has not filed the latter <br /> corrigendum before this Court. According to him, the petitioner purposefully <br /> chose not to file the corrigendum dated 15.09.2025 as the same would <br /> clearly demonstrate that the requirement under the bid was that the petitioner <br /> should have completed of 5 km of HSP works whereas the bid submitted by <br /> the petitioner did not fulfil this requirement. <br /> 27. The above clause and corrigenda stated that for the purpose of <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 13 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> meeting the technical eligibility under the RFP, three conditions must be <br /> cumulatively satisfied, which are the following:- <br /> i) The bidder ought to have received payments of more than <br /> Rs.790.91 Crore (threshold technical capacity) over the past <br /> five financial years for construction of eligible construction <br /> work by itself or in a public-private partnership project. <br /> ii) For computation of the threshold technical capacity the bidder <br /> must complete either of the following: a) two similar <br /> completed work not costing less than 25% each of the <br /> threshold technical capacity i.e. Rs.197.72 Crores; or b) one <br /> similar completed work costing not less than 35% i.e. <br /> Rs.276.82 Crores; and <br /> iii) Provided that in at least one of the aforesaid similar work, the <br /> bidder must have completed HSP works of at least 5 km. <br /> 28. According to Mr.Sethi, in cases where the bidder has acted as a sub-<br /> contractor, then the value of the above executed civil works for the purpose <br /> of assessing the threshold technical capacity as well as the eligibility for <br /> similar work, must be restricted only to the extent of allowable sub <br /> contracting limit in the original contract. Therefore, if there are any <br /> additions or modification in the contract, same are not be considered and it <br /> is only the value under the original contract that should be considered for the <br /> purpose of assessing the eligibility requirement. He stated that the above <br /> conditions pertaining to similar works are concurrent in nature and this <br /> condition along with the threshold technical capacity are required to be <br /> cumulatively satisfied. <br /> 29. Vide email dated 30.01.2026, respondent no.1 MoRTH sent query in <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 14 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> relation to the technical bid submitted by the petitioner and the said query <br /> clearly identifies that only the project code „c‟ with the completed value of <br /> Rs.113.27 crores was considered against similar work with 5 km HSP work, <br /> wherein notably similar work was less than 25%; whereas project code „a‟ <br /> and „b‟ do not demonstrate the completion of 5 km of HSP work. <br /> Accordingly, the petitioner was asked to clarify how it met the criteria <br /> clause 2.2.2.2(ii). Mr. Sethi, has referred to the petitioner‟s reply dated <br /> 05.02.2026 wherein it had admitted that the completion certificate for <br /> project codes „a‟ and „b‟ do not explicitly state that 5 km of slope protection <br /> is from projects executed in the hilly terrain. The petitioner had also <br /> admitted that the original sub contract value for project code „a‟ was <br /> Rs.303.14 Crores and had only increased in view of subsequent allotment of <br /> additional work. It was thereafter, after having given the ample <br /> opportunities to the petitioner that the respondent declared the petitioner as <br /> non-responsive. Mr. Sethi, has also referred to the document titled „List of <br /> eligible projects for hill road qualification‟ as annex IVA at Page 179 of the <br /> paper book to state in the said document only project „c‟ has details of <br /> relating to the length of different hill and valley protection work by the <br /> petitioner and none of the other projects demonstrate the same. Even then, <br /> the same does not satisfy the requirement of either 25% or 35% as per clause <br /> 2.2.2.2(ii). <br /> 30. It is the case of respondent no.2 that the petitioner while submitting <br /> its letter dated 25.02.2026 has submitted a purported certificate from the <br /> authority dated 23.02.2026 that the stretch of 12.398 km under project code <br /> „a‟ falls under the hilly terrain. The said certificate is also accompanied by <br /> another work done certificate dated 15.09.2025 which has been issued by the <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 15 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> Nagpur-Mumbai Super Communication Express Limited (NMSCEL) to <br /> state that there has been a slope protection work of 54.49 km and also an <br /> RCC retaining wall of 8.7 km. He stated that the certificate dated 05.02.2026 <br /> provided by the petitioner has been substituted with another certificate <br /> mentioning only slope protection work which was submitted along with <br /> their 25.02.2026 representation and the RCC retaining wall figures have also <br /> been changed from 0.87 km to 8.7 km. He stated that this ground alone is <br /> enough to dismiss this petition. <br /> <br /> 31. In this regard, Mr. Sethi has relied upon the following judgments for <br /> the following propositions: <br /> a) The judgment in the case of <b><i>Tata Cellular v. Union of India, </i></b><br /> <b><i>(1994) 6 SCC 651 </i></b> has been referred to state that the Courts do not <br /> possess the expertise to correct the administrative decision and the <br /> writ Courts ought not to sit as a court of appeal, but only review <br /> the manner in which the decision was made; <br /> b) In <b><i>Tata Motors Ltd. v. Brihan Mumbai Electric Supply & </i></b><br /> <b><i>Transport Undertaking, (2023) 19 SCC 1</i></b> the Supreme Court had <br /> held that a writ court ought to refrain itself from imposing its <br /> decision over the decision of the employer as to whether or not to <br /> accept the bid of a tenderer unless there is a patent illegality which <br /> is pointed out; <br /> c) As per the decision in the case of the <b><i>N.G. Projects Ltd. v. Vinod </i></b><br /> <b><i>Kumar Jain, (2022) 6 SCC 127</i></b> it was held that an injunction or <br /> interference in the tender process only leads to additional costs on <br /> the public exchequer and is also against public interest; and <br /> d) Lastly, he has also drawn our attention to the decision in the case <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 16 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> of <b><i>Haffkine Bio-Pharmaceutical Corporation Ltd v. Nirlac </i></b><br /> <b><i>Chemicals, (2018) 12 SCC 790 </i></b> to contend that the tender issuing <br /> authority is the best judge of its own requirements and a party <br /> whose claim is rejected may claim restitution if its bid is <br /> technically qualified and wrongly rejected. <br /> <br /> 32. Mr. Taneja in his rejoinder submissions in the context of Clause <br /> 2.2.2.2(i) stated that the petitioner not only placed on record merely the <br /> initial sub-contract agreement but also the subsequent work orders dated <br /> 20.06.2022 and 14.02.2023 which formally enhanced the scope of the work <br /> along with the authority issued certificate. The same enhanced the aggregate <br /> executed value of the project to Rs.806.88 crores. No reasonable evaluating <br /> authority should read the sub-contract in isolation from the subsequent work <br /> order which form part of the same contractual framework which had <br /> expressly enhanced this Court and value. With regard to Clause 2.2.2.2 (ii), <br /> since the executed value of work was Rs.806.88 crores under project code <br /> „a‟ which is nearly three times the threshold limit of Rs.276.82 crores for <br /> similar completed work. The TEC offered no rational basis for declining to <br /> treat the petitioner at par with other bidders at the time of bid evaluation. As <br /> on the issue of the Hill road qualification criteria, the respondent no.1, <br /> MoRTH had itself accepted project code „c‟ Pkg-13 as qualifying for the hill <br /> road criteria. Once the respondent no.1 had accepted Pkg-13, they could not <br /> have refused to extend the same recognition to Pkg-11 which is a parallel <br /> package on the same expressway corridor in terms of the Work Done <br /> Certificate and a detailed authority certificate also records explicitly <br /> execution of slope protection works and RCC retaining walls for 12.398 kms <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 17 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> of hilly terrain and the same goes against the principles laid in <b><i>Tata Cellular </i></b><br /> <b><i>(supra)</i></b> . <br /> 33. The failure to undertake independent verification before rejecting the <br /> official certificate as per Mr. Taneja amounts to denial of fair procedure. <br /> The petitioner had submitted adequate documents in support of their claim <br /> but the TEC did not consider the same and mechanically brushed them aside <br /> the same. He stated the actions of the TEC are against the <i>ratio</i> laid down in <br /> <b><i>Tata Cellular (supra)</i></b> and <b><i>S.R. Venkataraman (supra). </i></b> <br /> <br /> 34. It is also his case that the rejection of the clarificatory certificate as <br /> being termed as a new document is an erroneous and unreasonable exercise <br /> of power. The characterisation of the certificate dated 23.02.2026 as a „new <br /> document‟ demonstrates the wrong committed by the TEC. The said <br /> certificate does not introduce any new extraneous fact but merely clarifies <br /> and formally certifies the hilly terrain and nature of the BOQ items were <br /> already a part of the original bid document. The authority has wrongly <br /> labelled this document as a new document and these actions are against the <br /> principles as laid down in <b><i>Tata Cellular (supra)</i></b> and <b><i>S.R. Venkataraman </i></b><br /> <b><i>(supra). </i></b> <br /> 35. Lastly, he contended that the petitioner‟s bid as the undisputed record <br /> is highly competitive and would have come up as the L-1 bid. The <br /> acceptance of the higher bid while excluding the technically qualified bidder <br /> results in an avoidable and substantial financial prejudice to the public <br /> exchequer. In support of his arguments, he has relied upon the judgment in <br /> the case of <b><i>Tata Cellular (supra) </i></b> to contend that the principles of Article 14 <br /> under the Constitution must be kept in view while refusing or accepting her <br /> tender if the power of choice is exercised for any collateral purpose, the <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 18 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> same must be struck down. <br /> <b>ANALYSIS </b><br /> 36. Having heard the learned counsel for the parties and perused the <br /> record, the issue which arise for consideration in this petition is whether the <br /> decision of the respondent no. 1 to treat the bid of the petitioner as non-<br /> responsive is justified. <br /> 37. The TEC declared the bid of the petitioner as non-responsive in its <br /> meeting dated 20.02.2026. The two grounds on which the petitioner‟s bid <br /> was declared as non-responsive are: (a) non-compliance with similar work <br /> criteria [clause 2.2.2.2(ii)] and; (b) non-compliance with threshold technical <br /> capacity [clause 2.2.2.2(i)]. <br /> 38. In respect of ground no. 1 above, the bidder is required to <br /> demonstrate: <br /> a. Value Threshold i.e., One similar work of more than Rs. 272.82 <br /> crores or two similar works of more than Rs. 197.73 crores each <br /> and; <br /> b. completion of HSP in a total length of 5 kms in the said similar <br /> work i.e., within very same work satisfying the value threshold. <br /> Each similar work is needed to comply with 5 km HSP. <br /> 39. The case of the respondent no. 1 as canvassed by Mr. Gautam is that <br /> both the conditions are conjunctive. The case of the respondents is also that <br /> the petitioner has failed to meet the criteria in respect of any of the three <br /> projects relied as upon by the petitioner. <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 19 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <br /></div><table><thead><tr><th>i.</th><th>Project a</th><th>Original retaining wall only 0.87 km (less<br>than 5 km)<br>The petitioner submitted altered certificate,<br>which is inadmissible.</th></tr></thead><tbody><tr><td>ii.</td><td>Project b</td><td>Certificate silent on HSP – fails 5 km<br>condition.</td></tr><tr><td>iii.</td><td>Project c</td><td>5 km HSP met – but the value far below Rs.<br>197.73 crores / Rs. 272.82 crores threshold.</td></tr></tbody></table><div><br /> <br /> 40. Insofar as the ground (ii) of non-compliance with the threshold <br /> technical capacity is concerned, the case of the respondent no. 1 is that as <br /> per clause 2.2.2.2(i), the receipts from eligible projects in the last five <br /> financial years exceeds the threshold technical capacity of Rs. 790.91 crores. <br /> It is their case that in sub-contracting cases clause 2.2.2.5(iv) restricted the <br /> claimable amount to the “ <i>approved sub-contract value</i> ” as approved by the <br /> authority. <br /> 41. It is also their case that the petitioner relied upon project (a) <br /> Maharastra Samruddhi Expressway Package-11 wherein it was the sub-<br /> contractor to M/s. Gayatri Projects Limited, which was prime contractor <br /> with MSRDC. The petitioner claimed receipts of Rs. 806.88 crores from this <br /> project whereas the petitioner recorded the sub-contract value of only Rs. <br /> 303.14 crores as against the requirement of Rs. 790.91 crores. The case of <br /> the respondent no. 1 is also by stating that only documents forming part of <br /> the original bid shall govern the evaluation. <br /> 42. Whereas Mr. Taneja‟s submission is that the respondent no. 1 itself <br /> had called upon the petitioner to furnish response/clarification on the aspect <br /> of non-responsiveness. It is in compliance thereof that the petitioner <br /> furnished detailed replies and documents, which according to him were not <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 20 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> considered and the respondent no. 1 proceeded with the tender process and <br /> opened the financial bids. Having noted the above submission of Mr. <br /> Taneja, we are of the view that the issue of non-responsiveness has to be <br /> considered and decided on the basis of the bid and the clarification given by <br /> the petitioner along with the documents submitted along with the bid. <br /> 43. On the aspect of eligibility criteria under clause 2.2.2.2(i), which is a <br /> threshold technical capacity of Rs. 790,91,76,231/-, the case of the petitioner <br /> as canvassed by Mr. Taneja is that the petitioner has executed/received <br /> payment of Rs. 806.88 crores in the project „a‟ above. According to him, the <br /> sub-contract was initially for Rs. 303.14 crores, which contract was <br /> enhanced by Rs. 220.41 crores (on 20.06.2022) and further enhanced by Rs. <br /> 346.56 crores (on 14.02.2023) and hence meet the criteria. The aforesaid <br /> submission of Mr. Taneja is not at all appealing. This we say so because of <br /> clauses 2.2.2.2(i) and 2.2.2.2(ii) which are reproduced hereunder:- <br /> <i>“(i) For demonstrating technical capacity and experience </i><br /> <i>(the “Technical Capacity”), the Bidder shall, over the past </i><br /> <i>[5 (five)]financial years preceding the Bid Due Date, have </i><br /> <i>received payments for construction of Eligible Project(s), or </i><br /> <i>has undertaken construction works by itself in a PPP </i><br /> <i>project, such that the sum total thereof, as further adjusted </i><br /> <i>in accordance with clause 2.2.2.5 (i) & (ii), is more than the </i><br /> <i>“Threshold Technical Capacity” mentioned as below: </i> <i> </i><br /> <i> </i><br /></div><table><thead><tr><th>Particular</th><th>Amount (in Rs.)</th><th>in Words</th></tr></thead><tbody><tr><td>Threshold<br>Technical<br>Capacity</td><td>₹7,90,91,76,231</td><td>Seven Hundred Ninety<br>Crore Ninety One Lakh<br>Seventy Six Thousand Two<br>Hundred Thirty One</td></tr></tbody></table><div><br /> <i> </i><br /> <i>(ii) For normal Highway projects (including Major </i><br /> <i>Bridges/ROB/Flyovers/Tunnels): </i><br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 21 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <i>Provided that at least either of the following: </i><br /> <i>(i) Two similar completed works costing not less than </i><br /> <i>amount equal to 25% each of estimated cost. </i><br /> <i>or </i><br /> <i>(ii) One similar completed work costing not less than </i><br /> <i>amount equals to 35% each of estimated cost </i><br /> <i>[Similar work cost as in table below] shall have been </i><br /> <i>completed from the Eligible Projects in Category 1 and/or </i><br /> <i>Category 3 specified in Clause 2.2.2.5. Certificate(s) from </i><br /> <i>the </i> <b><i>concerned client(s) shall be required for the same. In </i></b><br /> <b><i>case the claimed project /(s) are subcontracting/ JV project </i></b><br /> <b><i>in such a case Approval from Govt. Authority / Client is </i></b><br /> <b><i>required (restricted to allowable sub-contracting limit/ JV </i></b><br /> <b><i>share in original contract)</i></b> <i>. </i><br /> <i> </i><br /> <i>For this purpose, a project shall be considered to be </i><br /> <i>completed, if more than 90% of the value of work has been </i><br /> <i>completed and such completed value of work is equal to or </i><br /> <i>more than the abovementioned criteria in the last 5 (five) </i><br /> <i>financial years preceding the Bid Due Date or till the Bid </i><br /> <i>Due Date. Eligible projects shall include following: </i><br /> <i> </i><br /> <i>(a) </i> <i>Widening/reconstruction/up-gradation </i> <i>works </i> <i>on </i><br /> <i>NH/SH/Expressway or on any category of road taken up </i><br /> <i>under CRF, ISC/El, SARDP, LWE </i><br /> <i> </i><br /> <i>(b) Widening/reconstruction/up-gradation works on MDRs </i><br /> <i>with loan assistance from multilateral agencies or on BOT </i><br /> <i>basis </i><br /> <i> </i><br /> <i>(c) Widening/reconstruction/up-gradation work of roads in </i><br /> <i>Municipal corporation limits, construction of Bypasses </i><br /> <i> </i><br /> <i>(d) Construction of stand-alone bridges, ROBs, tunnels </i><br /> <i> </i><br /> <i>(e) Construction/reconstruction of linear projects like </i><br /> <i>airport runways </i><br /> <i> </i><br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 22 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <i>(f) Viaducts of Railways/Metro </i><br /> <i> </i><br /> <i>(g) Container yard of ports </i><br /> <i> </i><br /> <i> </i><br /></div><table><thead><tr><th>Particulars</th><th>Amount (in Rs.)</th><th>In Words</th></tr></thead><tbody><tr><td>Two Similar<br>Work each<br>costing</td><td>₹ 1,97,72,94.058</td><td>One Hundred Ninety<br>Seven Crore Seventy<br>Two Lakh Ninety<br>Four Thousand Fifty<br>Eight</td></tr><tr><td>One Similar<br>work costing</td><td>₹ 2,76,82,11,681</td><td>Two Hundred<br>Seventy Six Crore<br>Eighty Two Lakh<br>Eleven Thousand<br>Six Hundred Eighty<br>One</td></tr></tbody></table><div><br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 23 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <i>longest span or 100 m, whichever is less, of the structure </i><br /> <i>proposed in this project and 40% of the length of Major </i><br /> <i>bridge/ROB/Flyover or 2km, whichever is less, of the </i><br /> <i>structure proposed in this project. </i><br /> <i> </i><br /> <i>And in case of tunnel, if any, shall have completed </i><br /> <i>construction of at least one tunnel consisting of single or </i><br /> <i>twin tubes (including tunnel(s) for roads/Railway/Metro </i><br /> <i>rail/irrigation/hydro-electric projects etc.) having at least </i><br /> <i>(a) In case Tunnel is a part of project having length less </i><br /> <i>than or equal to 200 m, then no additional qualification is </i><br /> <i>required. </i><br /> <i>(b) when length of tunnel more than 200 m: 80% of the </i><br /> <i>cross-sectional area of proposed tunnel or two-lane </i><br /> <i>highway tunnel cross-sectional area, whichever is less and </i><br /> <i>40% length of the tunnel to be constructed (other than cut </i><br /> <i>and cover method) in this project or 2 km, whichever is </i><br /> <i>less.” </i><br /> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> (emphasis supplied) <br /> <br /> 44. The aforesaid contemplates the claimed project, if sub-contracted, the <br /> approval from the client/Government authority is required (restricted to <br /> allowable sub-contracting limit). In the case in hand, the sub-contract as <br /> given to the petitioner by M/s. Gayatri Projects Limited, which was <br /> approved by MSRDC was worth Rs. 303.14 crores and nothing more. The <br /> enhanced sub-contracts of Rs. 220.41 croes and Rs. 346.56 crores granted to <br /> the petitioner were not expressly approved by MSRDC and in this regard, <br /> we agree with the submission of Mr. Gautam and Mr. Sethi that clause <br /> 2.2.2.5(iv) mandated a proof of the authority‟s approval of sub-contract i.e., <br /> approval from MSRDC (in this case) and not merely an <i>inter se</i> agreement <br /> between the private parties. Mr. Gautam and Mr. Sethi are also right in <br /> contending that no document has been filed by the petitioner on record in <br /> that regard. So, it follows that the eligibility must be restricted only to the <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 24 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> original sub-contract agreement, which is admittedly of the value of Rs. <br /> 303.14 crores. <br /> 45. Since, the petitioner has failed to satisfy the mandatory criteria of <br /> clause 2.2.2.2(i), its bid could not have proceeded to the evaluation under <br /> clause 2.2.2.2(ii), however, since the respondent no. 1 has disqualified the <br /> petitioner on this ground as well, we have examined the legality of the rival <br /> submissions. <br /> 46. That apart Mr. Gautam and Mr. Sethi are also justified in stating that <br /> apart from the aforesaid threshold technical capacity, the bidder has also to <br /> show completion of either of the following similar works:- <br /> a. two similar completed works costing not less than 25% each of <br /> the threshold technical capacity i.e. Rs. 197.72 crores (approx.) <br /> each or; <br /> b. one similarly completed work consisting not less than 35 % of <br /> the threshold technical capacity i.e. Rs. 276.82 crores. <br /> 47. In the present case, the completed projects (b) and (c) relied upon by <br /> the petitioner admittedly fail to satisfy the aforesaid criteria as they are ex-<br /> facie less than Rs. 197.72 crores and therefore cannot be considered as <br /> similar work. This leaves the petitioner with only one completed project (a) <br /> for establishing eligibility. However, the completed project (a) relied upon <br /> by the petitioner fails to fulfil clause 2.2.2.2(ii) on the similar work criteria <br /> as this project does not fulfil the requirement of completion of 5 km hill road <br /> and valleys side slope protection work, as discussed hereunder. <br /> 48. Now, coming to the eligibility of completing the hill slope protection <br /> in a total length of 5 km within the same work is concerned, the clause <br /> 2.2.2.2(ii) contemplates hill and valley side slope protection work has been <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 25 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> completed in 5 km length. The requirement pertaining to completion of 5 km <br /> hill road and valley side slope protection work is atleast one similar work <br /> was modified by way of corrigendum dated 01.09.2025 and later by another <br /> corrigendum dated 15.09.2025. The corrigendum dated 15.09.2025 reads as <br /> under:- <br /> <i>“Slope </i> <i>protection </i> <i>works </i> <i>viz. </i> <i>retaining </i> <i>wall/breast </i><br /> <i>wall/gabion wall/hydro seedings/soil nailing/rock anchor or </i><br /> <i>any other slope protection work shall have been completed </i><br /> <i>in a total length of 5 km in the said similar work” at para </i><br /> <i>2.2.2.2 (ii) may be read as “Hill Slope protection works viz. </i><br /> <i>retaining wall/gabion wall/hydro seeding/ soil nailing/ rock </i><br /> <i>anchor or any other slope protection works shall have been </i><br /> <i>completed in a total length of 5 km in the said similar </i><br /> <i>work.” </i><br /> <br /> 49. The above shows requirement under the bid was that the petitioner <br /> should have completed 5 km hill slope protection work, which requirement <br /> has not been fulfilled by the petitioner. <br /> 50. We agree with the submission of Mr. Gautam and Mr. Sethi that RFP <br /> mandated a specified quantified and certified, 5 km threshold and not a <br /> general characterisation of terrain in which the project was located. Even <br /> Mr. Sethi, by drawing our attention to clause 2.2.2.2 would highlight that the <br /> technical requirement pertains to 5 km of hill road and hill and valley slide <br /> protection work in atleast one similar work. From the aforesaid table at <br /> paragraph 17 above, it is clear that insofar as project code „a‟ is concerned, <br /> the retaining wall is only 0.87 km as submitted with the original bid. <br /> 51. The project code „a‟ record slope protection by earth work in banking <br /> as 54.49 km. According to Mr. Gautam, the retaining wall was only the <br /> component that could qualify as HSP and at 0.87 km it falls short of 5 km. <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 26 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> According to him, the earth work in banking is not HSP as it involves filling <br /> and compacting earth to form road embankments. In other words, it is <br /> structurally distinct from HSP work, which protects the existing hill slope <br /> from erosion and failure. It may be stated that the petitioner had submitted a <br /> second certificate dated 15.09.2025, which according to Mr. Gautam <br /> contained unexplained alterations being the deletion of (earth work in <br /> banking) and alteration of retaining wall component from 0.87 km to 8.70 <br /> km, which is a tenfold increase by transposition of digits. According to him, <br /> this document, which the petitioner had produced was not part of the <br /> original bid and materially contradicted it. We agree with the submission <br /> that law in this regard is well settled that post bid date documents cannot <br /> cure eligibility, deficiencies and documents contradicting original bid <br /> documents as such could not be considered. The plea of Mr. Taneja that <br /> clarifications were sought would not mean that very documents filed along <br /> with the bid are sought to be replaced by new documents. The clarification <br /> must necessarily be read in a manner that clarifications sought are in respect <br /> of documents which had already been filed. We hereunder reproduce both <br /> the documents which were produced by the petitioner along with the bid and <br /> later as certificate dated 15.02.2026: <br /> <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 27 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <br /> <i> </i><br /> <i> </i><br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 28 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> <br /> <br /> <br /> <br /> <br /> 52. The contradictions in the certificate pertaining to project (a) with <br /> respect to the area of retaining wall, makes it a sufficient ground for the <br /> tendering authority to not rely upon these certificates. <br /> 53. The respondent no. 1 has explained that project (c) though meets the 5 <br /> km hill slope protection work criteria, however, since the value of the said <br /> project was Rs. 113.27 crores it fails to meet the minimum threshold criteria <br /> of Rs. 197.73 crores or Rs. 272.82 crores (as applicable) set out in clause <br /> 2.2.2.2(ii). The petitioner has been unable to rebut the said submissions. We <br /> are of the considered opinion that the tendering authority‟s interpretation <br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 29 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> that value of similar work has to be Rs. 197.73 crores or Rs. 272.82 crores is <br /> in-conformity with the tender conditions and therefore project (c) has been <br /> rightly held to be ineligible for qualification. <br /> 54. One of the pleas of Mr. Taneja was that respondent no. 1 has without <br /> considering the representation of the petitioner dated 25.02.2026 has <br /> proceeded to open the tender whereas the case of respondent no. 1 as <br /> canvassed by Mr. Gautam is that the said representation was considered <br /> along with representation dated 05.02.2026 by the TEC before financial bids <br /> were opened on 12.03.2026. We agree with the said submission, as <br /> according to Mr. Gautam, the financial bids were opened on 12.03.2026, <br /> which is surely much after the representation dated 15.02.2026 was <br /> submitted and in any case, Mr. Taneja has not contradicted the submission <br /> made by Mr. Gautam that the representation was decided before the <br /> financial bids were opened. So, this plea of Mr. Taneja is also unmerited. <br /> 55. Mr. Taneja has relied upon two judgments in the case, which are one <br /> in the case of <b><i>Tata Cellular (supra) </i></b> and <b><i>S.R. Venkataraman (supra)</i></b> , of <br /> which the former has also been relied on by Mr. Sethi. However, we must <br /> accept the argument as advanced by Mr. Sethi that it is held in <b><i>Tata Cellular </i></b><br /> <b><i>(supra) </i></b> that writ Courts should not sit as a court of appeal but only act as a <br /> reviewing authority overseeing the manner in which a decision is made. <b><i> </i></b> Mr. <br /> Taneja has argued that although Courts must exercise judicial restraint in <br /> tender matters but the decision making process is amenable to judicial <br /> review. However, in the facts of this case, we do not find it fit to exercise the <br /> said power of judicial review as respondent no.1 is justified in the manner it <br /> has made the decision, treating the bid of the petitioner “non-responsive”. <br /> 56. Insofar as the judgment in the case of <b><i>S.R. Venkataraman (supra) </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 30 of 31 </i><br /> <br /><br /> <br /> <i> </i><br /> wherein it was held that an order which is based on non-existent facts must <br /> be seen as an abuse of power is concerned, the said judgment has no <br /> applicability in the facts of this case and also in view of our findings above. <br /> 57. Before parting with the case, we must also add that Mr. Sethi and Mr. <br /> Tandon are justified in relying upon the judgments in the cases of <b><i>Tata </i></b><br /> <b><i>Motors Ltd. (Supra), N.G. Projects Ltd. (Supra) </i></b> and <b><i> Haffkine Bio-</i></b><br /> <b><i>Pharmaceutical Corporation Ltd. (Supra) </i></b> wherein the Supreme Court has <br /> consistently held that Courts must practise great restraint in tender matters <br /> before exercising their powers under Article 226 of the Constitution and <br /> must not sit as a court of appeal to supplant its own decision over the <br /> Tendering authority and the same only leads to delay and costs borne by the <br /> public exchequer. Furthermore, it is clear that the tender issuing authority <br /> has been held to be the best judge of its own requirement. <br /> 58. In view of our reasoning above, this petition is dismissed as being <br /> devoid of merit along with the pending application which is dismissed as <br /> having become infructuous. <br /> <br /> <b>V. KAMESWAR RAO, J</b> <br /> <br /> <br /> <b>MANMEET PRITAM SINGH ARORA, J </b><br /> <b>APRIL 06, 2026</b> /sr <i> </i><br /> <br /> <br /> Signature Not Verified<br /> Signed By:PRADEEP<br /> SHARMA<br /> Signing Date:06.04.2026<br /> 19:18:01<br /> <i>W.P. (C) 3434/2026 </i> <i>Page 31 of 31 </i><br /> </div>