Kishore Jaiswal vs The State Of Madhya Pradesh

Court
Madhya Pradesh High Court

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
1 WP-32666-2026
IN THE HIGH COURT OF MADHYA PRADESH
AT INDORE

BEFORE
HON'BLE SHRI JUSTICE SANDEEP N. BHATT
th
ON THE 19 OF AUGUST, 2026
WRIT PETITION No. 32666 of 2026
KISHORE JAISWAL
Versus
THE STATE OF MADHYA PRADESH AND OTHERS
Appearance:
Shri Shailesh Tiwari - Advocate for the petitioner [P-1].
Ms Bhagyashree Gupta - Govt. Advocate for the respondent/State.
Shri Rishi Tiwari - Advocate for the respondent [R-6].
ORDER
The present petition under Article 226 of the Constitution of India has
been filed praying for the following reliefs:
"7. RELIEFS:
In view of the facts and circumstances stated hereinabove, the Petitioner most
respectfully prays that this Hon'ble Court may be pleased to:
7.1 issue a writ of Certiorari or any other appropriate writ, order, or direction to
quash the impugned order bearing number Zone -19/Ward-76/2026/3145/5
dated 03.08.2026, issued by the Respondent No. 07.
7.2 issue any other appropriate writ, order, or direction restraining the
Respondents from:
(a) interfering with the Petitioner's peaceful possession, enjoyment, and
existing construction over the subject land;
(b) demolishing the existing construction/boundary wall;over the subject land
situated at Khasra Nos. 35/1/1 and 37/1-2, Village Bicholi Mardana, Tehsil
Bicholi Hapsi, District Indore admeasuring 0.820 hectare."
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
2 WP-32666-2026
2. The Petitioner is the lawful owner and in possession of land bearing

Khasra Nos. 35/1/1 and 37/1-2 admeasuring 0.820 hectare, situated át village
Bicholi Mardana, Tehsil Bicholi Hapsi, District Indore, M. P. After
necessary demarcation and sanctioning of layout by the Respondent No. 2,
vide order dt. 31.12.2014 (Annex. P-2) showing that petitioner's land does
not fall in the proposed construction of Master Plan Road and obtaining the
requisite certificate of establishment of Hotel, the petitioner completed entire
construction and was in possession over the said land after clearing all
statutory requirements. The Resp. No. 7 had issued notice dated 24.04.2026
whereby it was informed that 5.69 meters of land of petitioner is coming in
the way of proposed Master Plan, 2021 in widening of road. The petitioner
has raised specific objection, but there is no such consideration on the
objection and in a formal manner. No demarcation or proper alignment of the
road was carried out and the respondent no. 7 has issued order dated
07.07.2026 by which the petitioner was directed to remove such excess
construction. Thereafter the said order was assailed before this Court by
filing W.P. No. 27725/2026 which was decided on 20.07.2026 directing the
petitioner to raise objection before respondent no. 7 within 02 days and
remain present before the respondent no. 7 for hearing who will take decision
afresh passing speaking order. The petitioner has filed representation before
the respondent no. 7 raising all the objections. The respondent no. 7 has
again passed the order dated 03.08.2026 which is impugned herein, by
which the petitioner was directed to remove such constructions by offering
certain relaxations of AFR. Hence, being aggrieved by the said order, the
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
3 WP-32666-2026
present petition has been filed.

3 . Learned counsel for the petitioner has made the following
contentions.
i. Learned counsel for the petitioner has raised preliminary objection
regarding jurisdiction in passing the order impugned dated 03.08.2026 by
the respondent no.7. It is submitted that the order so passed is wholly without
jurisdiction as the subject land is governed by the planning and development
regime under the Madhya Pradesh Nagar Tatha Gram Vikas Nivesh
Adhiniyam, 1973[referred to as ' the Adhiniyam, 1973' hereinafter] and the
respondent no. 7 derives power under the Madhya Pradesh Municipal
Corporation Act, 1956[referred to as ' the Act, 1956'].
ii. It is further contended that the petitioner has raised specific objection
on the proposed road alignment through letter dt. 15.05.2026 but there is no
such findings in the impugned order wherein it has been wrongly concluded
that the petitioner was found absent on 28.07.2026, whereas the objection of
road alignment of others has a favorable result in favor of such objector.
iii. It is further contended that under the scheme of the Adhiniyam of
1973, more particularly Section 38, the powers of development, road
alignment and control are vested exclusively with the planning authorities,
with exclusive power to plan, regulate, and implement development activities
within the planning area, including road alignment and road widening. The
statutory scheme consciously excludes parallel overlapping jurisdiction of
other authorities. In the absence of any action or decision by an authority
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
4 WP-32666-2026
constituted under Section 38, the assumption of jurisdiction by the

respondent no. 7 is wholly illegal, because the Indore Master Plan 2021 has
expired on 31.03.2026 and, therefore, the entire action of respondents are
unsustainable.
iv. It is also contended that the subject land has already been subjected
to a lawful and concluded demarcation by the competent revenue authority,
which conclusively determined the boundaries and extent of the land. Such
demarcation runs with the land and not with the individual owner, and once
it attains finality, it cannot be reopened or unsettled repeatedly, particularly
for purposes ünrelated to Municipal Administration and the same is apparent
violation of the Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act. 2013.
v. Learned counsel also contended that the demarcation is intended
only to identify boundaries and cannot be used as a tool to facilitate road
widening or development. The issuance of impugned order, despite an
existing demarcation, amounts to an abuse of power and is an illegal,
arbitrary and unauthorized exercise intended to bypass the statutory planning
and acquisition framework.
vi. It is contended that the petitioner is the lawful owner of the
property in question and the respondent no. 2 has already sanctioned the
layout of the petitioner's property on 31.12.2014, no part of the area of the
petitioner's land is affecting the construction of the proposed master plan
road, if any because the respondents have sufficient land on the other side, as
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
5 WP-32666-2026
averted by the petitioner earlier.

vii. It is further contended by the counsel that petitioner is absolute
owner of his land, as guaranteed under Article 300-A of the Constitution of
India as well as his bhumiswami rights, as per Section 158 of MPLRC,
cannot be curtailed by issuance of a formal notice in the absence of any land
acquisitions process by issuance of notification under the statute by inviting
objections thereon and granting proper compensation.
viii. Learned counsel also contended that the impugned action
bypasses mandatory statutory safeguards prescribed under the Adhiniyam of
1973, including preparation of plans, publication, invitation of objections,
consideration thereof, and lawful acquisition. Such circumvention of
statutory procedure renders the action arbitrary and unconstitutional, as also
in utter violation of settled propositions of law by the Hon'ble Apex Court
and this Hon'ble Court in similar cases.
ix. It is submitted that this Court in an identical matter i.e. W.P. No.
15272/2026 has passed interim order on the basis of findings given in M.P.
No. 4687/2025 dated 05.02.2026 wherein it has been held that the validity of
Master Plan 2021 seized to exist w.e.f. from 31.03.2021. Learned counsel
has further relied on the judgment of Hon'ble Apex Court in W.P.(Civil) No.
340/2022 in which specific directions have been issued in the matter of
demolition of private and public properties, but despite specific directions, no
such directions are followed by the respondent no.7 while issuing the
impugned notice.
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
6 WP-32666-2026
x. It is also contended that the impugned action is manifestly

arbitrary, lacking any statutory foundation, uniform procedure, or rational
basis, and in blatant violation of Article 14 of the Constitution of India as
also there is apparent violation of principles of natural justice because
proper opportunity of hearing has not been afforded to the petitioner, and
the impugned order was issued in slipshod manner.
xi. In support of his contentions, learned counsel has relied upon the
judgment of Telangana High Court rendered in the case of R. Pushpavathi
and Others Vs. Special Deputy Collector, L.A. GHMC, Hyderabad and
Others[W.P. no. 1023/2008 passed on 2nd April, 2012] as well s the
judgment passed by the Hon'ble Apex Court in the case of Hindustan
Petroleum Corpn. Ltd. Vs. Darisu Shapur Chenai & Ors. reported in
2005(7) SCC 627.
4. Learned counsel for the answering respondent(s) no. 6 and 7 has
made the following submissions:
i. The present petition has been filed challenging the impugned
notice dated 03.08.2026 (Annexure P-15) wherein after considering the
objections raised by the petitioner and the after granting due opportunity of
hearing the petitioner was informed regarding the obstructing portion of the
building in the road widening process and was directed to remove the same
within a period of 15 days.
ii. Learned counsel for the respondent no. 6 & 7 submitted that it is
pertinent to mention that the road widening of the existing road is being
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
7 WP-32666-2026
undertaken from Pride Hotel to City Forest as per the Indore Development

Plan, 2021, and the proposed width as per the Indore Development Plan of
2021, of the subject road is 30 meter wide road as per the aforementioned
plan has to be constructed from "Indore Bypass Hotel Pride to City Forest"
(Annexure R/1).
iii. Learned counsel submitted that the development plan was
prepared under the provisions of the M.P Nagar Tatha Gram Nivesh
Adhiniyam, 1973, after inviting objections and suggestions and was
subsequently, finalized and published under Section 19 (4) of the Act. It is
trite in law that the development plan once prepared is binding upon the
respondent Corporation.
iv. While replying to contention of the petitioner that the alignment was
undertaken by the answering respondent is wholly misconstrued as the
markings were done by the joint team is accordance with the development
plan. Moreover, it is imperative to bring to light that the regular line of street
is already delineated in the Development Plan, 2021, on the basis of which
markings have been done by a team of experts comprising i.e. T&CP, IMC
& the Revenue Department.
v. He has further pointed out that the sanctioned layout dated
14.11.2014 (Annexure-P/3) filed by the petitioner is not legible. Therefore,
the respondents reserve their rights to reply to the same when legible copies
of the same have been supplied. He further submitted that subsequent to the
exercise performed by the joint team of 03 departments, it appears that the
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
8 WP-32666-2026
petitioner has encroached over the land of the road.

vi. Learned counsel by referring to Annexure R-1 annexed with the
reply submitted that the subject road is being widened up to 30 meters as per
the Development plan which was finalized after inviting objections.
vii. Learned counsel referring to the contention of petitioner
regarding expiry of master plan submits that the same is misleading and
misconstrued. The year 2021 mentioned in the Indore Development Plan,
2021 does not mean that the year 2021 is it's expiry date. There is neither any
clause in the master plan nor any rule to suggest this interpretation. Instead,
2021 implies that the proposed development has been planned, keeping in
mind the requirement on the basis of population up to the year 2021. Until
the new master plan comes into force, the existing master plan continues.
viii. It is contended that the reliance placed by the petitioner on the
judgment passed in M.P. No.4687/2025 Raj Beesani and Others Vs. State of
Madhya Pradesh is misconstrued as the order passed in M.P. No. 4687/2025
has been stayed by this Hon'ble Court vide interim order dated 13.05.2026
passed in W.A No. 1413/2026.
ix. Learned counsel for the respondents submits that the contention of
petitioner regarding the impugned order being illegal, arbitrary and without
any authority of law is not acceptable and has relied upon the judgment
passed by the Hon'ble Supreme Court in the case of Ravindra Ramchandra
Waghmare Vs Indore Municipal Corporation and Others reported in (2017) 1
SCC 667 wherein it has observed that the Development Plan is binding upon
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
9 WP-32666-2026
the Corporation and has to be implemented by the Corporation. Thus, the

impugned notice issued under sections 305 and 306 of the M.P. Municipal
Corporation Act, 1956 does not suffers from any illegality and was issued
within the jurisdiction.
x. For ready reference relevant portion of the judgment passed in the
matter of Ravindra Ramchandra Waghmare (supra) is reproduced as under-
"66. On merits also, the submission based upon Sections 49 and 50 of the 1973
Act is found to be untenable. Development plan itself is binding and has to be
implemented by the Corporation not only under the provisions of Section 292
but also under the provisions of Section 66(1)(y) of the 1956 Act which
mandates a duty upon the Corporation for fulfilling any obligation imposed by
the Act or under any other law for the time being in force. Provision of Section
66(1) is extracted hereunder:
"66. Matters to be provided for by Corporation (1) The Corporation shall make
adequate provision, by any means or measures which it may lawfully use or take,
for each of the following matters, namely
(y) fulfilling any obligation imposed by this Act or any other law for the time
being in force;"
Thus Corporation while taking action, is simply carrying out the mandate of
Sections 19(5), 25 and other provisions of the 1973 Act. Framing of the scheme
under Section 291 as already held, is precluded by virtue of the provisions of
Section 292, in view of the existence of development plan which is final as to
width of road or town development scheme, as the case may be."
xi. Furthermore, it is submitted that vide order dated 29.08.2024 and
30.04.2026, the Commissioner, Indore Municipal Corporation, exercising his
powers under section 69 (4) of the 1956 Act, delegated his powers under
sections 302, 303, 307, 308, 309 and 310 to all the Building Officers of Zone
Nos. 01 to 22. From bare perusal of the aforementioned order, it is crystal
clear that respondent No. 7 has the power to issue the impugned order under
section 305 and 306 therefore, the contention of the petitioner that
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
10 WP-32666-2026
respondent No. 7 does not have the power to issue the impugned order is

wholly misconstrued.
xii. It is further submitted that the Indore Development Plan, 2021, is
binding on the respondent Corporation as per which the width of the road is
30 meters and the Corporation is simply following the mandate of the
Development Plan. There are constructions situated on both sides of the
subject road which are being affected due to the proposed road widening and
on the basis of alignment conducted by the team of 03 departments as
mentioned above it was found that the portion of the petitioner's hotel as
specified in the notice is obstructing the road widening. Accordingly, the
notice has been issued.
xiii. It is the contention of learned counsel for the respondent by
referring to Section 305 that the subject construction is liable to be removed
as per section 305 of the 1956 Act, which states as under:
"305. Power to regulate line of buildings.-(1) If any part of a building projects
beyond the regular line of a public street, either as existing or as determined for the
future or beyond the front of immediately adjoining buildings the Corporation
may-
(a) if the..........
(b) if the...................
require by notice either that the part or some portion of the part projecting beyond
the regular line or beyond the front of the adjoining building, shall be removed, or
that such building when being rebuilt shall be set back to or towards the said line
or front; and the portion of land added to the street by such setting back or removal
shall henceforth be deemed to be part of the public street and shall vest in the
Corporation: Provided............
(2)The.............
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
11 WP-32666-2026
xiv. Learned counsel for the respondents has further relied on the

judgment of this Court passed in the case of Suresh Singh Kushwah Vs.
Municipal Corporation Gwalior and another reported in 2006 (3) MPLI 412,
wherein it has been held as under-
"once the Municipal Corporation has prepared a plan determining the regular
line of public street any portion of the building which is projected beyond this
line automatically vests in the Corporation in view of section 305 of the Act
and, therefore, the Corporation has right to demolish the portion of said
building and no proceedings under the Land Acquisition Act are required."
xv. Learned counsel for the respondents submitted that petitioner has
wrongly raised a ground that there is a violation of the Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation and
Resettlement Act, 2013. The Hon'ble Supreme Court in Ravindra
Ramchandra Waghmare (supra) has held as under:
"56...... if the provision as to public street is made dependent upon the
acquisition of land, the very purpose behind the provisions of Section 305
would be frustrated"
xvi. It is further contended that the ground regarding violation of
Article 14 of Constitution of India is misconceived. The Hon'ble Supreme
Court in the matter of Ravindra Ramchandra Waghmare (supra) has held as
under-
“72..............In our opinion, the provision of Section 305 when it deals with the
public streets and removal of building falling in regular line is a wholesome
one and being a special provision, based on classification made for the purpose
of Section 305 as to public street cannot be said to be suffering from vice or
discrimination and violative of Article 14.....”
xvii. As regard the ground raised regarding violation of Article 300-A
of the Constitution, it is submitted that the same is also misinterpreted in as
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
12 WP-32666-2026
much as the respondent Corporation has initiated the process of widening of

the subject road as per the Indore Development Plan of 2021. The Division
Bench of this Court in W.A No. 873/2014 has held in this regard as under-
"..........in view of clear provision contained in Section 305 of the Act vesting of
land being automatic and so long the said section is in the statute book, the
appellant's contention based upon Article 300-A of the Constitution cannot be
accepted." Thus, the petitioner's contention that there has been violation of
Article 300-A is misconstrued.
xviii. Learned counsel for the respondents has further pressed into service
the judgment passed by the Constitution Bench of the Hon'ble Supreme
Court in the case of Indore Municipality V/s K.N Palsikar reported in AIR
1969 SC 579 wherein, it has been held as under:
"In fact it seems to us that there is automatic vesting of the land in the
Corporation under sec. 305 once the requisite conditions are satisfied."
xix. It is also submitted that the subject road is proposed at a stretch of
2.4 Kms, which connects the Bypass road to the Light House Project and the
Pradhan Mantri Awas Yojna via city forest. Several colonies will now have
paved access to Bypass. Construction of the subject road will benefit the
students too as Shishukunj school falls within the stretch of 2.4 Kms.
xx. It is also submitted that the impugned orders categorically states that
the petitioner can avail F.A.R as a form of compensation or T.D.R in the
alternative, which has not been done by the petitioner.
xxi. Learned counsel for the respondents also submitted that the ground
regarding violation of principle of natural justice has been raised by the
petitioner. However, from a bare perusal of notice dated 22.07.2026
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
13 WP-32666-2026
(Annexure R-8), it is evident that the petitioner was directed to remain

present for personal hearing on 27.07.2026 and from a bare perusal of the
attendance sheet dated 27.07.2026, it is evident that the representative of the
petitioner appeared before the answering respondent and submitted objection
in light of the judgment passed by this Hon'ble Court in W.P. No.
27725/2026. Thus, the ground raised by the petitioner regarding violation of
principle of natural justice is misleading as the petitioner was given proper
opportunity of hearing.
5. On all these grounds, the counsel for respondents no. 6 and 7
submitted that the present petition is bereft of merits and not maintainable,
either in the law or on facts and is liable to be dismissed in limine
6 . I have heard learned counsel for the parties and perused the
record.
7. The judgment which is relied on by the counsel for the
respondent rendered in the case of Ramchandra Waghmare(supra) is also
worthy of reference. Para 21,22,23,27, 28, 39, 55 , 56 and 71 of the
judgment are as under:
"21. It is apparent that the development plan once prepared is binding upon the
development authorities in the planning area as well as on the Municipal
Corporation and other local authorities as the case may be. They cannot modify
and permit the user in contravention thereof. In other words, restriction is
imposed upon the owners on enjoyment of the property in violation of the
development plan/regional plan, as the case may be.
22. Section 49 of the 1973 Act deals with the town development schemes.
Same has to be prepared under the umbrella of the regional plan and
development plan. The town development scheme is prepared by the Town
and Country Development Authority established under the provisions of
Section 38. The same shall be a body corporate under the provisions of Section
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
14 WP-32666-2026
39 and its constitution is provided in Section 40. Section 49 of the 1973 Act is
extracted hereunder:

"49. Town development schemes.—A town development scheme may make
provision for any of the following matters-
(i) acquisition, development and sale or leasing of land for the purpose of town
expansion;
(ii) acquisition, relaying out of, rebuilding, or relocating areas which have been
badly laid out or which has developed or degenerated into a slum;
(iii) acquisition and development of land for public purposes such as housing
development, development of shopping centres, cultural centres, administrative
centres;
(iv) acquisition and development of areas for commercial and industrial
purposes;
(v) undertaking of such building or construction work as may be necessary to
provide housing, shopping, commercial or other facilities;
vi) acquisition of land and its development for the purpose of laying out or
remodelling of road and street patterns;
(vii) acquisition and development of land for playgrounds, parks, recreation
centres and stadia;
(viii) reconstruction of plots for the purpose of buildings, roads, drains, sewage
lines and other similar amenities;
(ix) any other work of a nature such as would bring about environmental
improvements which may be taken up by the authority with the prior approval
of the State Government."
23. Section 50 of the 1973 Act provides for method of preparation of town
development schemes. The town development scheme may deal with the town
expansion, badly laid-out areas or slums, acquisition and development of land
for housing, shopping centres, cultural centres, administrative centres,
commercial and industrial purposes, remodelling of road and street patterns,
reconstruction of lands for building roads, drains, etc. Under Section 50 draft
plan has to be published, objections have to be invited, heard and decided.
Thereafter scheme is finalised, same has to be published in the Gazette. Section
55 provides that the land needed for town development scheme shall be
deemed to be a land required for public purpose within the meaning of the
Land Acquisition Act. Section 56 deals with acquisition of land for the Town
and Country Development Authority. Within 3 years of preparation of town
development scheme under Section 50, the authority may acquire the land by
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
15 WP-32666-2026
agreement and in case that is not possible the State Government at the request
of the authority may proceed to acquire the land under the provisions of the
Land Acquisition Act. The town development scheme has to be executed by
the authority within 3 years by acquiring the land in case it is necessary as per
the provisions contained in Section 56.

27. The 1960 Act provided for various improvement schemes under Section
30. Section 31 of the 1960 Act dealt with types of improvement schemes such
as general improvement schemes, re-building, re-housing, street, deferred
street schemes and development scheme. Ten types of schemes were provided
under Section 31. When scheme was proposed, consideration of b
representation was also provided. The State Government had the power to
sanction, reject or return the improvement scheme as provided in Section 51. In
case the State Government sanctioned the scheme it was required to be notified
under Section 52 of the 1960 Act. The 1960 Act has ceased to be operative in
the areas, once the 1973 Act has been made applicable by establishing the
authorities under the provisions of Sections 38 to 40. In our considered view,
the expression "scheme" in Section 292 has to be taken to mean the regional
plan, development plan and also to any scheme under Section 49 framed under
the 1973 Act. The provision is not confined to a scheme prepared under
Sections 49 and 50 of the 1973 Act. There cannot be two schemes for the same
area.
In re: Scope of power of the Corporation under Section 305
28. Before taking the question of vires of the provisions contained in Sections
305 and 306 of the 1956 Act, we consider it appropriate to deal with the
submissions raised on behalf of the appellants with respect to its interpretation
and ken of powers conferred upon the Municipal Corporation. Section 305 of
the 1956 Act is extracted hereunder:
"305. Power to regulate line of buildings. (1) If any part of a building
projects beyond the regular line of a public street, either as existing or as
determined for the future or beyond the front of immediately adjoining
buildings the Corporation may-
(a) if the projecting part is a verandah, step or some other structure
external to the main building, then at any time, or
(b) if the projecting part is not such external structure as aforesaid,
then whenever the greater portion of such building or whenever
any material portion of such projecting part has been taken down
or burned down or has fallen down,
require by notice either that the part of some portion of the part projecting
beyond the regular line or beyond the front of the immediate adjoining
building, shall be removed, or that such building when being rebuilt shall be set
back to or towards the said line or front; and the portion of land added to the
street by such setting back or removal shall henceforth be deemed to be part of
the public street and shall vest in the Corporation:
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
16 WP-32666-2026
Provided that the Corporation shall make reasonable compensation to the
owner for any damage or loss he may sustain in consequence of his building or
any part thereof being set back.
(2) The Corporation may, on such terms as it thinks fit, allow any building to
be set forward for the improvement of the line of the street."

In re: Possession/Deemed to be part of public street and vesting under Section
305 of the 1956 Act
39. Coming to question as to when vesting takes place. As soon as the building
or the projecting part has been removed or when the Corporation has issued a
notice when such re-building shall be set back or to the front line, the line
added by such action by setting back or removal, shall henceforth without any
further formalities, be deemed to be a part of public street and shall vest in the
Corporation. Vesting does not depend upon the volition of the owner.
Otherwise no public street can ever be brought in regular line. The Corporation
has the power to remove, as discussed hereinabove. As deemed vesting is
provided under Section 305, as such there is no requirement of separate
provision for taking possession. For removal there is specific provision and
adequate safeguards have been provided for fixing the regular line of a public
street while preparing the development plan or the town development scheme,
as the case may be.
55. Even assuming that public street is also a street, considering the special
provisions contained in Section 305, recourse can be had to the provision
without having adverting to the procedure prescribed under Sections 78 and 79
of the Act and the compensation in the case of action taken under Section 305
gis provided under the proviso to Section 305 and Section 306 read with
Section 387 to which the provisions of the Land Acquisition Act, 1894 have
been made applicable for determination. Section 387 provides for procedure in
case compensation determined under Section 306 is not acceptable, dissatisfied
claimants can have resort to Section 387 which require determination of dispute
by Panchayat/arbitration, and in case arbitration fails, parties can approach the
District Court which shall follow the procedure provided in the Land
Acquisition Act, 1894. The provision of Section 387 is very wide and covers
all the cases in which an agreement is not arrived at with respect to
compensation or damages which are under the Act directed to be paid. Section
387 would b cover the provisions of compensation payable under Sections 305
and 306 of the 1956 Act. Sections 305 and 306 use the expression "reasonable
compensation has to be paid" which would mean, reasonable on the principle
acceptable in accordance with law. It cannot be fanciful or arbitrary one as
suggested by the appellants.
56. The submission raised by the appellants that for acquisition of land,
Sections 78 and 79 should be resorted to for the purposes mentioned in Section
305 cannot be accepted for yet another reason, if the provision as to public
street is made dependent upon the acquisition of land, the very purpose behind
the provisions of Section 305 would be frustrated as well as the public interest,
there is already a regular line of public street fixed under the development plan
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
17 WP-32666-2026
and is binding under Section 19(5) and Section 25 of d the 1973 Act. Various
rights of ownership which ordinarily vest in an owner, are restricted by the
regional plan, development plan or the town development scheme, as the case
may be. User of the owner's land, property cannot be in derogation to any of
them. Development plan is binding upon the Corporation and local authorities
and all concerned including the owners. Though they can transfer the property
but subject to such restrictions which the property will carry with it. If the land
falls in a regular line of public street, no construction can be raised, no
projection can be made by owner whereas it can be removed or set back, as the
case may be. In case acquisition is resorted to under Sections 78 and 79, public
street can never be widened and the entire purpose of preparation of the
development plan shall stand defeated.

57. What can be achieved by procedural safeguards in case the property is
acquired under the provisions of the Land Acquisition Act, 1894 or the 2013
Act by way of holding inquiry, such exercise has already been taken care of
while preparing regional plan, development plan or the town improvement
scheme. The widening of the public street cannot brook any delay. The
provisions contained in Section 387(5) which empower the Corporation to take
possession after determination of compensation by arbitration or by the District
g Court, would be applicable only to the acquisition resorted to under Sections
78 and 79, particularly under the provisions of Section 79 and not to a case
which is covered by the special provisions contained in Section 305 where the
vesting is deemed to be by operation of law as soon as there is deemed vesting,
the area shall vest in the Corporation and it shall be deemed to be a part of
public street. Thus the provision of Section 387(5) is not attracted when it is
deemed to be part of the public street on vesting in the Corporation. The
process under Section for acquisition by the Town and Country Development
Authority for the purpose of any development scheme has to be laid down in
the zonal plan.
71. The appellants have also placed reliance on Rajendra Shankar Shukla v.
State of Chhattisgarh 48 to contend that the 1973 Act provides for
arrangement, the development plan is an umbrella which encompasses within
its fold a zonal plan which is implemented through Town Development
Scheme. This Court has laid down thus: (SCC pp. 440-42, paras 65-70 & 74-75
"65. As per the factual averments of this case, Respondent 2 RDA,
without any resolution of the Board, on its own motion, addressed a
Letter dated 31-7-2006 and approached the State Government for change
of land use because it had to propose the township in Tikrapara, Devpuri
and Boriakhurd Villages. Thereafter, KVTDS was also proposed,
published, finalised and approved before the land use was changed by
the State g Government. Under the provisions of the 1973 Act, the
development plan/ Raipur Master Plan (Revised) 2021 that is prevailing,
Respondent 2 RDA as well as the State Government gave primacy to
KVTDS and sought changes in the master plan to suit KVTDS. This is
impermissible in law. The finding recorded by the High Court of
Chhattisgarh, Bilaspur, in its judgment in this regard that no finality can
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
18 WP-32666-2026
be attached to the master plan is an erroneous finding. Accordingly, we
are of the opinion that the town development scheme which is KVTDS
in the present case, was not prepared in accordance with Section 50 of
the 1973 Act and we hold that KVTDS is ultra vires the 1973 Act.

Answer to Point (iii)
66. Though we have answered Point (ii) in favour of the appellant, we
intend to mention other grounds too, which render KVTDS as illegal.
The learned Senior Counsel on behalf of the appellants contended that in
the absence of a zonal plan, a town development scheme cannot be
framed by Respondent 2 RDA, and therefore, the acquisition
proceedings of the land of the appellants cannot be allowed to sustain.
67. The town development scheme is always subservient to the master
plan as well as the zonal plan, as provided under Section 17 of the 1973
Act, which reads as under:
17. Contents of development plan. A development plan shall take into
account any draft five year and annual development plan of the district
prepared under the Madhya Pradesh Zila Yojana Samiti Adhiniyam,
1995 (19 of 1995) in which the planning area is situated.....
68. Master plan falls within the category of broad development plans and
is prepared only after taking into account the Annual Development
Reports prepared by constitutionally elected bodies of local panchayats
and municipalities, etc. A zonal plan is mandated to be prepared only
after the publication of the development plan. Section 20 of the Act
reads thus:
20. Preparation of zonal plans. The local authority may on its own
motion at any time after the publication of the development plan, or
thereafter if so required by the State Government shall, within the next
six months of such requisition, prepare a zoning plan.'
Further, Section 21 of the Act reads thus:
21. Contents of zoning plan. The zoning plan shall enlarge the details of
the land use "as indicated in the development plan"....'
Thus, it is evident from the language of Sections 20 and 21 of the Act, that a
zonal plan can be prepared only in adherence to the development plan which in
the present case is the Raipur Master Plan of 2021.
69. Next, Section 49 of the Act which provides for the provisions for
which a town development scheme can be prepared, has to be read along
with Section 21 of the Act, which clearly mentions that the land required
70. Therefore, a combined reading of Sections 17, 21 and 49 lays down
that the development plan is the umbrella under which a zonal plan is
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
19 WP-32666-2026
made for the city. The zonal plan in turn allocates the land which could
be acquired for town development schemes.

74. In the case in hand, KVTDS has been prepared in the absence of a
zonal plan. It is not possible to define the utilisation of land under the
town development scheme unless the zonal plan formulated by the local
authority describes with sufficient particularity the details for which the
broadly indicated use of land in the development plan may be put.
Respondent 2 RDA is not permitted to either usurp or bypass the power
vested with the local authorities for preparing town development scheme
in the absence of zoning plan merely on the ground that the local
authority did not exercise its constitutional power in preparing the zonal
plan following the direction of Respondent 1 State Government under
Section 20 of the 1973 Act. A mere glance at the master plan would
clearly go to show that it does not set out the detailed land use with
sufficient particulars. Therefore, the framing of a zonal plan by local
authority in laying out a detailed plan of land use with sufficient
particulars is a sine qua non under the provisions of the Act.
75. The legal contention urged on behalf of the respondents that a town
development scheme can be framed pursuant to the development plan
without there being a zonal plan, is not sustainable. The learned Senior
Counsel, Ms Pinky Anand and Mr Prashant Desai on behalf of the
respondents relied upon the Act pari materia for the State of Gujarat
where the Town Planning Act does not contemplate a zonal plan, and
which contemplates "DP-TP"." (emphasis supplied)
There is no dispute with the law laid down by this Court and town planning
scheme has to be subservient to development plan/zonal plan. Development
plan which does not require micro planning is binding and can be
implemented."
8. Considering the facts and circumstances of the case and the settled
position of law, considering the submission made at the Bar, but without
repeating all the contentions which are recorded in detail in earlier portion, I
am of the view that that this is a fit case where Court should not entertain
petition under Article 226 of the Constitution as respondent authority has
acted by exercising power u/S 305 of the Act of 1956, which reads as under:
305. Power to regulate line of buildings.
(1) If any part of a building projects beyond the regular line of a public street,
either as existing or as determined for the future or beyond the front of
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
20 WP-32666-2026
immediately adjoining buildings the Corporation may-

(a) if the projecting part is a verandah, step or some other structure external to
the main building, then at any time; or
(b) if the projecting part is not such external structure as aforesaid, then
whenever the greater portion of such building or whenever any material portion
of such projecting part has been taken down or burned down or has fallen
down, require by notice either that the part or some portion of the part
projecting beyond the regular line or beyond the front of the immediate
adjoining building, shall be removed, or that such building when being rebuilt
shall be set back to or towards the said line or front; and the portion of land
added to the street by such selling back or removal shall henceforth be deemed
to be part of the public street and shall vest in the Corporation :
Provided that the Corporation shall make reasonable compensation to the
owner for any damage or loss he may sustain in consequence of his building or
any part thereof being setback.
(2) The Corporation may, on such term as it thinks lit, allow any building to be
set forward for the improvement of the line of the street.
9. Also considering the provisions of Section 17, 49, 50(7), 54 of
the Adhiniyam, 1973, which reads as under:
17 - [A development plan shall take into account any draft five-year and
Annual Development plan of the district prepared under the Madhya Pradesh
Zila Yojana Samiti Adhiniyam, 1995 (No. 19 of 1995) in which the planning
area is situated and shall.] [Substituted by M.P. Act No. 8 of 1996 (w.e.f. 17-4-
1996).](a)indicate broadly the land use proposed in the planning area;(b)
[allocate broadly areas or zones of land, keeping in view the regulations for
natural hazard prone areas, for-] [Substituted for 'allocate broadly areas or
zones of land for-' by M.P. Act No. 22 of 2005.](i)residential, industrial,
commercial or agricultural, purpose;(ii)open spaces, parks and gardens, green-
belts, zoological gardens and playgrounds;(iii)public institutions and offices;
(iv)such
special purposes as the Director may deem fit;(c)lay down the pattern of
National and State Highways connecting the planning area with the rest of the
region, ring roads, arterial roads and the major roads within the planning area;
(d)provide for the location of air-ports, railway stations, but terminus and
indicate the proposed extension and development of railways and canals;
(e)make proposals for general landscaping and preservation of natural areas;
(f)project the requirement of the planning area of such amenities and utilities as
water, drainage, electricity and suggest their fulfilment;(g)propose broad based
regulations for zoning, by way of guide lines, within each zone or sector of the
location, height, size of buildings and structures, open spaces, court yards and
the use to which such buildings and structures and land may be put;(h)lay
down the broad-based traffic circulation patterns in a city;(i)suggest
architectural control features; elevation and frontages of buildings and
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
21 WP-32666-2026
structures;(j)indicate measures for flood control, prevention of air and water
pollution, disposal of garbage and general environmental control.

In view of the above discussion and considering the material available on
record, more particularly, the procedure carried out by way of joint inspection,
by way of panchnama which clearly indicates that there is encroachment made
by the petitioner on the Government land on his site which is marked by
putting up construction on his land, neither there is violation of Article 14 nor
Article 300A of the Constitution. The provisions of Section 305 of the Act,
1956 mandates the Corporation to take action pursuant to the Indore Master
Plan, 2021.
49. Town Development Schemes.
- A town development scheme may make provision for any of the following
matters,-(i)acquisition, development and sale or leasing of land for the purpose
of town expansion;(ii)acquisition, relaying out of, rebuilding, or relocating
areas which have been badly laid out or which has developed or degenerated
into a slum;(iii)acquisition and development of land for public purposes such
as housing development, development of shopping centres, cultural centres,
administrative centres;(iv)acquisition and development of areas for commercial
and industrial purposes;(v)undertaking of such building or construction work as
may be necessary to provide housing, shopping, commercial or other facilities;
(vi)acquisition of land and its development for the
purpose of laying out or remodeling of road and street patterns;(vii)acquisition
and development of land for playgrounds, parks, recreation centres and stadia;
(viii)reconstruction of plots for the purpose of buildings, roads, drains, sewage
lines and other similar amenities;(xi)any other work of a nature such as would
bring about environmental improvements which may be taken up by the
authority with the prior approval of the State Government.
50. Preparation of Town Development Schemes.
(1)The Town and Country Development Authority may, at any time, declare its
intention to prepare a town development scheme.(2)Not later than thirty days
from the date of such declaration of intention to make a scheme, the Town and
Country Development Authority shall publish the declaration in the Gazette
and in such other manner as may be prescribed.(3)Not later than two years
from the date of publication of the declaration under sub-section (2) the Town
and Country Development Authority shall prepare a town development scheme
in draft form and publish it in such form and manner as may be prescribed
together with a notice inviting objections and suggestions from any person with
respect to the said draft development scheme before such date as may be
specified therein, such date being not earlier than thirty days from the date of
publication of such notice.(4)The Town and Country Development Authority
shall consider all the objections and suggestions as may be received within the
period specified in the notice under sub-section (3) and shall, after giving a
reasonable opportunity to such persons affected thereby as are desirous of
being heard, or after considering the report of the committee constituted under
sub-section (5) approve the draft scheme as published or make such
modifications therein as it may deed fit:[Provided that the final publication of
such draft scheme shall be notified not later than one year from the date of
publication of the draft scheme failing which the draft scheme shall be deemed
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
22 WP-32666-2026
to have lapsed.] [Inserted by M.P. Act No. 21 of 2004 (w.e.f. 24-12-2004).]
(5)Where the town development scheme relates to reconstitution of plots, the
Town and Country Development Authority shall, notwithstanding anything
contained in sub-section (4), constitute a committee consisting of the Chief
Executive Officer of the said authority and two other members of whom one
shall be representative of the Madhya Pradesh Housing Board and the other
shall be an officer of the Public Works Department not below the rank of an
Executive Engineer nominated by the Chief Engineer, Public Works
Department for the purpose of hearing objections and suggestions received
under sub-section (3).(6)The committee constituted under sub-section (5) shall
consider the objections and suggestions and give hearing to such persons as are
desirous of being heard and shall submit its report to the Town and Country
Development Authority within such time as it may fix along with proposals to,-
(i)define and demarcate the areas allotted to or reserved for public purpose;
(ii)demarcate the reconstituted plots;(iii)evaluate the value of the original and
the reconstituted plots;(iv)determine whether the areas reserved for public
purpose are wholly or partially beneficial to the residents within the area of the
scheme;(v)estimate and apportion the compensation to or contribution from the
beneficiaries of the scheme on account of the reconstitution of the plot and
reservation of portions for public purpose;(vi)evaluate the increment in value
of each reconstituted plot and assess the development contribution leviable on
the plot holder :Provided that the contribution shall not exceed half the accrued
increment in value;(vii)evaluate the reduction in value of any reconstituted plot
and assess the compensation payable therefor.(7)Immediately after the town
development scheme is approved under sub-section (4) with or without
modifications the Town and Country Development Authority shall publish in
the Gazette and in such other manner as may be prescribed a final town
development scheme and specify the date on which it shall come into
operation.

54. [ Lapse of scheme. [Substituted by M.P. Act No. 8 of 1996 (w.e.f.17-4-
1996).] - If the Town and Country Development Authority fails to commence
implementation of the town development scheme within a period of two years
or complete its implementation within a period of five years from the date of
notification of the final scheme under Section 50, it shall, on expiration of the
said period of two years or five years, as the case may be, lapse :Provided that,
if a dispute between the authority and parties, if any, aggrieved by such
scheme, is brought before a Court or Tribunal of competent jurisdiction, for
consideration, the period for which such dispute pending before such Court or
Tribunal shall not be reckoned for determination of the lapse of the scheme.]
10. Considering all these aspects and the fact that the larger public
interest is involved in the matter and there is no apparent illegality or
arbitrariness found in the action of respondent authority which is otherwise
found to be in accordance with law, I find that all the contentions raised in
the present petition by the petitioner though sounds to be attractive, but lacks
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 21-08-2026
15:18:25

NEUTRAL CITATION NO. 2026:MPHC-IND:23741
23 WP-32666-2026
in merits in the facts and circumstances of the present petition and in view of

various judgments.
11. Considering all these grounds, petitioner is not entitled to get
any relief as prayed in the petition. I find no arbitrariness, illegality or found
any action taken by the respondent authority in unjust manner warranting
interference by this Court by exercising power under Article 226 of the
Constitution of India.
12. All the contentions raised by the counsel for petitioner are dealt
in above mentioned discussion, more particularly by considering the
applicability of the judgment of Hon'ble Apex Court in the case
o f Ramchandra Waghmare(supra) and therefore all the contentions of
petitioner are not required to be accepted and rejected accordingly.
13. Petition fails on various grounds and even lacks on merits for
grant of any relief under Article 226 of the Constitution of India and,
therefore, deserves to be and is hereby dismissed.

(SANDEEP N. BHATT)
JUDGE