SMT BHARATI W/O. VISHWANATH BIDRIMATH vs THE STATE OF KARNATAKA
- Court
- Karnataka High Court
- 1 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
IN THE HIGH COURT OF KARNATAKA AT DHARWAD
TH
DATED THIS THE 7 DAY OF SEPTEMBER 2026
PRESENT
THE HON'BLE MR. JUSTICE M.NAGAPRASANNA
AND
THE HON'BLE MRS JUSTICE HEMA KULKARNI
WRIT PETITION NO.107564 OF 2026 (S-KAT)
BETWEEN:
SMT. BHARATI
W/O. VISHWANATH BIDRIMATH
AGE. 54 YEARS, OCC. WORKING AS DEPUTY DIRECTOR,
HANDLOOMS AND TEXTILES DEPARTMENT,
ASHOK CIRCLE, OPPOSITE MUNICIPALITY,
KOPPAL-583231, R/O. C/O. BASAVANNEPPA PATIL,
AROGYA BADAVANE, KOPPAL-583231.
…PETITIONER
(BY SRI.UMESH C.AINAPUR, ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
REPRESENTED BY ITS SECRETARY,
(DEPARTMENT OF INDUSTRY AND
COMMERCE (TEXTILES)), VIKASA SOUDHA,
DR. B.R. AMBEDKAR VEEDHI,
BENGALURU-560001.
2. THE COMMISSIONER FOR
TEXTILE DEVELOPMENT AND
DIRECTOR OF HANDLOOMS AND TEXTILES,
ST
VANA VIKASA, 1 FLOOR,
TH
18 CROSS, MALLESHWARAM,
BENGALURU-560001.
…RESPONDENTS
(BY SRI.SHARAD V.MAGADUM, AGA)
Digitally signed
by
VIJAYALAKSHMI
M KANKUPPI
Location: HIGH
COURT OF
KARNATAKA
DHARWAD
BENCH
Date: 2026.10.09
11:15:59 +0530
- 2 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227
OF THE CONSTITUTION OF INDIA PRAYING TO ISSUE WRIT IN THE
NATURE OF CERTIORARI TO QUASH THE IMPUGNED ORDER DATED
16/07/2026 PASSED BY THE KARNATAKA ADMINISTRATIVE
TRIBUNAL, BELAGAVI IN APPLICATION NO.12284/2024, AS
ANNEXURE-D AS WELL AS QUASH THE ORDER DATED 02/08/2024
(3/08/2024) GOVERNMENT ORDER NO.-CI 20 JAKY 2021
ST
BENGALURU PASSED BY THE 1 RESPONDENT WHEREBY THE
PENALTY OF WITHHOLDING THE NEXT FOUR ANNUAL INCREMENTS
UNDER RULE 8(iii) OF THE KARNATAKA CIVIL SERVICES
(CLASSIFICATION, CONTROL AND APPEAL) RULES, 1957, AS
ANNEXURE-A AND ALLOW THE APPLICATION FILED BY THE
PETITIONER VIDE ANNEXURE-B, IN THE INTEREST OF JUSTICE AND
EQUITY AND ETC.
THIS WRIT PETITION COMING ON FOR PRELIMINARY HEARING
THIS DAY, ORDER WAS MADE THEREIN AS UNDER:
CORAM: HON'BLE MR. JUSTICE M.NAGAPRASANNA
AND
HON'BLE MRS JUSTICE HEMA KULKARNI
ORAL ORDER
(PER: HON'BLE MR. JUSTICE M.NAGAPRASANNA )
The petitioner is before the Court calling in question an
order of the Karnataka State Administrative Tribunal, Belagavi
(hereinafter referred to as the 'Tribunal' for short) dated
- 3 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
16.07.2026, which dismisses the application filed by the
petitioner, in which the petitioner had called in question
imposition of penalty upon the petitioner of stoppage of four
annual increments with cumulative effect.
2. Heard Sri.Umesh C Ainapur, learned counsel
appearing for the petitioner, Sri.Sharad V Magadum, learned
Additional Government Advocate, appearing for the
respondents.
3. Facts in brief, germane, are as follows:
3.1. The petitioner on 27.05.2010, takes charge as
Assistant Director of Handlooms and Textiles Department, and
was later promoted as Deputy Director in the same department
on 08.07.2015. Availing the benefit of loan waiver, 64
beneficiaries of Kamatagi Agriculture Service Cooperative
Society were identified. On 04.01.2018, while the petitioner
was working as Deputy Director of Handlooms and Textiles
Department of Zilla Panchayat, Bagalkote between 13.06.2018
to 13.02.2020, is alleged to have identified the 64 beneficiaries
of the said Cooperative Society without verifying their
- 4 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
genuineness. After about five years of the alleged act, a charge
memo comes to be issued against the petitioner on
12.04.2023. The petitioner submits a detailed reply denying the
charges, submitting that she had personally verified the
beneficiaries in terms of the government guidelines.
3.2. Not being satisfied with the reply, Enquiry Officer is
appointed to conduct a departmental enquiry, who submits a
report on 18.01.2024. Enclosing the report of the Enquiry
Officer, a second show cause notice comes to be issued upon
the petitioner and then, the Disciplinary Authority imposes a
penalty of withholding of four annual increments with
cumulative effect as obtaining under Rule 8(iii) of the
Karnataka Civil Services (Classification, Control and Appeal)
Rules, 1957. The impugned order of penalty is implemented on
29.08.2024. This is called in question before the Tribunal in
Application No.12284 of 2024, which comes to be rejected by
the impugned order dated 16.07.2026. It is this that drives the
petitioner before us in the subject petition.
- 5 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
4. Learned counsel appearing for the petitioner
submits that the acts of the petitioner has resulted in no loss,
as all the 64 beneficiaries who had been identified, allegedly
erroneously, have all repaid the amount, and the charge memo
itself is issued after about five years of the alleged incident of
the act of the petitioner in identifying those beneficiaries.
The learned counsel proceed to place reliance upon certain
judgments of the Apex Court and that of this Court to buttress
his submission.
5. Per contra , the learned Government Advocate
Sri.Sharad V Magadum appearing for the respondent-State
would vehemently refute the submission in contending that the
Tribunal has on consideration of the facts, held that delay in the
case at hand has not vitiated the entire proceedings. The act of
the petitioner came to light only after five years. Therefore, this
Court should not interfere with the order of penalty. He would
seek dismissal of the petition.
- 6 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
6. We have given our anxious consideration to the
submissions of the learned counsel for the respective parties
and have perused the material on record.
7. The above narrated facts are a matter of record.
The incident that triggers the issuance of a charge memo, has
admittedly taken place in the year 2018. A show cause notice
comes to be issued against the petitioner on 20.06.2022. The
petitioner submits a reply. Nothing happens for close to one
year. Charge memo is issued against the petitioner on
12.04.2023, five years after the alleged incident.
The petitioner replies to the charge memo so issued,
contending that the beneficiaries were appropriately identified
and the payment made in terms of the scheme are all returned
back to the department. There is no loss even to a rupee
caused to the department. This is an admitted position. With
this being the admitted position, nothing stopped the
department from issuance of a charge memo, if the allegation
of misconduct had some semblance. The department takes five
years to issue the charge memo. Whether delay would vitiate
- 7 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
the proceedings, need not detain us for long or delve deep into
the matter.
8. The issue of delay vitiating the proceedings of the
kind stands completely answered by the judgment of the Apex
1
Court in STATE OF A.P. v. N. RADHAKISHAN , which is
subsequently followed by the Apex Court in P.V. MAHADEVAN
2
v. MD. T.N. HOUSING BOARD . The Apex Court in P.V.
MAHADEVAN supra observes as follows:
“ …. …. ….
5. In the second case of N. Radhakishan
[(1998) 4 SCC 154 : 1998 SCC (L&S) 1044] the
respondent was appointed as Assistant Director of Town
Planning in the year 1976. A report dated 7-11-1987
was sent by the Director General, Anti-Corruption
Bureau, Andhra Pradesh, Hyderabad to the Secretary to
the Government, Housing, Municipal Administration and
Urban Development Department, Andhra Pradesh,
Hyderabad about the irregularities in deviations and
unauthorised constructions in multi-storeyed complexes
in the twin cities of Hyderabad and Secunderabad in
collusion with Municipal Authorities. On the basis of the
report, the State issued two memos both dated 12-12-
1987 in respect of three officials including the
respondent Radhakishan, the then Assistant City
Planner. In this case, till 31-7-1995 the articles of
charges had not been served on the respondent. The
Tribunal, however, held that the memo dated 31-
7-1995 related to incidents that happened ten
1
(1988) 4 SCC 154
2
(2005) 6 SCC 636
- 8 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
years or more prior to the date of the memo and
that there was absolutely no explanation by the
Government for this inordinate delay in framing
the charges and conducting the enquiry against
the respondent and that there was no justification
on the part of the State now conducting the
enquiry against the respondent in respect of the
incidents at this late stage. This Court, in para 19,
has observed as follows: (SCC p. 165)
“19. It is not possible to lay down
any predetermined principles applicable to
all cases and in all situations where there
is delay in concluding the disciplinary
proceedings. Whether on that ground the
disciplinary proceedings are to be
terminated each case has to be examined
on the facts and circumstances in that
case. The essence of the matter is that the
court has to take into consideration all the
relevant factors and to balance and weigh
them to determine if it is in the interest of
clean and honest administration that the
disciplinary proceedings should be allowed
to terminate after delay particularly when
the delay is abnormal and there is no
explanation for the delay. The delinquent
employee has a right that disciplinary
proceedings against him are concluded
expeditiously and he is not made to
undergo mental agony and also monetary
loss when these are unnecessarily
prolonged without any fault on his part in
delaying the proceedings. In considering
whether the delay has vitiated the
disciplinary proceedings the court has to
consider the nature of charge, its
complexity and on what account the delay
has occurred. If the delay is unexplained
prejudice to the delinquent employee is
writ large on the face of it. It could also be
seen as to how much the disciplinary
authority is serious in pursuing the
charges against its employee. It is the
basic principle of administrative justice
that an officer entrusted with a particular
job has to perform his duties honestly,
efficiently and in accordance with the
- 9 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
rules. If he deviates from this path he is to
suffer a penalty prescribed. Normally,
disciplinary proceedings should be allowed
to take their course as per relevant rules
but then delay defeats justice. Delay
causes prejudice to the charged officer
unless it can be shown that he is to blame
for the delay or when there is proper
explanation for the delay in conducting the
disciplinary proceedings. Ultimately, the
court is to balance these two diverse
considerations.”
This Court held that there was hardly any
explanation worth consideration as to why the
delay occurred. In the circumstances, this Court
held that the Tribunal was justified in quashing the
charge memo dated 31-7-1995 and directing the
State to promote the respondent as per
recommendation of the DPC ignoring memos dated
27-10-1995 and 1-6-1996. Accordingly, the appeal
filed by the State of Andhra Pradesh was
dismissed.
6. Mr Prabhakar also invited our attention to the
affidavit filed by the appellant in support of his case. It
is stated in para 14 of the affidavit that the
respondent with mala fide intention issued the
present charge memo against the appellant even
though the alleged incident of issuance of sale
deed was of the year 1990, which was 10 years
prior to the issuance of charge memo and that the
very reason for issuing charge memo was that the
appellant could be detained from being promoted
to the post of Chief Engineer of the Housing Board.
7. The very same ground has been
specifically raised in this appeal before this Court
wherein it is stated that the delay of more than 10
years in initiating the disciplinary proceedings by
issuance of charge memo would render the
departmental proceedings vitiated and that in the
absence of any explanation for the inordinate
delay in initiating such proceedings of issuance of
charge memo would justify the prayer for
- 10 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
quashing the proceedings as made in the writ
petition.
8. Our attention was also drawn to the counter-
affidavit filed by the respondent Board in this appeal.
Though some explanation was given, the explanation
offered is not at all convincing. It is stated in the
counter-affidavit for the first time that the irregularity
during the year 1990, for which disciplinary action had
been initiated against the appellant in the year 2000,
came to light in the audit report for the second half of
1994-95.
9. Sections 118 and 119 of the Tamil Nadu State
Housing Board Act, 1961 (Tamil Nadu Act 17 of 1961)
read thus:
“118. At the end of every year, the
Board shall submit to the Government an
abstract of the accounts of its receipts and
expenditure for such year.
119. The accounts of the Board shall be
examined and audited once in every year by
such auditor as the Government may appoint in
this behalf.”
10. Section 118 specifically provides for
submission of the abstracts of the accounts at the end of
every year and Section 119 relates to annual audit of
accounts. These two statutory provisions have not been
complied with at all. In the instant case the transaction
took place in the year 1990. The expenditure ought to
have been considered in the accounts of the succeeding
year. In the instant case the audit report was ultimately
released in 1994-95. The explanation offered for the
delay in finalising the audit account cannot stand
scrutiny in view of the above two provisions of the Tamil
Nadu Act 17 of 1961. It is now stated that the appellant
has retired from service. There is also no acceptable
explanation on the side of the respondent explaining the
inordinate delay in initiating departmental disciplinary
proceedings. Mr R. Venkataramani, learned Senior
Counsel is appearing for the respondent. His submission
that the period from the date of commission of the
- 11 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
irregularities by the appellant to the date on which it
came to the knowledge of the Housing Board cannot be
reckoned for the purpose of ascertaining whether there
was any delay on the part of the Board in initiating
disciplinary proceedings against the appellant has no
merit and force. The stand now taken by the respondent
in this Court in the counter-affidavit is not convincing
and is only an afterthought to give some explanation for
the delay.
11. Under the circumstances, we are of the
opinion that allowing the respondent to proceed
further with the departmental proceedings at this
distance of time will be very prejudicial to the
appellant. Keeping a higher government official
under charges of corruption and disputed integrity
would cause unbearable mental agony and
distress to the officer concerned. The protracted
disciplinary enquiry against a government
employee should, therefore, be avoided not only in
the interests of the government employee but in
public interest and also in the interests of inspiring
confidence in the minds of the government
employees. At this stage, it is necessary to draw
the curtain and to put an end to the enquiry. The
appellant had already suffered enough and more
on account of the disciplinary proceedings. As a
matter of fact, the mental agony and sufferings of
the appellant due to the protracted disciplinary
proceedings would be much more than the
punishment. For the mistakes committed by the
department in the procedure for initiating the
disciplinary proceedings, the appellant should not
be made to suffer.
(Emphasis supplied)
9. The Division Bench of this Court in
SRI.M.R.VADDAR v. THE STATE OF KARNATAKA AND
- 12 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
3
ANOTHER, while referring to the law laid down by the Apex
Court in the afore-quoted judgments holds as follows:
" …. …. ….
9. In the case of P.V. Mahadevan Vs. M.D.,
T.N. Housing Board and others relying on two other
reported decisions, namely, State of Madhya
Pradesh Vs. Bani Singh reported in 1990 Supp. SCC
738 and in the case of State of A.P. Vs. N.
Radhakrishnan reported in (1998) 4 SCC 154, at
paragraph No. 19 of the later case it is held by Apex
Court as under:
"It is not possible to lay down any
predetermined principles applicable to all cases
and in all situations where there is delay in
concluding the disciplinary proceedings. Whether
on that ground the disciplinary proceedings are to
be terminated each case has to be examined on
the facts and circumstances in that case. The
essence of the matter is that the court has to take
into consideration all the relevant factors and to
balance and weigh them to determine if it is in the
interest of clean and honest administration that
the disciplinary proceedings should be allowed to
terminate after delay particularly when the delay
is abnormal and there is no explanation for the
delay. The delinquent employee has a right
that disciplinary proceedings against him are
concluded expeditiously and he is not made
to undergo mental agony and also monetary
loss when these are unnecessarily prolonged
without any fault on his part in delaying the
proceedings. In considering whether the
delay has vitiated the disciplinary
proceedings the court has to consider the
nature of change, its complexity and on what
account the delay has occurred. If the delay
is unexplained prejudice to the delinquent
employee is writ large on the face of it. It
could also be seen as to how much the
disciplinary authority is serious in pursuing
the charges against its employee. It is the
3
W.P.No.6116/2020, disposed on 11.12.2020
- 13 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
basic principle of administrative justice that an
officer entrusted with a particular job has to
perform his duties honestly, efficiently and in
accordance with the rules. If he deviates from this
path he is to suffer a penalty prescribed.
Normally, disciplinary proceedings should be
allowed to take their course as per relevant
rules but then delay defeats justice. Delay
causes prejudice to the charged officer
unless it can be shown that he is to blame
for the delay or when there is proper
explanation for the delay in conducting the
disciplinary proceedings. Ultimately, the
court is to balance these two diverse
considerations.
This Court held that there was hardly
any explanation worth consideration as to
why the delay occurred. In the
circumstances, this Court held that the
Tribunal was justified in quashing the charge
memo dated 31.07.1995 and directing the
State to promote the respondent as per
recommendation of the DPC ignoring memos
dated 27.10.1995 and 01.06.1996.
Accordingly, the appeal filed by the State of
Andhra Pradesh was dismissed."
In the case of Uco Bank and others Vs.
Rajendra Singh Shukla, reported in (2018) 14 SCC
92 the Apex Court at paragraph No. 12 has held as
under:
"12. We do not find any reason to
interfere with the judgment and order passed by
the High Court. However, it is necessary for us to
highlight a few facts of which were brought to
our notice during the course of submissions
made by the learned counsel. The first issue of
concern is the enormous delay of about 7
years in issuing a charge-sheet against
Shukla. There is no explanation for this
unexplained delay. It appears that some
internal discussions were going on within
the Bank but that it took the Bank 7 years
to make up its mind is totally unreasonable
and unacceptable. On this ground itself, the
- 14 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
charge-sheet against Shukla is liable to be
set aside due to the inordinate and
unexplained delay in its issuance ."
10. In the aforesaid judgment, Apex Court
came to a conclusion that allowing the respondents
to proceed further with the departmental
proceedings at that distance of time would be
prejudicial to the appellant. Keeping a higher
Government official under charges of corruption
and disputed integrity would cause unbearable
mental agony and distress to the officer concerned.
The protracted disciplinary enquiry against the
government employee should therefore be avoided
not only in the interest of the Government employee
but in public interest and also in the interest of
inspiring confidence in the minds of the
government employee. It is also held that it is
necessary to draw the curtain and to put an end to
the enquiry as appellant therein had already
suffered enough and more on account of pendency
of disciplinary proceedings. As a matter of fact, the
mental agony and sufferings of the appellant
therein was due to the protracted disciplinary
proceedings and it would be much more than the
punishment. For the mistakes committed by the
department in the procedure for initiating the
disciplinary proceedings, the appellant should not
be made to suffer.
11. In the instant case, alleged misconduct is for
the year 2007-08. Charge memo is dated 09.03.2017,
that is, nearly after nine years of the alleged misconduct.
This inordinate delay is not explained. Departmental
proceedings at this distance of time would be prejudicial
to the petitioner. That apart two (2) authorities have
already held that deviation of 6.62% might have occurred
for the reason that survey has been conducted after one
year from the date of completion of work vide report of
the Vigilance wing dated 26.10.2010 (Annexure A2) and
the enquiry conducted by Karnataka Lokayukta Technical
Division vide its report dated 08.05.2013 to 22.05.2013
(Annexure A4) it was held that allegations made in the
complaint are not proved. Therefore, we are of the
- 15 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
considered opinion that charge memo issued to petitioner
and consequential proceedings deserves to be quashed."
(Emphasis supplied)
The afore-quoted judgments of the Apex Court and the Division
Bench of this Court hold that delay in certain cases would cause
prejudice and can be taken note of to quash the proceedings,
as delay would undoubtedly cause prejudice to the employee.
In the case of SRI.M.R.VADDAR supra , the Division Bench
sets aside the order of the Tribunal on the score of delay in
issuing the charge memo, nine years after the alleged offence;
however, the delay in the case at hand is five years.
10. This factum of delay and no loss being caused to
the department, as every pie was returned by all the 64
beneficiaries, ought to have merited consideration at the hands
of the Tribunal. The Tribunal has glossed over the issue of
delay, without even entering into the submissions with regard
to the said delay and proceeds on a footing that delay has not
vitiated the proceedings and the penalty that is imposed is on
preponderance of evidence. Delay in certain cases vitiates the
entire proceedings and causes prejudice if permitted to
- 16 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
continue at the time of issuance of the charge memo and
causes grave prejudice, if it is permitted to sustain when the
penalty is imposed notwithstanding the said delay.
11. Therefore, in the peculiar facts of this case, we are
of the considered view that the penalty so imposed upon the
petitioner of stoppage of four annual increments with
cumulative effect, is unsustainable.
12. For the aforesaid reasons, the following:
O R D E R
[I] Petition is allowed .
[II] The impugned order dated 16.07.2026 passed by
the Karnataka State Administrative Tribunal,
Belagavi, in Application No.12284/2024 and the
order dated 02.08.2024 (03.08.2024) passed by
respondent No.1 stands quashed qua the petitioner.
- 17 -
HC-KAR
NC: 2026:KHC-D:14782-DB
WP No. 107564 of 2026
CNR: KAHC020158662026
[III] Petitioner becomes entitled to all consequential
benefits that would flow from the quashment of the
orders.
Sd/-
(M.NAGAPRASANNA)
JUDGE
Sd/-
(HEMA KULKARNI)
JUDGE
CBC
CT:VH
List No.: 1 Sl No.: 34