DIPAK PAL vs THE MANAGING DIRECTOR, FOOD CORPORATION OF INDIA AND ORS.
- Court
- Calcutta High Court
1
IN THE HIGH COURT AT CALCUTTA
CONSTITUTIONAL WRIT JURISDICTION
APPELLATE SIDE
WPA 19929 OF 2024
Dipak Pal
Vs.
The Managing Director, Food Corporation of India & Ors.
Before: The Hon’ble Justice Arjun Ray Mukherjee
: Mr. Arindam Das, Adv.
For the Petitioner
Mr. Bani Israil, Adv.
Mr. Adwitiyo Raha, Adv.
For the Union of India
: Mr. Pinaki Bhattacharyya, Adv.,
Ms. Rini Bhattacharjee, Adv.
For the respondent Nos.
5, 6&8
: Mr. Kamal Kr. Chattopadhyay, Adv.
CAV on : 01.10.2026
Judgment delivered on : 14.10.2026
Judgment uploaded on :
14.10.2026
2
Arjun Ray Mukherjee, J.
1. The petitioner has, inter alia, challenged a decision of the Food
Corporation of India/respondents [hereafter ‘the respondents’] contained
rd
in the letter dated 3 April, 2024, issued by the Divisional Manager, Food
Corporation of India (FCI), whereby a sum of Rs. 2,73,040/- was withheld
from his bills, submitted by him in connection with a tender work.
2. The respondents floated a tender bearing no.
th
S/1(1183)/Cont/2022 dated 8 December, 2022 for handling operations
at Cossimbazar Railway siding and transportation of food grains and
allied materials from Cossimbazar Railway siding to FSD-Berhampore
and vice versa via weighbridge on regular basis for two years. The
petitioner participated in the said tender process and by a Memo dated
th
29 March, 2023, the respondents issued a work order in his favour
against the said tender.
3. The petitioner subsequently found that a sum of Rs. 2,73,492/-
had been deducted by the respondents from the bills submitted by him.
st
The petitioner, by a letter dated 31 March, 2024, referred to the said
decision of the respondents to deduct the said amount and requested
them to furnish the details as to why such amount had been deducted.
rd
4. In reply, the respondents, by their letter dated 3 April, 2024,
informed the petitioner that a sum of Rs. 2,73,040/- had been realized
3
from the total amount claimed by the petitioner in the bills submitted by
him on account of transit loss owing to his irresponsible handling and
transportation of the consignment entrusted to him. The petitioner was
further informed that the aforesaid recovery had been made on the basis
th
of a letter dated 17 January, 2024, issued by the Zonal Office of FCI,
Kolkata.
rd
5. The respondents also forwarded a Memo dated 3 November, 2023,
to the petitioner, issued by the Manager (Depot), FCI Berhampur,
addressed to the Manager (Depot), FCI Balangir, whereby an intimation of
transit loss of rice rake had been made. By the said Memo, the relevant
facts which were intimated are set out herein below:
“Remarks: - The entire unloading operation was conducted under the strict
vigil of ICCS Dist. Squad, Manager (Depot), Manager (MOVT), RPF/ Railway
staff, High security seal found affix with wagons. Heavy losse grain found
in wagon. The stocks were received on 100% weighment through DOS of all
the 42 wagons through owned computerize Lorry weighbridge at FSD
BERHAMPORE premises under the supervision of FCI officials. Local
Berhampore Police/DSP Traffic has also informed to keep watch enroute
during unloading of Rake. This is for your kind information and necessary
action please.
Hence, it is requested to depute the team of consignor and for joint
verification of stock within 3 days because there is urgency of issue out the
4
stock to State Government. The Stock has been kept separately as per
instruction in vogue”.
nd
6. The petitioner thereafter sent a demand for justice dated 22 April,
2024 and since no response was received, he filed the instant writ
petition challenging the aforesaid decision of the respondents.
7. Learned advocate appearing for the petitioner submitted that
before deducting the said sum from the bills of the petitioner, neither any
opportunity of hearing was extended nor any show-cause notice was
issued to him by the respondents. Therefore, he submitted that such
decision was required to be set aside as the same was in violation of the
principles of natural justice.
8. Per contra, learned advocate appearing for the respondents referred
to various provisions of the terms and conditions of the said tender. He
submitted that as per the tender terms and conditions, the General
Manager was the sole judge for determining the quantum and value of
the loss and also regarding the liability of the contractor for any loss and
the amount to be recovered from him after taking into consideration the
relevant circumstances. As such, the decision of the General Manager
should be considered as final and binding on the contractor. He further
submitted that the terms and conditions of the said tender provided for a
Dispute/Grievance Redressal Committee (hereafter the said committee) in
order to settle any dispute. The petitioner should have approached the
5
said committee and without exhausting the remedy available under the
said tender terms and conditions, the petitioner filed the instant writ
petition. Accordingly, the writ petition is liable to be dismissed.
9. Heard the parties.
10. Before dealing with the issues involved in the writ petition, it is
apposite to refer to the relevant terms and conditions of the said tender.
11. Clauses X and XVIII of the said tender terms and conditions deal
with ‘Liability of contractor for losses etc. suffered by the Corporation’
and ‘Laws governing the contract and dispute resolution’ respectively.
Clauses X and XVIII read as follows:
“Clause X- (a)The contractor shall be liable for all costs, damages,
demurrages, wharf age, forfeiture of wagon registration fees,
charges and expenses suffered or Incurred by the Corporation due to
the contractor's negligence and un-workman like performance of any
services under this contract or breach of any terms thereof or his
failure to carry out the work with a view to avoid Incurrence of
demurrage, etc. and for all damages or losses occasioned to the
Corporation due to any act whether negligent or otherwise of the
contractor themselves or his employees. The decision of the General
Manager regarding such failure of the contractor and his liability for
the losses, etc. suffered by Corporation, and the quantification of
such losses, shall be final and binding on the contractor.
6
“(b) The Corporation shall be at liberty to reimburse themselves of
any damages, losses, charges, costs or expenses suffered or
incurred by it due to contractor's negligence and un-workman like
performance of services under the contract or breach of any terms
thereof. The total sum claimed shall be deducted from any sum then
due or which at any time hereafter may become due to the contractor
under this or any other contract with the Corporation. In the event of
the sum which may be due from the Corporation as aforesaid being
insufficient, the balance of the total sum claimed and recoverable
from the contractors as aforesaid shall be deducted from the security
deposit furnished by the contractor. Should this sum also be not
sufficient to cover the full amount claimed by the Corporation,
contractor shall pay to the Corporation on demand the remaining
balance of the aforesaid sum claimed.
“(c) In the event of delay on the part of the contractor in providing
other services as mentioned in the MTF i.e. labour, weighment
machines, weights and any other services mentioned in the
agreement, efficiently and to the entire satisfaction of the GM
(Region) or any officer acting on his behalf, the General Manager
shall without prejudice to other rights and remedies under this
agreement, have a lawful right to levy Liquidated Damages from the
7
contractor @ Rs. 2000/- per day or such lesser sum per day or part
of a day of the delay as the GM (Region) in his absolute discretion
may determine subject to the total liquidated damages not exceeding
15% of the value of the contract during the operation period of the
contract. The decision of the Corporation in regard to levy of above
Liquidated Damages shall be final and binding on the parties.
“(d) The Contractor shall be responsible for the safety of the goods
from the time they are loaded on his trucks from Railway Goods
shed or siding Godowns, until they have been unloaded from his
trucks at godowns or at other trucks or vice-versa, so as to avoid
loss of grain, etc. through the holes/crevices in the decks of the
trucks. He shall deliver the number of bags and the weight of
foodgrains, fertilizers/sugar/groundnut/any other food product etc.
received by him and loaded on his trucks and shall be liable to make
good the value of any loss, shortage or damage during transit. The
General Manager will be the sole judge for determining after taking
into consideration all the relevant circumstances, the quantum and
value of loss and also as regards the liability of the contractor for
such loss and the amount to be recovered from him. The decision of
the General Manager in this regard shall be final and binding on the
contractor.
8
“(e) The Contractor shall provide sufficient number of tarpaulins for
each truck to cover the bags of foodgrains etc. and take reasonable
precautions to avoid wetting/damage/loss to foodgrains during the
transport. In the event of deficiency in service by contractor in not
providing the tarpaulins for spreading on the decks of trucks or for
covering the truck after loading, Liquidated Damages @ Rs. 200/-
per truck will be imposed by the concerned General Manager/Area
Manager without prejudice to any other right or remedies under the
contract and law”.
“Clause XVIII- (a) The contract will be governed by the laws of India
for the time being in force.
“(b) In case of any dispute arising out of and touching upon the
contract, the same will be first referred to the Dispute/Grievance
Redressal Committee constituted and functioning at the Zonal Office
of the Corporation, with a view to settle the disputes. The role of GRC
shall cover the period from the date of award of contract. If any
dispute remains thereafter, the same will be settled in the Court of
Law having competent Jurisdiction.
“(c) The results of technical evaluation will be uploaded on the GeM
Portal. In case there are technically disqualified bidders, the reasons
for disqualification will be uploaded and price bid shall be opened
9
only after three working days. If any of the bidders is disqualified,
he may submit grievance (if any) to General Manager (Region) within
three working days from the date of disqualification. However, no
new documents will be accepted. In case of receipt of grievance,
General Manager (Region) will redress the grievance by passing
Speaking Order within seven (7) working days. In case of receipt of
grievance from any disqualified bidder, the validity period of the
tender shall get automatically extended by 15 working days, which
shall be binding on all the bidders.”
12. Before this Court proceeds further, it is relevant to state some of
the paragraphs of the affidavit-in-opposition filed by the respondents in
connection with the said writ petition:
“11. Upon completion of the weighment process for the entire stock at
the destination point it was noticed that a quantity of 160.46480
quintals was found transit loss comparing to the total dispatched
quantity of 27,252.49060 quintals, reflecting a loss percentage of
0.589%. The weighment was meticulously conducted using FCI’s
controlled electronic Lorry Weigh bridge.
“12. In order to accurately assess the substantial loss associated
with that particular consignment, the office of FCI initiated a joint
inspection and verification process by summoning a team from
10
dispatching end to collaborate with the team at the Murshidabad
Divisional office level. A detailed analysis of the wagon wise and
trick wise unloading statements revealed significant inconsistencies
in the average weight per bag across different wagons and tricks,
even within the same wagon. This clearly indicates that the
Handling and Transport Contractor, i.e. the writ petitioner’s negligent
attitude in handling of food grains.
“13. In the above situation, in accordance with the provisions
outlined in the tender agreement (MTF) for Handling and Transport
Contractors, specifically under Clause XX of points No. 4,8,21,26,27,
and 30 the writ petitioner Dipak Pal, who was entrusted with the
handling and transportation of the aforementioned consignment,
was held accountable for the resultant losses. Nevertheless, the
competent authority has determined to recover 50% of the total
transit loss, amount to 40.1087 quintals, at twice of the acquisition
cost fixed for the year 2022-23. The recovery sum was totaling Rs.
273040.78. The Divisional Office Murshidabad has already
communicated to Mr. Deepak pal vide the letter dated 03.04.2024,
the reason behind the deduction of Rs. 2,73,040.78 in response to
his query letter.”
11
13. It appears from the affidavit in opposition filed by the respondents
that they conducted a joint verification of the rice consignment assigned
to the petitioner in order to ascertain the transit loss suffered by the
respondents. The joint verification consisted of eight members, four
members each for the consignor and consignee joint verification teams.
th
The joint verification report dated 8 November, 2023 was submitted to
the Divisional Manager of FCI, Murshidabad. It appears from the records
submitted by the respondents in their affidavit that subsequently, the
General Manager [Region], FCI, conducted an investigation and upon
th
conclusion of such investigation, a report dated 15 February, 2024, was
submitted. In view of the decision taken on the basis of the joint
verification report and subsequent investigation report, the Divisional
rd
Manager issued the letter dated 3 April, 2024 whereby the petitioner
was informed about a decision to realize a sum of Rs. 2,73,040/- owing
to his alleged irresponsible handling and transportation of the
consignment in question.
14. The question which falls for consideration before this Court is
whether the decision taken by the respondents to deduct the aforesaid
sum from the bills of the petitioner suffers from any illegality and/or
procedural impropriety.
15. It appears that neither at the time of joint verification nor during
the investigation conducted by the General Manager, the petitioner was
12
allowed to participate in such verification or investigation. The entire
verification process, the investigation and the consequential decision to
deduct the amount were undertaken unilaterally behind the back of the
petitioner. Even a show cause notice was not issued by the respondents
to the petitioner before taking such a decision.
16. This Court posed a question to the learned advocate appearing for
the respondents with regard to a pleading mentioned in the said affidavit
in opposition. In paragraph 20 of the said affidavit filed by the
respondents, the following has been, inter alia, stated:
“… In this connection it is submitted that no written request was
received from the contractor regarding the participation in the joint
verification at the relevant point of time. …”
Upon a query from this Court as to when the petitioner was invited to
participate in the joint verification, the learned advocate for the
respondents fairly submitted that no such invitation was ever made.
17. The entire decision-making process, as it appears from the records
of this writ petition and the said affidavit- in- opposition filed by the
respondents, suffered from gross violation of the principles of natural
justice. There is no doubt about the contention of the learned advocate
appearing for the respondents that as per the tender terms and
conditions, the General Manager was the sole judge for determining the
quantum and value of loss and also regarding the liability of the
13
contractor for any loss and the amount to be recovered from him after
taking into consideration the relevant circumstances. But one cannot
exercise such power without following the rules of natural justice. It
appears that no opportunity of being represented or being heard was
extended to the petitioner prior to taking such decision to deduct the
amount.
18. It is well settled that an administrative order which involves civil
consequences must be consistent with the rules of natural justice. The
expression “civil consequences” encompasses infraction of not merely
property or personal rights but of civil liberties, material deprivations and
non-pecuniary damages. In its wide umbrella, everything that affects a
citizen in his civil life inflicts a civil consequence. [See: 1978 (1) SCC 405
(Paragraph 66) (Mohinder Singh Gill & Anr. Vs. Chief Election
Commissioner, New Delhi & Ors.)].
19. The total exclusion of the audi alteram partem rule is not
permissible as has happened in this case. Almost forty years ago, the
Hon’ble Supreme Court in Central Inland Water Transport Corporation
Vs. Brojo Nath Ganguly , reported in (1986) 3 SCC 156 , inter alia, held
as follows:
“98. No apter description of Rule 9(i) can be given than to call it “the
Henry VIII clause”. It confers absolute and arbitrary power upon
the Corporation. It does not even state who on behalf of the
14
Corporation is to exercise that power. It was submitted on behalf of
the appellants that it would be the Board of Directors. The
impugned letters of termination, however, do not refer to any
resolution or decision of the Board and even if they did, it would be
irrelevant to the validity of Rule 9(i). There are no guidelines
whatever laid down to indicate in what circumstances the power
given by Rule 9(i) is to be exercised by the Corporation. No
opportunity whatever of a hearing is at all to be afforded to the
permanent employee whose service is being terminated in the
exercise of this power. It was urged that the Board of Directors
would not exercise this power arbitrarily or capriciously as it
consists of responsible and highly placed persons. This submission
ignores the fact that however highly placed a person may be, he
must necessarily possess human frailties. It also overlooks the
well-known saying of Lord Acton, which has now almost become a
maxim, in the appendix to his “Historical Essays and Studies”,
that: “Power tends to corrupt, and absolute power corrupts
absolutely.” As we have pointed out earlier, the said Rules provide
for four different modes in which the services of a permanent
employee can be terminated earlier than his attaining the age of
superannuation, namely, Rule 9(i), Rule 9(ii), sub-clause (iv) of
clause (b) of Rule 36 read with Rule 38 and Rule 37. Under Rule
9(ii) the termination of service is to be on the ground of: “Services no
longer required in the interest of the Company.” Sub-clause (iv) of
clause (b) of Rule 36 read with Rule 38 provides for dismissal on
the ground of misconduct. Rule 37 provides for termination of
service at any time without any notice if the employee is found
guilty of any of the acts mentioned in that rule. Rule 9(i) is the only
rule which does not state in what circumstances the power
15
conferred by that rule is to be exercised. Thus, even where the
Corporation could proceed under Rule 36 and dismiss an employee
on the ground of misconduct after holding a regular disciplinary
inquiry, it is free to resort instead to Rule 9(i) in order to avoid the
hassle of an inquiry. Rule 9(i) thus confers an absolute, arbitrary
and unguided power upon the Corporation. It violates one of the
two great rules of natural justice — the audi alteram partem rule. It
is not only in cases to which Article 14 applies that the rules of
natural justice come into play. As pointed out in Union of India v.
Tulsiram Patel [(1985) 3 SCC 398 : 1985 SCC (L&S) 672] : (at SCC
p. 463, para 72) “The principles of natural justice are not the
creation of Article 14. Article 14 is not their begetter but their
constitutional guardian.” That case has traced in some detail the
origin and development of the concept of principles of natural justice
and of the audi alteram partem rule (at pp. 463-80). They apply in
diverse situations and not only to cases of State action. As pointed
out by O. Chinnappa Reddy, J., in Swadeshi Cotton Mills v. Union
of India [(1981) 1 SCC 664] they are implicit in every decision-
making function, whether judicial or quasi-judicial or
administrative. Undoubtedly, in certain circumstances the principles
of natural justice can be modified and, in exceptional cases, can
even be excluded as pointed out in Tulsiram Patel case [(1985) 3
SCC 398 : 1985 SCC (L&S) 672] . Rule 9(i), however, is not covered
by any of the situations which would justify the total exclusion of
the audi alteram partem rule.”
“104. As the Corporation is “the State” within the meaning of Article
12, it was amenable to the writ jurisdiction of the High Court under
Article 226. It is now well established that an instrumentality or
agency of the State being “the State” under Article 12 of the
16
Constitution is subject to the constitutional limitations, and its
actions are State actions and must be judged in the light of the
Fundamental Rights guaranteed by Part III of the Constitution (see
for instance, Sukhdev Singh v. Bhagatram Sardar Singh
Raghuvanshi [(1975) 1 SCC 421 : 1975 SCC (L&S) 101 : AIR 1975
SC 1331 : (1975) 3 SCR 619] , International Airport Authority case
[(1979) 3 SCC 489 : AIR 1979 SC 1628 : (1979) 3 SCR 1014] and
Ajay Hasia case [(1975) 1 SCC 421 : 1975 SCC (L&S) 101 : AIR
1975 SC 1331 : (1975) 3 SCR 619] ). The actions of an
instrumentality or agency of the State must, therefore, be in
conformity with Article 14 of the Constitution. The progression of the
judicial concept of Article 14 from a prohibition against
discriminatory class legislation to an invalidating factor for any
discriminatory or arbitrary State action has been traced in Tulsiram
Patel case [(1985) 3 SCC 398 : 1985 SCC (L&S) 672] (at pp. 473-
76). The principles of natural justice have now come to be
recognized as being a part of the constitutional guarantee contained
in Article 14. In Tulsiram Patel case [(1985) 3 SCC 398 : 1985 SCC
(L&S) 672] this Court said: (at p. 476, para 95)
“The principles of natural justice have thus come to be recognized
as being a part of the guarantee contained in Article 14 because of
the new and dynamic interpretation given by this Court to the
concept of equality which is the subject-matter of that article.
Shortly put, the syllogism runs thus: violation of a rule of natural
justice results in arbitrariness which is the same as discrimination;
where discrimination is the result of State action, it is violation of
Article 14; therefore, a violation of a principle of natural justice by a
State action is a violation of Article 14. Article 14, however, is not
the sole repository of the principles of natural justice. What it does
17
is to guarantee that any law or State action violating them will be
struck down. The principles of natural justice, however, apply not
only to legislation and State action but also where any tribunal,
authority or body of men, not coming within the definition of ‘State’
in Article 12, is charged with the duty of deciding a matter.”
20. In Dharampal Satyapal Ltd. Vs. CCE, reported in (2015) 8 SCC
519, the Hon’ble Supreme Court elaborately discussed the origins and
development of the principles of natural justice in India. The Hon’ble
Supreme Court held as follows:
“35. From the aforesaid discussion, it becomes clear that the
opportunity to provide hearing before making any decision was
considered to be a basic requirement in the court proceeding. Later
on, this principle was applied to other quasi-judicial authorities and
other tribunals and ultimately it is now clearly laid down that even
in the administrative actions, where the decision of the authority
may result in civil consequences, a hearing before taking a decision
is necessary. It was, thus, observed in A.K. Kraipak case [(1969) 2
SCC 262] that if the purpose of rules of natural justice is to prevent
miscarriage of justice, one fails to see how these rules should not
be made available to administrative inquiries. In Maneka Gandhi v.
Union of India [(1978) 1 SCC 248] also the application of principle of
natural justice was extended to the administrative action of the
State and its authorities. It is, thus, clear that before taking an
action, service of notice and giving of hearing to the noticee is
required. In Maharashtra State Financial Corpn. v. Suvarna Board
Mills [(1994) 5 SCC 566] , this aspect was explained in the following
manner : (SCC p. 568, para 3)
18
“3. It has been contended before us by the learned
counsel for the appellant that principles of natural justice
were satisfied before taking action under Section 29,
assuming that it was necessary to do so. Let it be seen
whether it was so. It is well settled that natural justice
cannot be placed in a straitjacket; its rules are not embodied
and they do vary from case to case and from one fact-
situation to another. All that has to be seen is that no
adverse civil consequences are allowed to ensue before one
is put on notice that the consequence would follow if he
would not take care of the lapse, because of which the
action as made known is contemplated. No particular form
of notice is the demand of law. All will depend on facts and
circumstances of the case.”
“36. In East India Commercial Co. Ltd. v. Collector of Customs [AIR
1962 SC 1893], this Court held that whether the statute provides
for notice or not, it is incumbent upon the quasi-judicial authority to
issue a notice to the persons concerned disclosing the
circumstances under which proceedings are sought to be initiated
against them, failing which the conclusion would be that principles
of natural justice are violated.”
21. The only permissible exception to, or exclusion of or inapplicability
of, the rules of natural justice was also indicated in the aforesaid
judgment in Dharampal Satyapal Ltd. [supra], that is, where an
opportunity of hearing would not change the ultimate conclusion reached
by the decision-maker. In such a case, no legal duty arises to afford an
opportunity of hearing. The Hon’ble Supreme Court also held that ‘the
validity of the order has to be decided on the touchstone of “prejudice”.
19
22. The instant case does not fall within any of the exceptions referred
to in the judgment in Dharampal Satyapal Ltd. [supra].
23. This is also not a fit case for remand for taking a post-decisional
hearing, as suggested by the learned advocate for the respondents. The
law is well settled in this regard. In H.L. Trehan Vs. Union of India ,
reported in (1989) 1 SCC 764 , the Hon’ble Supreme Court held:
“…In our opinion, the post-decisional opportunity of hearing does
not subserve the rules of natural justice. The authority who
embarks upon a post-decisional hearing will naturally proceed with
a closed mind and there is hardly any chance of getting a proper
consideration of the representation at such a post-decisional
opportunity.”
24. In the instant case, this Court does not think that the FCI
authority will proceed with a closed mind if an opportunity for post-
decisional hearing is extended. The difficulty is elsewhere. After a lapse
of more than two and a half years from the date of the incident, if the
case is remanded for taking a fresh decision, it would be extremely
difficult for the petitioner, if not impossible, to prove his innocence as
nothing remains to be decided. The food grains have been utilized in the
meantime and all the evidence have been irretrievably lost once and for
all. Remanding the matter in such circumstances will not only cause
immense prejudice to the petitioner, but it cannot also cure the defect.
20
For the same reason, the issue also cannot be decided by the
Dispute/Grievance Redressal Committee after a lapse of considerable
period of time. The entire endeavour would be, in the opinion of this
Court, an idle formality.
25. Before concluding, a few words are required to be recorded. FCI is
a statutory authority set up with the object of providing food grains to the
common people through fair-price shops and it also runs several welfare
schemes of the Government of India, namely, mid-day meals in schools,
Antyodaya Yojana etc. Any wastage of food grains is a national loss and
citizens are the sufferers. Apart from the wastage of food grains due to
the improper handling during transportation or otherwise, there are
incidents when dishonest contractors siphon off food grains illegally and
those misdeeds should be nipped in the bud by adopting proper
procedures followed by the imposition of necessary punishments. But
that does not give FCI a freehand to arrive at a decision without adhering
to the principles of natural justice. Any procedure which determines the
fate of a citizen involving civil consequences must follow the principles of
natural justice and non-compliance with such a rule vitiates the entire
decision-making process. If a faulty procedure is adopted by a statutory
authority for a substantial span of time, that not only affects the rights of
a citizen but also goes against the interests of the nation. FCI and like
authorities must remember that an innocent contractor should not be
21
punished and a dishonest contractor also should not be spared. It is
expected that FCI henceforth will follow the principles of natural justice
before taking a decision like the present one.
26. In view of the above, the decision-making process adopted by the
respondents suffered from the vice of procedural impropriety as it
violated the principles of natural justice. Accordingly, the decision
rd
contained in the letter dated 3 April, 2024 is set aside and all
consequential steps taken pursuant to such decision are also quashed.
The respondents are directed to release the sum of Rs. 2,73,040/- in
favour of the petitioner within two weeks from the date of communication
of this order, along with interest at the rate of 8% per annum from the
date of deduction till the date of actual disbursement.
27. The writ petition is allowed with costs of Rs. 10,000/- to be payable
to the petitioner by the respondents.
28. Urgent photostat certified copies of this judgment, if applied for, be
supplied to the parties on compliance of all necessary formalities.
(Arjun Ray Mukherjee, J.)