MR. NILESH PRAKASHRAO MORE vs STATE OF MAHARASHTRA THRU ITS URBAN DEVELOPMENT DEPT. AND ORS

Court
Bombay High Court
Case type
Writ Petition
Decided on
27-03-2026
<div> <b>2026:BHC-AS:14949-DB</b><br /> 1-WP-5798-2023-(C).odt<br /> <br /> Digitally signed<br /> by SUNNY<br /> ANKUSHRAO<br /> THOTE<br /> Date:<br /> 2026.03.27<br /> 20:50:53<br /> +0530<br /> IN THE HIGH COURT OF JUDICATURE AT BOMBAY<br /> SUNNY<br /> ANKUSHRAO<br /> THOTE<br /> CIVIL APPELLATE JURISDICTION<br /> WRIT PETITION NO. 5798 OF 2023<br /> 1. Mr. Nilesh Prakashrao More,<br /> Age : 37 years, Occ. Agriculturist,<br /> Indian inhabitant,<br /> Residing at “Shri Swami Samarth”<br /> 330, Gajanan chowk Phaltan,<br /> District : Satara, Pin : 415523 ….Petitioner<br /> Versus<br /> 1. State of Maharashtra<br /> Through its Urban Development<br /> Department,<br /> [Summons to be served on the Learned<br /> Government Pleader appearing for<br /> the State of Maharashtra under Order<br /> XXVII,<br /> Rule 4, of the Code of Civil<br /> Procedure, 1908].<br /> 2. Regional Transport Office (RTO)<br /> 213, E Ward, Tarabai Park, Warna<br /> Colony, Kolhapur District, Pin – 416003<br /> [Summons to be served on the Learned<br /> Government Pleader appearing for<br /> the State of Maharashtra under Order<br /> XXVII,<br /> Rule 4, of the Code of Civil<br /> Procedure, 1908].<br /> 3. Chief Executive Officer of the<br /> Phaltan Nagar Parishad,<br /> Phaltan, District : Satara.<br /> [Summons to be served on the Learned<br /> Government Pleader appearing for<br /> the State of Maharashtra under Order<br /> <i>Sunny Thote</i> <i>...1</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:53 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> XXVII,<br /> Rule 4, of the Code of Civil<br /> Procedure, 1908]<br /> 4. District Collector Satara,<br /> Satara.<br /> [Summons to be served on the Learned<br /> Government Pleader appearing for<br /> the State of Maharashtra under Order<br /> XXVII,<br /> Rule 4, of the Code of Civil<br /> Procedure, 1908] ….Respondents<br /> <b></b><br /> Mr. Yatin Malvankar, Advocate for the Petitioner.<br /> Mr. Milind Sathe, Advocate General a/w Smt. Neha Bhide, Government<br /> Pleader, Mr. Jay Sanklecha, ‘B’ Panel Counsel, Smt. R.M. Shinde, AGP for<br /> the Respondent/State.<br /> Mr. Vishwanath Talkute, Advocate for Respondent No.3.<br /> <b></b><br /> CORAM : RAVINDRA V. GHUGE,<br /> SANDEEP V. MARNE &amp;<br /> ABHAY J. MANTRI, JJ.<br /> th<br /> RESERVED ON : 5 MARCH, 2026<br /> th<br /> PRONOUNCED ON : 27 MARCH, 2026<br /> JUDGMENT (PER : RAVINDRA V. GHUGE, J.)<br /> 1. Rule. Rule made returnable forthwith and heard finally by<br /> consent of the parties.<br /> <i>Sunny Thote</i> <i>...2</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> th<br /> 2. By an order dated 29 July 2024, passed by the Division<br /> Bench of this Court, while hearing Writ Petition No.5180 of 2022, the<br /> Registry was directed to place that Petition before the Hon’ble The Chief<br /> Justice for directions under Rule 8 of Chapter I, of the Bombay High Court<br /> Appellate Side Rules, 1960. For ready reference, we deem it appropriate to<br /> reproduce the said order here under :<br /> “1. Heard learned counsel for the parties.<br /> 2. The development plan for Pune was initially finalised<br /> on 8 July 1966, reserving the Petitioner’s property for the<br /> public purpose of the Primary School. After following the<br /> necessary procedures, this plan was revised effective 5<br /> January 1987, maintaining the same reservation.<br /> 3. On 28th March 2013, a notice was issued under<br /> Section 26(1) of the Maharashtra Regional and Town<br /> Planning Act, 1966 (for short, “MRTP Act”) proposing to<br /> revise the above plan. However, before the revision could<br /> be finalised, the Petitioners issued a notice on 23rd May<br /> 2015, which the Planning Authority received on 26th May<br /> 2015 under Section 127(1) of the MRTP Act, urging the<br /> purchase of the said property.<br /> 4. Under the amendment to the MRTP Act, the 12-<br /> month period prescribed in Section 127(1) for taking steps<br /> to purchase was enhanced to 24 months, effective from 29<br /> August 2015. There is no dispute that this 24-month notice<br /> period under the amendment would govern the present case.<br /> 5. The revisions to the development plan were finalised<br /> on 5 January 2017, before the expiry of the 24-month notice<br /> period, which was 22 May 2017.<br /> 6. The Petitioner’s case is that the notice dated 23rd<br /> May 2015, issued by the Petitioner, neither lapses nor is<br /> rendered ineffective on account of the revision of the<br /> development plan effective from 5th January 2017. The<br /> <i>Sunny Thote</i> <i>...3</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> Petitioner contends that on the expiry of 24 months, i.e. on<br /> 22 May 2017, the reservation lapses because, in the<br /> meantime, the Planning Authority has failed to take steps to<br /> acquire the said property as contemplated under the scheme<br /> of Sections 126 and 127 of the MRTP Act.<br /> 7. At least prima facie, the petitioner’s contentions find<br /> support in the decisions of the Coordinate Division Bench<br /> in the case of Santu Sukhdeo Jaibhave &amp; Ors. Vs. Nashik<br /> 1<br /> Municipal Corporation &amp; Ors. and Sadashiv Tryambak<br /> 2<br /> Rajebahadur &amp; Ors. Vs. State of Maharashtra &amp; Ors<br /> . In<br /> similar facts, these decisions have held that the reservation<br /> lapses if no steps are taken by the planning authority to<br /> acquire the property.<br /> 8. However, Mr. Kulkarni, learned counsel for the Pune<br /> Municipal Corporation (PMC), which is the Planning<br /> Authority, relied upon the decisions of yet another<br /> Coordinate Bench in the case of Salim Nizam Sanadi &amp; Ors.<br /> Vs Municipal Corporation, Sangli, Miraj and Kupwad City &amp;<br /> 3<br /> Ors. and Shri. Amuksidha Shrikant Majge and Anr. vs.<br /> Commissioner, Sangli, Miraj and Kupwad Municipal<br /> 4<br /> Corporation, Sangli and Ors . to contend that once the<br /> revisions in the development plan are finalised, subsequent<br /> reservation of land by the revised Development Plan would<br /> be the fresh starting point for the period prescribed under<br /> Section 127 of the MRTP Act. This means that as long as<br /> the period of 10 years from the finalisation of the revised<br /> Development Plan has not expired, there was no question of<br /> lapsing the reservation provided in the finalised revised<br /> development plan.<br /> 9. Again, prima facie, the decisions in Salim Nizam<br /> Sanadi (supra) and Shri. Amuksidha Shrikant Majge (supra)<br /> support Mr. Kulkarni’s submission.<br /> 2022 SCC OnLine Bom. 5273<br /> 1<br /> 2 2023 SCC OnLine Bom. 999<br /> 2019(2) All MR 630<br /> 3<br /> 4 2018 SCC OnLine Bom. 2844<br /> <i>Sunny Thote</i> <i>...4</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> 10. In the case of Salim Nizam Sanadi (supra) and Shri.<br /> Amuksidha Shrikant Majge (supra) considered the decision of<br /> the Division Bench of this Court in Prafulla C. Dave &amp; Ors.<br /> 5<br /> vs Municipal Commissioner, Pune and Ors. However, the<br /> decisions in Santu Sukhdeo Jaibhave (supra) and Sadashiv<br /> Tryambak Rajebahadur (supra) considered the decision of the<br /> Hon’ble Supreme Court in Prafulla C. Dave vs Municipal<br /> 6<br /> Corporation of Pune , affirming the decision of the Division<br /> Bench of this Court.<br /> 11. Mr Godbole argued that the facts in Prafulla Dave<br /> were entirely different because, in the said case, notice<br /> under Section 127 was served after the revised<br /> Development Plan had been finalised. He submitted that in<br /> the present case, the notice under section 127 was<br /> admittedly served before the finalisation of the revised plan.<br /> Therefore, the subsequent finalisation does not affect the<br /> notice.<br /> 12. The two sets of decisions that at least prima facie<br /> take conflicting views do not discuss the distinction now<br /> sought to be made by Mr Godbole. In almost similar<br /> material facts, the two sets of decisions of Co-equal<br /> Benches reach diametrically opposite conclusions. Based<br /> upon the first set, this petition may have to be allowed. But<br /> if the second set of decisions are to be followed, this<br /> petition would have to be dismissed.<br /> 13. Similarly, none of the judgments have had the benefit<br /> of considering some of the observations made by the Full<br /> Bench of this Court in Vishwas Bajirao Patil Vs. State of<br /> 7<br /> Maharashtra &amp; Ors . The Full Bench, in the context of<br /> deciding whether the amendment to Section 127, which<br /> entered force on 29th August 2015 and enhanced the time<br /> limit from 12 months to 24 months, has observed that no<br /> 5 2008 (3) Mh.L.J. 120<br /> 6 2007(6) ALL MR 207<br /> 7 2019 SCC OnLine Bom. 1770<br /> <i>Sunny Thote</i> <i>...5</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> right is vested in a person having an interest in the land by<br /> merely serving notice as contemplated by Section 127 of<br /> the MRTP Act. The Full Bench observed that the right<br /> would have vested in the landowner upon the expiry of a<br /> period of one year from the date of issue of such notice had<br /> the MRTP Act not been amended in the meantime.<br /> 14. Given the prima facie conflict between the two sets<br /> of judgments delivered by the Coordinate Co-equal<br /> Benches and the fact that certain observations made by the<br /> Full Bench in Vishwas Bajirao Patil (supra) were not<br /> considered, We think that this matter could be more<br /> advantageously heard by a Bench of more than two Judges.<br /> This conflict, according to us, could be best resolved by<br /> resorting to the provisions of Rule 8 of Chapter I of the<br /> Bombay High Court, Appellate Side Rules, 1960 (for short,<br /> “the said Rules”).<br /> 15. Accordingly, we direct the Registry to place the<br /> matter before the Hon’ble Chief Justice, given the<br /> provisions of Chapter I Rule 8 of the said Rules.”<br /> 3. By the order of the Hon’ble The Chief Justice of the Bombay<br /> th<br /> High Court, dated 17 December, 2024, Writ Petition Nos.5180 of 2022<br /> and this Petition no.5798 of 2023, were clubbed and were referred to the<br /> Larger Bench under Rule 8 of Chapter I of the Bombay High Court<br /> Appellate Side Rules, 1960 (the ‘ 1960 Rules’ ).<br /> 4. Subsequently, Writ Petition No.5180 of 2022 was disposed off<br /> th<br /> by our Bench, by an order dated 25 July 2025, which reads as under :<br /> <i>Sunny Thote</i> <i>...6</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> “1. Mr. Godbole, the learned Senior Counsel<br /> submits that the Petitioner, who is 86 years of age, has filed<br /> th<br /> an affidavit dated 29 June, 2025. Vide the said affidavit, he<br /> has spelt out in paragraph 3 that considering the age of the<br /> Petitioner and other factors, including the fact that the<br /> Planning Authority has kept the land under reservation for<br /> 60 years, he may consider withdrawing the Writ Petition<br /> subject to appropriate directions/orders being passed by the<br /> Court, so as to facilitate an Award as regards the<br /> st<br /> Notification dated 21 January, 2021 by following the<br /> principles laid down in the Right to Fair Compensation and<br /> Transparency in Land Acquisition, Rehabilitation and<br /> Resettlement Act, 2013 (hereinafter referred to as “LARRA<br /> 2013”) within a period of six months. The said affidavit has<br /> been marked as ‘X-1’ for identification.<br /> 2. In response to the said affidavit, Mr. Kulkarni,<br /> the learned Advocate for the Corporation, places on record<br /> th<br /> a photostat copy of a communication dated 25 July, 2025,<br /> signed by the three officers of the Corporation and<br /> addressed to the Chief Law Officer of the Corporation’s<br /> Law Department dealing with the land acquisition. The<br /> same is marked as ‘X-2’ for identification. The said<br /> communication is indicative of the corporation’s intention<br /> in the proceedings with regard to the land acquisition, that<br /> the acquisition proceedings could be completed within a<br /> period of one year, considering that the land was reserved<br /> for a primary school, high school and 24 meters wide D.P.<br /> Road. The learned Advocate was instructed in the said<br /> communication to place the same before the Court.<br /> 3. Mr. Kulkarni further submits on instructions<br /> from the Corporation that an amount equivalent to 30%<br /> (approximately Rs. 12,49,93,329/-) on an approximate<br /> valuation of the land to be acquired as per the appropriate<br /> assessment of the SLAO, would be deposited with the<br /> SLAO, within 8 weeks.<br /> 4. Mr. Godbole submits that considering the<br /> advanced age of the Petitioner which is 86 years and<br /> considering his health status, it would be appropriate for this<br /> <i>Sunny Thote</i> <i>...7</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> Court to direct the Corporation to complete the acquisition<br /> within 9 months, instead of 1 year. Mr. Godbole further<br /> submits that since the suggestion of the Corporation is<br /> acceptable to the Petitioner, this Petition can be disposed<br /> off. He further submits that since the Corporation has made<br /> a statement before the Court, it will have to maintain the<br /> said statement and should not be resiled from the same.<br /> 5. In view of the above, we do not find any scope<br /> for indulgence in the said arrangement, save and except that<br /> the Petitioner is 86 years of age and the land is under<br /> reservation for nearly 60 years. If the Petitioner makes a<br /> request for reducing the timeline for completing the<br /> acquisition from one year to 9 months, we do not find that<br /> this could be an unreasonable request. For the Petitioner, a<br /> reduction of three months also matters. If the Corporation<br /> acts proactively in this proceedings and initiates quick steps<br /> with promptitude, the acquisition could be completed even<br /> within 9 months. We, therefore, record that this Court<br /> would appreciate the gesture of the Corporation that the<br /> acquisition of the land would be completed with<br /> promptitude, within 9 months.<br /> 6. Needless to state that the statement that 30%<br /> amount would be deposited with the SLAO within 8 weeks<br /> is recorded.<br /> 7. With the aforesaid understanding and<br /> directions, this Petition is disposed off by consent of the<br /> Petitioner.”<br /> PLEADINGS IN THE PETITION AND ORAL/WRITTEN SUBMISSIONS OF<br /> THE LEARNED ADVOCATE FOR THE PETITIONER<br /> 5. The Petitioner has put forth prayers at Clauses [A] and [B],<br /> which read as under :<br /> <i>Sunny Thote</i> <i>...8</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> “[A] That this Honourable Court be pleased to issue a writ<br /> of mandamus or writ in the nature of mandamus or any<br /> other appropriate writ direction and order under Article 226<br /> of the Constitution of India, 1950, holding that the said<br /> reservation to the extent of the said land stands lapsed and<br /> in furtherance thereof direct the Respondents to notify the<br /> same by publishing in the Official Gazette under the<br /> provisions of section 127(2) of the Maharashtra Regional<br /> and Town Planning Act, 1966.<br /> [B] That considering the issue involved in the<br /> present petition and considering the nature of reliefs sought<br /> the Petitioner most humbly prays that the present petition<br /> may be disposed of at the stage of admission and the rule be<br /> made absolute.” <br /> 6. The dates and events indicated by the Petitioner in Writ<br /> Petition No.5798 of 2023 and the submissions of the learned Advocate, can<br /> be summarized as under :<br /> a) Petitioner is the owner of land admeasuring 18 acres situated<br /> at Survey No.112/1A/1A/1/1A/1B, village Phaltan, taluka Phaltan,<br /> District : Satara. (‘said property’ for short)<br /> b) 18.12.1992 – The said property is under reservation bearing<br /> no.80 for the purpose of RTO pursuant to the coming into effect of<br /> nd<br /> the 2 Revised Development Plan vide Gazette Notification dated<br /> 18/12/1992.<br /> <i>Sunny Thote</i> <i>...9</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> c) 17.12.2002 – The prescribed period of 10 years post the<br /> Notification dated 18.12.1992 came to an end.<br /> d) 12.05.2010 – Phaltan Municipal Council, District : Satara,<br /> being the Planning Authority, declared its intention u/s 23 read with<br /> rd<br /> Sec.38 to prepare Draft Development Plan (3 Revision), vide its<br /> Resolution no.37.<br /> e) 10.09.2010 – Phaltan Municipal Council, u/s 2(19) of the<br /> MRTP Act, 1966, declared its intention under Section 23 read<br /> Section 38 of the MRTP Act to prepare a Draft Revised<br /> rd<br /> Development Plan (3 Revision) for the area within the limits of<br /> Phaltan Municipal Council by gazette notification.<br /> f) 05.03.2012 – Petitioner, by registered Sale Deed purchased<br /> the said land from the erstwhile owner.<br /> g) 26.09.2013 – Phaltan Municipal Council carried out the<br /> survey of the entire land within its jurisdiction as required u/s 25 of<br /> the MRTP Act and published a notice in the Official Gazette<br /> inviting suggestions and objections in respect of the Draft<br /> rd<br /> Development Plan (3 Revision).<br /> <i>Sunny Thote</i> <i>...10</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> h) 23.10.2013 – Petitioner raised objections to the reservation<br /> rd<br /> on the said land proposed in the Draft Development Plan (3<br /> Revision).<br /> i) 05.11.2014 – Phaltan Municipal Council vide its Resolution<br /> No.32, dated 19.08.2014, made certain modifications in the Draft<br /> rd<br /> Development Plan (3 Revision) and published the said plan, so<br /> modified in the Official Gazette dated 05.11.2014.<br /> j) 25.11.2014 – Phaltan Municipal Council, submitted the Draft<br /> rd<br /> Development Plan (3 Revision) to the Government of<br /> Maharashtra for its sanction.<br /> k) 17.11.2015 – Petitioner gave a purchase notice u/s 127 of the<br /> MRTP on to the Chief Office Phaltan Municipal Council.<br /> rd<br /> l) 23.05.2016 – Draft Development Plan (3 Revision) was<br /> sanctioned.<br /> rd<br /> m) 22.06.2016 – Final Revised Development Plan (3 Revision)<br /> came into effect in part.<br /> n) 28.06.2017 – The Petitioner preferred an application for<br /> obtaining development permission for the said land. However, the<br /> <i>Sunny Thote</i> <i>...11</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> said application was rejected by the Phaltan Municipal Council<br /> vide its letter dated 28.06.2017.<br /> o) 16.11.2017 – The two years period as prescribed under the<br /> provisions of Section 127 of the MRTP Act was completed on<br /> 16.11.2017.<br /> 7. The contentions and the grounds of objection set out by the<br /> learned Advocate for the Petitioner are reproduced (verbatim), hereunder :-<br /> (a) The Respondent Phaltan Municipal Council and the<br /> Director of Town Planning and the Government of Maharashtra has<br /> not proceeded with the acquisition of Petitioner’s land. The<br /> Respondent Authorities are not even permitting the Petitioner to<br /> beneficially enjoy his property by refusing to grant development<br /> permission to the Petitioner.<br /> (b) The State Government independently could have given<br /> the directions under the provision of Section 37, even that has also<br /> not been done by the Government of Maharashtra. The<br /> correspondence only shows that the Respondents are interested in<br /> continuing the reservation without actually acquiring the land of the<br /> <i>Sunny Thote</i> <i>...12</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> Petitioner and not making the payment and despite assurance from<br /> the correspondences no actual amount of compensation has ever<br /> been given to the Petitioner and the Petitioner is further being<br /> deprived of the beneficial use of his land.<br /> (c) Whether after publishing of a Draft Revised<br /> Development Plan, a Purchase Notice given before and after the<br /> period of 24 months as contemplated by Section 127 of the<br /> Maharashtra Regional and Town Planning Act, 1966 is over, the<br /> Revised Development Plan comes into operation, then whether the<br /> clock for 10 years period provided in Section 127 of the MRTP Act,<br /> 1966 gets reset. <br /> (d) The Petitioner contends that another aspect which<br /> requires consideration is that Section 38 uses the word ‘ At least<br /> once in 20 years… ’. Thus, in a given case planning authority may<br /> propose Revision of Development Plan even before the period of<br /> 10 years, from the coming into force of Development Plan, gets<br /> over and may bring into force such Revised Development Plan<br /> before the said 10 years period is over. In such eventuality the land<br /> under reservation will remain land locked for another period of 10<br /> <i>Sunny Thote</i> <i>...13</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> years and the right u/s. 127 could never be invoked. This could not<br /> have been the intention of the legislation.<br /> (e) The Petitioner further contends that in the present case<br /> nd<br /> the erstwhile 2 Revised Development Plan the Petitioners land<br /> had a Reservation for RTO. The said reservation has continued in<br /> rd<br /> the 3 Revised Development Plan. Thus, there can be two<br /> eventualities, either the said reservation of RTO was shown on the<br /> Petitioner’s land or it was not shown on the Petitioner’s land, in the<br /> Draft Revised Development Plan. In either of the eventualities the<br /> planning authority did have the intention, at the stage of Draft<br /> Revised Development Plan, to continue the reservation for RTO in<br /> the final Revised Development Plan.<br /> (f) Thus, upon receipt of the Purchase Notice from the<br /> Petitioner after the publication of Draft Revised Development Plan,<br /> the planning authority was not prevented from acquiring the<br /> Petitioners property, if it so intended to reserve it further for RTO.<br /> However, the non-acquisition of the Petitioners land after the<br /> purchase notice and instead continuing the reservation and even till<br /> date not acquiring the Petitioners land clearly amounts to depriving<br /> <i>Sunny Thote</i> <i>...14</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> the Petitioner from his beneficial use of land and defeating his<br /> substantive right to property u/ Art. 300A. These aspects have not<br /> been dealt with in the case of Prafulla Dave (supra) and hence the<br /> said judgment is not applicable in the facts of the present case.<br /> (g) It is further contended by the Petitioner that the option<br /> to invoke lapsing u/sec 127 of the MRTP Act is made available to<br /> the land owner upon expiry of 10 years from the date of coming<br /> into effect of the Development Plan. Similarly, the right u/s. 127<br /> gets crystalized on the day the Purchase Notice is sent. The right is<br /> accrued pursuant to the Notice u/s 127, in spite of the draft revised<br /> development plan. Hence, grant of sanction to revised development<br /> plan cannot curtail the running of the said period of 24 months<br /> from expiring.<br /> (h) It is further submitted by the Petitioner that there is no<br /> restriction on the landowner to issue notice u/s. 127 of the MRTP<br /> Act, 1966, when the revision of development plan is undertaken<br /> under Section 38 and as a necessary corollary time or waiting<br /> period is not suspended. In other words, the planning authority will<br /> have to take necessary steps as per Section 127 in the period of 24<br /> <i>Sunny Thote</i> <i>...15</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> months notwithstanding that the revision of development plan is<br /> undertaken. Therefore, upon expiry of 24 months from the date of<br /> notice under section 127 dated 17.11.2015, the reservation upon the<br /> subject property has lapsed and since then the property had become<br /> available to the Petitioner for the purpose of development.<br /> (i) The learned Advocate for the Petitioner submits that it<br /> is required to be noted that the MRTP is a regulatory statute,<br /> primarily focused on planning and development of land in<br /> Maharashtra. Whereas, right to property guaranteed under Article<br /> 300A of the Constitution of India is a substantive and constitutional<br /> right. The MRTP Act being a regulatory statute, the provisions<br /> therein cannot be construed in a manner to take away substantive<br /> right, which is guaranteed under Article 300A.<br /> SUBMISSIONS OF THE LEARNED ADVOCATE GENERAL<br /> 8. The learned Advocate General has extensively canvassed oral<br /> submissions and has tendered written notes as well. The same are<br /> summarized as under :-<br /> <i>Sunny Thote</i> <i>...16</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (A) The reference needs to be answered by considering, whether<br /> in the light of the relevant provisions of the MRTP Act, 1966, any right that<br /> may have accrued to the owner of the land thereunder, by service of a<br /> purchase notice upon the relevant authority, is sought to be taken away by<br /> imposing a fresh reservation under the revised development plan<br /> sanctioned prior to the expiry of the prescribed period from the date of<br /> such service.<br /> Conditions Precedent under Section 127 of the MRTP Act, 1966<br /> (B) Section 127 of the MRTP Act, 1966, deals with lapsing of<br /> reservation. Under the said provision, broadly, if the land reserved, allotted<br /> or designated for any purpose specified in any plan under the MRTP Act,<br /> 1966 is not acquired by agreement within ten years from the date on which<br /> the final development plan has come into force or if a declaration under<br /> Section 126(2) or (4) is not published within the said period of ten years,<br /> the owner or any person interested in the land may serve notice along with<br /> documents, showing his title or interest to the authority concerned and if<br /> within 24 months from the date of service of such notice the land is not<br /> acquired or no steps are taken for its acquisition, the reservation, allotment<br /> or designation is deemed to have lapsed and the land is deemed to be<br /> <i>Sunny Thote</i> <i>...17</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> released from such reservation, allotment or designation and becomes<br /> available to the owner.<br /> (C) It is pertinent to note that Section 127 of the MRTP Act, 1966<br /> originally stipulated that reservations under a final development plan<br /> would lapse if no effective steps were taken within a period of 6 months<br /> from the date of service of the purchase notice. Section 127 of the MRTP<br /> Act, 1966 was amended vide the Maharashtra Act XVI of 2009, whereby<br /> the prescribed period was extended from 6 months to 12 months with<br /> th<br /> effect from 24 June, 2009. Thereafter, Section 127 of the MRTP Act, vide<br /> the Maharashtra Act XLII of 2015, was again amended to increase the<br /> th<br /> prescribed period from 12 months to 24 months, with effect from 29<br /> August, 2015. <br /> (D) Section 127 requires the following cumulative conditions to be<br /> satisfied in order for a reservation to be deemed to have lapsed.<br /> (i) That the reserved/ designated land is not acquired by<br /> agreement within ten years from the date on which a final<br /> development plan comes into force. This circumstance is a<br /> peremptory condition for the operation of this provision.<br /> <i>Sunny Thote</i> <i>...18</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (ii) That after satisfaction of the condition (i) above, the<br /> land owner or any person interested in the land serves a purchase<br /> notice along with the documents of title or interest in the said land<br /> upon the relevant authority; and<br /> (iii) That after satisfaction of condition (i) above, if within<br /> the prescribed period from the date of service of the purchase<br /> notice in (ii) above, the relevant authority fails to acquire the land<br /> or takes steps for the commencement of its acquisition.<br /> (E) It is only on the satisfaction of these three cumulative<br /> conditions that Section 127 of the MRTP Act, 1966 creates a legal fiction,<br /> i.e. that the reservation of the land is deemed to have lapsed. It is submitted<br /> that the satisfaction of any one of the above three conditions does not per-<br /> se result in automatic lapsing. Accordingly, the mere expiry of the period<br /> of ten years from the date on which a final development plan comes into<br /> force and/or the service of the purchase notice by the land owner or person<br /> interested in the land on the planning authority, does not result in the<br /> lapsing of the reservation.<br /> (F) The observation of the Supreme Court in Prafulla C. Dave<br /> may be usefully referenced:<br /> <i>Sunny Thote</i> <i>...19</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> “21. Under Section 127 of the MRTP Act, reservation,<br /> allotment or designation of any land for any public purpose<br /> specified in a development plan is deemed to have lapsed and<br /> such land is deemed to be released only after notice on the<br /> appropriate authority is served calling upon such authority<br /> either to acquire the land by agreement or to initiate<br /> proceedings for acquisition of the land either under the MRTP<br /> Act or under the Land Acquisition Act, 1894 and the said<br /> authority fails to comply with the demand raised thereunder.<br /> Such notice can be issued by the owner or any person<br /> interested in the land only if the land is not acquired or<br /> proceedings for acquisition are not initiated within ten years<br /> from the date on which the final development plan had come<br /> into force. After service of notice by the landowner or the<br /> person interested, a mandatory period of six months has to<br /> elapse within which time the authority can still initiate the<br /> necessary action. Section 127 of the MRTP Act or any other<br /> provision of the said Act does not provide for automatic<br /> lapsing of the acquisition, reservation or designation of the<br /> land included in any development plan on the expiry of ten<br /> years. On the contrary, upon expiry of the said period of ten<br /> years, the landowner or the person interested is mandated by<br /> the statute to take certain positive steps i.e. to issue/serve a<br /> notice and there must occur a corresponding failure on the part<br /> of the authority to take requisite steps as demanded therein in<br /> order to bring into effect the consequences contemplated by<br /> Section 127. What would happen in a situation where the<br /> landowner or the person interested remains silent, and in the<br /> meantime, a revised plan under Section 38 comes into effect, is<br /> not very difficult to fathom. Obviously, the period of ten years<br /> under Section 127 has to get a fresh lease of life of another ten<br /> years. To deny such a result would amount to putting a halt on<br /> the operation of Section 38 and rendering the entire of the<br /> provisions with regard to preparation and publication of the<br /> revised plan otiose and nugatory. To hold that the inactivity on<br /> the part of the authority i.e. failure to acquire the land for ten<br /> years would automatically have the effect of the reservation,<br /> etc. lapsing would be contrary to the clearly evident legislative<br /> intent. In this regard it cannot be overlooked that under Section<br /> 38 a revised plan is to be prepared on the expiry of a period of<br /> 20 years from date of coming into force of the approved plan<br /> <i>Sunny Thote</i> <i>...20</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> under Section 31 whereas Section 127 contemplates a period of<br /> 10 years with effect from the same date for the consequences<br /> provided for therein to take effect. The statute, therefore,<br /> contemplates the continuance of a reservation made for a<br /> public purpose in a final development plan beyond a period of<br /> ten years. Such continuance would get interdicted only upon<br /> the happening of the events contemplated by Section 127 i.e.<br /> giving/service of notice by the landowner to the authority to<br /> acquire the land and the failure of the authority to so act. It is,<br /> therefore, clear that the lapsing of the reservation, allotment or<br /> designation under Section 127 can happen only on the<br /> happening of the contingencies mentioned in the said section.<br /> If the landowner or the person interested himself remains<br /> inactive, the provisions of the Act dealing with the preparation<br /> of revised plan under Section 38 will have full play. Action on<br /> the part of the landowner or the person interested as required<br /> under Section 127 must be anterior in point of time to the<br /> preparation of the revised plan. Delayed action on the part of<br /> the landowner, that is, after the revised plan has been finalised<br /> and published will not invalidate the reservation, allotment or<br /> designation that may have been made or continued in the<br /> revised plan. (Emphasis is supplied by the learned AG)<br /> Prerogative to revise Development Plan<br /> (G) Until and unless such reservation is deemed to have lapsed by<br /> operation of law under the provisions of the MRTP Act, 1966, the relevant<br /> authorities have complete liberty to revise the development plan in terms<br /> of the procedure under the Act and decide to continue the reservation for<br /> the concerned land either for the same purpose or for any other purpose. In<br /> fact, there is a statutory obligation cast upon the planning authority under<br /> Section 38 of the MRTP Act, 1966, to revise the development plan every<br /> <i>Sunny Thote</i> <i>...21</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> twenty years after carrying out a fresh survey, preparing the existing land<br /> use map, etc. It is submitted that by reading Section 127(1) of the MRTP<br /> Act, 1966 in the manner suggested by the Petitioners would be contrary to<br /> the avowed scheme and object of the MRTP Act, 1966, i.e. to provide for<br /> .<br /> the planned development and control of land use<br /> No vested right after service of the Purchase Notice <br /> (H) The Full Bench of this Hon&#x27;ble Court in Vishwas Bajirao<br /> 8 th<br /> Patil whilst considering the question of whether the amendment dated 29<br /> August 2015 to Section 127(1) of the MRTP Act, 1966, enlarging the<br /> period available to the planning authority for taking effective steps for<br /> acquisition of the reserved land from 12 months to 24 months would apply<br /> in a case where a purchase notice contemplated under 127(1) of the MRTP<br /> Act, 1966 has been served on the authority before the said amendment<br /> came into force. <br /> (I) The Full Bench observed that under the law, an amendment is<br /> prospective, unless by express or necessary implication, it is made to have<br /> retrospective operation. A law, therefore, which takes away or impairs any<br /> vested right acquired under an existing law, is retrospective. In this<br /> 8 Vishwas Bajirao Patil v. State of Maharashtra 2019 SCC Online Bom. 1770<br /> <i>Sunny Thote</i> <i>...22</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> connection, the Full Bench examined the question of whether by the<br /> service of the purchase notice, any vested right was created in the land<br /> owner which was sought to be taken away by the amendment. The Full<br /> Bench held that a future interest is vested in a person if it meets the<br /> requirement of there being no condition precedent to the interest.<br /> Accordingly, as per the Full Bench, no right is vested in the person having<br /> a proprietary interest in the land upon serving the purchase notice, but that<br /> such right would have vested only upon expiry of 12 months from the date<br /> of service of such notice. Only upon expiry of such period would any right<br /> have vested in the land owner. Since in the facts before the Full Bench, the<br /> amendment was made prior to the expiry of the prescribed period, no<br /> vested right had been taken away and the case of the land owner therein<br /> would be governed by the amended provision of the MRTP Act, 1966 viz.<br /> 24 months from the service of the purchase notice.<br /> (J) The decision of the Full Bench is illuminating in so far as it<br /> affirms that by the mere service of a purchase notice under Section 127(1)<br /> of the MRTP Act, 1966, upon the planning authority, does not by itself<br /> create any vested right in the land owner. It is only after the expiry of the<br /> prescribed period from the date of service of such purchase notice that any<br /> right is vested in the land owner. It may be possible to conceive of the<br /> <i>Sunny Thote</i> <i>...23</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> effect of Section 127 of the MRTP Act, 1966, in a different manner.<br /> Section 127 of the MRTP Act, 1966 prescribes two time periods. The two<br /> time periods are separated by an act of the land owner in serving the<br /> purchase notice. The first is a period of ten years from the date of the final<br /> development plan coming into force, within which the acquisition of the<br /> reserved land has to be completed or proceedings for acquisition ought to<br /> have commenced. The second time period is a period of two years from the<br /> date of service of the purchase notice upon the authority, within which the<br /> authority is required to take effective steps for acquisition. It is only after<br /> the elapse of the aforesaid two time periods, then the reservation of the<br /> land is deemed to have lapsed and any right is vested in the land owner. <br /> (K) Reference may be made to the relevant observations of this<br /> Hon’ble Court in Vishwas Bajirao Patil as under:<br /> 23. The traditional vested rights Doctrine is based on the<br /> principle i.e. State has the power to prescribe the Rules of<br /> conduct for transaction or occurrences that take place on its<br /> own territory. Once the last event of the transaction or<br /> occurrence takes place on the territory of the State the parties<br /> to it acquire vested right under Law of that jurisdiction.<br /> 24. A future interest is vested if it meets the requirement of<br /> there being no condition precedent to the interest.<br /> 25. Before formally answering the reference in the instant<br /> <i>Sunny Thote</i> <i>...24</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> case, as noted above the development plan was notified on<br /> 18-12-1999. Ten years expired on 17-12-2009. Notice under<br /> section 127 was issued on 17-11-2014 and twelve months<br /> would come to an end on 16-11-2015, but before that the<br /> amendment was made on 29-8-2015 replacing the words<br /> ‘twelve months’ by ‘twenty-four months ’.<br /> 26. We thus answer the reference by holding that the<br /> amendment is prospective but no right is vested in the person<br /> having proprietary interest in the land upon serving the<br /> notice. The right would have vested upon expiry of one year<br /> of the notice had the statute not been amended on 29th<br /> August, 2015, and thus as on the date of the amendment i.e.<br /> 29th August, 2015 there was no vested right in favour of the<br /> noticee. The rights of the noticee would be governed by the<br /> statute as amended on 29th August, 2015.<br /> (Emphasis is supplied by the learned AG)<br /> (L) The aforesaid decision of the Full Bench is binding on this Hon’ble<br /> Court. The Full Bench decision has been consistently followed by this Hon’ble<br /> 9<br /> Court, including in Atmaram Krishna Sawant v. Shaikh Abubakar Hassan<br /> Decisions in Salim Sanadi &amp; Amuksidha lay down the correct position of law<br /> (M) The decisions of this Hon’ble Court in Salim Nizam Sanadi<br /> and Amuksidha Srikant Majge correctly interpret the law regarding the<br /> effect of a sanction to the revised development plan under Section 127 of<br /> the MRTP Act, 1966.<br /> 9 Pertinently, the decision of the Full Bench has been followed by this Hon’ble Court in Atmaram Krishna<br /> th<br /> Sawant v. Shaikh Abubakar Hassan Writ Petition No. 2293 of 2018 (19 December, 2019)<br /> <i>Sunny Thote</i> <i>...25</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (N) In Salim Nizam Sanadi, the original Development Plan had<br /> th th<br /> been notified on 26 October, 1995. Thereafter, on 27 March, 2012, a<br /> th<br /> purchase notice was issued, and on 4 April, 2012 (before the expiry of one<br /> year of the purchase notice), a fresh revised Development Plan was<br /> sanctioned under Section 38 of the MRTP Act, 1966. The Division Bench<br /> of this Hon’ble Court, following the decision of the Hon’ble Supreme<br /> Court in Prafulla C. Dave (supra), held that the notification sanctioning the<br /> revised Development Plan has to be given effect to and the period under<br /> Section 127 of the MRTP Act, 1966 would commence from the date of the<br /> said notification. The Court held that since the notification sanctioning the<br /> revised Development Plan was published prior to the expiry of the<br /> prescribed period of 12 months from the service of the purchase notice, the<br /> reservation on the said land continues to subsist. The Court further held<br /> that the notification sanctioning the revised Development Plan was to be<br /> treated as the final Development Plan and the prescribed period of 10 years<br /> would commence from the date of the notification sanctioning the revised<br /> Development Plan under Section 38 of the MRTP Act, 1966. This Hon’ble<br /> Court, therefore, held that the reservation on the Petitioners’ land had not<br /> lapsed. <br /> <i>Sunny Thote</i> <i>...26</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (O) This Hon’ble Court observed as under: <br /> 9. We have considered the submissions. We find that<br /> Respondent No. 3, by a notification issued on 4 April 2012,<br /> sanctioned the Revised Development Plan, and the said<br /> land was again reserved for public purpose, viz., for a<br /> primary school and playground under Reservation Site No.<br /> 378. The purchase notice had been issued on 27 March,<br /> 2012 by the Petitioners and served on the Respondent No.<br /> 1 on that date itself and prior to the expiry of the prescribed<br /> period of 12 months from the service of the purchase<br /> notice, the notification sanctioning the Revised<br /> Development Plan had been issued. Therefore, the<br /> reservation of the said land continued to subsist when the<br /> Revised Development Plan again reserving the said land<br /> for a public purpose come into force. It is clear from the<br /> Judgment of this Court in Prafulla C. Dave (supra) that the<br /> notification sanctioning the Revised Development Plan has<br /> to be given effect to and the period under Section 127 of<br /> the said Act would commence from the date of the<br /> notification. This Court in paragraph 16 to 18 held thus: …<br /> 10. It is therefore, clear that from this Judgment that the<br /> notification sanctioning the Revised Development Plan is<br /> treated as final Development Plan and therefore, the<br /> prescribed period under Section 127 of the said Act would<br /> commence from the date of notification sanctioning the<br /> Revised Development Plan prepared under Section 38 of<br /> the said Act and notified under Section 31(6) of the said<br /> Act. In the present case, the subsequent reservation of the<br /> said land by the sanctioned Revised Development Plan<br /> would be the fresh starting point of the period prescribed<br /> under Section 127 of the said Act, particularly since the<br /> period had not expired from the service of the purchase<br /> notice. Therefore, in our view, since the period prescribed<br /> under Section 127 of the said Act from service of the<br /> <i>Sunny Thote</i> <i>...27</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> purchase notice dated 27 March, 2012 had not expired<br /> when the Revised Development Plan was sanctioned on 4<br /> April, 2012, the reservation of the said land has not lapsed.<br /> (P) In Amuksidha Srikant Majge, the original Development Plan<br /> th<br /> was notified on 6 April, 1979 and was in force when a purchase notice<br /> th th<br /> was issued on 27 February, 2012. On 4 April, 2012, a revised<br /> Development Plan under Section 38 of the MRTP Act, 1966, was<br /> th<br /> published. The Petitioner thereafter issued a further purchase notice on 28<br /> December, 2012. It was sought to be contended by the Petitioner that the<br /> th<br /> purchase notice having been issued on 27 February, 2012, prior to the<br /> issuance of the revised Development Plan, the revised Development Plan<br /> will not have an effect of providing of a fresh period of 10 years under<br /> Section 127 of the MRTP Act, 1966. The Division Bench of this Hon’ble<br /> Court, relying upon the observations of the Hon’ble Supreme Court in<br /> Prafulla C. Dave, held that as on the date of publication of the revised<br /> Development Plan, the period of 1 year from the date of issuance of<br /> statutory notice had not expired, and thereafter the reservation has not<br /> lapsed (Para 12). It was further held that from the decision of the Hon’ble<br /> Supreme Court in Prafulla C. Dave , it was apparent that the notification<br /> sanctioning the revised Development Plan is to be treated as the final<br /> Development Plan and the prescribed period under Section 127 of the<br /> <i>Sunny Thote</i> <i>...28</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> MRTP Act, 1966 would commence on the date of notification sanctioning a<br /> revised Development Plan. <br /> (Q) This Hon’ble Court observed as under:<br /> 12. In the facts of the present case, the reservation of the<br /> said property had not lapsed, as the prescribed period of<br /> one year from the issuance of the statutory purchase notice<br /> under Section 127 of the MRTP Act had not expired, when<br /> the revised part Development Plan had been sanctioned by<br /> the State Government. This Court has held that the<br /> notification sanctioning the revised Development Plan has<br /> to be given effect to and that the prescribed period under<br /> Section 127 of the MRTP Act would commence from the<br /> date of the notification. This has been held by this Court<br /> 2<br /> in Prafulla C. Dave v. Municipal Corporation, Pune .<br /> Paragraphs 16 to 18 of the decision read thus:—<br /> …<br /> 13. It is clear from the said decision that the notification <br /> sanctioning the revised Development Plan is treated as<br /> final Development Plan and the prescribed period under<br /> Section 127 of the MRTP Act would commence from the<br /> date of the notification sanctioning the revised<br /> Development Plan. In the present case, the reservation of<br /> the subject property by the sanctioned revised<br /> Development Plan would be the fresh starting point of the<br /> period prescribed under Section 127 of the MRTP Act.<br /> Hence, the period of ten years provided under Section 127<br /> of the MRTP Act would start running from the sanctioning<br /> th<br /> of the revised Development Plan on 4 April 2012 and <br /> only upon expiry of that period, purchase notice can be<br /> issued and upon expiry of one year from the issuance of<br /> <i>Sunny Thote</i> <i>...29</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> the purchase notice, reservation of the said property can be<br /> said to have lapsed. There is thus no lapsing of reservation<br /> in the present case. <br /> ( Emphasis is supplied by the learned AG )<br /> Reliance on Decisions in Bhavnagar, Santo Jaibhave and Sadashiv<br /> Tryambak is misplaced<br /> (R<br /> ) The reliance placed on the decision of the Hon&#x27;ble Supreme<br /> 10<br /> Court in Bhavnagar University is misplaced. The case arose in the context<br /> of Sections 20 &amp; 21 of the Gujarat Town Planning &amp; Urban Development<br /> 11<br /> Act, 1976 , which legislation is materially different and does not contain<br /> 12<br /> certain specific provisions embodied in the MRTP Act, 1966. <br /> (S) As would be evident from the said judgment, the case arose in<br /> a different factual situation. Under the Gujarat Act, revision of<br /> 10 Bhavnagar University v. Palitana Sugar Mills (2003) 2 SCC 111<br /> 11 “ 20. Acquisition of land. —(1) The area development authority or any other authority for whose purpose land<br /> is designated in the final development plan for any purpose specified in clause (b), clause (d), clause (f), clause<br /> (k), clause (n) or clause (o) of sub-section (2) of Section 12, may acquire the land either by agreement or under<br /> the provisions of the Land Acquisition Act, 1894.<br /> (2) If the land referred to in sub-section (1) is not acquired by agreement within a period of ten years from the date of<br /> the coming into force of the final development plan or if proceedings under the Land Acquisition Act, 1894, are<br /> not commenced within such period, the owner or any person interested in the land may serve a notice on the<br /> authority concerned requiring it to acquire the land and if within six months from the date of service of such<br /> notice the land is not acquired or no steps are commenced for its acquisition, the designation of the land as<br /> aforesaid shall be deemed to have lapsed.”<br /> “21. Revision of development plan. —At least once in ten years from the date on which a final development plan<br /> comes into force, the area development authority shall revise the development plan after carrying out, if<br /> necessary, a fresh survey and the provisions of Sections 9 to 20, shall, so far as may be, apply to such revision.”<br /> 12 See Section 37, 49 and 50 of the MRTP Act, 1966, which provisions are absent in the Gujarat Act.<br /> <i>Sunny Thote</i> <i>...30</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> development plan was mandatory every ten years, coinciding the period<br /> after which reservation would lapse, creating a unique statutory context not<br /> present in the instant case.<br /> (T) In that case, the land owners contended that under Section<br /> 20(2) of the Gujarat Town Planning &amp; Urban Development Act, 1976 upon<br /> the failure of the authorities to acquire the reserved land, after 6 months of<br /> the service of the purchase notice and the expiry of 10 years from the<br /> coming into force of the final development plan viz., the reservation in<br /> question had lapsed. The authorities contended that the sanction of revised<br /> development plan, which under Section 21 of said Act, was bound to take<br /> place at least once in 10 years from the coming in to force of the final<br /> development plan, arrested the lapsing of the reservation.<br /> (U) In that case the Supreme Court held that if the contention of<br /> the Authorities were accepted, and that upon every revision of the<br /> development plan every 10 years from the date of coming into force of the<br /> final development plan under Section 21 of the said Act, would start a fresh<br /> period of 10 years, Section 20(2) of the said Act would be rendered<br /> completely otiose. It was in this specific context that the decision was<br /> rendered.<br /> <i>Sunny Thote</i> <i>...31</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (V) Some of the observations of the Supreme Court in Bhavnagar<br /> University , which make this evident, are as under:<br /> 37. The said words indicate the intention of the legislature to<br /> the effect that by providing revision of the final development<br /> plan from time to time and at least once in ten years, only the<br /> procedure or preparation thereof as provided therein is<br /> required to be followed. Such procedural requirements must be<br /> followed so far as it is reasonably possible. Section 21 of the<br /> Act, in our opinion, does not and cannot mean that the<br /> substantial right conferred upon the owner of the land or the<br /> person interested therein shall be taken away. It is not and<br /> cannot be the intention of the legislature that what is given by<br /> one hand should be taken away by the other.<br /> 38. Section 21 does not envisage that despite the fact that in<br /> terms of sub-section (2) of Section 20, the designation of land<br /> shall lapse, the same, only because a draft revised plan is made,<br /> would automatically give rise to revival thereof. Section 20<br /> does not manifest a legislative intent to curtail or take away the<br /> right acquired by a landowner under Section 22 of getting the<br /> land defreezed. In the event the learned Solicitor-General is<br /> accepted, the same would completely render the provisions of<br /> Section 20(2) otiose and redundant.<br /> (Emphasis is supplied by the learned AG)<br /> (W) That the decision in Bhavnagar University (supra ) was confined<br /> to the factual context set out herein above is evident from some of the<br /> subsequent decisions of this Hon&#x27;ble Court.<br /> (i) In Manakini Ruprao Khangar v. State of Maharashtra<br /> 2023 SCC Online Bom. 1050, this Hon’ble Court distinguished the<br /> decision in Bhavnagar University at paragraphs 19 to 22. This Court<br /> <i>Sunny Thote</i> <i>...32</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> noted that the Supreme Court was considering the provisions of the<br /> Gujarat Town Planning Act, wherein there was no opportunity<br /> available for the owner of land reserved under the development plan<br /> to issue a purchase notice in view of the fact that the revision in plan<br /> was mandated every ten years. In that contingency, the Supreme<br /> Court held that section 21 of the Gujarat Act, does not and cannot<br /> mean that the substantive right conferred upon the owner of the land<br /> or the person interested therein shall be taken away and it is not and<br /> cannot be the intention of the Legislature that which is given by one<br /> hand should be taken away by the other.<br /> (ii) Similarly, in Prafulla C. Dave vs. Municipal Commissioner<br /> 2008 (3)Mh. LJ 120 , this Hon&#x27;ble Court at para 11 distinguished the<br /> judgment in Bhavnagar University on the ground that it did not<br /> answer the question raised therein. Paragraph 11 of the judgment is<br /> quoted as under:<br /> “In Bhavnagar University v. Palitna Sugar Mill Pvt. Ltd.,<br /> reported in (2003) 2 SCC 111 : AIR 2003 SC 511 the<br /> question which arose for consideration was whether by<br /> reason of inaction on the part of the State and its authorities<br /> under the Town Planning Act to acquire the lands for a<br /> period of more than 10 years, in terms of the provisions of<br /> Land Acquisition Act, 1894 despite service of notice, the<br /> same stood dereserved/de-designated in view of issuance<br /> <i>Sunny Thote</i> <i>...33</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> of draft revised plan under section 21 thereof or the term of<br /> 10 years stood extended? The Supreme Court was pleased<br /> to hold that after the period of 10 years as required under<br /> the Gujarat Act had expired and if the land had not been<br /> acquired in the manner contemplated merely because the<br /> draft revised plan was issued would not automatically<br /> extend the period of reservation. Considering section 21 of<br /> the Gujarat Act, the Court held that section 21 of the Act,<br /> in their opinion, does not and cannot mean that the<br /> substantive right conferred upon the owner of the land or<br /> the person interested therein shall be taken away and it is<br /> not and cannot be the intention of the Legislature that<br /> which is given by one hand should be taken away by the<br /> other. This was in the context that the planning authority<br /> was bound to revise the plan on the expiry of ten years<br /> from the notification of the sanctioned draft plan and the<br /> notice to acquire could ordinarily be given and on the<br /> expiry of ten years from the notification of the sanctioned<br /> plan. In other words, the owners would have no<br /> opportunity of serving the notice if in the draft revised plan<br /> a further extension of reservation was provided for. This<br /> Judgment does not answer the issue which has been raised<br /> by the petitioners herein.”<br /> ( Emphasis is supplied by the learned AG )<br /> The aforesaid decision of this Hon’ble Court was confirmed<br /> by the Supreme Court. <br /> (X) The reliance on the decision in Sadashiv Tryambak<br /> th<br /> Rajebahadur is misplaced. In that case, a purchase notice was issued on 8<br /> th<br /> July, 2015.Thereafter, on 29 August, 2015, the prescribed period of 12<br /> <i>Sunny Thote</i> <i>...34</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> months after the issuance of the purchase notice was substituted by 24<br /> months by an amendment to Section 127 of the MRTP Act, 1966. In the<br /> th<br /> meanwhile, a revised Development Plan was partly sanctioned on 9<br /> January, 2017. Opposing the grant of any relief, the Respondent contended<br /> that, in light of the period having been extended to 24 months, the period<br /> after the purchase notice had not expired on the date on which the revised<br /> Development Plan was notified, and as such, the reservation had not<br /> lapsed. The Division Bench of this Hon’ble Court proceeded on the basis<br /> that the amendment extending the period from 12 months to 24 months<br /> would not apply to the notices which had already been issued prior to the<br /> amendment. According to the Division Bench, the same would tantamount<br /> to giving retrospective effect to the amendment. This judgment proceeds<br /> on a premise which is contrary to the Full Bench judgment of this Hon’ble<br /> Court in Vishwas Bajirao Patil (supra) , and therefore, the said judgment is<br /> no longer good law.<br /> (Y) The reliance on the decision in Santo Sukhdeo Jaibhave is<br /> th<br /> misplaced. In that decision, the purchase notice was issued on 14 July,<br /> 2015 and prior to expiry of 24 months, a revised Development Plan came<br /> th<br /> into force on 9 January, 2017. An argument made on behalf of the<br /> Respondent that a purchase notice under Section 127 could not have been<br /> <i>Sunny Thote</i> <i>...35</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> issued after the publication of the draft revised Development Plan under<br /> Section 26 of the MRTP Act, 1966 though admittedly not sanctioned. This<br /> was the question framed by this Hon’ble Court in paragraph 25 of the<br /> judgment which reads as under:<br /> 25. Question that arises for consideration of this Court is<br /> whether the purchase notice issued by the petitioners<br /> subsequent to the date of the Draft Revised Development<br /> Plan for the city of Nashik would be a valid notice or not or<br /> the petitioners were required to again wait for expiry of 10<br /> years from the date of the Draft Revised Development Plan<br /> for the city of Nashik and then issue a fresh notice and then if<br /> no steps would be taken by the respondents within the time<br /> prescribed, the reservation in respect of the writ land would<br /> lapse at that stage or not.<br /> (Z) This judgment at paragraph 41 proceeded on the basis that a<br /> statutory right had accrued in the Petitioners on the issuance of the notice<br /> which is contrary to the decision of the Full Bench in Vishwas Bajirao<br /> Patil (supra) . This judgment did not deal with the effect of the issuance of<br /> the final notification prior to the expiry of the statutory period of 24<br /> months and it was held as under:-<br /> 41. In the present case, the notification under Section<br /> 6, admittedly, has not been issued. The statutory notice<br /> viz. the Purchase Notice under Section 127 of the<br /> MRTP Act was issued on 14th July 2015 and it is<br /> evident that no steps as contemplated under Section<br /> 126(1)(c) read with Section 127 were taken before the<br /> expiry of the statutory period of 24 months. We are<br /> unable to agree with the submissions of Ms. Deshmukh<br /> <i>Sunny Thote</i> <i>...36</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:54 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> on the application of the judgment of Prafulla C.<br /> Dave (supra) as it would deprive the petitioners of their<br /> statutory rights. In this regard, the Apex Court in the<br /> case of Godrej And Boyce Manufacturing Company<br /> Limited (supra) has held that the statutory right<br /> accrued to the owners cannot be taken away by an<br /> attempt to impose fresh reservation. We are also unable<br /> to agree with the contention of Mr. Patil that the<br /> publication of the Draft Revised Plan having been<br /> published prior to the issuance of the Purchase Notice<br /> and the same would have an effect of continuing the<br /> reservation on account of the same being sanctioned<br /> subsequently.<br /> (AA) The decision in Santo Sukhdeo Jaibhave has been clarified by<br /> 13<br /> the Hon’ble Bombay High Court subsequently in Babanrao Dattu . The<br /> Division Bench of the Hon’ble Bombay High Court has held that a right of<br /> de-reservation accrues to the landowner upon application of deeming<br /> fiction if he issues notice to the appropriate authority and the said authority<br /> fails to take steps for acquisition of the land in question within the period<br /> prescribed under Section 127 of the MRTP Act, 1996. <br /> (BB) In relation to the decision in Santo Sukhdeo Jaibhave, the<br /> Division Bench of this Hon’ble Court clarified as under:<br /> “In the case of Santu Sukhdeo Jaibhave (Supra), a Coordinate<br /> Bench of this court has taken a view that in a case involving<br /> question of deemed lapsing of reservation, the draft revised<br /> development plan has no legal sanctity and it cannot be<br /> 13 Babbanrao Dattu v. State of Maharashtra 2023 SCC Online Bom. 1590<br /> <i>Sunny Thote</i> <i>...37</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> considered as final. In other words, the Division Bench has<br /> taken a view that the question of deemed lapsing of<br /> reservation can be examined only in the context of final<br /> revised development plan and not in the context of draft<br /> revised development plan and if purchase notice has been<br /> issued after draft revised development plan is published but<br /> before it has received sanction so as to become a final revised<br /> development plan, the right shall accrue to the land owner to<br /> seek benefit of deemed lapsing of reservation, if other<br /> conditions of Section 127 of the MRTP Act are fulfilled.”<br /> (CC) No conflict therefore arises between the decisions in the case<br /> of this Court in Salim Nizam Sanadi and Amuksidha Majge on the one<br /> hand and Santu Sukhadeo Jaibhave and Sadashiv Tryambak Rajebahadur<br /> on the other hand. On the consideration of the aforesaid, it is apparent that<br /> decision in Salim Nizam Sanadi and Amuksidha Majge which dealt<br /> directly with the issue of the effect of a revised Development Plan being<br /> notified prior to the expiry of the statutory period after issuance of the<br /> purchase notice. Neither the judgment in Santu Jaibhave nor the judgment in<br /> Sadashiv Rajebahadur dealt with this issue. Both these decisions dealt with<br /> the effect of draft Development Plan being issued prior to the expiry of the<br /> statutory period after the purchase notice.<br /> (DD) The Petitioner has contended that Section 38 of the MRTP<br /> Act, 1966, requires the Planning Authority to revise the Development Plan<br /> “ at least once in 20 years” and therefore, in a given case the Planning<br /> <i>Sunny Thote</i> <i>...38</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> Authority may propose the revision of the Development Plan even before<br /> the expiry of period of 10 years, thereby frustrating the purported rights of<br /> the landowner available under Section 127 of the MRTP Act, 1966. The<br /> Petitioner implies that the provision may be abused to deny the landowners<br /> of the rights conferred under Section 127 of the MRTP Act, 1966.<br /> (EE) It is settled law that a mere possibility of the abuse of a<br /> provision does not affect its construction. The construction of a statutory<br /> provision cannot be determined on the assumption that the executive or<br /> authority will abuse the provision in an arbitrary manner in exercise of the<br /> 14<br /> discretion conferred on it. It is therefore submitted that the Petitioner’s<br /> contention as to possibility of abuse cannot be accepted.<br /> (FF) It is further submitted that the fact that in the Revised<br /> Development Plan sanctioned under Section 38 of the MRTP Act, 1966 the<br /> concerned land continues to be reserved for the same purpose is of no<br /> relevance. As set out herein above, under the provisions of the MRTP Act,<br /> 1966 the Planning Authority has complete liberty to revise the<br /> Development Plan in terms of the procedure under the Act and can decide<br /> to continue the reservation for the concerned land either for the same<br /> 14 See Generally DK Trivedi &amp; Sons v. State of Gujarat 1986 SCC Online SC 374 at Pr. 50; Collector of Customs <br /> v.; State of Punjab at Pr. 34<br /> <i>Sunny Thote</i> <i>...39</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> purpose or for any other purpose. The Petitioner’s contentions in this<br /> regard are devoid of any merit. <br /> 15<br /> (GG) In Godrej &amp; Boyce Manufacturing Company Ltd . , challenge<br /> th<br /> was laid to the notification dated 5 August 2008, issued by the State<br /> Government under Section 37(1) of the MRTP Act, 1966, proposing to<br /> modify the development plan by deleting the reservation of the land in<br /> question from Railways and adding the reservation for Road. In that case,<br /> 10 years after the expiry of the development plan, the Appellant issued a<br /> th<br /> purchase notice dated 04 September 2002 under section 127 of the MRTP<br /> Act, 1966. The period of six months prescribed at the relevant time under<br /> Section 127 of the MRTP Act, 1966, after issuance of the purchase notice<br /> rd<br /> had expired on 03 March 2003. In this context, the Supreme Court set<br /> th<br /> aside the notification dated 05 August 2008 modifying the reservation<br /> under the development plan, holding that upon the expiry of 10 years and 6<br /> months’ notice period, the Appellant acquired a statutory right over the<br /> land, and in view thereof, the notification could not be given effect to. The<br /> relevant extracts from the said judgment are reproduced as under :<br /> 15 Godrej &amp; Boyce Manufacturing Co. Ltd. v. State of Maharashtra (2015) 11 SCC<br /> 554<br /> <i>Sunny Thote</i> <i>...40</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> 17. By a careful reading of the provisions of Sections 127<br /> and 37(1) of the MRTP Act, which are extracted as above<br /> abundantly make it clear that the State Government is not<br /> empowered to delete the reservation of the land involved in<br /> this case from railway use and to modify the same for<br /> development plan of road in the development plan after<br /> expiry of 10 years and 6 months&#x27; notice period was over as<br /> the appellant has acquired the valuable statutory right upon<br /> the land and the reservation of the same for the proposed<br /> formation of railway track had lapsed long back. Further<br /> Respondent 2 vide its Letter dated 1-11-2004 has stated<br /> that there is no proposal for acquisition of land for the<br /> purpose for which it was reserved.<br /> 20….. Therefore, we have to hold that the impugned<br /> notification is bad in law and liable to be quashed. The<br /> High Court has not examined the impugned notification<br /> from the viewpoint of Section 127 of the MRTP Act and<br /> interpretation of the abovesaid provision made in Girnar<br /> Traders (2) [Girnar Traders (2) v. State of Maharashtra,<br /> (2007) 7 SCC 555], therefore, giving liberty to the<br /> appellant by the High Court to file objections to the<br /> proposed notification is a futile exercise on the part of the<br /> appellant for the reason that the State Government, once<br /> the purpose the land was reserved for has not been utilised<br /> for that purpose and a valid statutory right is acquired by<br /> the landowner/interested person after expiry of 10 years<br /> from the date of reservation made in the development plan<br /> and 6 months&#x27; notice period has also expired, the State<br /> Government has not commenced the proceedings to<br /> acquire the land by following the procedure as provided<br /> under Sections 4 and 6 of the repealed Land Acquisition<br /> Act, 1894. Therefore, the land which was reserved for the<br /> above purpose is lapsed and it enures to the benefit of the<br /> appellant herein. Therefore, it is not open for the State<br /> Government to issue the impugned notification proposing<br /> to modify the development plan from deleting for the<br /> purpose of the Railways and adding to the development<br /> plan for the formation of development plan of road after<br /> lapse of 10 years and expiry of 6 months&#x27; notice served<br /> upon the State Government. <br /> ( Emphasis is supplied by the learned AG )<br /> <i>Sunny Thote</i> <i>...41</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (HH) In Kesaranand Ginning &amp; Pressing Factory v. State of<br /> Maharashtra(Aurangabad Bench)Writ Petition No. 8878 of 2015 (order dated<br /> th<br /> 25 February 2016), the Respondent authority sought to resist a declaration<br /> of lapsing by the landowner, on the ground that upon the publication of the<br /> revised development plan, a fresh purchase notice under Section 127 of<br /> MRTP Act had not been issued. In that case, the revised development plan<br /> th<br /> was published on 04 December 2012, more than 1 ½ years from the<br /> th<br /> service of the purchase notice dated 09 March 2011 under Section 127 of<br /> the MRTP Act, 1966. Relying upon the decision in Godrej and Boyce<br /> Manufacturing Company Limited vs. State of Maharashtra (2015) 11 SCC<br /> 554, this Hon’ble Court held that upon the expiry of 1 ½ years from the<br /> date of service of the purchase notice, the rights of the Petitioners stood<br /> crystalised. It is pertinent to note that at the relevant time, the prescribed<br /> period under Section 127 of the MRTP Act, 1966 was 12 months from the<br /> date of service of the purchase notice.<br /> (II) In Natwarlal Dhanjibhai Vora v. State of Maharashtra (Aurangabad<br /> rd<br /> Bench) Writ Petition No. 8996 of 2018<br /> (order dated 03 May 2023), the<br /> Respondent authority sought to resist a declaration of lapsing by the<br /> landowner, on the ground that a revised development plan had been<br /> st<br /> published. In that case, the final development plan came into effect on 31<br /> <i>Sunny Thote</i> <i>...42</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> October 1981. After the expiry of 10 years therefrom, the Petitioner vide<br /> th<br /> purchase notice dated 08 March 2011 called upon the planning authority<br /> to acquire the land. However, admittedly, the planning authority failed to<br /> do so within 1 year of the service of the purchase notice, which was the<br /> period prescribed at the relevant time. Relying upon the decision in<br /> Kesaranand Ginning (supra), the High Court noted that the revised<br /> development plan came into effect after 1 ½ years of the service of the<br /> purchase notice under Section 127 of the MRTP Act, and the rights of the<br /> Petitioner stood crystalised. (Pr. 9). <br /> (JJ) The SLP against the judgment of the Aurangabad Bench was<br /> dismissed by the Supreme Court, stating that it was not inclined to interfere<br /> with the impugned judgment. It is well settled that the doctrine of merger is<br /> inapplicable to the dismissal of SLPs by the Hon’ble Supreme Court. In<br /> other words, an order refusing special leave to appeal does not stand<br /> substituted in place of the order under challenge ( See Kunhayammed &amp; Ors.<br /> v. State of Kerala 2000(6) SCC459 )<br /> (KK) In Leelabhai Champalal Chajjed v. State of Maharashtra<br /> nd<br /> (Aurangabad Bench) Writ Petition No. 8355 of 2023 (order dated 02<br /> <i>Sunny Thote</i> <i>...43</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> February 2024) the petition seeking declaration of lapsing of reservation<br /> was sought to be resisted on the ground that a modified development plan<br /> th<br /> with effect from 15 May 2012 had been sanctioned under Section 37 (1)<br /> nd<br /> of the MRTP Act, 1966 and therefore, the purchase notice dated 22 June<br /> 2000 was premature. In this context the High Court citing the judgments<br /> in Girnar Traders, Santu Sukhdeo Jaibhave and Natwarlal Dhanjibhai Vora<br /> held that despite the expiry of a more than a decade after the issuance of<br /> nd<br /> the purchase notice dated 22 June 2000, the authority had failed to take<br /> any effective steps as contemplated under Section 127 of the MRTP Act,<br /> 1966 and the Petitioner’s rights stood crystalised as held by the Supreme<br /> Court in Godrej Boyce .<br /> OUR ANALYSIS AND CONCLUSION<br /> 9. On considering the sequence of dates and events, on which<br /> there is no dispute, we find that the following aspects are decisive :-<br /> (a) The land at issue has been subjected to reservation<br /> bearing no.80 for the purpose of constructing the Regional<br /> Transport Office (‘ RTO’ ) vide the second Revised Development<br /> th<br /> Plan dated 18 December, 1992 under the provisions of the MRTP<br /> Act, 1966.<br /> <i>Sunny Thote</i> <i>...44</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> (b) The requisite period of 10 years for issuing a purchase<br /> th<br /> notice expired on 18 December, 2002.<br /> (c) The owner has not issued any purchase notice<br /> th<br /> immediately after 18 December, 2002.<br /> th<br /> (d) On 10 September, 2010, the Planning Authority<br /> declared its intention in the Maharashtra Government Gazette, to<br /> prepare a Draft Development Plan (Third Revision) from the Area<br /> within the limits of Phaltan Municipal Council.<br /> th<br /> (e) On 5 March, 2012, a Registered Sale Deed was<br /> executed by Shrikrushna Ramchandra Damodare, by virtue of<br /> which, the present Petitioner, Nilesh Prakashrao More became the<br /> owner of the Writ Property.<br /> rd<br /> (f) The Petitioner has raised objections on 23 October,<br /> 2013 in respect of the Third Revised Draft Development Plan. Yet,<br /> a purchase notice was not issued.<br /> th<br /> (g) On 19 August, 2014, the Phaltan Municipal Council<br /> passed a Resolution No.32 and made certain modifications in the<br /> <i>Sunny Thote</i> <i>...45</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> Third Revised Draft Development Plan. Yet, a purchase notice was<br /> not issued.<br /> th<br /> (h) On 17 November, 2015, the Petitioner issued a<br /> purchase notice under Section 127 of the MRTP Act, 1966. This is<br /> undisputed.<br /> th<br /> (i) On 5 March, 2016, Reservation Notice was addressed<br /> by the Phaltan Municipal Council to the Collector Satara with a<br /> proposal to acquire the land under reservation.<br /> rd<br /> (j) On 23 May, 2016, the Government of Maharashtra<br /> issued a notification granting partial sanction with modification to<br /> the Third Revised Draft Development Plan.<br /> th<br /> (k) On 16 March, 2017, the Deputy Director Town<br /> Planning, Satara, addressed a letter to the RTO, Kolhapur bringing<br /> to his notice that Reservation No.80 was for the purpose of<br /> constructing a building for the RTO.<br /> (l) The Petitioner preferred an application to the Phaltan<br /> Municipal Council for obtaining development permission for his<br /> <i>Sunny Thote</i> <i>...46</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> land (writ land under reservation), which was rejected by the<br /> th<br /> Municipal Council on 28 June, 2017.<br /> 10. For ready reference, we are reproducing the relevant Sections<br /> 2(19), 31(1), 31(6), 38, 126 &amp; 127 of the MRTP Act, 1966 hereunder, :-<br /> “ 2(19). Definition <br /> [(19) “Planning Authority” means a local authority;<br /> and includes,-<br /> (a) a Special Planning Authority constituted or<br /> appointed or deemed to have been appointed under section 40;<br /> (b) in respect of the slum rehabilitation area declared<br /> under section 3C of the Maharashtra Slum Areas (Improvement,<br /> Clearance and Redevelopment) Act, 1971, the Slum<br /> Rehabilitation Authority appointed under section 3A of the said<br /> Act;]”<br /> Section 31 - Sanction to draft Development plan<br /> (1) Subject to the provisions of this section, and not<br /> later than [twelve months] from the date of receipt of such plan<br /> from the Planning Authority, or as the case may be, from the said<br /> Officer, [ <i> </i> *] the State Government may, after consulting the<br /> Director of Town Planning by notification in the Official Gazette<br /> sanction the draft Development plan submitted to it for the whole<br /> area, or separately for any part thereof, either without<br /> modification, or subject to such modifications as it may consider<br /> proper or return the draft Development plan to the Planning<br /> Authority or as the case may be, the said Officer for modifying<br /> the plan as it may direct or refuse to accord sanction and direct<br /> the Planning Authority or the said Officer to prepare a fresh<br /> Development plan:<br /> <i>Sunny Thote</i> <i>...47</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> [ Provided that , the State Government may, if it thinks<br /> fit, whether the said period has expired or not, extend from time<br /> to time, by notification in the Official Gazette, the period for<br /> sanctioning the draft Development plan or refusing to accord<br /> sanction thereto, by such further period as may be specified in<br /> the notification:]<br /> [ Provided further that , where the modifications<br /> proposed to be made by the State Government or submitted by<br /> the Planning Authority under section 30 and proposed to be<br /> approved by the State Government without any further change<br /> are of a substitutional nature with respect to the draft<br /> Development plan published under Section 26, the Government<br /> shall publish a notice in the Official Gazette and also in not less<br /> than two local newspapers inviting objections and suggestions<br /> from any person in respect of the proposed modifications within<br /> a period of one months, from the date of such notice]: <br /> ……..<br /> ……..<br /> “(6) A Development plan which has come into operation<br /> shall be called the “final Development plan” and shall, subject to<br /> the provisions of this Act, be binding on the Planning Authority.”<br /> “ 38. Revision of Development Planning.<br /> At least once in [twenty years] from the date on<br /> which a Development plan has come into operation, and where a<br /> Development plan is sanctioned in parts, then at least once in<br /> [twenty years] from the date on which the last part has come into<br /> operation, a Planning Authority may [and shall at any time when<br /> so directed by the State Government], revise the Development<br /> Plan [(either wholly, or the parts separately)] after carrying out, if<br /> necessary, a fresh survey and preparing an existing land-use map<br /> of the area within its jurisdiction, and the provisions of sections<br /> [<i> </i> <i>] 22, 23, 24, 25, 26, 27, 28, [</i> <i> </i>], 30 and 31 shall, so far as<br /> they can be made applicable, apply in respect of such revision of<br /> the Development Plan.”<br /> <i>Sunny Thote</i> <i>...48</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> “126. Acquisition of land required for public purposes specified in<br /> plans<br /> (1) When after the publication of a draft Regional<br /> plan, [structure plan] a Development or any other plan or town<br /> planning scheme, any land is required or reserved for any of the<br /> public purposes specified in any plan or scheme under this Act at<br /> any time, the Planning Authority, Development Authority, or as<br /> the case may be, [any Appropriate Authority may, except as<br /> otherwise provided in section 113A] [acquire the land,-<br /> (a) by agreement by paying an amount agreed to, or<br /> (b) in lieu of any such amount, by granting the land-owner or<br /> the lessee, subject, however, to the lessee paying the lessor or<br /> depositing with the Planning Authority, Development<br /> Authority or Appropriate Authority, as the case may be, for<br /> payment to the lessor, an amount equivalent to the value of<br /> the lessors interest to be determined by any of the said<br /> Authorities concerned [on the basis of the principles laid<br /> down in the Right to Fair Compensation and Transparency in<br /> Land Acquisition, Rehabilitation and Resettlement Act,<br /> 2013], Floor Space Index (FSI) or Transferable Development<br /> Rights (TDR) against the area of land surrendered free of cost<br /> and free from all encumbrances, and also further additional<br /> Floor Space Index or Transferable Development Rights<br /> against the development or construction of the amenity on the<br /> surrendered land at his cost, as the Final Development<br /> Control Regulations prepared in this behalf provide, or<br /> (c) by making in application to the State Government for<br /> acquiring such land [under the provisions of the Right to Fair<br /> Compensation and Transparency in Land Acquisition,<br /> Rehabilitation and Resettlement Act, 2013] ,<br /> and the land (together with the amenity, if any, so developed or<br /> constructed) so acquired by agreement or by grant of Floor Space<br /> Index or additional Floor Space Index or Transferable<br /> Development Rights under this section [or under the provisions of<br /> the Right to Fair Compensation and Transparency in Land<br /> Acquisition, Rehabilitation and Resettlement Act, 2013], as the<br /> <i>Sunny Thote</i> <i>...49</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> case may be, shall vest absolutely free from all encumbrances in<br /> the Planning Authority. Development Authority, or as the case<br /> may be, any Appropriate Authority.]<br /> (2) On receipt of such application, if the State<br /> Government is satisfied that the land specified in the application is<br /> needed for the public purpose therein specified, or [if the State<br /> Government (except in cases falling under section 49 [and except<br /> as provided in section 113A)] itself is of opinion] that any land<br /> included in any such plan is needed for any public purpose, it may<br /> make a declaration to that effect in the Official Gazette, [in the<br /> manner provided in section 19 of the Right to Fair Compensation<br /> and Transparency in Land Acquisition, Rehabilitation and<br /> Resettlement Act, 2013], in respect of the said land. The<br /> declaration so published shall, notwithstanding anything contained<br /> in the said Act, be deemed to be a declaration duly made under the<br /> said section :<br /> [Provided that, subject to the provisions of sub-section<br /> (4), no such declaration shall be made after the expiry of one year<br /> from the date of publication of the draft Regional Plan,<br /> Development Plan or any other Plan, or Scheme, as the case may<br /> be.]<br /> [(3) On publication of a declaration under the said [section 19],<br /> the Collector shall proceed to take an order for the acquisition of<br /> the land under the said Act; and the provisions of that Act shall<br /> apply to the acquisition of the said land with the modification that<br /> the market value of the land shall be,-<br /> (i) where the land is to be acquired for the purposes of<br /> a new town, the market value prevailing on the date of<br /> publication of the notification constituting or declaring the<br /> Development Authority for such town ;<br /> (ii) where the land is acquired for the purposes of a<br /> Special Planning Authority, the market value prevailing on<br /> the date of publication of the notification of the area as an<br /> undeveloped area ; and<br /> (iii) in any other case, the market value on the date of<br /> publication of the interim development plan, the draft<br /> <i>Sunny Thote</i> <i>...50</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> development plan or the plan for the area or areas for<br /> comprehensive development, whichever is earlier, or as the<br /> case may be, the date or publication of the draft Town<br /> Planning Scheme :<br /> Provided that, nothing in this sub-section shall affect<br /> the date for the purpose of determining the market value of land<br /> in respect of which proceedings for acquisition commenced<br /> before the commencement of the Maharashtra Regional and Town<br /> Planning (Second Amendment) Act, 1972 :<br /> Provided further that, for the purpose of clause (ii) of<br /> this sub-section, the market value in respect of land included in<br /> any undeveloped area notified under sub-section (1) of section 40<br /> prior to the commencement of the Maharashtra Regional and<br /> Town Planning (Second Amendment) Act, 1972, shall be the<br /> market value prevailing on the date of such commencement.]<br /> [(4) [Notwithstanding anything contained in the proviso to sub-<br /> section (2) and sub-section (3), if a declaration] is not made<br /> within the period referred to in sub-section (2) (or having been<br /> made, the aforesaid period expired on the commencement of the<br /> Maharashtra Regional and Town Planning [(Amendment) Act,<br /> 1993], the State Government may make a fresh declaration for<br /> acquiring the land [under the provisions of the Right to Fair<br /> Compensation and Transparency in Land Acquisition,<br /> Rehabilitation and Resettlement Act, 2013], in the manner<br /> provided by sub-sections (2) and (3) of this section, subject to the<br /> modification that the market value of the land shall be the market<br /> value at the date of declaration in the Official Gazette, made for<br /> acquiring the land afresh.]”<br /> 127. Lapsing of reservations<br /> “[(1) If any land reserved, allotted or designated for<br /> any purpose specified in any plan under this Act is not acquired by<br /> agreement within ten years from the date on which a final<br /> Regional Plan, or final Development Plan comes into force [or if a<br /> declaration under sub-section (2) or (4) of section 126 is not<br /> published in the Official Gazette within such period, the owner or<br /> any person interested in the land may serve notice, along with the<br /> <i>Sunny Thote</i> <i>...51</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> documents showing his title or interest in the said land, on the<br /> Planning Authority, the Development Authority or, as the case<br /> may be, the Appropriate Authority to that effect; and if within<br /> [twenty-four months] from the date of the service of such notice,<br /> the land is not acquired or no steps as aforesaid are commenced<br /> for its acquisition, the reservation, allotment or designation shall<br /> be deemed to have lapsed, and thereupon, the land shall be<br /> deemed to be released from such reservation, allotment or<br /> designation and shall become available to the owner for the<br /> purpose of development as otherwise, permissible in the case of<br /> adjacent land under the relevant plan.<br /> [(2) On lapsing of reservation, allocation or<br /> designation of any land under sub-section (1), the Government<br /> shall notify the same, by an order published in the Official<br /> Gazette.]”<br /> 11. The much debated question that falls for our consideration is<br /> framed as under :-<br /> ‘ whether the sanction of the revised development plan, imposing a fresh<br /> reservation, after the receipt of the purchase notice, and before the expiry<br /> of the prescribed period of two years from the date of service of such<br /> notice, would continue the reservation for a further period of ten years?’ <br /> We have formulated the above issue, keeping in mind that the<br /> law on sanctioning a revised development plan, prior to the service of the<br /> purchase notice, and also after the expiry of the prescribed period from the<br /> date of service of such notice under Section 127(1) of the MRTP Act, 1966,<br /> is no longer res integra [ Prafulla C. Dave vs. Municipal Commissioner (2015)<br /> 11 SCC 90 ] .<br /> <i>Sunny Thote</i> <i>...52</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> 12. It is, thus, well settled that there is no vested right in an owner<br /> of the land or a person interested in the land to seek lapsing of reservation.<br /> A claim for lapsing would get converted into a right, only after all the<br /> requisites u/s 127 are satisfied. In short, the said claim for lapsing of<br /> reservation would assume the character of a right, only after the<br /> requirements under section 127 are satisfied.<br /> 13. The Division Bench (herein after ‘ The Referring Bench ’) had<br /> noticed a conflict of views between the Division Benches of this Court,<br /> th<br /> and vide the order dated 29 July 2024, expressed a view that the Hon’ble<br /> The Chief Justice of the Bombay High Court may consider referring the<br /> matter to a bench of 3 Judges. Since no issues as such were framed, the<br /> proceedings have been referred to our Bench for a decision, under Chapter<br /> I, Rule 8 of the 1960 Rules.<br /> 14. On perusing of view of the Referring Bench and the<br /> judgments cited, We observe that the view of the Full Bench of this Court<br /> in Vishwas Bajirao Patil (supra), was never brought to the notice of the<br /> Division Benches, which observation is shared by the Referring Bench in<br /> it’s reference order. Nevertheless, there is no dispute before us that the<br /> Petitioner admits that the period of 2 years (24 months) from the date of<br /> <i>Sunny Thote</i> <i>...53</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> th<br /> the issuance of the purchase notice u/s 127, would have expired on 16<br /> November, 2017.<br /> 15. In the above backdrop, the question is, what would be the fate<br /> of the purchase notice when the revised development plan was finalised by<br /> the State on 23/05/2016, which is after the amendment introducing the 24<br /> months period instead of the 12 months. Even otherwise, the revised<br /> development plan was finalised within 12 months from the date of receipt<br /> of the purchase notice, which is 17/11/2015.<br /> 16. In Prafulla C Dave (supra), the Hon’ble Supreme Court has<br /> crystallised the law that, if the revised development plan is finalised u/s 38<br /> before the issuance of the purchase notice, the reservation get a new lease<br /> of life of 10 years and the owner is precluded from issuing a purchase<br /> notice within 10 years from the date of the finalisation of the revised<br /> development plan. It is also crystallised that if the revised development<br /> plan is sanctioned after two years from the receipt of the purchase notice,<br /> the reservation would stand lapsed. It is also trite law that an owner of<br /> the land under reservation or any person having interest, would have no<br /> vested right towards lapsing of reservation, until the passage of 24 months<br /> from the receipt of the purchase notice.<br /> <i>Sunny Thote</i> <i>...54</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> 17. Section 38 clearly permits revision in the development plan,<br /> once in 20 years. In the facts of the case before us, there was no revision in<br /> the 20 years preceding the revision on 23/05/2016. Section 38 of the MRTP<br /> Act, 1966 cannot be rendered nugatory or itiose. What is permissible in<br /> law cannot be obliterated. The Council had adhered to section 38 when the<br /> draft development plan was submitted to the State which finally revised the<br /> plan on 23/05/2016. This revision cannot be faulted, much less, legally.<br /> Under section 38, the Planning Authority has the freedom and liberty to<br /> revise the Development Plan by following the procedure under the Act. It<br /> can proceed to continue the reservation over the concerned land, either for<br /> the same purpose or for any other purpose, which change is not legally<br /> barred. The said land, therefore, continues to be under reservation and at no<br /> stage can such reservation be said to have auto-lapsed. In the present case,<br /> the purpose for the reservation is not changed, though any change would<br /> not have inured to the advantage of the Petitioner.<br /> 18. In Writ Petition No.9610 of 2019 (Vinod Ramnarayan<br /> Agrawal And Others V/S. The State of Maharashtra And Others) decided<br /> th<br /> by the Aurangabad Bench on 24 April 2023, the issue of filing of a Writ<br /> Petition seeking issuance of the Writ of Mandamus to declare the lapsing<br /> <i>Sunny Thote</i> <i>...55</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> of reservation, was dealt with. Noticing that the Writ Petition was filed<br /> before the expiry of the two years from the issuance of the notice, it was<br /> held that such a Petition was premature and deserved to be dismissed. The<br /> relevant conclusions are found in paragraphs 15, 16 and 17, which read as<br /> under :-<br /> “15. However, the notice under Section 127(1)<br /> was issued on 07.09.2017 and the petition has been filed<br /> on 04.07.2019 that is within 24 months of the date of<br /> notice. By virtue of the amendment in Section 127 which<br /> came into effect from 29.08.2015 vide Section 7 of the<br /> Maharashtra Act 42 of 2015 a period of 24 months from<br /> the date of service of the notice has been kept as a<br /> window for the planning authority to take steps towards<br /> acquisition. It is trite that this statutory period is<br /> mandatory and the decisions are in plenty.<br /> 16. In the matter of Prafulla C. Dave (Supra)<br /> which has been referred to and relied upon by a full<br /> bench of this Court in the matter of Madanlal Zumberlal<br /> Nahar and others Vs. The Chief Officer Municipal<br /> Council Beed and others, in Writ Petition 2260/2010 with<br /> WP 4232/2008 decided on 13.03.2023, though in a little<br /> different context, this period has been held to be<br /> mandatory.<br /> 17. Pertinently, in the matter of Hasmukhrai<br /> (supra), the period that was consumed by way of<br /> pendency of the petition was held to be entitled to be<br /> considered by way of tagging to this statutory period.<br /> However, in the matter of Chhabildas (supra), it has been<br /> emphatically held that the decision in the matter of<br /> Hasmukhrai and even a similar view taken by the<br /> Supreme Court in the matter of Chhabildas was in<br /> exercise of the powers under Article 142 of the<br /> Constitution which powers the High Courts does not<br /> <i>Sunny Thote</i> <i>...56</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> have. Therefore, when the petition has been filed on<br /> 04.07.2019, even before expiry of 24 months of service<br /> of notice under Section 127 on 07.09.2017 as is appearing<br /> on acknowledgment in the copy of the notice (Exh. ‘D’),<br /> we are afraid, the petitioners are not entitled to seek any<br /> declaration regarding lapsing of reservation.” <br /> 19. The Hon’ble Supreme Court has crystallised the law in<br /> Prafulla C Dave (refer to paragraph no. 21 of the said judgment<br /> reproduced herein above) that, if ‘a revised plan under Section 38 comes<br /> into effect, before the issuance of the notice u/s 127, the period of ten years<br /> under Section 127 has to get a fresh lease of life of another ten years. To<br /> deny such a result would amount to putting a halt on the operation of<br /> Section 38 and rendering the entire of the provisions with regard to<br /> preparation and publication of the revised plan, otiose and nugatory. In this<br /> regard it cannot be overlooked that under Section 38 a revised plan is to be<br /> prepared on the expiry of a period of 20 years from date of coming into<br /> force of the approved plan under Section 31 whereas Section 127<br /> contemplates a period of 10 years with effect from the same date for the<br /> consequences provided for therein to take effect. The statute, therefore,<br /> contemplates the continuance of a reservation made for a public purpose in<br /> a final development plan beyond a period of ten years. Such continuance<br /> would get interdicted only upon the happening of the events contemplated<br /> <i>Sunny Thote</i> <i>...57</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> by Section 127 i.e. giving/service of notice by the landowner to the<br /> authority to acquire the land and the failure of the authority to so act. It is,<br /> therefore, clear that the lapsing of the reservation, allotment or designation<br /> under Section 127 can happen only on the happening of the contingencies<br /> mentioned in the said section. If the landowner or the person interested<br /> himself remains inactive, the provisions of the Act dealing with the<br /> preparation of revised plan under Section 38 will have full play. …...’<br /> 20. The decision of the Full Bench of this Court in Vishwas<br /> Bajirao Patil (placing reliance upon Prafulla C Dave ) clears all doubts<br /> about the creation of the right to seek lapsing of reservation. The Full<br /> Bench has concluded that no right is vested in a person having an interest<br /> in the land by merely serving a notice as contemplated under Section 127<br /> of MRTP Act. Such right would vest in the landowner upon the expiry of<br /> the period of one year from the date of issuance of such notice . This period<br /> of one year is now amended and extended to two years. The Full Bench<br /> answered the reference by concluding that the right would have vested<br /> upon the expiry of one year (now read as two years) of the notice. As such,<br /> there is no right created in favour of the noticee till the expiry of two years.<br /> <i>Sunny Thote</i> <i>...58</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> 21. Considering the law as it stands today, we conclude as under :-<br /> a) no right for lapsing of reservation is vested in the owner<br /> purely on the issuance of the purchase notice u/s 127, until the<br /> passage of 24 months from the date of service of the notice.<br /> b) as a consequence of the above, a Writ Petition seeking<br /> issuance of a Writ of Mandamus or an order or direction to declare<br /> the lapsing of the reservation, cannot be filed until the expiry of 24<br /> months from the date of receipt of the purchase notice u/s 127.<br /> c) in view of the dictum of the Hon’ble Supreme Court in<br /> Prafulla Dave (supra), if the revised final development plan is<br /> effected by strict compliance of section 38, after the receipt of the<br /> purchase notice and prior to the expiry of 24 months, the<br /> reservation shall continue for a further period of 10 years and only<br /> after the expiry of the 10 years, can the owner or the interested<br /> party issue a fresh purchase notice u/s 127.<br /> 22. As a consequence of the above, we record that the view<br /> expressed by the Division Bench of this Court in Salim Nizam Sanadi<br /> (supra) and Shri. Amuksidha Shrikant Majge (supra), lay down the correct<br /> position of law.<br /> <i>Sunny Thote</i> <i>...59</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b><br /><br /> 1-WP-5798-2023-(C).odt<br /> <br /> 23. Pursuant to our aforestated conclusion, the prayers put forth in<br /> this Petition by the Petitioner are devoid of merit and this Writ Petition,<br /> therefore, dismissed.<br /> 24. Rule is discharged.<br /> [RAVINDRA V. GHUGE, J.]<br /> [SANDEEP V. MARNE, J.] <br /> [ABHAY J. MANTRI, J.]<br /> <i>Sunny Thote</i> <i>...60</i><br /> <b><i>::: Uploaded on - 27/03/2026</i></b> <b><i>::: Downloaded on - 27/03/2026 21:04:55 :::</i></b></div>