Ajeet Singh And Anr vs State Of Haryana And Others

Court
Punjab and Haryana High Court

CWP-18425-2020 (O&M) along with -1 -

other connected matters


IN THE HIGH COURT OF PUNJAB & HARYANA
AT CHANDIGARH

(259)
1. CWP-18425-2023 (O&M)

Ajeet Singh and another .....Petitioners

Versus

State of Haryana and others ....Respondents

2. CWP-18467-2023 (O&M)

Suresh Kumar and another .....Petitioners

Versus

State of Haryana and others ....Respondents

3. CWP-18455-2023 (O&M)

Manoj Kumar .....Petitioner

Versus

State of Haryana and others ....Respondents

4. CWP-18797-2023 (O&M)

Raj Kumar and others .....Petitioners

Versus

State of Haryana and others ....Respondents

5. CWP-18860-2023 (O&M)

Sube Singh and another .....Petitioners

Versus

State of Haryana and others ....Respondents
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -2 -

other connected matters


6. CWP-19506-2023 (O&M)

Virender Singh .....Petitioner

Versus

State of Haryana and others ....Respondents

7. CWP-14176-2025 (O&M)

Daljit Singh and others .....Petitioners

Versus

State of Haryana and others ....Respondents

8. CWP-18927-2025 (O&M)

Rajender Singh .....Petitioner

Versus

State of Haryana and others ....Respondents

Date of Decision:- 10.09.2026

CORAM: HON'BLE MR. JUSTICE VIKAS BAHL
HON'BLE MS. JUSTICE DIVYA SHARMA

Present:- Mr. Ankur Mittal, Senior Advocate, with
Mr. Sakal Sikri, Advocate,
Ms. Kushaldeep K. Manchanda, Advocate,
Mr. Siddhant Arora, Advocate,
Mr. Shivam Garg, Advocate,
Mr. Abhinav Chaudhary, Advocate, and
Mr. Babbar Bhan, Advocate,
Mr. Ajay Ghangas, Advocate, for the petitioners.

Mr. Saurabh Mago, DAG, Haryana.

Mr. Deepak Sabherwal, Advocate,
Mr. Pankaj Kundra, Advocate, and
Ms. Hitika Sabherwal, Advocate
for the respondent(s)-HSVP.
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -3 -

other connected matters


Mr. Manjeet Kumar, LAO, Rohtak, present in person.

Mr. Sidharth Singh, Estate Officer, HSVP, Bahadurgarh
present in person.

*
DIVYA SHARMA, J.
1. The present order shall dispose of a bunch of eight writ
petitions as common questions of law and facts arise in the same. For
convenience and with the agreement of the counsel for the parties, the facts
are being taken from CWP-18425-2023 titled as ‘Ajeet Singh and another
Vs. State of Haryana and others’.
2. Petitioners approached this Court with the following prayers:-
“Civil Writ Petition under Article 226 of the Constitution of
India for calling records and after perusal of same issuing order,
direction or writ in the nature of Mandamus for directing the
respondents to allot developed residential and commercial plots
under the 'Land Pooling Scheme' notified by the respondent no. 1
on 10.09.2012 (Annexure P-4) in lieu of the land of the petitioners
which was acquired for the public purpose namely Residential &
Commercial Sector-6 Part, Jhajjar, considering the fact that the
petitioners have applied for the same well within time as prescribed
under the scheme and since then no plots have been allotted to the
petitioners, in the interest of justice.
AND
Further praying for issuance of writ in the nature of Certiorari
for quashing the communication dated 18.02.2022 (Annexure P-11)
initiated by the Administrator, H.S.V.P, Rohtak whereby, it has
been wrongly reported that none of the landowners filed its
application under the 'Land Pooling Scheme' notified on
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -4 -

other connected matters


10.09.2012 within the prescribed period of 60 days from the
issuance of the notification dated 10.09.2012.
AND
Further issuance of any writ, order or direction to waive the
interest @ 9% p.a. on the upfront money taken by the petitioner.
AND
Further issuance of any writ, order or direction to call upon
the records pertaining to the applications submitted by the
petitioners and other landowners including the report dated
27.05.2021 submitted to the Chief Administrator vide memo no.
3824.
AND
Further praying for issuance of any other writ, order or
direction that this Hon'ble Court may deem fit in the light of the
peculiar facts and circumstances of the case at hand.”
3. The case of the petitioners is that vide Notification dated
11.04.2011 issued under Section 4 of the Land Acquisition Act, 1894
(hereinafter to be referred as ‘the Act of 1894’) acquisition of the land of the
petitioners was proposed for the public purpose, namely, development of
Sector-6 Part Residential, Jhajjar and pursuant thereto, vide Declaration
dated 10.04.2012 issued under Section 6 of the Act of 1894, their land was
sought to be acquired. The notification and declaration under the Act of
1894 finally culminated into Award No.5 dated 23.08.2013.
4. Before passing of the Award, respondent No.1 on 10.09.2012
introduced and notified a ‘Land Pooling Scheme’. The ‘Land Pooling
Scheme’ as introduced vide Notification dated 10.09.2012, gave an option to
the landowners, whose land was acquired, to become partners in the
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -5 -

other connected matters


development process. The landowners whose land had been acquired for the
development of residential sectors were given an option either to accept the
compensation in monetary terms as available under the Act of 1894 along
with non-statutory benefits under the Rehabilitation and Resettlement Policy
(hereinafter to be referred as ‘R&R Policy’) or to seek the compensation in
the form of developed plots as full and final settlement. The relevant
provisions of the aforesaid ‘Land Pooling Scheme’ are reproduced herein
below:-
“2. The Government has now decided to introduce a 'Land
Pooling Scheme' whereby the landowners are given an option to
become partners in the development process. The land owners
whose land is acquired for the development of residential sectors
will have the option either to accept the compensation in
monetary terms as available under the Land Acquisition Act
alongwith non statutory benefits under R & R policy or to seek
the compensation in the form of developed plots as full and final
settlement. The salient features of this Land Pooling Scheme are
as follows:
3. Applicability
(i) The Land Pooling Scheme shall be applicable in respect
of acquisition proceedings initiated for the purposes of
development of residential sectors pursuant to this Notification
and shall take effect from the date of its Notification in the
Official Gazette.
(ii) A one-time opportunity of exercise of option under this
scheme shall also be available to the landowners in respect of the
current acquisition proceedings for aforesaid purposes where
Notifications under Section 4 or Section 6 of the Act have been
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -6 -

other connected matters


issued and the period available for announcement of the Award
is four months or more. The landowners will be required to
exercise their option in writing on prescribed application form
(Appendix-2) within a period of 60 days of the issue of this
Notification.
(iii) The landowner(s) would be eligible to participate in the
Land Pooling Scheme only if a minimum of 1000 sq yards or
more of his/their land is acquired.
4. Procedure
(i) The option for the Land Pooling Scheme, except in cases
covered under 1(ii), will have to be exercised by the
landowner(s) in writing in the prescribed form (Appendix-2)
within a period of four(4) months of the publication of Section 4
Notification.
5. Scheme
(i) The landowner(s) opting for the Land Pooling Scheme
will be provided developed residential site in the form of
residential plots measuring 1000 sq. yards and commercial site
measuring 100 sq yards against each one acre of land acquired
or in the same proportion for the land acquired in lieu of the
compensation package and all other benefits admissible under
the R & R Policy' of the Government, at the time of first
floatation of the residential sector for which land of the applicant
has been acquired;
(ii) The applicant can also claim the amount in lieu thereof
for the entitled developed land at the allotment rates applicable
at the time of first floatation of the residential sector;
(iii) The landowner(s), who opt(s) for the Land Pooling
Scheme, will also have the option to request for payment of a
part amount upfront at the time of Award as per floor rates as
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -7 -

other connected matters


applicable to the area and seek developed plots as per
entitlement at 5(i) above. The different sub-set of options under
this option will be as under:
(a) The landowner may request for allotment of developed
land as per his entitlement at the time of first floatation
on refund of the amount availed earlier at the time of
Award, along with interest calculated @ 9% per annum,
to the acquiring agency of the Government;
OR
(b) The landowner may opt for allotment of developed land
against balance amount as per his entitlement i.e. after
adjustment of the advance amount paid to him along with
interest thereon computed @ 9% per annum. In this case,
his entitlement for the developed land shall be worked out
on the basis of allotment price determined at the time of
first floatation;
OR
(c) The landowner may opt for payment of the balance
amount after adjustment of the amount paid in advance
along with interest thereon computed @ 9% per annum.
His entitlement for the balance amount shall be worked
out on the basis of allotment price determined at the time
of first floatation.
6. The Landowner shall also have the option to opt for the
'Land Pooling Scheme' in respect of part of his land being
acquired and accept 'compensation package along with the R &
R Benefits' in respect of the balance land provided:
(a) The minimum land being acquired is one acre; and
(b) The option for the 'Land Pooling Scheme' and the
'Compensation along with R & R Benefits' is split in the ratio of
50:50 of his land being acquired.
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -8 -

other connected matters


7. In case of those owners where the land acquired is less
than one acre, the developed sites/plots will be given in
proportion to the land acquired.
8. Allotment of plots shall be of standard size as per norms
of Haryana Urban Development Authority.
9. Other Important Conditions:
(i) In case the owners are co-sharers in the acquired land,
the plots/sites will be allotted in proportion to the share of each
of the co-sharer. However, where such proportion is less than the
standard size of the plot/site, the owners will be eligible either to
have a plot in their joint name or seek monetary benefits in
accordance with their share.
(ii) The developed land will be allotted to the eligible
landowners as per their entitlements through draw of lots from
among the applications received from the landowners opting for
the scheme.
(iii) Plots will be transferred on freehold basis and will be
governed by the rules and regulations of HUDA. There will be no
upper limit for the beneficiary landowner under the scheme for
utilisation or sale of his developed sites. However, any
subsequent purchaser of land shall be governed by the HUDA
policies as applicable from time to time and time limit for
construction shall also be applicable for subsequent buyers as
per HUDA policy. The land use in respect of such land shall
remain residential' or 'Commercial' as the case may be and shall
not change under any circumstances.
(iv) The Award in respect of the land pooled under this
Scheme shall be announced by the Land Acquisition Collector
under Section 11 (2) read with sub-sections (3) and (4) of Section
31 of the Land Acquisition Act, 1894.
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -9 -

other connected matters


(v) Wherever the entitlement of developed land is in fraction
of the standard sizes of residential/commercial plots, the
landowner will be compensated in monetary terms for such
fraction.
(vi) The Haryana Urban Development Authority shall execute
conveyance deeds in favour of the landowners opting for the
Land Pooling Scheme as per their entitlement/allotment of
developed land for which no Stamp Duty and Registration Fee
shall be payable.”
5. Learned Senior Counsel for the petitioners argued that the intent
behind the ‘Land Pooling Scheme’ was to make the landowners as partners
in the development process and to prevent long winding litigation pursuant
to acquisition of land and the scheme emanated from Section 11(2) of the
Act of 1894.
6. It is the case of the petitioners that they had applied under the
‘Land Pooling Scheme’ within the prescribed period of 60 days from the
issuance of notification dated 10.09.2012 and opted for the developed land
as per their entitlement at the time of first flotation of the Estate/Township
and further agreed to accept the cash or deposit the cash amount, calculated
at the time of first flotation in respect of the land in excess of entitlement as
per the Scheme vis-à-vis the standard size of the plot of land allotted.
Pursuant to notification dated 10.09.2012, the petitioners had applied under
Clause 3(ii) of the ‘Land Pooling Scheme’ and had submitted their
applications before the Land Acquisition Officer, Bahadurgarh. After the
announcement of the Award dated 23.08.2013, the petitioners were paid
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -10 -

other connected matters


Rs.42 lakhs each, vide cheques dated 10.09.2013 in terms of Clause 5(iii) of
the Scheme as payment of part amount upfront as per floor rates applicable
to the area.
7. It was further argued that the petitioners, after a considerably
long waiting period, vide representation dated 22.07.2021, requested the
Chief Administrator, Haryana Urban Development Authority [now Haryana
Shehri Vikas Pradhikarn (HSVP in short)] for allocating plots under the
‘Land Pooling Scheme, 2013’. Pursuant thereto, the Administrator, HSVP,
Rohtak, vide impugned letter dated 18.02.2022, informed the Director,
Urban Estate, Panchkula that none of the petitioners had submitted their
application forms within the time limit of 60 days from the issuance of the
notification, exercising their rights under the ‘Land Pooling Scheme’ and
thus the petitioners had failed to exercise their option within the stipulated
period.
8. It is only thereafter that the petitioners realized that their claim
under the ‘Land Pooling Scheme’ had been declined by the Respondent-
Authorities despite the fact that the options had been exercised within the
stipulated period and thereafter the petitioners had even received the upfront
amount. The petitioners have thus approached this Court seeking directions
to the respondents to allot developed residential and commercial plots under
the ‘Land Pooling Scheme’ notified on 10.09.2012 in lieu of their acquired
land.
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -11 -

other connected matters


9. Respondents disputed the claim of the petitioners on the ground
that their applications were submitted after the expiry of the period of 60
days, as provided under the Scheme i.e. after 09.11.2012. The respondents
vehemently argued that the case of the petitioners fell under Clause 3(ii) as a
one-time opportunity to exercise of option under the scheme and they were
required to exercise their option in writing on prescribed application form
(Appendix-2) within a period of 60 days of the issuance of the notification
and thus, were required to submit their option forms on or before
09.11.2012. The failure of the petitioners to deposit their option forms
within the requisite period disentitled them from any benefit under the ‘Land
Pooling Scheme’.
10. Disputing the claim of the respondents, Learned Senior Counsel
for the petitioners had relied upon copies of the original applications
submitted by the petitioners which were claimed to have been submitted on
09.11.2012. The said copies of the original applications bore
acknowledgement receipts dated 09.11.2012. Thus, this Court on 09.09.2026
passed the following order: -
“Patwari-Ravinder from the office of Land Acquisition
Collector, Bahadurgarh has appeared and has brought the
record which contains only photocopy of the applications which
have been submitted by the petitioners under the Land Pooling
Scheme. It is stated by him that the original record is with the
Estate Officer, HSVP, Bahadurgarh.
The respondents are directed to produce the original record
of the landowners, more so, the petitioners, which has the
original applications filed by the landowners including the
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -12 -

other connected matters


petitioners under the Land Pooling Scheme, with respect to
residential Sector-6 Part, Jhajjar for which the award was
announced on 23.08.2013. The complete record including the
original record of the undertakings given and the
acknowledgments of the said applications would be produced.
The relevant diary register be also produced.
The Land Acquisition Collector, Rohtak as well as the
Estate Officer, HSVP, Bahadurgarh, are directed to be present in
person in the Court tomorrow along with the said record.”
11. Pursuant thereto, the original record from the office of the
Estate Office, HSVP, Bahadurgarh, was produced in court. The same was
perused and thereafter, the Estate Officer, HSVP Bahadurgarh, made a
statement that as per the original record, the petitioners in CWP-18425-
2023; CWP-18455-2023; CWP-18797-2023 CWP-14176-2025 and CWP-
18927-2025 had submitted their option forms for the land pooling scheme in
time as the acknowledgements were dated 09.11.2012 and therefore, their
cases were covered under the Land Pooling Scheme and would be
considered thereunder. The said statement is taken on record as 'Mark A'
12. Under the ‘Land Pooling Scheme’ Appendix-1 thereto provided
Para 4(i), where under, the landowners were required to exercise their option
under the ‘Land Pooling Scheme’ in writing in the application form
prescribed in Appendix-2 along with an undertaking, which reads as follows:
“ UNDERTAKING
Verified that I/We have exercised the option to become
partners under the 'Land Pooling Scheme' and further options
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -13 -

other connected matters


exercised there under after complete understanding of the
Scheme and its provisions. without any pressure or persuasion by
any other person or authority and these options are irrevocable.
The contents of paragraphs 1 to 4 of my above application are
true and correct to the best of my/our knowledge and belief and
which I/We believe to be correct. No part of it is false and
nothing material has been concealed therein. I/ We undertake to
abide by our options exercised in this application in accordance
with the provision of the Land Pooling Scheme of the
Government.
I/We also undertake that after allotment of developed plots
under the Land Pooling Scheme. I/We will inform HUDA about
the sale of plot before entering into sale agreement with any
purchaser (transferee) and shall incorporate appropriate
conditions in the sale agreement making it mandatory for the
purchaser to (i) get his/her name entered in the HUDA record by
presenting a certified copy of registered sale deed to the
concerned Estate Officer of HUDA within 90 days of
registration; and (ii) to be bound by the conditions of allotment
letter that would be issued by HUDA and the HUDA policies/
time limit for construction as applicable from time to time.
(Landowner/Name/Signature)
Witness: _____________”
13. The aforesaid undertaking was followed by verification and
acknowledgement by the respondent authorities, which reads as under:-
“ Verification
The details of land of the applicants herein, as mentioned
in para 1 and para 3.1 of this application, which is being
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -14 -

other connected matters


acquired by the Urban Estates Department, are certified to be
correct as per the latest revenue records/ mutations/ sale deeds
available in this office.
(Revenue Tehsildar / Naib Tehsildar concerned)
Acknowledgement
This is to acknowledge that S/Sh.
________________have submitted their application for
becoming partners under the Land Pooling Scheme in respect of
their land measuring _____ Kanal ____ Marla, situated in
village _____________, forming part of Section 4 Notification
dated ________ issued for a public purpose Le development of
residential sector ______ at ______. This receipt is issued
acknowledgment of the said application.

Dated: (Land Acquisition
Collector_____)

(Estate Officer,
HUDA________)”
A perusal of the copies of the original applications submitted by the
petitioners in CWP-18425-2023; CWP-18455-2023; CWP-18797-2023
CWP-14176-2025 and CWP-18927-2025 exercising their options under the
‘Land Pooling Scheme’ reveals that the same were verified/acknowledged
by the respondent authorities on 09.11.2012 i.e. within the time period of 60
days from the date of notification of the ‘Land Pooling Scheme’. Thus, the
same could not have been said to be delayed. After perusal of the original
NARESH KUMAR record and in view of the statement of the Estate Officer, HSVP Bhadurgarh
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -15 -

other connected matters


dated 10.09.2026, there remains no impediment in accepting the claim of the
petitioners and thus, the aforesaid writ petitions i.e. CWP-18425-2023;
CWP-18455-2023; CWP-18797-2023 CWP-14176-2025 and CWP-18927-
2025 deserve to be allowed.
14. Learned Senior Counsel vehemently contended that the
remaining Petitioners had also submitted their Option Forms within the
stipulated period. Perusal of the original record revealed certain
discrepancies regarding the date of receipt of the Option Forms, inasmuch
as, the dates as mentioned in the acknowledgement forms and the Diary &
Dispatch Register maintained by the Respondent-Authorities did not match.
Thus, the contention of the respondent-authorities regarding delayed
submission of the Option Forms could not be accepted. The case of the
remaining petitioners i.e. petitioners in CWP-18467-2023, CWP-18860-
2023 and CWP-19506-2023 is that they had also submitted the applications
in time and the same is also evident from the fact that the Respondent-
Authorities had paid the Rs. 42 lakhs through cheques towards payment of
the upfront amount under the ‘Land Pooling Scheme’.
15. We have heard learned Senior Counsel for the petitioners as
well as learned Counsel for the respondents and have gone through the
record.
16. Undisputed position which emerges is that the land of the
petitioners was acquired for public purpose i.e. development of residential,
NARESH KUMAR and commercial Sector-6 Part Jhajjar, vide Notification dated 11.04.2011
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -16 -

other connected matters


under Section 4 of the Act of 1894 and a Declaration dated 10.04.2012 under
Section 6 of the Act of 1894 and pursuant thereto, the Award No.5 dated
23.08.2013 was announced by the respondent authorities. The State had
floated the ‘Land Pooling Scheme’ on 10.09.2012 and pursuant thereto, the
petitioners had exercised their option under the ‘Land Pooling Scheme’ and
had given up their claim for compensation and other statutory benefits under
the Act of 1894, 33 years Annuity and the benefits under the R&R Scheme.
It is also not disputed that after the announcement of the Award on
23.08.2013, the petitioners were paid upfront money amounting to Rs.42
lakhs, vide cheque dated 12.09.2013. Furthermore, the respondent-State had
failed to give any plausible explanation for making the payment of amount
of Rs.42 lakhs to the petitioners after the passing of the Award.
17. The position which thus emerges is that the petitioners had
applied under the ‘Land Pooling Scheme’ and exercised their option in terms
of Clause 5(iii) thereof. The very fact that the respondents vide cheques
dated 12.09.2013 paid Rs.42 lakhs to the petitioners would show that after
the exercise of option by the landowners, the respondent authorities in
furtherance of the option exercised by the petitioners made payment in lieu
of compensation which would act as a loan to the landowners till allotment
of plots as per their entitlement after the first flotation of the sectors. It is an
admitted stand of the respondents that the sector has not yet been floated.
18. Thus, it is clear that on the basis of the unambiguous promise of
the respondent authorities to provide developed sites to the landowners
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -17 -

other connected matters


whose land had been acquired, the said landowners altered their position by
neither taking compensation under the Act of 1894 nor other statutory
benefits nor the benefits under the R&R Scheme. Thus, the respondent
authorities could not have gone back on their promise to deny the benefit of
the ‘Land Pooling Scheme’ to the petitioners/landowners.
19. The Hon’ble Supreme Court in the case of “State of Himachal
Pradesh and others Vs. M/s Kundlas Loh Udyog, reported as 2026 INSC
534 , reviewed the law on the doctrine of promissory estoppel and held as
under: -
“ xxx xxx xxx
58. Furthermore, in a recent decision of this Court in IFGL
Refractories Ltd. v. Orissa State Financial Corporation, reported in
2026 SCC OnLine SC 28, wherein one of us, J.B. Pardiwala, J., was
part of the Bench had occasion to consider the doctrine of promissory
estoppel at considerable length. This Court in IFGL Refractories Ltd.
(supra) considered the following authorities:-
(a) Motilal Padampat Sugar Mills Co. Ltd. v. State of U.P.,
reported in (1979) 2 SCC 409;
(b) Pawan Alloys & Casting (P) Ltd. v. U.P. State Electricity
Board, reported in (1997) 7 SCC 251;
(c) Gujarat State Financial Corpn. v. Lotus Hotels (P) Ltd.,
reported in (1983) 3 SCC 379;
(d) Tata Metals and Strips Ltd. v. State of Gujarat, reported in
1991 SCC OnLine Guj 220;
(e) Camma Textile Industries v. State of Orissa, reported in 1994
SCC OnLine Ori 207; and
(f) The State of Jharkhand and Ors. v. Brahmputra Metallics Ltd,
Ranchi and anr., reported in (2023) 10 SCC 634.
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -18 -

other connected matters


59. Upon a conspectus of the above authorities discussed
in IFGL Refractories Ltd. (supra) and other cases as dealt above, the
following principles governing the doctrine of promissory estoppel
may be regarded as well-settled:
(i) The doctrine of promissory estoppel is a principle
evolved by equity to avoid injustice. It operates not in the realm of
contract, nor within the technical confines of estoppel under the law of
evidence, but upon the broader considerations of fairness, justice and
good conscience;
(ii) Where one party, by words or conduct, makes to
another a clear, unequivocal and unambiguous promise, intended to
create legal relations or affect a legal relationship to arise in the
future, knowing or intending that it would be acted upon, and it is in
fact so acted upon, the promise becomes binding upon the promisor;
(iii) The doctrine of promissory estoppel is a doctrine
whose foundation is that an unconscionable departure by one party
from the subject matter of an assumption which may be of fact or law,
present or future, and which has been adopted by the other party as
the basis of some course of conduct, act or omission, should not be
allowed to pass muster. And the relief to be given in cases involving
the doctrine of promissory estoppels contains a degree of flexibility
which would ultimately render justice to the aggrieved party;
(iv) The doctrine is not merely defensive in nature. Under
Indian law, it may itself furnish a cause of action and can be
affirmatively enforced where equity so requires;
(v) It is not necessary, in order to attract the doctrine, that
the promisee should prove actual detriment. It is sufficient that the
promisee has altered his position, acting in reliance upon the
promise;
(vi) The alteration of position may consist in making
substantial investments, incurring liabilities, establishing industrial
infrastructure, entering into agreements, or otherwise rearranging
one's affairs on the faith of the representation;
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -19 -

other connected matters


(vii) The doctrine applies with full force against the State,
its departments, statutory corporations and instrumentalities,
including authorities falling within Article 12 of the Constitution,
which cannot arbitrarily resile from a solemn representation upon
which another has acted;
(viii) Where the State or its instrumentalities frame
industrial or fiscal incentive schemes with the avowed object of
attracting investment and establishing industries, the representations
contained therein are intended to induce entrepreneurs to act upon
them, and such representations are enforceable. Once an
entrepreneur, relying upon such representation, establishes an
industrial unit, commences commercial production, or otherwise
satisfies the eligibility conditions during the currency of the scheme,
and the State agencies recognise them as being eligible, the promise
crystallises, and an enforceable equity arises in its favour. Whether a
benefit has accrued or not in such cases depends on the facts and
circumstances of each case;
(ix) The grant of an exemption, concession or incentive
under a statutory scheme is ordinarily defeasible, and the Government
is competent to modify or revoke the same in exercise of the very
power under which it was granted. Thus, what is granted can
ordinarily be withdrawn. However, the Government may be precluded
from doing so on the ground of promissory estoppel, which principle
itself remains subject to considerations of equity and public interest.
(x) Where a specific sanction or approval of incentive, or
eligibility certificate has been issued in favour of an individual
enterprise, and the enterprise has acted thereon by making a
substantial investment, the promisor is all the more firmly bound by its
representation;
(xi) The doctrine rests upon the larger constitutional
principle that State action must be fair, non-arbitrary, and consistent;
governmental assurances are not empty declarations, but solemn
representations on the faith of which citizens regulate their affairs;
and
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -20 -

other connected matters


(xii) The ultimate object of the doctrine is to prevent
manifest injustice and to ensure that a party, particularly the State,
does not act inconsistently to the prejudice of one who has relied upon
its promise and altered his position irretrievably.”
20. The Hon’ble Supreme Court in the case of “ Lalaram and
others Vs. Jaipur Development Authority & Anr.”, reported as 2016(11)
SCC 31, observed as follows:-
“xxx xxx xxx xxx
111. Having regard to the progression of events pertaining
to the decision of allotment of developed land and the conscious
initiatives taken by the State Government in furtherance thereof, it is
impossible as well as impermissible to conclude, that it had
remained unaware thereof. The land of the appellants had been
compulsorily acquired, in the exercise of the State's power of
eminent domain by invoking an expropriatory legislation. Admittedly
as well, the compensation as guaranteed by the Reference Court for
the land has not been paid to them. To reiterate, the facts
demonstrate that the State Government had taken a pre-meditated
decision to allot developed land to the land oustees in lieu of
compensation. As per the successive circulars including the one
dated 13.12.2001, it was incumbent on the State Government to allot
developed land with all the essential attributes thereof. As is
apparent from the order dated 7.5.2015 of this Court, the plots
offered to the appellants till now are not developed. The land had
been acquired in the year 1981 and more than three decades have
elapsed. In our view, the delay cannot be attributed to the appellants
for the obvious failure of the State Government to allot developed
land in lieu of compensation as represented.
xxx xxx xxx xxx
122. The right to property though no longer a fundamental
right is otherwise a zealous possession of which one cannot be
divested save by the authority of law as is enjoined by Article 300A
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -21 -

other connected matters


of the Constitution of India. Any callous inaction or apathy of the
State and its instrumentalities, in securing just compensation would
amount to dereliction of a constitutional duty, justifying issuance of
writ of mandamus for appropriate remedial directions.
xxx xxx xxx xxx
127. In summa, the right to property having been elevated
to the status of human rights, it is inherent in every individual, and
thus has to be venerably acknowledged and can, by no means, be
belittled or trivialized by adopting an unconcerned and nonchalant
disposition by anyone, far less the State, after compulsorily
acquiring his land by invoking an expropriatory legislative
mechanism. The judicial mandate of human rights dimension, thus,
makes it incumbent on the State to solemnly respond to its
constitutional obligation to guarantee that a land looser is
adequately compensated. The proposition does not admit of any
compromise or laxity.
128. Added to this, is the promissory estoppel perspective,
the State being the promisor. Estoppel is a rule of equity which has
entrenched itself with time in the domain of public life. A new class
of estoppel recognised as "promissory estoppel" has assumed
considerable significance in the recent years. So far as this Court is
concerned, it invoked the doctrine in Anglo Afghan Agencies
(supra) in which it was enounced that even if a case would not fall
within the purview of section 115 of the Indian Evidence Act, 1872, it
would still be open to a party, who had acted on a representation
made by the Government, to claim that it should be bound to carry
out the promise made by it, even though the promise was not
recorded in the form of a formal contract as required by Article 299
of the Constitution of India. This principle, evolved by equity, to
avoid injustice is traceable as well in the leading case on the subject
in Central London Property Trust Ltd. V. High Trees House
Ltd.(1947) 1 KB 130.
129. In a later decision of this Court in Motilal Padampat
Sugar Mills Co. (supra), responding to the plea of the State
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -22 -

other connected matters


Government, inter alia, that there could be no promissory estoppel
against it, so as to inhibit it from formulating and implementing its
policies in public interest, this Court underlined, in reiteration, the
well-known preconditions for the operation of the doctrine as
under:-
(1) A clear and unequivocal promise, knowing and
intending that it would be acted upon by the promise;
(2) On such acting upon the promise by the promise, it
would be inequitable to allow the promisor to go back on the
promise.
130. This Court in Nestle India Limited (supra), while
referring to the decision of Motilal Padampat Sugar Mills (supra)
quoted para 24 of that judgment to the effect that the Government
stood on the same footing as a private individual so far as the
obligation in law was concerned and that the former was equally
bound as the latter and it was difficult to see on what principle,
could a Government, committed to the rule of law, claim immunity
from the doctrine of promissory estoppel.
131. This hallowed notion of equitable estoppel has stood
the test of time with peripheral variations to reverberate in the
following exposition in Monnet Ispat (supra) in the following terms:
182.1 Where one party has by his words or conduct
made to the other a clear and unequivocal promise which is
intended to create legal relations of affect a legal relationship
to arise in the future, knowing or intending that it would be
acted upon by the other party to whom the promise is made and
it is, in fact, so acted upon by the other party, the promise
would be binding on the party making it and he would not be
entitled to go back upon it, if it would be inequitable to allow
him to do so having regard to the dealings which have taken
place between the parties, and this would be so irrespective of
whether there is any pre-existing relationship between the
parties or not.
182.2 The doctrine of promissory estoppels may be
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -23 -

other connected matters


applied against the Government where the interest of justice,
morality and common fairness dictate such a course. The
doctrine is applicable against the State even in its
governmental, public or sovereign capacity where it is
necessary to present fraud or manifest injustice. However, the
Government or even a private party under the doctrine of
promissory estoppels cannot be asked to do an act prohibited in
law. The nature and function which the Government
discharges is not very relevant. The Government is subject to
the rule of promissory estoppels and if the essential ingredients
of this doctrine are satisfied, the Government can be compelled
to carry out the promise made by it.
132. Adding a caveat to the State Government otherwise
inescapably bound by the doctrine, this Court in S.V.A. Steel Re-
Rolling Mills (supra) ruled that before extending benefits to its
subjects by laying down any policy, it must ponder over the pros and
cons thereof and its capacity to accord the same, as it would be
unfair and immoral on its part thereafter, not to act as per its
promise.
133. A parallel doctrine founded on the doctrine of fairness
and natural justice baptised as "legitimate expectation" has grown
as well in the firmament of administrative law to ensure the
predication of fairness in State action. The concept of "legitimate
expectation" is elaborated in Halsbury’s Laws of England, Fourth
Edition , Volume 1(1) 151 as hereunder:
“81. Legitimate expectations:-A person may have a
legitimate expectation of being treated in a certain way by an
administrative authority even though he has no legal right in
private law to receive such treatment. The expectation may
arise either from a representation or promise made by the
authority, including an implied representation, or from
consistent past practice.
The existence of a legitimate expectation may have a
number of different consequences; it may give locus standi to
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -24 -

other connected matters


seek leave to apply for judicial review; it may mean that the
authority ought not to act so as to defeat the expectation
without some overriding reason of public policy to justify its
doing so: or it may mean that, it the authority proposes to
defeat a person’s legitimate expectation, it must afford him an
opportunity to make representations on the matter. The courts
also distinguish, for example in licensing cases, between
original applications, applications to renew and revocations; a
party who has been granted a license may have a legitimate
expectation that it will be renewed unless there is some good
reason not to do so, and may therefore be entitled to greater
procedural protection than a mere applicant for a grant.”
134. In espousing this equitable notion of exacting
fairness in governmental dealings, this Court in Food Corporation
of India (supra) proclaimed that there was no unfettered discretion
in public law and that a sovereign authority possessed powers only
to use them for public good. Observing that the investiture of such
power imposes with it, the duty to act fairly and to adopt a procedure
which is 'fair play in action', it was underlined that it also raises a
reasonable or legitimate expectation in every citizen to be treated
fairly in his dealings with the State and its instrumentalities.
135. The observance of this obligation as a part of good
administration, is obligated by the requirement of non-arbitrariness
in a state action, which as a corollary, makes it incumbent on the
State to consider and give due weight to the reasonable or legitimate
expectations of the persons, likely to be affected by the decision, so
much so that any failure to do so would proclaim unfairness in the
exercise of power, thus vitiating the decision by its abuse or lack of
bona fide. The besieged decision would then be exposed to the
challenge on the ground of arbitrariness. It was propounded that
mere reasonable or legitimate expectation of a citizen, may not by
itself be a distinct enforceable right in all circumstances, but the
failure to consider and give due weight to it, may render the decision
arbitrary. It was thus, set down that the requirement of due
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -25 -

other connected matters


consideration of legitimate expectation formed a part of the principle
of non-arbitrariness, a necessary concomitant of the rule of law. In
reiteration to the above enunciation, this Court in Monnet Ispat
(supra) did rule as well, that the doctrine of legitimate expectation is
founded on the principle of reasonableness and fairness and arises
out of the principles of natural justice and can be invoked as a
substantive and enforceable right.
xxx xxx xxx xxx
140. Dwelling upon the constitutional imperative of
fairness in State action in Noida Entrepreneurs Association v.
Noida and others (2011)6 SCC 508 , this Court revisited the
dynamics of the interplay between administrative power and
discretion vis-a-vis public duty accompanying the same. Underlying
the essentiality of non-arbitrariness and transparency in executive
functioning as a guarantee of certitude and probity, it was observed
thus:
“39: State actions are required to be non-arbitrary and
justified on the touchstone of Article 14 of the Constitution.
Action of the State or its instrumentality must be in conformity
with some principle which meets the test of reason and
relevance. Functioning of a “democratic form of Government
demands equality and absence of arbitrariness and
discrimination.” The rule of law prohibits arbitrary action and
commands the authority concerned to act in accordance with
law. Every action of the State or its instrumentalities should
neither be suggestive of discrimination, nor even apparently
give an impression of bias, favouritism and nepotism. If a
decision is taken without any principle or without any rule, it is
unpredictable and such a decision is antithesis to the decision
taken in accordance with the rule of law.
40: The public trust doctrine is a part of the law of the
land. The doctrine has grown from Article 21 of the
Constitution. In essence, the action/order of the State of State
instrumentality would stand vitiated if it lacks bona fides, as it
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -26 -

other connected matters


would only be a case of colourable exercise of power. The rule
of law is the foundation of a democratic society. [Vide Erusian
Equipment & Chemicals Ltd. V.State of W.B., Ramana
Dayaram Shetty v. International Airport Authority of India,
Haji T.M.Hassan Rawther v. Kerala Financial Corpn,
Shrilekha Vidyarthi v. State of U.P and M.I.Builders(P) Ltd.
V. Radhey Shyam Sahu.]
41: Power vested by the State in a public authority
should be viewed as a trust coupled with duty to be exercised in
larger public and social interest.Power is to be exercised
strictly adhering to the statutory provisions and fact situation
of a case. “Public authorities cannot play fast and loose with
the powers vested in them.” A decision taken in an arbitrary
manner contradicts the principle of legitimate expectation. An
authority is under a legal obligation to exercise the power
reasonably and in good faith to effectuate the purpose for
which power stood conferred. In this context, "in good faith"
means "for legitimate reasons". It must be exercised bona fide
for the purpose and for none other. [Vide Commr. Of Police v.
Gordhandas Bhanji, Sirsi Municipality v. Cecelia Kom
Francis Tellis, State of Punjab vs. Gurdial Singh, Collector
(District Magistrate) v. Raja Ram Jaiswal, Delhi Admn. V.
Manohar Lal and N.D.Jayal v. Union of India.]
141. In the overall perspectives, in our discernment, the
respondents have utterly failed to abide by a public policy upon
which, the appellant had altered their position and had suffered
immense prejudice. The persistent denial to the appellants of their
right to the developed land in lieu of compensation and that too
without any legally acceptable justification, has ensued in manifest
injustice to the appellants over the years. Neither have they been
paid just compensation for the land acquired nor have they been
provided with the developed land in place thereof, as assured. They
are thus predominantly entitled for the remedial intervention of this
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -27 -

other connected matters


court to ensure fair, just, efficacious, tangible and consummate relief
in realistic terms. If fairness is an indispensable and innate
constituent of natural justice, this imperative indubitably has to
inform as well the judicial remedy comprehended. In the
overwhelming factual scenario, as obtains in the instant case refusal
to grant the relief to which they are entitled, would amount to
perpetuation of gross illegality, unjustness and unfairness meted out
to them. The textual facts demand an appropriate response of the
judicial process to effectuate the guarantee of justice, engrafted in
the preamble of the Constitution reinforced by the canons of equity.”

21. Thus, it is clear that the respondent authorities were bound by
the principle of promissory estoppel especially as legitimate expectations
had arisen in the minds of the petitioners after receiving the upfront amount.
22. In view of the aforesaid facts and circumstances, the claims of
the petitioners warrant acceptance and the writ petitions deserve to be
allowed for the following reasons:-
(i) The respondent-HSVP has claimed the Land Pooling Scheme to
be a welfare scheme. In the aforesaid backdrop and considering the
objects of the scheme being to protect the interest of land owners by
making them partners in development and extending the benefit of the
scheme to the land owners who have been divested of their
Proprietary Rights by the State by exercising its power of eminent
domain, the petitioners eminently qualify for the said Scheme. Clause
2(i) of the Scheme shows that the land owner would have the choice,
upon notification of his land for acquisition, to opt for developed land
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -28 -

other connected matters


measuring 1200 square yards for each acre of land proposed to be
acquired “in lieu of the compensation package and all other benefits
admissible under the R & R policy of the Government”. It is thus
evident that the Land Pooling Scheme has been projected as an
improvement over the R & R policy and that having exercised the
option, benefits only under the scheme are admissible to the land
owners. Where however, the land holding under acquisition is bigger
than one Acre, the land owner has been given the choice to opt partly
under the Land Pooling Scheme and to accept compensation along
with the R & R benefits against the balance land.
(ii) The stand of the respondents that the petitioners failed to apply
within the prescribed time limit falls flat on its face in view of the
perusal of the original record, which shows that the applications had
been submitted and verified and acknowledged by the respondent
authorities within the prescribed time limit of 60 days in CWP-18425-
2023; CWP-18455-2023; CWP-18797-2023 CWP-14176-2025 and
CWP-18927-2025 and thus, the stand of the respondents for denying
the claim of the petitioners that their applications were beyond the
prescribed time limit is completely fallacious.
(iii) The remaining petitioners i.e. in CWP-18467-2023, CWP-
18860-2023 and CWP-19506-2023, altered their position to their
detriment on the basis of the assurance of the respondents for
allotment of developed plots under the ‘Land Pooling Scheme’,
inasmuch as, the petitioners neither took any compensation for the
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -29 -

other connected matters


compulsory acquisition of their land nor received 33 years annuity nor
any benefit under the R&R Scheme of the respondent authorities. It is
not even the case of the respondents that the compensation for the
compulsorily acquired land was ever offered to the petitioners. Thus,
the respondents are bound by the principle of promissory estoppel and
now cannot be allowed to deny the benefit of the ‘Land Pooling
Scheme’ to the petitioners as they had altered their position, on
account of the act of the respondents.
(iv) The petitioners, who applied for the Land Pooling Scheme,
which was floated by the respondents-State, had a legitimate
expectation that on account of being divested of their proprietary
rights due to compulsory acquisition of their land, that they would
become partners of the State in developed land pursuant to the
provisions of the Land Pooling Scheme. It was incumbent upon the
respondent-State, being a welfare State, to fulfill the Legitimate
Expectation of the petitioners especially in light of the fact that the
petitioners had foregone all the other benefits on account of
compulsory acquisition of their land i.e. compensation under the Act
of 1894, 33 years annuity and the benefits available under the R&R
Scheme. Thus, the action of the respondents in denying the claim of
the petitioners under the Land Pooling Scheme cannot be sustained.
(v) No financial or monetary loss would be caused to the State in
case the petitioners are allotted developed plots even today, inasmuch
as, the Respondents would receive back the upfront amount paid to
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -30 -

other connected matters


the petitioners with 9% interest and yet further even the developed
sector has not been floated. The Land Pooling Scheme is a
compensatory scheme in lieu of the acquired land in a non-monetary
form. Instead of making payment for the acquired land in terms of
determined value at market prices and benefits under R & R policy,
the land owner is compensated by allotting a developed plot
measuring 1200 sq. yards for each Acre of land acquired. It has further
gone uncontroverted that the monetary compensation for compulsory
acquisition of land has not yet been paid to the petitioners. Hence, the
petitioners have not availed of any compensation and/or benefits
under the R&R policy or the ‘Land Pooling Scheme’ so far. The
HSVP is under statutory obligation to pay the land owners in
accordance with the value of land assessed. A mere change in the
mode of payment viz. from the monetary compensation as awarded to
the ‘Land Pooling Scheme’ does not cause any prejudice to the HSVP.
It is under statutory obligation to compensate the land owners for the
land acquired and the said obligation has to be satisfactorily
discharged.
(vi) It is also apparent that no prejudice has been caused to the
respondent authorities by the delayed submission of option under the
Land Pooling Scheme by the petitioners (if any), inasmuch as, the
respondents-State on account of the exercise of option under the Land
Pooling Scheme by the petitioners saved on the payment of
compensation on account of compulsory acquisition, the payment of
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -31 -

other connected matters


33 years annuity and any other benefits to the petitioners under the
R&R scheme. Furthermore, despite passage of a period of more than
13 years of the passing of the award, even the first flotation has not
taken place. In fact, denial of the benefit under the Land Pooling
Scheme to the petitioners would cause great prejudice to them,
inasmuch as, they have been deprived of their right to compensation
for compulsory acquisition, any enhanced amount of compensation,
payment of annuity of 33 years and other benefits under the R&R
scheme. Thus, the equities would be balanced if the petitioners are
held entitled to the benefits under the Land Pooling Scheme.
(vii) Petitioners, whose land was compulsorily acquired by the
respondents, cannot be left high and dry as the same would amount to
infringement of their rights under Article 300-A of the Constitution of
India. The Hon’ble Supreme Court in the case of “ Bernard Francis
Joseph Vaz and Ors. Vs . Government of Karnataka and others” ,
reported as 2025(7) SCC 580 observed as follows:-
“xxx xxx xxx xxx
45. Recently, this Court in the aforesaid case of Ultra-Tech
Cement Ltd. (supra) observed that the Government as a welfare
State ought to have proactively intervened in the matter with a view
to ensure that the requisite amount towards compensation is paid at
the earliest. It was further observed that the State cannot abdicate its
constitutional and statutory responsibility of payment of
compensation by arguing that its role was limited to initiating
acquisition proceedings. It was, therefore, observed that the delay in
the payment of compensation, in accordance with law, to the
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -32 -

other connected matters


landowners after taking away ownership of the subject land from
them is in contravention to the spirit of the constitutional scheme of
Article 300-A and the idea of a welfare State.
46. In the aforesaid case of Ultra-Tech Cement Ltd.
(supra), this Court further observed that acquisition of land for
public purpose is undertaken under the power of eminent domain of
the government much against the wishes of the owners of the land
which gets acquired. It was, therefore, observed that when such a
power is exercised, it is coupled with a bounden duty and obligation
on the part of the government body to ensure that the owners whose
lands get acquired are paid compensation/awarded amount as
declared by the statutory award at the earliest.
47. It will also be appropriate for the purpose of the present
discussion to refer to the judgment of this Court, in the case of K.
Krishna Reddy and others v. Special Deputy Collector, Land
Acquisition Unit II, LMD Karimnagar, Andhra Pradesh, (1988) 4
SCC 163 : 1988 INSC 265, specifically in paragraph 12, observed
thus:
“12. We can very well appreciate the anxiety and need of
claimants to get compensation here and now. No matter what it
is. The lands were acquired as far back in 1977. One decade has
already passed. Now the remand means another round of
litigation. There would be further delay in getting the
compensation. After all money is what money buys. What the
claimants could have bought with the compensation in 1977
cannot do in 1988. Perhaps, not even one half of it. It is a
common experience that the purchasing power of rupee is
dwindling. With rising inflation, the delayed payment may lose
all charms and utility of the compensation. In some cases, the
delay may be detrimental to the interests of claimants. The
Indian agriculturists generally have no avocation. They totally
depend upon land. If uprooted, they will find themselves
nowhere. They are left high and dry. They have no savings to
draw. They have nothing to fall back upon. They know no other
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -33 -

other connected matters


work. They may even face starvation unless rehabilitated. In all
such cases, it is of utmost importance that the award should be
made without delay. The enhanced compensation must be
determined without loss of time. The appellate power of remand,
at any rate ought not to be exercised lightly. It shall not be
resorted to unless the award is wholly unintelligible. It shall not
be exercised unless there is total lack of evidence. If remand is
imperative, and if the claim for enhanced compensation is
tenable, it would be proper for the appellate court to do modest
best to mitigate hardships. The appellate court may direct some
interim payment to claimants subject to adjustment in the
eventual award.”
48. It cannot be gainsaid that the appellants herein have been
deprived of their legitimate dues for almost 22 years ago. It can also
not be controverted that money is what money buys. The value of
money is based on the idea that money can be invested to earn a
return, and that the purchasing power of money decreases over time
due to inflation. What the appellants herein could have bought with
the compensation in 2003 cannot do in 2025. It is, therefore, of
utmost importance that the determination of the award and disbursal
of compensation in case of acquisition of land should be made with
promptitude.”

23. Thus, the petitioners could not have been deprived of their
proprietary rights without adequately compensating them for the same.
24. At this stage, learned senior counsel for the petitioners has
submitted that some of the petitioners wish to return the upfront amount
received by them under the Land Pooling Scheme along with interest at the
rate of 9%, as envisaged under the scheme without prejudice to their rights
under the ‘Land Pooling Scheme’. It is further submitted that the said
petitioners, who wish to return the amount, would submit applications for
NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -34 -

other connected matters


the same along with a demand draft of the upfront amount and interest @
9% up to the date of submitting such an application and the said application
may be disposed of by the respondents in a timely fashion.
25. Learned counsel for the respondents-HSVP, on instructions, has
submitted that they would pursue and dispose of the said applications within
a period of four weeks from the date the application is submitted along with
the draft.
26. In light of the aforesaid discussion and having considered the
submissions raised on behalf of the respective parties and in light of the
pleadings and judicial pronouncements, referred above, the present writ
petitions are allowed with the following directions:-
(i) The petitioners are held eligible/entitled under the ‘Land Pooling
Scheme’ dated 10.09.2012.
(ii) The petitioners would be allotted plots as per their entitlement
and/or payment of money in view of the provisions of the ‘Land
Pooling Scheme’ dated 10.09.2012 in the developed sector on first
flotation, in accordance with law.
(iii) The petitioners, who wish to return the original upfront amount
along with interest, would be at liberty to file an application for
returning the original upfront amount along with interest @ 9% up
to the date of submission of such an application which would be
accompanied by a demand draft of the amount so calculated. The
NARESH KUMAR said application would be considered and positively disposed of by
2026.09.18 15:36
I attest to the accuracy and
integrity of this document

CWP-18425-2020 (O&M) along with -35 -

other connected matters


the competent authority within a period of four weeks from the
date of its submission and no interest would accrue upon the
petitioners after the date of submission of such an application.
Furthermore, it is clarified that the return of the said upfront
amount would not in any way preclude the petitioners from their
rights of allotment of developed plots under the Land Pooling
Scheme at the time of first floatation.
(iv) Respondents shall endeavor to carry out the flotation exercise
expeditiously, as a period of more than 13 years has already
expired after the announcement of the Award.

(VIKAS BAHL) (DIVYA SHARMA)
JUDGE JUDGE



September 10, 2026
naresh.k


Whether reasoned/speaking? Yes
Whether reportable? Yes

NARESH KUMAR
2026.09.18 15:36
I attest to the accuracy and
integrity of this document