National Highway Authority Of India vs The Competent Authority-Cum-Sub-Divisional Magistrate, Khamano, District Fatehgarh Sahib And Others
- Court
- Punjab and Haryana High Court
IN THE HIGH COURT OF PUNJAB AND HARYANA
AT CHANDIGARH
201 CWP-35795-2019 (O&M)
Date of Decision: 19.11.2026
NHAI ...Petitioner
Versus
THE COMPETENT AUTHORITY-CUM-SUB-DIVISIONAL
MAGISTRATE & ORS. ...Respondents
And
Sr.
No.
Case Details Petitioner(s) Respondent(s)
2. CWP-7074-2018 (O&M) NHAI Competent Authority-
cum-SDM
3. CWP-14216-2018 (O&M) Baljinder Singh & Anr. Union of India & Ors.
4. CWP-14260-2018 (O&M) Gurdev Singh Union of India & Ors.
5. CWP-21560-2018 (O&M) Manohar Lal Union of India & Ors.
6. CWP-35758-2019 (O&M) NHAI The Competent Authority-
cum-Sub-Divisional
Magistrate & Ors.
7. CWP-35774-2019 (O&M) NHAI The Competent Authority-
cum-Sub Divisional
Magistrate & Ors.
8. CWP-7109-2018 (O&M) NHAI Competent Authority-
cum-SDM & Ors.
CORAM:- HON'BLE MR. JUSTICE JAGMOHAN BANSAL
Present:- Mr. R.S. Madan, Advocate
for petitioner (in CWPs No.7074 and 7109 of 2018, CWPs
No.35758, 35774, 35795 of 2019)
for respondent (in CWPs No.14260, 14216, 21560 of 2018)
Ms. Pratibha Bali, Assistant Advocate General, Punjab
Mr. Bikramjit Singh Baath, Advocate and
Mr. Ritesh K. Sharma, Advocate
for respondents No.4 to 8 ( in CWP-35795-2019 )
Mr. C.S. Bagri, Advocate (through V.C.)
for petitioner (in CWPs No.14216, 14260, 21560 of 2018)
for respondent ( in CWPs No.7074 and 7109 of 2018 )
*
JAGMOHAN BANSAL, J. (ORAL)
1. As common issues are involved in the captioned petitions,
with the consent of both sides, the same are hereby disposed of by this
common order. For the sake of brevity and convenience, facts are
borrowed from CWP-35795-2019.
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -2-
2. The petitioner through instant petition under Article 226/227
of the Constitution of India is seeking setting aside of order dated
08.07.2019 whereby Competent Authority for Land Acquisition (for short
‘CALA’) has reviewed/modified its award and enhanced the amount of
compensation.
3. The petitioner-NHAI on 03.04.2014 issued notification
under Section 3A of the National Highways Act, 1956 (for short ‘1956
Act’), proposing acquisition of land for the widening, maintenance,
management and operation of National Highway-95. The interested
parties filed their objections and notification dated 28.01.2015 under
Section 3D came to be issued. CALA vide award dated 23.06.2015
determined amount of compensation. Land in question was considered as
agricultural and amount of compensation was determined
@₹1,00,00,000/- per acre. The petitioner assailing aforesaid award
preferred an application under Section 3G(5) before the Arbitrator and
matter as per NHAI is still pending for adjudication. The petitioner
deposited assessed amount of compensation with CALA. The
respondents No.2 to 9 submitted representation dated 25.06.2019 before
CALA claiming that their land was required to be assessed as
commercial. CALA by impugned supplementary award dated
08.07.2019 has declared the acquired land as commercial and assessed
market value @ ₹2,00,00,000/- per acre.
4. Learned counsel for petitioner-NHAI submits that the
impugned supplementary award was passed without issuing notice or
granting opportunity of hearing to them. CALA became functus officio ,
the moment original award was passed. CALA could rectify clerical,
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -3-
mathematical or algebraic mistakes. CALA being quasi-judicial
authority, in the absence of any specific provision could not
review/revise/modify/set aside/recall its own order. Power was very
limited i.e. to correct any clerical or mathematical mistake and that too
within six months. CALA in the present case has changed colour and
contour of the award. Market price of the acquired land is determined as
per type of the land. In the original award, type of land was considered as
agricultural whereas in the supplementary award it has been considered
as commercial. The amount of compensation has been made double than
original. As per communication made to NHAI, impugned award was
passed under Section 33 of Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (for short
‘2013 Act’) whereas stand in the reply is totally different.
5. Per contra , learned State counsel as well as counsel for
respondent submit that the impugned supplementary award has not been
passed in exercise of power conferred by Section 33 of the 2013 Act
whereas impugned award is a separate award which has been passed on
account of documents submitted by the landowners. The competent
authority by mistake treated acquired land as agricultural and on the basis
of documents submitted by the landowners, it was treated as commercial
and a separate award in this regard was passed.
6. Mr. C.S. Bagri, Advocate submits that there are multiple
cases where CALA passed supplementary or corrigendum awards after
the expiry of more than six months from the date of award and enhanced
amount of compensation. The petitioner-NHAI selectively accepted
those supplementary/corrigendum awards and released payments. NHAI
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -4-
is extending stepmotherly treatment to the landowners herein. There are
categoric evidence establishing that the land in question was used either
for operating a petrol pump or a Dhaba. It is well known fact that a petrol
pump cannot be set up without seeking permission from the Deputy
Commissioner who has to seek NOC from multiple Departments
including Fire, Pollution, Forest etc. In the present case, the landowner
was having permission from the Deputy Commissioner and existence of
petrol pump is undisputed. In these circumstances, even in the absence of
specific provision, this Court should intervene and direct the NHAI to
assess compensation as per actual entitlement. The landowners are not
claiming undue benefit. Writ petitions of the NHAI are not maintainable
because it is their pleaded case that they had filed petition before the
Arbitrator against the award. At this stage, Mr. R.S. Madan clarified that
petitions have been filed before the Arbitrator against original award and
no petition has been filed against supplementary award.
7. All the arguments raised by both sides have been recorded in
the presence of counsel for the parties. They have not raised any other
argument.
8. Heard the arguments and perused the record.
9. By impugned supplementary awards, CALA has reviewed its
awards. It is settled law that the power of review can be exercised only
when the statute provides for the same. In the absence of any such
provision in the statute concerned, such power of review cannot be
exercised by the authority concerned. The Supreme Court
in “ Kalabharati Advertising v. Hemant Vimalnath Narichania”, ( 2010)
9 SCC 437 has held as under:
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -5-
“12. It is settled legal proposition that unless the statute/rules so
permit, the review application is not maintainable in case of
judicial/quasi-judicial orders. In the absence of any provision in
the Act granting an express power of review, it is manifest that a
review could not be made and the order in review, if passed, is
ultra vires, illegal and without jurisdiction.”
9.1 In Patel Narshi Thakershi Vs. Pradyuman Singhji
Arjunsinghji, ( 1971) 3 SCC 844 , Chandra Bhan Singh Vs.Latafat
Ullah Khan, ( 1979) 1 SCC 321 , Kuntesh Gupta v. Hindu Kanya
Mahavidyalaya , (1987) 4 SCC 525 , State of Orissa Vs. Commr. of Land
Records & Settlement, ( 1998) 7 SCC 162 and Sunita Jain Vs. Pawan
the Apex Court has held that the power
Kumar Jain , (2008) 2 SCC 705
to review is not an inherent power. It must be conferred by law either
expressly/specifically or by necessary implication and in the absence of
any provision in the Act/Rules, review of an earlier order is
impermissible as review is a creation of statute. Jurisdiction of review can
be derived only from the statute and thus, any order of review in the
absence of any statutory provision for the same is a nullity, being without
jurisdiction.
9.2 The Supreme Court in “Deputy Commissioner and Special
Land Acquisition Officer Vs. M/s S.V. Global Mill Limited”, 2026 SCC
OnLine SC 171 while dealing with question of condition of delay under
Section 74 of 2013 Act has observed that the Collector while passing
award acts as a quasi-judicial authority. Relevant extracts of the
judgment read as:-
“22. Section 23 of the 2013 Act makes it clear that
the Collector is required to determine the
compensation along with rehabilitation and
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -6-
resettlement entitlements and, accordingly, pass an
award, after duly considering the objections raised
by the landowners under Section 15 of the 2013 Act.
While doing so, the Collector performs a quasi-
judicial role, as the aforesaid determination directly
concerns the rights of the parties before him.”
10. It is settled proposition of law that there is fundamental
difference between administrative, judicial and quasi-judicial orders/
authorities. CALA appointed under 1956 Act or Collector under
1894/2013 Act exercises administrative as well as quasi-judicial powers.
Determination of compensation is a quasi-judicial function which is
evident from the following statutory provisions:
i. As per Section 3C every interested person has right to file
objections and CALA is bound to grant opportunity of
hearing to the objector and conduct enquiry, if any, as he
thinks necessary. CALA may allow or disallow the
objections.
ii. As per Section 3G(3), CALA before proceeding to determine
the amount of compensation shall give a public notice
inviting claims from all the persons interested in the land.
iii. Section 3G(1) specifically provide that where any land is
acquired, the amount of compensation shall be determined
by an order of the CALA.
iv. As per Section 3I, CALA carries powers of Civil Court in
respect to following matters:-
(a) summoning and enforcing the attendance of any person
and examining him on oath;
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -7-
(b) requiring the discovery and production of any
document;
(c) reception of evidence on affidavits;
(d) requisitioning any public record from any court or
office;
(e) issuing commission for examination of witnesses.
v. The order passed by the Competent Authority may be
assailed before the Arbitrator as per provisions of the
Arbitration and Conciliation Act, 1996.
10.1 During hearing, learned counsel for the parties have agreed
that while passing Award, CALA acts as quasi-judicial authority.
11. By notification dated 28.08.2015 issued by the Central
Government, in exercise of power conferred by Section 113(1) of the
2013 Act, provisions of 2013 Act relating to the determination of
compensation in accordance with First Schedule, rehabilitation &
resettlement in accordance with Second Schedule and provisions of
infrastructure amenities in accordance with Third Schedule have been
made applicable to acquisition under National Highway Act, 1956. For
the sake of convenience, aforesaid notification is reproduced as below:-
“Now, therefore, in exercise of the powers conferred by
sub-section (1) of Section 113 of the Right to Fair
Compensation and Transparency in Land Acquisition,
Rehabilitation and Resettlement Act, 2013 (30 of 2013),
the Central Government hereby makes the following Order
to remove the aforesaid difficulties, namely:-
1. (1) This Order may be called the Right to Fair
Compensation and Transparency in Land Acquisition,
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -8-
Rehabilitation and Resettlement (Removal of Difficulties)
Order, 2015.
(2) It shall come into force with effect from the 1st
day of September, 2015.
2. The provisions of the Right to Fair Compensation
and Transparency in Land Acquisition, Rehabilitation and
Resettlement Act, 2013, relating to the determination of
compensation in accordance with the First Schedule,
rehabilitation and resettlement in accordance with the
Second Schedule and infrastructure amenities in
accordance with the Third Schedule shall apply to all
cases of land acquisition under the enactments specified in
the Fourth Schedule to the said Act.”
As per aforesaid notification, provisions relating to
determination of compensation in accordance with First Schedule and
Second Schedule have been made applicable to acquisition under the
National Highways Act, 1956.
10.1 Determination of compensation as per First Schedule and
Second Schedule of 2013 Act is contemplated under Section 26 to 42.
Sections 26 to 30 are prescribing mode and manner of determination of
the market value for the acquired land. Section 31 prescribes for award
of Rehabilitation and Resettlement. Sections 33, 34, 35, 36, 37 & 38 are
incorporated for the aid and implementation of other provisions i.e.
Sections 26 to 32 whereby market value of the acquired land is
determined and rehabilitation & resettlement award is passed.
12. As per Section 33, the Collector has power to correct any
clerical or arithmetical mistake. The said power can be exercised within
six months from the date of award if there is no application seeking
reference and prior to making reference to the Authority where there is
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -9-
application seeking reference. As per proviso, no correction can be made
which is likely to affect any person unless he has been given reasonable
opportunity of making representation. Section 33 reads as:-
Section 33. Corrections to awards by Collector – ‘(1) The
Collector may at any time, but not later than six months
from the date of award or where he has been required
under the provisions of this Act to make a reference to the
Authority under section 64, before the making of such
reference, by order, correct any clerical or arithmetical
mistakes in either of the awards or errors arising therein
either on his own motion or on the application of any
person interested or local authority:
Provided that no correction which is likely to affect
prejudicially any person shall be made unless such person
has been given a reasonable opportunity of making
representation in the matter.
(2) The Collector shall give immediate notice of any
correction made in the award so corrected to all the
persons interested.
(3) Where any excess amount is proved to have been
paid to any person as a result of the correction made
under sub-section (1), the excess amount so paid shall be
liable to be refunded and in the case of any default or
refusal to pay, the same may be recovered, as prescribed
by the appropriate Government.’
[Emphasis supplied]
11.1 Section 37 provides that the award shall be filed in the
Collector’s office and shall be final and conclusive evidence between the
Collector and the person interested. Section 37 reads as:-
“ 37. Awards of Collector when to be final - (1) The
Awards shall be filed in the Collector's office and shall,
except as hereinafter provided, be final and conclusive
evidence, as between the Collector and the persons
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -10-
interested, whether they have respectively appeared before
the Collector or not, of the true area and market value of
the land and the assets attached thereto, solatium so
determined and the apportionment of the compensation
among the persons interested.
(2) The Collector shall give immediate notice of his
awards to such of the persons interested who are not
present personally or through their representatives when
the awards are made.
(3) The Collector shall keep open to the public and
display a summary of the entire proceedings undertaken in
a case of acquisition of land including the amount of
compensation awarded to each individual along with
details of the land finally acquired under this Act on the
website created for this purpose.”
From the conjoint reading of Section 33 and 37, it is evident
that the Collector’s award is final and conclusive evidence between the
parties with respect to area, market value of the land and assets attached
thereto. The Collector has power to correct any clerical or arithmetical
mistake. The aforesaid power can be exercised within six months from
the date of award. In case there is application seeking reference to the
Authority, correction may be carried out before making reference.
Section 37 candidly provides that award shall be final with respect to area
and market value of the land.
13. Like Section 33 in 2013 Act, there was Section 13A in 1894
Act providing correction in the award. Section 13A reads as:-
“ 13A. Correction of clerical errors, etc. - (1) The
Collector may, at any time but not later than six months
from the date of the award, or where he has been required
under section 18 to make a reference to the Court, before
the making of such reference, by order, correct any
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -11-
clerical or arithmetical mistakes in the award or errors
arising therein either on his own motion or on the
application of any person interested or a local authority:
Provided that no correction, which is likely to affect
prejudicially any person, shall be made unless such person
has been given a reasonable opportunity of making a
representation in the matter.
(2) The Collector shall give immediate notice of any
correction made in the award to all the persons interested.
(3) Where any excess amount is proved to have
been paid to any person as a result of the correction made
under sub-section (1), the excess amount so paid shall be
liable to be refunded and in the case of any default or
refusal to pay, the same may be recovered as an arrear of
land revenue.”
12.1 While dealing with the scope and ambit of Section 13A of
1894 Act, a three Judge Bench of the Hon’ble Supreme Court in “ Naresh
Kumar & Ors. Vs. Government of NCT of Delhi”, 2019(9) SCC 416
has held that in the absence of specific provision, the Collector has no
power to review its award. Review award can be passed only for the
correction of any clerical or arithmetical mistake. In the aforesaid case,
review award was passed whereby amount of compensation was reduced
on the ground that the compensation ought not to have been awarded in
respect of illegal structure on the land. Relevant extracts of the judgment
read as:
“8. There is no provision under the Land Acquisition
Act, 1894 for review of the award once passed under
Section 11 of the Act and had attained finality. The only
provision is for correction of clerical errors in the award
which is provided for under Section 13-A of the Act, which
was inserted with effect from 24-9-1984. The relevant
Section 13-A of the Act reads as under:
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -12-
“ 13-A. Correction of clerical errors, etc .—(1) The
Collector may, at any time but not later than six
months from the date of the award, or where he has
been required under Section 18 to make a reference
to the court, before the making of such reference, by
order, correct any clerical or arithmetical mistakes
in the award or errors arising therein either on his
own motion or on the application of any person
interested or a local authority:
Provided that no correction which is likely to affect
prejudicially any person shall be made unless such
person has been given a reasonable opportunity of
making a representation in the matter.
(2) The Collector shall give immediate notice of any
correction made in the award to all the persons
interested.
(3) Where any excess amount is proved to have
been paid to any person as a result of the correction
made under sub-section (1), the excess amount so
paid shall be liable to be refunded and in the case
of any default or refusal to pay, the same may be
recovered as an arrear of land revenue.”
(Emphasis supplied)
9. A bare reading of the said Section 13-A would make it
clear that the same is not a provision for review of the award
but only for correction of clerical or arithmetical mistakes in
the award. It is further provided in sub-section (1) of Section
13-A that the said correction can be made at any time, but not
later than six months from the date of award. In the present
case, the Land Acquisition Collector has actually not made
any correction of clerical or arithmetical mistake, but has in
fact reviewed the award dated 1-10-2003 by its Review Award
No. 16/03-04 dated 14-7-2004, which was also clearly passed
beyond such period of six months.
10. In our considered view, the review award could not
have been passed under Section 13-A of the Act, which is
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -13-
meant only for correction of any clerical or arithmetical
mistake. There is no other provision in the Act under which
the said order dated 14-7-2004 could have been passed.
11. In the present case, the compensation for the
structure on the land has been deducted from the award dated
1-10-2003 by the review award dated 14-7-2004 on the
ground of the same being illegal structure, which actually
amounts to review of the award and cannot be said to be a
correction of any clerical or arithmetical mistake. The
question whether the structure on the land of the appellants
was legal or illegal could only be decided after the parties
were given opportunity to adduce evidence, which correction
cannot be termed as correction of any clerical or arithmetical
mistake. There being no provision under the Land Acquisition
Act, 1894 for review of the award, the passing of the order
dated 14-7-2004 in Review Award No. 16/03-04 cannot be
justified in law.
12. Section 12 of the Act clearly provides that the
award of the Collector shall become final on the same being
filed in the Collector's office, of which the Collector shall give
immediate notice to the persons interested. From the facts of
this case, it is clear that the award dated 1-10-2003, of which
due notice had been given to the appellants and part
compensation had also been paid to the appellants in
pursuance thereto, had become final and the same could not
have been reviewed, and that too beyond a period of six
months, within which period only clerical or arithmetical
mistakes could have been corrected.
14. Therefore, in view of the above, the law on the
point can be summarised to the effect that in the absence of
any statutory provision providing for review, entertaining an
application for review or under the garb of
clarification/modification/correction is not permissible.”
(Emphasis Supplied)
14. The Supreme Court M/s S.V. Global Mill Limited (supra)
has also adverted to question of power of Collector to review its order.
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -14-
The Court has held that the Collector has no power to review its order. It
is apt to mention here that Supreme Court in “ Rajasthan Housing Board
Vs. M/s. Hariyali Rural Ventures Ltd. & Ors.”, 2026 Law Finder (SC)
7064 has disapproved aforesaid judgment with respect to power of High
Court to condone delay beyond prescribed period, however, there is no
observation with respect to power of the Collector to review its order.
Relevant extracts of M/s S.V. Global Mill Limited (supra) read as:-
“24. The proceedings until this stage constitute the first
phase of the acquisition with the Collector playing a quasi-
judicial role in determining the compensation. Upon such
determination and passing of the award under Section 23
of the 2013 Act, the Collector becomes functus officio and
does not have the power to revisit or modify the award
passed by him. Thus, his quasi-judicial role stands
extinguished, and the substantive rights of the parties
stand concluded qua him.”
15. Section 36 of 2013 Act provides that the appropriate
Government may call for any record of any proceeding for the purpose of
satisfying itself as to the legality or propriety of any finding or order
passed. Section 36 reads as:-
“ 36. Power to call for records, etc. - The appropriate
Government may at any time before the award is made by
the Collector under section 30 call for any record of any
proceedings (whether by way of inquiry or otherwise) for
the purpose of satisfying itself as to the legality or
propriety of any findings or order passed or as to the
regularity of such proceedings and may pass such order or
issue such direction in relation thereto as it may think fit:
Provided that the appropriate Government shall not pass
or issue any order or direction prejudicial to any person
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -15-
without affording such person a reasonable opportunity of
being heard.”
The appropriate Government can call record of the Collector
and pass an appropriate order only before the passing of award by the
Collector. The moment award is passed, even the appropriate
Government has no power to interfere. It would be strange if it is held
that the Collector has power to review or modify its award when
appropriate Government has no power to modify or review award passed
by the Collector. Award passed by the Collector can be challenged by
way of reference before the Authority/Reference Court or before the
Arbitrator as per applicable provisions but cannot be modified by the
Collector.
16. In the case in hand, CALA has passed supplementary award
whereby nature of the land as well as quantum of compensation has been
changed. CALA vide letter dated 22.01.2018 (Annexure P-6 in CWP-
7109-2018 ) intimated the petitioner that the impugned supplementary
award has been passed in terms of provisions of Section 33 of the 2013
Act. During hearing, pointing out reply, the State Counsel has pleaded
that the impugned supplementary award was passed in addition to
original award. It has not been passed under Section 33 of the 2013 Act.
To a pointed query, learned State Counsel as well as counsel for the
landowners failed to point out any provision which empowers the
Collector to pass supplementary award with respect to the same land.
Mr. Bagri contended that though there is no provision in the Act yet this
Court in exercise of power conferred by Article 226 of the Constitution of
India, to do complete justice with the landowners, may hold that the
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -16-
Collector has rightly passed supplementary award. The Court may also
direct the Collector to pass supplementary award. It is true that where no
award is passed with respect to part of the land, the Court may ask the
Collector to pass the award, however, Court can neither in exercise of
writ jurisdiction ask the Collector to pass supplementary award nor
approve already passed supplementary award. As held by the Apex
Court in the afore-cited judgments, no quasi-judicial authority in the
absence of specific provision can review its order in the guise of
corrigendum/clarification/amendment. The statutory provisions have
circumscribed power of the Collector after passing of award. Writ Court
cannot ask any Authority to act contrary to the statutory provisions. In
‘ Assistant Commissioner (CT) LTU, Kakinada & Ors Vs. M/s. Glaxo
Smith Kline Consumer Health Care Limited, 2020 SCC OnLine SC
440 and Oil and Natural Gas Corporation Limited Vs. Gujarat Energy
Transmission Corporation Limited, ( 2017) 5 SCC 42 the Supreme Court
has held that even Supreme Court while exercising power under Article
142 cannot pass order contrary to the statutory provisions. Therefore,
contention of the landowners that this Court should approve
supplementary award in exercise of its writ jurisdiction cannot be
countenanced.
Contention of the State that the Collector has not exercised
power under Section 33 and passed another award deserves to be
outrightly rejected. The State has raised a very strange and innocuous
argument. It appears that the State Authorities either intentionally or
unintentionally are trying to extend undue advantage to the landowners.
The Collector has passed supplementary award whereby type of the land
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -17-
i.e. agricultural has been substituted for commercial. The market value
has been made double of the original value. By no stretch of imagination,
it can be called as additional award. It is simple review/modification of
the original award.
17. The impugned supplementary awards have been passed after
2-4 years from the date of passing original award. The CALA has passed
supplementary awards even without issuing notice to the NHAI. Leaving
aside proviso to Section 33 of 2013 Act, it is basic principle of law that
no modification in the order should be made without granting opportunity
to the person who is going to be prejudiced by modification. In the case
in hand, liability of the NHAI on account of supplementary awards
multiplied. NHAI was prejudiced without being heard. The impugned
awards have been passed without granting opportunity of hearing to the
NHAI, thus, are bad in the eye of law.
18. The landowners have pleaded that the petitioner-NHAI has
filed petition before the Arbitrator, thus, writ petition is not maintainable.
Ld. Counsel for petitioner-NHAI has clarified that no petition against
supplementary award has been filed before the Arbitrator. It is true that
writ petition except in exceptional circumstances should not be
entertained against the award, however, NHAI has not laid challenge to
the original award whereas supplementary award has been challenged.
The CALA has passed supplementary award beyond its jurisdiction, thus,
writ petition is maintainable. He has not only acted beyond its
jurisdiction but also ignored statutory provisions. He has passed
supplementary awards though there is no such power or provision under
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -18-
1956 or 2013 Act. He has also ignored question of limitation. As per
Section 33 of 2013 Act even clerical mistake cannot be corrected beyond
six months from the date of award whereas CALA has passed impugned
supplementary awards even after four years from the date of original
award. In such circumstances, there seems no reason to reject writ
petitions on the ground of maintainability.
19. The landowners have pleaded that CALA did not award
them accurate amount of compensation, thus, supplementary award could
be passed. The landowners were not remediless. 1956 Act provides
remedy. They did not avail remedy as provided under 1956 Act and
requested CALA to pass supplementary award and that too after more
than two years. It is apt to notice here that NHAI has filed petitions
against the original award before the Arbitrator seeking reduction in the
amount of compensation assessed by the CALA. The landowners could
file counter-claim but they did not. If procedure adopted by them is
approved, it would lead to chaos and anarchy. Any person at any time
would approach Collector and seek modification/review of the original
award. It would certainly lead to corruption. The mechanism to
challenge award would become meaningless.
20. In the wake of afore-stated factual and legal position, this
Court is of the considered option that CALA had no power to review or
modify its order. It became functus officio, the moment award was
passed. It could correct clerical or typing mistake. The impugned
supplementary awards deserve to be set aside and accordingly are hereby
set aside.
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment
CWP-35795-2019 & connected cases -19-
CWP-14216-2018, CWP-14260 of 2018 and CWP-21560-2019
21. In view of the aforesaid findings, petitions filed by the
landowners are not sustainable, thus, disposed of with liberty to them to
avail remedies as permissible by law.
22. It would be apt to notice here that this Court has noticed that
supplementary awards are passed only where beneficiary agencies are
NHAI, Railways etc. No such supplementary award is passed where
acquisition is for the State itself. This practice of passing supplementary
awards need to be curbed. Registry is directed to send copy of this order
to the Chief Secretary, State of Punjab for his perusal and further
necessary instructions.
23. Before parting with the judgment, this Court finds it
appropriate to direct Regional Officer, NHAI Chandigarh to file status
report with respect to supplementary/corrigendum awards passed by
CALA during 2019 to 2025. The status report shall clarify whether
NHAI has accepted supplementary/corrigendum awards and released
enhanced amount of compensation. The report shall be filed before this
Court within four months from today.
24. Pending application(s), if any, stands disposed of.
(JAGMOHAN BANSAL)
JUDGE
November 19, 2026
Deepak DPA
Whether Speaking/reasoned: Yes/No
Whether Reportable: Yes/No
DEEPAK BISSYAN
2026.11.23 12:50
I attest to the accuracy and
authenticity of this
order/judgment