Rakesh Kumar Jaiswal, vs The State of Bihar

Court
Patna High Court

IN THE HIGH COURT OF JUDICATURE AT PATNA
Civil Writ Jurisdiction Case No.15822 of 2026
CNR No. BRHC011071312026
======================================================
Rakesh Kumar Jaiswal, son of Dharmachand Prasad Jaiswal, Resident of
village Jhakhari Mahadev, Gola Road, P.S. - Danapur, District Patna.
... ... Petitioner/s
Versus
1. The State of Bihar through the Secretary, Energy Department, Government
of Bihar, Patna.
2. The South Bihar Power Distribution Company Limited through its
Managing Director, Vidyut Bhawan, Bailey Road, Patna.
3. The Executive Electrical Engineer, Electric Supply Division, Danapur,
Patna.
4. The Assistant Electrical Engineer, Electric Supply Sub Division, Digha,
Patna.
5. The Junior Electrical Engineer, Electric Supply Section, Digha, Patna.
... ... Respondent/s
======================================================
Appearance :
For the Petitioner/s : Mr.Akshansh Ankt, Adv.
For the Company : Mr. Shashank Chandra, Adv.
For the state : Mr. Jogendra Kumar, GP 32
=======================================================
CORAM: HONOURABLE MR. JUSTICE HARISH KUMAR
ORAL JUDGMENT
Date : 23-11-2026
Heard Mr. Akshansh Ankit, learned advocate for the
petitioner and Mr. Shashank Chandra, learned advocate for the
South Bihar Power Distribution Company Limited, whereas
the State is represented through Mr. Jogendra Kumar, learned
advocate.
2. The petitioner, a Government Teacher, has let out
the front portion of the premises to a tenant for running a
video and photography studio. The tenant had undertaken to

Patna High Court CWJC No.15822 of 2026 dt.23-11-2026
2/4
obtain a separate electricity connection in his own name and to
remain solely responsible for any unlawful act committed in
the tenanted portion. The petitioner is aggrieved by the
inspection conducted by the Junior Electrical Engineer,
Electric Supply Section, Digha, the report submitted by him,
as well as the action of the concerned respondent in
disconnecting the electricity supply to the premises.
3. In the aforesaid premise, the petitioner approached
this Court by filing the present writ petition seeking a direction
upon the respondents to forthwith restore the supply of
electricity to the residential premises of the petitioner, bearing
Consumer No. 102339858, which was disconnected on
04.02.2026.
4. Besides various submissions, inter alia, it is
submitted that the Junior Electrical Engineer was not the
authorized authority to disconnect the electric supply, and thus
his action is in the teeth of the mandate of Section 135(1A) of
the Electricity Act, 2003. It is further submitted that the
application of the petitioner dated 09.02.2026 for re-
assessment by a reasoned and speaking order after affording
an opportunity of hearing to the petitioner has also not been
disposed of till date.

Patna High Court CWJC No.15822 of 2026 dt.23-11-2026
3/4
5. Mr. Chandra, learned advocate for the SBPDCL,
at the outset, submits that the submission of the petitioner to
the authorization of the Junior Electrical Engineer is
concerned, in exercise of the power conferred by sub-section
(1A) of Section 135 of the Electricity Act, 2003, the Bihar
Electricity Regulatory Commission had authorized the Junior
Electrical Engineer posted in the Electricity Supply Section for
the purpose of disconnecting the supply line of electricity
within their respective jurisdiction where theft of electricity is
detected in the premises of low tension consumers for
maximum connected load up to 7KW. To support the aforesaid
contention, a notification dated 31.05.2013 has been placed on
record. It is further contended that so far as the second
grievance of the petitioner is concerned, if any final
assessment order has not been passed, the concerned authority
shall ensure passing of the final order, preferably within a
period of two weeks.
6. Considering the nature of the dispute, without
delving into its merit, this Court deems it fit and proper to
direct the respondent nos. 4 and 5 to pass the final assessment
order over the representation of the petitioner, preferably
within a period of two weeks from today, if the same has not

Patna High Court CWJC No.15822 of 2026 dt.23-11-2026
4/4
been done, and communicate the order to the petitioner so that
the petitioner may avail the remedy of challenging the same in
terms of Section 127 of the Electricity Act, 2003.
7. The grounds taken in the writ petition shall always
be available to the petitioner before the appropriate forum.
8. With the aforesaid direction, the present writ
petition stands disposed.


(Harish Kumar, J)
Anjani/-
AFR/NAFR
CAV DATE
Date of Pronouncement 23.11.2026
Uploading Date 23.11.2026