Okhla Enclave Plot Holders Wel. Ason. vs Union Of India
- Court
- Supreme Court
2026 INSC 1259
REPORTABLE
IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION
MISCELLANEOUS APPLICATION NO. 89 OF 2026
IN
WRIT PETITION (C) No. 876 OF 1996
OKHLA ENCLAVE PLOT HOLDERS
WELFARE ASSOCIATION ….PETITIONER(S)
VERSUS
UNION OF INDIA AND
OTHERS ….RESPONDENT(S)
WITH
MISCELLANEOUS APPLICATION NO(S). 811 OF 2026
IN WRIT PETITION (C) NO(S). 876 OF 1996
DIARY NO(S). 38954 OF 2024
DIARY NO(S). 5631 OF 2025
MISCELLANEOUS APPLICATION NO(S). 810 OF 2026
IN MISCELLANEOUS APPLICATION NO(S). 1221 OF
2024 IN WRIT PETITION(C) NO(S). 876 OF 1996
MISCELLANEOUS APPLICATION NO(S). 3155 OF
2026 IN WRIT PETITION (C) NO(S). 876 OF 1996
MISCELLANEOUS APPLICATION NO(S). 812 OF
2026 IN WRIT PETITION (C) NO(S). 876 OF 1996
MISCELLANEOUS APPLICATION NO(S). 813 OF
2026 IN WRIT PETITION (C) NO(S). 876 OF 1996
Signature Not Verified
Digitally signed by
SONIA BHASIN
Date: 2026.11.23
16:55:21 IST
Reason:
1
MISCELLANEOUS APPLICATION NO(S). 2650 OF 2026
DIARY NO(S). 17124 OF 2026
DIARY NO(S). 35139 OF 2026
DIARY NO(S). 45101 OF 2026
MISCELLANEOUS APPLICATION NO(S). 3153 OF
2026 IN WRIT PETITION (C) NO(S). 876 OF 1996
DIARY NO(S). 54035 OF 2026
O R D E R
Vikram Nath, J.
1. Heard.
2. The present batch of matters arise out of Writ
Petition (Civil) No. 876 of 1996, which came to be
rd
disposed of by this Court by judgment dated 3
October, 2019. Subsequent thereto, the matter has
continued to frequently and expansively engage the
attention of this Court in relation to the
implementation of, and compliance with, the
directions issued therein. The present proceedings
have been occasioned by the need to facilitate and
streamline the implementation of the directions
issued by this Court, particularly those contained in
2
th th
the orders dated 25 April, 2025 and 18 May, 2026.
In the intervening period, several applications and
representations have been placed before this Court
by persons claiming to be plot holders or otherwise
asserting an interest in the project in question.
BRIEF FACTS
3. Before proceeding to consider the issues arising
in the present batch of matters, it would be
appropriate to briefly note the factual background of
the dispute, the grievances raised by the allottees and
the course of proceedings before this Court, including
the directions issued from time to time.
4. In the year 1985, M/s Durga Builders Private
1
Limited , together with its associate entities, acquired
land admeasuring approximately 235 acres
(comprising 126.724 acres in Phase I and 107.95
acres in Phase II), situated in the revenue estates of
Villages Sehatpur, Agwanpur, and Ismailpur, Sector
91, Faridabad, Haryana, for setting up a residential
colony originally styled as ‘Okhla Enclave’ and
subsequently renamed as ‘Edenburg City’.
1
Hereinafter, referred to as the ‘Developer’.
3
5. For the purpose of developing the aforesaid
colony, the Department of Town and Country
2
Planning, Haryana , granted seven colonisation
licences under Section 3 of the Haryana Development
3
and Regulation of Urban Areas Act, 1975 . The
covenants governing the development of the colony
were incorporated into a Bilateral Agreement dated
nd
2 December, 1991, executed between the Developer
and DTCP. In terms of the said agreement, the
residential plots were earmarked into three distinct
categories in the ratio of 20:25:55, as under:-
(i) Economically Weaker Section
4
Category : Constituting 20% of the total
plottable area, with plot sizes ranging
between 50 and 125 square metres, to be
allotted at subsidised rates determined by
the State Government;
5
(ii) No Profit No Loss Category :
Constituting 25% of the total plottable
area, with plot sizes ranging between 125
and 225 square metres, to be allotted at
2
Hereinafter, referred to as ‘DTCP’.
3
Hereinafter, referred to as the ‘1975 Act’.
4
For short, “EWS”.
5
For short, “NPNL”.
4
cost-reflective rates determined by DTCP
on a no-profit-no-loss basis; and
(iii) General Category: Constituting the
remaining 55% of the plottable area,
comprising plots generally measuring
above 225 square metres, to be sold at
market rates determined by the
Developer, subject to a statutory ceiling of
15% on net profit.
6. The underlying objective of the aforesaid
statutory classification was to ensure that the
revenue generated from the commercial sale of
General Category plots would, inter alia , cross-
subsidise the allotment of plots under the EWS and
NPNL categories.
7. However, despite having collected substantial
sums from prospective allottees, the Developer
completely failed to discharge its obligations under
the corresponding statutory and contractual
covenants. It defaulted in executing the requisite
internal and external development works, effected
allotments in excess of the sanctioned layout
capacity, and made unauthorised as well as duplicate
allotments. The Developer also defaulted in
5
depositing the mandatory External Development
Charges and licence renewal fees with the State
Government, with the outstanding arrears on
account of licence renewal fees alone exceeding
Rs.21.86 crores. In addition thereto, the Developer
issued unilateral demand circulars arbitrarily
enhancing the Internal Development Charges to
Rs.2,390-Rs.2,500 per square yard, notwithstanding
the significantly lower rates assessed by the
Government, namely Rs.878/- and Rs.975/- per
square yard towards internal development works,
and Rs.4.70 lakhs per gross acre towards External
Development Charges. Significantly, all seven
colonisation licences granted in favour of the
Developer expired in the year 1999 and were not
renewed thereafter by the State Government.
8. The persistent failure to provide basic civic
infrastructure, coupled with arbitrary monetary
demands, generated widespread discontent amongst
the plot allottees.
9. In the aforesaid backdrop, diverse associations
representing the plot allottees instituted writ
petitions before this Court under Article 32 of the
Constitution of India in the year 1996, the lead
6
matter being Writ Petition (Civil) No. 876 of 1996,
raising a grievance against the Developer for its
failure to fulfill the statutory and contractual
covenants. In these proceedings, a specific group of
492 original petitioners was recognized, in whose
th
favour this Court passed interim directions on 7
rd
April, 1997 and 23 November, 2000 for carving out
smaller plot sizes to enable plot adjustments within
the colony layout. During the pendency of the said
nd
proceedings, this Court, vide order dated 2
December, 1999, directed the allottees to deposit a
sum of Rs.50/- per square yard directly into a
designated account to meet the costs of colony
th
development. Subsequently, vide order dated 14
December, 2007 (in I.A. Nos. 41-42 in W.P. (C) No.
113 of 1996), this Court directed the State authorities
to approve building plans submitted by these
petitioners to enable them to raise residential
construction on their allotted plots.
10. Simultaneously, certain aggrieved plot holders
also invoked the writ jurisdiction of the High Court of
6
Punjab and Haryana by filing C.W.P. No. 3311 of
6
Hereinafter, referred to as the ‘High Court’.
7
2001. The Division Bench of the High Court, vide
th
judgment and order dated 18 March, 2002, directed
that these litigating allottees, comprising 567
members, be extended full parity with the 492
petitioners before this Court, ordering the execution
of sale deeds in their favour upon payment of an
additional sum of Rs.50/- per square yard, followed
by the delivery of physical possession. The said
th
judgment was reaffirmed by the High Court on 19
May, 2006 in Civil Misc. No. 2971 of 2005 in C.W.P.
No. 3311 of 2001, and was ultimately upheld by this
th
Court vide order dated 4 January, 2008 in SLP (C)
No. 14843 of 2006 preferred by the Developer.
11. However, a subsequent scrutiny of the
conveyances executed by the Developer unearthed
grave and systematic irregularities. It is alleged that
between 2003 and 2010, the Developer executed a
vast number of disputed and unauthorized sale
deeds. Several of these instruments contained
recitals depicting that the conveyances were executed
in compliance with directions issued by this Court,
notwithstanding that the vendees concerned were
complete strangers to the proceedings before this
Court. Other glaring anomalies included registered
8
sale deeds lacking the signatures of the purchasers,
backdated conveyances, and the issuance of
duplicate payment receipts in respect of same plot
numbers. This multiplicity of competing claims,
compounded by severe discrepancies in the allotment
and title records, necessitated an independent,
comprehensive examination into the land ownership,
the genuineness of allotments, and the actual extent
of site development completed.
12. To resolve this convoluted mismanagement, this
st
Court, vide order dated 21 October, 2008, appointed
Shri H.P. Sharma, a retired member of the Delhi
Higher Judicial Service, as Court Commissioner. The
learned Court Commissioner was tasked, inter alia ,
with:-
(i) Ascertaining the precise quantum of
land owned by the Developer and its
associate entities across different
temporal intervals;
(ii) Identifying genuine allottees and
determining the legal basis of their
respective entitlements;
(iii) Assessing the quantum of internal
development works completed vis-à-vis
9
the financial outlay required to execute
the remaining infrastructure; and
(iv) Conducting an audit of the funds
collected by the Developer from plot
purchasers against the amounts actually
deposited with the State authorities.
13. Pursuant to the directions issued by this Court,
the learned Court Commissioner published public
notices in national English and Hindi dailies,
conducted hearings of concerned stakeholders, and
carried out a comprehensive record scrutiny. The
th
Commissioner submitted his report dated 5
January, 2010, which was taken on record by this
th
Court on 8 January, 2010. Out of more than 3,000
claimants, the Commissioner identified 2,196 valid
plot entitlements. However, during subsequent
th nd
proceedings on 4 April, 2013 and 22 April, 2013,
diverse groups of allottees filed objections alleging
that their individual claims had not been properly
evaluated. Consequently, this Court directed the
Director General, Town and Country Planning,
10
7
Haryana , to undertake a fresh field survey and
demarcate the plots available for allotment.
14. In order to safeguard the subject land against
further unauthorized encroachments and third-party
th
encumbrances, this Court, vide orders dated 17
th
July, 2013 and 18 July, 2013, directed DGTCP to
assume official custody of the entire licensed area
admeasuring approximately 235 acres and take
charge of its watch-and-ward and maintenance.
DGTCP was further directed to reconcile the 2,196
entitlements identified by the Court Commissioner
with the 844 allottees recognized pursuant to the
orders of the High Court, and to prepare a
consolidated draft allotment list. In compliance
therewith, DGTCP filed a comprehensive affidavit
th
dated 15 November, 2013, identifying 3,002
potential claimants across the three categories.
15. To resolve the multiplicity of competing claims
and establish a uniform verification mechanism, this
th
Court, orders dated 10 December, 2015 and
vide
th
27 January, 2016, constituted a one-member
Special Committee headed by Hon’ble Mr. Justice
7
Hereinafter, referred to as ‘DGTCP’.
11
(Retd.) Vikramajit Sen, former Judge of this Court.
The Special Committee, in turn, constituted a
Scrutiny Committee under the chairmanship of the
Senior Town Planner, Faridabad, to conduct field
inspections, audit physical files, and verify payment
receipts.
16. To ensure transparency in the verification
exercise and following public notices issued in
August, 2016 inviting all original allottees to submit
their claim records, the Special Committee, vide order
th
dated 7 May, 2016, prescribed the following
mandatory eligibility criteria:-
(i) Payment of Land Cost: The entire
land cost must have been booked and
th
paid on or before 7 April, 1997;
(ii) Deposit of Development Charges:
The entire development charges, or the
interim sum of Rs.50/- per square yard
nd
pursuant to the order dated 2
December, 1999, must have been
st
deposited on or before 31 December,
1999; and
(iii) One Plot Per Family: Strict
adherence to the restriction of one plot
12
per family, regardless of the allotment
category, to prevent speculative hoarding
and cross-subsidise subsidized housing
quotas.
17.
The scrutiny exercise was conducted against
the sanctioned layout plan comprising 2,926 plots
(1,502 in Phase I and 1,424 in Phase II), across an
inventory of 1,603 EWS, 783 NPNL, and 540 General
Category plots, notwithstanding that approximately
46.85 acres of the 235-acre project land had fallen
under heavy illegal encroachments, leaving only
187.825 acres available for layout planning. Against
this inventory, over 2,690 claims were submitted for
verification. During the scrutiny, when legal
complexities arose regarding cut-off dates, power of
attorney transfers, and multi-plot holdings, the
Special Committee issued a communication dated
th
11 October, 2018, referring four fundamental legal
questions to this Court for clarification. Following
multiple hearings, the eligibility criteria and
verification mechanism so formulated were
subsequently examined and approved by this Court
13
rd 8
vide judgment dated 3 October, 2019 , thereby
affirming the two cut-off dates and the one-plot-per-
family rule as the definitive basis for scrutinising all
claims.
18.
While addressing the completion of the balance
development works abandoned by the defaulting
developer, this Court approved a total financial
outlay of Rs.128.70 crores, comprising Rs.70 crores
towards internal development works, Rs.47 crores
towards External Development Charges, and
Rs.11.70 crores towards a 10% contingency
provision. The aforesaid expenditure was directed to
be apportioned amongst the eligible plot holders, who
were required to deposit their proportional shares
with DGTCP within a stipulated timeframe, failing
which their allotment would revert and the developer
would be liable to refund their land consideration
with interest. Upon deposit of the apportioned
development charges, DTCP was directed to execute
the requisite conveyance deeds in favour of the
eligible allottees in terms of Section 8(4) of the 1975
8
(2019) 9 SCC 572.
14
Act and deliver physical possession of demarcated
plots.
19. Pursuant to the scrutiny exercise conducted
under the aegis of the Special Committee, Justice
(Retd.) Vikramajit Sen submitted the primary Special
th
Committee Report dated 16 January, 2023,
identifying 1,011 eligible allottees in Phase I
(comprising 96 EWS, 866 NPNL, and 49 General
Category allottees) and the same was accepted by this
th
Court vide order dated 11 July, 2023. Although
Justice (Retd.) Vikramajit Sen tendered his
th
resignation on 5 September, 2023 upon completing
rd
the Phase I report, this Court vide order dated 23
July, 2024 requested him to re-engage and chair the
Special Committee to resolve remaining disputes.
However, as a substantial number of persons
asserting title on the strength of unscrutinised sale
deeds and allied documents remained outside the
audit, the overall determination of claims pertaining
to the project land remained incomplete/non
conclusive.
20. To bring these unresolved claims within the
framework of judicial scrutiny, this Court vide order
th
dated 25 April, 2025 directed a fresh scrutiny
15
exercise for the remaining claims in Phase II,
specifically directing 480 holders of unverified sale
deeds (out of 492 litigating petitioners) to submit
their title deeds before the Scrutiny Committee for
verification. Crucially, this Court modified its earlier
rd
judgment dated 3 October, 2019, to permit General
Category allottees holding multiple market-rate plots
to participate in the Phase II scrutiny and ordered the
verification of commercial/shop plot claims as well.
The State Government was further directed to evict
unauthorized encroachers, clear outstanding
statutory developer liabilities, and make earnest
endeavour to secure a 65% land share for plotted
development, while Justice (Retd.) Vikramajit Sen
was requested to oversee the verification of the
remaining claims.
21. In response to the public notices issued
pursuant to the aforesaid directions, a total of 2,036
claims were received for Phase II scrutiny (the second
round of claim audits conducted by the Committee),
comprising 1,739 claims backed by registered sale
deeds or General Power of Attorney instruments (to
be specific, 1637 registered Sale Deeds and 102
GPAs/SPAs verified with local revenue records), and
16
297 fresh claims supported by ancillary
documentation. However, before the scrutiny
exercise could reach its logical conclusion, a grave
administrative irregularity surfaced. It was brought
th
to notice of this Court that by 25 March, 2025 local
DTCP officials had unauthorizedly sanctioned
building plans in respect of 480 claims that had not
yet been verified by the Special Committee, allowing
certain unverified claimants to jump the queue ahead
of genuine, verified allottees in an egregious manner.
22. Perturbed by the premature sanction of building
plans without awaiting judicial verification and the
systematic undermining of court directives, Justice
(Retd.) Vikramajit Sen tendered his resignation to the
th
Hon’ble the Chief Justice of India on 17 November,
th
2025 (reiterated vide official letters dated and 5
th
June, 2026 and 29 August, 2026). This untoward
development stalled the Phase II scrutiny,
necessitating further directions from this Court to
ensure the orderly completion of the verification
process.
23. In the aforesaid backdrop, and upon
considering several urgent applications filed by plot
holder associations and DTCP, this Court passed
17
th
further directions vide order dated 18 May, 2026,
with a view to ensuring effective implementation of its
rd th
earlier orders dated 3 October, 2019 and 25 April,
2025 and facilitating the expeditious completion of
the pending scrutiny exercise. By the said order, the
State of Haryana was directed to appoint a senior
officer as a Nodal Officer, who would function as a
single-window authority to receive, index, and digitize
all allottee representations without making any
independent administrative determination on the
merits or legal eligibility of individual claims.
24. Significantly, vide paragraph 8(ix) of the said
order, this Court issued specific directions to the
registration, revenue, municipal, and development
authorities, restraining them from permitting any
transfer, mutation, registration, building permission,
or creation of third-party rights in respect of the
project land in any manner prejudicial to the
directions given by this Court vide judgments dated
rd th
3 October, 2019 and 25 April, 2025, or the ongoing
proceedings before the Special Committee, thereby
establishing an absolute judicial embargo against
unauthorized construction permissions and arbitrary
title mutations.
18
25. Furthermore, to prevent administrative
conundrum and to ensure that the Special
Committee does not remain functus officio , this Court
issued notice to Mr. Alok Sangwan, learned senior
A.A.G. appearing for the State as well as Ms. Rashmi
Nandakumar, learned Amicus Curiae, on the aspect
of appointing a new Chairperson of the Special
Committee, so as to facilitate the completion of the
pending Phase II scrutiny, the verification of
competing claims, and the eventual handover of plots
to the eligible allottees.
26. In compliance with the directions issued vide
th
order dated 18 May, 2026, the State of Haryana filed
th
a compliance affidavit dated 17 August, 2026,
detailing the administrative steps taken pursuant
thereto. As per the affidavit, the Senior Town Planner,
Faridabad, was designated as the Nodal Officer to
function as a single point of contact for receiving
representations from the allottees. Public notices
were also duly published, inviting the remaining
unscrutinised claimants and holders of sale deeds to
submit their claim dossiers. The notices laid down
the procedure for submission of physical copies as
well as digitised records on flash drives, while
19
expressly directing claimants to refrain from directly
approaching or contacting the Special Committee.
27. The affidavit further detailed the protective
measures executed to secure the project land and
enforce the restraint enjoined under Paragraph 8(ix)
th
of the order dated 18 May, 2026. These measures
included the deployment of dedicated watch-and-
ward personnel to safeguard the unencumbered area
admeasuring 187.825 acres and prevent any fresh
unauthorized construction or encroachment. It was
submitted that the State had already issued
administrative instructions to the revenue,
registration, and municipal authorities in Faridabad
prohibiting mutations, registration of sale deeds, and
grant of building plan approvals.
28. The Senior Town Planner-cum-Nodal Officer,
Faridabad, convened meetings with the
th
representatives of the allottees on 29 July, 2026,
th st
13 August, 2026, and 21 August, 2026. The
meetings were convened to receive and compile the
claim representations submitted by the allottees,
both in physical form and in digitised form on flash
drives, and to ensure their proper indexing and
preservation.
20
SUBMISSIONS ON BEHALF OF LEARNED AMICUS
CURIAE
29. Ms. Rashmi Nandakumar, learned Amicus
Curiae, brought to the notice of this Court the
unfortunate circumstances which culminated in the
resignation of Justice (Retd.) Vikramajit Sen as
Chairperson of the Special Committee. It was
submitted that Justice (Retd.) Vikramajit Sen had, in
July 2024, graciously consented to re-engage with
the matter, moved by the plight of hundreds of
homebuyers who had been awaiting the resolution of
their claims for nearly four decades. However, the
very administrative machinery entrusted with
implementing the directions of this Court failed to
extend the requisite cooperation and, instead, acted
in a manner prejudicial to the functioning of the
Special Committee and impeded the implementation
of the judicial directions.
30. Learned Amicus Curiae further submitted that,
during the meeting of the Special Committee held on
st
21 August, 2026, it came to light that officials of the
th
DTCP had sanctioned building plans, up to 25
March, 2025, in respect of 480 claimants whose
claims had not been scrutinised by the Special
21
Committee. These approvals were stated to have been
th
granted shortly before the judgment dated 25 April,
2025, which had contemplated verification of the
claimants’ title by the Scrutiny Committee before any
demarcation or construction could be undertaken. It
was submitted that, by permitting building plans to
be sanctioned in favour of persons whose claims
remained unverified, the concerned officials had
enabled such claimants to bypass the prescribed
scrutiny process and gain precedence over genuine
allottees who had duly submitted themselves to the
verification exercise.
31. The learned Amicus Curiae also invited the
th
attention of this Court to the letter dated 29 August,
2026 addressed by Justice (Retd.) Vikramajit Sen to
the Hon’ble the Chief Justice of India, wherein he
expressed his inability to “gloss over” the aforesaid
departures from the directions of this Court. It was
submitted that Justice (Retd.) Vikramajit Sen
regarded the sanctioning of such building plans as
indicative of circumstances extending beyond a mere
administrative lapse and expressed his inability to
continue as Chairperson of the Special Committee
22
when the implementation of the judgments of this
Court was being frustrated in this manner.
32. In these circumstances, learned Amicus Curiae
urged this Court to take serious note of the
discrepancies brought to its notice.
33. It was further urged that a new Chairperson be
appointed to the Special Committee to ensure
continuity of the scrutiny process.
SUBMISSIONS ON BEHALF OF THE
APPLICANTS/PLOT ALLOTTEES
34. Learned Senior Counsel and learned counsel
appearing for the respective categories of plot
allottees advanced extensive submissions touching
upon their competing claims and legal entitlements.
35. It was vehemently contended on behalf of the
verified allottees that their claims stood conclusively
audited and verified by the Special Committee vide its
th
primary report dated 16 January, 2023, which was
th
formally accepted by this Court on 11 July, 2023.
These allottees had fully satisfied the tripartite
eligibility criteria approved by this Court, namely,
th
payment of the entire land cost on or before 7 April,
1997; deposit of the development charges or the
23
interim sum of Rs.50/- per square yard on or before
st
31 December, 1999; and strict compliance with the
‘one plot per family’ mandate. Consequently, it was
submitted that their status and entitlements had
achieved finality before the judicial fora and could not
be subjected to re-scrutiny or unravelled through any
subsequent administrative exercise. It was further
urged that these verified allottees ought not to be
forced into a fresh draw of lots or placed on an equal
footing with unverified claimants, as doing so would
cause grave prejudice to genuine homebuyers who
have been awaiting physical possession of the plots
as per their entitlement for several decades.
36. Learned counsel representing the General
Category allottees submitted that they had
purchased plots falling within the open-market quota
at prevailing commercial rates and paid full
consideration under registered conveyances. Unlike
the EWS and NPNL categories, these purchasers had
not availed of any state subsidy or concessional
pricing. It was, therefore, argued that registered
conveyance deeds executed by the Developer and
duly stamped by the State revenue authorities could
24
not be unilaterally ignored or invalidated by the DTCP
through botched up administrative process.
37. Learned counsel appearing for the EWS and
NPNL allottees placed reliance upon the Bilateral
nd
Agreement dated 2 December, 1991, which
earmarked 20% of the plottable area for EWS and
25% for NPNL categories to fulfill the statutory
objective of affordable social housing.
38. It was contended that priority and precedence
must be accorded to the original allottees who had
paid full consideration between 1986 and 1997, as
opposed to claims originating from subsequent open-
market transactions between 2003 and 2010.
39. Learned counsel appearing on behalf of the
Okhla Enclave Plot Holders (Allottees) Forum (Regd.)
submitted that the property rights of its members
already stand crystallised pursuant to the judgments
th th
dated 18 March, 2002 and 19 May, 2006 passed
by the High Court in C.W.P. No. 3311 of 2001, which
were affirmed by this Court upon dismissal of SLP (C)
th
No. 14843 of 2006 on 4 January, 2008. It was
contended that the claims of the members of the
Forum stand on an entirely distinct footing and are
not comparable to those of persons asserting rights
25
on the basis of unverified open-market transactions.
According to learned counsel, no further substantive
adjudication of their claims survives and, therefore,
they ought not to be subjected to any fresh or further
administrative scrutiny.
40. With respect to the claimants whose sale deeds
and title documentation is still pending scrutiny, it
was submitted that this Court, vide its judgment
th
dated 25 April, 2025, had explicitly mandated a
fresh scrutiny exercise for the remaining unverified
title-holders. Pursuant to public notices published in
that behalf, these applicants had deposited their
respective original title deeds and credentials in good
faith, adhering strictly to the prescribed procedure. It
was, therefore, contended that bona fide purchasers
ought not to be penalized, nor should their
entitlements be indefinitely stymied, on account of
administrative lapses, procedural delays, or
irregularities solely attributable to the State
authorities and the Developer.
41. Learned counsel appearing for the purchasers
of commercial plots submitted that they had booked
commercial units during the early 1990s and had
paid the full land consideration together with the
26
requisite development charges upfront. It was urged
that their claims stand on an entirely distinct footing
from those of residential plot allottees and warrant
independent consideration. Learned counsel prayed
for the immediate demarcation and delivery of
physical possession of commercial plots to eligible
purchasers, contending that their accrued rights
ought not to be held hostage or prejudiced by the
protracted litigation surrounding residential
allotments.
SUBMISSIONS ON BEHALF OF THE STATE
42. Shri Alok Sangwan, learned Senior A.A.G.
appearing for the State of Haryana, submitted that
the State proposes to undertake a comprehensive
verification exercise at the district level. For this
purpose, it was suggested that a Committee be
constituted comprising the Senior Town Planner, the
District Town Planner, the Tehsildar/Sub-Registrar,
Faridabad, and designated State Legal
Officers/Advocates, to examine and verify the claims
and documents submitted by the persons concerned.
43. It was further submitted that the exercise of
verification ought to be completed within a strict and
non-extendable time frame, upon the expiry of which
27
the total number of claimants should stand finally
determined and frozen, so as to prevent any further
claims from being introduced into the process.
44. Shri Sangwan also proposed strict enforcement
of an absolute prohibition on the execution and
registration of any fresh sale deeds, transfers through
General Power of Attorney, or mutations in respect of
the project land, so as to preserve the status of the
property and prevent the creation of any further
third-party rights during the pendency of the
verification and scrutiny process.
SUBMISSIONS ON BEHALF OF THE DEVELOPER
45. Shri Balbir Singh, learned senior counsel
appearing for the Developer, drew the attention of
this Court to the findings recorded by the Scrutiny
Committee and the Special Committee, which had
revealed instances of extensive duplication in respect
of individual plots. It was submitted that multiple
competing registered sale deeds, General Power of
Attorneys and booking receipts were found to be in
circulation in respect of the same plots, giving rise to
overlapping and conflicting claims.
46. Learned senior counsel contended that such
parallel/multiple claims had, in several instances,
28
been created by secondary property dealers and
unauthorised intermediaries without the knowledge,
consent or authorisation of the Developer. He,
therefore, submitted that a comprehensive
verification exercise ought to be undertaken to
identify and eschew forged, fabricated, backdated,
duplicate and unauthorised documents.
47. It was further urged that such an exercise
should specifically ascertain the genuineness and
validity of the sale deeds relied upon by the respective
claimants, thereby distinguishing genuine first-
instance allottees who had duly paid the requisite
land consideration from those asserting rights on the
basis of unauthorised or fabricated transactions.
ANALYSIS AND DISCUSSION
48. We have heard learned Amicus Curiae, learned
counsel appearing for the claimants, learned
Additional Advocate General appearing for the State
of Haryana and learned senior counsel appearing for
the Developer. We have also perused the material
placed on record and considered the notes and
suggestions tendered during the course of the
hearings.
29
49. The factual matrix of the present dispute has
been complicated beyond imagination by a
multiplicity of judicial and administrative
proceedings spanning nearly four decades,
overlapping categories of claimants, and glaring
discrepancies in the numerical data emerging across
various records. Over the years, the controversy has
traversed multiple forums and stages of scrutiny,
commencing with writ petitions under Article 32 of
the Constitution of India before this Court and
parallel proceedings before the High Court, followed
by the appointment of a Court Commissioner, the
constitution of a Special Committee by this Court,
and subsequent departmental audits. The
determinations emerging from these distinct
exercises have generated competing sets of rights and
entitlements that now urgently require judicial
reconciliation.
50. The complexity is further accentuated by the
stark disparity between the land area physically
available on site and the sheer volume of claims
founded upon title instruments executed by the
Developer and other opportunistic persons who have
tried to take advantage of the prevailing
30
uncertainties. It was brought to notice of this Court
that over 2,000 registered sale deeds had been
executed against a strictly limited inventory of
plottable land, and that a substantial portion of the
land remains affected by unauthorized
encroachments. The situation is further compounded
by distinct tiers of claimants, comprising 492 original
writ petitioners, 567 allottees recognized pursuant to
High Court judgments, 1,011 Phase I allottees whose
claims stand verified, and 2,036 Phase II applicants
whose title documents await verification.
51. The category-wise inventory presents an even
more daunting challenge. For instance, against 866
verified NPNL allottees in Phase I, only about 150
vacant plots are stated to be physically available on
the ground. Consequently, the task before this Court
is not confined to the routine verification of individual
title deeds; it mandates a comprehensive
reconciliation of competing equities against actual
land availability at the ground level, the protection of
rights already crystallised under judicial orders, and
the formulation of a workable, non-disruptive
mechanism to bring these protracted proceedings to
a definitive and equitable conclusion.
31
52. Indisputably, the following core facts, eligibility
parameters, and some ancillary issues have attained
finality and do not require further attention or re-
agitation before this Court:-
i. The entitlement of plot claimants remains
governed by the cut-off parameters as
affirmed by this Court vide judgment and
rd
order dated 3 October, 2019, i.e.,
requiring full payment of land costs on or
th
before 7 April, 1997 and development
st
charges on or before 31 December, 1999.
While compliance with the “one claim per
family” rule remains mandatory for EWS
and NPNL categories, this Court vide
th
judgment dated 25 April, 2025 explicitly
rd
modified the 3 October, 2019 order to
exempt General Category allottees from
the single-claim restriction, permitting
multiple-plot holders in the General
Category to participate in Phase II
scrutiny.
ii. The substantive property rights and plot
entitlements of the 1,011 verified allottees,
comprising 866 NPNL, 96 EWS, and 49
32
General Category purchasers, stand fully
crystallised, finalized, and judicially
confirmed, having been conclusively
identified under the primary report of the
th
Special Committee dated 16 January,
2023, which was formally taken on record
and given imprimatur by this Court vide
th
order dated 11 July, 2023.
iii. Notwithstanding the fact that several
amongst the 480 unscrutinised allottees
(out of the original 492 Supreme Court
petitioners) possessed registered sale
deeds, held building plan sanctions issued
th
under this Court’s interim order dated 14
December, 2007, and asserted physical
possession or prior judicial protection, this
th
Court judgment dated 25 April, 2025
vide
unequivocally rejected any plea of blanket
exemption. This Court observed that
interim protective orders or paper
conveyances cannot dispense with a
rigorous title audit, and directed these 480
allottees to mandatorily submit to the
document verification criteria so as to
33
establish the underlying legality and
genuineness of their respective claims.
iv. Out of the total licensed area of 234.674
acres comprising Sector 91 (Okhla
Enclave), an extensive pocket
admeasuring 46.85 acres is reportedly
encumbered by unauthorized
encroachments and illegal constructions.
This substantial physical reduction in land
area has severely constrained and reduced
the actual area available at the site for
layout planning, infrastructural execution,
and plot allocation to merely 187.825
acres.
53. While the core eligibility parameters and verified
lists stand judicially accepted, the following
substantive issues remain pending and require
adjudication and directions from this Court:-
i. Following the formal resignation tendered
by Justice (Retd.) Vikramajit Sen, the
Special Committee has become functus
officio . Consequently, it becomes
imperative for this Court to appoint a new
Chairperson and reconstitute the Special
34
Committee and steer the Phase II scrutiny
to its logical conclusion.
ii. Pursuant to the directions issued vide
th
judgment dated 25 April, 2025, the
authorities received a total of 2,036 fresh
Phase II claims, comprising 1,637 claims
supported by registered sale deeds, 102
backed by General or Special Power of
Attorney instruments, and 297
applications founded upon ancillary
documentation. Preliminary
administrative checks unearthed glaring
anomalies, including duplicate sale deed
registrations executed over identical plot
units. However, comprehensive title
verification across this entire pool of 2,036
claims remains pending.
iii. While the basic plot entitlement of the
1,011 verified claimants stood crystallised
and judicially recognised upon the
acceptance of the primary Special
th
Committee Report vide order dated 11
July, 2023, the physical handing of
possession is stalled owing to severe
35
physical inventory deficit, specifically,
where 866 verified NPNL purchasers
compete for merely 150 vacant NPNL plots
(a net deficit of 716 plots), and 49 verified
General Category buyers compete for a
solitary 1 vacant plot (a net deficit of 48
plots).
iv. The moot question requiring answer thus
is whether this Court ought to evolve a
comprehensive, equitable framework to
resolve this acute supply-demand
mismatch, establish transparent criteria
for plot distribution, and determine the
rights and remedies available to
unaccommodated verified allottees?
v. Whether the DTCP can be directed to
rezone, re-layout, or convert the unutilised
land bank earmarked for the EWS category
into NPNL sized plots or multi-storeyed
residential group housing complexes to
mitigate the acute physical deficit of 716
NPNL plots, and whether any such
conversion or land-use modification would
be legally permissible under the statutory
36
framework, rules, and bilateral agreement
covenants governing the original
development plan?
th
vi. Whether the judgment dated 25 April,
2025, insofar as it modified the earlier
rd
judgment dated 3 October, 2019 by
exempting open-market General Category
plot purchasers from the ‘one plot per
family’ restriction, warrants revisiting,
modification, or further clarification to
prevent speculative hogging of plots and to
ensure equitable land distribution across
all categories?
vii. Out of the 480 unscrutinised original
petitioners before this Court, 74 allottees
have defaulted in submitting their sale
deeds and supporting credentials for
audit. Whether these defaulting allottees
deserve to be granted a final opportunity to
submit their title documentation before the
reconstituted Special Committee?
viii. Whether the plot entitlements of the 567
members of the Okhla Enclave Plot
Holders (Allottees) Forum stand fully
37
crystallised pursuant to the judgment of
the High Court in C.W.P. No. 3311 of 2001
(which attained judicial finality upon
affirmation by this Court vide order dated
th
4 January, 2008 in SLP (C) No. 14843 of
2006), and whether, by virtue thereof, they
are entitled to an absolute exemption from
undergoing any further Phase II
administrative re-scrutiny or document re-
verification?
ix. The final list of eligible allottees, the
criteria governing allotment, and the
applicable pricing structure in respect of
commercial shop plots likewise mandate
rigorous examination, financial audit, and
verification under the aegis of the
reconstituted Scrutiny Committee.
x. Whether the building plans sanctioned by
local DTCP officials in favour of unverified
th
plot holders up to 25 March, 2025,
allegedly in direct breach of the restraint
orders passed by this Court and prior to
document verification by the Special
Committee, are liable to be declared null
38
and void ab initio, and what consequential
directions, administrative inquiries, or
remedial measures are warranted in
respect thereof?
xi. The Developer is reportedly in continued
default of its statutory liability towards
licence renewal fees and External
Development Charges, quantified at
Rs.21.86 crores, together with interest at
the rate of 6% per annum calculated from
th
28 February, 2019. Additionally, a sum of
Rs.1.25 crores has been incurred by DTCP,
towards watch-and-ward security
arrangements for the project land. The
current recovery status of these amounts
and the enforcement measures executed
against the defaulting Developer,
therefore, warrant close scrutiny.
xii. Equally, a comprehensive audit is
imperative regarding the development
charges payable by eligible allottees
towards the completion of essential colony
infrastructure. This necessitates verifying
the precise quantum collected from
39
verified allottees and deposited into the
designated State account against the total
approved outlay of Rs.128.70 crores. It is
essential to reconcile individual deposits
made by allottees over the preceding three
decades, ensuring that past payments are
duly credited and adjusted against their
final financial obligations. Such an audit is
crucial to establish the net funds available
for infrastructure completion and
determine the final financial liabilities, if
any, of the respective stakeholders.
54. In view of the aforesaid backdrop and taking
judicial notice of the formal resignation tendered by
Justice (Retd.) Vikramajit Sen, and having regard to
the imperative need to ensure seamless continuity in
the administration, supervisory oversight, and
functioning of the Special Committee, we deem it
appropriate to appoint Justice (Retd.) Sanjay Karol,
former Judge of this Court, as the Chairperson of the
reconstituted Special Committee.
55. The Special Committee shall process and verify
all applications submitted by the open-market
General Category plot claimants to determine valid
40
title and payment of full market consideration. Such
verification shall proceed on its individual merits,
unfettered by the ‘one plot per family’ restriction.
56. All defaulting claimants who have hitherto failed
to submit their claim dossiers before the Special
Committee are granted a final indulgence to submit
their applications along with complete supporting
documentation before the Nodal Officer strictly
within a period of three weeks from the date of
th
present order i.e., 20 November, 2026, who then
shall index the applications and forward the same to
the Special Committee. However, any allotment in
favour of such applicants shall remain subject to the
final orders of this Court.
57. Inasmuch as all original writ petitioners before
this Court were directed to subject their documents
to verification, the members of the Okhla Enclave Plot
Holders (Allottees) Forum cannot claim any
automatic parity or exemption from scrutiny, and
shall accordingly submit their claim dossiers before
the Special Committee for title and document audit.
58. The broad parameters, terms of reference, and
supervisory mandate governing the functioning of the
reconstituted Special Committee shall be as under:-
41
a. Undertake a comprehensive document scrutiny,
revenue audit, and title verification of all
pending Phase II claims, including applications
received within the final 3-week window granted
herein. Scrutiny shall be conducted with strict
adherence to the twin cut-off parameters as
rd
affirmed vide judgment dated 3 October, 2019.
The Special Committee may examine the
corresponding revenue records to resolve title
anomalies, including duplicate sale deeds and
parallel third-party transfers, and weed out
fraudulent claims.
b. Audit the physical status of the 1,011 verified
claimants whose basic entitlement stands
th
crystallized vide order dated 11 July, 2023;
ascertain how many of them have secured
physical possession, how many remain
unaccommodated due to inventory deficits, and
identify all unauthorized occupants or
encroachers currently holding project land.
c. Evaluate the net unencumbered plottable land
vis-à-vis verified allottees and formulate a
transparent, equitable allocation scheme,
incorporating draws of lots, layout plan
42
modifications, or monetary refund with/without
interest, to address the acute plot deficit. In
doing so, the Special Committee shall examine
whether the DTCP can be directed to re-layout,
rezone, or convert unutilized EWS land banks,
if any, into NPNL-sized plots or multi-storey
residential group housing complexes to
maximize yield and mitigate physical land
shortfalls.
d. Prepare and place before this Court final
category-wise lists of verified allottees across
NPNL, EWS, and General categories, as well as
eligible commercial shop plot claimants who
satisfy prescribed eligibility norms.
e. The Special Committee shall investigate and
report on the administrative irregularities
highlighted in the communication addressed by
Justice (Retd.) Vikramajit Sen regarding
building plans sanctioned by local DTCP
officials in favour of unscrutinised claimants up
th
to 25 March, 2025, in direct breach of this
Court’s restraint orders, and suggest
appropriate remedial and disciplinary
measures.
43
f. The Special Committee shall verify the exact
financial liabilities of both the developer and the
verified allottees, determine the amounts
actually paid till date, and suggest effective
recovery mechanisms to secure project
development funds.
g. The Special Committee shall have full autonomy
to frame such ancillary issues as it may deem
fit, and to lay down its own procedure and
modalities for conducting the scrutiny exercise
in an expeditious and transparent manner.
59. The newly appointed Hon’ble Chairperson shall
forthwith assume all administrative, supervisory,
and adjudicatory responsibilities hitherto entrusted
to the Special Committee constituted by this Court.
60. Mr. Alok Sangwan, learned Senior A.A.G.
appearing for the State of Haryana, shall coordinate
with the Hon’ble Chairperson to finalize the
operational modalities, administrative infrastructure,
secretarial assistance, and logistical support
requisite for the seamless functioning of the
reconstituted Special Committee.
61. The State of Haryana, acting through the
designated Nodal Officer (Senior Town Planner,
44
Faridabad), shall ensure that all compiled, indexed
and digitised records pertaining to the Phase II
claims, together with the revenue audit findings and
reports reflecting the status of the physical land
inventory, are handed over and placed before the
Hon’ble Chairperson within a period of two weeks
from the date of this order.
62. The State of Haryana shall continue to extend
complete administrative, logistical, and financial
cooperation to the Special Committee, including the
prompt disbursement of honorarium, administrative
expenses, and the provision of secure, suitable venue
facilities for conducting hearings, stakeholder
interactions, and scrutiny drives.
63. The Special Committee shall be provided with
dedicated secretarial and administrative assistance,
comprising one Personal Assistant, one Lower
Division Clerk, and two Legal Researchers, who may
be engaged as per the choice and discretion of the
Hon’ble Chairperson. The State of Haryana shall also
make the necessary administrative arrangements
and provide the requisite infrastructure for the
sittings of the Special Committee.
45
64. The Chairperson of the Special Committee shall
be entitled to a fixed Honorarium of Rs. 60,00,000/-
(Rupees Sixty Lakhs Only), payable in three equal
tranches by the State of Haryana, which shall be at
liberty to recover the amount so disbursed from the
Developer. Of the said amount, a sum of Rs.
20,00,000/- (Rupees Twenty Lakhs Only) shall be
paid upfront by the State of Haryana. All persons
seeking consideration of their applications, who have
not undergone the process of scrutiny earlier and
have now been permitted to submit their
applications, shall submit, along with their respective
applications, a demand draft for a sum of Rs.
10,000/- (Rupees Ten Thousand Only), drawn in
favour of the State of Haryana. The amounts so
received shall be credited to an escrow account to be
opened by the State of Haryana, which shall be
utilised for meeting the expenses incurred in the
functioning of the Special Committee and for
payment of the honorarium to the Chairperson.
65. The Special Committee shall endeavour to
complete the scrutiny exercise and submit its report
before this Court, in a sealed cover, within a period
of four months from today. The State of Haryana, its
46
designated Nodal Officer and all claimants shall
extend full assistance and cooperation to the Special
Committee to facilitate the timely completion of the
exercise and submission of its report. The learned
Amicus Curiae is requested to extend such
assistance to the Special Committee as and when
called upon to do so.
66. In light of the reconstitution of the Special
Committee and the appointment of Hon’ble Justice
(Retd.) Sanjay Karol as its Chairperson,
Miscellaneous Application bearing Diary No. 17124
of 2026, Miscellaneous Application Nos. 812 of 2026
and 813 of 2026, seeking the appointment of a
presiding head for the Special Committee, shall stand
disposed of accordingly. All pending interlocutory
applications seeking impleadment or directions to
submit claim dossiers before the Special Committee
are consequently referred to the Hon’ble Chairperson
for appropriate consideration in accordance with the
Terms of Reference laid down herein.
67. The Registry is directed to forthwith send a copy
of this order to Justice (Retd.) Sanjay Karol, Hon’ble
Chairperson of the reconstituted Special Committee.
47
nd
68. List the matters on 02 March, 2027 at 2 PM
as part-heard for further consideration of the status
report and to monitor compliance with the directions
contained in the present order.
….……………………J.
(VIKRAM NATH)
...…………………….J.
(SANDEEP MEHTA)
NEW DELHI;
NOVEMBER 20, 2026.
48