Rahi Systems Private Limited vs Union Of India & Ors.
- Court
- Delhi High Court
$~
* IN THE HIGH COURT OF DELHI AT NEW DELHI
% Judgment reserved on: 29.07.2026
Judgment pronounced on: 19.08.2026
Judgment uploaded on: 19.08.2026
+ W.P.(C) 7091/2025, CM APPL. 32055/2025 & CM APPL.
50815/2025
ZENLAYER NETWORKS INDIA
PRIVATE LIMITED ......Petitioner
Through: Mr. Gajendra Maheshwari, Mr.
Siddharth Punj and Ms.
Priyamwada Sinha, Advs.
versus
UNION OF INDIA AND ORS. .....Respondents
Through: Ms. Babita Saini, SPC for UOI.
Mr. Aditya Singla, SSC along
with Mr. Arya, Ms. Shreya, Mr.
Dhananjay Gautam, Mr. Akhil
and Ms. Sakshi Chandna, Advs.
Mr. Anurag Ojha, SSC along
Mr. Dipak Raj, Mr. Aryaman
Singh Chouhan and Mr. Aditya
Chaudhary, Advs. for R-3.
+ W.P.(C) 1374/2026, CM APPL. 6803/2026 & CM APPL.
6805/2026
AMIT SINGH ......Petitioner
Through: Mr. Gajendra Maheshwari, Mr.
Siddharth Punj and Ms.
Priyamwada Sinha, Advs
versus
UNION OF INDIA AND ORS. .....Respondents
Through: Ms. Babita Saini, SPC for UOI.
Mr. Aditya Singla, SSC along
with Mr. Arya, Ms. Shreya, Mr.
Dhananjay Gautam, Mr. Akhil
and Ms. Sakshi Chandna, Advs.
Mr. Anurag Ojha, SSC along
with Mr. Dipak Raj, Mr.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 1 of 30
Aryaman Singh Chouhan and
Mr. Aditya Chaudhary, Advs.
for R-3.
+ W.P.(C) 1407/2026, CM APPL. 6937/2026 & CM APPL.
6939/2026
ZENLAYER NETWORKS INDIA
PRIVATE LIMITED ......Petitioner
Through: Mr. Gajendra Maheshwari, Mr.
Siddharth Punj and Ms.
Priyamwada Sinha, Advs
versus
UNION OF INDIA AND ORS. .....Respondents
Through: Ms. Babita Saini, SPC for UOI.
Mr. Aditya Singla, SSC along
with Mr. Arya, Ms. Shreya, Mr.
Dhananjay Gautam, Mr. Akhil
and Ms. Sakshi Chandna, Advs.
Mr. Anurag Ojha, SSC along
with Mr. Dipak Raj, Mr.
Aryaman Singh Chouhan and
Mr. Aditya Chaudhary, Advs.
for R-3.
+ W.P.(C) 5470/2026, CM APPL. 26685/2026, CM APPL.
26686/2026 & CM APPL. 26687/2026
RAHI SYSTEMS PRIVATE LIMITED ......Petitioner
Through: Mr. Ashok Dhingra, Ms.
Harleen dhingra, Ms. Sonia
Gupta, Ms. Muskan Jain & Mr.
Kunal rai, Advs.
versus
UNION OF INDIA AND ORS. .....Respondents
Through: Mr. Aditya Singla, SSC along
with Mr. Arya, Ms. Shreya, Mr.
Dhananjay Gautam, Mr. Akhil
and Ms. Sakshi Chandna, Advs.
Mr. Anmol Sharma, GP.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 2 of 30
CORAM:
HON'BLE MR. JUSTICE ANIL KSHETARPAL
HON'BLE MR. JUSTICE SHAIL JAIN
J U D G M E N T
ANIL KSHETARPAL, J.:
1. By way of the present batch of Writ Petitions, this Court is
called upon to examine interconnected controversies arising out of the
adjudication proceedings initiated pursuant to an investigation
conducted by the Directorate of Revenue Intelligence [„DRI‟] in
relation to imports of information technology and networking
equipment by M/s Zenlayer Networks India Private Limited
[„Zenlayer‟]. Since the Petitions arise from the same investigation,
involve overlapping factual and legal issues and were heard together,
they are being disposed of by this common judgment.
2. W.P.(C.) No.7091/2025 has been instituted by Zenlayer
primarily assailing Notification No.58/2024-Customs (N.T.) dated
04.09.2024 issued by the Central Board of Indirect Taxes and
Customs [„CBIC‟], whereby a Common Adjudicating Authority
[„CAA‟] came to be appointed in respect of only one of the three
Show Cause Notices [„SCNs‟] issued pursuant to the DRI
investigation. The principal relief sought in the said Petition is for
appointment of a single CAA for adjudication of all three SCNs dated
02.01.2023, 20.11.2023 and 21.11.2023.
3. W.P.(C.) No.1407/2026 has also been instituted by Zenlayer
and assails Order-in-Original Nos.48-49/2025-26/DR/Pr.Commr./
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 3 of 30
ACC Import dated 14.11.2025 passed by Respondent No.5, whereby
the adjudication in respect of SCN No.24/2022-23 dated 02.01.2023
and SCN No.40/2023-24 dated 20.11.2023 culminated in confirmation
of the demand proposed therein along with applicable penalties. The
challenge, inter alia, is founded on the alleged violation of the orders
passed by this Court in W.P.(C.) No.7091/2025, denial of an effective
opportunity of hearing, violation of the principles of natural justice
and, in respect of SCN No.24/2022-23, the alleged expiry of the
statutory period for determination of the duty.
4. W.P.(C.) No.1374/2026 has been preferred by Mr. Amit Singh,
who was associated with Zenlayer as its General Manager/Country
Head from January 2020 and became a Director of the company in
February 2021. He was arrayed as a noticee in the proceedings arising
from the DRI investigation. The challenge in the said Petition, inter
alia , concerns the adjudication proceedings culminating in the Order-
in-Original dated 14.11.2025 and proceeds on the grounds of non-
consideration of his detailed reply to SCN No.24/2022-23 and the
alleged denial of an effective opportunity of personal hearing.
5. W.P.(C.) No.5470/2026 has been preferred by M/s Rahi
Systems Private Limited [„Rahi Systems‟], one of the co-noticees in
Show Cause Notice No.40/2023-24 dated 20.11.2023. The challenge
therein is directed against Order-in-Original Nos.48-49/2025-
26/DR/Pr.Commr./ACC Import dated 14.11.2025, insofar as it
concerns the Petitioner, principally on the ground that the adjudication
proceedings were conducted in violation of the principles of natural
justice by failing to afford the Petitioner an effective opportunity of
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 4 of 30
hearing.
FACTUAL MATRIX
6. In order to appreciate the controversy involved in the present
batch of Petitions, the relevant facts, in brief, are required to be
noticed.
7. Zenlayer is engaged in the business of providing cloud and edge
networking services through deployment of information technology
infrastructure comprising servers, routers, switches, optical modules
and other networking equipment at various data centres across the
country. For the purposes of its business operations, the company
imports substantial quantities of such networking equipment.
8. The DRI, Delhi Zonal Unit, initiated an investigation into the
import of such networking equipment. During the course of the
investigation, it was alleged that the imports had been undertaken
through third-party Importer Exporter Code [„IEC‟] holders, by
resorting to undervaluation and misdeclaration of imported goods and
without complying with the requirements of the Bureau of Indian
Standards [„BIS‟]. The investigation culminated in issuance of the
following three SCNs:
S.No. Show Cause
Notice
Issuing
Authority
Nature of Proceedings
1. Show Cause
Notice
No.24/2022-23
dated
02.01.2023
Additional
Commissioner
of Customs,
Air Cargo
Complex
(Import), New
Delhi
Pertaining to four live
consignments
intercepted at the time
of import, proposing
confiscation of goods
under Section 111 of
the Customs Act
together with recovery
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 5 of 30
of differential customs
duty and imposition of
penalties under
Sections 112 and 114
thereof.
2. Show Cause
Notice
No.40/2023-24
dated
20.11.2023
Principal
Commissioner
of Customs,
ACC
(Import), New
Delhi
Pertaining to seventy-
four Bills of Entry
relating to
consignments already
cleared and proposing
recovery of differential
customs duty under
Section 28(4) of the
Customs Act together
with consequential
penalties.
3. Show Cause
Notice
No.12/2023
dated
21.11.2023
Joint/
Additional
Director,
Directorate of
Revenue
Intelligence,
Delhi Zonal
Unit
Pertaining to imported
networking equipment
found at various data
centres situated across
different jurisdictions
in respect whereof,
according to the
Department, no lawful
import documentation
or evidence of customs
clearance could be
produced.
9. After issuance of the aforesaid SCNs, Zenlayer submitted a
representation dated 02.04.2024 requesting appointment of a CAA for
adjudication of all three SCNs.
10. Pursuant thereto, CBIC issued Notification No.58/2024-
Customs (N.T.) dated 04.09.2024 appointing the Additional or Joint
Commissioner of Customs, Office of Commissioner of Customs
(Preventive), Mumbai, as the CAA in respect of Show Cause Notice
No.12/2023 dated 21.11.2023. No CAA was appointed in respect of
Show Cause Notice Nos.24/2022-23 dated 02.01.2023 and 40/2023-
24 dated 20.11.2023.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 6 of 30
11. Aggrieved thereby, Zenlayer instituted W.P.(C.) No.7091/2025
before this Court seeking quashing of the Notification dated
04.09.2024 to the extent it restricted the appointment of a CAA to
only one SCN and seeking consequential directions for appointment
of a single CAA for adjudication of all three SCNs.
12. During the pendency of W.P.(C.) No.7091/2025, the matter
came up before this Court on 23.05.2025, 28.05.2025 and 28.07.2025.
Thereafter, by order dated 19.08.2025, this Court directed that the
personal hearing fixed on 21.08.2025 before the Commissioner of
Customs, Mumbai, be adjourned to a date beyond 10.11.2025. The
said order also recorded, prima facie , that no useful purpose would be
served in having different authorities adjudicate the SCNs arising
from the same fact situation and that multiplicity of adjudication could
result in contradictory findings and outcomes.
13. While W.P.(C.) No.7091/2025 was pending, adjudication
proceedings in respect of SCN Nos.24/2022-23 dated 02.01.2023 and
40/2023-24 dated 20.11.2023 continued before the customs authorities
at New Delhi. A personal hearing notice dated 11.09.2025 was issued
by Respondent No.5 fixing the hearing in respect of SCN
Nos.24/2022-23 and 40/2023-24 on 22.09.2025. Zenlayer addressed a
communication dated 16.09.2025, inter alia, referring to the order
dated 19.08.2025 passed by this Court and requesting that the hearing
be deferred.
14. Subsequently, Order-in-Original Nos.48-49/2025-
26/DR/Pr.Commr./ACC Import dated 14.11.2025 came to be passed
by Respondent No.5 in respect of SCN Nos.24/2022-23 dated
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 7 of 30
02.01.2023 and 40/2023-24 dated 20.11.2023. The said Order-in-
Original has been assailed by Zenlayer in W.P.(C.) No.1407/2026.
15. Mr. Amit Singh was associated with Zenlayer as its General
Manager/Country Head from January 2020 and became a Director of
the company in February 2021. During the DRI investigation, his
statements came to be recorded on 18.10.2022, 19.10.2022 and
20.10.2022. He was thereafter arrayed as a noticee in all three SCNs
arising from the investigation.
16. Insofar as the adjudication proceedings are concerned, Mr.
Amit Singh submitted a detailed reply dated 27.03.2023 to SCN
No.24/2022-23. He thereafter addressed communications dated
11.04.2024, 14.10.2024 and 21.03.2025 seeking appointment of a
CAA for adjudication of all three SCNs and objecting to continuation
of the adjudication proceedings pending consideration of the said
request. During this period, personal hearing notices were issued in
respect of the SCNs and Mr. Amit Singh, through his communications
in response thereto, repeatedly brought to the notice of the concerned
authorities the pendency of his request for appointment of a CAA and
sought deferment of the proceedings.
17. By corrigendum dated 25.02.2025, the Principal
Commissioner/Commissioner of Customs, Export Commissionerate,
ICD Tughlakabad, New Delhi was appointed as the adjudicating
authority in respect of SCN Nos.24/2022-23 dated 02.01.2023 and
40/2023-24 dated 20.11.2023. Subsequently, by a further corrigendum
dated 15.05.2025, the aforesaid appointment was withdrawn and
Respondent No.5 was appointed as the adjudicating authority in
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 8 of 30
respect of the said SCNs.
18. A personal hearing notice dated 11.09.2025 was thereafter
issued by Respondent No.5 fixing the hearing in respect of SCN
Nos.24/2022-23 and 40/2023-24 on 22.09.2025. Mr. Amit Singh
contends that the said notice was not received by him and that he was
consequently not afforded an effective opportunity of personal hearing
before the passing of the Order-in-Original dated 14.11.2025. The said
Order-in-Original records, inter alia , that no written submissions had
been made by Mr. Amit Singh.
19. Rahi Systems is engaged in the business of providing
information technology infrastructure solutions and allied services. It
was arrayed as Co-Noticee No.13 in Show Cause Notice No.40/2023-
24 dated 20.11.2023 on the allegation that its Importer Exporter Code
[„IEC‟] had been utilised by Zenlayer for import of servers and other
information technology equipment into India by resorting to
undervaluation and other violations of the Customs Act. While the
principal demand of differential customs duty was proposed against
Zenlayer, the SCN also proposed imposition of penalties upon various
IEC holders, including Rahi Systems, under Sections 112(a) and
114AA of the Customs Act on the allegation that they had knowingly
and actively assisted in the aforesaid imports.
20. The record discloses that Rahi Systems entered appearance
before the adjudicating authority through counsel and filed its
Vakalatnama on 20.12.2023. A notice of personal hearing dated
04.10.2024, fixing the hearing on 15.10.2024, was thereafter issued to
Rahi Systems at the email address of a former employee of the
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 9 of 30
company. According to Rahi Systems, the said notice came to its
knowledge only on 14.10.2024. On 15.10.2024, Rahi Systems
addressed an email to the adjudicating authority seeking an
adjournment and, while doing so, also furnished three email addresses
for future correspondence, stating that the email address to which the
notice dated 04.10.2024 had been sent was no longer in use.
21. It is the case of Rahi Systems that, notwithstanding the
aforesaid communication, it was not served with the corrigenda dated
25.02.2025 and 15.05.2025 or with notices of the subsequent personal
hearings stated to have been conducted on 28.04.2025, 15.05.2025 and
22.09.2025. According to Rahi Systems, no notice of the subsequent
proceedings was served upon it at the email addresses furnished by it
on 15.10.2024 and it consequently remained unaware of the
proceedings culminating in the Order-in-Original dated 14.11.2025.
Rahi Systems states that it came to know of the adjudication only
upon receipt of the said Order-in-Original by post at its registered
address in Pune on 01.12.2025.
22. By the aforesaid Order-in-Original dated 14.11.2025, penalties
of Rs.2,00,00,000/- under Section 112(a)(i) of the Customs Act and
Rs.4,00,00,000/- under Section 114AA thereof were imposed upon
Rahi Systems.
23. The Petitioners in W.P.(C.) Nos.1407/2026, 1374/2026 and
5470/2026 have accordingly assailed the adjudication culminating in
the Order-in-Original dated 14.11.2025 on grounds which, though
varying in their precise formulation, substantially concern the legality
of the adjudication proceedings and the fairness of the opportunity
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 10 of 30
afforded to the respective Petitioners during such proceedings. The
Respondents have entered appearance and filed their respective
replies/counter affidavits opposing the Writ Petitions.
CONTENTIONS ON BEHALF OF THE PARTIES
24. Contentions on behalf of the Petitioner in W.P.(C) 7091/2025 &
W.P.(C) 1407/2026
24.1 Learned counsel for the Zenlayer submitted that the three SCNs
arise from a single investigation conducted by the DRI and involve
common facts, allegations and evidence. It was submitted that 19
RUDs are common to all three SCNs, while all 99 RUDs relied upon
in SCN Nos.40/2023-24 dated 20.11.2023 and 12/2023 dated
21.11.2023 are common. It was further submitted that substantial
portions of the latter SCN reproduce the contents of SCN No.40/2023-
24. According to the learned counsel, the three SCNs therefore
constitute a connected group of proceedings which ought to be
adjudicated by a single authority.
24.2 It was submitted that Circular No.30/2015 dated 04.12.2015
issued by the CBIC provides for appointment of a CAA in cases
involving an aggregate customs duty demand of Rs.5 crores or more
and identical issues. It was contended that the conditions stipulated in
the Circular stood satisfied in the present case and that the Petitioner
had accordingly applied on 02.04.2024 for appointment of a CAA for
all three SCNs. The subsequent appointment of a CAA only in respect
of SCN No.12/2023 was contrary to the aforesaid Circular. It was
further submitted that the Circulars issued by the Board are binding
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 11 of 30
upon the authorities functioning under it.
24.3 Reliance was placed upon Star Delta Exim (P) Ltd. v. Union of
1
India to contend that where different show cause notices arise from
the same subject matter and are founded upon common evidence, their
adjudication by a single authority is warranted to obviate the
possibility of divergent findings. It was submitted that the said
decision was affirmed by the Supreme Court in Union of India v. Star
2
Delta Exim (P) Ltd. wherein the direction for adjudication of the
connected show cause notices by one authority was upheld.
24.4 It was further submitted that this Court, while considering the
Petitioner‟s challenge to the appointment of the CAA, had recorded in
its order dated 19.08.2025 a prima facie view that no useful purpose
would be served by having different authorities adjudicate the SCNs
arising from the same fact situation and that multiplicity of
adjudication could result in contradictory findings and outcomes. It
was contended that, in these circumstances, all three SCNs ought to be
adjudicated by a single authority.
24.5 Insofar as W.P.(C.) No.1407/2026 is concerned, it was
submitted that, notwithstanding the pendency of W.P.(C.)
No.7091/2025 and the order dated 19.08.2025 passed therein,
Respondent No.5 proceeded with the adjudication of SCN
Nos.24/2022-23 and 40/2023-24. It was submitted that, upon receipt
of the personal hearing notice dated 11.09.2025 fixing the hearing on
22.09.2025, the Petitioner, by communication dated 16.09.2025,
1
2019 (37) E.L.T. 133 (Raj.)
2
2022 (380) E.L.T. 398 (S.C.)
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 12 of 30
specifically brought the order dated 19.08.2025 to the notice of
Respondent No.5 and requested deferment of the proceedings.
24.6. It was submitted that, notwithstanding the said communication
and the Petitioner‟s request that no adverse order be passed without
affording it an opportunity of hearing, Respondent No.5 proceeded to
pass the Order-in-Original dated 14.11.2025. It was contended that no
further effective opportunity of personal hearing was afforded to the
Petitioner before the said Order-in-Original was passed and that the
Impugned Order was consequently vitiated by violation of the
principles of natural justice.
25. Contentions on behalf of the Petitioner in W.P.(C) 1374/2026
25.1 It was submitted that the factual and legal background of the
present Petition substantially overlaps with that of W.P.(C.)
No.1407/2026 and that the Petitioner adopts the submissions advanced
on behalf of Zenlayer in the said Petition, insofar as they are
applicable to him.
25.2 It was further submitted that the Petitioner herein had filed a
detailed reply dated 27.03.2023 to SCN No.24/2022-23 dated
02.01.2023. However, the Order-in-Original dated 14.11.2025
proceeded on the erroneous premise that no written submissions had
been made by him. It was therefore contended that the adjudicating
authority failed to consider a material defence submitted by the
Petitioner and, consequently, the findings recorded against him stood
vitiated by non-consideration of the material on record.
25.3 It was further submitted that the Petitioner was not afforded an
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 13 of 30
effective opportunity of personal hearing before the passing of the
Order-in-Original. It was pointed out that personal hearing notices
dated 04.10.2024 and 05.05.2025 were responded to by the Petitioner
through communications dated 14.10.2024 and 14.05.2025,
respectively, requesting that the proceedings be deferred in view of
the pending request for appointment of a CAA. Thereafter, although a
further personal hearing notice dated 11.09.2025 was stated to have
been issued, the Petitioner contended that the same was never received
by him.
26. Contentions on behalf of the Petitioner in W.P.(C.) 5470/2026
26.1 It was submitted that W.P.(C) 5470/2026 is confined to the
legality of the adjudication proceedings, insofar as the Petitioner is
concerned, on the ground that the Order-in-Original dated 14.11.2025
was passed without affording it a real and effective opportunity of
hearing. It was submitted that the Petitioner was arrayed as Co-
Noticee No.13 in SCN No.40/2023-24 dated 20.11.2023 and had duly
entered appearance before the adjudicating authority by filing its
Vakalatnama on 20.12.2023. Therefore, the Petitioner had not
remained absent from the proceedings from the outset.
26.2 It was submitted that the personal hearing notice dated
04.10.2024, fixing the hearing for 15.10.2024, was sent to an email
address belonging to a former employee of the Petitioner and came to
the Petitioner‟s knowledge only on 14.10.2024. On 15.10.2024, the
Petitioner‟s authorised representative addressed an email to the
adjudicating authority seeking an adjournment and, importantly,
furnished 03 alternative email addresses for all future correspondence.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 14 of 30
It was contended that, having thus specifically intimated the
adjudicating authority of the correct email addresses, the Petitioner
was entitled to receive all subsequent notices and communications at
those addresses.
26.3 It was submitted that, notwithstanding the aforesaid
communication, the corrigenda dated 25.02.2025 and 15.05.2025, as
well as the notices relating to the personal hearings stated to have been
fixed on 28.04.2025, 15.05.2025 and 22.09.2025, were not served
upon the Petitioner at any of the 03 email addresses furnished on
15.10.2024. Consequently, the Petitioner remained unaware of the
subsequent proceedings and had no occasion to place its defence
before the adjudicating authority.
26.4 It was further submitted that the Order-in-Original dated
14.11.2025 was consequently passed ex parte insofar as the Petitioner
is concerned and imposed penalties of Rs.2,00,00,000/- under Section
112(a)(i) and Rs.4,00,00,000/- under Section 114AA of the Customs
Act. It was contended that the absence of written submissions from the
Petitioner could not be treated as a failure on its part to participate in
the proceedings when the subsequent hearing notices themselves had
not been served upon it at the addresses specifically furnished for that
purpose.
26.5. Attention was drawn to the finding recorded in the Order-in-
Original that the hearing notices for 28.04.2025 and 15.05.2025 had
been “also served on the Noticees”. It was submitted that there was no
material on record demonstrating service of the said notices upon the
Petitioner at any of the 03 email addresses furnished by it on
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 15 of 30
15.10.2024. According to the learned counsel, the aforesaid finding
was therefore contrary to the record insofar as the Petitioner was
concerned and could not sustain the conclusion that the Petitioner had
been afforded an opportunity of hearing.
26.6 Reliance was placed upon Jupiter Exports v. Commissioner of
3 4
GST and Alaknanda Steel v. Commissioner to contend that an
opportunity of hearing must be real and effective and that an ex parte
order passed without proper service of the hearing notice is
unsustainable in law.
27. Contentions on behalf of the Respondents
27.1 Per contra, learned counsel for the Respondents raised a
preliminary objection to the maintainability of the present Writ
Petitions in view of the efficacious alternative statutory remedy
available to the Petitioners under Section 128 of the Customs Act. It
was submitted that the challenge in W.P.(C.) Nos.1407/2026,
1374/2026 and 5470/2026 is directed against the Order-in-Original
dated 14.11.2025 and essentially seeks re-examination of the
adjudication proceedings, the evidence on record and the findings
returned by the adjudicating authority. According to the learned
counsel, such matters fall within the statutory appellate mechanism
and do not warrant exercise of the extraordinary jurisdiction of this
Court under Article 226 of the Constitution.
27.2 It was further submitted that Zenlayer had itself approached this
Court in W.P.(C.) No.7091/2025 seeking appointment of a CAA and
3
2023 SCC OnLine Del 4343
4
(2025) 31 Centax 245 (Del.)
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 16 of 30
had thereafter participated in the adjudication proceedings. It was
contended that the Petitioners cannot, merely because the adjudication
has culminated in an order adverse to them, bypass the statutory
appellate remedy and invoke the writ jurisdiction of this Court. It was
submitted that no exceptional circumstance warranting interference
under Article 226 had been demonstrated.
27.3 It was further submitted that the 03 SCNs, although emanating
from the same DRI investigation, concern materially different factual
situations, categories of goods and stages at which the alleged
violations came to light. It was submitted that SCN No.24/2022-23
dated 02.01.2023 concerns live consignments intercepted at the time
of import and proposes confiscation of the goods under Section 111 of
the Customs Act, together with consequential duty and penalties. SCN
No.40/2023-24 dated 20.11.2023, on the other hand, concerns
seventy-four (74) Bills of Entry covering consignments which had
already been cleared through various Customs formations and
proposes recovery of differential customs duty under Section 28(4) of
the Customs Act along with consequential penalties. SCN No.12/2023
dated 21.11.2023 concerns imported information technology and
networking equipment found at various data centres in different
jurisdictions in respect of which, according to the Department, no
valid import documentation or evidence of lawful customs clearance
could be produced.
27.4 It was therefore submitted that the mere fact that the SCNs
arose from a common investigation did not, by itself, render them
incapable of separate adjudication. According to the learned counsel,
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 17 of 30
the proceedings involve different consignments, different factual
circumstances and different statutory consequences. It was submitted
that SCN Nos.24/2022-23 and 40/2023-24 fell within the jurisdiction
of the Customs authorities at New Delhi, whereas SCN No.12/2023
involved goods located across multiple jurisdictions and was, for that
reason, dealt with separately. The appointment of a CAA in respect of
SCN No.12/2023 was accordingly justified in the facts and
circumstances of the case.
27.5 In response to the reliance placed by the Petitioners upon the
order dated 19.08.2025 passed in W.P.(C.) No.7091/2025, it was
submitted that the said order did not stay or otherwise restrain the
adjudication proceedings in respect of SCN Nos.24/2022-23 and
40/2023-24 before the adjudicating authority at New Delhi. It was
submitted that the direction contained in the said order was confined
to adjourning the personal hearing fixed on 21.08.2025 before the
Commissioner of Customs, Mumbai to a date beyond 10.11.2025.
According to the Respondents, SCN Nos.24/2022-23 and 40/2023-24
were not pending adjudication before the Commissioner of Customs,
Mumbai and, consequently, there was no impediment to their
adjudication by the competent authority at New Delhi.
27.6 It was further submitted that the Petitioners‟ allegation that the
Order-in-Original dated 14.11.2025 was passed in disregard of the
order dated 19.08.2025 was therefore misconceived. It was contended
that, the order dated 19.08.2025 having not interdicted the
adjudication of SCN Nos.24/2022-23 and 40/2023-24, the proceedings
before Respondent No.5 were validly continued.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 18 of 30
27.7 Insofar as W.P.(C.) No.1374/2026 is concerned, it was
submitted that Mr. Amit Singh had been issued several notices for
personal hearing, including notices dated 20.02.2024, 31.05.2024,
04.10.2024, 29.10.2024, 07.03.2025, 11.04.2025 and 05.05.2025. It
was submitted that the Petitioner had responded to some of these
notices and had himself sought deferment of the proceedings on the
ground of the pending request for appointment of a CAA. According
to the Respondents, having repeatedly sought deferment of the
proceedings, the Petitioner could not subsequently contend that he had
been denied an opportunity of hearing.
27.8 It was further submitted that the mere assertion that the personal
hearing notice dated 11.09.2025 was not received by Mr. Amit Singh
could not, in the absence of any demonstrated prejudice, invalidate the
entire adjudication proceedings. The Respondents accordingly
contended that the allegation of violation of principles of natural
justice was without merit.
27.9 Insofar as W.P.(C.) No.5470/2026 is concerned, the
Respondents disputed the allegation that Rahi Systems had been
denied an opportunity of hearing. It was submitted that the Petitioner
had been a noticee in the proceedings and had entered appearance
through counsel. The Respondents, however, contended that the
subsequent proceedings had been duly undertaken in accordance with
law and that the mere assertion of non-receipt of individual
communications could not, by itself, establish that the adjudication
was conducted in violation of the principles of natural justice.
27.10 It was accordingly submitted that the Petitioners had failed to
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 19 of 30
establish either any want of jurisdiction or any exceptional
circumstance warranting exercise of writ jurisdiction in the face of the
statutory appellate remedy. It was submitted that the challenges to the
Order-in-Original dated 14.11.2025 ought, therefore, to be relegated to
the appellate remedy available under Section 128 of the Customs Act.
ISSUES FOR DETERMINATION
28. In view of the rival submissions, the following issues arise for
determination:
i. Whether the Petitioner in W.P.(C.) No.7091/2025 is
entitled to a direction for appointment of a CAA for adjudication
of all three SCNs arising from the DRI investigation?
ii. Whether the adjudication of SCN Nos.24/2022-23 dated
02.01.2023 and 40/2023-24 dated 20.11.2023, culminating in
Orders-in-Original Nos.48-49/2025-26/DR/Pr.Commr./ACC
Import dated 14.11.2025, was impermissible on account of the
pendency of W.P.(C.) No.7091/2025 and the order dated
19.08.2025 passed therein?
iii. Whether the Orders-in-Original dated 14.11.2025 are
liable to be set aside, insofar as Zenlayer and Mr. Amit Singh are
concerned, on the ground that they were not afforded an effective
opportunity of hearing?
iv. Whether the Orders-in-Original dated 14.11.2025 are
liable to be set aside, insofar as Rahi Systems is concerned, on
the ground that it was not served with the subsequent notices of
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 20 of 30
personal hearing and was consequently denied an effective
opportunity to present its defence?
v. Whether the challenge to the Orders-in-Original dated
14.11.2025, including the contention regarding limitation in
respect of SCN No.24/2022-23 dated 02.01.2023, ought to be
examined in exercise of the writ jurisdiction of this Court
notwithstanding the statutory appellate remedy available under
Section 128 of the Customs Act?
ANALYSIS & FINDINGS
29. This Court has carefully considered the submissions advanced
on behalf of the parties and perused the material on record.
30. The first question concerns the prayer made by Zenlayer in
W.P.(C.) No.7091/2025 for appointment of a CAA in respect of all
three SCNs. It is not in dispute that the three SCNs emanate from the
investigation conducted by the DRI in relation to the imports
undertaken by Zenlayer and that there is substantial overlap in the
material relied upon by the Department. The request for common
adjudication is, therefore, not without basis.
31. The fact, however, remains that the three SCNs have distinct
subject matters and arise at different stages of the alleged transactions.
SCN No.24/2022-23 dated 02.01.2023 concerns live consignments
intercepted at the time of import and proposes, inter alia, confiscation
of the goods and recovery of differential customs duty. SCN
No.40/2023-24 dated 20.11.2023 concerns seventy-four Bills of Entry
relating to consignments which had already been cleared and proposes
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 21 of 30
recovery of differential duty under Section 28(4) of the Customs Act
together with consequential penalties. SCN No.12/2023 dated
21.11.2023 concerns networking equipment found at different data
centres in respect of which the Department alleges that no lawful
import documentation or evidence of customs clearance could be
produced.
32. The decision in Star Delta Exim (P) Ltd. v. Union of India
(supra) , subsequently affirmed by the Supreme Court in Union of
India v. Star Delta Exim (P) Ltd . (supra) , recognises the utility of
common adjudication where connected show cause notices arise from
substantially common material and separate adjudication may result in
inconsistent findings. The principle, however, cannot be understood as
laying down that every show cause notice emanating from a common
investigation must, irrespective of the nature of the allegations and
reliefs proposed therein, necessarily be adjudicated by one authority.
33. In the present case, it is not necessary for this Court to finally
determine the scope of the aforesaid principle or to pronounce upon
every aspect of Zenlayer‟s challenge to the decision to appoint a CAA
only in respect of SCN No.12/2023. The circumstances which have
subsequently intervened are material. While W.P.(C.) No.7091/2025
remained pending, SCN Nos.24/2022-23 and 40/2023-24 came to be
adjudicated by Respondent No.5 by Orders-in-Original Nos.48-
49/2025-26/DR/Pr.Commr./ACC Import dated 14.11.2025. The
validity of that adjudication is itself under consideration in the
connected petitions.
34. The order dated 19.08.2025 passed in W.P.(C.) No.7091/2025
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 22 of 30
does not lead to a contrary conclusion. The observations recorded
therein were prima facie observations at an interlocutory stage. The
operative direction was to adjourn the personal hearing fixed before
the Commissioner of Customs, Mumbai to a date beyond 10.11.2025.
The said order did not expressly stay the adjudication proceedings in
respect of SCN Nos.24/2022-23 and 40/2023-24 before the competent
authority at New Delhi.
35. Consequently, the pendency of W.P.(C.) No.7091/2025, by
itself, did not render the subsequent adjudication of SCN
Nos.24/2022-23 and 40/2023-24 without jurisdiction. The
communication dated 16.09.2025 addressed by Zenlayer to
Respondent No.5, bringing the order dated 19.08.2025 to the notice of
the adjudicating authority and requesting deferment of the
proceedings, was undoubtedly a circumstance requiring consideration.
It did not, however, amount to an order of this Court restraining
Respondent No.5 from proceeding with the adjudication.
36. In view of the subsequent adjudication of two of the three
SCNs, this Court is not persuaded that any useful or effective purpose
would now be served by directing, in W.P.(C.) No.7091/2025, that all
three SCNs be placed before a CAA. Such a direction would
necessarily require the adjudication already undertaken in respect of
SCN Nos.24/2022-23 and 40/2023-24 to be displaced, while the
validity of that very adjudication is presently under consideration in
the connected petitions.
37. The prayer in W.P.(C.) No.7091/2025 for appointment of a
CAA in respect of all three SCNs is, accordingly, not liable to be
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 23 of 30
granted at this stage. This conclusion, however, is confined to the
relief sought in the present proceedings and does not amount to an
adjudication upon the merits of the allegations contained in the
respective SCNs.
38. The remaining petitions assail the Orders-in-Original Nos.48-
49/2025-26/DR/Pr.Commr./ACC Import dated 14.11.2025. The
principal question at this stage is whether the grounds urged by the
respective Petitioners warrant exercise of the extraordinary
jurisdiction of this Court notwithstanding the statutory appellate
remedy available under Section 128 of the Customs Act.
39. The existence of an alternative statutory remedy is not an
absolute bar to the exercise of jurisdiction under Article 226 of the
Constitution. The Court may nevertheless decline to exercise such
jurisdiction where the impugned order has been passed by a competent
statutory authority and the challenge substantially involves
examination of the adjudication record, disputed questions of fact,
appreciation of material and matters which can effectively be
considered by the statutory appellate forum.
40. The present Orders-in-Original constitute a consolidated
adjudication in respect of twenty-three (23) firms and individuals. The
challenges brought before this Court do not rest upon a common
jurisdictional defect apparent on the face of the record. The objections
raised by the Petitioners, though arising from their respective
circumstances, essentially concern the manner in which the
adjudication proceedings were conducted and the consideration
accorded to the material relating to the respective Noticees.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 24 of 30
41. In the case of Mr. Amit Singh, it is not in dispute that he is one
of the co-noticees and that he has been penalised in the adjudication in
the capacity in which he was working as the General Manager of
Zenlayer Networks India Pvt. Ltd. The principal grievance urged on
his behalf is the alleged non-consideration of his reply dated
27.03.2023 to SCN No.24/2022-23. The Respondents, however,
contest this position and rely upon the opportunities of personal
hearing stated to have been afforded to him during the course of the
adjudication proceedings.
42. Whether the said reply was duly received and formed part of the
adjudication record, whether it was considered by the adjudicating
authority and what opportunities of personal hearing were in fact
afforded to Mr. Amit Singh are matters which require examination of
the complete adjudication record. These aspects can appropriately be
examined by the statutory appellate authority, which has ample power
to consider the reply relied upon by the Petitioner and, where
warranted, afford him an opportunity to present his case. In these
circumstances, particularly when the impugned order is a consolidated
order passed by the Principal Commissioner of Customs against
several Noticees, setting it aside qua Mr. Amit Singh on disputed
questions of fact would not be appropriate in exercise of writ
jurisdiction.
43. The position of Rahi Systems is similar. The Petitioner claims
that, despite informing the adjudicating authority on 15.10.2024 of
three alternative email addresses, the subsequent notices were not
served upon those addresses and were instead sent to an email address
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 25 of 30
which, according to the Petitioner, belonged to a former employee.
The Respondents dispute the allegation. Whether the subsequent
notices were duly served, the manner in which they were transmitted
and the effect of such service upon the opportunity available to Rahi
Systems are matters which can be examined by the statutory appellate
authority on the basis of the complete adjudication record.
44. Rahi Systems is also one of the co-noticees against whom the
consolidated adjudication has proceeded and upon whom penalties
have been imposed. The mere assertion of violation of the principles
of natural justice, where the existence and effect of the alleged
procedural violation depend upon disputed questions of fact, does not
by itself warrant bypassing the statutory appellate mechanism. The
appellate authority is competent to examine the record and determine
whether Rahi Systems was afforded an effective opportunity to
present its defence and whether any prejudice was occasioned to it.
45. The consolidated nature of the impugned Orders-in-Original
assumes significance in the present context. The adjudicating
authority, namely the Principal Commissioner of Customs, has passed
a common order dealing with as many as twenty-three (23) firms and
individuals. Zenlayer Networks India Pvt. Ltd. is the principal
beneficiary identified in the adjudication and, insofar as Zenlayer is
concerned, the material placed before this Court demonstrates that
sufficient notices and opportunities were afforded to it during the
adjudication proceedings.
46. In these circumstances, setting aside the consolidated Orders-in-
Original only qua Mr. Amit Singh or Rahi Systems, on disputed
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 26 of 30
questions concerning the receipt or consideration of particular
communications and the opportunities afforded to them, would not be
an appropriate exercise of the extraordinary jurisdiction of this Court.
The statutory appellate authority is better placed to examine these
individual grievances in the context of the complete adjudication
record and to grant such relief as may be permissible in law.
47. The same consideration applies to Zenlayer‟s challenge to the
Orders-in-Original, including its contention that the adjudication of
SCN Nos.24/2022-23 and 40/2023-24 ought not to have proceeded in
view of the order dated 19.08.2025 and its objection concerning the
statutory period for determination of duty in respect of SCN
No.24/2022-23. As already held hereinabove, the order dated
19.08.2025 did not expressly stay the adjudication before Respondent
No.5. The remaining objections require examination of the relevant
show cause notice, the underlying transactions, the dates material for
the computation of limitation and the findings recorded in the Orders-
in-Original.
48. This Court is, therefore, not persuaded that the present Writ
Petitions disclose circumstances warranting departure from the
ordinary rule of relegating the Petitioners to the statutory appellate
remedy. No inherent lack of jurisdiction on the part of the adjudicating
authority has been demonstrated. Nor is this a case where the Court is
called upon to decide a pure question of law which the statutory
appellate forum is incapable of examining.
49. The Court is conscious that the Petitioners have relied upon
decisions concerning the requirement of a real and effective
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 27 of 30
opportunity of hearing and the consequences of an adjudication
undertaken without proper service of notice. Those principles remain
undisputed. The question whether those principles were violated in the
individual cases, however, depends upon examination of the disputed
factual record relating to the respective Noticees. Such examination
can appropriately be undertaken by the statutory appellate authority.
50. In these circumstances, the Court declines to examine, at the
first instance, the individual procedural objections raised by Mr. Amit
Singh and Rahi Systems or the substantive objections raised by
Zenlayer to the Orders-in-Original. The Petitioners shall remain at
liberty to urge all such grounds before the competent appellate forum.
The dismissal of the present petitions on the ground of availability of
the statutory remedy shall not preclude the appellate authority from
considering such objections in accordance with law.
51. Nothing contained herein shall be construed as an expression of
opinion on the merits of the allegations contained in the respective
show cause notices, the valuation adopted by the Department, the
liability to duty or penalty, the question of limitation, or the individual
procedural objections raised by the Petitioners. All such questions are
left open for consideration by the competent appellate forum in
accordance with law.
CONCLUSION
52. In view of the foregoing discussion, the present batch of Writ
Petitions is disposed of in the following terms:
I. W.P.(C.) No.7091/2025 is dismissed. The prayer for
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 28 of 30
appointment of a CAA for adjudication of all three SCNs is
declined in the facts and circumstances of the case. The pendency
of the said Writ Petition and the order dated 19.08.2025 passed
therein did not render the subsequent adjudication of SCN
Nos.24/2022-23 and 40/2023-24 without jurisdiction. This Court
has expressed no opinion on the merits of the allegations
contained in the respective SCNs.
II. W.P.(C.) No.1407/2026 is dismissed. The challenge to
the Orders-in-Original Nos.48-49/2025-26/DR/Pr.Commr./ACC
Import dated 14.11.2025 is not entertained in exercise of writ
jurisdiction. Zenlayer shall be at liberty to avail the statutory
appellate remedy and to urge therein all contentions available to
it in law, including the contention regarding limitation in respect
of SCN No.24/2022-23 and the effect of the order dated
19.08.2025.
III. W W.P.(C.) No.1374/2026 is dismissed. Mr. Amit Singh
shall be at liberty to avail the statutory appellate remedy and to
urge therein all contentions available to him in law, including the
contention regarding the alleged non-consideration of his written
reply dated 27.03.2023 and the alleged denial of an effective
opportunity of hearing.
IV. W.P.(C.) No.5470/2026 is dismissed. M/s Rahi Systems
Private Limited shall be at liberty to avail the statutory appellate
remedy and to urge therein all contentions available to it in law,
including its contention regarding service of the subsequent
notices of personal hearing, the three email addresses furnished
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 29 of 30
by it on 15.10.2024 and the alleged denial of an effective
opportunity to present its defence.
V. The dismissal of W.P.(C.) Nos.1374/2026, 1407/2026
and 5470/2026 shall not preclude the respective Petitioners from
raising before the competent appellate forum all substantive and
procedural objections available to them in law. Nothing
contained in this judgment shall be construed as an expression of
opinion on the merits of such contentions.
53. The pending applications also stand closed.
ANIL KSHETARPAL, J.
SHAIL JAIN, J.
AUGUST 19, 2026
jai /pal
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:19.08.2026
12:31:51
W.P.(C) 7091/2025 and connected matter Page 30 of 30