Sp Singla Constructions Pvt Ltd vs State Of Jharkhand & Anr.
- Court
- Delhi High Court
- Case type
- Original Misc Petition Misc Commercial
- Decided on
- 01-04-2026
<div> <br /> $~ <br /> <b>* </b> <b>IN THE HIGH COURT OF DELHI AT NEW DELHI </b><br /> % <b><i>Judgment reserved on: 12.03.2026 </i></b><br /> <b><i> Judgment pronounced on: 01.04.2026 </i></b><br /> <b><i> </i></b><br /> + O.M.P.(MISC.)(COMM.) 384/2024, I.A. 10888/2024 (Ex.) & <br /> I.A. 38745/2024 (Stay) <br /> <br /> SP SINGLA CONSTRUCTIONS PVT LTD .....Petitioner <br /> Through: Mr. Anirudh Wadhwa, Mr. <br /> Kartik Gupta and Mr. Vibhu <br /> Pahuja, Advocates. <br /> versus <br /> <br /> STATE OF JHARKHAND & ANR. .....Respondents <br /> Through: Mr. Sachin Kumar, Additional <br /> Advocate General, Mr. Kumar <br /> Anurag Singh and Mr. Zain A. <br /> Khan, Advocates, for <br /> Respondent No. 1. <br /> Ms. Astha Sharma and Mr. <br /> Nikhil Anand, Advocates, for <br /> Respondent No. 2. <br /> <br /> <b>CORAM:</b> <br /> <b>HON'BLE MR. JUSTICE HARISH VAIDYANATHAN </b><br /> <b> </b> <b>SHANKAR</b> <br /> <b> </b><br /> <b>J U D G M E N T </b><br /> <b>HARISH VAIDYANATHAN SHANKAR, J. </b><br /> 1. The present Petition has been instituted under Sub-sections (4) <br /> and (5) of Section 29A of the <b>Arbitration and Conciliation Act, </b><br /> <b>1</b><br /> <b>1996</b> , <i>inter alia</i> , seeking the regularisation of the period commencing <br /> from 03.12.2023 and the grant of a further extension of twelve <br /> <br /> 1<br /> A&C Act <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>1</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> months, or such period as this Court may deem fit and appropriate, for <br /> the continuation of the mandate of the learned Arbitral Tribunal. <b> </b><br /> 2. At the outset, it is noted that Respondent No. 1 has raised a <br /> preliminary objection with respect to the jurisdiction of this Court, <br /> which has been duly contested by the Petitioner. It is evident that, <br /> should the objection as to jurisdiction be sustained in the present <br /> adjudication, the Petition itself would not survive for consideration, <br /> and consequently, the reliefs sought by the Petitioner herein would not <br /> be liable to be granted. <b> </b><br /> <b><i> </i></b><br /> <b><i>BRIEF FACTS: </i></b><br /> 3. Shorn of unnecessary details, the material facts germane to the <br /> institution of the present Petition are set out hereunder: <b> </b><br /> <b>2</b><br /> (a). The parties entered into an <b>Agreement dated 25.05.2019</b> for <br /> the „ <i>Construction of a 4-Lane Elevated Corridor with Cable-</i><br /> <i>Stayed Bridge and Approach Road for Anna Chowk-Gobindpur </i><br /> <i>Bypass Road at Jamshedpur, having a total length of 1540 </i><br /> <i>metres, on EPC mode</i> ‟. <b> </b><br /> (b). Alleging certain breaches on the part of the counterparty, the <br /> Agreement came to be terminated <i>vide</i> Termination Notice <br /> dated 22.10.2020. Consequently, the Petitioner issued a Notice <br /> dated 14.01.2021 under Section 21 of the A&C Act, invoking <br /> arbitration and seeking reference of the disputes to an Arbitral <br /> Tribunal. <br /> (c). In the <i>interregnum</i> , it is the Petitioner‟s case that Respondent <br /> No. 1 failed to release the performance security furnished under <br /> the Agreement. The Petitioner was, therefore, constrained to <br /> <br /> 2<br /> Agreement <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>2</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> seek interim protection by filing a Petition under Section 9 of <br /> the A&C Act. <i>Vide</i> Order dated 27.01.2021, this Court issued <br /> notice in the said Petition and directed maintenance of <i>status </i><br /> <i>quo</i> , till the next date of hearing, i.e., 04.03.2021, in respect of <br /> the Performance Bank Guarantee furnished by the Petitioner for <br /> an amount of Rs. 6,93,85,000/-. <br /> (d). On the next date of hearing, i.e., 04.03.2021, the said Section 9 <br /> Petition came to be withdrawn by the Petitioner on instructions. <br /> (e). Thereafter, <i>vide</i> letter dated 03.06.2022, the <b>Society for </b><br /> <b>3</b><br /> <b>Affordable Redressal of Disputes</b> constituted the learned <br /> Arbitral Tribunal and appointed Mr. Justice Vidya Bhushan <br /> Gupta (Retd.) as the learned Sole Arbitrator to adjudicate the <br /> disputes between the parties. <b> </b><br /> (f). Pursuant thereto, the Petitioner filed its Statement of Claim <br /> before the learned Arbitrator on 30.09.2022. <b> </b><br /> (g). In the meantime, Respondent No. 1 instituted Writ Petition No. <br /> 3609/2022 before the Jharkhand High Court, challenging the <br /> constitution of the learned Arbitral Tribunal. The said writ <br /> petition came to be dismissed as not maintainable <i>vide</i> Order <br /> dated 03.01.2023. The Jharkhand High Court, however, <br /> observed that such a challenge could appropriately be raised <br /> before the learned Arbitral Tribunal by way of an application <br /> under Section 16 of the A&C Act. <b> </b><br /> (h). In light of the aforesaid, Respondent No. 1 filed an application <br /> under Section 16 of the A&C Act on 05.01.2023, which came to <br /> be dismissed by the learned Arbitral Tribunal <i>vide</i> Order dated <br /> 08.08.2023. <b> </b><br /> <br /> 3<br /> SAROD <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>3</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> (i). Thereafter, Respondent No. 1 filed its Statement of Defence and <br /> also preferred counterclaims. The said counterclaims were, <br /> however, dismissed by the learned Arbitrator <i>vide</i> Order dated <br /> 05.10.2023 on account of non-payment of fee. <b> </b><br /> (j). The Petitioner thereafter filed its Rejoinder along with the <br /> Affidavit of Admission and Denial, which were taken on record <br /> on 30.11.2023. <b> </b><br /> (k). Respondent No. 1, in turn, filed its Affidavit of Admission and <br /> Denial on 07.02.2024. <b> </b><br /> (l). On the same date, i.e., 07.02.2024, the learned Arbitral Tribunal <br /> sought the consent of the parties for extension of its mandate by <br /> a further period of six months with effect from 03.12.2023. <br /> However, the learned counsel for Respondent No. 1 submitted <br /> that he would need to seek instructions in this regard. <b> </b><br /> (m). On the subsequent date of hearing, i.e., 05.03.2024, the learned <br /> Arbitral Tribunal directed the Petitioner to file an appropriate <br /> application seeking extension of the Tribunal‟s mandate, in <br /> view of Respondent No. 1‟s continued stand of requiring <br /> instructions. <b> </b><br /> (n). Upon such application being filed, Respondent No. 1 declined <br /> to accord its consent for extension of the mandate of the learned <br /> Arbitral Tribunal, <i>inter alia</i> , on the ground that once the <br /> mandate had lapsed, the same could not be extended by mutual <br /> consent of the parties. <b> </b><br /> 4. In these circumstances, the Petitioner has preferred this Petition <br /> under Section 29A of the A&C Act seeking appropriate orders from <br /> this Court. <b> </b><br /> <b> </b><br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>4</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> <b><i>SUBMISSIONS BY THE PARTIES: </i></b><br /> <b>4</b><br /> 5. Learned <b>Additional Advocate General</b> <b> </b> appearing for <br /> Respondent No. 1-State would raise a preliminary objection as to the <br /> maintainability of the present Petition, contending that the same is not <br /> maintainable before this Court for want of jurisdiction. In support of <br /> this contention, reliance would be placed upon Article/Clause 27 of <br /> the Agreement, being the jurisdiction clause, which unequivocally <br /> stipulates that the courts at Ranchi shall have exclusive jurisdiction in <br /> respect of all matters arising out of or relating to the Agreement. <b> </b><br /> 6. It would be further submitted that Clause 26 of the Agreement, <br /> which governs dispute resolution, and in particular Clause 26.3(ii)(d) <br /> thereof, provides that the venue of arbitration shall be at Ranchi. <br /> According to the learned AAG, a conjoint reading of the aforesaid <br /> clauses clearly establishes that the courts at Ranchi alone would have <br /> territorial jurisdiction to entertain disputes arising between the parties, <br /> thereby excluding the jurisdiction of the courts at Delhi. <b> </b><br /> 7. In order to buttress the aforesaid submissions, learned counsel <br /> for Respondent No. 1 would place reliance upon the judgment of the <br /> <b>5</b><br /> Hon‟ble Supreme Court in <b><i>BGS</i></b> <b> </b> <b><i>SGS SOMA JV v. NHPC</i></b> <i>.</i> <b> </b><br /> 8. <b><i>Per Contra, </i></b> learned counsel appearing for the Petitioner would <br /> submit that the present Petition is maintainable before this Court and <br /> that this Court possesses the requisite territorial jurisdiction to <br /> entertain the same. <b> </b><br /> 9. It would be contended that this Court had, on an earlier <br /> occasion, entertained and adjudicated upon a Petition filed by the <br /> Petitioner under Section 9 of the A&C Act, and in view thereof, it <br /> <br /> 4<br /> AAG <br /> 5<br /> (2020) 4 SCC 234 <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>5</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> would be urged that the objection raised by Respondent No. 1 is <br /> barred by virtue of Section 42 of the A&C Act, which mandates that <br /> once a Court has been approached in relation to an arbitration <br /> agreement, all subsequent applications arising out of the same <br /> agreement must be made before that very Court. <b> </b><br /> 10. It would be further submitted that the reliance placed by the <br /> learned AAG on the exclusive jurisdiction clause, i.e., Clause 27 of <br /> the Agreement, is misplaced. Attention would be drawn by Petitioner <br /> to the Dispute Resolution Clause, particularly Clause 26.3(i), which <br /> provides that disputes not resolved amicably through conciliation shall <br /> be referred to arbitration „ <i>in accordance with the Rules of the Society </i><br /> <i>for Affordable Redressal of Disputes (SAROD)</i> ‟. <b> </b><br /> 11. Learned counsel for the Petitioner would then place reliance <br /> upon Rule 23.1 of the SAROD Rules to contend that the seat of <br /> arbitration is designated as New Delhi. It would thus be argued that, <br /> since the parties have expressly agreed to be governed by the SAROD <br /> Rules, the seat of arbitration as stipulated therein would prevail, <br /> thereby conferring jurisdiction upon the courts at New Delhi. <b> </b><br /> 12. Learned counsel for the Petitioner would further submit that it <br /> is a well-settled principle of law that, in the event of a conflict <br /> between a broad or general exclusive jurisdiction clause and a clause <br /> designating the seat of arbitration, primacy must be accorded to the <br /> latter, and this is for the reason that the designation of the seat of <br /> arbitration carries with it the legal consequence of conferring <br /> exclusive supervisory jurisdiction upon the courts of the seat. <b> </b><br /> 13. In support of this proposition, reliance, by the learned counsel <br /> for the Petitioner, would be placed upon the judgment of the Madras <br /> High Court in <b><i>Balapreetham Guest House (P) Ltd. v. Mypreferred </i></b><br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>6</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> <b>6</b><br /> <b><i>Transformation and Hospitality (P) Ltd.</i></b> , as well as the decisions of <br /> the Coordinate Benches of this Court <b><i>Manmohan Kapani v. Kapani </i></b><br /> <b>7</b><br /> <b><i>Resorts (P) Ltd.</i></b> <b><i> </i></b> and <b><i>Devyani International Ltd. v. Siddhivinayak </i></b><br /> <b>8</b><br /> <b><i>Builders and Developers</i></b> . <b> </b><br /> 14. Learned counsel for the Petitioner, in conclusion, would submit <br /> that in light of the material placed on record, this Court is duly vested <br /> with the jurisdiction to entertain the present Petition, and, therefore, <br /> would pray that the present Petition be allowed and the mandate of the <br /> learned Arbitral Tribunal be extended in terms of the reliefs sought <br /> herein. <b> </b><br /> 15. <b><i>In rebuttal, </i></b> learned AAG for Respondent No. 1 would submit, <br /> on the aspect of the earlier Section 9 Petition relied upon by the <br /> Petitioner, that no adjudication on merits was ever undertaken by this <br /> Court in the said proceedings. It would be contended that the order <br /> passed on the first date of hearing was purely <i>ex parte</i> , rendered in the <br /> absence of and without participation by Respondent No. 1, and <br /> furthermore, the said Petition itself came to be withdrawn on the very <br /> next date of hearing by the Petitioner. <b> </b><br /> 16. In such circumstances, it would be urged by the learned AAG <br /> that there was no adjudication on merits under Section 9 of the A&C <br /> Act. It would further be submitted that a petition which is withdrawn <br /> without adjudication, particularly in the context of arbitration <br /> proceedings, ceases to exist in the eyes of the law and, therefore, <br /> cannot be relied upon to anchor jurisdiction before this Court under <br /> Section 42 of the A&C Act. <b> </b><br /> <br /> 6<br /> (2021) 1 HCC (Mad) 515 <br /> 7<br /> 2023 SCC OnLine Del 1618 <br /> 8<br /> 2017 SCC OnLine Del 11156 <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>7</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> 17. Learned AAG would further submit that the Agreement <br /> executed between the parties does not expressly designate any “seat” <br /> of arbitration. According to him, the Agreement merely stipulates that <br /> disputes, once referred to arbitration, shall be governed by the Rules <br /> of the SAROD, which, in itself, does not <i>ipso facto</i> imply that the seat <br /> indicated in the SAROD Arbitration Rules would automatically <br /> become the juridical seat of arbitration. <b> </b><br /> 18. It would further be contended that there exists a catena of <br /> judicial precedents to the effect that, in the absence of an express <br /> designation of the “seat” in the agreement, the “venue” of arbitration <br /> may, depending on the facts and intention of the parties, be construed <br /> as the seat. <b> </b><br /> 19. Expanding upon the aforesaid submissions, learned AAG would <br /> argue that the Agreement, as consciously executed between the <br /> parties, makes a dual reference to “Ranchi”, <i>first</i> , as the venue of <br /> arbitration, and <i>second</i> , as the place whose courts shall have exclusive <br /> jurisdiction. It would thus be contended that the intention of the <br /> parties is manifest and unequivocal, <i>namely</i> , to vest exclusive <br /> jurisdiction in the courts at Ranchi. <br /> <b><i> </i></b><br /> <b><i>ANALYSIS:</i></b> <i> </i><br /> 20. This Court has heard learned counsel for the parties at <br /> considerable length. With the able assistance rendered by them, the <br /> Court has also carefully perused the material placed on record, <br /> including the pleadings, documents, and the judicial precedents relied <br /> upon during the course of arguments. <br /> 21. Upon hearing learned counsel for the parties on the preliminary <br /> issue of jurisdiction, which arises at the very outset for consideration, <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>8</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> this Court is of the view that the following broad questions fall for <br /> determination: <br /> I. Whether the Petition under Section 9 of the A&C Act, filed by <br /> the Petitioner before this Court in January 2021, prior to the <br /> constitution of the learned Arbitral Tribunal, in the facts and <br /> circumstances of the present case, would operate so as to vest or <br /> seize jurisdiction in the courts at New Delhi in terms of Section <br /> 42 of the A&C Act; and <br /> II. If the aforesaid question is answered in the negative, whether <br /> the juridical seat of arbitration, as contemplated under the <br /> SAROD Arbitration Rules, would prevail over the other clauses <br /> in the Agreement designating the “venue” of arbitration and <br /> conferring “exclusive jurisdiction”, for the purpose of <br /> determining the court vested with supervisory jurisdiction over <br /> the arbitral proceedings. <br /> 22. Turning first to the submission regarding the filing of the <br /> petition under Section 9 before this Court, it is apposite, for the sake <br /> of clarity and convenience, to extract Section 42 of the A&C Act, <br /> which reads as follows: <br /> “ <b>42. Jurisdiction.- </b> Notwithstanding anything contained elsewhere <br /> in this Part or in any other law for the time being in force, where <br /> with respect to an arbitration agreement any application under this <br /> Part has been made in a Court, that Court alone shall have <br /> jurisdiction over the arbitral proceedings and all subsequent <br /> applications arising out of that agreement and the arbitral <br /> proceedings shall be made in that Court and in no other Court.” <br /> <br /> 23. Section 42 of the A&C Act essentially stipulates that once an <br /> application concerning an arbitration agreement is made before a <br /> “Court” of competent jurisdiction, that Court alone shall exercise <br /> jurisdiction over the arbitral proceedings and all subsequent <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>9</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> applications arising out of the arbitration agreement and the arbitral <br /> process. <br /> 24. However, within the scheme of the A&C Act, Section 42 is not <br /> intended to vest exclusive jurisdiction in a court merely by virtue of <br /> the fortuitous, premature, or tactical filing of an application under Part <br /> I. The underlying legislative intent is to prevent multiplicity of <br /> proceedings and to ensure procedural certainty and consistency, but <br /> only after a court of competent jurisdiction has validly and lawfully <br /> assumed seisin of the matter. Consequently, the jurisdiction <br /> contemplated under Section 42 of the A&C Act must be real, <br /> effective, and legally sustainable, and cannot be founded upon a <br /> jurisdictional assumption that is illusory, contrived, or inherently <br /> lacking in competence. <br /> 25. The expression “ <i>has been made in a Court</i> ” occurring in <br /> Section 42 assumes considerable significance, as it necessarily <br /> requires a determination of what qualifies as a “ <i>Court</i> ” for the <br /> purposes of the A&C Act. This determination is not left to general <br /> notions of jurisdiction, but is specifically governed by Section 2(1)(e) <br /> of the Act, which provides an exhaustive and determinative definition <br /> of the term “Court” as under: <br /> “ <b>2. Definitions. -</b> (1) In this Part, unless the context otherwise <br /> requires, - <br /> (e) “Court” means – <br /> (i) in the case of an arbitration other than international commercial <br /> arbitration, the principal Civil Court of original jurisdiction in a <br /> district, and includes the High Court in exercise of its ordinary <br /> original civil jurisdiction, having jurisdiction to decide the <br /> questions forming the subject-matter of the arbitration if the same <br /> had been the subject-matter of a suit, but does not include any Civil <br /> Court of a grade inferior to such principal Civil Court, or any Court <br /> of Small Causes; <br /> (ii) in the case of international commercial arbitration, the High <br /> Court in exercise of its ordinary original civil jurisdiction, having <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>10</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> jurisdiction to decide the questions forming the subject-matter of <br /> the arbitration if the same had been the subject-matter of a suit, and <br /> in other cases, a High Court having jurisdiction to hear appeals <br /> from decrees of courts subordinate to that High Court;” <br /> <b><i>(emphasis supplied) </i></b><br /> <b><i> </i></b><br /> 26. A plain and contextual reading of the said definition makes it <br /> manifest that the term “ <i>Court</i> ” refers to the principal civil court of <br /> original jurisdiction in a district, or, where applicable, a High Court <br /> exercising ordinary original civil jurisdiction, provided such court is <br /> competent to adjudicate the subject-matter of the arbitration as if it <br /> were a civil suit. The provision expressly excludes courts subordinate <br /> to such principal civil court, as well as Courts of Small Causes. <br /> 27. The determinative test, therefore, is whether the forum in <br /> question possesses the requisite subject-matter, territorial, and <br /> pecuniary jurisdiction to entertain and decide the dispute forming the <br /> subject-matter of the arbitration. In the context of domestic arbitration, <br /> this would ordinarily denote the principal civil court at the district <br /> level; however, in jurisdictions such as Delhi, Mumbai, Kolkata, <br /> Chennai, and Himachal Pradesh, where High Courts exercise ordinary <br /> original civil jurisdiction, such High Courts would also qualify as the <br /> “ <i>Court</i> ” within the meaning of the A&C Act, subject to the applicable <br /> pecuniary thresholds. Thus, the expression “Court” for the purposes of <br /> Section 42 must be understood as the forum which is otherwise <br /> competent to entertain the dispute in terms of Section 2(1)(e) of the <br /> Act. <br /> 28. The phrase “ <i>having jurisdiction to decide the questions forming </i><br /> <i>the subject-matter of the arbitration</i> ” further reinforces that only a <br /> court vested with complete and lawful jurisdiction, encompassing <br /> subject-matter, territorial, and pecuniary competence, can validly <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>11</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> assume supervisory authority over arbitral proceedings under the <br /> A&C Act. In the present case, the principal controversy between the <br /> parties centres around the territorial jurisdiction of this Court to <br /> entertain the present proceedings. <br /> 29. Consequently, for the bar under Section 42 of the A&C Act to <br /> be attracted, it is not sufficient that the initial application is one <br /> referable to Part I of the Act; it must, in addition, be instituted before <br /> and entertained by a court that satisfies the statutory definition under <br /> Section 2(1)(e). This legal position stands authoritatively settled by a <br /> three-Judge Bench of the Hon‟ble Supreme Court in <b><i>State of W.B. v. </i></b><br /> <b>9</b><br /> <b><i>Associated Contractors</i></b> , wherein it was held that the exclusivity <br /> contemplated under Section 42 is triggered only when the first <br /> application is made to a court of competent jurisdiction. Applications <br /> instituted before forums lacking jurisdiction, or before authorities that <br /> do not qualify as a “ <i>Court</i> ” within the meaning of the Act, fall outside <br /> the ambit of Section 42 and, therefore, do not operate as a bar to <br /> subsequent proceedings being instituted before a duly competent <br /> forum. The relevant portion of the said judgment reads as under: <br /> “ <b>24.</b> If an application were to be preferred to a court which is not a <br /> Principal Civil Court of original jurisdiction in a district or a High <br /> Court exercising original jurisdiction to decide questions forming <br /> the subject matter of an arbitration if the same had been the subject <br /> matter of a suit, then obviously such application would be outside <br /> the four corners of Section 42. If, for example, an application were <br /> to be filed in a court inferior to a Principal Civil Court, or to a High <br /> Court which has no original jurisdiction, or if an application were <br /> to be made to a court which has no subject-matter jurisdiction, <br /> such application would be outside Section 42 and would not debar <br /> subsequent applications from being filed in a court other than such <br /> court. <br /> <b>25.</b> Our conclusions therefore on Section 2(1)( <i>e</i> ) and Section 42 of <br /> the Arbitration Act, 1996 are as follows: <br /> <br /> 9<br /> (2015) 1 SCC 32 <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>12</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> ( <i>a</i> ) Section 2(1)( <i>e</i> ) contains an exhaustive definition marking out <br /> only the Principal Civil Court of Original Jurisdiction in a <br /> district or a High Court having original civil jurisdiction in the <br /> State, and no other court as “court” for the purpose of Part I of <br /> the Arbitration Act, 1996. <br /> ( <i>b</i> ) The expression “with respect to an arbitration agreement” <br /> makes it clear that Section 42 will apply to all applications made <br /> whether before or during arbitral proceedings or after an award <br /> is pronounced under Part I of the 1996 Act. <br /> ( <i>c</i> ) However, Section 42 only applies to applications made under <br /> Part I if they are made to a court as defined. Since applications <br /> made under Section 8 are made to judicial authorities and since <br /> applications under Section 11 are made to the Chief Justice or <br /> his designate, the judicial authority and the Chief Justice or his <br /> designate not being court as defined, such applications would be <br /> outside Section 42. <br /> ( <i>d</i> ) Section 9 applications being applications made to a court and <br /> Section 34 applications to set aside arbitral awards are <br /> applications which are within Section 42. <br /> ( <i>e</i> ) In no circumstances can the Supreme Court be “court” for the <br /> purposes of Section 2(1)( <i>e</i> ), and whether the Supreme Court <br /> does or does not retain seisin after appointing an arbitrator, <br /> applications will follow the first application made before either a <br /> High Court having original jurisdiction in the State or a <br /> Principal Civil Court having original jurisdiction in the district, <br /> as the case may be. <br /> ( <i>f</i> ) Section 42 will apply to applications made after the arbitral <br /> proceedings have come to an end provided they are made under <br /> Part I. <br /> ( <i>g</i> ) If a first application is made to a court which is neither a <br /> Principal Court of Original Jurisdiction in a district or a High <br /> Court exercising original jurisdiction in a State, such application <br /> not being to a court as defined would be outside Section 42. <br /> Also, an application made to a court without subject-matter <br /> jurisdiction would be outside Section 42. <br /> The reference is answered accordingly.” <br /> <br /> 30. In the present case, although a petition under Section 9 of the <br /> A&C Act was initially instituted before this Court, there is no <br /> consideration, either express or implied, that this Court possessed the <br /> requisite jurisdiction to entertain the same. This aspect assumes <br /> particular significance in light of the sequence of events that unfolded. <br /> The initial order dated 27.01.2021, directing Respondent No. 1 to <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>13</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> maintain the <i>status quo</i> , came to be passed in its absence, as <br /> Respondent No. 1 had not yet entered an appearance. On the very next <br /> date of hearing, upon Respondent No. 1 entering an appearance before <br /> this Court, the Petitioner chose, of its own volition, to withdraw the <br /> said petition. As a direct consequence of such withdrawal at a nascent <br /> stage, the question of jurisdiction, whether territorial, pecuniary, or <br /> with respect to subject-matter, was neither adjudicated upon nor even <br /> substantively examined by this Court. <br /> 31. In this backdrop, it becomes evident that Respondent No. 1 was <br /> effectively deprived of any meaningful and substantive opportunity to <br /> raise objections as to the jurisdiction of this Court. Jurisdictional <br /> objections, particularly those going to the root of the matter, are <br /> required to be raised and determined at the threshold, so as to ensure <br /> that proceedings are not conducted before a forum lacking <br /> competence in law. Had the proceedings under Section 9 been pursued <br /> and contested, Respondent No. 1 would have been fully entitled to <br /> challenge the maintainability of the petition on jurisdictional grounds, <br /> and this Court would have been called upon to render a considered <br /> finding on such objections. However, in the absence of any such <br /> opportunity or adjudication, no presumption can be drawn that this <br /> Court had validly assumed jurisdiction over the dispute. <br /> 32. In these circumstances, it would be wholly untenable to suggest <br /> that Respondent No. 1 stands precluded, by operation of Section 42 of <br /> the A&C Act, from questioning the jurisdiction of this Court in the <br /> present proceedings. Section 42 cannot be construed in a manner that <br /> forecloses a party‟s right to raise a fundamental jurisdictional <br /> objection, particularly when such objection could never be raised or <br /> was never adjudicated upon at any prior stage. Indeed, if this Court <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>14</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> otherwise lacks jurisdiction in accordance with the settled principles <br /> of law, the mere prior filing of a petition under Section 9 or any other <br /> petition of application under the A&C Act, without any determination <br /> thereon, cannot operate as a binding factor so as to confer jurisdiction <br /> by default or estoppel. It is a settled principle of law that jurisdiction <br /> cannot be conferred by acquiescence, waiver, or mere procedural <br /> happenstance; it must inherently exist in law and be demonstrable in <br /> accordance with established legal principles. <br /> 33. In such circumstances, to hold that the mere filing of a petition <br /> under Section 9, followed by its immediate withdrawal, or the <br /> institution of any application under Part I of the Act without any <br /> judicial scrutiny on the issue of jurisdiction, would irrevocably vest <br /> exclusive jurisdiction in that court under Section 42 of the A&C Act, <br /> would amount to a manifest distortion and misuse of the statutory <br /> framework. Section 42 of the A&C Act, as noticed hereinabove, is <br /> intended to ensure consistency and avoid multiplicity of proceedings <br /> by conferring exclusive jurisdiction upon a court that has validly <br /> assumed seisin of the arbitral process. However, such an assumption <br /> of jurisdiction must be real, effective, and judicially sustainable. <br /> 34. Where proceedings are terminated at the threshold without any <br /> adjudication, and where the opposing party is not even afforded a fair <br /> and effective opportunity to contest the competence of the forum, the <br /> foundational requirement for the application of Section 42 of the A&C <br /> Act remains unfulfilled. To permit the invocation of Section 42 of the <br /> A&C Act in such a scenario would enable parties to engage in forum <br /> shopping by filing proceedings in a court of their choice, obtaining ad <br /> interim orders in the absence of the opposite party, and thereafter <br /> withdrawing such proceedings so as to create an artificial basis for <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>15</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> invoking exclusivity. Such an interpretation would not only defeat the <br /> legislative intent underlying Section 42 of the A&C Act but would <br /> also undermine the principles of fairness, procedural propriety, and <br /> jurisdictional discipline that form the bedrock of the arbitral <br /> framework. <br /> 35. Accordingly, Section 42 of the A&C Act cannot be invoked to <br /> legitimise or sanctify proceedings instituted before a forum whose <br /> competence remains uncertain, untested, or unadjudicated, particularly <br /> where such proceedings are not carried to their logical or legal <br /> conclusion. The provision cannot be employed as a tool to create <br /> jurisdiction where none exists, nor can it be used to preclude a <br /> legitimate challenge to jurisdiction in subsequent proceedings. <br /> 36. This Court is, therefore, unable to accept the proposition that a <br /> unilateral and transient invocation of jurisdiction, by way of filing an <br /> application under Part I of the Act before a potentially incompetent <br /> forum, can bind the parties for all subsequent proceedings arising out <br /> of the arbitration agreement. The exclusivity envisaged under Section <br /> 42 A&C Act is neither automatic nor mechanical; rather, it is <br /> conditional upon the initial application having been made before a <br /> court of competent jurisdiction which has validly and effectively <br /> assumed seisin of the arbitral process. <br /> 37. The concept of “ <i>seisin</i> ” in this context necessarily implies a <br /> conscious and lawful assumption of jurisdiction by the court, coupled <br /> with an opportunity to the parties to contest such jurisdiction and a <br /> corresponding judicial determination, whether express or implicit. In <br /> the absence of such elements, the mere filing of an application cannot <br /> be elevated to the status of a jurisdiction-conferring event. To hold <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>16</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> otherwise would be to reduce the statutory safeguards embedded in <br /> the A&C Act to a matter of form rather than substance. <br /> 38. In view of the foregoing analysis, and having regard to the facts <br /> and circumstances of the present case, this Court is of the considered <br /> view that the reliance placed by the Petitioner on Section 42 of the <br /> A&C Act, to sustain the jurisdiction of this Court, is wholly <br /> misconceived and untenable in law. The invocation of Section 42 of <br /> the A&C Act, in the absence of any prior adjudication or lawful <br /> assumption of jurisdiction, cannot operate as a bar to the present <br /> proceedings, nor can it confer jurisdiction where none otherwise <br /> exists. <br /> 39. The determinative question that thus arises for consideration is <br /> whether this Court independently possesses the requisite jurisdiction, <br /> within the meaning of the A&C Act and in accordance with settled <br /> principles governing territorial competence, which constitutes the <br /> central issue in the present adjudication, to entertain the petition <br /> arising out of the arbitration agreement and the arbitral proceedings in <br /> question. It is only upon a proper and conclusive determination of this <br /> foundational issue that the maintainability of the present proceedings <br /> can be finally determined. <br /> 40. The Court now turns to the next aspect for consideration, <br /> namely, the interpretation and effect of the relevant clauses of the <br /> agreement executed between the parties, in particular the Dispute <br /> Resolution Clauses and the Exclusive Jurisdiction Clause contained <br /> therein, which are extracted herein below for ready reference: <br /> “…. <br /> <b>Article 26 </b><br /> <b>Dispute Resolution </b><br /> <b> </b><br /> 26.1 Dispute Resolution <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>17</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> (i) Any dispute, difference or controversy of whatever nature <br /> howsoever arising under or out of or in relation to this Agreement <br /> (including its interpretation) between the Parties, and so notified in <br /> writing by either Party to the other party (the ''Dispute") shall, in <br /> the first instance, be attempted to be resolved amicably in <br /> accordance with the conciliation procedure set forth in Clause 26.2. <br /> <br /> (ii) The Parties agree to use their best efforts for resolving all <br /> Disputes arising under or in respect of this Agreement promptly, <br /> equitably and in good faith, and further agree to provide each other <br /> with reasonable access during normal business hours to all non-<br /> privileged records, information and data pertaining to any Dispute. <br /> <br /> 26.2 Conciliation <br /> <b></b> <br /> 26.3. Arbitration <br /> (i) Any Dispute which is not resolved amicably by conciliation, as <br /> provided in Clause 26.2, shall be finally settled by arbitration in <br /> accordance with the rules of arbitration of the Society for <br /> Affordable Redressal of Disputes (SAROD). <br /> (ii). The parties expressly agree as under in case of arbitration of <br /> disputes: <br /> (a) There shall be no arbitration for a dispute involving a claim <br /> value upto INR 50 Lakh (IN fifty lakh). The Authority's <br /> Engineer shall give a reasoned decision in case of such dispute <br /> and the same shall be binding on both the parties. <br /> (b) In case of a dispute involving claim value of above INR <br /> 50Lakh (INR fifty lakh), but upto INR 50 Crore (INR fifty <br /> crore), the same shall be referred to a Sole Arbitrator within 30 <br /> days propose names of 5 (five) Arbitrators from the list of <br /> Arbitrators maintained by SAROD (Society for Affordable <br /> Redressal of Disputes) and the Contractor shall within 30 <br /> (thirty) days select one name from the list of five and the name <br /> so selected by the Contractor shall be the Sole Arbitrator for <br /> the matter in dispute. In case Authority delays in providing the <br /> list of 5 (five) names, President, SAROD will provide 5 names <br /> within 30 (thirty) days of receipt of reference from aggrieved <br /> party in this regard In case the Contractor fails in selecting one <br /> from the list of five, President, SAROD shall select one from <br /> the list of five provided by Authority within 30 (thirty)days of <br /> receipt of reference from aggrieved party in this regard <br /> (c) In case of a dispute involving a claim value of more than IN <br /> 50 Crore (INR Fifty crore), the same shall be referred to an <br /> Arbitral Tribunal comprising 3 (three) Arbitrators. The Dispute <br /> shall be settled in accordance with the rules of Arbitration of <br /> the Society for Affordable Redressal of Disputes (SAROD) <br /> (d) The venue of arbitration shall be Ranchi, and the language if <br /> arbitration proceedings shall be in English. <br /> <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>18</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> <b></b> <br /> 26.4 Adjudication by Regulatory Authority, Tribunal or <br /> Commission <br /> <b></b>* <br /> <b>Article 27 </b><br /> <b>Miscellaneous </b><br /> 27.1 Governing law and jurisdiction <br /> This Agreement shall be construed and interpreted in accordance <br /> with and governed by laws of India, and the courts at [Ranchi] <br /> shall have exclusive jurisdiction over matters arising out of or <br /> relating to this Agreement.” <br /> <b></b>* <br /> ….” <br /> <b><i>(emphasis supplied) </i></b><br /> <b><i> </i></b><br /> 41. It is also necessary to advert to Rule 23 of the SAROD <br /> Arbitration Rules, upon which considerable reliance has been placed <br /> by the Petitioner in support of the contention that the juridical seat of <br /> arbitration ought to be New Delhi. The said Rule 23 reads as follows: <br /> “ <b>Rule 23 - Judicial Seat of Arbitration </b><br /> 23.1 Unless otherwise agreed by the Parties, the judicial seat of <br /> arbitration shall be New Delhi. The venue for the Arbitration <br /> meeting shall be organized by the SAROD Secretariat. <br /> 23.1 Notwithstanding Rule 22 and 23.1, the Tribunal may, unless <br /> otherwise agreed by the Parties, hold hearings and meetings <br /> anywhere convenient, subject to the provisions of Rule 28.2.” <br /> <b><i>(emphasis supplied)</i></b> <br /> <br /> 42. A holistic and purposive reading of Clauses 26 and 27 of the <br /> agreement, however, reveals that the intention of the parties with <br /> respect to jurisdiction and the arbitral framework must be discerned <br /> from the agreement as a whole, and not from isolated provisions read <br /> in abstraction. The contractual scheme indicates a carefully structured <br /> dispute resolution mechanism, beginning with amicable resolution and <br /> conciliation, followed by arbitration under SAROD Rules, and <br /> culminating in a clear stipulation regarding governing law and <br /> exclusive jurisdiction. <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>19</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> 43. The principal controversy between the parties, therefore, centres <br /> on the determination of the juridical seat of arbitration. While <br /> Respondent No. 1 relies upon Clause 26.3(ii)(d), which designates <br /> Ranchi as the venue of arbitration, read conjointly with Clause 27.1, <br /> which confers exclusive jurisdiction upon courts at Ranchi, to contend <br /> that Ranchi is the seat of arbitration, the Petitioner, on the other hand, <br /> relies upon the incorporation of SAROD Arbitration Rules through <br /> Clause 26.3(i), and then read with Rule 23 of the SAROD Arbitration <br /> Rules, to assert that New Delhi must be treated as the juridical seat. <br /> 44. This Court is unable to accept the submissions advanced on <br /> behalf of the Petitioner. The contention that the seat of arbitration is <br /> New Delhi, solely by virtue of the incorporation of SAROD Rules, <br /> overlooks the fundamental principle that party autonomy must be <br /> gathered from the express terms of the contract, and that a clear and <br /> specific stipulation in the agreement cannot be overridden by a general <br /> provision contained in a set of institutional rules. <br /> 45. The determination of the juridical seat in the present case, <br /> therefore, necessitates a careful reconciliation of three competing <br /> contractual indicators, <i>first</i> , the designation of Ranchi as the venue of <br /> arbitration; <i>second</i> , the conferment of exclusive jurisdiction upon <br /> courts at Ranchi; and <i>third</i> , the incorporation of SAROD Rules, which <br /> provide that, in the absence of agreement to the contrary, the seat shall <br /> be New Delhi. The resolution of this apparent divergence must be <br /> guided by settled principles of arbitral jurisprudence, particularly <br /> those relating to party autonomy, contractual interpretation, and the <br /> distinction among “seat”, “venue”, “exclusive jurisdiction”, and <br /> “institutional rules”. <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>20</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> 46. It is well settled that the “seat” of arbitration constitutes the <br /> juridical centre of gravity of the arbitral process. It determines the <br /> curial law governing the arbitration and identifies the court that <br /> exercises supervisory jurisdiction over the arbitral proceedings. The <br /> Hon‟ble Supreme Court, in a catena of decisions including <b><i>Indus </i></b><br /> <b>10</b><br /> <b><i>Mobile Distribution Pvt. Ltd. v. Datawind Innovations Pvt. Ltd</i></b> . and <br /> <b><i>BGS SGS Soma JV </i></b> <i>(supra), </i> has authoritatively held that the <br /> designation of a seat is akin to an exclusive jurisdiction clause, <br /> conferring supervisory authority upon the courts of that seat to the <br /> exclusion of all others. However, these principles operate on the <br /> foundational premise that the seat has been clearly and consciously <br /> designated by the parties. <br /> 47. In the present case, the agreement does not contain any explicit <br /> stipulation designating New Delhi as the seat of arbitration. The <br /> Petitioner‟s contention seeks to derive such designation indirectly, on <br /> account of the adoption of SAROD Rules. This distinction between an <br /> express designation and a derivative or implied attribution is of <br /> critical importance. The juridical seat must emanate from the <br /> conscious and deliberate choice of the parties, and not from a default <br /> provision contained in institutional rules, particularly where the <br /> contract itself contains indications to the contrary. <br /> 48. In contrast, the agreement contains two clear and unequivocal <br /> stipulations pointing towards Ranchi. <i>First</i> , Clause 26.3(ii)(d) <br /> designates Ranchi as the venue of arbitration. <i>Second</i> , and more <br /> significantly, Clause 27.1 confers exclusive jurisdiction upon courts at <br /> Ranchi in respect of all matters arising out of or relating to the <br /> agreement. These provisions are explicit, deliberate, and leave little <br /> <br /> 10<br /> (2017) 7 SCC 678 <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>21</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> room for ambiguity. The exclusive jurisdiction clause, in particular, is <br /> a strong indicator of the parties‟ intention to localise all legal <br /> proceedings in Ranchi. <br /> 49. While it is true that the designation of a “ <i>venue</i> ” does not, in <br /> every case, amount to the designation of a “ <i>seat</i> ”, the legal position is <br /> equally clear that where the designation of a venue is accompanied by <br /> other significant indicia, such as an exclusive jurisdiction clause, the <br /> venue may, in fact, assume the character of the seat. The combined <br /> effect of specifying Ranchi as the venue and conferring exclusive <br /> jurisdiction upon Ranchi courts strongly suggests that the parties <br /> intended Ranchi to be the juridical seat of arbitration. <br /> 50. This position finds support in the decisions of the Hon‟ble <br /> Supreme Court in <b><i>Brahmani River Pellets Ltd. v. Kamachi Industries </i></b><br /> <b>11</b><br /> <b><i>Ltd.</i></b> and <b><i>BGS SGS Soma JV </i></b> <i>(supra)</i> , wherein it has been held that <br /> where an agreement specifies a particular place for arbitration and also <br /> evinces an intention to exclude other courts, such place may be <br /> construed as the seat of arbitration. The rationale underlying this <br /> principle is that the combination of a specified location and an <br /> exclusionary jurisdiction clause reflects a conscious and deliberate <br /> localisation of the arbitral process. The relevant extract of <b><i>BGS SGS </i></b><br /> <b><i>Soma JV </i></b> <i>(supra)</i> <b><i> </i></b> is reproduced below: <br /> <b>“59.</b> Equally incorrect is the finding in <i> </i> <b><i>Antrix Corpn. </i></b><br /> <b><i>Ltd.</i></b> <b> v. </b> <b><i>Devas Multimedia (P) Ltd.</i></b> <b>, 2018 SCC OnLine Del 9338,</b> <br /> that Section 42 of the Arbitration Act, 1996 would be rendered <br /> ineffective and useless. Section 42 is meant to avoid conflicts in <br /> jurisdiction of courts by placing the supervisory jurisdiction over <br /> all arbitral proceedings in connection with the arbitration in one <br /> court exclusively. This is why the section begins with a <i>non </i><br /> <i>obstante</i> clause, and then goes on to state “… <i>where with respect to </i><br /> <i>an arbitration agreement any application under this part has been </i><br /> <i>made in a court</i> …” It is obvious that the application made under <br /> <br /> 11<br /> (2020) 5 SCC 462 <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>22</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> this part to a court must be a court which has jurisdiction to decide <br /> such application. The subsequent holdings of this court, that where <br /> a seat is designated in an agreement, the courts of the seat alone <br /> have jurisdiction, would require that all applications under Part I be <br /> made only in the court where the seat is located, and that court <br /> alone then has jurisdiction over the arbitral proceedings and all <br /> subsequent applications arising out of the arbitral agreement. So <br /> read, Section 42 is not rendered ineffective or useless. Also, where <br /> it is found on the facts of a particular case that either no “seat” is <br /> designated by agreement, or the so-called “seat” is only a <br /> convenient “venue”, then there may be several courts where a part <br /> of the cause of action arises that may have jurisdiction. Again, an <br /> application under Section 9 of the Arbitration Act, 1996 may be <br /> preferred before a court in which part of the cause of action arises <br /> in a case where parties have not agreed on the “seat” of arbitration, <br /> and before such “seat” may have been determined, on the facts of a <br /> particular case, by the Arbitral Tribunal under Section 20(2) of the <br /> Arbitration Act, 1996. In both these situations, the earliest <br /> application having been made to a court in which a part of the <br /> cause of action arises would then be the exclusive court under <br /> Section 42, which would have control over the arbitral <br /> proceedings. For all these reasons, the law stated by the Bombay <br /> and Delhi High Courts in this regard is incorrect and is overruled. <br /> <b><i></i></b><i></i> <br /> <b><i>Tests for determination of “seat”</i></b> <br /> <b>60.</b> The judgments of the English courts have examined the <br /> concept of the “juridical seat” of the arbitral proceedings, and have <br /> laid down several important tests in order to determine whether the <br /> “seat” of the arbitral proceedings has, in fact, been indicated in the <br /> agreement between the parties. The judgment of Cooke, J., <br /> in <b><i>Shashoua</i></b> <b> v. </b> <b><i>Sharma</i></b> <b>, 2009 EWHC 957 (Comm): (2009) 2 </b><br /> <b>Lloyd's Law Rep 376</b> , states: <br /> “ <i>34</i> . London arbitration is a well-known phenomenon <br /> which is often chosen by foreign nationals with a different <br /> law, such as the law of New York, governing the <br /> substantive rights of the parties. This is because of the <br /> legislative framework and supervisory powers of the <br /> courts here which many parties are keen to adopt. When <br /> therefore there is an express designation of the arbitration <br /> venue as London and no designation of any alternative <br /> place as the seat, combined with a supranational body of <br /> rules governing the arbitration and no other significant <br /> contrary indicia, the inexorable conclusion is, to my mind, <br /> that London is the juridical seat and English Law the <br /> curial law. In my judgment it is clear that either London <br /> has been designated by the parties to the arbitration <br /> agreement as the seat of the arbitration, or, having regard <br /> to the parties' agreement and all the relevant <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>23</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> circumstances, it is the seat to be determined in <br /> accordance with the final fall back provision of Section 3 <br /> of the Arbitration Act.” <br /> <b>61.</b> It will thus be seen that wherever there is an express <br /> designation of a “venue”, and no designation of any alternative <br /> place as the “seat”, combined with a supranational body of rules <br /> governing the arbitration, and no other significant contrary indicia, <br /> the inexorable conclusion is that the stated venue is actually the <br /> juridical seat of the arbitral proceeding.” <br /> <b><i>(emphasis supplied) </i></b><br /> <i> </i><br /> 51. Applying the aforesaid principles to the facts of the present <br /> case, this Court is of the considered view that Ranchi cannot be <br /> regarded as a mere geographical venue chosen for convenience. <br /> Rather, it emerges as the juridical focal point intended by the parties. <br /> The presence of an exclusive jurisdiction clause in favour of Ranchi <br /> courts removes any residual ambiguity and reinforces the conclusion <br /> that the parties intended Ranchi to be the seat of arbitration. <br /> 52. On the contrary, the reliance placed by the Petitioner on the <br /> SAROD Arbitration Rules to contend that New Delhi constitutes the <br /> juridical seat of arbitration must be examined in the proper contractual <br /> and legal context. It is a well-settled canon of contractual <br /> interpretation that terms incorporated by reference, whether expressly <br /> or by necessary implication, cannot override or supplant clear and <br /> specific stipulations contained in the principal agreement between the <br /> parties. Institutional arbitration rules are, by their very nature, <br /> designed to provide a procedural framework for the conduct of arbitral <br /> proceedings. While such rules may supplement the agreement by <br /> filling gaps or providing default mechanisms in the absence of <br /> contrary stipulations, they cannot be construed in a manner that <br /> displaces or nullifies an express contractual arrangement regarding <br /> jurisdiction, venue, or forum. <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>24</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> 53. To accept the Petitioner‟s contention that New Delhi becomes the <br /> seat of arbitration solely by virtue of the applicability of the SAROD <br /> Arbitration Rules would effectively elevate a derivative procedural <br /> provision above the express and negotiated terms of the agreement. <br /> Such an approach would not only undermine the fundamental <br /> principle of party autonomy but would also invert the established <br /> hierarchy between the primary contractual terms and secondary <br /> incorporated rules. The correct interpretative approach, therefore, is to <br /> treat institutional rules as subordinate to, and operating within, the <br /> framework delineated by the agreement, rather than as instruments <br /> capable of overriding it. <br /> 54. Furthermore, the argument advanced by the Petitioner, if <br /> accepted, would lead to uncertainty and inconsistency in the <br /> interpretation of arbitration agreements. The Petitioner seeks to isolate <br /> Clause 26.3(i), which provides that disputes shall be resolved in <br /> accordance with the SAROD Arbitration Rules, and to read it <br /> independently so as to import the default seat provision contained in <br /> Rule 23.1. Such a piecemeal and fragmented reading of the dispute <br /> resolution clause cannot be countenanced. It is trite that contractual <br /> provisions must be construed holistically, with due regard to the <br /> agreement as a whole. A conjoint reading of Clause 26 ( <i>dealing with </i><br /> <i>dispute resolution</i> ) and Clause 27 ( <i>dealing with governing law and </i><br /> <i>jurisdiction</i> ) makes it abundantly clear that the parties intended to <br /> anchor the arbitral process in Ranchi. <br /> 55. This Court also cannot be oblivious to the internal structure and <br /> scheme of the relevant clauses. Clause 26 constitutes the <br /> comprehensive dispute resolution mechanism, within which Clause <br /> 26.3 specifically addresses arbitration, including the applicable <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>25</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> procedural rules, the venue, and the language of proceedings. Clause <br /> 27.1, on the other hand, is a distinct and explicit provision dealing <br /> with governing law and jurisdiction, wherein it is categorically <br /> stipulated that the courts at Ranchi shall have exclusive jurisdiction <br /> over all matters arising out of or relating to the agreement. The intent <br /> of the parties, as reflected in these provisions, is both clear and <br /> unequivocal. A harmonious construction of the designation of Ranchi <br /> as the venue, read together with the conferment of exclusive <br /> jurisdiction upon Ranchi courts, leads to the inescapable conclusion <br /> that Ranchi was intended to be the juridical centre of the arbitral <br /> process. The mere absence of the express term “ <i>seat</i> ” in the agreement <br /> does not detract from, or dilute, the significance of these provisions in <br /> determining the parties‟ intention as to the <i>seat of arbitration</i> . <br /> 56. It is also a settled principle that contractual provisions must be <br /> interpreted in a manner that gives effect to all parts of the agreement, <br /> and avoids any construction that renders a clause redundant, otiose, or <br /> devoid of meaning. If New Delhi were to be treated as the seat of <br /> arbitration, the express conferment of exclusive jurisdiction upon the <br /> courts at Ranchi would be rendered nugatory. Such an interpretation <br /> would effectively deprive Clause 27.1 of its substantive content and <br /> reduce it to a mere surplusage, which is impermissible in law. If the <br /> parties had indeed intended to designate Ranchi as the venue and to <br /> confer exclusive jurisdiction upon its courts, while simultaneously <br /> treating New Delhi as the seat of arbitration, such an arrangement <br /> would have been explicitly provided for in the agreement. It cannot be <br /> inferred indirectly by placing reliance on a default provision contained <br /> in institutional rules. Acceptance of the Petitioner‟s construction <br /> would, in effect, result in a situation where, in most institutional <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>26</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> arbitrations, the default provisions of arbitral rules would override <br /> contractual stipulations unless the term “seat” is expressly used, an <br /> outcome that is both anomalous and contrary to established principles <br /> of contractual interpretation. <br /> 57. It is further pertinent to note that Rule 23.1 of the SAROD <br /> Arbitration Rules itself is prefaced with the qualifying expression <br /> “ <i>unless otherwise agreed by the Parties</i> ”. This phrase is of critical <br /> importance, as it clearly indicates that the default designation of New <br /> Delhi as the seat is subject to any contrary agreement between the <br /> parties. In the present case, the agreement, when read as a whole, <br /> clearly manifests such a contrary intention by designating Ranchi as <br /> the venue and conferring exclusive jurisdiction upon its courts. <br /> Accordingly, the default rule contained in Rule 23.1 stands displaced <br /> by the express and implied terms of the agreement. In any event, at the <br /> cost of repetition, institutional rules cannot, as a matter of principle, <br /> override the express or necessarily implied contractual stipulations <br /> agreed upon between the parties. <br /> 58. As regards the various judicial precedents relied upon by the <br /> Petitioner, this Court is of the considered view that none of them <br /> advance the Petitioner‟s case in the factual matrix at hand. In none of <br /> the cited decisions has it been held that a default provision contained <br /> in the rules of an arbitral institution can override a clear designation of <br /> venue coupled with an exclusive jurisdiction clause in determining the <br /> seat of arbitration. The factual and contractual context in the present <br /> case is materially distinct, and the principles laid down in those <br /> decisions do not support the proposition canvassed by the Petitioner. <br /> 59. Lastly, this Court is of the considered view that treating Ranchi <br /> as the juridical seat of arbitration enables a harmonious and consistent <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>27</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> construction of the arbitration agreement in its entirety. Under this <br /> interpretation, Ranchi serves both as the designated venue and the <br /> juridical seat of arbitration; consequently, the courts at Ranchi alone <br /> would exercise exclusive supervisory jurisdiction over the arbitral <br /> proceedings. At the same time, the SAROD Arbitration Rules operate <br /> purely as the procedural framework governing the conduct of the <br /> arbitration and do not, in any manner, displace or dilute the parties‟ <br /> express choice of seat. Such a construction preserves the coherence, <br /> efficacy, and internal consistency of the contractual arrangement, <br /> while giving due primacy to the clearly manifested intention of the <br /> parties. <br /> 60. Further, this Court cannot lose sight of the fact that it is <br /> nobody‟s case before this Court that any part of the contract was <br /> performed in Delhi. On the contrary, the cause of action between the <br /> parties has arisen in Ranchi. This undisputed factual matrix lends <br /> further support to the conclusion that Ranchi constitutes the <br /> appropriate juridical seat of arbitration. <br /> 61. It is also pertinent to emphasise that the doctrine of the arbitral <br /> seat is ultimately a means to give effect to party autonomy, and not to <br /> defeat it. Where the agreement discloses a clear and discernible <br /> preference for a particular forum, courts must lean in favour of <br /> upholding that choice, unless there exists an equally clear and <br /> competing designation of seat. In the present case, no such competing <br /> express designation exists. The invocation of New Delhi as the seat <br /> rests solely on an indirect and inferential basis, which is insufficient to <br /> override the clear contractual indicators pointing towards Ranchi. <br /> 62. In view of the foregoing discussion, this Court is of the <br /> considered opinion that the only tenable conclusion is that the parties, <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>28</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i><br /><br /> <br /> by expressly designating Ranchi as the venue of arbitration and by <br /> conferring exclusive jurisdiction upon the courts at Ranchi, have <br /> consciously and unequivocally chosen Ranchi as the juridical seat of <br /> arbitration. The incorporation of the SAROD Arbitration Rules does <br /> not evince any contrary intention sufficient to displace this conclusion <br /> and must be understood as procedural in character. <br /> 63. Accordingly, the reliance placed by the Petitioner on Clause <br /> 26.3(i) read with Rule 23.1 of the SAROD Arbitration Rules to <br /> contend that New Delhi is the seat of arbitration is misconceived and <br /> untenable, and is therefore rejected. <br /> <br /> <b><i>CONCLUSION: </i></b><br /> 64. In view of the foregoing analyses, this Court is of the <br /> considered opinion that it lacks territorial jurisdiction to entertain the <br /> present petition. The competent court, having regard to the contractual <br /> stipulations and the juridical seat of arbitration, is the court at Ranchi <br /> alone. <br /> 65. Accordingly, the present petition is held to be not maintainable <br /> and is, therefore, dismissed. <br /> 66. The present Petition, along with pending application(s), if any, <br /> stands disposed of in the above terms. <br /> 67. No orders as to cost. <br /> <br /> <b>HARISH VAIDYANATHAN SHANKAR, J.</b> <br /> <b>APRIL 01, 2026/sm/va</b> <br /> Signature Not Verified<br /> Digitally Signed<br /> By:VARNIKA<br /> Signing Date:03.04.2026<br /> 13:58:18<br /> <i>O.M.P.(MISC.)(COMM.) 384/2024 Page </i> <b><i>29</i></b> <i> of </i> <b><i>29</i></b> <i> </i><br /> <i> </i></div>