Getamber Anand And Others vs Vaibhav Raheja
- Court
- Delhi High Court
$~53 and 55
* IN THE HIGH COURT OF DELHI AT NEW DELHI
%
Date of Decision : 20.11.2026
# CNR No.DLHC010057372025
CRL.M.C. 868/2025, CRL.M.A.4034/2025, CRL.M.A.12113/2025
+
(53) GETAMBER ANAND AND OTHERS .....Petitioners
Through: Mr. Krish Kalra, Adv.
versus
VAIBHAV RAHEJA .....Respondent
Through: Mr. Akshay Srivastava, Mr. Suryansh
Vashisht, Ms. Divya Sharma and Ms.
Avani Sharma, Advs.
# CNR No.DLHC010065232025
CRL.M.C. 977/2025, CRL.M.A.4496/2025, CRL.M.A.12104/2025
+
(55) GETAMBER ANAND AND OTHERS .....Petitioners
Through: Mr. Krish Kalra, Adv.
versus
VANI RAHEJA .....Respondent
Through: Mr. Akshay Srivastava, Mr. Suryansh
Vashisht, Ms. Divya Sharma and Ms.
Avani Sharma, Advs.
CORAM:
HON'BLE MR. JUSTICE SACHIN DATTA
SACHIN DATTA, J. ( ORAL )
1. These petitions were heard at length on 29.10.2026 and 18.11.2026
and have been further heard today.
2. The petitioners are as under:-
i. GETAMBER ANAND (petitioner no.1)
ii. PUNEET ARORA (petitioner no.2)
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 1 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
iii. UDAIVIR ANAND (petitioner no.3)
iv. M/s ATS INFRASTRUCTURE LIMITED (petitioner no.4)
3. The petitioners assail the common order dated 03.07.2024 passed by
the learned JMFC, (NI Act), Digital Court-01, South District, Saket Courts,
New Delhi in CC NI Act 121/2020 and CC NI Act 6747/2022 and the
common order dated 05.11.2024 passed by the learned Principal District and
Sessions Judge, South, Saket Courts, New Delhi in Criminal Revision
No.305/2024 and Criminal Revision No.304/2024. CRL.M.C. 868/2025
pertains to CC NI Act 121/2020 (Vaibhav Raheja v. ATS Infrastructure Ltd.
& Ors.) and Criminal Revision No. 305/2024, and CRL.M.C. 977/2025
pertains to CC NI Act 6747/2022 (Vani Raheja v. ATS Infrastructure Ltd. &
Ors.) and Criminal Revision No. 304/2024.
4. By way of the said orders, the applications filed on behalf of the
petitioners no. 1 and 3 seeking stay of the proceedings qua them in CC NI
Act 121/2020 and CC NI Act 6747/2022, on the strength of the interim
moratorium under Section 96 of the Insolvency and Bankruptcy Code, 2016
(“IBC”), were dismissed, and the revision petitions preferred by the
petitioners against such dismissal were also dismissed.
5. The factual conspectus is that the cheques in question were issued by
the petitioner no.4. The petitioner nos.1 and 3, being the directors of
petitioner no.4, are arrayed as accused by virtue of Section 141 of the
Negotiable Instruments Act, 1881 (“NI Act”). The petitioners no. 1 and 3
sought stay of the proceedings on the strength of interim moratorium under
Section 96 of the IBC arising from the Insolvency Petitions filed under
Section 95 of the IBC by creditors against them namely, CP (IB) No.
196/2024 (Yes Bank Ltd. v. Mr. Getamber Anand) and RCP (IB) No.
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 2 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
17(PB)/2024 (Vistra ITCL (India) Ltd. v. Getamber Anand) against
petitioner no.1 and CP(IB) No. 289/2024 (IDBI Trusteeship Services Ltd. v.
Udaivar Anand) against petitioner no.3.
6. By interim orders dated 11.02.2025 (in CRL. MC. 868/2025) and
13.02.2025 (in CRL. MC. 977/2025), this Court kept the proceedings in
abeyance qua the directors facing insolvency proceedings, while also
making it clear that the proceedings qua the company and the other directors
may continue in accordance with law. The learned Trial Court was also
directed not to pass any final order.
7. On 01.04.2026, in a Special Leave Petition (SLP (Crl.) No.
5570/2026) filed by the respondent in CRL. M.C. 868/2025 (Vaibhav
Raheja), the Supreme Court observed as under:-
“4. At this juncture, we are informed that the main matter is listed
before the High Court of Delhi on 07.04.2026. We hope and also
request the High Court to finally dispose of the matter at the earliest.”
8. Thereafter, on 10.04.2026, the Supreme Court tagged the aforesaid
SLP with the SLP (Crl.) No. 6024/2026 filed by the respondent in CRL.
M.C. 977/2025 (Vani Raheja).
9. It transpires during the course of hearing that there is no moratorium
in subsistence qua petitioner no.1 (Getamber Anand). CP (IB) No. 196/2024
was dismissed as withdrawn by the NCLT, New Delhi on 30.07.2024, and
RCP (IB) No. 17(PB)/2024 was dismissed as settled by the NCLT, Principal
Bench, New Delhi on 27.01.2026.
10. The Insolvency Petition qua the petitioner no.3 was admitted under
Section 100 of the IBC by order dated 20.03.2025 passed by the NCLT,
New Delhi, whereupon a moratorium under Section 101 of the IBC
commenced. In terms of Section 101(1) of the IBC, the said moratorium was
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 3 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
to cease to have effect at the end of 180 days from the date of admission.
Although the said period of 180 days has expired, it is informed during the
hearing today, that an interim order dated 27.03.2025 has been passed by
NCLAT which directs that personal insolvency resolution process qua the
petitioner no.3 shall go on, however, no repayment plan shall be finalized.
11. I have given my thoughtful consideration to the matter.
12. There is no merit in the present petitions. The reasons are as under:
i. The question is squarely covered by the judgment of the Supreme
Court in Rakesh Bhanot v. Gurdas Agro(P) Ltd. (2025) 6 SCC 781 in
which the Supreme Court held that the object of moratorium is not to
stall the criminal prosecution but only to postpone the civil actions to
recover any debt. It was concluded in Rakesh Bhanot as under:
“31. For the foregoing discussion, we are of the opinion that the
object of moratorium or for that purpose, the provision enabling the
debtor to approach the Tribunal under Section 94 is not to stall the
criminal prosecution, but to only postpone any civil actions to
recover any debt. The deterrent effect of Section 138 is critical to
maintain the trust in the use of negotiable instruments like cheques
in business dealings. Criminal liability for dishonouring cheques
ensures that individuals who engage in commercial transactions are
held accountable for their actions, however subject to satisfaction of
other conditions in the NI Act, 1881. Therefore, allowing the
respective appellant-petitioners to evade prosecution under Section
138 by invoking the moratorium would undermine the very purpose
of the NI Act, 1881, which is to preserve the integrity and credibility
of commercial transactions and the personal responsibility persists,
regardless of the insolvency proceedings and its outcome.
32. In view thereof, the contention of the appellants that the
decisions relied on by the High Court dealt with the proceedings
under Section 14 IBC and not the proceedings under Section 96 IBC,
cannot be countenanced by us. Furthermore, the decision in Dilip B.
Jiwrajka [Dilip B. Jiwrajka v. Union of India, (2024) 5 SCC 435 :
(2024) 242 Comp Cas 358] is not relevant to the facts of the present
case, as the issue therein was relating to the constitutional validity of
certain provisions of IBC and the applicability of moratorium to a
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 4 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
proceedings under Section 138 of the NI Act, 1881 was not the
subject-matter.
33. For the foregoing discussion, the prayer of the appellant-
petitioners to stay the prosecution under Section 138 of the NI Act,
1881, relying on the interim moratorium under Section 96 IBC,
cannot be entertained. Therefore, the judgments/orders [Rakesh
,
Bhanot v. Gurdas Agro (P) Ltd., 2023 SCC OnLine P&H 7240]
[Sandeep Gupta v. Shri Ram Steel Traders, 2023 SCC OnLine Del
,
2786] [Gurdas Agro (P) Ltd. v. Arjun Mall Retail Holding (P) Ltd.,
,
2023 SCC OnLine P&H 7243] [Rakesh Bhanot v. Gurdas Agro (P)
,
Ltd., 2023 SCC OnLine P&H 7241] [Rakesh Bhanot v. Gurdas
,
Agro (P) Ltd., 2023 SCC OnLine P&H 7242] [Sanjeev Narula v.
,
Elkay International Ltd., 2024 SCC OnLine P&H 3165] [Shiva
Shakti Grains (India) (P) Ltd. v. Kaur Chand Munish Kumar, 2024
,
SCC OnLine P&H 3404] [Ashok B. Jeswani v. Redington India
,
Ltd., (2024) 248 Comp Cas 248 : 2023 SCC OnLine Mad 8029]
[Pacific Infotech (P) Ltd. v. Redington India Ltd., 2024 SCC OnLine
,
Mad 8346] [Jitender Singh Sodhi v. CIT, 2024 SCC OnLine P&H
,
14106]
[Yogesh Jogindernath Mehra v. State of Maharashtra, 2024
SCC OnLine Bom 3978] passed by the different High Courts
affirming the orders of the trial court, which had rightly refused to
stay Section 138 proceedings, need not be interfered with by us.”
ii. The reasoning in Rakesh Bhanot (Supra) turns on the object of the
moratorium. According to the Supreme Court, the same does not
enure for the benefit of postponing or stalling any criminal
prosecution. The relevant observations of the Court are as under:
“23. Upon filing of the application under Section 94 IBC, a moratorium
comes into effect, designed to protect the debtors from any legal actions
concerning their debts. Specifically, Section 96 IBC provides that any
legal proceedings pending against the debtor concerning any debt shall
be deemed to have been stayed. The term “any legal action or
proceedings” does not mean “every legal action or proceedings”. In
Sections 96(b)(i) and (ii), the term “legal action or proceedings” are
followed by the term “in respect of any debt”. The term “legal action or
proceedings” would have to be understood to include such legal action
or proceedings relating to recovery of debt by invoking the principles of
noscitur a sociis. The purpose of interim moratorium contemplated under
Section 96 is to be derived from the object of the act, which is not to stall
the proceedings unrelated to the recovery of the debt. The protection is
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 5 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
not available against penal actions, the object of which is to not recover
any debt. This moratorium serves as a critical mechanism, allowing the
debtor to reorganise their financial affairs without the immediate threat
of creditor actions. The clear and unequivocal language of this provision
reflects the legislative intent to provide a protective shield for debtors
during the insolvency process.”
iii. The judgment of the Supreme Court in Dinesh Chand Surana v.
UCO bank, 2026 SCC OnLine SC 987, does not unsettle the aforesaid
view. In paragraph 140 thereof, the Supreme Court held that the
proceedings under Section 138 of the NI Act cannot be stayed by way
of Section 96 and 101 of the IBC. The relevant observations read as
under:-
“140. There is no gainsaying that the nature of Section 138 of the NI Act
is predominantly criminal as the provision utilizes punishment as a
measure of deterrence to ensure the integrity and credibility of the use of
cheques in commercial transactions. This coupled with the exclusion of
the ‘liability of fine’ from the definition of ‘debt’ for the purposes of
proceedings and protections under the IBC, leaves no manner of doubt in
our minds that the proceedings under Section 138 cannot be stayed by
way of Sections 96 and 101 of the IBC respectively. If the protection of
moratorium is granted to the persons accused of cheque dishonour, it
would tantamount to allowing evasion of criminal liability. We say so
because any debt which is not considered to be an ‘excluded debt’ and in
respect of which legal action or proceedings are stayed, can also be
discharged if in case the accused person is declared bankrupt. In our
opinion, it cannot be the intention of the Parliament that such fine, which
is imposed as a personal criminal liability, be treated as debt for the
purposes of protection of the moratorium provisions.
(ii)
Applicability of moratorium provisions on the compensatory aspect of
Section 138 proceedings”
iv. The Supreme Court also clearly observed in Paragraphs 193 thereof
that the moratorium provisions would not operate in respect of the
criminal aspect of Section 138 and the directors of the corporate
debtors cannot escape personal criminal liability. Paragraph 193 is
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 6 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
reproduced as under:
“193. We may, at the cost of repetition, reiterate that the moratorium
provisions would not operate in respect of the criminal aspect of Section
138 and the director(s) of the corporate debtor cannot escape personal
criminal liability, as clarified in Rakesh Bhanot (supra).”
v. Further, it has been clarified in Dinesh Chand Surana (Supra) that
any benefit of the moratorium is confined to the compensatory aspect
of Section 138 proceedings. In this regard, it has been observed in
paragraph 204 as under:
“III. Whether director(s) liable under Section 141 of the NI Act would
enjoy the benefit of moratorium in respect of Section 138 proceedings,
while undergoing personal insolvency?
204. We have answered the aforesaid question in the affirmative. We find
it apposite to reiterate that the benefit of moratorium is available only in
respect of the compensatory aspect of Section 138 proceedings.”
vi. In paragraphs 210 and 211 of Dinesh Chand Surana (Supra) , the
Supreme Court has referred certain questions to a larger Bench.
However, there is no direction to keep the ongoing prosecution in
abeyance. Until the reference is answered, the law laid down in
Rakesh Bhanot governs. In Union Territory of Ladakh v. Jammu
and Kashmir National Conference , 2023 INSC 804 the Supreme
Court has held as under:
“35. We are seeing before us judgments and orders by High Courts not
deciding cases on the ground that the leading judgment of this Court on
this subject is either referred to a larger Bench or a review petition
relating thereto is pending. We have also come across examples of High
Courts refusing deference to judgments of this Court on the score that a
later Coordinate Bench has doubted its correctness. In this regard, we
lay down the position in law. We make it absolutely clear that the High
Courts will proceed to decide matters on the basis of the law as it stands.
It is not open, unless specifically directed by this Court, to await an
outcome of a reference or a review petition, as the case may be. It is also
not open to a High Court to refuse to follow a judgment by stating that it
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 7 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
has been doubted by a later Coordinate Bench. In any case, when faced
with conflicting judgments by Benches of equal strength of this Court, it
is the earlier one which is to be followed by the High Courts, as held by a
5-Judge Bench in National Insurance Company Limited v Pranay Sethi,
(2017) 16 SCC 6805. The High Courts, of course, will do so with careful
regard to the facts and circumstances of the case before it.”
vii. As regards the moratorium, it has already been noticed that there is no
moratorium in subsistence qua petitioner no.1. Even as regards the
petitioner no.3, the situation appears to be somewhat nebulous. The
order of the NCLAT, referred to by the learned counsel for the
petitioners, does not, in terms, extend the moratorium. It makes no
reference to the Moratorium under section 101 of the IBC, and was
passed within a week of the admission order, when the moratorium
was in any case in operation. Even assuming that it continues by
implication, the result would be the same, since a moratorium under
Section 96 or Section 101 of the IBC would not result in stay of the
prosecution under Section 138 of the NI Act.
viii. It is also noticed that no moratorium is claimed in favour of the
petitioner no. 2 or petitioner no.4 (the drawer of the cheques). It
would be anomalous to keep the prosecution of the persons arrayed
under Section 141 NI Act in abeyance, while the prosecution of the
company proceeds.
13. Accordingly, CRL.M.C. 868/2025 and CRL.M.C. 977/2025 are
dismissed.
14. The trial Court shall proceed with CC NI Act No. 121/2020 and CC
NI Act No. 6747/20222 against all the accused in accordance with law and
endeavour to conclude the same expeditiously.
15. If, after compensation is ordered, a moratorium under the IBC is
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 8 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57
shown to subsist in favour of any of the petitioner no. 1-3, it shall be open to
them to raise the plea at the stage of recovery.
16. The petitions are disposed of in the above terms. Pending applications
also stand disposed of.
SACHIN DATTA, J
NOVEMBER 20, 2026/r
Signature Not Verified
CRL.M.C. 868/2025 & Connected Matter Page 9 of 9
Digitally Signed
By:ABHISHEK THAKUR
Signing Date:23.11.2026
18:42:57