Mr Rahul Mehta & Anr. vs Delhi Development Authority
- Court
- Delhi High Court
$~
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
% Date of Decision: 15 May, 2026
+ W.P.(C) 8908/2021 & CM APPL. 27674/2021
MR RAHUL MEHTA & ANR. .....Petitioners
Through: Mr. Prosenjeet Banerjee, Ms. Mansi
Sharma, Ms. Anshika Sharma and Mr. Rehan
Verma, Advocates.
versus
DELHI DEVELOPMENT AUTHORITY .....Respondent
Through: Mr. Rahul Kaul, Advocate.
CORAM:
HON'BLE MS. JUSTICE JYOTI SINGH
JUDGEMENT
JYOTI SINGH, J.
1. This writ petition is preferred on behalf of the Petitioners under
Articles 226 and 227 of the Constitution of India for quashing letters dated
24.10.2013, 08.07.2014 and 29.06.2021 issued by Respondent/DDA with a
direction to DDA accept the conversion application bearing No. 01629 dated
24.09.2012 filed by Petitioner No. 1 and execute a Conveyance Deed in
respect of Plot No. C-49, Okhla Industrial Area, Phase-II, Delhi (‘subject
property’) in favour of M/s R.M.X Joss through its proprietor Mr. Rahul
Mehta/Petitioner No. 1.
2. To the extent necessary, the facts as pleaded in the writ petition are
that on 05.04.1974, M/s Western India Electrical Corporation (‘M/s
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 1 of 18
Western’) was granted permission to carry out construction on subject
property and on 31.03.1978, DDA executed a Perpetual Lease Deed in its
favour. Occupancy Certificate was issued on 06.07.1979 with respect to the
entire building constructed on the plot i.e., ground floor, first floor,
mezzanine floor and basement. The built-up area of ground floor was 7110
sq. ft; first floor was 469 sq. ft; mezzanine floor was 2032 sq. ft; and
basement was 3942 sq. ft, as recorded by MCD in its Rectification Order
dated 26.06.2002, which is an order rectifying House Tax Assessment Order
passed by the MCD on 10.11.1999, where the rateable value was confirmed
ex parte (hereinafter referred to as ‘Rectification Order’).
3. It is stated that M/s Western executed a registered Agreement to Sell
dated 16.11.1995 in favour of M/s R.M.X Joss, through its proprietor
Petitioner No. 1, for sale of the plot as well as building structures thereon,
including other fittings and fixtures etc. Registered irrevocable Power of
Attorney dated 16.11.1995 was also issued by M/s Western in favour of
Petitioner No. 2, wife of Petitioner No. 1. Petitioner No. 1 decided to carry
out some additions/alterations to the existing structure and submitted a
request vide letter dated 19.11.1998 for permission, which was granted by
the concerned statutory authority vide communication dated 15.12.1998, as
per the Sanction Plan. On 22.02.1999, water connection was disconnected to
the subject property and all industrial operations on the subject property
were seized on 01.03.1999 to carry out the construction. On 18.03.1999, the
existing electricity connection was also disconnected and only temporary
connection was granted for construction purposes to the subject property.
4. It is averred that civil work was completed in December, 1999 and
interior work began. MCD granted Form-D for sanitary and water works,
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 2 of 18
while water supply was restored on 03.08.2000 followed by sanction of new
electrical connection on 06.09.2000. Between March, 1999 to October,
2000, no manufacturing or industrial activity was carried on the subject
property in view of ongoing construction/renovation and post-renovation,
the area of the mezzanine floor increased from 2032 sq. ft to 10,692 sq. ft
between 2000 to 2001.
5. It is averred that on 03.10.2012, Petitioners applied for conversion of
subject property from leasehold to freehold and Petitioner No. 1 deposited a
sum of Rs. 1,12,62,263/- towards conversion charges. On 04.02.2013, DDA
officials inspected the subject property and no misuse was found, which is
evident from the noting in paragraph 6(a) of Inspection Report dated
04.02.2013 and Petitioner No. 1 was informed that the subject property was
compliant with terms of Perpetual Lease Deed and other applicable rules and
regulations and conversion application shall be processed. However, vide
impugned Demand Letter dated 24.10.2013, Petitioner No. 1 was informed
by DDA that owing to misuse, he was liable to pay misuse charges to the
tune of Rs. 2,48,89,151/- and payment of the charges was made a pre-
condition for processing the application. Demand Letter did not mention the
area or the period of alleged misuse and/or the particulars thereof. Even the
basis or calculation of the amount demanded was not disclosed by DDA.
6. It is averred that DDA reiterated the demand vide impugned letter
dated 08.07.2014, but again without any detail and Petitioner No. 1 was
informed that the amount payable towards interest shall be communicated
later. Responding to the demand letters, Petitioner No. 1, who had no
knowledge of the misuse alleged, wrote to DDA on 20.08.2014 disputing the
levy of misuse charges as there was no misuse in the property and without
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 3 of 18
prejudice referred to the freehold conversion policy/circular dated
22.04.2014 published in leading newspapers for grant of relief in misuse
charges. However, DDA did not respond to this letter and on independent
enquiries at DDA’s office, Petitioner No. 1 learnt that the basis of the
demand were purported show cause notices sent about 16 years ago, which
Petitioners had never received and accordingly, wrote to DDA on
25.04.2016 informing that no show cause notice had been received and
requesting that the show cause notices be withdrawn. Petitioner No. 1
reiterated his request vide letter dated 27.06.2016 to issue the Conveyance
Deed and on 30.06.2016 applied under Right to Information Act, 2005 (‘RTI
Act’) for inspection of the concerned file and records.
7. It is stated that vide letter dated 13.07.2016, DDA rejected the request
of Petitioner No. 1 to withdraw the misuse charges. In August, 2016,
Petitioner No. 1 received the relevant DDA notings. Noting dated
24.12.1997, revealed that subject property was purportedly inspected on
24.12.1997 and it was endorsed by the inspecting officer that ‘Inspection
could not be conducted’ as he could not enter the premises, however, he
made certain observations from ‘outside’ that the mezzanine floor of the
industrial unit was being used for carrying out industrial activity. RTI
information also revealed issuance of show cause notices dated 15.05.1998
and 02.07.1999, which Petitioner No. 1 avers were never received by him.
Noting dated 25.02.2013 revealed that misuse charges were calculated by
taking the mezzanine floor area as 12,222 sq. ft. and the period of misuse as
24.12.1997 to 23.12.2000, which was wholly incorrect as no industrial
activity was carried out in the property in that period and secondly, the
entire constructed area of the floor was actually 2032 sq. ft on 24.12.1997
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 4 of 18
and 10,692 sq. ft even in 2013.
8. It is averred that after perusal of the notings, Petitioner No.1 sent a
detailed response to DDA on 06.03.2017 disputing the levy of misuse
charges on several grounds: (a) Petitioner No.1 never received the show
cause notices; (b) Inspection Report dated 24.12.1997 which formed the
basis of the impugned demand, was on conjectures without actual inspection
of the premises from inside; (c) no manufacturing/industrial activity was
carried out in the subject property from 1999 as major renovation work was
carried out and which was supported by several official documents
pertaining to water and electricity disconnections and approvals issued by
statutory authorities; (d) built up area of mezzanine floor was 2032 sq. ft. in
1997 which was established from the Rectification Order dated 26.06.2002
for the Assessment Year 1997-1998; (e) Inspection Report dated 04.02.2013
found no misuse in the subject property; and (f) the show demand letters had
been issued after 16 years of the alleged detection of misuse. On receipt of
the letter, DDA called Petitioner No.1 for a public hearing during which he
reiterated his stand.
9. It is averred that noting dated 03.04.2017 revealed that after
considering Petitioner No.1’s submissions, the Assistant Director agreed that
the Inspection Report dated 24.12.1997 was based on outside observation
and documents submitted by Petitioner No.1 corroborated the fact that no
industrial activity was carried out from 1999 to 2000. In noting dated
06.06.2017, it is recorded that the documents given by Petitioner No.1 be
examined to determine the area under misuse as also the period. Noting
dated 21.08.2017 revealed that officials concerned accepted that area of
mezzanine floor was not 12,222 sq. ft. in 1997. Contrary to this, Petitioner
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 5 of 18
No. 1 was informed during the public hearing on 07.11.2017 that misuse
period shall be taken as 1997 to 2012, relying upon Inspection Report dated
02.11.2012, which was strongly contested by Petitioner No. 1 and in his
letter dated 09.11.2017, he pointed out that this report was invalid in light of
Inspection Report dated 04.02.2013. Thereafter, Petitioner No. 1 made
several representations for withdrawal of misuse charges but to no avail and
impugned communication dated 29.06.2021 was issued by DDA informing
that the conversion application dated 03.10.2012 was rejected due to non-
submission of misuse charges and copy of payment details be furnished so
that conversion charges could be refunded.
10. Learned counsel for the Petitioners argued that the impugned
communication dated 29.06.2021, whereby DDA has rejected the
conversion application after 9 years of submitting the same as also the
impugned demand letters dated 24.10.2013 and 08.07.2014 raising a demand
of Rs. 2,48,89,151/- are ex facie illegal, arbitrary and unfair. The demand is
based on alleged misuse of the mezzanine floor of the subject property,
which was purportedly detected in 1997 i.e., 16 years before the demand
was raised. The illegal demand of misuse charges is predicated on an
Inspection Report dated 24.12.1997 but there was complete silence
thereafter until the first communication by DDA on 24.10.2013. Albeit DDA
contends that show cause notices dated 15.05.1998 and 02.07.1999 were
issued, however, no such notices were ever received by the Petitioners and
this is fortified by the fact that no action was taken by DDA thereafter till
the Petitioners applied for conversion. Impugned communications deserve to
be quashed on ground of inordinate delay alone.
11. It was further urged that the impugned demand notices are completely
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 6 of 18
silent on the area and period of misuse, applicable policy/provision of law,
basis of calculation of the demanded amount of Rs. 2,48,89,151/- and
Petitioners are in the dark on how the demanded amount towards misuse
charges was computed. Demand notices thus deserve to be quashed, being
bereft of the basic details and in fact this also goes to show that DDA had no
cogent material and/or basis to allege misuse and/or calculate the charges.
12. It was argued that Inspection Report dated 24.12.1997, which forms
the basis of the impugned demand is based on conjectures and surmises
inasmuch as perusal of the report reveals that the Inspecting Officer did not
enter the premises and the report was prepared on ‘outside observation’, as
recorded in the report itself. Therefore, clearly, the report is not based on
actual inspection and hence, is false to the extent that the mezzanine floor
has been extended upto full workshop hall and is being used for industrial
activity. Once the report is false and incorrect, the very basis of the
impugned demand falls to the ground and demand letters cannot be
sustained in law.
13. It was also argued that Petitioners were never informed of the period
or area of alleged misuse and it was only in August, 2016 that they learnt
through file noting dated 25.02.2013 given in response to the application
under RTI Act, wherein it is recorded that misuse charges were calculated
taking the period as 24.12.1997 to 23.12.2000 and area of mezzanine floor
as 12,222 sq. ft. Albeit it is a categorical assertion of the Petitioners that
there was no misuse of the mezzanine floor, however, without prejudice,
assuming there was any misuse, the same could only be upto 1998 since the
subject property underwent major renovations and alterations during 1999 to
2000 and there was no question of using the mezzanine floor for any
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 7 of 18
industrial activity. This position is fortified by several official documents
pertaining to disconnection of electricity to the subject property on
18.03.1999; completion of civil works and modification of interior work in
December, 1999; grant of Form-D by MCD in relation to sanitary and
waterworks undertaken on 21.12.1999; request for disconnection of water
supply on 22.02.1999; request for reconnection of water supply on
03.08.2000; sanction of new electrical connection load of 400 H.P. by DVB
on 06.09.2000; and removal of temporary electricity connection on
14.12.2000, which were given to DDA by Petitioner No.1. In fact, in DDA’s
own internal noting dated 03.04.2017, it is noted and admitted that
documents such as disconnection of electricity and water did prove that no
industrial activity could have been carried out in the absence of electricity
and water connection and that the only defect in the stand of the Petitioners
was that they did not bring these facts to the notice of DDA when given
show cause notices. It was also noted that Inspection Report dated
15.12.1997 is indeed a report of outside observation. Therefore, the basis of
calculating the misuse charges from 1997 to 2000 is faulty and illegal.
14. It was argued that noting dated 25.02.2013 further revealed that while
calculating the impugned demand, DDA has taken into consideration 12,222
sq. ft of area of the mezzanine floor, which is wholly factually incorrect
since on 24.12.1997, the area was only 2032 sq. ft. and even in 2013, after
renovation/alteration, constructed area of floor was only 10,692 sq. ft. This
position is substantially supported by Rectification Order dated 26.06.2002.
The rectification order notes that prior to renovations, the mezzanine floor
measured 2032 sq. ft. This is also fortified by the Sanction Plan dated
05.09.1974. Both these documents find mention in column 5 in Inspection
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 8 of 18
Report Form of DDA by way of ‘options’ to determine the building status.
In fact, in DDA’s noting dated 05.04.2021, it is recorded that based on facts
and documents submitted by Petitioner No.1 it appears that the area of the
mezzanine floor during the site inspection in 1997 was 2032 sq. ft. This fact
also finds mention in file notings dated 06.12.2019, 27.12.2019 and
13.01.2020. Till date, DDA has been unable to place any substantive
material before this Court, which indicates that the area of the mezzanine
floor was 12,222 sq. ft. Moreover, once the area and/or the period of alleged
misuse were not mentioned in the demand notices, the same cannot be relied
upon by ex post facto explanation in the counter affidavit filed in this Court
as held by the Supreme Court in State of Himachal Pradesh and Another v.
OASYS Cybernatics Pvt. Ltd., 2025 SCC OnLine SC 2536 .
15. It was also argued that the Inspection Report dated 07.11.2012 heavily
relied upon by DDA in its counter affidavit can be of no avail. In the said
report, it is stated that the mezzanine floor was being used for manufacturing
of garments and storage of clothes. This report is signed by only one officer
of DDA and contains patently wrong findings. After this report was
rendered, Petitioners requested DDA to carry out a fresh and independent
inspection owing to the falsity of the contents of the said report and on their
request, premises was re-inspected on 04.02.2013. Report dated 04.02.2013
in column 6(a) records that there was ‘no’ misuse at the time of inspection
and hence, the Inspection Report dated 07.11.2012 stands superseded by the
the second report. It is also significant that while the report of 07.11.2012
was signed by one officer, report of 04.02.2013 is based on inspection by
joint team of Assistant Engineer, Mr. Chanveer and Assistant Directors.
Therefore, going by the reports of 1997 and 2013, no misuse was found on
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 9 of 18
the subject property and there is no independent evidence or material to
show misuse between 1997 to 2000, as alleged.
16. Arguing on behalf of DDA, learned counsel submitted that writ
petition is not the appropriate remedy of the Petitioners since they raise
disputed question of facts and the only remedy available is to file a civil suit
and on this ground alone, the writ petition deserves to be dismissed. Without
prejudice to this objection, it is urged that M/s Western was allotted the
subject property admeasuring 2420 sq. yards. DDA executed a Perpetual
Lease Deed dated 31.03.1978 in its favour through its partners, who in turn
executed a registered Agreement to Sell dated 16.11.1995 in favour of M/s
R.M.X Joss through its proprietor Petitioner No. 1 and a Power of Attorney
was executed on 16.11.1995 itself in favour of Petitioner No. 2. Inspection
conducted by DDA on 24.12.1997 revealed that mezzanine floor had been
extended upto full workshop hall and was being used for industrial activity
in violation of lease deed and show cause notices were issued on 15.05.1998
and to 02.07.1999 to which no response was filed by the Petitioners.
17. It was further submitted that conversion application was filed by
Petitioners on 03.10.2012, however, since the subject property was under
misuse, a fresh site inspection was carried out on 07.11.2012, which showed
that mezzanine floor was being used for manufacture of garments and
storage of clothes. On request of the Petitioners, another inspection was
carried out and report dated 04.02.2013, also reveals that mezzanine floor
was used for industrial activity. Accordingly, as per the existing Misuse
Policy dated 26.03.2010, the misuse dates were calculated as per category (i)
(II) being from 24.12.1997 to 23.12.2000 and the area under misuse was
found to be 12,222 sq. ft. Accordingly, misuse charges were demanded vide
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 10 of 18
the impugned demand letters, which Petitioners have chosen to challenge
before this Court after an inordinate delay. There is no infirmity in the
demands raised towards misuse charges and the same are based on three
inspections conducted by responsible officers of DDA.
18. It was also argued that contention of the Petitioners that constructed
area of mezzanine floor was 2032 sq. ft is incorrect. Reliance placed on the
MCD’s assessment order dated 26.06.2002 and Sanction Plan dated
05.09.1974 is of no consequence in light of the inspection reports of DDA.
Moreover, the Property Tax Bye-laws, their amendments and policies of
MCD are in different tax regime and have nothing to do with the misuse
charges levied by DDA for misuse of one floor of the subject property, in
violation of the lease deed. In fact, it is not the case of the Petitioners that
MCD officials ever conducted physical inspection of the mezzanine floor to
verify and/or certify the exact area. If there was any truth in the submission
of the Petitioners regarding the use of mezzanine floor and/or its area, they
ought to have availed the opportunity of replying to the two show cause
notices sent by DDA. The demand has been raised correctly based on the
period and area of misuse and unless the demanded amount towards misuse
charges is paid, conversion application cannot be processed.
19. Heard learned counsels for the parties and examined their
submissions.
20. By this writ petition, Petitioners seek quashing of impugned demand
letters dated 24.10.2013 and 08.07.2014 as also communication dated
29.06.2021, whereby application filed by Petitioner No.1 for conversion of
the subject property into freehold has been rejected, owing to non-payment
of alleged misuse charges. Petitioners have challenged the demand of Rs.
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 11 of 18
2,48,89,151/- on multiple grounds: (a) demand letters are completely silent
on the area and period of misuse; (b) there is no inspection report and/or any
other material on record, which supports the allegation of misuse of the
mezzanine floor in the subject property; (c) non-application of mind is
evident from the fact that while DDA claims that the period of misuse is
from 1997-2000, documents placed before DDA as also filed before this
Court issued by MCD and other statutory authorities substantiate that
Petitioner No.1 had stopped all manufacturing and industrial activities in
1999 to carry out major renovations in the subject plot; and (d) built up area
of mezzanine floor was 2032 sq. ft in 1997 and even after the renovations
which took place in 1999-2000, the total area was 10,692 sq. ft and this fact
is also admitted by DDA in its internal notings and hence, it is not
understood how an area of 12,222 sq. ft. has been taken for computing the
alleged misuse charges. DDA on the other hand contends that three
Inspection Reports dated 24.12.1997, 07.11.2012 and 04.02.2013 point out
to the fact that the mezzanine floor was misused by the Petitioners for
carrying out manufacture of garments and storage of clothing which is an
industrial activity. Documents pertaining to area of mezzanine floor are
official documents of MCD and it is not known whether actual physical
verification of the area was done by MCD officials. It was urged that since
Petitioners did not pay the misuse charges, conversion application was
rightly rejected since the misuse was in violation of terms of Lease Deed
dated 31.03.1978. Petitioners neither responded to the two show cause
notices served on them nor took steps to remove breaches and DDA had no
option but to reject the conversion application.
21. There is merit in the contention of the Petitioners that the two demand
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 12 of 18
letters dated 24.10.2013 and 08.07.2014 do not mention the period and/or
the area of the mezzanine floor in respect of which misuse charges to the
tune of Rs. 2,48,89,151/- have been levied. There is no gainsaying that it
was the obligation of DDA to disclose in the demand letters the period and
area of alleged misuse as also the method of computation. Reference to this
data, post-facto in the file noting dated 25.02.2013 and/or in the affidavit
before this Court is of no consequence and this is enough to hold that the
demand is ex-facie illegal and arbitrary . Petitioners urge and rightly so, that
the show cause notices were never served on them and they learnt of the
same only from DDAs file notings received under RTI Act in 2016. DDA
has not placed any material on record even today which substantiates that
the show cause notices were served. This amounts to violation of principles
of natural justice and makes the demand notices vulnerable.
22. On merits of the demand of misuse charges, the question that arises
for consideration is whether Petitioners are liable to pay the misuse charges
amounting to Rs. 2,48,89,151/- and this in turn begs a question as to what
material was available with DDA to come to a conclusion that there was
misuse in the mezzanine floor of the subject plot.
23. DDA relies on three Inspection Reports dated 24.12.1997, 07.11.2012
and 04.02.2013 to support the levy of misuse charges. Be it reiterated that
the period of alleged misuse as per DDA was 1997-2000 and even as per file
notings, the only basis of levying the charges is Inspection Report dated
24.12.1997, albeit it be mentioned that at some places in the notings the date
is erroneously referred to as 15.12.1997. A bare perusal of the Inspection
Report shows that when the Inspecting Officer went to conduct the
inspection, he was unable to enter the premises and it was on his ‘outside
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 13 of 18
observation’ that he noted in the report that the mezzanine floor had been
extended to full workshop hall and was being used for industrial activity.
Court fails to comprehend how anyone can make an observation of misuse
of a floor for industrial activity without even entering the premises and
therefore, to this extent Petitioners are right that this report cannot form the
basis of misuse charges. Pertinently, in DDA’s noting dated 03.04.2017, the
concerned officer after looking into the Site Inspection Report dated
24.12.1997 and after hearing the Petitioners as also taking on record the
documents submitted by the Petitioners observed that “In view of above
facts and documents submitted by the unit, the following facts emerged: i.
The inspection report dated 15.12.1997 is indeed the report of outside
observations,….vii. The case for levy of misuse charges are based on the
inspection report i.e. 15.12.1997 which is also a outside observation,…”.
Since no inspection was admittedly carried out within the premises of the
mezzanine floor and the report is based on an observation from outside, the
same cannot be taken as cogent or relevant material to come to a conclusion
that there was misuse and since as per the noting, this was the only basis for
the demand, case of DDA fails.
24. Insofar as the Inspection Report dated 07.11.2012 is concerned, it is
matter of record that Petitioners pointed out to the concerned officials of
DDA that the report contained incorrect finding and on their asking, third
inspection was carried out on 04.02.2013 and in this report, it is
categorically stated in clause 6(a) that there was ‘no’ misuse in the
mezzanine floor. In fact, in my view, neither of the two reports could reflect
the correct and true position of use in 1997 as the property had undergone
major renovations and alterations. In any event, there is a serious
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 14 of 18
inconsistency in the 2012 and 2013 reports. Thus, the only report which
could form the basis of alleging misuse is the 1997 report, which is
admittedly not based on actual physical inspection of the premises.
25. Once DDA is unable to substantiate misuse for the period 1997-2000,
the relevance of area in question, which is the second factor for computing
the misuse charges, goes into oblivion and Court need not detain itself into
entering into the exercise of determining the actual area of the mezzanine
floor at the relevant time albeit for the sake of completeness and for record,
be it noted that there is a complete fallacy in the impugned demand even on
this score. Strangely, DDA has taken into consideration an area of 12,222
sq. ft. for computing the misuse charges. Firstly, it is not known on what
basis the area was calculated as 12,222 sq. ft. inasmuch as this figure
suddenly emerges in the noting dated 25.02.2013, as per records provided to
the Petitioners. Secondly, Petitioners have been able to demonstrate that M/s
Western had entered into Lease Deed dated 31.03.1978 with DDA and the
Lease Deed refers to an area ad measuring 2420 sq. yards. Copy of the
Lease Deed has been placed on record. It is stated in the petition that M/s
Western carried out construction on the subject plot as per plan sanctioned
by DDA on 05.09.1974, whereafter Occupancy Certificate was issued on
06.07.1979 in respect of the entire building which included mezzanine floor
and copy of the Occupancy Certificate is also filed along with the writ
petition and none of these facts have been controverted by DDA in the
counter affidavit. Petitioners have further averred that in 1998-1999, they
sought permission from concerned authorities to carry out
additions/alterations, which was granted vide letter dated 15.12.1998 and
after construction was carried out the total area increased to 10,692 sq. ft,
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 15 of 18
which is evident from the Rectification Order dated 26.06.2002 issued by
MCD. In this regard DDA’s noting dated 05.04.2021 is significant. It flows
from the noting that based on the representation dated 18.02.2021 given by
Petitioners during public hearing for conversion of property, the matter was
examined taking into consideration the documents furnished, which included
Rectification Order. It is recorded that misuse data was firmed up on the
basis of Site Inspection Report dated 24.12.1997, however, from the
documents and facts furnished by the Petitioners such as Rectification Deed
dated 26.06.2002, it appears that the area of mezzanine floor during the site
inspection in 1997 was 2032 sq. ft. It is also captured in the noting that
Petitioners had brought forth that in 1998, there was major renovation work
and the area taken by DDA as 12,222 sq. ft. was totally wrong as increase in
area was only 8,660 sq. ft. Based on these facts and documents as also a
query by Commissioner (LD) after the file was put up for reduction of area,
it was decided to submit the file to the Competent Authority for taking a
comprehensive decision with respect to the area in question. It is again not
known what transpired thereafter. Even before this Court, DDA is unable to
place any material which contradicts the stand of the Petitioners that the
total area of the mezzanine floor between 1997-2000 was 2032 sq. ft., while
Petitioners are able to demonstrate through official documents of MCD that
the initial area was 2032 sq. ft.
26. Therefore, what emerges from a holistic reading of the averments in
the writ petition, counter affidavit and the documents appended to the writ
petition including file notings of DDA is that there is no inspection report on
record of DDA and/or any other material which substantiates that the
mezzanine floor was misused during 1997-2000, the period in question. The
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 16 of 18
1997 report, which even as per DDA is the sole basis of the impugned
demand, was basis an ‘outside observation’. The Inspecting Officer did not
enter the premises concerned and therefore, was neither privy to the
activities carried out inside the premises nor was in a position to take the
measurements of the area of the mezzanine floor. From 1999, there were
major renovations carried out by the Petitioners, which is amply
demonstrated from documents issued by Statutory Authorities. Petitioners
placed on record before the DDA several documents such as: (a) application
for disconnection of water connection on 22.02.1999; (b) disconnection of
electricity connection on 18.03.1999; (c) new MCD factory license granted
on 18.04.2000; (d) pollution control permission dated 25.09.2000; and (e)
requisite NOC from Delhi Fire Service dated 20.05.2010, which is evident
from the file noting dated 03.04.2017, to prove this point. It is thus clear that
the misuse charges levied on the Petitioners have no legs to stand on and
deserve to be quashed.
27. It bears repetition to state that DDA neither ensured service of show
cause notices on the Petitioners before raising the impugned demand nor
intimated the details of area/period of alleged misuse. Had the notices been
sent and there was no response to the alleged misuse and consequently
breach of the conditions of the Lease Deed, DDA would have taken coercive
action of terminating the Lease Deed, which it did not do. In fact, after the
Inspection Report dated 24.12.1997, there was no action by DDA with
respect to the alleged misuse of the property in terms of the Lease Deed and
it is only after the Petitioners applied for conversion on 03.10.2012 that
DDA raised a demand vide letter dated 24.10.2013 alleging misuse. Having
slept for over 15 years, DDA cannot be heard to say even otherwise that
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 17 of 18
there was misuse in the subject plot for the period 1997-2000.
28. Accordingly, this writ petition is allowed quashing demand letters
dated 24.10.2013 and 08.07.2014, whereby DDA directed the Petitioners to
deposit misuse charges to the tune of Rs. 2,48,89,151/-. Consequently,
communication dated 29.06.2021, whereby the conversion application of
Petitioners was rejected for non-deposit of misuse charges is also quashed.
DDA is directed to process the conversion application filed by the
Petitioners bearing no. 01629 dated 24.09.2012 for which Petitioners have
already deposited conversion charges to the extent of Rs. 1,12,62,263/-, in
accordance with law and execute the Conveyance Deed on completion of
necessary formalities by the Petitioners. Needless to state that if any further
legitimate charges for conversion are due from the Petitioners, DDA shall
intimate the same within three weeks from today. The entire exercise will be
completed within 3 months from today.
29. Writ petition stands disposed of in the aforesaid terms along with the
pending application.
JYOTI SINGH, J.
MAY _15__, 2026/YA/ S.Sharma
Signature Not Verified
Digitally Signed
By:SAHIL SHARMA
Signing Date:18.05.2026
18:25:10
W.P.(C) 8908/2021 Page 18 of 18