Dinesh Garg vs C.B.I.

Court
Delhi High Court
Case type
Criminal Appeal
Decided on
02-04-2026
<div> <br /> <br /> <br /> * <b>IN THE HIGH COURT OF DELHI AT NEW DELHI </b><br /> <i>% </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <b><i>Judgment Reserved on: 23.03.2026 </i></b><br /> <b><i>Judgment pronounced on: 02.04.2026</i></b> <i> </i><br /> <br /> + <b>CRL.A. 748/2002</b> <br /> DINESH GARG .....Appellant <br /> Through: Mr. Sameer Chandra, Ms. Vivya <br /> Nagpal, Mr. Ekansh Bansal and <br /> Mr.Aryan Tomar, Advocates. <br /> <br /> Versus <br /> <br /> C.B.I. .....Respondent <br /> Through: Mr. Atul Guleria, SPP with Mr. <br /> Aryan Rakesh and Ms. Atreyi <br /> Chatterjee, Advocates. <br /> <br /> + <b>CRL.A. 763/2002</b> <br /> V.K. DATTA .....Appellant <br /> Through: Mr. Sunil Dalal, Senior Advocate <br /> with Mr. Raghav Bhalla, Mr. Ankit <br /> Rana, Ms. Shipra Bali, Ms. Zeba <br /> Khan, Advocates. <br /> <br /> Versus <br /> <br /> NCT OF DELHI .....Respondent <br /> Through: Mr. Atul Guleria, SPP with Mr. <br /> Aryan Rakesh and Ms. Atreyi <br /> Chatterjee, Advocates. <br /> <br /> <b>CORAM:</b> <br /> <b>HON&#x27;BLE MS. JUSTICE CHANDRASEKHARAN SUDHA</b> <br /> <b>JUDGMENT</b> <br /> <b> </b> <b> </b> <br /> <b>CHANDRASEKHARAN SUDHA, J. </b><br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 1 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> <br /> 1. These appeals under Section 374 of the Code of <br /> Criminal Procedure, 1973 (the Cr.P.C.) read with Section 27 of the <br /> Prevention of Corruption Act, 1988 (“the PC Act”) has been filed by <br /> accused nos. 1 and 2 (A1 and A2) in C.C.No.109/1994 on the file of <br /> the Court of Special Judge, Delhi, challenging the conviction <br /> entered and sentence passed against them for the offences <br /> punishable under Section 7 and 13(1) (d) read with 13(2) of the PC <br /> Act. <br /> 2. The prosecution case is that on 20.09.1991, A1, <br /> Assistant Engineer, Flood Control Department, and A2, Junior <br /> Engineer, Flood Control Department, both being public servants, <br /> demanded and accepted ₹900/- each from PW1 as illegal <br /> gratification for facilitating the release of the PW1’s running and <br /> final bills. <br /> 3. On 20.09.1991, PW1 lodged a complaint, that is, Ext. <br /> PW1/E, with the Anti-Corruption Branch, New Delhi, based on <br /> which, RC No. 57(A)/91-DLI, Ext. PW7/A FIR was registered <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 2 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> alleging commission of the offence punishable under Section 7 of <br /> the PC Act. <br /> 4. PW8, Inspector, Anti-Corruption Branch, CBI, New <br /> Delhi, conducted investigation into the crime and on completion of <br /> the same, submitted the charge-sheet/ final report alleging <br /> commission of the offences punishable under the Section 7 read <br /> with 13(2) read with 13(1)(d) of the PC Act. <br /> 5. Ext. PW2/A and Ext. PW2/B Sanction Orders for <br /> prosecuting both A1 and A2 was accorded by PW2, Chief Secretary, <br /> Delhi Administration. <br /> 6. When the accused persons on receipt of summons <br /> appeared before the trial court, the Court after complying with the <br /> formality contemplated under Section 207 Cr.P.C, and after hearing <br /> them, on 15.07.1992, framed a Charge under Section 7 and 13(l)(d) <br /> r/w 13(2) of the PC Act against both the accused persons, which <br /> was read over and explained to them to which they pleaded not <br /> guilty. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 3 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 7. On behalf of the prosecution, PW1 to PW8 were <br /> examined and Ext. PW1/A - Q, Ext. PW2/A-B, Ext. PW4/A, Ext. <br /> PW5/A - C, Ext. PW6/A, Ext. PW7/A and Ext. PW8/DA were <br /> marked in support of the prosecution case. <br /> 8. After the close of the prosecution evidence, the accused <br /> persons were questioned under Section 313(1)(b) Cr.P.C. regarding <br /> the incriminating circumstances appearing against them in the <br /> evidence of the prosecution. The accused persons denied all those <br /> circumstances and maintained their innocence. Both A1 and A2 <br /> submitted that PW1 came to the office of A1 and complained about <br /> the dragline. A1 called A2 and the moment the latter entered A1’s <br /> cabin the whole raiding party came inside his cabin and there was a <br /> commotion. Subsequently, they were taken to the CBI office. No <br /> document was prepared at the spot. <br /> 9. DW1 and DW2 were examined on behalf of the <br /> accused persons. Ext. D-1 and Ext. D-2 were marked in support of <br /> the defence. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 4 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 10. On consideration of the oral and documentary evidence <br /> on record and after hearing both sides, the trial court, <i>vide</i> the <br /> impugned judgment dated 03.09.2002, held both the accused <br /> persons, that is, A1 and A2, guilty of the offences punishable under <br /> Section 7 and Section 13(1)(d) read with Section 13(2) of the PC <br /> Act. Accordingly, both the convicts have been sentenced to undergo <br /> rigorous imprisonment for a period of two years each with a fine of <br /> ₹5,000/- each under Section 7 of the PC Act and in default of <br /> payment of fine to further undergo rigorous imprisonment for six <br /> months; and rigorous imprisonment for a period of two years each <br /> with a fine of ₹5,000/- each under Section 13(1)(d) read with <br /> Section 13(2) of the PC Act and in default of payment of fine to <br /> further undergo rigorous imprisonment for six months each. The <br /> sentences have been directed to run concurrently. Aggrieved, A1 <br /> and A2 have preferred these appeals. <br /> 11. The learned counsel appearing for A2 submitted that <br /> the latter has been falsely implicated by PW1 in this case as A2 had <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 5 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> earlier reported <i>vide</i> Ext. PW8/DA complaint dated 27.05.1991 <br /> regarding the poor quality of work carried out by the contractor, <br /> pursuant to which he directed stopping of the work and locked the <br /> cement store. However, A2 later found that the contractor, had <br /> broken the lock of the store and resumed the work. It was further <br /> submitted that the trial court erred in not appreciating the fact that <br /> the prosecution had failed to prove that any demand for illegal <br /> gratification had been made by A2. To buttress this contention, the <br /> learned counsel for A2 pointed out several inconsistencies in the <br /> prosecution case, such as the absence of any occasion to demand a <br /> bribe since no bills were pending for payment at the relevant time; <br /> the fact that earlier bills had been cleared without any such demand, <br /> and that A2 was not even present at the spot at the time of the <br /> alleged demand but at the site, as demonstrated from Ext. D1 and <br /> D2 muster rolls and that even the independent witnesses, namely, <br /> PW3 and PW4, had not mentioned anything with regard to the <br /> presence of A2 at the time of the raid or with respect to any demand <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 6 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> for illegal gratification having been made by him to PW1, thereby <br /> further weakening the prosecution case against A2. <br /> 11.1. It was further submitted that PW1 has materially <br /> improved his version from what was originally stated in Ext. <br /> PW1/E complaint with regard to the alleged demand of bribery, <br /> inasmuch as no role was attributed to A2 at the initial stage. <br /> Moreover, as per Ext. PW1/E, the alleged demand was for a sum of <br /> ₹1,800/- for facilitating the settlement of bills, whereas only ₹900/- <br /> was recovered during the raid. This material discrepancy further <br /> probabilises the version that A2 was not involved in any such <br /> demand from the very inception and has been subsequently <br /> implicated by PW1. It was also submitted that the testimony of <br /> PW4 is completely silent with respect to any demand for illegal <br /> gratification having been made by A2, thereby further weakening <br /> the prosecution case against him. <br /> 11.2. It was also submitted that the recovery proceeding <br /> was not proved duly as PW3 did not identify A2 and PW3 was not <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 7 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> sure of the amount of money recovered from A2. The learned <br /> counsel for A2 further pointed out the inconsistencies in the <br /> testimony of PW3 and PW4 with regard to the place of incident, as <br /> the former deposed that the trap took place at the office of A2, <br /> whereas the latter stated that it occurred at the office of A1. It was <br /> further submitted that as many as 11 charge witnesses were dropped <br /> during trial without being examined, including officers, namely, <br /> CW6, CW7, CW8 and CW9, who had allegedly apprehended the <br /> accused by catching hold of his wrists. It was further submitted that <br /> CW14, namely, the contractor on whose behalf PW1 was acting as a <br /> power of attorney holder, was a material witness, inasmuch as PW1 <br /> was merely a supervisor, and it was CW14 who was actually aware <br /> of the financial transactions and dealings pertaining to the contracts <br /> and the related bills. Therefore, such withholding of material <br /> witnesses on the part of the prosecution entitles the accused to <br /> invoke the presumption under Section 114 illustration (g) of the <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 8 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> Indian Evidence Act, 1872 (IEA) by drawing an adverse inference <br /> against the prosecution. <br /> 12. The learned senior counsel appearing for A1 submitted <br /> that the prosecution has failed to establish any cause for the alleged <br /> demand of bribe by the accused persons. It was contended that this <br /> aspect stands established by the testimony of PW5, who has <br /> deposed that none of the three works had been completed and, as <br /> shown from Ext. PW5/A, the work had not only been halted but the <br /> contractor had also submitted a request letter undertaking that no <br /> claim for damages would be raised against the Department. It was <br /> further submitted that after the foreclosure order, the bill stood at <br /> minus ₹300/-, thereby indicating that the contractor, in fact, owed <br /> money to the Department. It was also pointed out that PW1, in his <br /> testimony, admitted that he was unaware of the exact amount, if <br /> any, payable by the Department. These circumstances, according to <br /> the learned senior counsel, clearly negate the existence of any <br /> occasion or motive for the alleged demand of illegal gratification. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 9 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 12.1. It was further contended that PW1 was merely <br /> acting as an employee of CW14, the contractor, who, as admitted by <br /> PW1 in his testimony, was the person operating the accounts and <br /> not PW1 himself. Therefore, if any dues were pending, or if any <br /> illegal demand was allegedly made for clearing such dues, the <br /> material evidence to substantiate the same ought to have come from <br /> CW14 and not from PW1. Rather, it was a false proceeding initiated <br /> by PW1 against A1 and A2 due to Ext. PW8/DA complaint given <br /> against his act of pilfering cement from the cement store. It was also <br /> submitted that the prosecution’s timeline regarding the registration <br /> of the FIR is also practically not possible as the demand was made <br /> at 10:15 AM at the Shastri Nagar office, after which PW1 is alleged <br /> to have travelled approximately 15 kilometers to the CBI Office at <br /> Lodhi Road, inquired about the complaint procedure, drafted a <br /> handwritten complaint, reached the reception area, met PW7 IO, <br /> obtained an audience with the S.P., received a direction to register <br /> the FIR, and successfully had Ext. PW-7/A FIR registered by 11:15 <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 10 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> AM. Furthermore, Exts. D1 and D2 muster rolls conclusively <br /> establish that the accused persons were engaged in official <br /> inspection duties during the relevant time and had no occasion to <br /> meet PW1. By placing such material on record, the accused have <br /> effectively rebutted the presumption and shifted the burden back <br /> upon the prosecution. In such circumstances, it was incumbent upon <br /> the prosecution to discredit or challenge the authenticity of Exts. D1 <br /> and D2 muster rolls, which it has failed to do, and the same stand <br /> duly proved by the defence. <br /> 12.2. The learned senior counsel appearing for A1 <br /> further contended that both PW3 and PW4 are stock witnesses, <br /> whose presence in the proceedings is doubtful, as no requisition for <br /> their participation has been placed on record, despite such <br /> procedure being mandatory. It was further pointed out that, as per <br /> their own testimony, both the witnesses were already present in the <br /> CBI office prior to PW1’s arrival, thereby casting serious doubt on <br /> the fairness and credibility of their involvement in the trap <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 11 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> proceedings. Reliance was placed on the dictum in <b>Ved Prakash </b><br /> <b>Maurya v. State of Delhi, </b> Crl. Appeal No. 45/2010 (Delhi High <br /> Court), <b>Har Swarup Verma v. State of Delhi, </b> Crl. Appeal No. <br /> 228/2003 (Delhi High Court), <b>Jagan v. State of Maharashtra</b> , Crl. <br /> Appeal No. 187 of 2012 (Bombay High Court, Nagpur Bench), <b> </b><br /> <b>Rajinder Kumar v. CBI, </b> Crl. Appeal No. 733/2003 (Delhi High <br /> Court) <br /> 13. <i>Per Contra, </i> it was submitted by the Special Public <br /> Prosecutor appearing for the CBI that the impugned judgment does <br /> not suffer from any infirmity warranting interference by this court <br /> as the trial court has duly considered each and every ground raised <br /> in the present appeal and, upon an overall appreciation of the <br /> materials on record, adjudicated the matter on merits <i>. </i><br /> 13.1. It was submitted that both A1 and A2 did not <br /> cross examine PW2, the Sanctioning Authority, and PW6, the <br /> Scientific Officer, with regard to the phenolphthalein test, and <br /> therefore the aspect of the solution turning pink has remained <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 12 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> unchallenged. In such circumstances, it was contended that the <br /> prosecution case on this aspect stands duly proved, and the non-<br /> examination of the witnesses who apprehended the accused persons <br /> during the trap proceedings does not materially affect the <br /> prosecution case. It was also contended that the mere mention or <br /> non-mention of the name of A2 at the stage of registration of Ext. <br /> PW7/A FIR is not of material significance, inasmuch as Ext. PW7/A <br /> FIR is only intended to set the criminal law in motion. It was further <br /> submitted that the demand and acceptance of the bribe amount by <br /> A2 have been duly established through the testimony of PW4, <br /> which is sufficient to sustain the prosecution case against him. It <br /> was also submitted that PW5 has deposed in detail with regard to <br /> the bills raised by PW1 in his capacity as power of attorney holder, <br /> and that the said bills were to be processed and dealt with by A1 and <br /> A2, who were responsible for executing the same. <i> </i><br /> 14. Heard both sides and perused the records. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 13 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 15. The only point that arises for consideration in the <br /> present appeal is whether there is any infirmity in the impugned <br /> judgment calling for an interference by this Court. <br /> 16. I shall first briefly refer to the evidence on record relied <br /> on by the prosecution in support of the case. The initial demand in <br /> this case is alleged to have taken place on 20.09.1991 and the trap <br /> laid on the same day. PW1 submitted a written complaint, that is, <br /> Ext. PW1/E in the office of the Anti-Corruption Branch in which he <br /> has stated thus:- “… <i>I am a power of attorney holder on behalf of </i><br /> <i>Contractor&#x27;s M/s Gupta Const. Co. E-1625/4, Najafgarh, N. Delhi. </i><br /> <i>Two works relating to Construction of boundary wall cum barbed </i><br /> <i>wire fences at RD - 22471 to 23000 M at Supplementary drain (left </i><br /> <i>side and Construction of boundary wall cum barbed wire fencing at </i><br /> <i>RD - 22200 to 21350 M at Supplementary drain (Right side) and </i><br /> <i>left side also were awarded to M/s Gupta Construction Co. The said </i><br /> <i>work were started but could not be completed due to encroachment </i><br /> <i>on the land and the alternative site was not made available by the </i><br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 14 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> <i>deptt. (FCD, D.A). The payments for the work so far executed after </i><br /> <i>Ist and IInd running bills respectively of the above said works have </i><br /> <i>not been made to me so far, though I had repeatedly visited the SDO </i><br /> <i>III, FCD deptt. On 20/9/91, I visited the office of the Flood Control </i><br /> <i>dept and met Sh. V.K. Dutta, A.E and requested him for expediting </i><br /> <i>my payments. Sh. Dutta told me that if I want an early payment of </i><br /> <i>the works done, I will have to pay a bribe of ₹1800/- which will be </i><br /> <i>equally distributed between him and the J.E Sh. Dinesh Garg. Mr </i><br /> <i>Dutta told me to pay the bribe money today i.e. 20/9/1991 in the </i><br /> <i>afternoon in their office at L.M. Bund, Shastri Nagar. I do not want </i><br /> <i>to give bribe, so necessary action may please be taken against these </i><br /> <i>officer&#x27;s</i> ” <br /> 17. PW1, in his examination-in-chief, deposed that in the <br /> year 1991 he was working as a civil contractor associated with M/s <br /> Gupta Construction Co. on the basis of Ext. PW1/A Power of <br /> Attorney as per which, he was authorised to supervise work and <br /> obtain payments from Government Departments. During the year <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 15 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 1991, he was supervising the construction work relating to <br /> boundary wall cum barbed wire fencing at Nangloi Drain, which <br /> had been allotted to M/s Gupta Construction Co. by the Flood <br /> Control Department. Due to encroachment, the work could not be <br /> completed and so he moved Ext. PW1/C and Ext. PW1/D <br /> applications for foreclosing the work and for release of payment. At <br /> the relevant time, payments were pending with the department and <br /> the officials concerned included A1, Assistant Engineer, and A2, <br /> Junior Engineer, both of whom he identified before the trial court. <br /> According to PW1, A2 was maintaining the measurement book and <br /> preparing the bills, while A1 was inspecting the work and passing <br /> the bills for payment. During August 1991, three of his bills were <br /> pending and he was pursuing the same. On 20.09.1991, he met both <br /> the accused persons in their office and requested for release of <br /> payment. On that day, A1, in the presence of A2, demanded a bribe <br /> of ₹1,800/- for release of the payment and that the amount would be <br /> shared between them. PW1 expressed his inability to arrange the <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 16 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> money immediately, however, he was asked to make the payment <br /> on the same day after lunch. As he did not want to pay the bribe, he <br /> went to the office of the CBI for lodging a complaint. He reached <br /> the office of the CBI at about 11.00-11.15 am, made inquiries, and <br /> thereafter wrote Ex. PW1/E complaint addressed to the SP. He met <br /> PW7 Inspector, who took him to the SP, and thereafter he was <br /> introduced to the panch witnesses, namely, PW3 and PW4, to whom <br /> he narrated the facts. Another CBI officer informed him that a trap <br /> would be laid after confirming that he had brought the bribe <br /> amount. He produced 18 currency notes of ₹100/- each, which were <br /> treated with phenolphthalein powder. PW1 further deposed about <br /> the pre-trap proceedings conducted by the CBI team and Ext. <br /> PW1/E handing over memo was prepared and the numbers of the <br /> currency notes were recorded in Ext. PW1/F memo. PW4 was <br /> directed to remain with him, observe the transaction and give a <br /> signal by scratching his head on acceptance of bribe. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 17 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 17.1. According to PW1, the raiding party left the <br /> office of the CBI at about 03.00 to 03.15 pm and reached the office <br /> of the accused at about 03.45 pm. He along with PW4 entered the <br /> office room of A1 where both the accused persons were present. On <br /> inquiry, he introduced PW4 as his friend. A1 asked him whether he <br /> had brought the demanded money, to which he replied in the <br /> affirmative. Thereafter, on demand, he handed over ₹900/- to A1, <br /> who accepted the same with his right hand, counted it and kept it in <br /> the right-side drawer of his table. Thereafter, A2 demanded his <br /> share and so he handed over ₹900/- to A2, which he accepted with <br /> his left hand, counted the same and kept it in the left pocket of his <br /> shirt. PW1 further deposed that upon his request for early release of <br /> payment, both accused assured him that the work would be done. In <br /> the meantime, PW4 went out on the pretext of attending the nature’s <br /> call and thereafter the raiding party entered the room and <br /> apprehended both the accused persons. The accused persons were <br /> challenged regarding acceptance of bribe but they remained silent. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 18 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> On being informed by the panch witness, the tainted currency notes <br /> were recovered from the drawer of the table of A1 and from the <br /> shirt pocket of A2. The number of the currency notes tallied with <br /> those mentioned in the handing over memo. <br /> 17.2. PW1 further deposed that after recovery of the <br /> tainted currency notes, fresh solutions of sodium carbonate were <br /> prepared and the hand washes of A1 and A2 were taken separately, <br /> which turned pink. The hand washes were preserved in separate <br /> bottles. The inner portion of the left pocket of the shirt of A2 was <br /> also washed in sodium carbonate solution, which also turned pink <br /> and the wash was preserved. PW1 further deposed that the contract <br /> for construction of boundary wall and fencing at Nangloi Drain had <br /> been awarded to M/s Gupta Construction Co. on 22.02.1991. And <br /> that earlier payments had been received by way of cheques from the <br /> department. He further deposed that due to encroachment and <br /> damage caused to the construction, he had lodged an FIR at PS <br /> Mangolpuri and had made requests for alternative site and for <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 19 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> release of payments, but no action was taken by the officials <br /> concerned, including the accused persons. <br /> 17.3. PW1, in his cross examination, further deposed <br /> that the work allotted to M/s Gupta Construction Co. pertained to <br /> Nangloi Drain covering specified R.D. points on both left and right <br /> banks. He further deposed that due to encroachment, work on both <br /> sides had been affected and applications had been moved for <br /> foreclosure or alternative assignment. He deposed that no order for <br /> foreclosure had been formally ordered and he could not recall the <br /> exact amount due at the relevant time, though he denied the <br /> suggestion that no amount was payable. He further deposed that one <br /> cheque was received after the raid and denied that no payment was <br /> due. A third work relating to another stretch of the drain had not <br /> commenced and that he had moved Ex. PW1/DA application dated <br /> 13.09.1991 in that regard. He further deposed regarding the <br /> procedure of execution of work, stating that cement was issued by <br /> the department on the basis of indent and was stored at site, the keys <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 20 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> of which were shared between the contractor and the Junior <br /> Engineer. He admitted that the Junior Engineer would generally <br /> come at 8 a.m. in the morning to open the store and issue cement. <br /> He could not recall on what dates cement was issued. In further <br /> cross examination, he deposed that at the time of the raid, only one <br /> work was in progress, while two works had been stopped due to <br /> encroachment. He further deposed that he had applied for <br /> foreclosure of those works but was not aware of their status and that <br /> bills in respect thereof had not been prepared at that time. PW1 <br /> admitted that after the incident, he was removed from service by the <br /> proprietor and he was not aware of the final payments received. <br /> PW1 further deposed that he had been requiring payment of the <br /> running bill of the ongoing work and final bills of the other works <br /> and estimated that approximately ₹50,000/- was pending. He denied <br /> that no payment was due in respect of the three works. He further <br /> deposed that bills were prepared by the Junior Engineer and passed <br /> by the Assistant Engineer and Executive Engineer. He also deposed <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 21 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> that the work had temporarily stopped due to rains and was restarted <br /> shortly before the trap, and denied that work was continuously in <br /> progress except for cement work. He further deposed that where <br /> work is stopped and not completed, it is foreclosed, and that <br /> payment is made after completion of curing period in cement work <br /> as there was a curing period of seven days for the cement work. <br /> 17.4. PW1 further deposed that he could not recollect <br /> the reason for obtaining the signatures of Kailash Chand Gupta on <br /> the Ex. PW1/DB indent for issuance of cement which was prepared <br /> on 13.09.1991 and denied knowledge of any complaint made by A2 <br /> regarding pilferage from the cement store. He deposed that <br /> payments were made by cheque in favour of Gupta Construction <br /> Company and that the bank account of the Company was operated <br /> by Kailash Chand Gupta and not by him. He admitted that in Ext. <br /> PW1/E complaint, he had not mentioned that he had met A2 on the <br /> morning of 20.09.1991, nor had he mentioned the time of 10.15 <br /> AM, or that the demand of ₹1,800/- was made by A1 in the <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 22 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> presence of A2. PW1 denied that he had any prior acquaintance <br /> with PW7 or that the complaint was false or drafted at the instance <br /> of the latter. He further denied being a witness in any other <br /> corruption case involving PW7. PW1 described the office layout of <br /> A1 and A2, stating that it consisted of a large room partitioned into <br /> two portions, one for the Junior Engineers and clerical staff and the <br /> other for the Assistant Engineer, and that Junior Engineers would <br /> enter the Assistant Engineer’s portion when required. PW1 denied <br /> that on 20.09.1991 he had visited the office of the A1 on the pretext <br /> of complaint on dragline or that the A1 had called A2 in that <br /> context. <br /> 18. PW4, shadow witness, deposed that on 20.09.1991 he <br /> had gone to the office of the CBI on the directions of the <br /> Administrative Officer of his department along with PW3, where <br /> they met PW7 who introduced him to PW1 and he was appraised of <br /> the contents of Ext.PW1/E complaint, which pertained to a demand <br /> of ₹ 1,800 by A1 for passing the payment. He further deposed about <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 23 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> the pre-trap proceedings conducted in the office of the CBI. He <br /> further deposed that PW1 was instructed to hand over the money <br /> only on specific demand and that he along with the other witnesses <br /> was directed to remain close, observe the transaction and overhear <br /> the conversation. He was instructed to give a prearranged signal by <br /> scratching his head after the money had been passed, and that he <br /> was satisfied that the money was to be given as a bribe. After the <br /> pre-trap proceeding was completed, the raiding party proceeded to <br /> the office of the accused persons at Flood Control Department, <br /> Shastri Nagar. He along with PW1 entered the office while other <br /> members of the raiding party remained outside. Both the accused <br /> present in the room offered them seats. When A1 enquired about his <br /> identity, PW1 introduced him as a friend. PW1 offered money to <br /> A1, who accepted the same and kept it in the drawer of his table. <br /> PW1 gave ₹900/- each to A1 and A2. A2 kept his share in the front <br /> pocket of his shirt. Thereafter, PW4 went out of the room and gave <br /> the pre-arranged signal. Upon receipt of the signal, the raiding party <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 24 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> entered and apprehended the accused persons. A1 and A2initially <br /> did not disclose where the money was kept, whereupon he informed <br /> the officials about the location. Thereafter, PW3 recovered the <br /> tainted currency notes from the drawer of A1 and from the shirt <br /> pocket of A2. PW4 further deposed that the number of the <br /> recovered currency notes tallied with the number noted in Ex. <br /> PW1/F. The hand wash of both the accused persons were taken in <br /> sodium carbonate solution, which turned pink, and the solutions <br /> were transferred into separate bottles and sealed. PW4 identified the <br /> bottles as Ex. P1 to P5. He further deposed that the post trap <br /> proceedings were conducted at the spot. At this juncture, the <br /> prosecutor is seen to have sought the permission of the trial court to <br /> “cross-examine” PW4 on the ground that he was suppressing <br /> material facts. <br /> 18.1. On further examination by the prosecutor, PW4 <br /> deposed that he could not recollect the exact words of the <br /> conversation between A1 and PW1, but there was discussion <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 25 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> regarding money between them. He could not recollect whether A1 <br /> had specifically enquired from PW1 as to whether he had brought <br /> the money, or whether PW1 had replied in the affirmative. PW4 <br /> admitted that A1 had demanded money by stating “ <i>Lao paise de do</i> ” <br /> and had also given some assurance that the work of PW1 would be <br /> done, though he did not remember the exact words. He further <br /> deposed that thereafter A1 accepted the money. A2 had also spoken <br /> regarding his share, though he did not recollect the exact words <br /> used. A2 indicated that he was in a hurry and assured that the PW1’s <br /> work would be done after inspecting the site, where after PW1 <br /> handed over the money to him. In his cross examination, PW4 <br /> denied the suggestion that any enquiry regarding disproportionate <br /> assets was pending against him at the time he became a witness and <br /> that he had become a witness to oblige the CBI. <br /> 19. PW3, recovery witness, fully supported the version of <br /> the prosecution case in his examination in chief before the trial <br /> court. In his cross examination, PW3 deposed that the vehicles of <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 26 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> the raiding party were parked across the road opposite the office at <br /> Shastri Nagar and the interior of the office was not visible from the <br /> said location. He deposed that there were two rooms in the office <br /> premises, one where A2 was present, from where recovery was <br /> effected, and another room situated behind it from where A1 was <br /> brought after about 3-4 minutes of his arrival. He further deposed <br /> that the recovery memo was prepared and signed at the spot, while <br /> some further report was prepared at the CBI office, though he did <br /> not recollect the details. <br /> 20. PW-5, the then Executive Engineer, Irrigation and <br /> Flood Control Department, Government of NCT of Delhi deposed <br /> that he had taken charge of Supplementary Drainage Division III in <br /> August 1991. Three fencing works had been awarded to M/s Gupta <br /> Construction Company prior to his taking charge, but none had been <br /> completed despite expiry of the stipulated period. One work was <br /> sought to be foreclosed by the contractor due to encroachment, <br /> which request had initially been declined by his predecessor-in-<br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 27 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> office but was later approved by him on 06.08.1991 after site <br /> inspection, which is Ext. PW5/A-1. Administrative orders in that <br /> regard were issued on 19.08.1991, which is Ext. PW5/B-1. He <br /> further deposed that two running bills had already been paid prior to <br /> his joining, and after the trap proceedings, a final bill was prepared <br /> which reflected a minus amount of approximately ₹300/-, meaning <br /> the contractor was liable to pay that amount to the department. With <br /> respect to the second work, he deposed that it was lying suspended <br /> and a request dated 13.09.1991 was received from the contractor <br /> seeking issuance of cement to resume work. The cement was <br /> accordingly issued and the work recommenced. PW5 further <br /> deposed that the work was supervised by the Junior Engineer and <br /> Assistant Engineer, measurements were recorded by the Junior <br /> Engineer and checked by the Assistant Engineer, and occasionally <br /> test checked by the Executive Engineer. A2 was the Junior Engineer <br /> and A1 was the Assistant Engineer for all three works. PW5 proved <br /> Ex. PW 1/DB indent for issuance of cement, which was approved <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 28 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> and signed by him on 13.09.1991. He further proved Ext. PW 5/C <br /> cement register, deposing that it was initially issued by his <br /> predecessor-in-office to A1 and thereafter handed over to A2. <br /> Entries regarding issuance of cement were made by the Junior <br /> Engineer and signed by the contractor, and were also checked by the <br /> Assistant Engineer. <br /> 20.1. PW5 in his cross examination deposed that in <br /> respect of one work, the final bill showed a minus amount of <br /> approximately ₹300/- payable by the contractor to the department <br /> and no further amount was due to the contractor. In respect of the <br /> second work, where only fencing poles had been erected, running <br /> payments had already been made and no further amount was due. <br /> He further deposed that in respect of the third work; payment could <br /> be made only after completion of curing period of seven days from <br /> the date of cement work. The amount payable to the contractor after <br /> curing was approximately ₹14,000/- after deductions. PW5 deposed <br /> that the contractor had not submitted any bill for the work executed <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 29 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> after issuance of cement till the trap was laid, and that during the <br /> curing period, as per normal practice, contractors do not submit <br /> bills. PW5 admitted that no payment was due to the contractor when <br /> the trap was laid as the curing period had not been completed. <br /> 21. Now a brief reference to the defence witness also. <br /> DW1, Cashier, Office of the Executive Engineer, Irrigation and <br /> Flood Control Department produced Ext. D-1 muster roll, which <br /> was initially issued to A1 and thereafter to A2. He also deposed that <br /> Ex. D-2 muster roll was issued to A1, who in turn issued the same <br /> to Ajit Kumar, Junior Engineer. <br /> 22. DW2, Junior Engineer, Irrigation and Flood Control <br /> Department, posted in Supplementary Drainage Division No. 3 at <br /> Nangloi deposed that he knows A2, who was in charge of <br /> supervising the work of the supplementary drainage, and that A1 <br /> was the Assistant Engineer. A1 used to check up to 50 percent of the <br /> work supervised by him and A2, and that at the time of such <br /> checking, the Junior Engineer concerned and the contractor used to <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 30 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> be present. Entries in Ext. D1 muster roll up to 20.09.1991 are in <br /> the handwriting of A2, and the remaining entries up to 30.09.1991, <br /> in his own handwriting. DW2 deposed that point ‘A’ in Ex. D1 <br /> bears the initials of A1 in token of having checked the work. He <br /> further deposed that point ‘B’ in Ex. D-2 at three places also bears <br /> the initials of A1 in token of checking. DW2 in his cross <br /> examination identified the initials of A1 in Ex. D2 as the same were <br /> made in his presence. He similarly identified the initials and <br /> handwriting of A2 as the entries were made by the latter at the spot <br /> in his presence. <br /> <br /> 23. The testimony of the aforesaid witnesses is mainly <br /> relied on by the prosecution to prove the demand and acceptance of <br /> the bribe by A1 and A2/ the appellants herein. As can be seen from <br /> the materials on record, the prosecution case is that both the accused <br /> persons, namely, A1 and A2, while discharging their official duties <br /> as Assistant Engineer and Junior Engineer respectively in the Flood <br /> Control Department, Delhi Administration, demanded illegal <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 31 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> gratification of ₹1,800/- (₹900/- each) from PW1, who was acting <br /> as the power of attorney holder of CW14, the contractor, to whom <br /> the work of construction along the Supplementary Drain had been <br /> awarded in 1991, for the purpose of expediting the payment of <br /> alleged pending dues. The primary question that arises for <br /> consideration is whether the prosecution has succeeded in <br /> establishing beyond reasonable doubt that A1 and A2 had in fact <br /> demanded and accepted illegal gratification as a motive or reward <br /> for performing a specific official act, thereby attracting the offences <br /> punishable under Sections 7 and 13(2) read with Section 13(1)(d) of <br /> the PC Act. It is well settled law that both the offer by the bribe <br /> giver and the demand by the public servant constitute foundational <br /> facts which must be proved by the prosecution. Mere acceptance of <br /> illegal gratification, in the absence of proof of demand, would not <br /> be sufficient to bring home the guilt under Sections 7 and <br /> 13(1)(d)(i) and (ii) of the Act, as held by the Hon’ble Apex Court in <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 32 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> <b>Neeraj Dutta v. State (Government of NCT of Delhi), (2023) 4 </b><br /> <b>SCC 731</b> . <br /> 24. In the case on hand, on behalf of A1 and A2 a series of <br /> arguments have been advanced to contend that the essential <b> </b><br /> ingredient of demand by A1 and A2, being public servants, was <br /> never established. At the outset, it was argued that the presence of <br /> A1 and A2 at the office premises at the relevant time is doubtful, by <br /> placing reliance on Ext. D1 and Ext. D2 muster rolls to suggest that <br /> both were not present at the office when the demand is alleged to <br /> have been made but were instead engaged at the inspection site. <br /> 25. Exhibits DW1 and DW2 were marked through DW1. <br /> DW1 was never cross examined. According to DW2 in September, <br /> 1991, he was working in the Civil Irrigation Flood Control <br /> Department and his duty was at Supplementary Drainage, Division <br /> No.3, Nangloi. According to him, A1 the then, Assistant Engineer <br /> used to check up to 50% of the work which had been supervised by <br /> him and by Dinesh Garg, A2. He further deposed that the junior <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 33 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> engineer concerned as well as the contractor concerned would be <br /> present at the time when the works were being checked. He also <br /> deposed that entries in Ext. D1 up to the date 20.09.1991 are in the <br /> handwriting of A2 Dinesh Garg and that the remaining entries are in <br /> his handwriting. He also identified the signatures of A1 V.K. Dutta <br /> in Ext. D1 and Ext. D2 muster rolls. Neither DW1 nor DW2 were <br /> cross examined regarding the entries made in Ext. D1 and Ext. D2 <br /> muster rolls. Ext. D1 and Ext. D2 muster rolls show that on <br /> 20.09.1991 both A1 and A2 were at the work site. During the <br /> course of arguments, it was submitted that the work site was about <br /> 30 <b> </b> kilometres away from the office of A1 and A2 situated at L.M. <br /> Bund, Shastri Nagar, FCD Complex, New Delhi. Therefore, it was <br /> argued that it was impossible for A1 and A2 to have been present in <br /> their office at 10:15 a.m. as deposed by PW1 in the box. <br /> 26. It is true that that no evidence has been brought in <br /> through the examination of the prosecution witnesses or the defence <br /> witnesses regarding the distance from the work site till the office of <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 34 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> A1 and A2. However, this argument advanced on behalf of the A1 <br /> and A2 was not disputed by the learned prosecutor. As long as Exts. <br /> D1 and D2 are not disputed it can only be concluded that A1 and <br /> A2 were in fact at the site on the said day. It is true that A1 and A2, <br /> while questioned under Section 313(1)(b) Cr.P.C., admitted that at <br /> the time of trap, which was at about 03.45-04.00 p.m., they were <br /> present in the office. But the exact time or atleast the approximate <br /> time when A1 and A2 returned from the site to the office is not <br /> available from the materials on record. <b> </b> However, as long as, the <br /> entries in Ext. D1 and Ext. D2 Muster rolls are not discredited or <br /> challenged or disputed, there is no reason for this Court to <br /> disbelieve the entries in the same, which would show that A1 and <br /> A2 were at the site on the said day. This aspect raises doubts as to <br /> whether A1 and A2 were in fact in their office when PW1 is alleged <br /> to have met them in the morning at about 10.15 a.m., when the <br /> demand is alleged to have been made. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 35 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 27. There is yet another aspect which raises doubts in the <br /> mind of the Court regarding the prosecution case. At the risk of <br /> repetition, I once again refer to certain portions in the testimony of <br /> PW1. PW1 in his examination-in-chief deposed that from the <br /> month of August, 1991, three bills were pending and that he was <br /> pursuing the same for payments of the bills. One of the three bills <br /> was required to be foreclosed because the work could not be done <br /> due to encroachment. Though he was following up the bills, the <br /> payment of the bill was not being processed, therefore, he met the <br /> accused persons on 20.09.1991 in their office at about 10:15 a.m. <br /> According to him, the office of the accused is situated at L.M. <br /> Bund, Shastri Nagar, FCD Complex, New Delhi. On 20.09.1991, <br /> he spoke to A1 V.K. Dutta regarding payment of bill in the presence <br /> of A2 Dinesh Garg in their office and requested them to make the <br /> payment of the bills. A1 V.K. Dutta in the presence of A2 Dinesh <br /> Garg demanded ₹1,800/- as bribe for release of payment. A1 also <br /> told him that the amount would be shared equally with A2. He then <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 36 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> requested A1 and A2 that he would make arrangements for the <br /> money within one or two days. But, A1 V.K. Dutta told him that <br /> the payment should be made on that very date sometime after lunch <br /> in the office. As he did not want to pay the bribe, on the very same <br /> day, he proceeded to the office of the CBI where he reached at <br /> about 11-11:15 a.m. He contacted the reception and enquired about <br /> the procedure of action to be taken regard to demand of bribe. He <br /> was asked to give a complaint in writing. He then drafted a <br /> complaint addressed to the Superintendent, CBI and again went <br /> back to the reception. The person at the reception asked him to wait. <br /> After some time PW7 came and introduced himself. He was then <br /> taken to the office of the SP who went through his complaint and <br /> made necessary endorsements thereof. Thereafter, PW7 Inspector <br /> Ramesh Kumar, took him to another room where he was asked to <br /> again wait for some time. After some time, he was called to another <br /> room where he met the panch witnesses, namely, PW4 Vijay Kumar <br /> Arora and PW3 Purshotam Lal Oberoi. The witnesses spoke to him <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 37 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> regarding his complaint and he told them that as bribe was being <br /> asked, he had filed the complaint. Another CBI inspector namely, <br /> Varma asked him whether he had brought the money to which he <br /> replied in the affirmative. Thereafter, he speaks about the pre-trap <br /> proceedings that were taken. The FIR, therefore could have been <br /> lodged only after PW1 gave his complaint and the officials of the <br /> CBI being convinced of the genuineness of the complaint. But Ext. <br /> PW7/A FIR is seen registered on 20.09.1991 at 11:15 a.m. If PW1 <br /> is to be believed, he reached the office of the CBI only at 11:15am. <br /> No clarification was sought by the prosecutor on this aspect. If that <br /> be so, the question arises as to whether the Superintendent of <br /> Police, CBI, ACB, New Delhi, had registered the crime even before <br /> PW1 reached the office and gave his complaint? This is yet another <br /> aspect which raises doubts in the mind of the Court. <br /> 28. Now, coming to the testimony of PW1 and the panch <br /> witnesses regarding the recovery. According to PW1, the raiding <br /> party left the office of the CBI by about 03.00-03:15 p.m. and they <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 38 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> reached the spot at about 03:45 p.m. He along with PW4, the <br /> shadow witness, went inside the room of A1 V.K. Dutta while the <br /> other members of the raiding party remained outside and took up <br /> their respective positions. When he entered the office room, both <br /> A1 V.K. Dutta and A2 Dinesh Garg were present. They offered <br /> seats and so he as well as PW4 took their seats. He introduced PW4 <br /> as his friend. Thereafter, A1 V.K. Dutta asked him whether he had <br /> brought the money which was demanded in the morning to which <br /> he answered in the affirmative. A1 asked him to hand over the <br /> money and so he took out the tainted currency notes from his pocket <br /> and handed over 9 currency notes of ₹100/- to A1 V.K. Dutta which <br /> the latter accepted with his right hand and kept them inside the <br /> right-side drawer of his office table. A2 Dinesh Garg also <br /> demanded his share and so he gave ₹900/- which A2 accepted with <br /> his left hand and kept it inside the left pocket of his shirt. PW4, the <br /> shadow witness, supports this version of PW1. However, PW3, the <br /> recovery witness, in his chief examination deposed thus:- <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 39 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> <i>“...The raiding party then went to Shastri Nagar in the </i><br /> <i>Flood Control Office. Complainant and Mr. Roda went inside the </i><br /> <i>office while I remained with the CBI officials outside. We reached </i><br /> <i>that office around 4 p.m. After some time, CBI staff rushed inside </i><br /> <i>the office. I also went with them. Mr. Roda informed the Inspector </i><br /> <i>that the money had been accepted by Jr. Engineer Mr. Garg. The </i><br /> <i>CBI staff caught hold of both the hands of Mr. Garg. The Inspector </i><br /> <i>disclosed his identity to Mr. Garg. In the meantime Mr. VK Dutta </i><br /> <i>was also brought to that room from the adjoining room. The </i><br /> <i>accused were challenged by the Inspector. </i><br /> <i>I was asked to recover the money from left side upper pocket </i><br /> <i>shirt of Mr. Garg. I took out the money. I do not remember exactly </i><br /> <i>how much money was recovered from the pocket of Mr. Garg. Then </i><br /> <i>I was asked to recover the money from the table drawer of Mr. </i><br /> <i>Dutta. That table of Mr. Dutta was in the same room where Mr. </i><br /> <i>Garg had been caught. I recovered the money lying in the drawer of </i><br /> <i>the table of Mr. Dutta. The total amount recovered from pocket of </i><br /> <i>Mr. Garg and from Mr. Dutta was Rs. 1800/-. The numbers of the </i><br /> <i>currency notes were tallied by me with the handing over memo and </i><br /> <i>were found to be the same... </i><br /> <i>(Emphasis supplied)” </i><br /> <i> </i><br /> 28.1. In the cross examination, PW3 reiterated his case <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 40 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> and deposed thus:- <br /> <i>&quot;...The inside of the office of the accused was not visible </i><br /> <i>from that place. There were two rooms, one in which Mr. Garg was </i><br /> <i>found and in which the table from which money was recovered was </i><br /> <i>also lying. There was second room behind the first room from </i><br /> <i>where Mr. Dutta was brought. Mr. Dutta was brought from the </i><br /> <i>other room 3/4 minutes after I had reached the spot. After </i><br /> <i>completing the work, we had gone back to the CBI office. We had </i><br /> <i>left the Flood Control Office around 6 p.m... </i><br /> <i>(Emphasis supplied)&quot; </i><br /> 29. The testimony of PW3 is apparently inconsistent with <br /> the testimony of PW1 and PW4. This is yet another aspect which <br /> raises doubts in the mind of the Court regarding the recovery. <br /> 30. Further, going by the testimony of PW1, it appears that <br /> PW3 and PW4 were already present in the office of the CBI. If <br /> PW1 is to be believed, he reached the office of the CBI at 11:00-<br /> 11:15 a.m, went to the reception, enquired about the formalities, <br /> wrote down the complaint. Thereafter, he went back to the <br /> reception, where he was taken to the room of PW7 who asked him <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 41 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> to wait for some time. Thereafter, he was called to another room <br /> where he met PW3 and PW4 panch witnesses. This has to be read <br /> along with PW7/A FIR, which according to the prosecution was <br /> registered on the very same day at 11:15 a.m. The aforesaid <br /> evidence has also to be read in the background of Ext.8/DA <br /> complaint that was given by A2 dated 27.05.1991, which reads <br /> thus:- <br /> <i>&quot;...Please refer to my earlier letter No. 14, dated 17.5.91 on </i><br /> <i>the above cited subject. It is stated that the contractor has restarted </i><br /> <i>the work from 24/5/91. When I reached the site on dated 25.5.91 </i><br /> <i>then I found &amp; pointed out to the contractor that quality of work </i><br /> <i>was very poor. He was using dry bricks in brick work. The </i><br /> <i>contractor did not lay the C.C. 1:4:8 as per the drawing and </i><br /> <i>designing of the work, moreover he was casting the post &amp; was </i><br /> <i>using 40 mm nominal size against 20 mm nominal size in Cement </i><br /> <i>concrete work. So I stopped the work &amp; locked the cement store. </i><br /> <i>Today when I went to site then I found that the lock has been </i><br /> <i>removed by the contractor from cement store &amp; he was executing </i><br /> <i>the work. So it is therefore informed you that I will not measure the </i><br /> <i>works which are not executed as per the drawing &amp; design of the </i><br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 42 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> <i>work...&quot; </i><br /> 31. Further, it has also come out in evidence that there was <br /> no amount due at the time when the demand was alleged to have <br /> been made. It was submitted on behalf of A1 and A2 that there was <br /> no occasion for the accused persons to demand any bribe as no bills <br /> were pending for payment at the relevant time and in any event, the <br /> earlier bills have been cleared without any such demand. A reading <br /> of the testimony of PW5, the executive engineer substantiates this <br /> contention. PW5 deposed that three fencing works had been <br /> awarded to the contractor. However, none of the works had been <br /> completed within the stipulated period. One of the works had to be <br /> foreclosed and the final bill prepared thereafter reflected a minus <br /> amount of approximately ₹300/-, indicating that the contractor was <br /> in fact liable to pay the said amount to the Department. In respect of <br /> another work, running payments had already been released and no <br /> further amount was due. As regards the third work, PW5 deposed <br /> that payment could be made only after completion of the curing <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 43 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> period and that no bill had been submitted by the contractor till the <br /> date of the trap. PW5 admitted in his cross-examination that no <br /> payment was due to the contractor at the time when the trap <br /> proceedings were conducted. In the light of the testimony of PW5, a <br /> loyal prosecution witness, it becomes evident that there was no <br /> subsisting due or liability on the part of the department towards the <br /> contractor at the relevant time. This also raises doubts regarding the <br /> existence of any motive or occasion for the alleged demand of <br /> illegal gratification by A1 and A2. <br /> 32. It was further submitted that as many as 14 charge <br /> witnesses (CWs) were dropped by the prosecution without being <br /> examined, including material witnesses such as the officers who <br /> were part of the trap proceedings and were involved in the <br /> apprehension of A1 and A2, such as CW6, CW7, CW8 and CW9 <br /> and most significantly CW14, namely, Kailash Chand Gupta, on <br /> whose behalf PW1 was acting as power attorney holder. PW1 while <br /> examined deposed regarding the role of CW14. His testimony <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 44 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> makes it clear that he was merely acting on behalf of M/s Gupta <br /> Construction Company and that the bank account of the said Firm <br /> was operated by CW14, the proprietor. PW1 while cross-examined <br /> admitted that he was unaware of the exact amount due at the <br /> relevant time and that payments were made directly to the <br /> contractor. PW1 also expressed lack of clarity regarding the status <br /> of the foreclosure of works, preparation of bills and filing payments <br /> and even admitted that he had been removed from service after the <br /> incident and was not aware of the final settlement of accounts. In <br /> such circumstances, CW14, being the proprietor and the person <br /> actually dealing with the financial transactions and contractual <br /> obligations was the most competent witness to speak about the <br /> existence of any pending dues. It is no doubt true that evidence has <br /> to be weighed and not counted. It is also true that it is the <br /> prerogative of the prosecutor to decide which of the witnesses in the <br /> witness list needs to be examined. But there must be some reason as <br /> to why crucial or material witnesses are not examined or given up <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 45 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> by the prosecution. The failure of the prosecution to examine the <br /> aforesaid crucial witnesses coupled with the aforesaid <br /> inconsistencies brought out in the materials raise further doubts in <br /> the mind of the Court. It is well settled that a party is bound to lead <br /> the best evidence in its possession, which would throw light on the <br /> issue in controversy and if such material evidence is withheld, the <br /> court may draw an adverse inference under illustration (g) of <br /> section 114 of IEA, notwithstanding that the burden of proof may <br /> not lie on such party as held by the Apex Court in <b>Mussauddin </b><br /> <b>Ahmed v. State of Assam, (2009) 14 SCC 541</b> . <br /> 33. It is no doubt true that Section 20 of the PC Act <br /> mandates a statutory presumption in favour of the prosecution; <br /> however, such presumption is not automatic and can only be <br /> invoked when the prosecution first establishes the foundational <br /> facts, namely, the demand for and acceptance of illegal gratification <br /> by the accused. It is only upon such proof that the burden shifts <br /> upon the accused to rebut the presumption by adducing cogent and <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 46 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> credible evidence and only on the touchstone of preponderance of <br /> probabilities. <br /> 34. The aforesaid aspects raise doubts in the mind of the <br /> Court regarding the prosecution case and hence it cannot be held <br /> that the materials on record are sufficient to find the guilt of the <br /> accused persons beyond reasonable doubt. Suspicion, however, <br /> strong cannot take the place of proof. Therefore, I find that the <br /> appellants/ A1 and A2 are entitled to the benefit of doubt. In such <br /> circumstances, it can only be held that the trial court went wrong in <br /> relying on the aforesaid unsatisfactory evidence to conclude <br /> regarding the guilt of the accused persons. <br /> 35. In the result, the appeals are allowed. The impugned <br /> judgment is set aside and the appellants/A1 and A2 are acquitted <br /> under Section 248(1) Cr.P.C. for the offences charged against them. <br /> They shall be set at liberty and their bail bonds shall stand <br /> cancelled. <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 47 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05<br /><br /> <br /> <br /> <br /> 36. Applications, if any, pending, shall stand closed. <br /> <br /> <b>CHANDRASEKHARAN SUDHA </b><br /> <b> (JUDGE) </b><br /> <b> </b><br /> <b>APRIL 02, 2026 </b><br /> <i>p’ma </i><br /> <br /> <b><i>CRL.A. 748/2002 &amp; CRL.A. 763/2002 </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>Page 48 of 48 </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b><br /> <br /> <br /> Signature Not Verified<br /> Signed By:KOMAL<br /> DHAWAN<br /> Signing Date:02.04.2026<br /> 16:48:05</div>